Loading...
HomeMy WebLinkAboutContract 48971 CITY SECRETARY CCNTRACTNO. Developer and Project Information Cover Sweet: Developer Company Name: Southwestern Baptist Theological Seminary Address, State, Zip Code: 2001 W. Seminary Dr Phone &Email: 817-923-1921, kensley@swbts.edu Authorized Signatory, Title: Kevin Ensley,VP of Business Administration Project Name and Brief Southwestern Baptist Theological Seminary Evangelical&Missions Building Description: Project Location: 2000 W. Spurgeon Plat Case Number: FS-009-196 Plat Name: Seminary Hill Addition Mapsco: F90K Council District: 9 City Project Number: 100027 CFA Number: 2016-023 DOE Number: None To be compl to by staff Received by: ate: V—�/r7�� r City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 �F�ICI�h �' � Page 1 of 12 CITY SECRETARY STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Southwestern Baptist Theological Seminary, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as SW Baptist Theological Seminary Evangelical and Missions Building ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 2 of 12 further acknowledges that said acceptance process requires the Developer's contractor(s) to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) © Sewer (A-1) ©', Paving (B) © Storm Drain(B-1) ®,, Street Lights & Signs (C) 01.. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 3 of 12 bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 4 of 12 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in tivhole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 5 of 12 and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 6 of 12 iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 7 of 12 Cost Summary Sheet Project Name: SW Baptist Theological Seminary Evangelical&Missions Building CFA No.: 2016-023 DOE No.: None An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 8 of 12 } Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 18,400.00 2. Sewer Construction $ 115.00 Water and Sewer Construction Total $ 18,515.00 B. TPW Construction 1. Street $ 91,968.00 2. Storm Drain $ 21,672.00 3. Street Lights Installed by Developer $ 2,280.00 4. Signals $ - TPW Construction Cost Total $ 115,920.00 Total Construction Cost(excluding the fees): $ 134,435.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 370.30 D. Water/Sewer Material Testing Fee(2%) $ 370.30 Sub-Total for Water Construction Fees $ 740.60 E. TPW Inspection Fee(4%) $ 4,545.60 F. TPW Material Testing(2%) $ 2,272.80 G. Street Light Inspsection Cost $ 91.20 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 6,909.60 Total Construction Fees: $ 7,650.20 Choice Financial Guarantee Options, choose one Amount Mark one Bond=100% $ 134,435.00 Completion Agreement= 100%/Holds Plat $ 134,435.00 Cash Escrow Water/Sanitary Sewer= 125% $ 23,143.75 x Cash Escrow Paving/Storm Drain = 125% $ 144,900.00 x Letter of Credit= 125%w/2yr expiration period $ 168,043.75 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH Date: Recommended by.- Jesus y:Jesus J. Chapa Assistant City Manager Wendy Chi-Babulal, EMBA, P.E. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 9 of 12 Development Engineering Manager DEVELOPER Water Department Southwestern Baptist Theological Seminary Douglas . Wiersig, P.E. Namei Kevin Ensl Director Title: VP of Business dministration Transportation & Public Works Department / n Date: Approved as to Form &Legality: ATTEST: (Only if required by Developer) A. Yl'l�' la4eh Assistant City Attorney Signature Name: M&C No. N I A Date: H 117 Foe" 1295: A)[A ATTEST: Mary J. a s r City Secrry OFFICIAL, RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement FT. WORTH]TX CFA Official Release Date: 07.30.2015 Page 10 of 12 ` Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Date: LJ b-1/"7 Janie S. Morales J�Y1 Development Ma ager Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement ❑X Location Map Exhibit A: Water Improvments Water Cost Estimate FX Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate ©' Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate Di Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 11 of 12 ATTACIEWENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100027 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 12 of 12 N 0 10 20 40 GRAPHIC SCALE IN FEET LEGEND — — — PROPERTY LINE EASEMENT LINE O POINT FOR CORNER (UNLESS OTHERWISE NOTED) CONTRACTOR TO MOVE EX. FIRE HYDRANT TO A MAXIMUM OF 9' AWAY FROM BACK OF I CURB c� ASPHALT PA/EMENT CD 3 PER PLAN V SEE NOTE ) E E o , ui BEGIN WATERLINE LOWERING. REF N DETAIL 1 SHEET 12 — — — — — — o — o ICV W W— o E WV WV E END WATERLINE Tv 730.72LOWERING. REF —� UNABLE To oP DETAIL 1 SHEET 12 i — 6"q i I CD — V 8 W - - - 8„W- W CONNECT TO LOWERED o ASEMFFL I 749.60 3, PG. ) I F_ — — -8" WATER LINE. REF 24"W I —DETAIL 3 SHEET 12 _ ASPHALT RIM8"(W=74gOf I I.78 PAVEMENT Cl FL a"(E =741.0t I _BEGIN WATERLINE 8"SS — o —8"S� S LOWERING. REF F� — — I DETAIL 3 SHEET 12 WV PROP. 30" PUBLIC STORM TN 747.40 749.42 TN DRAIN. REF. SHEET 11 FOR 30 R C.P. L' � — -r2" c. ADDITIONAL DETAILS a N N END WATERLINE — BEGIN WATERLINE — LOWERING. REF FL(E)=746.2 LOWERING. REF INLET T46.2 9 9.z4 DETAIL 2 SHEET 12 � DETAIL 2 SHEET 12 o„ I 0 N 0 6100WESTERN PLACE, SUITE 1001 Pacheco Koch FORT WORTH, TX 76107 817.412.7155 SOUTHWEST BAPTIST TX REG. ENGINEERING FIRMTHEOLOGICAL SEMINARY DALLAS FORT WORTH HOUSTON TX REG. SURVEYING FIRM LS-100-100 080-01 > DRAWN BY CHECKED BY SCALE DATE JOB NUMBER LOCATED IN THE CITY OF FORT WORTH, TEXAS w TSR JCM 1"=20' 03/03/2016 1 3139-15.036 TARRANT COUNTY, TX DWG FILE: 3139-15.036UT.DWG XREF FILE: 3139-15.036BA.DWG C NHOoOIr qv[aEm 9v BEYER N 0 10 20 40 GRAPHIC SCALE IN FEET LEGEND - - - PROPERTY LINE EASEMENT LINE O POINT FOR CORNER (UNLESS OTHERWISE NOTED) u STA 0+40.32 LINE "SS-1" INSTALL: 1-6" CLEANOUT @ PROPERTY LINE FL 6"=742.62 (S) FL 6"=742.62 (N) E- 0 E j W W 0 �i m SIG r N o I 8"W -8"W- - o PROP. SDR-26 6" S.S. @ 6.0% 24"W 2L„W 24"W 24"W u RIM=751.18 CD FL 8"(W)=740.2± ( j FL 8"(S)=740.2± 8"SS S W SPURGEON STREE 0 i STA 0+00.00 LINE "SS-1" i CONNECT TO EX. MANHOLE " Cn FL 6"=740.20 (N) 00 a 8„W N 0 0 0 100 WESTERN01 Pacheco Koch FORT WORTH, TX L7 107SU817412.7155 SOUTHWEST BAPTIST N TX REG. ENGINEERING FIRM THEOLOGICAL SEMINARY DALLAS . FORT WORTH HOUSTON TX REG. SURVEYING FIRM LS-100-100 080-01 > DRAWN BY CHECKED BY SCALE DATE JOB NUMBER LOCATED IN THE CITY OF FORT WORTH, TEXAS TSR JCM 1"=20' 03/03/2016 3139-15.036 TARRANT COUNTY, TX DWG FILE: 3139-15.036UT.DWG E N N O o O Y "C"o P Q WM 0 EXISTING PRIVATE WALK 0 30 60 120 1 PROPOSED C GRAPHIC SCALE IN FEET CONCRETE CURB 1 LEGEND — — — PROPERTY LINE EASEMENT LINE O POINT FOR CORNER (UNLESS OTHERWISE NOTED) 4'REINFORCED CONCRETE (CLASS'A', 3000 PSI) I PARKING&DRIVE AISLES, 5'REINFORCED CONCRETE PAVEMENT (CLASS°C', 3600 PSI) IFIRE LANE, 6'REINFORCED CONCRETE PAVEMENT PROPOSED (CLASS°C'. 3600 PSI) __dBARRIER FREE MATCH EX. ASPHALT SECTION RAMP TYPE P-2 PROPOSED FIRE O LANE DRIVEWAY O O O O a PROPOSED BARRIER FREE Z RAMP TYPE N �ti P-2 Q cc W N CONNECT TO > Q EXISTING CONCRETE C CURB AND GUTTER 0 0 d� ( PROPOSED PROPOSED FIRE I — PROPOSED 8' LANE DRIVEWAY PROPOSED BARRIER WIDE SIDEWALK BARRIER FREE FREE RAMP PROPOSED TYPE P-2 c� er n.aw BARRIER FREE RAMP TYPE R-1 o - - RAMP TYPE R-1 - W SPURGEON STREET >= PROPOSED N PROPOSED 6" PRIVATE T-_ REPAIR EX. - CONCRETE CURB - - DRIVEWAY VALLEY GUTTER AND GUTTER 0 6100 , N \ /� ^ /� c' fy_ Pacheco KochFORT TXPLACE SOUTHWEST BAPTIST 3 TX REG. ENGINEERING FIRM THEOLOGICAL SEMINARY DALLAS ■ FORT WORTH HOUSTON TX REG. SURVEYING FIRM LS-100-100 080-07 > DRAWN BY CHECKED BY SCALE DATE JOB NUMBER LOCATED IN THE CITY OF FORT WORTH, TEXAS POS TSR 1"=60 ' 03/03/2016 3139-15.036 TARRANT COUNTY, TX DWG FILE: 3139-15.036EP.DWG if z� 0 10 20 40 I GRAPHIC SCALE IN FEET °O ( LEGEND — — — PROPERTY LINE EASEMENT LINE POINT FOR CORNER 00 0 (UNLESS OTHERWISE NOTED) � I c C7 0 ul ul 0 m � r N I END OF PROPOSED PUBLIC 30" STORM DRAIN PROP. 72 LF OF 30" CLASS III RCP STORM DRAIN 8"w- -8"W g"W o / i " 24"W � 24„W 24"W i rn EX. 30" STORM 8"SS 8"SS - DRAIN. REF. 8"SS RECORD DRAWING CONNECT TO EX. 10' CURB INLET o S-1899-45 W 00 30" R.C.P. 12" F.C.P. a N INLET TC=749.24 FL(E)=746.29 ° FL(W)=744.89 0 N Pacheco Koch FORT WORTH,6100 NTX 76107 817.412.7155 0017155 SOUTHWEST BAPTIST � TX REG. ENGINEERING FIRM -100F-469THEOLOGICAL SEMINARY DALLAS FORT WORTH ■ HOUSTON TX REG. SURVEYING FIRM LS-100080-Ot > DRAWN BY CHECKED BY SCALE DATE JOB NUMBER Cn LOCATED IN THE CITY OF FORT WORTH, TEXAS POS TSR 1"=20' 03/03/2016 3139-15.036 TARRANT COUNTY, TX DWG FILE: 3139-15.036ST.DWG LSln�l(1�0 0 0� "E"- LO W7OM 0 30 60 120 / GRAPHIC SCALE IN FEET ° LEGEND — — — PROPERTY LINE EASEMENT LINE O POINT FOR CORNER (UNLESS OTHERWISE NOTED) Rmll a w CONTRACTOR CD TO O � a INSTALL j ( LUMINAR N 0 ccW CD Fol N ' oc M N m I d CONTRACTOR TO ADD WOOD —� W SPURGEON STREET POLE ARM W/LUMINAIRE TO a EX. POWER POLE ON SOUTH cv — SIDE OF W SPURGEON T T 0 6100 WESTERN N O Pacheco Koch FORT WORTH, TX 1007SU81�412.7155 SOUTHWEST BAPTIST T TX REG. ENGINEERING FIRM -100 THEOLOGICAL SEMINARY r q DALLAS FORT WORTH HOUSTON TX REG. SURVEYING FIRM LS-100080-Ot > DRAWN BY CHECKED BY SCALE DATE MBLOCATED IN THE CITY OF FORT WORTH, TEXAS TSR JCM 1"=60,"=60' 03/03/2016 3139-15.036✓OBNUER TARRANT COUNTY, TX DWG FILE: 3139-15.036CV.DWG The Southwestern Baptist Theological Seminary Corporate Resolution I Kevin Ensley,do hereby certify that a meeting of the Board of Trustees of The Southwestern Baptist Theological Seminary(a corporation organized under the laws of Texas)duly called and held in the City of Fort Worth,State of Texas,on the 19th day of October,2004 at which a quorum was present and voting throughout, the following resolution,upon motion made,seconded and carried,was duly adopted as the action of the Board and has not been modified or rescinded and is now in full force and effect: "BE IT RESOLVED,that the President of the Seminary or the Vice President for Institutional Advancement of The Southwestern Baptist Theological Seminary be authorized to execute deeds, mineral deeds,transfer and division orders with respect to oil,gas and other minerals,leases, releases,transfers and assignments of notes,liens,stocks and bonds,contracts,or other instruments affecting real or personal property,or any other documents necessary or expedient in connection with the normal course of business of The Southwestern Baptist Theological Seminary,when attested by the Secretary of the Corporation." I Kevin Ensley,do further certify that there is no provision in the Charter or By-Laws of The Southwestern Baptist Theological Seminary limiting the power of the Board of Trustees to pass the foregoing resolution and do certify and warrant that the same is in conformity with the provisions of said Charter and the By-Laws of the Corporation and within its Corporate and lawful powers. I do further certify that the present officers of this corporation are as follows: Paige Patterson President Kevin Ensley Vice President for Business Administration Mike Hughes Vice President for Institutional Advancement PURPOSE: To authorize Kevin Ensley with signature authority for Community Facilities Agreement with City of Fort Worth. � WITNESS my hand and the seal of the corporation this Z day of P, � 20A. (Corporate Seal) i Rev" Ensley,Sec a STATE OF TEXAS COUNTY OF TARRANT SWORN TO AND,,SUBSCRIBE before me,a Notary Public of the State and County aforesaid,this—144-"day of 204- EE, SANDY D.MANNry Public.State of TexasNotary Public m.Expires 02-01-2019otary ID 128509559 Notary's name printed:6r L� M1 My Commission Expires: z 9 NATE OF TEXAS COUNTY OF TARRANT v� This instrument was acknowledged before me on this day of 20��by Kevin / Ensley. °pad^e, SANDY D.MAN% N S.,Notaiy Public.State of Texas Notary Public Comm.Expires 02-01-2019 Notary's name printed: b��c� �'Mann Notary ID 128509559 My Commission Expires: Z• (•2 61 q 00 42 43 DAP-BID PROPOSAL Page 1 of I SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Specification Unit of Bid No. Description Section NO. Measure Quantity Unit Price Bid Value Unit I-Water and Sewer Improvements 1 3305.0003 8"Waterline Lowering 33 05 12 EA 3 $5,800.00 $17,400.00 2 3305.0101 Fire Hydrant Stem Extension 33 0514 EA 1 1. $1,000.00 $1,000.00 3 3331.3201 6"Sewer Service 3331 50 EA 1 $75.00 $75.00 4 3305.0109 Trench Safety 33 05 10 LF 40 $1.00 $40.00 Unit I-Water and Sewer Improvements-Subtotal $18,515.00 Unit II-Paving and Drainage Improvements 5 0241.0300 Remove ADA Ramp 0241 13 EA 1 $300.00 $300.00 6 0241.0401 Remove Concrete Drive 0241 13 SF 5550 $0.60 $3,330.00 7 0241.1300 Remove Conc Curb&Gutter 024-1 15 LF 500 $3.60 $1,800.00 8 3110.0101 Site Clearing 31 1000 LS 1 $2,200.00 $2,200.00 9 3110.0102 6"-12"Tree Removal 31 1000 EA 4 $350.00 $1,400.00 10 3110.0103 12"-18"Tree Removal 31 10 00 EA 4 $350.00 $1,400.00 11 3110.0104 18"-24" Tree Removal 31 1000 EA 4 $350.00 $1,400.00 12 3125.0101 MOP>_1 acre 31 2500 LS 1 $5,000.00 $5,000.00 1 11 3 3201.0111 4'Wide Asphalt Pvmt Repair,Residential 32 01 17 LF 21 $70.00 $1,470.00 14 3201.0112 5'Wide Asphalt Pvmt Repair,Residential 320117 LF 51 $85.00 $4,335.00 15 32 13.0311 4"Conc Sidewalk,Adjacent to Curb 3213 20 SF 5709 -$5.52 $31,514.00 16 3213.0400 5"Concrete Driveway 32 13 20 SF 403 $2.73 $1,114.00 17 3213.0401 6"Concrete Driveway 32 13 20SF 2848 $3.13 $8,914.00 18 3213.0501 Barrier Free Ramp,Type R-1 32132 0 EA 2 $250.00 $500.00 19 3213.0507 Barrier Free Ramp,Type P-2 32 13 20 EA 4 $250.00 $1,000.00 20 3216.0101 6"Conc Curb and Gutter 32 1613 LF 547 $22.00 $1 1.2,034.00 21 3291.0100 Topsoil 3291 19 CY 29.5 $32.22 $950.00 22 3292.0100 Block Sod Placement 32 92 13 SY 420 $2.67 $1,121.00 23 3293.0104 Plant 4"Tree 326343 EA 5 $579.50 $2,898.00 24 3305.0109 Trench Safety 3305 10 LF 72 $1.00 $72.00 25 3341.0302 W'RCP,Class III 3341 10 LF 72 $300.00 $21,600.00 26 3471.0001 Traffic Control 3471 13 MO 1 $1,000.00 $1,000.00 27 9999.0000 Shrubs&Grasses-3,gal, 32 93 43 EA 425 $19.50 $8,288.00 28 2605.0121 Furnish/Install Elec Sery Pole Mnt 26 05 00 EA 1 $1,345.00 $1,345.00 29 2605.0122 Install Elec Sery Pole Mnt 26 05 00 EA 1 $485.00 $485.00 30 2605.3001 1 1/4"Condt PVC SCH 80(T) 26 05 33 LF 60 $7.50 $450.00 Unit II-Paving and Drainage Improvements-Subtotal 1 $115,920.00 Total Construction Bid 1 $134,435.00 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 0042 43 Bid Proposal_DAPxIs