Loading...
HomeMy WebLinkAboutContract 47661-FP2 Department of T &W Co st. Services CP,N# Date! Projec an ger Risk Manageme ano D.O.E. RT WORTH® L )� Brotherton CITY SECRETLY CFA Morales/Scanned - CONTRACT NO. Gutzler/Scanned 1 The Proceeding people have been Contacted concerning the request for final payment& have rATION AND PUBLIC WORKS released this project for such payment. DF PROJECT COMPLETION (Developer Projects) Clearance Conducted By 01"266a`�����— 3&� �/� City Project Ne: 02703 0-�� �4�/ /11 4C sAe y7G6i Regarding contract 02703 for PRIMROSE CROSSING PHASE 3B as required by the TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through Ivf&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the reconunendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Price: $524,071.45 Amount of Approved Change Orders: Ns Revised Contract Amount: - Total Cost Work Completed: $524,071.45 VIVA (� ti`lftv 1 Recommended for Acceptance Date Asst. Director, TPW - Infrastructure Design and Construction )� L".-, �- Oho? Accepted Date ab Director, TRANSPORTATION & PUBLIC WORKS Asst. City Manager Date Comments: � i . Rev.9/22/16i ! FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name PRIMROSE CROSSING,PH 3B Contract Limits Project Type PAVING City Project Numbers 02703 DOE Number 2703 Estimate Number I Payment Number I For Period Ending 3/20/2017 WD City Secretary Contract Number Contract Time 2WD Contract Date Days Charged to Date 234 Project Manager NA Contract is 100.00 Complete Contractor L.H.LACY COMPANY P.O.BOX 541297 DALLAS, TX 75354 Inspectors DICKINSON / CROWLEY Monday,March 20,2017 Page I of 4 City Project Numbers 02703 DOE Number 2703 Contract Name PRIMROSE CROSSING,PH 3B Estimate Number I Contract Limits Payment Number I Project Type PAVING For Period Ending 3/20/2017 Project Funding PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 REMOVE CONCRETE CURB&GUTTER 69 LF $10.21 $704.49 69 $704.49 2 MEDIUM STONE RIPRAP DRY 60 SY $76.44 $4,586.40 60 $4,586.40 3 MEDIUM STONE RIPRAP GROUTED 16 SY $98.28 $1,572.48 16 $1,572.48 4 HYDRATED LIME 200 TN $134.32 $26,864.00 200 $26,864.00 5 6"LIME TREATMENT 12531 SY $2.39 $29,949.09 12531 $29,949.09 6 6"CONC PVMT 360OPSI a 28DAYS 11809 SY $35.99 $425,005.91 11809 $425,005.91 7 4"CONC SIDEWALK 56 SF $9.38 $525.28 56 $525.28 8 BARRIER FREE RAMP 10 EA $1,298.28 $12,982.80 10 $12,982.80 9 BARRIER FREE RAMP 2 EA $1,153.84 $2,307.68 2 $2,307.68 10 INSTALL ALUM SIGN GROUND MOUNT 10 EA $354.90 $3,549.00 10 $3,549.00 11 TRAFFIC CONTROL 1 MO $1,365.00 $1,365.00 1 $1,365.00 12 REMOVE AND RELOCATE EXISTING 1 EA $1,318.54 $1,318.54 1 $1,318.54 BARRICADE 13 INSTALL STANDARD BARRICADE 3 EA $1,218.40 $3,655.20 3 $3,655.20 14 PAVEMENT HEADER 124 LF $8.24 $1,021.76 124 $1,021.76 15 T DOUBLE YELLOW BUTTONS 237 LF $2.46 $583.02 237 $583.02 16 SIGNSWI-11, 2 EA $382.20 $764.40 2 $764.40 17 SIGNS WI-1R 2 EA $382.20 $764.40 2 $764.40 18 SIGNS W13-1P 2 EA $382.20 $764.40 2 $764.40 19 STOP SIGN ONLY 8 EA $191.10 $1,528.80 8 $1,528.80 20 NAME BLADE ONLY 10 EA $425.88 $4,258.80 10 $4,258.80 Sub-Total of Previous Unit $524,071.45 $524,071.45 Monday,March 20,2017 Page 2 of 4 City Project Numbers 02703 DOE Number 2703 Contract Name PRIMROSE CROSSING,PH 313 Estimate Number I Contract Limits Payment Number I Project Type PAVING For Period Ending 3/20/2017 Project Funding Contract Information Summary Original Contract Amount $524,071.45 Chane Orders Total Contract Price $524,071.45 Date 3 �� Total Cost of Work Completed $524,071.45 n actor Less %Retained $0.00 Net Earned $524,071.45 Date •J Earned This Period $524,071.45 �spection Supervisor Retainage This Period $0.00 0"r A. Date Less Liquidated Damages Pr ject Man er GV �� Days @ /Day $0.00 1 Date LessPavement Deficiency $0.00 st. irector/TPW-Infrastructure Design and onstruction Less Penalty $0.00 Date -7 Less Previous Payment $0.00 Direc /Contracting Depa lent Plus Material on Hand Less 15% $0.00 Balance Due This Payment $524,071.45 Monday,March 20,2017 Page 3 of 4 City Project Numbers 02703 DOE Number 2703 Contract Name PRIMROSE CROSSING,PH 3B Estimate Number I Contract Limits Payment Number I Project Type PAVING For Period Ending 3/20/2017 Project Funding Project Manager NA City Secretary Contract Number Inspectors DICKINSON / CROWLEY Contract Date Contractor L.H.LACY COMPANY Contract Time 25 WD P.O.BOX 541297 Days Charged to Date 234 WD DALLAS, TX 75354 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $524,071.45 Less %Retained $0.00 Net Earned $524,071.45 Earned This Period $524,071.45 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $524,071.45 Monday,March 20,2017 Page 4 of 4 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS STATEMENT OF CONTRACT TIME STATEMENT# FINAL STATEMENT# 1 Pro# 2703 NAME OF PROJECT: Primrose Crossing,Phase 3-B Contractor I L.H.Lacy,LTD YEAR: 'QtG PROJECT NO.: FINAL INSPECTION DATE 7118/2016 2703 WD CD CONTRACT TIME 160 X PERIOD FROM: 3/1/2017 TO: 3/15/2017 BEG Month IDEVELOPMEN11(N /N)I N WORK ORDER EFFECTIVE: 1 4125/2016 y MID /n n 146.3% DAY OF MONTH DAYS REASON FOR DAY OF MONTH DAYS REASON FOR CHARGED DAYS CREDITED CHARGED DAYS CREDITED 1 Wed 1 N/A 16 N/A 2 Thu 1 N/A 17 N/A 3 Fri 1 NIA 18 N/A 4 Sat 1 N/A 19 N/A 5 Suri 1 N/A 20 NIA 6 Mon 1 N/A 21 N/A 7 Tue 1 N/A 22 N/A 8 Wed 1 N/A 23 N/A 9 Thu 1 NIA 24 N/A 10 Fri 1 N/A 25 N/A 11 Sat 1 N/A 26 NIA 12 Sun 1 N/A 27 N/A 13 Mon 1 NIA 28 N/A 14 Tue 1 NIA 29 N/A 15 Wed 1 NIA 30 N/A 31 N/A NA Wkn&Hol Wea utl 0th Not Applicable SAT,SUN,and WEATHER UTILITIES OTHERS DAYS TOTAL DAYS HOLIDAYS RELOCATE CHARGED THIS PERIOD 0 0 0 0 0 PREVIOUS PERIOD 0 234 234 TOTAL TO DATE 1 0 0 0 0 1 234 234 REMARKS: Time Was Stopped 12/14/2016 Signature: Signature: (Print Name) (Print Name) John Crowley CONTRACTOR L I-I L*-(. DATE 3 Z 3 INSPECTOR DATE /L FORTWORTHREV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Name of Contractor Project Name L.H. Lacy Company,LTD Primrose Crossing Phase 3-13 DOE Inspector DOE Number John Crowley CPN#2703 DOE Inspector Project Manager ❑ Water❑ Waste Water❑ Storm Drainag421 Pavement Khal Jaafari Initial Contract Amount Project Difficulty $524,071.45 O Simple Routine O Complex Final Contract Amount Date $524,071.45 3/22/2017 II)PERFORMANCE EVALUATION 0-Inadequate I -Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 3 8 6 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 3 20 15 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 3 20 15 12 After Hours Response 5 Y 3 20 15 13 Project Completion 5 Y 3 20 15 TOTAL ELEMENT SCORE(A) 361 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 361 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating(ITS/MS] * 100%) 361 / 448 = 81% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector Signature Contractor Signature DOE Inspector's Supervisor ,7j,,,/ CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS (D The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845 CONSENT X111(- SUNET ll O\VNF.R ❑ T RNAL PAYMENT ARMITECT ❑ CONTRACTOR ❑ t.ZAFocunwnt G70% SURar'y )0 Bond No. 4099327 OTHER ❑ TO OWNER: ARCHITECT'S PROJECT NO.: fNa,ne eaid adehrv) City of Fort Worth & First Texas Homes CONTRACT FOR- Construction 500 Crescent Court#350 Dallas, TX 75201 PROJECT: CONTRACT DA'Z'ED: (Netme and adrh-i?o Primrose Crossing Phase 3B In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (l+apw r:unne and add)xm ojSm-eti) Great American Insurance Company of New York 1111 North Loop West, Suite 400 Houston, TX 77008 SURFTY, on bond of {lnsen+aan+r and addrsss q�'Cont+wcro+) L.H. Lacy Company, Ltd. 1880 Crown Road Dallas, TX 75234 CONTRACTOR, hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any of Its obligations to (hzwrr ncu+re a+rd add�rs�of(ktwc,J City of Fort Worth & First Texas Homes 500 Crescent Court#350 Dallas, TX 75201 OWNER, as set ford)in said Surety's bond. IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: March 10, 2017 (Arse+Y in 1<�+iN,+(;1/%,wontbMo ouwd kv dxt tuune i[date and]var,) Great American Insurance Company of New York (Srar.NY) f By: � Wen .Attsst: Joni Attorney-in-Fact (sew); Tabith Stare ness (Arirued,ru+r+e u++d titJa) G707-1994 GREAT AMERICAN INSURANCE COMPANY OF NEW YORK New York Administrative Office:301 E 4TH STREET • CINCINNATI,OHIO 45202 • 513-369-5000 • FAX 513-723-2740 The number of persons authorized by this power of attorney is not more than TEN No. 0 15054 POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS:That the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK,a corporation organized and existing under and by virtue of the laws of the State of New York, does hereby nominate, constitute and appoint the person or persons named below its true and lawful attorney-in-fact,for it and in its name, place and stead to execute on behalf of the said Company,as surety, any and all bonds, undertakings and contracts of suretyship,or other written obligations in the nature thereof;provided that the liability of the said Company on any such bond,undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below. Name Address Limit of Power DAVID G.MICLETTE KRISTI LOVETT ALL OF ALL EDWARD G.BRITT,JR. JENNIE GOONIE HOUSTON, $100,000,000.00 BARRY K.McCORD TABITHA STARKEY TEXAS DAVID T.MICLETTE BRETT A.TISDALE JONI BOWEN ASHLEY BRITT This Power of Attorney revokes all previous powers issued on behalf of the attorney(s)-in-fact named above. IN WITNESS WHEREOF,the GREATAMERICAN INSURANCE COMPANY OF NEW YORK has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 5TH day of DECEMBER , 2016 Attest GREAT AMERICAN INSURANCE COMPANY OF NEW YORK RA COP70L E%3N w E1YHFd' tF C • Ile. Assistant Se cretaiy Divisional Senior Pice President DAVID C.KITCHIN(877-377-2405) STATE OF OHIO,COUNTY OF HAMILTON-ss: On this 5TH day of DECEMBER 2016 ,before me personally appeared DAVID C.KITCHIN,to me known, being duly sworn, deposes and says that he resides in Cincinnati, Ohio,that he is a Divisional Senior Vice President of the Bond Division of Great American Insurance Company of New York,the Company described in and which executed the above instrument; that he knows the seal; that it was so affixed by authority of his office under the By-Laws of said Company, and that he signed his name thereto by like authority. 3usanA Koholg _ NatarY Pubic,SW dohio My Colalrrtlaton Eon*18,2Q20 This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great American Insurance Company of New York by unanimous written consent dated May 14, 2009. RESOLVED: That the Divisional President, the several Divisional Senior Vice Presidents,Divisional Vice Presidents and Divisional Assistant Vice Presidents, or any one of them, be and hereby is authorized, from time to time, to appoint one or more Attorneys-in-Fact to execute on behalf of the Company, as surety,any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof,,to prescribe their respective duties and the respective limits of their authority,and to revoke any such appointment at any time. RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond, undertaking, contract of suretyship, or other written obligation in the nature thereof, such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the Company with the same force and effect as though manually affixed. CERTIFICATION I,STEPHEN C. BERAHA,Assistant Secretary of Great American Insurance Company of New York,do hereby certify that the foregoing Power of Attorney and the Resolutions of the Board of Directors of May 14, 2009 have not been revoked and are now in full force and effect. Signed and sealed this 1C day of M,OQ.YC)V-�, • Assistant SecretaAy S1185L(06/15) AFFIDAVIT STATE OF Texas COUNTY OF Dallas Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Ronald S. Murawski, President of L.H. Lacy Company, Ltd., known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said, That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as: Primrose Crossing, Phase 3B —City Project 47661 BY i 'Ronald S. Murawski Subscribed and sworn before me on this date D of ��;'�+. � '� ' 2017. Notary, State of Texas, County of Dallas DARLENE CONEY e Notary ID # 10317301 My Commission Expires s March 9, 2020 - N FIRST TEXAS® HOMES March 27, 2017 Mr. Ben Drake L.H. Lacy Company, LTD. P.O. Box 541297 Dallas,Texas 75354 Re: Contract for Primrose Crossing, Phase 3B City Project No.47662 Dear Ben: This letter will document that First Texas Homes confirms that L.H. Lacy Company, LTD. has completed the Work associated with the above-referenced contract in an appropriate time frame,subject to completion of any warranty or maintenance work as identified and required by the City of Fort Worth, and that no liquidated damages will be assessed by First Texas Homes in connection with the Work. First Texas Homes, Inc. L �--� Keith Hardesty Cc: John Crowley, City of Fort Worth Pete Werner 500 Crescent Court,Suite 350 • Dallas,Texas 75201 • 214-613-3400 • Fax 214-432-0350 WWW 1'4rsC1'c.xasllomes coni ,Ww ' FORTWORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.FINAL NAME OF PROJECT: HIGHPOINT ON SOUTH MAIN PROJECT NO.: CPN 02514 CONTRACTOR: KWA CONSTRUCTION DOE NO. 7392 PERIOD FROM TO: FINAL INSPECTION DATE: WORK ORDER EFFECTIVE CONTRACT TIME 132 O WDO CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL & HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS THIS 0 0 PERIOD PREVIOUS 660 660 PERIOD TOTALS 660 660 TO DATE "REMARKS: 100%COMPLETE 9 it CONTRACTOR DATE T DATE ENGINEERING DEPAR IENT The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX-76012-6311 0 (817) 392-7941 •Far-: (817)392-7845 U qO b 0 O V � U t Q 0 O p b T ru o $. wz � � � ZW N S� W U p � M Z � $ r, Z 00 O p N N N C7 F V " i air:` m W Z 00 00 v) Z n� n v+ V ui d $ Qu w w Z z A a. C c r 6 z o v a 0. d' a IS o u Q Z 2IN w z � o W w c � Qems- p' 'S o o o N c5 d •• o N I O N0) NN o � a n K otu $ w Q t U U Q $ mon o °w ~ Z a $ boa Z F- z d a W o z Q W J w z 0 > CoUoui 0: ao aaUU3 ¢R. W W w N n \ � #i OM §*-C-4 CR • F fa_-~ __° § ) )§[B)k k__ ®--®-- \ @ { / � a $ m 2 F- 31 1 cc kkk2k§ \ \ � k § \ k z o E a � { \ Z £ ) k t §§� »§bw / 2 ■ { .. ! � � $ - k mmg 7 § $ \\o)�§) &A§W 2gGR@gR \ 2 ) 2 * \ § ± k k ) � z � - k / ; § @ ) )k k ) } k 2 E INVESTMENTS March 22,2017 Keller W. Webster KWA Construction LP 16800 Westgrove Suite 300 Addison,TX 7500 Re: High Point on South Main Fort Worth,TX Release of Liquidated Damages Keller: This letter,which we acknowledge is supported by our receipt of good and valuable consideration, shall serve as our release of KWA Construction from any claim for Liquidated Damages as provided in paragraph 3.3 of the Section 00 52 43 Agreement dated April 20,2015 by and between High Point on South Main,LP as "Developer" therein and KWA Construction,LP as"Contractor"therein(the"Agreement"). It is the intention of High Point on South Main,LP by this letter to release and hold KWA harmless from any and all financial obligations by reason of the provisions of paragraph 3.3 of the Agreement and to waive any and all claims for liquidated damages thereunder. This release and waiver shall extend to any and all parries,known or unknown,that may claim any interest whatsoever under the Agreement. High Point on South Main,LP By:HPOSM Venture,LLC,its GP By: i- !&6a Wainer E. Stone,Manager 16800 Wes4qme,Suite 100♦Addison,Texas 75001 21-1.265.8686 ♦ wwtiv Senlimcons FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I) PROJECT INFORMATION _ Date: 3/22/2017 Name of Contractor Project Name L.H.Lacy Company,LTD Primrose Crossing Phase 3-13 DOE Inspector Project Manager John Crowley Khal Jaafari DOE Number Prglec!D&rJculty Type of Contract CPN#2703 O Simple @) Routine O Complex ❑ Water Waste Water❑ Storm DrainageE Pavement Initial Contract Amount Final Contract Amount $524,071.45 $524,071.45 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions 3 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 3 Accuracy of Measured Quantities _ 3 3 Applicability of Specifications 3 4 Dis lay Of Professionalism 4 Accuracy of Plan Quantities 3 5 Citizen Complaint Resolution H PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews, Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availabilityof Project Manager 1 Change Order Processing Tune 3 Communication 2 Tininess of Contractor Payments ( �( 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timefi•ame III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS n s' The C4 of Fort Worth• 1000 Throckmorton Street•Fort Worth,TZ 76012-6311 (817)392-7941 •Fax: (817)392-7845