HomeMy WebLinkAboutContract 47661-FP4 Departm t f'T3 &W Const.Services
CPN# I Dat
Project anager
IT WORT H
Risk Management nad . 1 a CITY SECRETARY
D.O.E. Brotherton CONTRACT NO.
CFA Morales/Scanned --M
Gutzler/Scanned
The Proceeding people hav been Contacted
concerning the request for final payment& have CATION AND PUBLIC WORKS
released this project for such payment. )F PROJECT COMPLETION __nn ,Z-70,
(Developer Projects) `J
Clearance Conducted By PAIWA06 City s
Pro- N : 02703
y7401
Regarding contract 02703 for PRIMROSE CROSSING PHASE 3B as required by the WATER DEPARTMENT as
approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
Original Contract Price: $366,129.10
Amount of Approved Change Orders: No
Revised Contract Amount:
Total Cost Work Completed: $366,129.10
J -1
Recommended for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
a �/c � L//6//7
Accepted Date
Asst. Director, WATER DEPARTMENT
Asst. City Manager Date
Comments: "
APR 111017
Rev.9/22/16 Inifla :
-C02 03
City Project Numbers 02703 DOE Number 2703
Contract Name PRIMROSE CROSSING,PHASE 313 Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 3/20/2017
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors DICKINSON / CROWLEY Contract Date
Contractor C.W.YOUNG CONSTRUCTION Contract Time 40 CD
210 S.SIXTH STREET Days Charged to Date 234 CD
MANSFIELD, TX 76063 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $366,129.10
Less % Retained $0.00
Net Earned $366,129.10
Earned This Period $366,129.10
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $366,129.10
Monday,March 20,2017 Page 4 of 4
P2&5- D27b3
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name PRIMROSE CROSSING,PHASE 3B
Contract Limits
Project Type WATER&SEWER
City Project Numbers 02703
DOE Number 2703
Estimate Number 1 Payment Number I For Period Ending 3/20/2017
CD
City Secretary Contract Number Contract Time 4GD
Contract Date Days Charged to Date 234
Project Manager NA Contract is 100.00 Complete
Contractor C.W.YOUNG CONSTRUCTION
210 S.SIXTH STREET
MANSFIELD, TX 76063
Inspectors DICKINSON / CROWLEY
Monday,March 20,2017 Page 1 of 4
City Project Numbers 02703 DOE Number 2703
Contract Name PRIMROSE CROSSING,PHASE 3B Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 3/20/2017
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No.
Quanity Total Quanity Total
------- --- ---- -- -- -- -- -- - - - - - - - -- -- - - ---- -
1 TRENCH SAFETY WATER 3614 LF $0.25 $903.50 3614 $903.50
2 DUCTILE IRON WATER FITTINGS 2.258 TN $4,020.17 $9,077.54 2.258 $9,077.54
W/RESTRAINT
3 8"WATER PIPE 3614 LF $20.23 $73,111.22 3614 $73,111.22
4 FIRE HYDRANT 6 EA $3,852.10 $23,112.60 6 $23,112.60
5 CONNECTION TO EXISTING 4"-12"WATER 4 EA $300.00 $1,200.00 4 $1,200.00
6 1"WATER SERVICE 82 EA $645.00 $52,890.00 82 $52,890.00
7 8"GATE VALVE 9 LF $1,094.00 $9,846.00 9 $9,846.00
Sub-Total of Previous Unit $170,140.86 $170,140.86
SEWER
Item Description of Items Estimated Estimated Completed Completed
No. P Unit Unit Cost P P
Quanity Total Quanity Total
------------ - - - -------------------------
I
--- ---- ----- __1 POST CCTV INSPECTION 2870 LF $1.10 $3,157.00 2870 $3,157.00
2 MANHOLE VACUUM TESTING 11 EA $70.00 $770.00 11 $770.00
3 TRENCH SAFETY 2870 LF $0.25 $717.50 2870 $717.50
4 8"WATER PIPE CSS BACKFILL 154 LF $68.50 $10,549.00 154 $10,549.00
5 4"SEWER SERVICE 83 EA $474.91 $39,417.53 83 $39,417.53
6 8"SEWER PIPE 2562 LF $37.33 $95,639.46 2562 $95,639.46
7 12"SEWER PIPE 308 LF $46.91 $14,448.28 308 $14,448.28
8 4'MANHOLE I1 EA $2,513.52 $27,648.72 11 $27,648.72
9 4'EXTRA DEPTH MANHOLE 33 VF 33
10 CONNECT TO EXISTING SANITARY SEWER 2 EA $300.30 $600.60 2 $600.60
11 EPDXY LINER 19.1 VF $159.17 $3,040.15 19.1 $3,040.15
Sub-Total of Previous Unit $195,988.24 $195,988.24
----------------
Monday,March 20,2017 Page 2 of 4
City Project Numbers 02703 DOE Number 2703
Contract Name PRIMROSE CROSSING,PHASE 313 Estimate Number 1
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 3/20/2017
Project Funding
Contract Information Summary
Original Contract Amount $366,129.10
Change Orders
Total Contract Price $366,129.10
3
Date Z In Total Cost of Work Completed
$366,129.10
C ntractor `) Less %Retained $0.00
Date V-Z3!< Net Earned $366,129.10
Inspection Supervisor Earned This Period $366,129.10
l Date
Z61 1. Retainage This Period $0.00
�`� � � I
Less Liquidated Damages
Pr 'ect Man/aj p�,
1 Vl 7 t G� 'I- Days @ /Day $0.00
Date`( I LessPavement Deficiency $0.00
Asst.Director/TPW-Infrastructure Design and Construction Less Penalty $0.00
11L
Date ���� Less Previous Payment $0.00
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $366,129.10
Monday,March 20,2017 Page 3 of 4
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
STATEMENT OF CONTRACT TIME
STATEMENT#
FINAL STATEMENT# 1 Pro# 2703
NAME OF PROJECT: Primrose Crossing,Phase 3-B Contractor C.W.Young
YEAR: 2016
PROJECT NO.: FINAL INSPECTION DATE 7/18/2016
r
03WD CD
CONTRACT TIME 160 X
PERIOD FROM: 3/1/2017 TO: 1 3/15/2017 BEG - Month I N
WORK ORDER EFFECTIVE: 4/25/2016 MID l /ill n 146.3%
DAY OF MONTH DAYS REASON FOR DAY OF MONTH DAYS REASON FOR
CHARGED DAYS CREDITED CHARGED DAYS CREDITED
1 Wed 1 N/A 16 N/A
2 Thu 1 N/A 17 N/A
3 Fri 1 N/A 18 N/A
4 Sat 1 N/A 19 N/A
5 Sur, 1 N/A 20 N/A
6 loon 1 N/A 21 N/A
7 Tue 1 N/A 22 N/A
8 Wed 1 N/A 23 N/A
9 Thu 1 N/A 24 N/A
10 ri 1 N/A 25 N/A
11 Sat 1 N/A 26 N/A
12 Sun 1 N/A 27 N/A
13 Mon 1 N/A 28 N/A
14 Tue 1 N/A 29 N/A
15 Wed 1 N/A 30 N/A
31 N/A
ate Lt's:
Not Applicable SAT,SUN,and WEATHER UTILITIES OTHERS DAYS TOTAL DAYS
HOLIDAYS RELOCATE CHARGED
THIS PERIOD 0 0 0 0 0
PREVIOUS PERIOD 0 234 234
TOTAL TO DATE 0 0 0 0 1 234 234
REMARKS:
Time Was Stopped 12/14/2016
Signature: Signatur .
(Print N e (Prin .ame) John Crowley
CONTRACTOY DATE Z317INSPECTOR DATE -/
AFFIDAVIT
STAFF OF Texas
COUNTY OF Tarrant
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Joe Winchester,
Proj. Manager Of CW Young Construction, known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Primrose Crossing, Ph. 3B - K#2442 - City Project# 02703
BY
Joe Winchester-Project Manager
Subscribed and sworn before mon t 's date 27th of January, 2017.
11-x-
Notary Public
Tarrant, TX
LOILEV�RETTW
P — — — — - - -STEWART IIIMy Commiss on ExpiresMarch 12,2019
210 South Sixth Ave. i, — ,•
pi �Il I ��� ,� i,� tf �� (877)477-1414
Mansfield, TX 76063 1 ti ���� E � � � I �,ai i r ii ii � I i�i fax(017)473-6077
Ivy ry f, 4 ry
January 27, 2017
City of Fort Worth
CFA Administration
1000 Throckmorton St.
Fort Worth, TX 76102
RE: Primrose Crossing, Ph. 3B
K # 2442 City Project # 02703
The purpose of this letter is to acknowledge that we have been paid in full by First
Texas Homes, Inc for the public improvements constructed to serve Primrose Crossing,
Ph. 3B in Fort Worth, Texas. As a result, we hereby waive, release and relinquish all
rights to assert any claim or demand for lien in connection with this project.
Please feel free to contact me with any questions you may have.
Sin rely,
e inchester
Pr
Manager
C.W. oung Construction
.477.1414
BOND NUMBER 022053749
C OWNER
ARCHITECT
�� [�[�\ i �r l[� �! CONTRACTOR
Conforms w`.h th-Amnerican o1 SURETY
Architects,AE.l Document C707 OTHER
TO OWNER: First Texas Homes,Inc.and City of Fort Worth ARCHITECT'S PROJECT NO.:
(Name and address) 500 Crescent Court#350
Dallas,Texas 75201
CONTRACT FOR: Water Sewer&Storm Improvement
PROJECT: Primrose Crossing,Ph.3B CONTRACT DATED:
(Nmne and address) t
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(Insert name and address o/'Suret))
Liberty Mutual Insurance Company
175 Berkeley Street,Boston,Massachusetts 02116
,SURETY,
on bond of
(Insert name and address of Contractor)
C.W.Young Construction,LP
210 S 6th Ave Mansfield,Texas 76063
,CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any
of its obligations to
(Insert name and address ofOu•net)
First Texas Homes,Inc.and City of Fort Worth
500 Crescent Court Suite 350,Dallas,Texas 75201
OWNER,
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: January 24,2017
(Insert in it ritntg the month,followed br the numeric date and rear.)
Liberty Mutual Insurance Company
Attest: (Signature f authorised representative)
Sonia Lara,Attorney-in-Fact
(Printed name and title)
:w=
,777
=-y
TEXAS TEXAS
IMPORTANT NOTICE AVISO IMPORTANTE
To obtain information or make a complaint: Para obtener informacion o para someter una
quej a:
You may call toll-free for information or to Usted puede llamar al numero de telefono gratis
make a complaint at para informacion o para someter una queja al
1-877-751-2640 1-877-751-2640
You may also write to: Usted tambien puede escribir a:
2200 Renaissance Blvd., Ste. 400 2200 Renaissance Blvd., Ste. 400
King of Prussia, PA 19406-2755 King of Prussia, PA 19406-2755
You may contact the Texas Department of Puede comunicarse con el Departamento de
Insurance to obtain information on companies, Seguros de Texas para obtener informacion
coverages, rights or complaints at acerca de companias, coberturas, derechos o
1-800-252-3439 quejas al
1-800-252-3439
You may write the Texas Department of Insurance Puede escribir al Departamento de Seguros
Consumer Pro,ection(111-1A) de Texas Consumer Protection(111-1A)
P. O. Box 149091 P. O. Box 149091
Austin, TX 78714-9091 Austin, TX 78714-9091
FAX: (512)490-1007 FAX# (512)490-1007
Web: http://www.tdi.texas.gov Web: ht-tp://www.tdi.texas.Qgov_
E-mail: ConsumerProtectiongtdi.texas og_v E-mail: ConsumerProtectionna tdi.texas gov
PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS O RECLAMOS:
Should you have a dispute concerning your Si tiena una disputa concerniente a su prima o a
premium or about a claim you should first un reclamo, debe comunicarse con el agente o
contact the agent or call 1-800-843-6446. primero. Si no se resuelve la disputa, puede
If the dispute is not resolved, you may contact the entonces comunicarse con el departamento (TDI)
Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR UNA ESTE AVISO A SU POLIZA:
POLICY:
This notice is for information only and does not Este aviso es solo para proposito de informacion
become a part or condition of the attached y no se convierte en parte o condicion del
document. documento adjunto.
NP 70 68 09 01
LMS-15292 10/15
THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND.
This Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated.
American Fire and Casualty Company Liberty Mutual Insurance Company Certificate No. 7114583
The Ohio Casualty Insurance Company West American Insurance Company
I
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS: ThatAmerican Fire&Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under the laws of
the State of New Hampshire,that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts,and WestAmerican Insurance Company I
y is a corporation duly organized under the laws of the State of Indiana(herein collectively called the"Companies"),pursuantto and by authority herein set forth,does hereby name,constitute
and appoint, Tomi J Pope,Paul W Bower Bill Ballinger Richard S Maxey Candace Reynolds Brian A Smith Andrew P Clark Kevin Claborn Hilaria
Tijerina,Rachel Duncan,Melissa Allaire David W Morgan Diana Perez Colin E Conly,Mark Rozewlcz LaCasha Grimes Sonia Lara Bryant Ahmed '
Zia Reeves,Teresa Skertchly,Todd Tschantz,Allsha Weis
I
all of the city of Dallas state of TX each individually if there be more than one named,its true and lawful attorney-in-fact to make,execute,seal,acknowledge
and deliver,for and on its behalf as surety and as its act and deed,any and all undertakings,bonds,recognizances and other surety obligations,in pursuance of these presents and shall
be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons.
IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 16th day of September 2015
PP10 CASU �N INso �Wso PwsuR - - American Fire and Casualty Company
QF.\,oavorWrF'q� JP s+�'o2:rR9 JP pro q't/ C,P N
The Ohio Casualty Insurance Company W
1906 no 1919 o s 1912 1991 Liberty Mutual Insurance Company ai
a a N ti West merican Insurance Company
J'�Ly`"�i�t��*� �'y�"'ynmes����-AD ygi7�rsr�cr+u'���' �� �,;��nr�F <' •3
r * * * By:
= STATE OF PENNSYLVANIA ss David M.Care ;;Assistant Secretary
L COUNTY OF MONTGOMERY cc
ca �
d On this 16th day of September , 2015, before me personally appeared David M. Carey,who acknowledged himself to be the Assistant Secretary of American Fire and O
ww Casualty Company,Liberty Mutual Insurance Company,The Ohio Casualty Insurance Company,and West American Insurance Company,and that he,as such,being authorized so to do, �,�
O R execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. C W
'a—)> IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting,Pennsylvania,on the day and year first above written. Lr—.
.� ca
N 3 � CL
gP PAS,, COMMONWEALTH OF PENNSYLVANIA
� 1 /J '�l ��%�� Q M
gtitiON W� Notarial Seal /'
Teresa Pastella,Notary Public
By:
O i OF Plymouth Twp.,Montgomery County Teresa Pastella,Notary Public L
L ��p My Commission Expires March 28,2017 a
0 'LOT <y� G Member,Pennsylvania Association of Notaries
CL
C ca This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of American Fire and Casualty Company,The Ohio Casualty Insurance cn
6 r Company,Liberty Mutual Insurance Company,and West American Insurance Company which resolutions are now in full force and effect reading as follows: c
�6i
L ARTICLE IV—OFFICERS—Section 12.Power ofAttorney.Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President,and subject O r—
to such limitation as the Chairman or the President may prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute,seal, y
O.S acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attorneys-in-fact,subject to the limitations set forth in their respective
E y powers of attorney,shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so '�m
"O i executed,such instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attorney-in-fact under >
12 T the provisions of this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or authority.
v ARTICLE XIII—Execution of Contracts—SECTION 5.Surety Bonds and Undertakings.Any officer of the Company authorized for that purpose in writing by the chairman or the president, r o0
Cq
,.. P y P PP y = y necessary> and subject to such limitations as the chairman or the resident may rescribe,shall appoint such attorne s in fact,as may be necessa to actin behalf of the Company to make,execute, M
O 3 seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attomeys-in-fact subject to the limitations set forth in their =M
Z v respective powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so 010
executed such instruments shall be as binding as if signed by the president and attested by the secretary. v T—
O
Certificate of Designation—The President of the Company,acting pursuant to the Bylaws of the Company,authorizes David M.Carey,Assistant Secretary to appoint such attorneys-i ~n- Q—
fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety
obligations.
Authorization—By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company,wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds,shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I,Gregory W.Davenport,the undersigned,Assistant Secretary,of American Fire and Casualty Company,The Ohio Casualty Insurance Company,Liberty Mutual Insurance Company,and
West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full,true and correct copy of the Power of Attorney executed by said
Companies,is in full force and effect and has not been revoked.-
IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies thin �dayf
20
Pp10CASU �J'NINSU tPliUa NKsu
�oHvorrgr�92� �----�
1906 0 0 1919 1917_ `0 1991 ° B
Gregory W.Davenport,Assistant Secretary
* *
I
149 of 500
LMS 12873 122013
FORTWORT H REV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR& PROJECT DATA
Name of Contractor Project Name
C.W.Young Construction, LP Primrose Crossing Phase 3-13
DOE Inspector DOE Number
John Crowley CPN#02703
DOE Inspector Project Manager
Q Water 0 waste water Storm DrainageO Pavement Khal Jaafari
Initial Contract Ainount Project Difficulty
$366,129.10 O Simple 0 Routine
Complex
Final Contract Amount Date
$366,129.10 3/22/2017
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 3 60 45
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 368
BONUS POINTS(25 Maximum)(B)
III)CONTRACTOR'S RATING TOTAL SCORE(TS) 368
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS] 100%) 368 / 448 = 82%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
c
Signature DOE Inspector Signature Contractor
Signature DOE Inspector's Supervisor d
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
Q)
(817)392-7941 •Fax: (817)392-7845
FORTWORTHREV:02'22/07
TRANSPORTATION AND PUBLIC WORDS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date:
Name of Contractor Project Name
C.W.Young Construction,LP Primrose Crossing Phase 3-B
DOE Inspector Project Manager
John Crowley Khal Jaafari
DOE Number Project Dculty Type of Contract
CPN#2703 O Simple Q Routine Q Complex Q Water El Waste WaterO Storm Drainage Pavement
Initial Contract Amount Final Contract Amount
$124,784.56 $124,784.56
In PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector I �> I Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 2 Clarity& Sufficiency of Details
3 Accuracy of Measured Quantities L 3 Applicability of Specifications
4 Display Of Professionalism 3 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution L-( PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager c
1 Change Order Processing Time j L( 3 Communication
2 Timliness of Contractor Payments L/ 14 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe L/
III)COMMENTS&SIGNATURES
COMMENTS
+ \ e
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor AOV/— 4-
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
(a The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817) 392-7941 •Fax: (817)392-7845
FO. RT WORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT" FOR:
PROJECT NAME: Primrose Crossing Phase 3-B
PROJECT NUMBER: 2703
DOE NUMBER:
WATER
PIPE LAID SIZE TYPE OF PIPE LF
C-900 8" PVC 3614
FIRE HYDRANTS: 6 VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES: p oe v
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
SDR-26 8" PVC 2562
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES: gig -3 ®ey{t
TRANSPORTATION AND PUBLIC WORKS
E
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
i
FIRST TEXAS°
HOMES
March 27, 2017
Mr.Trey Stewart
C.W.Young Construction, L.P.
210 S.Sixth Street
Mansfield,Texas 76063
Re: Contract for Primrose Crossing, Phase 3B
City Project No.47662
Dear Trey:
This letter will document that First Texas Homes confirms that C.W.Young Construction, L.P. has
completed the Work associated with the above-referenced contract in an appropriate time frame,
subject to completion of any warranty or maintenance work as identified and required by the City of
Fort Worth,and that no liquidated damages will be assessed by First Texas Homes in connection with
the Work.
First Texas Homes, Inc.
L, \-, L, —
Keith Hardesty
Cc: John Crowley, City of Fort Worth
Pete Werner
500 Crescent Court,Suite 350 • Dallas,Texas 75201 • 214-613-3400 • Fax 214-432-0350
vv ww.F irstTexaslYoiiies.coin-I