Loading...
HomeMy WebLinkAboutContract 47746-FP1 Department of TP&W Const. Services CPN# ��-� Date Project Manager—6� Risk Management(anadv D.O.E. BrothertonAgI'TWORTH, CONTRACT on SECRETARY I n a CFA Morales/Scanned I NTRACTNO j% !r� ( I Esteban Perez/Scanned The Proceeding people have been Contacted concerning the request for final payment& have ATION AND PUBLIC WORKS released this project for such payment. F PROJECT COMPLETION e J'17�//2f Developer Projects) Clearance Conducted By (�� 1, /�n City Project N2: 02747 Regarding contract 02747 for MATADOR ADDITION PHASE II as required by the TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the recornmendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Price: $48,732.00 Amount of Approved Change Orders: Ns Revised Contract Amount: Total Cost Work Completed: $48,732.00 i Recommended for Acceptance Dat Asst. Director, TPW - Infrastructure Design and Construction 0. L) 313111-,2 Accepted Date Dir ctor, TRANSPORTA ION & PUBLIC WORKS —_ 2 Asst. City Manager Date Comments: MAR 0 5 2017 Rev.9/22/16 FORT WO RT H CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name MATADOR ADDITION PHASE II Contract Limits Project Type STORM DRAIN City Project Numbers 02747 DOE Number 1014 Estimate Number 1 Payment Number 1 For Period Ending 3/1/2017 CD City Secretary Contract Number Contract Time 66`D Contract Date Days Charged to Date 175 Project Manager NA Contract is 100.00 Complete Contractor WALKER UTILITIES,INC. P.O.BOX 54122 HURST, TX 76054 Inspectors DICKINSON / BENNETT i I Wednesday,March 1,2017 Page I of 4 City Project Numbers 02747 DOE Number 1014 Contract Name MATADOR ADDITION PHASE II Estimate Number I Contract Limits Payment Numberg3/l/2017 Project Type STORM DRAIN For Period Endi Project Funding STORM DRAIN Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 42"RCP CLASS III 187 LF $128.50 $24,029.50 187 $24,029.50 2 36"RCP CLASS I1I 9 LF $103.50 $931.50 9 $931.50 3 24"RCP CLASS 111 64 LF $70.50 $4,512.00 64 $4,512.00 4 21"RCP CLASS I11 42 EA $64.50 $2,709.00 42 $2,709.00 5 5'STORM JUNCTION BOX 1 EA $4,900.00 $4,900.00 1 $4,900.00 6 15'CURB INLET 1 EA $4,950.00 $4,950.00 1 $4,950.00 7 10'CURB INLET 2 EA $3,350.00 $6,700.00 2 $6,700.00 Sub-Total of Previous Unit $48,732.00 $48,732.00 Wednesday,March 1,2017 Page 2 of 4 City Project Numbers 02747 DOE Number 1014 Contract Name MATADOR ADDITION PHASE tI Estimate Number I Contract Limits Payment Number Project Type STORM DRAIN For Period Ep in 3/1/2017 ) Project Funding Contract Information Summary Original Contract Amount $48,732.00 Change Orders Total Contract Price $48,732.00 Date 3/03/19 Total Cost of Work Completed $48,732.00 Contract Less %Retained $0.00 Net Earned $48,732.00 Dat Earned This Period $48,732.00 I spection Supervisor Retainage This Period $0.00 Date Less Liquidated Damages ro' et Manager ` Days @ Day $0.00 " Date $0.00l' 0 Deficiency Asst. ector/TPW`-hifrastructure Design dCo trruuctilon Less Penalty $0.00 W• ate 3 31 /1/ Less Previous Payment $0.00 Director/ ontracting Departmen Plus Material on Hand Less 15% $0.00 Balance Due This Payment $48,732.00 - I Wednesday,March 1,2017 Page 3 of 4 City Project Numbers 02747 DOE Number 1014 Contract Name MATADOR ADDITION PHASE II Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN For Period Ending 3/1/2017 Project Funding Project Manager NA City Secretary Contract Number Inspectors DICKINSON / BENNETT Contract Date Contractor WALKER UTILITIES,INC. Contract Time 60 CD P.O.BOX 54122 Days Charged to Date 175 CD HURST, TX 76054 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $48,732.00 Less %Retained $0.00 Net Earned $48,732.00 Earned This Period $48,732.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $48,732.00 Wednesday,March 1,2017 Page 4 of 4 FORTWORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Matador Addition Ph II B PROJECT NO.: 02747 CONTRACTOR: Walker Utilities DOE NO.: N/A PERIOD FROM:02/01/17 TO: 02/08/17 FINAL INSPECTION DATE: 16-Feb-17 WORK ORDER EFFECTIVE:6/20/2016 CONTRACT TIME: 175 0 Wo CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL & HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS 0 0 PERIOD PREVIOUS 175 175 PERIOD TOTALS 175 175 TO DATE *REMARKS: CONTRACTOR DATE IN PECTOR DATE ENGINEERING DEPARTMENT � F The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817) 392-7941 •Fax: (817)392-7845 FORTWORTHREV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR CONTRACTOR&PROJECT DATA Name of Contractor Project Naive Walker Utilities Madador Addition Ph II Inspector City Project Number Karl Bennett 2747 Construction Components Project Manager ❑ Water❑ Waste water Storm Drainage❑✓ Pavement Aaron Lon Initial Contract Amount ProjectDculty $48,732.00 0 Simple Routine 0 Complex Final Contract Amount Date $48,732.00 3/3/2017 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 1 1 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 418 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 418 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS] * 100%) 418 / 448 = 93% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=E.icellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature Contractor Signature — - Inspector's Supervisor Signature CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 8851 Camp Bowie West Blvd.•Fort Worth,TX 76116 • (817) 392-8306 FORTWORTHREV:02122107 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 3/3/2017 Name of Contractor Project Name Walker Utilities Matador Addition Ph II DOE Inspector Project Manager Karl Bennett Aaron Lon DOE Number Project Dculh, T)pe of Contract N/A O Simple * Routine Q Complex ❑ water[:] Waste water0 Storm Drainage[:] Pavement Initial Contract Amount Final Contract Amount $48,732.00 $48,732.00 I1)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4)_ INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector y I Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity& Sufficiency of Details 1 3 AccuracX of Measured Quantities `f' 3 Applicability of Specifications 4 Display Of Professionalism y 4 Accuracy of Plan Quantities `1 5 Citizen Complaint Resolution �f PROJECT MANAGER EVALUATION 6 Performance- Setting up Valve Crews,Labs Li 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager I Chan e Order Processing Time '� 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Tunefi-ame �I IM COMMENTS&SIGNATURES COMMENTS Signature Contractor __._._.._..... . Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS (a The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817) 392-7941 •Fax: (817)392-7845 CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ TO FINAL PAYMENT CONTRACTOR ❑ AIA DOCUMENT G707 SURETY ❑ OTHER ❑ BOND# 4404091 PROJECT: Lots 10-40,Block 1&Lots 1-16,Block 2 Matador Addition Phase II B (name, address) Fort Worth,TX TO: (Owner) CONTRACT FOR: Water,Sanitary Sewer,Paving,Street Lights and City of Fort Worth Drainage Improvements 1000 Throckmorton Street CONTRACT DATE: 4/12/2016 Fort Worth,TX 76102 CONTRACTOR: Walker Utilities,Inc. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here insert name and address of Surety Company) SureTec Insurance Company 1330 Post Oak Blvd.,Suite 1100 Houston,TX 77056 SURETY COMPANY, on bond of (here insert name and address of Contractor) Walker Utilities,Inc. P.O.Box 54122 Hurst,TX 76053 ,CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety company of any of its obligations to (here insert name and address of Owner) City of Fort Worth 1000 Throckmorton Street OWNER, Fort Worth,TX 76102 as set forth in the said Surety Company's bond IN WITNESS WHEROF, The Surety Company has hereunto set its hand this 1st day of February. 2017 SureT,ec-Insprance Company ,"Surety Compa SigreAuth ob#epr9sentative Attest (seal): Y ohne Sims Witness Jennifer Picchi _ Title Attorney-in-Fact AIA DOCUMENT G707*CONSENT OF SURETY COMPANY TO FINAL PAYMENT*APRIL 1970 EDITION*AIA 1970 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.NW WASHINGTON,D.G.2006 POA#: 4221029 SureTec Insurance Company LIMITED POWER OF ATTORNEY Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents make,constitute and appoint Clem F. Lesch,Steven W.Lewis, Eric Lesch,Jennifer Picchi, Melissa Lesch,Linda Stalder its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute, acknowledge and deliver any and all bonds,recognizances,undertakings or other instruments or contracts of suretyship to include waivers to the conditions of contracts and consents of surety for: Five Million and 00/100 Dollars($5,000,000.00) and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President,sealed with the corporate seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney-in-Fact may do in the premises. Said appointment shall continue in force until 05/18/2017 and is made under and by authority of the following resolutions of the Board of Directors of the SureTec Insurance Company: Be it Resolved, that the President, any Vice-President, any Assistant Vice-President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute, acknowledge and deliver,any and all bonds,recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability.thereunder, and any such instruments so executed by any such Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 206 of April, 1999) In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President, and its corporate seal to be hereto affixed this 21 st day of March,A.D.2013. +S\jFiAN°�F SURETEC INSURANCE COMPANY X....,.•y o - •,� B N• Oa John oz Jr: resident t 5 ;2> State of Texas ss: County of Harris �d'°huMmn*mN'c'. On this 21st day of March,A.D.2013 before me personally came John Knox Jr.,to me known,who,being by me duly swam,did depose and say,that he resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above instrument;that be knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the Board of Directors of said Company;and that he signed his name thereto by like order. JACQUELYN MALDONADO Notary Public ( I i state of Texas "yarn+may My comm.Exp.5/18/2017 Jacg6lyn Maldonado,Notary Public My commission expires May 18,2017 I,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney,executed by said Company,which is still in full force and effect; and furthermore,the resolutions of the Board of Directors,set out in the Power of Attorney are in full force and effect. Given under my hand and the seal of said Company at Houston, Texas this 5+ day of e U 40 17 , A.D. Bre t Beaty,Assistant ecretary Any instrument issued in excess of the penalty stated above is totally void and without any validity. For verification of the authority of this power you may call(713)812-0800 any business day between 8:00 am and 5:00 pm CST. AFFIDAVIT STATE OF TEXAS COUNTY OF TAR NT Before me, the undersigned authority, a Notary Public in the state 'and county aforesaid, on this day personally appeared Theresa Walker, Treasurer, of Walker,Utilities Inc., known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in :full; That the wage scale established by the City Council in the City of Fort Worth has been paid; and That there are no claims, pending for personal injury and/or property damages; On Contract described as; iMatador.Addition.Phase 2-B City Project# 02,747 Subscribed and sworn before me on this day of -w& JasonEscobeldo Comm"on Eom 02-26-2017J ry Public in Tarrant County, Texas