Loading...
HomeMy WebLinkAboutContract 33420 AMENDMENT NO.2 STATE OF TEXAS g CITY SECRETARY CONTRACT NO (No M&C Needed) COUNTY OF TARRANT g WHEREAS, the City of Fort Worth (City) and Stream Water Group, Inc.,(Engineer) made and entered into City Secretary Contract No. 31252, (the Contract) which was authorized by the City Council by M&C C-20438 on the 14th day of December 2004 ; and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: 2004 CIP Minor Drainage Projects; Contract F: Miscellaneous Culvert Improvements Drainage Project No.00098 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated February 17, 2006, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total 1,76 2-00- 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$133,714.00. 04-12-06 A10 :24 IN 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the At of 1k , 2006, in Fort Worth, Tarrant County, Texas. ATTEST: Marty Hendrix LN�_M&(' q!3QUIRECity Secretary -sa--,-�--_._.__ APPROVAL RECOMMENDED: ROVED: L A. Douglas Rademaker, P.E. Marc A. Ott Director, Department of Assistant City Manager Engineering Stream Water Group_ Inc_ ENGINEER By: . IV Name: Shamsul Arefin, P.E. President 6737 Brentwood Stair Rd; Suite 230 Fort Worth, TX 76112 APPROVED AS TO FORM AND LEGALITY: Assistant Ci ttorney -2- STREAM WATER GROUP,INC. Consulting Engineers a— --—---------- (onup February 17,2006 Mr.Cannon R. Henry,P.E. Project Manager Department of Engineering City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Phone: 817 392 2690 RE: Contract Amendment No.2 2004 CIP Drainage Projects Contract F: Miscellaneous Culvert Improvements Drainage Project No. 00098 Stream Water Group Project No. 17016 Dear Mr. Henry: The following is a summary of additional work requested for Amendment No.2 to the 2004 CIP Drainage Projects, per recent design meetings with City of Fort Worth officials. The proposed amendment includes additional design for Truman Storm Drain Extension. The Engineer's Opinion of Probable Construction Cost for the additional work is$304,799(see Attachment A). The total cost to perform the additional services included in Contract Amendment No. 2 is as follows: Basic Design Fee: Construction Cost X ASCE Curve "A"(from original contract)X 0.85 $304,799 X 8.4%X 0.85= $21,762.00 Total Amendment No. 2 $21,762.00 The current status of the contract between Stream Water Group, Inc and City of Fort Worth is as follows: Original Contract Amount= $ 71,162.00 Amendment No. I Amount= $ 40,790.00 Amendment No.2 Amount= $ 21,762.00 Total Contract Amount including Amendment No. 1 = $133,714.00 Please process Amendment No.2,to the 2004 CIP Drainage Projects in the amount of$21,762.00. If you require any additional information or have any questions regarding this matter,please do not to hesitate to give me a call at 817-446-4171 or my cell phone 972-898-5685. We appreciate the opportunity to provide Engineering services for the City of Fort Worth. Sincerely, Stream Water Gro p nc. Shamsul Arefin, .E. President Copy: File Attachment A D C-i1"%1 rlkl d'Y . �. Nu r r - G,p f P," Hr_ 611= • Phone- S17_ 46 41-1 1 crgroup.coiu Attachment A 2004 CIP Minor Drainage Project Contract F: Miscellaneous Culvert Improvement F3: Truman Storm Drain Extension Drainage Project No. 00098 ITEM DESCRIPTION OF ITEM UNITS UNIT COST UNIT TOTAL COST SEWER 1 Concrete Encasement for SS LF $ 40 20 $ 800 STORM DRAIN AND PAVING 1 4'H X 7'W Direct Drive PreCast Concrete Box LF $ 580 300 $ 174,000 2 Cast in Place Concrete Storm Drain Junction Box LS $ 18,000 1 $ 18,000 3 Cast in Place Inlet Cover LS $ 1,500 1 $ 1,500 4 Remove and Realign 24"RCP SD LF $ 25 40 $ 1,000 5 4"Sand Cushion SY $ 3 250 $ 750 6 Headwall/Wingwall for Box Culvert EA $ 10,000 1 $ 10,000 7 5" Reinforced Concrete Slab SY $ 40 50 $ 2,000 8 Seeding SY $ 5 250 $ 1,250 9 Install 4"Topsoil SY $ 5 250 $ 1,250 10 2:27 Backfill CY $ 75 50 $ 3,750 11 Remove and Replace 6"Concrete Driveway SY $ 60 15 $ 900 12 Remove and Dispose of 36" RCP SD LF $ 10 30 $ 300 13 Misc. Excavation CY $ 16 750 $ 12,000 14 Misc.Backfill CY $ 20 1000 $ 20,000 15 Remove and Replace Concrete Curb and Gutter LF $ 25 40 $ 1,000 16 Rough Grading SY $ 3 50 $ 150 17 Remove and Dispose of Concrete 4"-5"Concrete Slab SY $ 15 250 $ 3,750 18 Fine Grading SY $ 5 250 $ 1,250 MISCELLANEOUS 1 Remove and Dispose of 6'Chain Link Fence LF $ 4 285 $ 1,140 2 Remove and Dispose of Channel Debris and Dewater Channel LS $ 2,500 1 $ 2,500 3 Install&Remove Temporary Sheet Pile for Temporary Dam LF $ 250 75 $ 18,750 4 Install 6'Chain Link Fence LF $ 20 35 $ 700 5 Remove and Dispose Guard Rail LF $ 10 35 $ 350 Subtotal $ 277,090 10%Cont. $ 27,709 TOTAL $ 304,799