COMMUNITY FACILITIES AGREEMENT
GOVERNMENTAL ENTITY
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.�
WHEREAS, Keller Independent School District, a governmental entity,
hereinafter called "Developer", desires to make certain improvements to Keller Hicks
Road addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
KELLER 1
f
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to hold the City harmless for any
inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached.
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
KELLER 2
r , �1'.6J"p �:o
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $1,025,058.40.
KELLER 3
SUMMARY OF
COST
Item Developer City Cost Total Cost
Cost
A. Construction
1. Paving Improvements $ 642,250.00 $ - $ 642,250.00
2. Storm Drainage $ 326,460.00 $ - $ 326,460.00
3. Street Lights $ 17,600.00 $ - $ 17,600.00
4. Street Name Signs $ - $ - $ -
5. Signal Inspection $ 2,800.00 $ - $ 2,800.00
B. Engineering Design $ - $ - $ -
C. Construction Engineering and
Management by DOE (4%) $ 35,948.40 $ - $ 35,948.40
TOTALS $1,025,058.40 $ - $1,025,058.40
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalks.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
KELLER 4 `,
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the City affixed, and said DevLoper has
executed this instrument in triplicate, at Fort Worth, Texas this the May of
, 2006.
Approval Recommended:
Transportation and Public Works
Department
/Robe Goode, P. E.
Director
Cit f F W
NO M&C REQUIRED
i
Marc Ott
Assistant City Manager
Y1ATTTEST:
Y ` �
Marty Hendrix
City Secretary
Appro d s to Form-
Amy J. se
Assist ity Attorney
ATTEST: DEVEL PER
By:
Y
Corporate Secreta y
KELLER 5
OPINION OF PROBABLE COST-OFFSITE PUBLIC IMPROVEMENTS
Keller Hicks Road(3-Lane,Concrete Pavement,Full Tum Lane)
07/22/2005
ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL
I KELLER-HICKS OFFSITE PAVING IMPROVEMENTS
1 Right-of-Way Preparation 1 LS $2,500.00 $2,500.00
2 Unclassified Street Excavation 5,000 CY $6.50 $32,500
3 Unclassified Channel Excavation 2,000 CY $6.00 $12,000
4 Remove and Dispose of Ex.Asphalt Pavement 6,700 SY $9.00 $60,300
5 6"Lime Stabilized Sub rade 27#'s/SY 11,835 SY $2.25 $26,630
6 Lime for Stabilization 160 TON $105.00 $16,800
7 7"Reinforced Concrete Pavement 10,900 SY $28.00 $305,200
8 Concrete Curb 2,500 LF $3.00 $7,500
9 6"Asphalt Pavement Transition 2,374 SY $16.00 $37,990
10 4'Std.Sidewalk 10,000 SF $4.00 $40,000
11 Concrete Wheel Chair Rams M1,45O
EA $750.00 $750
12 UtilityAdjustments LS $3,000.00 $3,000
13 Pavement Striping&Signage LS $3,000.00 $3,000
14 Traffic Control LS $3,500.00 $3,500
15 Erosion Control LS $2,000.00 $2,000
16 H dromulch SeedingSY $0.50 $730
17 6"Reinforced Concrete Driveway 300 SY $27.00 $8,100
18 Metal Beam Guard Fence 300 LF $25.00 $7,500
19 Metal Beam Guard Fence Transition 1 EA $250.00 $250
20 Metal Beam Guard Fence End Treatment 1 EA $2,000.00 $2,000
21 Traffic Lights 1 LS
22 ISigns 1 1 1 LS
23 ITemporary Si nalization 1 1 1 EA 1 $70,000.00 $70,000
SUBTOTALI 1 $642,250
11 ALL STORM DRAINAGE IMPROVEMENTS
1 21"RCP Storm Drain Line 10 LF $40.00 $400
2 24"RCP Storm Drain Line 140 LF $44.00 $6,160
3 36"RCP Storm Drain line 80 LF $64.00 $5,120
4 42"RCP Storm Drain Line 40 LF $84.00 $3,360
5 48"RCP Storm Drain Line 35 LF $110.00 $3,850
6 6'X4'Box 666 LF $220.00 $146,520
7 8'X4'Box 423 LF $250.00 $105,750
8 15'Inlet 1 EA $3,200.00 $3,200
9 20'Inlet 1 EA $3,600.00 $3,600
10 Safety End Treatment 24"RCP 2 EA $800.00 $1,600
11 Safety End Treatment 42"RCP 1 EA $2,100.00 $2,100
12 Safety End Treatment 6'X4'Box 2 EA $3,500.00 $7,000
13 Conc.Win wall Parallel Wins 1 EA $4,100.00 $4,100
14 Conc.Win wall Flared Wins 1 EA $4,500.00 $4,500
15 Conc.Headwall Flared Wins 1 EA $2,200.00 $2,200
16 8'x8'Junction Box 2 EA $4,500.00 $9,000
17 4'X4'Junction Box 2 EA $3,000.00 $6,000
18 Manhole 2 EA $2,500.00 $5,000
19 Rock Rip-Rap 200 SY $35.00 $7,000
SUBTOTAL $326,460
Keller Hicks Total Construction Cost $968,710
City of Fart Worth T/PW Inspection Fee 4%a $38,748
Keller Hicks Offsite Total (Developer) $1,007,458
NOTE:
(1)Total probable construction cost for all Improvements on Keller Hicks Road between Alts Vista Road and the schoors west property ins.The total does not
include engineering or surveying fees,easements,Irrigation,City monument,lighting,or special Landscaping.
I . STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK RESIDENTIAL 8 EA $ 2, 000 $16, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000. 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000. 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000. 00
Subtotal $16,000.00
City' s Cost $00 ,000.00
Developer' s Subtotal $16,000.00
10% Contingency $1,600.00
Project Total $17, 600.00
Adjacent Developer' s Cost $00,000.00
Developer' s Cost $17,600.00
2% Inspection Fee $00,000. 00
CFA CODE #2005097
DEVELOPER' S COST: $17,600.00
KELLER ISD MIDDLE AND INTERMEDIATE SCHOOLS
Fort Worth, Texas
August 4, 2005
PAGE I OF Exhibit C
II . STREET LIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at the
approximate locations shown in Exhibit "C", immediately after final
acceptance of the street construction, in accordance with engineering plans
and specifications approved by the Transportation and Public Works
Department.
2. Streetlights on residential and /or collector streets can be installed
using overhead or underground conductors with the approval of the Director
of Transportation and Public Works.
3. The City will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to
pay the city the amount shown below prior to the City starting its design
efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors.
5. The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for the
installation of any electrical transformers required for the proper
operation of the street lights
6. The estimated cost of this street light installation is detailed on page 1
of exhibit C and is summarized below, the street lights will remain the
property of, and will be maintained by the City of Fort Worth.
DEVELOPER'S COST: $17,600.00
KELLER ISD MIDDLE AND INTERMEDIATE SCHOOLS
July 29, 2005
FORT WORTH, TEXAS
CFA CODE #2005097
Page II of Exhibit C
`S7 LrY r'
III
"STREETLIGHTS"
MID BLOCK
KELLER HICKS RD 8
KELLER ISD MIDDLE AND INTERMEDIATE SCHOOLS
Page III of Exhibit C
'� _ `,��"sem : - :�! `11111►
�IIion
.tl�_•� 1 01 __ _ • _ _� Il�1111.11�■�
- •I\' f��',":�"�ti,•r�.'' .�`(:1B°�"IIT"'=��1� � _=c_
/It
Ill
111 � -
►\1111 :umpu:�� - .,,,,.;,,.f■,:_ - ., ?;:�••�....::...:u:
:....iiiinnf■1111111 �!1• .•`.',!:;;5 E5=
1a■a11f1111111111 �� '= °o:•%:'r •�-
.::'::�s
■, _u�111fffflf111111111� �_�_/ �" ".•....ua•r•,.•.. .•--.��-
' %piiii 110111111111■111_ .:, `inuutl.. ��
anu�ounwunur/IIIIIunwOOwry -• nnua.•u
11 .IIIIIF.��g::::-`In'::: :i°S� ! •:Ila:luuu� �
�1 /III►\�.A� %. .•i■O�.ui�nr•.'ei=:iil•� i u.•...'.:':':'.�.�
W W IS. .��u11■111■�1�•
'' 1 ' ��■■i�■■■It*;1--:c■Jllillll■�1111�-`` 7.�f
ppa1
911111■�11:�r;nu iiiiniuiiiiiii:■ i'�- I,Ir
■111■ __- __-�_.���`•�•'��`•, ■�_.tl11111C i� �uuw unu B ��
:�.... •_ -r illll.:is'.�:. i-1 11fi1f�
"1/11-1f11111.11II1f■1f1111111 ,�%! �� �.
11111111111/�111:;-11111► '•';;;;,;;,,,"II„ .f f�■
■/1lu.u.r��ir.r■■i111U1► :;�: :'I -e o..RMINMAS
PA
f ���■_�
L%IP♦ �■:I •':_'�. '■■-�■■..■ ;jun•i_-.=.:_:3:7 ,-=C0'-5 ..i. —
an
1 �� .■■■■■■■� -�r1■■■: ►.'-........-_�,�_•e:e•� '•i �� 1
�- ■-■■.1110 '7G - !e 'lli 111��1m,
gllli nlll\\-. •uuuuu■fOii1■U111ff-� - =, - - =-
1 =r.
L- uun•• ■�`�: ..i:. ■—
MENNE
CITY OF .-
PROPOSED MIDDLE & INTOMMATE SCHOOLS
..��1111 n�r�i�r�" �s��_r.����11 � ►a
� _ Itieeo �°'iWiIIYW�■iWWIWWWiY`�1 II
..�..
N
� r
I U ITT,
I►lei ,
11leiKaLER ISO
r
I _
118 / _ 1III
Y6PC�fw RODCtN�.V1LW9�ELIMY Nq` // Z I e��
k
I `I Im
U \yYq\
Jx
\ Px
-
J = v
I
two
PU
14 I ?
Ac
fl g� �
N I _
I
--— - --U- ALTA TAo
r R
o
I
D �
2 I
o I
\ n I I
1 N
\ m
I
- � I
SCALE 1EAG11ENA/1/INOPEIeK/NS CITY OF FORT WORTH, icXAS �"4`�
N/A SNO/NIRS•SUAYSIORS•CONSULAN/S KFl I FR ISU SHEET
�A PROPOSED INTERMEDIATE & MIDDLE SCHOOLS
mo M.�ftom ZW W Hbko y 8~#100 IrW�b. A"d#506 1
on IE ovc Fon WorMt Tw.78= D«rcn Tw.7a m D.I�T. 76243 STORM DRAINAGE IMPROVEMENTS or
'LY 20os (Mn 336-6779 (ora 361 (21181-° EXHIBIT 'B-1' 1