Loading...
HomeMy WebLinkAboutContract 48944 CITY SECRETARY CONTRACT NO. Developer and Project Information Cover Sheet: Developer Company Name: Domain at Bluff View,LLC Address, State,Zip Code: 1020 NE Loop 410, Ste 700, San Antonio,TX 78209 Phone&Email: � 210-804-6044,jshalley@embreydc.com Authorized Signatory,Title: Jacob Shalley, Senior Vice President-Development Project Name: Domain at the Bluff Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: Samuels Avenue south of Greer Street Plat Case Number: FP-16-096 I, Plat Name: The Bluffs Mapsco: 63S i Council District: 1 City Project Number: 100654 CFA Number: 2017-033 DOE Number. I <DOE#> To be completed by staff Received by: J Date: 17 EOFFICIALECOR® ETARYHS TX City of Fort Worth,Texas Standard Community Facilities Agreement-Domain at the Bluff CFA Official Release Date: 01.03.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Domain at Bluff View, LLC , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Domain at the Bluff ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Domain at the Bluff CFA Official Release Date: 01.03.2017 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) M,, Paving (B) ®, Storm Drain (13-1) 0 Street Lights & Signs (C) M. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section Il, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement-Domain at the Bluff CFA Official Release Date: 01.03.2017 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement-Domain at the Bluff CFA Official Release Date: 01.03.2017 Page 4 of 11 4 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in Part, by the allezed nezUkence of the City of Fort Worth, its officers, servants, or employees M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged neWizence of the City of Fort Worth, its officers, servants, or employees Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement-Domain at the Bluff CFA Official Release Date: 01.03.2017 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement-Domain at the Bluff CFA Official Release Date:01.03.2017 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Domain at the Bluff CFA Official Release Date: 01.03.2017 Page 7 of 11 Cost Summary Sheet Project Name: Domain at the Bluff CFA No.: 2017-033 City Project No.: 100654 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 258,741.72 2.Sewer Construction $ 22,412.22 Water and Sewer Construction Total $ 281,153.94 B. TPW Construction 1.Street $ 276,333.79 2.Storm Drain $ ' 166,302.86 3.Street Lights Installed by Developer $ 147,803.69 4. Signals $ - TPW Construction Cost Total $ 590,440.34 Total Construction Cost(excluding the fees): $ 871,594.28 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 5,623.07 D. Water/Sewer Material Testing Fee(2%) $ 5,623.07 Sub-Total for Water Construction Fees $ 11,246.14 E. TPW Inspection Fee(4%) $ 17,705.47 F. TPW Material Testing(2%) $ 8,852.73 G. Street Light Inspsection Cost $ 5,912.15 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ i - Sub-Total for TPW Construction Fees $ 32,470.35 Total Construction Fees: $ 43,716.49 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 871,594.28 x Completion Agreement=100%/Holds Plat $ 871,594.28 Cash Escrow Water/Sanitary Sewer=125% $ 351,442.43 Cash Escrow Paving/Storm Drain=125% $ 738,050.43 Letter of Credit=125%w/2yr expiration period 1 $ 1,089,492.85 City of Fort Worth,Texas Standard Community Facilities Agreement-Domain at the Bluff CFA Official Release Date: 01.03.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER DOMAIN AT BLUFF VIEW,LLC, .�' a Texas limited liability company Jesus J. Chapa By:DBV-GP,LLC, Assistant City Manager a Texas limited liability company its managing member Date: >f / Recommended by: Nam9z"" cob Shalley Wend Chi abulal EMBA P.E. Tit� nior Vice President -Development Wendy > Development Engineering Manager Water Department Date: '0,4 Lj- u ,, / ATTEST: (Only if required by Developer) Dougl W. Wiersig, P.E. Director Transportation &Public Works Department Signature Approved as to Form &Legality: Name: / Contract Compliance Manager: Richard A. McCracken By signing, I acknowledge that I am the Assistant City Attorney person responsible for the monitoring and M&C No. nney administration of this contract, including ensuring all performance and reporting Date: "t .O equirements. Form 1295: ATTES �qg Name: _ Title: �— a J. Kayser City Secretary City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Domain at the Bluff CITY SECRETARY CFA Official Release Date: 01.03.2017 Page 9 of 11 FT.WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvements M Water Cost Estimate Exhibit A-1: Sewer Improvements ( Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate Exhibit 13-1: Storm Drain Improvements �! Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Domain at the Bluff CFA Official Release Date: 01.03.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100654 None City of Fort Worth,Texas Standard Community Facilities Agreement-Domain at the Bluff CFA Official Release Date: 01.03.2017 Page 11 of 11 0 SNS\OE rig o C> O v z m 0 w � a ST U 9 11TH WINDMILL ST o 10TH ST cn SWIFT ST � cn Cl S�. O R s� �-p Q S �O S� `° PROJECT SITE S� P� 5 S\ GOUNAH ST -/5-9� HARRIS I�OCHER SMITH EXHIBIT AA: 101 Fort Worth,Summit Avenue, Suite 1014 N.T.S. OWNER/DEVELOPER: P: 817.769.6279TF: 817769 .6298 LOCATION MAP for DOMAIN AT BLUFF VIEW, LLC HarrisKocherSmith.com DOMAIN AT THE BLUFF TAN N.E.LOOP 410,SUITE 700 TBPE Firm No. F-15501 PHONE:T22 0�804 5226 8209 CRANFILL S ADDITION T 1 L0 \ -.VOL 654, PG 515 -�- � o PRT.C.T 1cl o G. WALL P146049 68 BLDG 2 '� \\ .i � � BLDG 1 u - F O EL THE UFF DOMAIN AT �- jH BLOCK AL LOT VAO 915 SAMUELS, LLC ,, l f " Q STREET D214134584 �w ` rw Iwcr < 6 w o---- TRINITY BLU FLn DEVELOPMENT, LTD D2g5144818 l-_ ) �`_ 1) MORREEON 1 TODD A. PHILLIPS �> caRVEv HouSE 170217 S BLOCK A. LOT 2 I D214 " z TRINITY BLUFF DEVELOPMENT, LTD. _ I D205144818 R—I-- a� -z - FORTWO T TEEN I - i CHALLENGE VOL. 5113, PG. 822 - , LEGEND: 1 W PROPOSED WATER PROPOSED FIRE HYDRANT _ I 1 " PROPOSED GATE VALVE EXISTING WATER - - --�<- - - - EXISTING FIRE HYDRANT — ---- EXISTING GATE VALVE HARRIS 250 0 250 i500 KOCHER SMITH SCALE: 1"= 250' 101 Summit Avenue, Suite 1014 EXHIBIT A: Fort Worth, Teras 7669. WATER IMPROVEMENTS for OWNER/DEVELOPER: IW, ��C P: 817.769.6279 F: 817.769.6298 HarrisKocherSmith.comDO MAIN AT THE BLUFF 020 N.E.LOOP 410,SUITE 700 SAN TBPE Firm No. F-15501 PHONE:T4 OI 804 5226 78209 _ - I � LO - -. -- -- co CRANFILL' - S ADDITION o o VOL. 654, PG. 515 - O PR.TCT z �h L I C� \ i BLDG 2 7 ' 1 P BLDG 1 -- JI EARLINE G. WALL [ [ D14604986 =�t Lel 0 1 °IBL14' _ T � THE BLUFFL- 1 -BLOCK A LOT 1 "_ 915 SAMUELS, LLC N LOCUST STREET 4' � "- ' � � (40'PUBLIC RIGHT-OF-WAY) D214134584 b _�� 1 T co - -- �� _ •� m I f{ W W w o _Lj V � m cn U) TkI�NITY BLUFF - DEVELOPMENT, LTD. --__ _ w D205144818 T�o MORRISON STREET PUBLIC RIGHT OF-WAY) o m --- 1 _ JTi TOD� A. PHILLIPS �`_ GARV �' HOUSE -- -- D 3 � 2 4170217 �` !� �' � LOCK A, LOT 2 r I 1 , � Ir 'I TRINITY BLUFF s �` �� I DEVELOPMENT, LTD. II G), BLDG 5 - D205144818 ` LEGEND: Ss --_ - PROPOSED SANITARY SEWER LINE • PROPOSED SANITARY SEWER MANHOLE FORT WORTH TEEN • PROPOSED SANITARY SEWER CLEANOUT CHALLENGE EXISTING SANITARY SEWER LINE VOL. 5113, PG. 822 EXISTING SANITARY SEWER MANHOLE - -- HARRIS 150 0 150 300 KOCHER SMITH SCALE: 1"= 150' 101 Summit Avenue, Suite 1014 EXHIBIT A-1 : Fort Worth, Texas 76SEWER IMPROVEMENTS for o_MAIN ER/AAT BLUFF VIEW, LLC P: 817.769.6279 F: 817.769.69.6298 HarrisKocherSmith.com DOMAIN AT THE BLUFF 020 N.E.LOOP 410,SUITE 700 SAN TBPE Firm No. F-15501 PHONE:T4 0�604 5226 78209 -_ -- - ---- GREER STREETLO --- - - - —- -- - - CRANFILL'S ADDITION i o 1� VOL. 654, PG. 515 P.R.T.C.T. ( z o EL _ I_� L_ E -- r- - `� ��t��-?�� '-_`"""=tri-t�=t� fL�=-T t � � I U 1 f11 BLDG 2 �. ! BLDG 1 EARLINE G. WALL D146049868rl�1 [ -- ----- I L �, f `Jtll9��L�Gj1d" __. OMAIN AT - L_ j� THE BLUFF - —_ �BLOCK E A, LOT 1' - � .� LOCUST STREET 915 AMUELS, LLC �� (40'PUBLIC RIGHT-OF-WAY) E D2�4134584 EI "I LLI LL 3 -----_- -_-_____— W o wTITY � DEVE OPMENT,FLTD. � m 1 a D205144818 �;rA MORRISON STREET I �cn m (27 PUBLIC RIGHT OF WAY) ` \7 1 i� TOD A. PHILLIPS � - VG RA VG RA EHOUSE LOCK A, LOT 2 D2�4170217 1\ { , L TRINITY BLUFF [ to DEVELOPMENT, LTD. BLDG 5 I D205144818 LEGEND: 4" CONCRETE SIDEWALK 5" CONCRETE PAVEMENT FORT WORTH TEEN __ T CHALLENGE 1 VOL. 5113, PG. 822 6" CONCRETE PAVEMENT HARRIS 150 0 150 300 KOCHER SMITH SCALE: 1"= 150' 101 Summit Avenue, Suite 1014 EXHIBIT B: Fort Worth, Texas 76PAVING IMPROVEMENTS for OWNER/DEVELOPER: _OMAIN AT BLUFF VIEW, LLC P: 817.769.6279 F: 817.769.69.6298 HarrisKocherSmith.com DOMAIN AT THE BLUFF AN LOOP 209 OP410,S780 TBPE Firm No. F-15501 PHONE: 210-804-5226 8209 - _-.- - --GREER STREET------ --- - d- CRANFILL'S ADDITION �0 ��.. VOL. 654, PG. 515 p P.R.T.C.T. I . ! - - — z � U \, BLDG 2 BLDG 1 iEA LINE G. WALL ( �� D146049868 24 RCP 30 24" RCP AT - - - -1 L OMAN �Y R - m $Lu��lBl G114j Ih-- - --- m - -Aj 5'x3 THE BLUFF - — LL i SSG= RCB "BLOCK A, LOT 1 - I LOCUST S � � 915 AMUELS, LLC TREET 1P, - a- (40'PUBLIC RIGHT-OP-WAY) D2 4134584 E � - -�. � o W � _ LLJ } LL- - ---. {, I� �- W AJVFL T I�ITY BLUFF C DEVELOPMENT, LTD. C- D2�05144818 ��;.- �I -1MORRISON STREET (27'PUBLIC RIGHT-OF-WAY) , - r_ TODD A PHILLIPS GARY HOUSE — 1)2 4170217 \, r� L� OCK A, LOT 2 - r TRINITY BLUFF "t DEVELOPMENT, LTD. I a, BLDG 5 D205144818 i i FORT WORTH TEEN --- LEGEND: CHALLENGE VOL 5113, PG. 822 PROPOSED STORM DRAIN o PROPOSED JUNCTION BOX -- 0 PROPOSED 5' CURB INLET _ HARRIS 150 0 150 300 KOCHER SMITH EXHIBIT B-1 : SCALE: 1"= 150'101 Summit Avenue, Suite 1014 STORM DRAIN Fort Worth,P: 817 69.6279Texas F: 8177 102 _69. 6298 IMPROVEMENTS for DOMAIN AT BLUFF EW, LLC HarrisKocherSmith.com DOMAIN AT THE BLUFF SAN N.E.ANTONIO, S78209UITE 0 TBPE Firm No. F-15501 PHONE: 210-804-5226 78209 -- - -----GREEK STREETLO - -- CD RC ANFILL'S ADDITION �I o_ VOL. 654, P.R. o \ f BLDG 2 f 4 � j--L BLDG 1 I , C EA LINE G. WALL - D146049868I } � _1 0 Al �i— --- ------------ �' \V THE BLUFF �i �I �r ----- �I -- \� —BLOCK A, LOT 1 — — 915` AMUELS, LLC , \ LOCUST STREET D��4134584 \ } a - rl _. (4VPu6uC RIGHT—OF—WAY) w �1 5wo TRI ITY BLUFFLl DEVELOPMENT, LTD. , F� D20�5144818 � — \V' � G� �� �` MORRISON STREETco —j y � � \ \ Com* (2T PUBLIC RIGHT-OF-WAY) GARVEY HOUSE T00 A. PHILLIPS \ — D214170217 14 LOCK A, LOT 2 !, - TRINITY BLUFF DEVELOPMENT, LTD. I BLDG 5 �--- D205144818 I �T � LEGEND: FORT WORTH TEEN CHALLENGE VOL. 5113, PG. 822 PROPOSED STREET LIGHT - I HARRIS 150 0 150 300 KOCHER EXHIBIT C: SCALE: 1"= 150' SMITH STREET LIGHTS & SIGNS _ 101 Summit Avenue, Suite 1014 P: 817 69.6279Fort Worth, Texas F: 817769.6298 IMPROVEMENTS for DOMAI102 N AT BLUFF VIEW, LLC HarrisKocherSmith.com DOMAIN AT THE BLUFF 1AN N.E.LOOP 410,SUITE 700 TBPE Firm No. F-15501 PHONE:T22 0 804-5226 78209 00 42 43 DAP-BID PROPOSAL Page 1 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT I:WATER IMPROVEMENTS 1 0241.1218 4"-12"Water Abandonment Plug 0241 14 EA 5 $344.90 $1,724.50 2 0241.1512 Salvage 1"Water Meter 0241 14 EA 31 $125.00 $3,875.00 3 3305.0109 Trench Safety 33 05 10 LF 2321 $7.85 $18,219.85 4 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 0.97 $4,349.87 $4,219.37 5 3311.0061 4"_PVC Water Pipe 3311 12 LF 78 $18.00 $1,404.00 6 3311.0161 6"PVC Water Pipe 33 11 12 LF 48 $35.48 $1,703.04 7 3311.0261 8"PVC Water Pipe 33 11 12 LF 158 $31.97 $5,051.26 83311.0461 12"PVC Water Pipe 3311 12 LF 2037 $41.86 $85,268.82 9 3312.0001 Fire Hydrant 331240 EA 1 $2,851.48 $2,851.48 10 3312.2001 1"Water Service,Meter Reconnection 33 12 10 EA 31 $135.65 $4,205.15 11 3312.2002 1"Bored Water Service 33 12 10 EA 19 $1,500.00 $28,500.00 12 3312.2003 1"Water Service 33 12 10 EA 16 $602.44 $9,639.04 13 3312.2203 2"Water Service 33 12 10 EA 1 $1,524.98 $1,524.98 14 3312.2801 3"Water Meter and Vault 3312 11 EA 2 $14,496.33 $28,992.66 15 3312.3003 8"Gate Valve 33 12 20 EA 2 $1,126.67 $2,253.34 16 3312.3005 12"Gate Valve 33 12 20 EA 9 $2,145.47 $19,309.23 17 3312.4109 12"x 12"Tapping Sleeve&Valve _ 33 12 25 EA 1 $10,000.00 $10,000.00 18 9999.0001 8"Double Gate Double Check Valve Vault 00 00 00 EA 2 $15,000.00 $30,000.00 19 _ _ _ 20 21 - 22 23 24 - 25 26 _ 27 28 29 30 31 - 32 33 _ 34 35 36 37 - 38 39 - 40 41 - 42 43 44 45 - TOTAL UNIT I:WATER IMPROVEMENTS $258,741.72 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43 Bid Proposal DAP 00 42 43 DAP-BID PROPOSAL Page 2 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. I Measure Quantity Unit Price Bid Value UNIT 11:SANITARY SEWER IMPROVEMENTS 1 3301.0101 Manhole Vacuum Testing 3301 30 EA 3 $107.16 $321.48 2 3301.0002 Post-CCTV Inspection 33 01 31 LF 143 $1.60 $228.80 3 3305.0109 Trench Safety 33 05 10 LF 143 $7.85 $1,122.55 4 3305.0116 Concrete Encasement for Utility Pipes 33 05 10 CY 9.5 $500.00 $4,750.00 5 3331.3101 4"Sewer Service 3331 50 EA 1 $313.60 $313.60 6 3331.4115 8"Sewer Pipe 3311 10,33 LF 143 $29.03 $4,151.29 39 7 33 .0001 Epoxy Manhole Liner 33 39 60 VF 15 $161.94 $2,429.10 -8 3339.1002 4'Drop Manhole 33 39 10,33 EA 1 $4,307.40 $4,307.40 9 3339.1004 4'Shallow Manhole 33 39 10,33 EA 2 $2,394.00 $4,788.00 10 11 12 13 14 15 16 17 _ 18 19 20 21 22 23 _ 24 25 _ 26 27 28 29 30 31 _ 32 33 34 35 _ 36 37 _ 38 39 40 41 42 43 44 45 TOTAL UNIT I1:SANITARY SEWER IMPROVEMENTS1 $22,412.22 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Foam Version September 1,2015 00 42 43_Bid Proposal DAP 00 42 43 DAP-BID PROPOSAL Page 3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT III: DRAINAGE IMPROVEMENTS 1 0241.4401 Remove Headwall/SET 0241 14 EA 1 $941.89 $941.89 2 3292.0500 Seeding,Soil Retention Blanket 321-9213, SY 1216 $3.49 $4,243.84 3 3305.0109 Trench Safety 33 05 10 LF 621 $7.85 $4,874.85 4 3305.0112 Concrete Collar 33 05 17 EA 3 $424.28 $1,272._84 5 3341.0205 24"RCP,Class III 3341 10 LF 499 $45.05 $22,479.95 6 3341.0302 30' RCP,Class III 3341 10 LF 30 $71.30 $2,139.00 7 3341.0303 30"RCP,Class IV 33-4-1 -10 LF 64 $59.61 $3,815.04 8 3341.1201 5x3 Box Culvert 33 41 10 LF 28 $146.00 $4,088.00 9 3349.0001 4'Storm Junction Box 33 49 10 EA 5 $3,848.49 $19,242.45 10 3349.0003 6'Storm Junction Box 33 49 10 EA 2 $7,500.00 $15,000.00 11 9999.0002 5'Curb Inlet 00 00 00 EA 1 $4,000.00 $4,000.00 12 9999.0003 Coffer Dam 00 00 00 EA 1 $50,000.00 $50,000.00 13 9999.0004 Temporary Maintainence Road 00 00 00 SF 2309 $5.00 $11,545.00 14 9999.0005 Permanent Maintainence Road 00 00 00 SF 2151 $10.00 $21,510.00 15 9999.0006 Articulating Concrete Block Pavement 00 00 00 SY 23 $50.00 $1,150.00 16 _ 17 18 19 - 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 _ 40 41 42 43 _ 44 _ 45 TOTAL UNIT 111:DRAINAGE IIVIPROVEIVIEN[TSI $166,302.86 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43_Bid Proposal DAP 00 42 43 DAP-BID PROPOSAL Page 4 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT IV: PAVING IMPROVEMENTS 1 3201.0113 6'Wide Asphalt PvmtRepair, Residential 32 01 17 LF 2081 $40.00 $83,240.00 2 0241.1300 Remove Conc Curb&Gutter 02 41 15 LF 64 $4.28 $273.92 3 3125.0101 SWPPP >_1 acre 31 2500 LS 1 $10,000.00 $10,000.00 4 3211.0400 Hydrated Lime 3211 29 TN 61 $150.43 $9,176.23 5 3211.0501 6"Lime Treatment 32 11 29 SY 3362 $3.25 $10,926.50 6 3213.0101 6"Conc Pvmt 32 13 13 SY 2864 $32.58 $93,309.12 7 3213.0301 4"Conc Sidewalk 32 13 20 SF 46.13 $3.94 $18,175.22 8 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 11 $1,000.00 $11,000.00 9 3216.0101 6"Conc Curb and Gutter 32 16 13 LF 64 $20.20 $1,292.80 10 3471.0001 Traffic Control 3471 13 MO 6 $5,000.00 $30,000.00 11 9999.0007 5"Conc Pvmt 00 00 00 SY 298 $30.00 $8,940.00 12 13 14 15 16 17 18 19 20 21 _ 22 23 _ 24 _- 25 26 27 28 - 29 30 31 32 33 34 - 35 36 37 38 39 40 41 42 43 _ 44 45 TOTAL UNIT IV:PAVING IMPROVEMENTS $276,333.79 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43—Bid Proposal—DAP 00 42 43 DAP-BID PROPOSAL Page 5 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT V:STREET LIGHTING IMPROVEMENTS 1 3441.1603 Furnish/Install 10'-14'Ped Pole Assmbly 3441 10 EA 21 $5,000.00 $105,000.00 2 2605.3018 2"CONDT PVC SCH 80,Open Cut 26 05,33 LF 1189 $20.00 $23,780.00 3 3441.3303 Rdwy IIIum Foundation TY 7 34 41 20 EA 21 $905.89 $19,023.69 4 - 5 - 6 - - 7 _- 8 9 10 11 - 12 - 13 14 15 16 - 17 18 19 _ - 20 21 22 23 - 24 - 25 _. 26 27 _ _ - 28 29 30 _ 31 32 33 - 34 35 _ - - 36 37 38 39 _ 40 41 42 - 43 44 45 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $147,803.69 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43 Bid Proposal_DAP