Loading...
HomeMy WebLinkAboutContract 48972 CITY SEC140MY Com, 7i CONTRACT NO, b Developer and Project Information Cover Sheet: Developer Company Name: FG Aledo Development,LLC Address, State,Zip Code: 3045 Lackland Rd.,Fort Worth,TX 76116 Phone &Email: 817-731-7595,kgill@sableholdings.com I Authorized Signatory,Title: I Kimberly Gill, President Project Name: Morningstar Section 5 Phase 3 Off-Site Brief Description: Off-Site Sewer Project Location: FM 3325 Parker County j Plat Case Number: FP-16-023 Plat Name: Morningstar Development Mapsco 710-Z Council District: ETJ ' City Project Number: 100723 CFA Number: 2017-006 DOE Number: None To be completed by s ff Received by: Date: 1 ti O City of Fort Worth, Texas OFFICIAL,RECORD Standard Community Facilities Agreement-Morningstar Section 5 Phase 3 Off-Site CITY SECRETARY CFA Official Release Date: 01.03.2017 FTS WORTH,TX Page 1 of 12 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, FG Aledo Development, LLC , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Morningstar Section 5 Phase 3 Off-Site Sewer ("Project")within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Morningstar Section 5 Phase 3 Off-Site CFA Official Release Date: 01.03.2017 Page 2 of 12 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) O Sewer (A-1) 0, Paving (B) ❑, Storm Drain (B-1) ❑', Street Lights & Signs (C) Fl,. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth, Texas Standard Community Facilities Agreement-Morningstar Section 5 Phase 3 Off-Site CFA Official Release Date: 01.03.2017 Page 3 of 12 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Morningstar Section 5 Phase 3 Off-Site CFA Official Release Date: 01.03.2017 Page 4 of 12 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Morningstar Section 5 Phase 3 Off-Site CFA Official Release Date: 01.03.2017 Page 5 of 12 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Morningstar Section 5 Phase 3 Off-Site CFA Official Release Date: 01.03.2017 Page 6 of 12 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Morningstar Section 5 Phase 3 Off-Site CFA Official Release Date: 01.03.2017 Page 7 of 12 Cost Summary Sheet Project Name: Morningstar Section 5 Phase 3 Off-Site Sewer CFA No.: 2017-006 City Project No.: 100723 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. City of Fort Worth,Texas Standard Community Facilities Agreement-Morningstar Section 5 Phase 3 Off-Site CFA Official Release Date: 01.03.2017 Page 8 of 12 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ - 2. Sewer Construction $ 175,189.60 Water and Sewer Construction Total $ 175,189.60 B. TPW Construction 1. Street $ - 2.Storm Drain $ 3. Street Lights Installed by Developer $ - 4. Signals $ TPW Construction Cost Total $ - Total Construction Cost(excluding the fees): $ 175,189.60 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 3,503.79 D. Water/Sewer Material Testing Fee(2%) $ 3,503.79 Sub-Total for Water Construction Fees $ 7,007.58 E. TPW Inspection Fee(4%) $ - F. TPW Material Testing (2%) $ G. Street Light Inspsection Cost $ H. Signals Inspection Cost $ H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ - Total Construction Fees: $ 7,007.58 Choice Financial Guarantee Options, choose one Amount Mark one Bond= 100% $ 175,189.60 Completion Agreement= 100%/Holds Plat $ 175,189.60 EscroW Water/Sanitary Sewer= 125% $ 218,987.00 x Cash Escrow Paving/Storm Drain = 125% $ - Letter of Credit= 125%w/2yr expiration period $ 218,987.00 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH Recommended by.- Jesus y:Jesus J. Chapa Wendy C Babulal, EMBA, P.E. Assistant City Manager Development Engineering Manager Date: q, & `tel Water Department City of Fort Worth, Texas Standard Community Facilities Agreement-Morningstar Section 5 Phase 3 Off-Site CFA Official Release Date: 01.03.2017 Page 9 of 12 DEVELOPER FG Aledo Development,LLC Douglas W. Wiersig, P.E. Director Transportation&Public Works Department Approved as to Form &Legality: Name: imberly Gill Title: President Date: Richard A. McCracken Assistant City Attoo�rpeey ATTEST: (Only if required by Developer) M&C No. Date: Lihlr1 Form 1295: Signature ATTEST: Name: Contract Compliance Manager: By signing, I acknowledge that I am the Mary J.1 a � x person responsible for the monitoring and City Secr y administration of this contract, including FORT ensuring all performance and reporting ® ® requirements_ no Name:_ XAS Title: OFFICIAL,RECORD Cirri SECM--.TAP.Y City of Fort Worth,Texas FT.WORTH,TX Standard Community Facilities Agreement-Morningstar Section 5 Phase 3 Off-Site CFA Official Release Date: 01.03.2017 Page 10 of 12 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement Location Map ❑ Exhibit A: Water Improvements Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate ❑' Exhibit B: Paving Improvements ❑% Paving Cost Estimate ❑' Exhibit B-1: Storm Drain Improvements ❑i Storm Drain Cost Estimate ❑' Exhibit C: Street Lights and Signs Improvements ❑I Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement-Morningstar Section 5 Phase 3 Off-Site CFA Official Release Date: 01.03.2017 Page 11 of 12 ATTACIIWNT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100723 None City of Fort Worth,Texas Standard Community Facilities Agreement-Morningstar Section 5 Phase 3 Off-Site CFA Official Release Date: 01.03.2017 Page 12 of 12 1 4kc` wHI TE OAK � �RF�'� R ECT �eMFNT C TION SECTION 5PHASE 2 SECTION 5 0 0� �gRrSF SRF WEST p PHASE 1MORNING MIST TR. N.T.S. OLD WEATHERFORD / t / 9RPNCN / OLD WEATHERFORD TE SON qR CHAPIN i 1187 \ 20 \ cRfFk 3 SOUTH 30 58 � MA Underwood l f Cemetery UNION ( f 20 1 I ` ALEDO Q I41 8 UNION PACIFIC R R 9� af LOCATION MAP WATER NO. 59601-0600430-100723-001480 SANITARY SEWER NO. 59607-0700430-100723-001380 MORNINGSTAR STREET/STORM DRAIN NO. W-2455 CITY SECTION 5, PHASE 3 X-24082JECT N0. 100723 WELCH ENGINEERING, INC. CONSUL TING ENGINEERS Lu z —PRf*10'55 Ir X PROP.10"SS w LLJ z cl PROP.WSS PROP. 12'SS zvsST 12-A I 4_ 00 77 Olt,- PHASE 2, 9STAR pI. SECTISECTION 8 1.,��SF ON DEVELOPER'S COST ami 10" AND 12" SANITARY SEWER LINES AND'ASSOCIATED APPURTENANCES —EXHIBIT "A-1 to SCALE: 1"=300' WATER NO. 59601-0600430-100723-001480 SANITARY SEWER IMPROVEMENTS SANITARY SEWER NO. 59607-0700430-100723-001380 MORNINGSTAR STREET/STORM DRAIN NO. W-2455 SECTION 5, PHASE 3 X-2 CITY4082ROPJECT NO. 100723 WELCH ]ENCIRSIFMUNCY, INC. CONSUL TING ENGINEERS SHEET 2 OF 2 00 42 43 DAP-BID PROPOSAL Page 2 of 7 SECTION 00 42 43 OFF-SITE Developer Awarded Projects-PROPOSAL FORM CFA VALUES 12/29/2016 MORNINGSTAR-SECTION 5,PHASE 3 CPN: 100723 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bid"I Item Description Specification Unit of I Bid Unit Price Bid Value No Section No. Measure Quantity UNIT It:SANITARI I SEWER IMPROVEMENTS 1 3331.4115 8"Sewer Pipe 33 31 20 LF 40 $34. $1,360.00 2 3331.4116 8"Sewer Pipe,CSB Backfill 331110 LF 3 3331.420110"Sewer Pipe 33 31 20 LF 1,755 $42.0 $73,710.0 4 3331.420210"Sewer Pipe,CSB Backfill 33 11 10 LF 73 $90.0 $6,570.0 5 3331.4208 12"Sewer Pipe 33 31 20 LF 35 564.0C $2,240. 6 3305.0116 Concrete Encasement 33 05 10 CY 3 $50.0 $150. 7 3305.0112 Concrete Collars 33 OSIS EA 13 $150.0 $1,950.0 8 3339.1001 4'Manhole 33 39 20 EA 13 $3,600. $46,800.0 9 3339.1002 4'Drop Manhole 33 29 20 EA 10 3339.1003 4'Extra Depth Manhole 33 39 20 VF 72 $15001 $10,800. 11 3331.3101 4"Sewer Service,Two-way-cleanout 33 31 50 EA 52 $385.Oq $20,020. 12 3301.0002 Post-CCTV Inspection 33 01 31 LF 1,903 $2.8 $5,328,4 13 3301.0101 Manhole Vacuum Testing 33 01 30 EA 13 $150.01 $1,950.0 14 3339.0001 Epoxy Manhole Liner 33 39 60 VF 15 3305.0109 Trench Safety 33 05 10 LF 1,903 $0. $761.2 16 9999.0001 Connect to Existing Sanitary Sewer Main 3311 10 EA I $500.0 $500. 17 3305.0113 Trench Water Stops 33 05 10 EA 5 $250.0 $1,250.0 18 3125.0101 SWPPP>1 acre 312500 LS 0.5 $3,600.0 $1,800. TOTAL UNIT It:SANITARY SEWER 1MPROVEMEN $175,189.60 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2.2014 201336M-OFFSITE-CFA COST and QUANTITIES-SECTION 5 PHASE 3.12-24-16 W 42 43 DAP-JIM PROPOSAL Page 7 0f 7 SECTION 00 42 43 OFF-SITE Developer Awarded Projects-PROPOSAL FORM CFA VALUES 12/29/2016 MORNINGSTAR-SECTION 5,PHASE 3 CPN: 100723 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity Bid Summary UNIT I:WATER IMPROVEMENTS UNIT 11:SANITARY SEWER IMPROVEMENTS $175,189.60 UNIT III:DRAINAGE IMPROVEMENTS UNIT IV.PAVING IMPROVEMENTS UNIT V:STREET LIGHTING IMPROVEMENTS Total Construction Bi $176,189.60 Contractor agrees to complete WORK for FINAL ACCEPTANCE within i''•nMP calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 201336$3-OFF-SITE-CFA COST and QUANTITIES-SECTION 3 PHASE 3.12.24.16 e l 1�3 d _o M _ Nil wi - x,41 i '-y \\` \\_ ' /-: vi• �+- - " 0 a -------- II pZ. -1 1 I <•�i� ✓ \+y o �a '\ \:)� SSS ~ I 1 7y JAW + �' ✓", E "�'� '\r' z `o\\\•vin.'��e�� r � wm dd d �-- ----44 14 o�p T m � ;�{ � I�I:F• zoW � J 631 .7078 3NVI ATOjy—NOl3M LLJ K�Fz R. Zi LLI \ ` "1tL �\ �y�V'i "~ �I�O �,IIJ�r \ -' ) •' ` \ ZY � / � � F;G o� a� LF yxj$U<p W f S "•gJg s U ciol } LU \\ \ - NL 1 3AINo NOONe AMOK wg o 7 w i vj D t- b A z vi ;. ...t*rui cu•wm wow��...+.� /NJO 1 i 7e (SLEC WiI/avow N3WNVd u o W a7 10 X,p�` �j^! /vim !/� i m tf�✓ \ `� uj za my ZI .__ice •--. \ �T, � .j. �F c4:�j.'.� 1k: 1—. i/ \`'•` AL2 i'!'\\ ,�- 'P K+ =K _ Fo '� tri • i \ 1\4 a isix a t'i� — ,I €�' Hug En 00 —�:—__-.. .N eye\\ t� b,.s�°/ %' `. h ,✓ ,` /\\� —;��`-'..�-_ z&�� p �� tG $�\ ''%/SjB\e\\\ r�/�"s`l e•�e/ r� '%k �/ •,i j/ \\\ �..\\%' a�� �a � g6 ass � Kia§ ��/��.� > / ' S� ;;��:g�e�/ / - \ �'..�•-�\ Ya cwi / f d0 L INS-3t4n FIO�vW SME $� J 0 {�4 � o d g tA. . s o ., - 1S 1 l - W I\ 1111 l/ I \\/ pL / / /:, .L 3Nn HOIV20 l IHS,-3Nn Ho1Vr6 gi 4 � � 1r pro,,, / J/ If rs \\�� / T � I/ /EGG / j/ s� F� / \'> s�- - -----1-- ew.nv(6 _ fie/ ;/ / Rg2g /woopK,Nis IE ;i/ a - ------ / J pxeNil vis �R �rc f I �j------ - - - ILp'LxaLl 1 I , o � r 1/w �'""'1/ /• N`°! /� l /1'✓/ Jca Too � I6RYKl Y161�� •---�--vi. °� i / 1 / , �' �Z F -_- _ ----_ / I z ' [C'L6K1 vis _�=- �/•I 1 Y� /" \� ......vise„ s.wRa �J -----\\\�\\� 1 \ --- ------------ 5 I j111111 llhj I TI i /I / 3AMO INIOd 1VN3N1V` - --------------- K11aS;Y16 Ill Ijllll rl /� ---- -------- i / / �'/ :'-.-•_/"v i�I i/ / i� VSs €g �7 �� WEE 6.,9z+61 Y16 / x 5 I / � / / tz �// uT�g <•i� —� 1 1 � I / i j 's� �qr�=��,. ,.:•` � // / � Q pdddd�l��Bl. y ttYjYjE IV;NUR of ° IZVI — /// I' 1 a�sg� !'/I I / / 3nivi iNlod rIO If ,_; \\� / 7':• 7`. /�I' /�� fia'"syr / / /� / / � � � � � � & � Iq £IHs NnVp -�,,,x / �. 1- 1 / :�i/%-..t// /rte-/t 211£IIS-;1Nn L" (-�-,`•:_ ! / Os +r -�c`�c� 1 1 ;S_N_9016 OsJIONI ��������■■®■©■■e■■®■®ew■®■■-■fie®■®C C eee■wee■eeeee■■■■M■■w■e■e■■■eee■ee■■w■eeee■e■■e■.e■I °o■ ■e■■�wew■■■■■■■■o■■■ ■ee■ew■e■t■■Co■Iwwe■■■■■■w■■to■I _- w■■■te■e■eM■Mee■we■Mee■■e■■eeM ■tweeeeee■eee■e■el -0 ■ee®a■M■■■■■aeoeoe■®w■■■■■■poseMoo■ eeoe000eww■oo■I ■■■OMANM ■■■■■■ MEeew ■■■1■■■■e■■■e■C■■t■t■■■eO ee■eeL!�eeeenl ■■■■.■■■e■■e■e■■ee■e■�■C■■■■■■■■■■■eeeee■a■■■■■ee■Ce■■��■■■■FSI e■■■w■■■■■■■■■■e■eeewee■■■■■■■■■e■ee■■eeeee■■■e■see■wt■e■■WI • • IImC11im111mmiII11C11m1111m11111mIC111m11imillillClimmlB I'I"�C�Re��,sijCC°CCCC�iiiCCC°C�CCCCCCC°C°CCCCCCCCCCCCCCCCCCCCC IIIIIIr��lzr�>,.■■C■e■e��nu■■■e■C■■C■■■■■eeCei�eee■■■■e■■e■■e■laeee■el • ■■■■■■■F.ri�iMi+l�l a■a■■■■■La�mom e°°e■■■■■■°°.■esee ■Mee■■e■■eee■e®eeeeEl ■■ewo�-����eleeeee■ear■■■weCe■■C■■waC€x�ew■wee■■eee■■eeeweeeMME>a ■■eE� ..�a � 1 -_e...eeaa-t■®e ■■e e■■e e■M■ to■M■■e■eseMoew®■eeeee ■■■I�rrrrlla �slar�eoe■■ee■asr,m■w�!■eeew ■eee■■e■eC■■e1■■■ee■■■e■®■■■et;l ■■■■■■ 1wwMw■■lees■■■■ 111■evil■113']■C■e��e■■■■�■■■■■■Mee■■■■■■weeM■■l ■s■te17"1F563?Y ■M ee■■■■■ Ktr10m,awaso■■°ea■eeeR®■°eee■■■■soee■�e°°s■el Oe■et■[ :1�' i ■■ne■e■■ENV.,t■�3ahl i■■°°°a■[�l!:E■eee■■e■°■■■°■weee■■I CCC '� Ci■'CCCCCCCsCli °CCCCCCCCiCCCCCCCi°CCCCCCCCCCCCiiii iiiira■ii�i ■eQE.€�■�z��lu>!t■Me■et■nl{ute�■�■°°eke°■■eeeeeeewe■e■■eeCMeMee■eweleoeeeee�ewe■fie■e■■ Ilmmll ■ :11®hill®i®1®►� IIIIIIIII�IIII � i11 �II11Cillmlllllilll� illl ■I\1�Mts��,r�,r .eneuee�eo■e■r..�sv:-r■■■■■ese■ eee ■er�b�;rw�1��1 a■t ■■esee■ee■e■e■■■ ®■ue ■�u�,�;r��r�n�rrwriner■■is■■■■■�•�,®■e■■■■■esee■■eeeeewlrW�����ewe■o®eeee■■■■e■eeee■®eeee eee.tsee� z�one■e■■■■ee��tl��et�■e■s■■eeew■e��e■owl�;eraaL:�■■eeltwee■■ecce■o■■■■®■sen i.n■ ■■■■_■�_�:_,i-■-,�■■■■.■.■��C�o■ul;�:�e-�r�;t�.w■■■eo■e.■■.■■■■■■ .eeeC��e iF icer i---�-____-- ��l7aFk1■eee■e■■■■ ■eE.�F.U—*"�.]■H■■■�°■■■■E■■eeeee■� ■e ■■■■■■■■■ ■�1��tMEN Ski■■1R�C'MC1t]■■■■■e■■o■■ww1s1LIEla.Ore■®moos ■■`�oM■e■1we■Mee ■e■eMee■sew■N■ell■■■CeeO■■OQ�I'e!!:l■■■■eeeeeeeMelaFlFl fd►!tP�\ef■ee�ee���i�`■®!Mee■MENEM eeeeeMee■®else■wM■e*leee■1■flF ■■t■Mee■■■■ ■eO■eee■■\■t■��■e_ WE Em°sa■e■° ■etc■■etlwwEateHe■k eeeee�Y1F��6.7weee■eeE .7eCeee......i:�.:G� �C��";�l7l�l■ ■■SGS+ e CCiiiCICCC il°sCVOTE m�mmo CiCCCCCCas�UCCCCCCsiiCCCCCCCCCCCCCvCC aC■°wwCCCCw' 1 °nCCCCCC Im.11C1..■ac�±�r■■s■rad■■■■■aaeeeee■eese■eeeeee■■■e�r�a�a�■■u■®eee■■ra�u'r;�ynl�:aees•■e■n ■■eteMMte®�;:�etnuF+�e■eteeMAn■e■eelteee■��tteteter�r�!ss�+�:��euwe®■weed�ult�:raE•�o■sez�o IIIm11111C��m11111m1111� 6�imlllml1111111�1111� �1 � I1lCilmmm�'ll��lm®ilii ■■■e■e■■■s■■■eeNeae■■■■■ ■sea■■■■■■■■Mee■■■e■�eyr. w■�■�.�■ee■■a■ eC°�■■■■ mee■■■et■Mee■■E■■■11■■■■■eeetrl\gee■1■■e■■E�a■ r:rs:^�r;sr,�nr,.a�riG;C:;��_--�Js■�• ■ewc��■ ese■t■eee ■eo■,N■■■■Oee�x111■■■■■■e■■e■e■C■ssO■■tese■OH■lt®e0aiie,i�9■lase+!ae�ee■e ■■■■■■■■■o■Ceeeeur■esee■eeela�p\e■ee■■■ee■■■■w■eeeee■■e■■eH■awe■ee■e:�.••oee■tee■■e CCCCCCCCCCCCmiClwlCimlCCieCA�CCCCCCCCCCmCI°�wwiiCCCCCCCCCCsCte®wCCCCCiiimmmmCCCC°n_ CCCCCCCCCCCCCCCCi°Cmmmiiw®■ �liliiiiiiiimiiiCCCCCCCCCCmmiCl°i�wC �■Cii CCCCCCCCCCCCCCCC yC°■CCCC®■eeC �ieiiiiiCiiCCCCCCCCCCCCCICCHUMAN CCCCC 111mmooCC1111II1C ■■Oe■eee■®■1e■■O t1■■■e■®Mli1\ewwe■■� e■Oew■■te■1t■a■eeea�tlgeO■■■ra111wN■■■■®■Ewt CCCCCCCCCCCCCCCCCCummmmm®MMIlksiiiiCCvC �CwwiiiiiiimsC°eCCia�CCCCi�.ai{is°°�CCCECmmo ■■■■■e■■e�■■■■e■■ml■■■■■■�aeelul■ee■i�ee■■eew■eee■e■■se■e■el�a■eee eauleraa■e■®Mee■ Ilmmm1111C11mmm111m11111C111C'mllml'�IIImAClllmllll�'�����UIIm11mm1�ll{m��llmClmm� ■■■e■■MMMMwoete■■■eN�.eMMettotMtlneelM�ecz�. ■■ttesel�afss:��:�y■tva Me■ ■���M1a�ee■®r��� ■Mee■■■■■MwsetOe■■■111■■■■�■■e1111Mwel�■■ee�Ceeete tai Ei7L ■ TetH�■■e�Ce-.i�dMMMM °ee■e°■eee ■■■■■■■ee■oe�111R�R!■HH■e■■t0e■11111■■e■Yeee ■ e■ ae_Y xllfl`"■le1■■ c�� A■e■■elan ■■■■■■■e■�e►dIEYf'■rl.■■■■■■eeewa\I■■■Q!ieeell ■■msnz� as^rrszi:..wo----ase■■■eke■mom eeeeeee■seeee■e�ee��7lM=���Mw=:1■MesOeeee■■■■�ww■e■■ee1■1\\■■111teetdSRMOeMe�.m ■■eeeee■Mt e■wUNC ia■t1■■ eGMMOeteeee°■°Yo■e°ee■e le■eetee■■O OPMi ! et ■ ■ ■■ we■r1.t ■ MEMO CCCCCCCCC ii®i■ii*°C"wii■°iCii°eeiiiiiiCe mCCCCCCCCCCCCCCa z CCCCCC iriii CSOMER ■■■e■e■e■ewe■e■■■1-aen■■■■ewes■■lul■e!*ee■eww■■eee■■■■■��.±�=si«ooeee■e��{u■�+a•;.■e■■■■c: Mee■eMee■ew■weee■1�a,n■atew■■■■■�w■■!�■I S�Yw■■wee■■■E�c�l r ■ue■e■■lnlmen-IMMU ■ �c� ■e■e■Mee■�■eEe■■I��E1Heht1■ew■■eMain■■r�eee■■ ■■werrr�E>:usJ.�.:w ■ ONE■■Frlleryrter e■■■t ■■e■eeeewwMee■■■r \YIH■F:\■ewe■■■Fl n■■s�■eeee eeeee■ee ^3'J•. lsee■eEle.leR►7i■■E-J■■■■■ ■■■eseUM11■■■oN mimu�1°�■■■■Mll■■n oe■eeCets■■■• 1!B_-_-_�9Ca a■■nleeee eee■°■■■■w■■■■■■ti3n.e �a■®■■■■ta.l■■! ■■■e■wee■■e�Wrr�s�i �arr■tnoeoseee�. ��.>t■r►:■■■■C ■�milllllCllmmmilmiill��lI mm�CllmllillillmiilllmlliliClimmlllm���Ilml�llllm ■O■MtOeeB■eeO■■■1111■L■eMew■�■■q■a■e�■elf■wMOeOe■■■■■■eO■w■lew""non■■rll111100 �°°■°■ ■■tMewMMtwwtsle■■■ ■Istate�■eoer+l■■MSMeeeel�®tetete■eee■ttlm+�enEtlMMemneoe■t�1■terl °CCCCCCiCCCC��'��C1wuC1w1CCCCCCCCdCCCCCiiii°iCCCCCCCCCCi°CCCNor- ■■■■ �IiCCCCICiii■�CCFr�Cii�e ■eee■■e■®■l�lr 'i �yaer ■■■w■■■■■. ■■■■ ■■e■■■■■esee■eewneo■■eesreseee.■■we■ ee■e■eeewwaalu�le � eteCe■ew■ee■■ ■■■■CeeeeCeen■■■■eee■ee■�,�auen■e ese■■■Mee■eee■ C■■■■eet■e !is►��* keuete■�■e�■■ I■e■CC■l■e■■Ce■etMOeCie�teOmes■eeweCi■letew■e°aeelMlese■CettOeieeCMe■ieeelC eeMeeerewwwMwwwEwQalGeFeI°�P�aL>l�■.'.'El!SOe7!!sr�!tFM-v7�3ii�da�i■e^-`mlGe�sk�M�!ey:■�hzeM��■i�iR2ORa■r&��t■oO6aBus1iwu1aOes1eeYYM1lw1ii..■UHnGIIMGOt�■■�■ews■M■o®ww■M�.eM■■i■M=e.enel.■ioae■M.■.G1■m�=■n�.i[bL�=a1qi F..�i1:uC�u.1■�.u1llll■�■�i1lae■�■MM■Urtno�l�CFs■;��A33�YlaYwwvs1'I■MMwe�JO■■eeOEO[eeec�eewlIeE'it�e�t■eI■■eee■I■te■■tww�eteCMwMwwwweel■etOM■■eBMeewl■eeeM■e■OoOBnleMeMOwemeOteeee1e■el■e■e■eel■e■■e■■■e■■■e■l■�■eOle■ieee�awwwl■Cis�otMawwsslesoeeM1weiie■lteeetcCieeawOt■■1OtCl1e ■t■eteie■wCweB�1M■�w�lewlwOseels SHE oa■Gzzl■ ■oeseweeMeeeClaeEe°Ew�m1r1Oe■■twoge■eiunullEn.n■etuaaleelere1e■:9!eeO#!C1eCleeeeMCe1■■■eMeswe1wEer■e1eMeR�urlr.OM■�1l■ll1iHe■91.■ea.1�eC■te11ee■1hI�■le■Me1w■w■wCtewwe'Dwww■w■eMee■■a■e■e■ll■r■■r wTteMeTlxe■ii weMe�eia■■ieteOl�tt■ w -LLI11wi{CCw°AMMM0mMCCnm141 i'UU111MEE z ° iiiaCCCCCMwC� ■ CCmCCoe°° ° ° w ° OE Mslowe °°■°°eO° ® ■ea MEMO -3muO111eMewMBlewMO [FfMttn1M ® MM■® M1soallnee eeeettwwMMMOMeweEee■HHUMaWwwon ■■°°t■s°■ weHO ■o■■ Fas011etw ■/11 ■ ewMleeuws1 ■■■■eeMe1Z"'17 w■°°OMesoee.aa' e■sew■etlewnlrawMtll�eyaan■lewleeelE� ■�+ee[��ete■anew■■■OatOOeeMM■MO1letse1Oe1AElf" M1011 ■eOweteeO■wwYri�titf3flL�6t tC:Z=========71^9ee!■■weeEe■e■■eB■ie�7f1'@}fl7�r■lO■sOellsr 3M■■■we CCisICC�CiSakCMrlYti��1I�CCC�eww°ieaiiicissiiiiA°w°ie�i°iiiClsiiiiyhsi4����lki•C�LINE oi{ieCOBi ■■Meeeetr WG^7�WFT Dee.mMwt■ee■ea.taeeeetlew■t!t■e■eOstC _i 3Wu.�etN�f �,-!A s ■One IlmmmlC�� 11111C11mm111�1e111111��11�10m11®®i::�: :�:� n�0NOTa ��ol ■■te■esee■wQc€�I� �s�seewe■■■■■■■e■nuN�leee■■ ■ 1?113� Q z�>''■aH■ee■■ .1■1rulE ZZINe■M■■e■t■ M■■■e■t■■■■Mee■E ■eH■eeeea■lii►7■Mee�OMee■e■ee■eaeC-- rMG■■lls■O■■ laMr°■°°° C■eeeee■ee®eee■etoMowe!■■ww■e■e■■■■EM■MNM ®■nee■■°1112•fi%22luzu'%•es___s__n••'.6mMHER ■eeteeMMtwMlteteeeeeaOOewtlweMweeMtltt■eeeMwMtetteteetGNr � Ficx�r-�f/iii4iBffieelreMMM1■1i.:J°e■■L-7 ■■■■te■eew■eeeeeeeeMeMMMeew■■■■e■Mee■■eeteweeoeeeeeeeMe■■eweMee■■■■■ee■■e