HomeMy WebLinkAboutContract 33427 • COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.cr 3'1""d-- WHEREAS, Centex Homes , hereinafter called "Developer", desires to make certain improvements to The Parks at Boat Club Phase 1, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. �'fly 04-14-06 P03 : 11 � � Parks at Boat Club Ph. 1-Newer CFA 4%.dol Ij f Ile .� �✓�:��� �'�G'e F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). 1. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. Parks at Boat Club Ph. 1-Newer CFA 4%.doZ L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached. M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, BI, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $627,451.92. Parks at Boat Club Ph. 1-Newer CFA 4%.doh SUMMARY OF COST Parks at Boat Club Phase 1 Item Developer City Cost Total Cost Cost A. Construction $ - $ 1. Streets $376,840.00 376,840.00 2. Storm Drainage $202,633.00 202,633.00 3. Street Lights $24,200.00 24,200.00 4. Street Name Signs $600.00 600.00 B. Engineering Design $C. Construction Engineering and Management by DOE $ $ 4% 23,178.92 23,178.92 TOTALS 627,451.92 $ - 627,451.92 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Paid $190,861.00 for future improvements for Bailey Boswell Drive. Parks at Boat Club Ph. I-Newer CFA 4%.do41�'�' �'� �� IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Develope has executed this instrument in triplicate,at Fort Worth, Texas this the y of /' 2006. RECEIVED Approval Recommended: JAS' I Transportation and Public W r Department NO M&C REQUIRED Robert Goode, P. E. Director ATTEST: Ci f rt Wo�A"tym Marty Hendrix Marc Ott City Secretary Assistant City Manager d/' d as to Fo Aity Attorney ATTEST: CENTEX HOMES, a Nevada general partnership BY: Centex Real Estate Corporation, Corporate Secretary a Neveda corporation, Its managing partner By: Name: Clint Vincent, P.E. Title: Vice President of Engineering - Centex Homes-DFW-Metro 01.MCI A L PRO Parks at Boat Club Ph. 1-Newer CFA 4%.doii Ciff 3MCIE TEN. p )�f COST ESTIMATE-CURRENT IMPROVEMENTS Ptc PARKS AT BOAT CLUB--PHASE 1 t Ye PAVING&STORM DRAINAGE ®f� 10/24/2005 PAVING ITEM UNIT NO. DESCRIPTION OUANTITY PRICE AMOUNT 1 6"LIME STABILIZED SUBGRADE 14,215 SY @ $2.25 $31,984.00 2 HYDRATED LIME(27#/SY) 228 TN @ $105.00 $23,940.00 3 6"REINFORCED CONCRETE PAVEMENT 12,321 SY @ $22.00 $271,062.00 4 MONOLITHIC 7"CONCRETE CURB 7,090 LF @ $2.00 $14,180.00 5 SAWCUT AND REMOVE EXISTING ASPHALT 75 LF @ $2.50 $188.00 PAVEMENT 6 4'CONCRETE SIDEWALK 338 LF @ $14.00 $4,732.00 7 STANDARD A.D.A.ACCESSIBLE RAMPS 15 EA @ $350.00 $5,250.00 5"ASPHALT PAVEMENT(TEMPORARY 1,105 SY @ $20.00 $22,100.00 8 TURNAROUND) STANDARD CITY OF FORT WORTH"END OF ROAD" 92 LF @ $37.00 $3,404.00 9 BARRICADE TOTAL PAVING $376,840.00 STORM DRAINAGE ITEM UNTf NO. DESCRIPTION OUANTITY PRICE AMOUNT 1 4-5X4'REINFORCED BOX CULVERTS 80 LF @ $510.00 $40,800.00 2 4-5X4'RCB HEADWALL(SW-0) 1 EA @ $7,500.00 $7,500.00 3 4-5'X4'RCB HEADWALL(FW-0) 1 EA @ $8,000.00 $8,000.00 4 12"GRADED ROCK RIP-RAP 205 SY @ $35.00 $7,I75.00 5 18"GRADED ROCK RIP-RAP 76 SY @ $50.00 $3,800.00 6 24"GRADED ROCK RIP-RAP 185 SY @ $70.00 $12,950.00 7 21"(CLASS III)C-76 RCP PIPE 87 LF @ $40.00 $3,480.00 8 24"(CLASS III)C-76 RCP PIPE 711 LF @ $44.00 $31,284.00 9 30"(CLASS III)C-76 RCP PIPE 336 LF @ $52.00 $17,472.00 10 36"(CLASS III)C-76 RCP PIPE 95 LF @ $64.00 $6,080.00 11 42"(CLASS III)C-76 RCP PIPE 152 LF @ $84.00 $12,768.00 12 24"6:1 BEVELED END TREATMENT W/8"ROCK RIP RAP 2 EA @ $2,300.00 $4,600.00 13 30"4:1 BEVELED END TREATMENT W/T CONCRETE 1 EA @ $2,500.00 $2,500.00 APRON 14 42"(FW-0)HDWL I EA @ $2,900.00 $2,900.00 15 10'CURB INLET 7 EA @ $2,200.00 $15,400.00 16 15'CURB INLET 2 EA @ $3,200.00 $6,400.00 17 4'STORM DRAIN MANHOLE 2 EA @ $2,500.00 $5,000.00 18 Y STORM DRAIN MANHOLE 1 EA @ $3,300.00 $3,300.00 19 TRENCH SAFETY 1,464 LF @ $1.00 $1,464.00 20 INLET PROTECTION 9 EA @ $50.00 $450.00 21 4"REINFORCED CONCRETE SLOPE PAVEMENT(#1) 148 SY @ $35.00 $5,180.00 22 4"REINFORCED CONCRETE SLOPE PAVEMENT(#2) 118 SY @ $35.00 $4,130.00 TOTAL STORM DRAINAGE $202,633.00 TOTAL COST $ 579,473.00 125%FINANCIAL GUARANTEE AMOUNT $ 724,341.25 4%INSPECTION FEE-PAVING&STORM DRAINAGE $ 23,178.92 COST ESTIMATE - FUTURE IMPROVEMENTS BOAT CLUB—PHASE 1 BAILEY BOSWELL DRIVE 10/24/2005 ITEM UNIT NO. DESCRIPTION QUANTITY PRICE AMOUNT PAVING IMPROVEMENTS- 28' 13-13 (1/2 of 4 Lane Divided) P.1 Unclassified Excavation 3,123 CY @ $3.50 $10,929.72 P.2 6" Lime Stabilized Subgrade 5,110 SY @ $2.25 $11,497.50 P.3 Hydrated Lime(27#/SY) 68 TON @ $105.00 $7,140.00 PA 6" Reinforced Concrete Pavement 4,769 SY @ $22.00 $104,925.33 P.5 4' Concrete Sidewalk 1,827 SY @ $14.00 $25,578.00 Future Paving Improvements (Developers Share) Subtotal $160,071 DRAINAGE IMPROVEMENTS SD.1 24" RCP 20 LF @ $44.00 $880.00 SD.2 10'CURB INLET 2 EA @ $2,200.00 $4,400.00 SD.3 4-5'x4' Reinforced Box Culverts 80 LF @ $510.00 $40,800.00 SDA 4-5'x4' RCB Headwall(SW-0) 1 EA @ $7,500.00 $7,500.00 SD.5 4-5'x4' RCB Headwall (FW-0) 1 EA @ $8,000.00 $8,000.00 Developer's Share of Future Drainage Improvements (1/2 Subtotal Cost): $61,580 Future Drainage Improvements Subtotal $30,790 Escrow Amount for Parks at Boat Club Phase 1: $190,861 Page I . STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 5 EA $ 2, 000 $10, 000. 00 MID-BLOCK RESIDENTIAL 6 EA $ 2, 000 $12, 000. 00 CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000. 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000. 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 .00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000. 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000. 00 Subtotal $22,000.00 City' s Cost $00 ,000.00 Developer' s Subtotal $22 ,000.00 10% Contingency $2,200. 00 Project Total $24,200.00 Adjacent Developer' s Cost $00,000. 00 Developer' s Cost $24,200. 00 2% Inspection Fee $00,000. 00 CFA CODE #2005062 DEVELOPER' S COST: 24 ,200. 00 THE PARKS AT BOAT CLUB, PHASE I Fort Worth, Texas June 13, 2005 PAGE I OF Exhibit C on ,�' c • 19 II. STREET LIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works. 3. The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the city the amount shown below prior to the City starting its design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors. 5. The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER' S COST: $24,200. 00 THE PARKS AT BOAT CLUB, PHASE I June 13, 2005 FORT WORTH, TEXAS CFA CODE #2005062 Page II of Exhibit C III "STREETLIGHTS" INTERSECTIONS PLYMOUTH POINT ST & NAVIGATION DR 1 PLYMOUTH POINT ST 6 PRAIRIE COVE DR_ 1 PLYMOUTH POINT ST 6 PUERTO VISTA 1 NAVIGATION DR 6 PORTVIEW LN 1 PRAIRIE COVE DR 6 PORTVIEW LN 1 MID BLOCK PLYMOUTH POINT DR 2 PORTVIEW LN 3 PRAIRIE COVE DR 1 THE PARKS AT BOAT CLUB, PHASE I Page III of Exhibit C IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following six (6) intersections at a cost to the Developer of $600.00: Navigation Dr & Bailey Boswell Rd Navigation Dr & Portview Lane Navigation Dr & Plymouth Point St Puerto Vista Dr & Plymouth Point St Plymouth Point St & Prairie Cove Dr Portview Lane & Prairie Cove Dr Parks at Boat Club, Phase I CFA code: 2005062 May 13, 2005 :%M 1.{%:'sem:�1�.. )♦ Iti-.�[�\i�' �r�u• alitxxiNHrxila•� !�j►����iQ�:-lpvl i`.:. aa�■ .- u�mmmwrvaa�i tfmxtwm nxJ sun - ........... 11r�� ...rte ie►l�i� �� � - A•a�*+nii:ine:i �..)��. � • a a^t.mtitiii I` �.�1�,,, ite:ii,'�i•ni�a' aua:ni� � I nnn u m HIM m _ '� .atxxtt ttn..rta.= � _ I Mw �1�� __ __:_ 1� `;�;�to+•'aa•"ext a ■ aata+ � 11 MT T µ u 1 W w m w O n i y � a V p n I IIIw III � G S m w � w O w ^ m ~ 0 9 �M I y m w w PAVEMENT WIDTHS 29' B—B: PUERTO VISTA t PLYMOUTH POINT STREET Cly " w P0RTYIEW LANE PRAIRIE COVE DRIVE m n ~ 2e' B—B (WESTBOUND): FUTURE BAILEY—BOSWELL � 35' B—B: NAVIGATION DRIVE SIDEWALKS TO BE BUILT m ® IIITH HOME CONSTRUCTION ��. SIDEWALIKS TO BE BUILT 1RTH PHASE 1 CONSTRUCTION FUTURE BAILEY BOSWELL DRIVE PAVEMENT TO BE ESCROWED 1, PHASE 1 PAVEMENT 1 f I " ® TEMPORARY ASPHALT II1{l " TURNAROUNDS m EXHIBIT " B" " p STREET & PAVING IMPROVEME 9 TS THE PARKS AT BOAT CLUB i PHASE 1 CITY OF FORT WORTH GRAPHIC SCALE 1"=200 ' Graham Associates,lnc. CONSULTING ENGINEERS & PLANNERS O 200 800 SIX FLAGS DRIVE. SUITE 500 ARLINGTON, TEXAS 75011 (817) 840-8535 Bob ciif MC-I�� Y !U. ~:VU ,I QEK. u 1 i - i• w " mu 0= O M o`c.l m R y w y n ^ m n w 15' m I � I 15' Cl " m 10'clAl M i� a m nm i m 1 , m IO ^ ^ OND 0. jI � m m e 4x' (FWO) HDWL w � n n Si m DETENTION POND OUTLET " STRUCTURE NO.2 i a N " � I 10' 6.1 a 1 ca 1 , 10 c1 N S 4-574' RCB —A WAIL (FW-0) ' 10' C b 4.,5'z CCB 4-574' R\C8 MAD9f4LL ETENTION \� _ CURB INLET i x SirW 4:1 B� '�A Z. cONTIUM EXHIBIT " B- 1" I STORM DRAINAGE IMPROVEMENTS THE PARKS AT BOAT CLUBI DETENTION POND OUTLET PHASE 1 STRUCTURE No.i CITY OF FORT WORTH GRAPHIC SCALE 1 "=200 " raham Associates,lnc. � CONSULTING ENGINEERS & PLANNERS 600311 FlJ1G5 DRIVE, SUITE 300 0 200 0 ARLINGTON TEXAS 76011 817 64Q-83}3 I u I 1 I R N O ^ b 9 wO • w O m w m m IL 'm w I• O« 4 f O w ID I i p w N I = I m � w o f O m m 1 ( M � � m I w wO y o w >H ^ o Nm r w r o M i i v w m rL I 1 rL � n w I m l � F m W v R m I � I m c0 ^ w N ^ 7 b � I 1 w N q • m O fL I 1 I I w m EXHIBIT " C" _m STREET LIGHTS IMPROVEME TS ` -- THE PARKS AT BOAT CLUB PHASE 1 CITY OF FORT WORTH GRAPHIC SCALE 1"=200 ' aham Associates,lnc. CONSULTING ENGINEERS & PLANNERS 600 SIX FLAGS DRIVE. SUITE 500 O OO ARI INGTDN. TEXAS 76011 (817) 5111—SW5