Loading...
HomeMy WebLinkAboutContract 48396-FP1 -r- •.. v. ocvv -unsi.cervices CP.N# Dat Project Manager Risk Management Canadv ZTWORTH, D.O.E. Brotherton �l-j CFA Morales /Scanned Z71- CITY SECRETARY Gutzler/scanned CONTRACT NO. The Proceeding people have been Contacted concerning the request for final payment& have 'ATION AND PUBLIC WORKS released this project for such payment. )F PROJECT COMPLETION Developer Projects) 5q(,00-7-10035 s Clearance Conducted By �VAW� `) City Project Ns: 100355 PF-Si7� ,p L�, gg39Z Regarding contract 100355 for LAKES OF RIVER TRAIL PHASE 1 as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Price: $321,175.32 Amount of Approved Change Orders: X.o Revised Contract Amount: Total Cost Work Completed: $321,175.32 r� C; i -� Recommended for Acceptance Date Asst. Director, TPW - Infrastructure Design and Construction /1)ell AZ Accepted Date Asst. Director, WATER DEPARTMENT 41 -7 � Asst. City Manager Date Comments: APR 11 -.2017 _r _ Rev.9/22/16 101 tid! 6-qb 0-7-100 3 55 �q( M-IC0355 City Project Numbers 100355 DOE Number 0355 Contract Name OFF SITE SANITARY SEWER LINE TO SERVE Estimate Number 1 Contract Limits "LAKES OF RIVER TRAILS PHASE 15" Payment Number 1 Project Type SEWER For Period Ending 3/21/2017 Project Funding Project Manager NA City Secretary Contract Number Inspectors DICKINSON / MCLAURIN Contract Date Contractor WALKER UTILITIES,INC. Contract Time 90 CD P.O.BOX 54122 Days Charged to Date 90 CD HURST, TX 76054 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $321,175.32 Less %Retained $0.00 Net Earned $321,175.32 Earned This Period $321,175.32 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $321,175.32 Tuesday,March 21,2017 Page 4 of 4 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name OFF SITE SANITARY SEWER LINE TO SERVE Contract Limits "LAKES OF RIVER TRAILS PHASE 15" Project Type SEWERyJ) City Project Numbers 100355 DOE Number 0355 Estimate Number I Payment Number I For Period Ending 3/21/2017 CD City Secretary Contract Number Contract Time 9CD Contract Date Days Charged to Date 90 Project Manager NA Contract is 100.00 Complete Contractor WALKER UTILITIES,INC. P.O.BOX 54122 HURST, TX 76054 Inspectors DICKINSON / MCLAURIN Tuesday,March 21,2017 Page 1 of 4 City Project Numbers 100355 DOE Number 0355 Contract Name OFF SITE SANITARY SEWER LINE TO SERVE Estimate Number 1 Contract Limits "LAKES OF RIVER TRAILS PHASE 15" Payment Number 1 Project Type SEWER For Period Ending 3/21/2017 Project Funding SEWER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Qua Total Quanity Total --------- -- --- ----- --- --- -- --- ---- - - ---—_ 1 8"SEWER PIPE 1152 LF $25.50 $29,376.00 1152 $29,376.00 2 10"SEWER PIPE 307 LF $27.75 $8,519.25 307 $8,519.25 3 12"SEWER PIPE 2307 LF $30.50 $70,363.50 2307 $70,363.50 4 18"SEWER PIPE 565 LF $40.50 $22,882.50 565 $22,882.50 5 4'MANHOLE 19 EA $4,600.00 $87,400.00 19 $87,400.00 6 CORE AND CONNECT TO EXISTING SANITARY 1 EA $1,250.50 $1,250.50 1 $1,250.50 SEWER MH 7 4"SEWER SERVICE 99 EA $560.00 $55,440.00 99 $55,440.00 8 CONCRETE COLLAR 19 EA $137.50 $2,612.50 19 $2,612.50 9 TRENCH SAFETY 4981 LF $0.35 $1,743.35 4981 $1,743.35 10 MANHOLE VACUUM TESTING 19 EA $120.00 $2,280.00 19 $2,280.00 11 POST CCTV INSPECTION 4981 LF $1.00 $4,981.00 4981 $4,981.00 12 4'EXTRA DEPTH MANHOLE 44 VF $151.13 $6,649.72 44 $6,649.72 13 18"SEWER PIPE CSS BACKFILL 650 LF $42.58 $27,677.00 650 $27,677.00 Sub-Total of Previous Unit $321,175.32 $321,175.32 --------------------------- - ------- -- - Tuesday,March 21,2017 Page 2 of 4 City Project Numbers 100355 DOE Number 0355 Contract Name OFF SITE SANITARY SEWER LINE TO SERVE Estimate Number 1 Contract Limits "LAKES OF RIVER TRAILS PHASE 15" Payment Number 1 Project Type SEWER For Period Ending 3/21/2017 Project Funding Contract information Summary Original Contract Amount $321,175.32 Change Orders Total Contract Price $321,175.32 Date �,/zz- Contra Total Cost of Work Completed $321,175.32 c Less %Retained $0.00 Date _ Net Earned $321,175.32 `� As e t' n up isor Earned This Period $321,175.32 Retainage This Period $0.00 Date A�4 Pr ect Less Liquidated Damages M er Days @ /Day $0.00 Date I LessPavement Deficiency $0.00 Asst. irector//TPWr-Infrcture Design and Construction Less Penalty $0.00 (�`^ Date -11G 1lq Less Previous Payment $0.00 Director/Contracting Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $321,175.32 Tuesday,March 21,2017 Page 3 of 4 FORTWORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Off-Site Sanitary Sewer Line to Serve "Lakes of River Trails Phase 15" PROJECT NO.: 100355 CONTRACTOR: Walker Utilities DOE NO.; PERIOD FROM;03/01/17 TO: 03/31/17 FINAL INSPECTION DATE: 21-Mar-17 WORK ORDER EFFECTIVE: 12/14/2016 CONTRACT TIME: 90Q W*i CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS H CHARGED CHARGED REASON FOR DAYS MONTH DURING CREDITED MONTH DURING CREDITED 1. Wed 1 16. Thurs 16 2. Thurs 2 17. Fri 17 3. Fri 3 18. Sat 18 4. Sat 4 19. Sun 19 5. Sun 5 20. Mon 20 6. Mon 6 21. Tues 21 Stop Time 7. Tues 7 22 8. Wed 8 23. 9. Thurs 9 24 10. Fri 10 25. 11. Sat 11 26 12. Sun 12 27 13. Mon 13 28 14. Tues 14 29 15. Wed 15 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL THIS & HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS PERIOD 90 90 PREVIOUS PERIOD 0 0 TOTALS TO DATE 90 90 *REMARKS: CONTRACTOR DATE I PECTOR DATE ENGINEERING DEPARTMENT SBF The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TZ 76012-6311 (817)392-7941 •Fax: (817) 392-7845 FORTWOR7H TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Off-Site Sanitary Sewer Line to Serve "Lakes of River Trails Phase 15" PROJECT NUMBER: 100355 DOE NUMBER: N/A WATER PIPE LAID SIZE TYPE OF PIPE LF No No FIRE HYDRANTS: No VALVES(16" OR LARGER) No PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: No NEW SERVICES: No SEWER PIPE LAID SIZE TYPE OF PIPE LF Yes 8" PVC 1152 Yes 10" PVC 307 Yes 12" PVC 2307 Yes 18" PVC 565 PIPE ABANDONED SIZE TYPE OF PIPE LF No No No No DENSITIES: Yes NEW SERVICES: 4" PVC 2480 TRANSPORTATION AND PUBLIC WORKS � s The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817) 392-7845 CONSE-N7 (37 OWNER ❑ SURETY COMPANY ARCHITECT ❑ 70 TiNAL PAYMENT CONTRACTOR ❑ AIA DOCUMENT G707 SURETY ❑ OTHER ❑ BOND# 4407015 PROJECT: Lakes of River Trails,Phase 15-Off-Site Sanitary Sewer-City Project No. 100355 (name, address) Fort Worth,TX TO: (Owner) CONTRACT FOR: Water,Sanitary Sewer,and Storm Water,Paving and Lighting City of Fort Worth, Improvements 1000 Throckmorton Street CONTRACT DATE: 7/28/2016 Fort Worth,TX 76102 CONTRACTOR: Walker Utilities,Inc. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here insert name and address of Surety Company) SureTec Insurance Company 1330 Post Oak Blvd.,Suite 1100 Houston,TX 77056 on bond of SURETY COMPANY, (here insert name and address of Contractor) Walker Utilities,Inc. P.O.Box 54122 Hurst,TX 76053 CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety company of any of its obligations to (here insert name and address of Owner) City of Fort Worth 1000 Throckmorton Street OWNER, Fort Worth,TX 76102 as set forth in the said Surety Company's bond IN WITNESS WHEROF, The Surety Company has hereunto set its hand this 20th day of March 2017 . SureTec Insurance Company Surety Co pany J z Si tore f thorized Representative Attest (seal): Ltieda Stald4j Witness Jennifer Picchi Title Attorney-in-Fact AIA DOCUMENT G707*CONSENT OF SURETY COMPANY TO FINAL PAYMENT*APRIL 1970 EDITION*AIA 19710 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.NW WASHINGTON,D.C.2006 POA#: 4221029 SurerTec Insurance Company LIMITED POWER OF ATTORNEY Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents make,constitute and appoint Clem F. Lesch,Steven W. Lewis, Eric Lesch,Jennifer Picchi,Melissa Lesch, Linda Stalder its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the conditions of contracts and consents of surety for: Five Million and 00/100 Dollars($5,000,000.00) and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President,sealed with the corporate seal of the Company and.duly attested by its Secretary,hereby ratifying and confirming all that the said Attomey-in-Fact may do in the premises. Said appointment shall continue in force until 05/18/2017 and is made under and by authority of the following resolutions of the Board of Directors of the SureTec Insurance Company: Be it Resolved, that the President, any Vice-President, any Assistant Vice-President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute, acknowledge and deliver,any and all bonds,recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20'h of April, 1999.) In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seal to be hereto affixed this 21st day of March,A.D.2013. a5�jgjJ%� SURETEC INSURANCE COMPANY a q Ey: n= John kdox Ji: resident State of Texas ss: �tP:,y 5 'Ys County of Harris `` On this 21st day of March,A.D.2013 before me personally came John Knox Jr.,to me known,who,being by me duly swom,did depose and say,that he resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the Board of Directors of said Company;and that he signed his name thereto by like order. JACQUELYN MALDONADO n Notary Public I n state of Texas / I My Comm.Exp.5/18/2017 Jacquelyn Maldonado,Notary Public My commission expires May 18,2017 I,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney,executed by said Company,which is still in full force and effect;and furthermore,the resolutions of the Board of Directors,set out in the Power of Attomey are in full force and effect. � / 7 Given under my hand and the seal of said Company at Houston,Texas this�b day of " ` ���1 A.D. M.Bre t Beaty,Assistant§ecretary Any instrument issued in excess of the penalty stated above is totally void and without any validity. For verification of the authority of this power you may call(713)812-0800 any business day between 8:00 am and 5:00 pm CST. FORTWORTHREV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR n CONTRACTOR&PROJECT DATA Name of Contractor Project Name Walker Utilities Off-Site SS Lines to Serve "Lakes of River Trails Phase 15" Inspector City Project Number Julius McLaurin 100355 Construction Components Project Manager ft Water Q Waste Water❑ Storm Drainage[—] Pavement Patrick Buckley Initial Contract.4mount ProjectDiffilculty $321,175.32 Q Simple Routine Complex Final Contract,4mount Date $321,175.32 21-Mar-17 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 448 BONUS POINTS(25 Maximum)(B) III)CONTRACTOR'S RATING TOTAL SCORE(TS) 448 Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS] * 100%) 448 / 448 = 100% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature _ Contractor Signature , Inspector's Supervisor Signature k CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 8851 Camp Bowie West Blvd. •Fort Worth,TX 76116 • (817) 392-8306 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Theresa Walker, Treasurer, of Walker Utilities Inc., known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid; and That there are no claims pending for personal injury and/or property damages; On Contract described as; Lakes of River Trails Phase 15 Off-Site Sanitary Sewer DOE # 7415 BY (� Subscribed and sworn before me on this X20 day of JASON ES— COBEpO ?Y PGBi Notary Public,State of Texas Qr Comm.Expires 02-26-2021. Notary ID 126817961 o ary Public in Tarrant County, Texas FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 21-Mar-17 Name of Contractor Project Name Walker Utilities Off-Site SS line to Serve"Lakes of River Trails Phase 15" DOE Inspector Project Manager Julius McLaurin Patrick Buckley DOE Number -Project Diffi-culty Type of Contract Q Simple Q Routine Q Complex E] Water E] Waste Water® Storm Drainage Pavement Initial Contract Amount Final Contract Amount $321,175.32 $321,175.32 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions `I 2 Knowledge of Inspector y 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 4 13 Applicability..of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs '{ 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time T 4 3 Communication 2 Timliness of Contractor Payments '} 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe '{ III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector1 1� --- Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817) 392-7941 •Fax: (817) 392-7845