HomeMy WebLinkAboutContract 47583-FP3 Departgt o &W Const Services
CP'N# ate
Project ana er
Risk Management Canad _: —) T WORTH CITY SECRETARY
D.O.E. Brotherton ® CONTRACT N0.
CFA Westerman/Scanned
Esteban Perez/Scanned 9�i6 V1
The Proceeding people have been Contacted
concerning the request for final payment& have ATION AND PUBLIC WORKS
released this project for such payment. F PROJECT COMPLETION
Clearance Conducted By
)evelopex Projects)
��4��� �� �C��ry�� /
l' ,3 � (/� City Project Ne: 02400
n
J c-g# x{7583
Regarding contract 317334 for STONE CREEK RANCH PH 5 as required by the
TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION&PUBLIC WORKS upon die recorrunendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Contract Price: $56,988.01
Amount of Approved Change Orders: NO
Revised Contract Amount:
Total Cost Work Completed: $56,988.01
Uhti p Z-0 i'
Recommended for Acceptance Dat
Asst. Director, TPW - Infrastructure Design and Construction
I
Accepted Date
Director, ANSPORT TION1 PUBLIC WORKS
Asst. City"'Manager Date
Na
Comments:
MAR 0 6 2017
wtid:
Rev.9/22/16
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name STONE CREEK RANCH PH 5
Contract Limits
Project Type STREET LIGHT
City Project Numbers 02400
DOE Number 7334
Estimate Number I Payment Number 1 For Period Endin2/16/2017
City Secretary Contract Number 317334 Contract Time 5FD
Contract Date Days Charged to Date 55
Project Manager Jaafari Contract is 100.00 Complete
Contractor BEAN ELECTRICAL,INC
821 E ENON
FORT WORTH, TX 76140
Inspectors LAYER / ROGERS
Tuesday,February 21,2017 Page 1 of 4
City Project Numbers 02400 DOE Number 7334
Contract Name STONE CREEK RANCH PH 5 Estimate Number I
Contract Limits Payment Number I
Project Type STREET LIGHT For Period Ending 2/16/2017
Project Funding
STREET LIGHT
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 1 1/4"CONDT PVC SCH 80 1240 LF $6.00 $7,440.00 1240 $7,440.00
2 GROUND BOX TYPE B W/APRON 2 EA $500.00 $1,000.00 2 $1,000.00
3 RDWY ILLUM ASSEMBLY 14 EA $1,403.00 $19,642.00 14 $19,642.00
4 LED LIGHTING FIXTURE 14 EA $860.00 $12,040.00 14 $12,040.00
5 RDWY ILLUM FOUNDATION 14 EA $850.00 $11,900.00 14 $11,900.00
6 FURNISH/INSTALL ALUM SIGN GROUND I EA $550.00 $550.00 1 $550.00
MOUNT CITY STD
7 #6 ALUMINUM CONDUCTOR 2480 EA $0.85 $2,108.00 2480 $2,108.00
8 #1 OCU ALUMINUM CONDUCTOR 1240 EA $0.85 $1,054.00 1240 $1,054.00
9 CITY BONDS FOR ALL STREET LIGHT 1 LS $1,254.01 $1,254.01 1 $1,254.01
IMPROVEMENTS
Sub-Total of Previous Unit $56,988.01 $56,988.01
Tuesday,February 21,2017 Page 2 of 4
City Project Numbers 02400 DOE Number 7334
Contract Name STONE CREEK RANCH PH 5 Estimate Number I
Contract Limits Payment Number I
Project Type STREET LIGHT For Period Ending 2/16/2017
Project Funding
Contract Information Summary
Original Contract Amount $56,988.01
Change Orders
Total Contract Price $56,988.01
Da I —2�t� Total Cost of Work Completed $56,988.01
Co r Less %Retained $0.00
i G 7 Net Earned $56,988.01
Date
Earned This Period $56,988.01
Inspection S �r
Retainage This Period $0.00
L/"C' a,.p %A Date I�
Less Liquidated Damages
Oul"u—
ct Manage Days n /Day $0.00
ku�g4) - '30 t LessPavement Deficiency $0.00
Dat
Asst. irector/T,P-W1 -Inf
rastructure Design and Construction Less Penalty $0.00
�^'• "" Date J �V Less Previous Payment $0.00
Direct Contracting Departm t Plus Material on Hand Less 15% $0.00
!J` Balance Due This Payment $56,988.01
Tuesday,February 21,2017 Page 3 of 4
City Project Numbers 02400 DOE Number 7334
Contract Name STONE CREEK RANCH PH 5 Estimate Number I
Contract Limits Payment Number I
Project Type STREET LIGHT For Period Ending 2/16/2017
Project Funding
Project Manager Jaafari City Secretary Contract Number 317334
Inspectors LAYER / ROGERS Contract Date
Contractor BEAN ELECTRICAL,INC Conti-act Time 55 CD
821 E ENON Days Charged to Date 55 CD
FORT WORTH, TX 76140 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $56,988.01
Less %Retained $0.00
Net Earned $56,988.01
Earned This Period $56,988.01
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $56,988.01
Tuesday,February 21,2017 Page 4 of 4
FORTWORTH rev 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.FINAL
NAME OF PROJECT: STONE CREEK RANCH PH2
PROJECT NO.: 2400 CONTRACTOR: Bean Electrical
STREET LIGHTS DOE NO. 7334/CPN 02400
PERIOD FROM TO: FINAL INSPECTION DATE: 15-Feb-17
WORK ORDER EFFECTIVE CONTRACT TIME 55 O WD* CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
& HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS 0 0
PERIOD
PREVIOUS 55 55
PERIOD
TOTALS 55 55
TO DATE
*REMARKS. FINAL ESTIMATE CONTRACT TIME
PROJECT 100%COMPLETE.
7
CONT O DATE INSPE DATE
ENGINEERING DEPARTMENT
� �' The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817) 392-7941 •Fax: (817) 392-7845
FORTWORTH REV:8/20/16
r
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR& PROJECT DATA
Name of Contractor Project Name
Bean Electrical Stone Creek Ranch Ph5/Street Lights
Inspector City Project Number
Darryl Ruffin/Joe Rogers 2400
Construction Components Project Manager
❑ Water❑ Waste Water❑ Storm Drainage❑ Pavement Khal Jaafari
Initial Contract Amount Project Difficulty
$56,988.01 O Simple OO Routine O Complex
Final Contract Amount Date
$56,988.01 2/14/2017
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(X) APPLICABLE(Y/N) RATING 0-4 MAX SCORE SCORE
I Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 N
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 N
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 N
T-1 Property Restoration 5 N
12 After Hours Response 5 N
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 296
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 296
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 308
Rating([TS/MS] * 100%) 296 / 308 = 96%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good > % Ex e
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector Signature X0ntr Signature
Inspector's Supervisor Signature
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•8851 Camp Bowie West Blvd. •Fort Worth,TX 76116 • (817)392-8306
CONSENT OF OWNER o
SURETY COMPANY ARCHITECT ❑
TO FINAL PAYMENT CONTRACTOR ❑
AIA DOCUMENT G707 SURETY ❑
OTHER ❑ Bond# 4403221
PROJECT Stone Creek Ranch,Phase V
(name,address)
TO(Owner)LGI Homes-Texas LLC ARCHITECT'S PROJECT NO:
1450 Lake Robbins Dr CONTRACT FOR:
The Woodlands,TX 77380 CONTRACT DATE:
CONTRACTOR: Bean Electrical,Inc.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(here insert name and address of Surety Company)
SureTec Insurance Company
1330 Post Oak Blvd.,Ste 1100
Houston,TX 77056
,SURETY COMPANY,
on bond of
(here insert name and address of Contract
Bean Electrical,Inc.
PO Box 40016
Fort Worth,TX 76140 i CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall
not relieve the Surety company of any of its obligations to
(here insert name and address of Owner)
LGI Homes-Texas LLC
1450 Lake Robbins Dr
The Woodlands,TX 77380 OWNER,
as set forth in the said Surety Company's bond
IN WITNESS WHEROF,
The Surety Company has hereunto set its hand this 15th day of February, 2017.
SureTec Insurance Company
Surety Company
Signature of Authorized Representative
A�iest
(seal): Mistie Beck, Attorney-in-Fact
Title
NOTE:This form is to be used as a companion document to AIA DOCUMENT G706,CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBT AND CLAIMS,
Current Edition
AIA DOCUMENT G707*CONSENT OF SURETY COMPANY TO FINAL PAYMENT*APRIL 1970 EDITION*AIA
1970 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.NW WASHINGTON,D.C.2006
WARNING: Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution.
POA#: 4221049
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make,constitute and appoint Tony Fierro,Jay Jordan,Johnny Moss, Steven W. Searcey, Robert J. Shuya,
Mistie Beck,Jeremy Barnett, Robert G. Kanuth,Jade Porter,Jennifer Cisneros
its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for:
Five Million and 00/100 Dollars($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President, sealed with the corporate
seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney-in-Fact may do in the
premises. Said appointment shall continue in force until 05/18/2017 and is made under and by authority of the following
resolutions of the Board of Directors of the SureTec Insurance Company:
Be it Resolved, that the President, any Vice-President, any Assistant Vice-President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute, acknowledge and
deliver,any and all bonds,recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary,
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20'h of April,
1999)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President, and its corporate seal
to be hereto affixed this 3rd day of August A.D. 2015
SURETEC INSURANCE COMPANY
�SURANcF��
B
W i w j y John ox Jr. resident
0 ;z
State of Texas ss: %, ,t � Ye
County of Harris '' a
On this 3rd day of August,A.D. 2015 before me personally came John Knox Jr.,to me known,who,being by me duly sworn,did depose and say,that he
resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the
Board of Directors of said Company;and that he signed his name thereto by like order.
2o�,nePus�, JACQUELYN MALDONADO
Notary Public
Stale of Texas
My Comm.Exp.5118/2017 Jacq elyn Maldonado,Notary Public
My commission expires May 18,2017
.r,
I,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney,executed by said Company,which is still in full force and effect; and furthermore,the resolutions of the Board of Directors,set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston, Texas this day of A.D.
Bre t Beaty,Assistant Secretary
Any instrument issued in excess of the penalty stated above is totally void and without any validity.
For verification of the authority of this power you may call(713)812-0800 any business day between 8:00 am and 5:00 pm CST.
AFFIDAVIT OF BILLS PAID
THE STATE OF TEXAS
COUNTY OF Tarrant
Roy E. Bean,II being first duly sworn states that he is the President
of Tarrant County of Texas, hereinafter called"Company", and the said Company
has performed work and/or furnished labor for LCI Homes Tx LLC hereinafter called"Owner"
pursuant to a contract,dated 10/25/17 with Owner(hereinafter called
"CONTRACT")for the construction of: stone Creek Ranch Phase 5
That all just and lawful invoices against the Company for labor,materials, and expendable equipment
employed in the performance of the Contract and have been paid in full (with the exception of the
attached invoice prior to acceptance of payments from the Owner, and
That the Company agrees to indemnify and hold the Owner and Engineers harmless from all liability
arising from claims by subcontractors, materialmen and suppliers under Contract, and
That no claims have been made or filed upon the payment bond,
That the Company has not received any claims or notice of claims from the subcontr r
materialmen and suppliers. r
Contractor: B an Elec�r cal, Inc.
Date: 3/1/2017 By'
STATE OF TEXAS
COUNTY OF Tarrant
BEFORE ME,the undersigned, a Notary Public in and for the State of Texas, on this day
personally appeared Roy E. Bean, II , known to be the acknowledged to me that he executed
the same for the purposes and consideration therein express.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this 1st of March, 2017
My Commission Expires: (SEAL) Notary Nbi in ailid foi he St4e of Texas
CHERYIE R. ESPREE
Notary Public, State of Texas
'N• .'y: Comm.Expires 02-29-2020
Notary ID 1890225
�„nn„
PAPE-DAWSON
ENGINEERS
February 15,2017
Bean Electrical, Inc.
Attn: Mr. Roy E. Bean II
821 E Enon
Fort Worth, TX 76140
Re: Liquidated Damages
Project: Stone Creek Ranch Phase V—Street Lighting Improvements
Pape-Dawson Project No. 61066-01
Contract Number: 001
Owner: LGI Homes—Texas, LLC
Dear Mr. Bean:
LGI Homes—Texas, LLC will not be seeking liquidated damages from you on the work you have
performed on the above reference project.
Should you have any questions,please do not hesitate to contact us.
Sincerely,
LGI Homes—Texas, LLC
Shannon Birt
Vice President of Development
cc: Mr. Jason Elms, P.E. —Pape-Dawson Engineers, Inc.
Texas Board of Professional Engineers,Firm Registration#470
Dallas I San Antonio I Austin I Houston I Fort Worth
Transportation I Water Resources I Land Development I Surveying I Environmental
570D W.Plano Pkwy.,Suite 2500,Plano,TX 75093 T:214.420.8494 www.Pape-Dawson.com
FoRL.,r Wo 1� ytn� REV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 2/14/2017
Name of Contractor Project Name
Bean Electrical Stone Creek Ranch Ph 5/Street Lights
DOE Inspector Project Manager
Darryl Ruffin/Joe Rogers Khal Jaafari
DOE Number Project D ctdtj, Tjpe of Contract
CPN 02400 O Simple OO Routine O Complex ❑ Water❑ Waste Water❑ Storm Drainage❑ Pavement
Initial Contract Amount Final Contracl Amount
$56,988.01 1$56,988.01
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS& SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5__Citizen Complaint Resolution (PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve_Crews, Labs I 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 12 Availability of Project Manager
-
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Openingto Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Super sor
k--11�4;��
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
(a The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845