Loading...
HomeMy WebLinkAboutContract 45578-CO3 FORT WORTH City of Fort worth CITY SECRETARY S Change Order Request CONTRACT NO.. Project Namel Northside II 48-inch Water Main,Phase 1 Part 1 City Sec No. 45578 Project No.(s) P265-602140208283/P275-702170208283 DOE No. 7048 City Proj.No. 2082 Installation of a 48-inch Water Main and small diameter water and sanitary sewer mains on Keller Hicks Road from Old Project Description: Denton Roas to Alta Vista Road Contractor: S.J.Louis Construction of Texas,Ltd Change Order: ® Date: 1 10/26/2016 City Project Mgr.J Roberto C.Sauceda City Inspector: I Raymond Brice Phone Number:1 817-392-2387 Phone Number: 817-319-7943 Dept. Water Unit 1A Water Unit 1 B Sewer Totals Contract Time (Calender days) Original Contract Amount $6,968,125.50 $942,381.30 $614,637.65 $8,525,144.45 260 Extras to Date $251,835.81 $28,265.00 $280,100,81 27 Credits to Date $17,840.00 $152,400.00 $170,240.00 Pending Change Orders(in M&C Process) Contract Cost to Date $7,219,961.31 $952,806.30 $462,237.65 $8,635,005.26 287 Amount of Proposed Change Order $3,710.00 $3,710.00 Revised Contract Amount $7,219,961.31 $952,806.30 $465,947.65 $8,638,715,26 287 Original Funds Available for Change Orders $209,050.00 $28,265.00 $25,000.00 $262,315.00 Remaining Funds Available for this CO $33,911,19 $21,877.20 $25,000.00 $80,788.39 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 1.33% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $10,656,430.56 The change order will provide for the replacement of trees and shrubs that were in conflict with the projects 8-inch sewer line. npOIIfiJp�. ®�°1 ` OFFICIAL RECORD .A �°-a �`� °-4 CITY SECRETARY _$ s v° FT. WORTH TX _.._ , ary J s , C1 Swre LL.a A It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's ;)-r p2 ra Nam ntractor Na Siq.Eli.1re O.ul ,,. td rete z�tahi Date Project M_apger Dule VAss+stsrrL ire "Wa'er Def da'e Construction u ervisor Water Det fu v„�Lrli�li ueL3 M&C Number _..., N/A Ni&C nate Approved FORT WORTH City of Fort worth Change Order Additions Project Name Northside II 48-inch Water Main, Phase 1 Part 1 City Sec No. 1 45578 Project No.(s) P265-602140208283/P275-702170208283 DOE No.= City Proj. No. 2082 Project Installation of a 48-inch Water Main and small diameter water and sanitary sewer mains on Keller Hicks Road from Description Old Denton Roas to Alta Vista Road Contractor S.J. Louis Construction of Texas, Ltd Change Order: ® Date: 10/26/2016 City Project Mgr, Roberto C.Sauceda City Inspector Ra mond Brice ADDITIONS ITEM nESMIFT[ON DEPT Qty Unit Unit Cost, Total 37 Tree removal and installation Sewer 1.00 LS $3,710.00 $3,710.0C Water Unit 1A Water Unit 1 B Sewer $3,710.00 Page 2 of 4 Additions Sub Total 1$3,710.00 Fc3 R-r WCC 3ZT H City of Fort Worth Change Order Deletions Project Name Northside II 48-inch Water Main, Phase 1 Part 1 City Sec No. 45578 Project No.(s) P265-602140208283/P275-702170208283 DOE No. 7048 City Proj. No. 2082 Project Description Installation of a 48-inch Water Main and small diameter water and sanitary sewer mains on Keller Hicks Road from Old Denton Roas to Alta Vista Road Contractor S.J. Louis Construction of Texas,Ltd Change Order: ® Date 10/26/2016 City Project Mgr. Roberto C.Sauceda City Inspector Raymond Brice DELETIONS ITEM DESCRIPTION DEPT Qty Unit unit cost Total Water Unit 1A Water Unit 1 B Sewer Page 3 of 4 Deletions Sub Total MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this C0 Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 Page 4 of 4