Loading...
HomeMy WebLinkAboutContract 46465-A2 CITY SECRETARY � �� MT No . 2 CONTRACT NO. TO CITY SECRETARY CONTRACT VVHMMa1&&2, the City of Fort Worth (CITY) and Hazen and Sawyer, P.C. , (ENGINEER) made and entered into City Secretary Contract No. 46465, (the CONTRACT) which was authorized by M&C C-27183 on the 2nd day of February, 2015 in the amount of $196,485 . 00 ; and VVEEI EMMA2, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount $38, 914 . 00 which was administratively authorized September 28, 2015; and VVHEREA-6, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 90; and WHEIREA6, it has become necessary to execute Amendment No . l to the CONTRACT to include an increased scope of work and revised fee. FST®lW TffMR EF0 Rv3E, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal letter dated February 1, 2017 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $22, 384 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $257 , 783 . 00 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. A Page -1- CITY _l EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Hazen and Sawyer, P.C . I--— Jesus J. Chapa ert C. R'pech, P.E. Assistant City Manager Vice President DATE : �, ` DATE : AP '1 '3' 20 APPROVAL RECOMMENDED: Chris Harder, P.E . Assistant Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A Douglas W. Black Senior Assistant City Attorney ATTEST : �oF FoRr� yser City Secretary _ k-'XAS Page -2- CT i i Hazen Hazen and Sawyer 500 W. 7"Street,Suite 702•Fort Worth,TX 76102 February 1,2017 i Walter Norwood, PE j Project Manager Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 i Re: Sanitary Sewer Rehabilitation, Contract 90-Amendment No. 2 City Project No. 02382 Dear Walter: As a result of Oncor's request to relocate sanitary sewer main L-3242 and a portion of M-187 out from under the foundation of their high-voltage tower, we have prepared a scope of services for Amendment No. 2 for Sanitary Sewer Rehabilitation Contract 90. The relocation of L-3242 and M-187 will also require redesign of M-265 within its current alignment.We considered relocating this line to minimize tree removal,however,relocating would require a new casement,which would add cost and further delay the project. Therefore,it is our recommendation that this line remain in its current location. The scope of services and corresponding fees are as follows: Description Unit Qty I Unit Additional Services Requested Evaluate Alignment Alternatives for L-3242 &M-187 1 LS Redesign of 150 LF of L-3242 1 SHT Redesign of 806 LF of M-187 2 SHT Redesign of 271 LF of M-265—In the same location. 1 SHT Additional Survey—1000 LF 290 R Wide 1 LS Fee For Additional Services $22,384.00 Work not included in the amendment include the following: Permit application filing fees Online submittal of permit applications Services to acquire real property including but not limited to acquisition of easements, approval of easements,preparation of additional temporary right-of-entry documents, and other related services The engineering fee of$22,3 84 is based on design fees of$12.42/LF and survey fees of$6500 for the additional width through the Oncor property. A detailed level of effort is attached for your reference. Kazan The original contract between Hazen and Sawyer and the City of Fort Worth(Contract 46465)was authorized by M&C C-27183 on February 26,2015 in the amount of$196,485.00. The cost to the City for additional design services to be performed by Hazen and Sawyer totals$38, 914.00 for Amendment No. 1 and$22,384.00 for Amendment No. 2,resulting in a revised total of$257,783.00 as shown in the table below. Item Amount Original Contract $ 196,485.00 Amendment No. 1 $38,914.00 Amendment No.2 $22,384.00 Total Contract Amount with Amendments $ 257,783.00 Please feel free to contact me at 817-870-2630 or shardy(cvhazenandsawyer.com should you have any questions. Sincerely, Scott Hardy, PE, PMP Senior Associate&Fort Worth Office Manager Enclosure: Level of Effort Spreadsheet cc: Bob Reach. PE- Hazen Tracey Long, PE- Hazen Page 2 oft • h O N O O pp mm0VOo aM VIN �V3 EH�ry E9 N OM Vl � e9^Ul N N F9 V)V) bf Vl m N M� M fA H a N s N q F NQ.2 N 2 ppI O W KN C d_ %q W U N O H c w w voi ron w v 0 d o: w $ w w w 'm o � U1 W LU voi w w w w E q G o 't z 0 w w voi w w w p � m � � oo pp pp VV st}( v b� U O m 6 a � y z U G ~ NO mvallo ,�; o r R N e td co �L c o pj d W .�w O ;c F- MW d - m Q � w IT, N N o W W O Z a O = C 3 U C 2L d R W m N O M O o N N N N a L c W 6 'm A G W d O a` m w q 0 M N J � T d u o d q O F a`. R u q n m F M K a o O 00 E Oc t a c v q N q N a 0 G 3 C C O om d d K o R°1drym E W Y G X y > ` V)N M d UGi >�F O �¢ 61 m 49= tma in G� w d way ^ m E ED=q u q a- �« � q LO o` �•c Ti 'H a°o o avm m rc„ cG u d� p2 yy v2 qU aRi °'n• f°-'gym C� g IV" t r o v d o >A d c c ro m v c c a.ul o m=v) a q io 00.0aa V1[L O gU W aUV)0. O:5 U (J�U a6U U�f/)UCJ1 u.IS Va uLLU i6 tD o r N rnfMQ N� N r. ry ry Y .-N(V N�ry`7{`j r - •�V(7 7 fy M VI 4i N Vj i ty p ®\;2 �v,m /m■ \ G)( \\ {\} ¥:6 ■ a 2 � z o ® ® § \7 ■ aa.0 ;2 a a§ §50 8848 �\\§\ � !®24 § 2ƒ /;m;7� e ` ° $Gama } ) - . §® \ l 1 7, ul /o W. Q&7 M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FORTWO�RTH COUNCIL ACTION: Approved on 3/21/2017 - Ordinance No. 22631-03-2017 DATE: 3/21/2017 REFERENCE **C-28153 LOG NAME: 60SS9OA2HAZENFUNDING NO.. CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Adopt Appropriation Ordinance in the Amount of$62,384.00 for Increased Project Management and Material Testing Costs on Sanitary Sewer Rehabilitation, Contract No. 90, Located in the Central Meadowbrook and Handley Neighborhoods (COUNCIL DISTRICTS 5 and 8) RECOMMENDATION: It is recommended that the City Council adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Fund - Legacy in the amount of $62,384.00 from available funds for the purpose of funding Sanitary Sewer Rehabilitation, Contract No. 90. DISCUSSION: On February 10, 2015, Mayor and Council Communication (M&C C-27183) the City Council authorized an engineering Agreement with Hazen and Sawyer, P.C., in the amount of$196,485.00 for Sanitary Sewer Rehabilitation Contract No. 90, The Agreement was subsequently revised by Amendment No. 1 in the amount of$38,914.00 administratively approved September 28, 2015. This Agreement requires additional funding for project management material testing and to cover costs associated with Amendment No. 2, in the amount of$22,384.00, that provides additional design and survey services on the project. In addition to the amendment amount, $40,000.00 is required for project management and material testing. This project will have no impact on the Water Department's operating budget when completed. Design is expected to be completed by March 2018. Construction is expected to start on August 2018 and be completed by May 2019. The total cost for the Sanitary Sewer Rehabilitation Contract No. 90 is estimated to be $2,910,000.00. The project is located in COUNCIL DISTRICTS 5 and 8, Mapsco 79A, 79B, 79E, 79F and 79G. This M&C does not request approval of a contract with a business entity. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendation and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Sewer Capital Projects — Legacy Fund, The Fiscal Year 2017 Sewer Operating Budget includes appropriations of$31,636,073.00 for the purpose of providing Pay-As-You-Go Funding for Capital Projects. After this transfer for Fiscal Year 2017, the balance will be $21,599,237.00. Funding for the Sanitary Sewer Rehabilitation Contract 90 Project as depicted below: http://apps.cfwnet.org/council_packet/ino—review.asp?IL=24440&councildate=3/21/2017 3/22/2017 M&C Review Page 2 of 2 FUND Existing Existing Project Appropriations Appropriations Total Sewer Capital Fund- $258,099.00 $62,384.00 $320,483.00 Legacy 59607 Project Total O-O�F $62,384.00 $320,483.00 * Numbers rounded for presentation purposes. TO _ Fund Department Account Project Program Activity i Budget Reference# Amount I ID ID I I Year (Chartfield 2) FROM Fund I Department Account Project Program ! Activity Budget Reference# Amount ID ( ID Year i (Chartfield 2) Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: John Carman (8246) Additional Information Contact: Walter Norwood (5026) ATTACHMENTS 60SS9OA2HAZENFUNDING MAP 01.pdf 60SS9OA2HAZENFUNDING MAP 02.pdf 60SS9OA2HAZENFUNDING SWER CAP FUND A017.docx http://apps.cfwnet.org/council_packet/1nc_review.asp?ID=24440&councildate=3/21/2017 3/22/2017 O O O O O O O O O O O O O O O O J V J V V V V V O O O O O O O O A A A CD A -OP A A W W W N W W W W O O O OC O O Cl cn In Vt A _ �n cn In A W W N 1p W W N 1p WW F` M W W F` M 0 0 0 CD 0 0 0 0 (n In F) O Ul N O O O O O 0 O O O O C) ID Cl - �j O O O O O O O N N N N N N N W W W W W W W CO 00 CO co co W Co ' N N N N N N N 7T TT TT TT O O O O O O J J V J J V 00 W W OJ W W A W O A W O N N N N N N N N O O O O O O O O • i/1 F� N W Q1 • 1' N W Ol O N O N O N O N O W O W O W O W O W O W O W O W O cn O A o to O A 0 0 0 0 0 0 0 0 O O O O O O O O a Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Walter Norwood Name of Employee _Senior Professional Engineer Title