Loading...
HomeMy WebLinkAboutContract 49009 CITY SECRETARY D.O.E. FILE CIfYSECRUAW 1, ���,c _ CONTRACTOR'S BONING CO FORT WORTH CONTRACT NO. CONSTRUCTION'S COPY .'. .'". CLIENT DEPARTMENT PROJECT MANUAL FOR THE CONSTRUCTION OF CONCRETE RESTORATION (2017-1) AT VARIOUS LOCATIONS City Project No. 100630 Betsy Price David Cooke Mayor City Manager Douglas W. Wiersig,P.E. Director,Transportation and Public Works Department Prepared for The City of Fort Worth TRANSPORTATION AND PUBLIC WORKS 2017 OF !�� Ir� .� ••% j) 88823 . . X6 1 $ 9j07 \ tK > a � Qti _ aci OFFICIAL RECORD C) __.._..... CITY SECRETARY FT.WORTH,TX FORTWORTH PROJECT MANUAL FOR THE CONSTRUCTION OF CONCRETE RESTORATION (2017-1) AT VARIOUS LOCATIONS City Project No. 100630 Betsy Price David Cooke Mayor City Manager Douglas W. Wiersig,P.E. Director,Transportation and Public Works Department Prepared for The City of Fort Worth TRANSPORTATION AND PUBLIC WORKS 2017 =q�OF e O � e /.oeseoe000ee0000eieee� �..R 1.NUSR/�i.t ►H',� 88823 COIQ�I�e.�,a•' .i� s r � J Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA Fu` I] COUNCIL ACTION: Approved on 3/7/2017 REFERENCE ,.,C-28134 2000NCRETE RESTORATION DATE: 3/7/2017 NO.: LOG NAME: 2017-1 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of a Contract with Arreguin Group, Inc., in the Amount of$818,975.00 for Concrete Street Restoration at Five Locations and Provide for Project Costs and Contingencies for a Total Project Amount of$983,975.00 (COUNCIL DISTRICTS 4, 8 and 9) RECOMMENDATION: It is recommended that the City Council authorize the execution of a contract with Arreguin Group, Inc., in the amount of$818,975.00 for Concrete Street Restoration 2017-1 at five locations (City Project No. 100630). DISCUSSION: In the Fiscal Year 2017 Contract Street Maintenance Program, various types of street maintenance are grouped into specific contract packages. The Concrete Restoration 2017-1 contract provides for the repair and reconstruction of failed concrete pavement at five locations listed on the attachment provided (City Project No. 100630). Description Amount Design $ 0.00 Construction $818,975.00 Project Management/Inspection/Contingencies, Etc. $165,000.00 Total Project Budget $983,975.00 Construction for this project is to start approximately on April, 2017 with a completion date of approximately August, 2017. Funding for this project is included in the Fiscal Year 2017 General Capital Projects Fund. This project was advertised for bid on October 13, 2016 and October 20, 2016 in the Fort Worth Star- Telegram. On November 10, 2016, the following bids were received: Bidders Amount Jackson Construction, Ltd. $ 499,998.00 Arreguin Group, Inc. $ 818,975.00 Westhill Construction, Inc. $ 838,981.00 Ragle Construction, Inc. $ 890,361.50 Cheyenne Construction Co. $ 908,122.00 Advanced Paving $ 994.432.00 The apparent low bidder, Jackson Construction, Ltd., did not submit fully complete M/WBE paperwork upon request, as such their bid is considered non responsive. Jackson Construction, Ltd., is being issued a warning letter.- Staff considers second low bid from Arreguin Group, Inc., as competitive and acceptable. M/WBE OFFICE -Arreguin Group, Inc., is in compliance with the City's BDE Ordinance by committing to 10 percent MBE participation.The City's MBE goal on this project is 9 percent. Additionally, Arreguin Group, Inc., is a certified MMBE firm. The City reserves the right to increase or decrease quantities of individual pay items within the contract provided that the total contract amount remains within plus or minus 25 percent of the contract award. This project is located in COUNCIL DISTRICTS 4, 8 and 9, Mapsco 36R, 36L, 77U, 91E and 91 H. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in City Project No.100630 Concrete Restoration 2017-1, as appropriated within the General Capital Projects Fund. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 FROM Fund Department Account Project Program Activity Budget Reference#I mount ID ID Year Chartfield 2 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Douglas Wiersig (7801) Additional Information Contact: Tariqul Islam (2486) ATTACHMENTS Map 1 CR 2017-1.odf Mao 2 CR 2017-1.0f Mao 3 CR 2017-1.odf Mao 4 CR 2017-1.odf Street List CR(2017-1):pdf CERTIFICATE OF INTERESTED PARTIES FORM 1.295 1 of 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-155961 Arreguin Group,Inc. Dallas,TX United States Date Fled: 2 Name of governmental entity or state agency that is a parry to the contract for which the form is 01/18/2017 being filed. City of Ft Worth,Texas Date Acknowledged. 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 100630 Concrete Restoration 2017-1 4 Nature of interest Name of Interested Party City,State,Country'(place of business) (check applicable) Controlling intermediary Arreguin Group,Inc. Dallas,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. GERARDO ESPINOZA Notary ID f 126360025 My Commission Expires Signature of authorized agent of contracting business entity ''a�►a..N' April 5,2020 _r =offitf!�*eAng fore me,by the said this the day of cI ,witness my hand and seal of office. i to g oath Printed name of officer administ9drig oath Title of officer admini Bring oath Forms provided by Texas Ethics Commission vwvw.ethics.state.t<.us Version V1.0.277 V" FOR*TWORTH. City of Fort Worth Standard Construction Specification Documents Adopted September 2011 000000-1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 3 SECTION 00 00 00 TABLE OF CONTENTS Division 00- General Conditions 00 05 10 Mayor and Council Communication 00 05 15 Addenda 00 11 13 Invitation to Bidders 0021 13 Instructions to Bidders 00 35 13 Conflict of Interest Affidavit 00 41 00 Bid Form 00 42 43 Proposal Form Unit Price 00 43 13 Bid Bond 00 43 37 Vendor Compliance to State Law Nonresident Bidder 00 45 26 Contractor Compliance with Workers'Compensation Law 00 45 40 Minority Business Enterprise Goal 00 52 43 Agreement 00 61 13 Performance Bond 00 61 14 Payment Bond 0061 19 Maintenance Bond 00 61 25 Certificate of Insurance 00 72 00 General Conditions 00 73 00 Supplementary Conditions Division 01 - General Requirements 01 11 00 Summary of Work 01 25 00 Substitution Procedures 01 31 19 Preconstruction Meeting 01 31 20 Project Meetings 01 32 16 Construction Progress Schedule 01 32 33 Preconstruction Video 013300 Submittals 0135 13 Special Project Procedures 014523 Testing and Inspection Services 01 50 00 Temporary Facilities and Controls 015526 Street Use Permit and Modifications to Traffic Control 015713 Storm Water Pollution Prevention Plan 01 58 13 Temporary Project Signage 01 60 00 Product Requirements 01 70 00 Mobilization and Remobilization 01 71 23 Construction Staking and Survey 01 74 23 Cleaning 017719 Closeout Requirements 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents Division 02-Existing Conditions CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 000000-2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 3 0241 13 Selective Site Demolition 0241 15 Paving Removal Division 31 -Earthwork 3123 16 Unclassified Excavation Division 32-Exterior Improvements 32 11 23 Flexible Base Courses 3213 13 Concrete Paving 32 13 20 Concrete Sidewalks,Driveways and Barrier Free Ramps 32 13 73 Concrete Paving Joint Sealants 32 17 23 Pavement Markings 32 17 25 Curb Address Painting 3291 19 Topsoil Placement and Finishing of Parkways 32 92 13 Hydro-Mulching,Seeding,and Sodding Division 33—Utilities 3305 10 Utility Trench Excavation,Embedment,and Backfill 33 05 14 Adjusting Manholes,Inlets,Valve Boxes,and Other Structures to Grade Division 34-Transportation 3471 13 Traffic Control Division 35—Special (TxDOT) 99 99 00 TxDOT Geogrid Base Reinforcement Appendix GC-6.06.1) Minority and Women Owned Business Enterprise Documents GC-6.07 Wage Rates A Street Locations and Quantity,Plans and Details B Standards END OF SECTION CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 001113-1 INVITATION TO BIDDERS Page l of 2 1 SECTION 00 11 13 2 INVITATION TO BIDDERS 3 RECEIPT OF BIDS 4 Sealed bids for the construction of CONCRETE RESTORATION(2017-1)AT VARIOUS 5 LOCATIONS,City Project No. 100630 will be received by the City of Fort Worth Purchasing 6 Office: 7 8 City of Fort Worth 9 Purchasing Division 10 1000 Throckmorton Street 11 Fort Worth,Texas 76102 12 until 1:30 P.M. CST,Thursday,November 10,2016,and bids will be opened publicly and read 13 aloud at 2:00 PM CST in the Council Chambers. 14 15 GENERAL DESCRIPTION OF WORK 16 The major work will consist of the(approximate)following: 17 18 7,916 S.Y. Remove Concrete and Replace with 7"Concrete Pavement HES 19 3,500 S.Y. Geogrid 20 770 C.Y. Flex Base 21 100 C. Y Concrete HES 22 23 DOCUMENT EXAMINATION AND PROCUREMENTS 24 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City 25 of Fort Worth's Purchasing Division website at http://www.fortworth og v orglpurchasind and 26 clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site.The 27 Contract Documents may be downloaded,viewed,and printed by interested contractors and/or 28 suppliers. The contractor is required to fill out and notarize the Certificate of Interested 29 Parties Form 1295 and the form must be submitted to the Project Manager before the 30 contract will be presented to the City Council.The form can be obtained at 31 httys://www.ethics.state.tx.us/tec/1295-Info.htm 32 33 Copies of the Bidding and Contract Documents may be purchased from Nikki McLeroy, 817- 34 392-8363.City of Fort Worth,TPW, 1000 Throckmorton St.,Fort Worth,TX 76102. 35 36 The cost of Bidding and Contract Documents is: $30.00 37 38 PREBID CONFERENCE 39 A prebid conference may be held as described in Section 00 21 13 -INSTRUCTIONS TO 40 BIDDERS at the following location,date,and time: 41 DATE: Wednesday,October 26,2016 42 TIME: 09.00 A.M. 43 PLACE: Transportation and Public Works,Street Services,5001 James Avenue,Suite#: 44 201,Fort Worth,Texas 76115 45 46 CITY'S RIGHT TO ACCEPT OR REJECT BIDS 47 City reserves the right to waive irregularities and to accept or reject bids. 48 49 INQUIRIES CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 001113-2 INVITATION TO BIDDERS Page 2 of 2 1 All inquiries relative to this procurement should be addressed to the following: 2 Attn: Tariqul Islam,City of Fort Worth 3 Email: tariqul.islam@fortworthTexas.gov 4 Phone: 817-392-2486 5 6 ADVERTISEMENT DATES 7 October 13, 2016 8 October20, 2016 9 10 END OF SECTION CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 002113-1 INSTRUCTIONS TO BIDDERS Page 1 of 9 1 SECTION 00 2113 2 INSTRUCTIONS TO BIDDERS 3 1. Defined Terms 4 5 1.1.Terms used in these INSTRUCTIONS TO BIDDERS,which are defined in Section 00 72 6 00-GENERAL CONDITIONS. 7 8 1.2.Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 9 meanings indicated below which are applicable to both the singular and plural thereof. 10 11 1.2.1. Bidder: Any person,firm,partnership,company, association,or corporation acting 12 directly through a duly authorized representative, submitting a bid for performing 13 the work contemplated under the Contract Documents. 14 15 1.2.2. Nonresident Bidder: Any person,firm,partnership,company,association,or 16 corporation acting directly through a duly authorized representative, submitting a 17 bid for performing the work contemplated under the Contract Documents whose 18 principal place of business is not in the State of Texas. 19 20 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 21 (on the basis of City's evaluation as hereinafter provided)makes an award. 22 23 2. Copies of Bidding Documents 24 25 2.1.Neither City nor Engineer shall assume any responsibility for errors or misinterpretations 26 resulting from the Bidders use of incomplete sets of Bidding Documents. 27 28 2.2.City and Engineer in making copies of Bidding Documents available do so only for the 29 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant 30 for any other use. 31 32 33 34 35 36 37 . 38 39 ,ffmst be pfepafed to submit to City%4hin 40 , 41 4 5 11,BIDDERS PREQUALEPICATIONS. 42 43 3.2.1. Submission of anEVer-questions related te pre"alifieatien should be addressed 44 . 45 46 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 27,2012 002113-2 INSTRUCTIONS TO BIDDERS Page 2 of 9 1 2 , 3 , 4 , 5 te ffissist Qh-e City in eva4aafing and assessing the ability of the appefent low bidder-(s)to 6 7City's 8 , 9 ,may be gr-eands 10 11 . 12 13 3.4.In additien te pfequalifieat4en, 15 16 4. Examination of Bidding and Contract Documents,Other Related Data,and Site 17 18 4.1.Before submitting a Bid,each Bidder shall: 19 20 4.1.1. Examine and carefully study the Contract Documents and other related data 21 identified in the Bidding Documents (including "technical data"referred to in 22 Paragraph 4.2.below).No information given by City or any representative of the 23 City other than that contained in the Contract Documents and officially 24 promulgated addenda thereto, shall be binding upon the City. 25 26 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general,local and 27 site conditions that may affect cost,progress,performance or furnishing of the 28 Work. 29 30 4.1.3. Consider federal,state and local Laws and Regulations that may affect cost, 31 progress,performance or furnishing of the Work. 32 33 4.1.4. 34 4.1.5. Study all: (i)reports of explorations and tests of subsurface conditions at or 35 contiguous to the Site and all drawings of physical conditions relating to existing 36 surface or subsurface structures at the Site(except Underground Facilities)that 37 have been identified in the Contract Documents as containing reliable "technical 38 data" and(ii)reports and drawings of Hazardous Environmental Conditions,if any, 39 at the Site that have been identified in the Contract Documents as containing 40 reliable "technical data." 41 42 4.1.6. Be advised that the Contract Documents on file with the City shall constitute all of 43 the information which the City will furnish.All additional information and data 44 which the City will supply after promulgation of the formal Contract Documents 45 shall be issued in the form of written addenda and shall become part of the Contract 46 Documents just as though such addenda were actually written into the original 47 Contract Documents.No information given by the City other than that contained in 48 the Contract Documents and officially promulgated addenda thereto, shall be 49 binding upon the City. 50 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.I00630 Revised November 27,2012 0021 13-3 INSTRUCTIONS TO BIDDERS Page 3 of 9 1 4.1.7. Perform independent research,investigations,tests,borings,and such other means 2 as may be necessary to gain a complete knowledge of the conditions which will be 3 encountered during the construction of the project.On request,City may provide 4 each Bidder access to the site to conduct such examinations,investigations, 5 explorations,tests and studies as each Bidder deems necessary for submission of a 6 Bid. Bidder must fill all holes and clean up and restore the site to its former 7 conditions upon completion of such explorations,investigations,tests and studies. 8 9 4.1.8. Determine the difficulties of the Work and all attending circumstances affecting the 10 cost of doing the Work,time required for its completion,and obtain all information 11 required to make a proposal.Bidders shall-rely exclusively and solely upon their 12 own estimates,investigation,research,tests,explorations,and other data which are 13 necessary for full and complete information upon which the proposal is to be based. 14 It is understood that the submission of a proposal is prima-facie evidence that the 15 Bidder has made the investigation,examinations and tests herein required.Claims 16 for additional compensation due to variations between conditions actually 17 encountered in construction and as indicated in the Contract Documents will not be 18 allowed. 19 20 4.1.9. Promptly notify City of all conflicts,errors,ambiguities or discrepancies in or 21 between the Contract Documents and such other related documents.The Contractor 22 shall not take advantage of any gross error or omission in the Contract Documents, 23 and the City shall be permitted to make such corrections or interpretations as may 24 be deemed necessary for fulfillment of the intent of the Contract Documents. 25 26 4.2. Reference is made to Section 00 73 00—Supplementary Conditions for identification of: 27 28 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 29 the site which have been utilized by City in preparation of the Contract Documents. 30 The logs of Soil Borings,if any,on the plans are for general information only. 31 Neither the City nor the Engineer guarantee that the data shown is representative of 32 conditions which actually exist. 33 34 4.2.2. those drawings of physical conditions in or relating to existing surface and 35 subsurface structures(except Underground Facilities)which are at or contiguous to 36 the site that have been utilized by City in preparation of the Contract Documents. 37 38 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 39 on request. Those reports and drawings may not be part of the Contract 40 Documents,but the "technical data" contained therein upon which Bidder is entitled 41 to rely as provided in Paragraph 4.02. of the General Conditions has been identified 42 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 43 responsible for any interpretation or conclusion drawn from any "technical data" or 44 any other data,interpretations,opinions or information. 45 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 27,2012 002113-4 INSTRUCTIONS TO BIDDERS Page 4 of 9 1 4.3.The submission of a Bid will constitute an incontrovertible representation by Bidder(i) 2 that Bidder has complied with every requirement of this Paragraph 4,(ii)that without 3 exception the Bid is premised upon performing and furnishing the Work required by the 4 Contract Documents and applying the specific means,methods,techniques, sequences or 5 procedures of construction(if any)that may be shown or indicated or expressly required 6 by the Contract Documents,(iii)that Bidder has given City written notice of all 7 conflicts,errors,ambiguities and discrepancies in the Contract Documents and the 8 written resolutions thereof by City are acceptable to Bidder,and when said conflicts, 9 etc.,have not been resolved through the interpretations by City as described in 10 Paragraph 6.,and(iv)that the Contract Documents are generally sufficient to indicate 11 and convey understanding of all terms and conditions for performing and furnishing the 12 Work. 13 14 4.4.The provisions of this Paragraph 4,inclusive,do not apply to Asbestos,Polychlorinated 15 biphenyls(PCBs),Petroleum,Hazardous Waste or Radioactive Material covered by 16 Paragraph 4.06. of the General Conditions,unless specifically identified in the Contract 17 Documents. 18 19 5. Availability of Lands for Work,Etc. 20 21 5.1.The lands upon which the Work is to be performed,rights-of-way and easements for 22 access thereto and other lands designated for use by Contractor in performing the Work 23 are identified in the Contract Documents. All additional lands and access thereto 24 required for temporary construction facilities,construction equipment or storage of 25 materials and equipment to be incorporated in the Work are to be obtained and paid for 26 by Contractor. Easements for permanent structures or permanent changes in existing 27 facilities are to be obtained and paid for by City unless otherwise provided in the 28 Contract Documents. 29 30 5.2.Outstanding right-of-way,easements,and/or permits to be acquired by the City are listed 31 in Paragraph SC 4.01 of the Supplementary Conditions.In the event the necessary right- 32 of-way,easements,and/or permits are not obtained,the City reserves the right to cancel 33 the award of contract at any time before the Bidder begins any construction work on the 34 project. 35 36 5.3. The Bidder shall be prepared to commence construction without all executed right-of- 37 way,easements,and/or permits,and shall submit a schedule to the City of how 38 construction will proceed in the other areas of the project that do not require permits 39 and/or easements. 40 41 6. Interpretations and Addenda 42 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 27,2012 0021 13-5 INSTRUCTIONS TO BIDDERS Page 5 of 9 1 6.1.All questions about the meaning or intent of the Bidding Documents are to be directed to 2 City in writing on or before 2 p.m.,the Monday prior to the Bid opening. Questions 3 received after this day may not be responded to. Interpretations or clarifications 4 considered necessary by City in response to such questions will be issued by Addenda 5 delivered to all parties recorded by City as having received the Bidding Documents. 6 Only questions answered by formal written Addenda will be binding. Oral and other 7 interpretations or clarifications will be without legal effect. 8 9 Address questions to: 10 11 City of Fort Worth 12 1000 Throckmorton Street 13 Fort Worth,TX 76102 14 Attn: Tariqul Islam,Transportation and Public Works 15 Fax: 817-392-7969 16 Email:tariqul.islam@fortworthtexas.gov,Phone: 817-392-2486 17 18 19 6.2.Addenda may also be issued to modify the Bidding Documents as deemed advisable by 20 City. 21 22 6.3.Addenda or clarifications may be posted via Buzzsaw at<Insert Link to Documents. 23 24 6.4.A prebid conference may be held at the time and place indicated in the Advertisement or 25 INVITATION TO BIDDERS. Representatives of City will be present to discuss the 26 Project. Bidders are encouraged to attend and participate in the conference. City will 27 transmit to all prospective Bidders of record such Addenda as City considers necessary 28 in response to questions arising at the conference. Oral statements may not be relied 29 upon and will not be binding or legally effective. 30 31 7. Bid Security 32 33 7.1.Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 34 (5)percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 35 the requirements of Paragraphs 5.01 of the General Conditions. 36 37 7.2.The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 38 have been satisfied. If the Successful Bidder fails to execute and deliver the complete 39 Agreement within 10 days after the Notice of Award,City may consider Bidder to be in 40 default,rescind the Notice of Award,and the Bid Bond of that Bidder will be forfeited. 41 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all 42 other Bidders whom City believes to have a reasonable chance of receiving the award 43 will be retained by City until final contract execution. 44 45 8. Contract Times 46 The number of days within which,or the dates by which,Milestones are to be achieved in 47 accordance with the General Requirements and the Work is to be completed and ready for 48 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 49 attached Bid Form. 50 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 27,2012 002113-6 INSTRUCTIONS TO BIDDERS Page 6 of 9 1 9. Liquidated Damages 2 Provisions for liquidated damages are set forth in the Agreement. 3 4 10. Substitute and "Or-Equal" Items 5 The Contract,if awarded,will be on the basis of materials and equipment described in the 6 Bidding Documents without consideration of possible substitute or"or-equal" items. 7 Whenever it is indicated or specified in the Bidding Documents that a"substitute" or"or- 8 equal" item of material or equipment may be furnished or used by Contractor if acceptable to 9 City,application for such acceptance will not be considered by City until after the Effective 10 Date of the Agreement. The procedure for submission of any such application by Contractor 11 and consideration by City is set forth in Paragraphs 6.05A.,6.05B. and 6.05C. of the General 12 Conditions and is supplemented in Section 01 25 00 of the General Requirements. 13 14 11. Subcontractors,Suppliers and Others 15 16 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020- 17 12-2011 (as amended),the City has goals for the participation of minority business 18 and/or small business enterprises in City contracts.A copy of the Ordinance can be 19 obtained from the Office of the City Secretary. The Bidder shall submit the MBE and 20 SBE Utilization Form, Subcontractor/Supplier Utilization Form,Prime Contractor 21 Waiver Form and/or Good Faith Effort Form with documentation and/or Joint 22 Venture Form as appropriate.The Forms including documentation must be received 23 by the City no later than 5:00 P.M. CST,five(5)City business days after the bid 24 opening date.The Bidder shall obtain a receipt from the City as evidence the 25 documentation was received.Failure to comply shall render the bid as non- 26 responsive. 27 28 11.2. No Contractor shall be required to employ any Subcontractor,Supplier,other person 29 or organization against whom Contractor has reasonable objection. 30 31 12. Bid Form 32 33 12.1. The Bid Form is included with the Bidding Documents; additional copies may be 34 obtained from the City. 35 36 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form 37 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 38 the Bid Form. A Bid price shall be indicated for each Bid item, alternative,and unit 39 price item listed therein. In the case of optional alternatives,the words "No Bid," 40 "No Change," or"Not Applicable" may be entered. Bidder shall state the prices, 41 written in ink in both words and numerals,for which the Bidder proposes to do the 42 work contemplated or furnish materials required.All prices shall be written legibly. 43 In case of discrepancy between price in written words and the price in written 44 numerals,the price in written words shall govern. 45 46 12.3. Bids by corporations shall be executed in the corporate name by the president or a 47 vice-president or other corporate officer accompanied by evidence of authority to 48 sign. The corporate seal shall be affixed. The corporate address and state of 49 incorporation shall be shown below the signature. 50 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 27,2012 0021 13-7 INSTRUCTIONS TO BIDDERS Page 7 of 9 1 12.4. Bids by partnerships shall be executed in the partnership name and signed by a 2 partner,whose title must appear under the signature accompanied by evidence of 3 authority to sign. The official address of the partnership shall be shown below the 4 signature. 5 6 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 7 member and accompanied by evidence of authority to sign. The state of formation of 8 the firm and the official address of the firm shall be shown. 9 10 12.6. Bids by individuals shall show the Bidder's name and official address. 11 12 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 13 indicated on the Bid Form. The official address of the joint venture shall be shown. 14 15 12.8. All names shall be typed or printed in ink below the signature. 16 17 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda,the numbers of 18 which shall be filled in on the Bid Form. 19 20 12.10. Postal and e-mail addresses and telephone number for communications regarding the 21 Bid shall be shown. 22 23 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 24 Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance 25 to State Law Non Resident Bidder. 26 27 13. Submission of Bids 28 Bids shall be submitted on the prescribed Bid Form,provided with the Bidding Documents, 29 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 30 addressed to City Manager of the City,and shall be enclosed in an opaque sealed envelope, 31 marked with the City Project Number,Project title,the name and address of Bidder,and 32 accompanied by the Bid security and other required documents. If the Bid is sent through the 33 mail or other delivery system,the sealed envelope shall be enclosed in a separate envelope 34 with the notation "BID ENCLOSED" on the face of it. 35 36 14. Modification and Withdrawal of Bids 37 38 14.1. Bids addressed to the City Manager and filed with the Purchasing Office cannot be 39 withdrawn prior to the time set for bid opening. A request for withdrawal must be 40 made in writing by an appropriate document duly executed in the manner that a Bid 41 must be executed and delivered to the place where Bids are to be submitted at any 42 time prior to the opening of Bids.After all Bids not requested for withdrawal are 43 opened and publicly read aloud,the Bids for which a withdrawal request has been 44 properly filed may,at the option of the City,be returned unopened. 45 46 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 47 time set for the closing of Bid receipt. 48 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 27,2012 002113-8 INSTRUCTIONS TO BIDDERS Page 8 of 9 1 15. Opening of Bids 2 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 3 abstract of the amounts of the base Bids and major alternates(if any) will be made available 4 to Bidders after the opening of Bids. 5 6 16. Bids to Remain Subject to Acceptance 7 All Bids will remain subject to acceptance for the time period specified for Notice of Award 8 and execution and delivery of a complete Agreement by Successful Bidder. City may,at 9 City's sole discretion,release any Bid and nullify the Bid security prior to that date. 10 11 17. Evaluation of Bids and Award of Contract 12 13 17.1. City reserves the right to reject any or all Bids,including without limitation the rights 14 to reject any or all nonconforming,nonresponsive,unbalanced or conditional Bids 15 and to reject the Bid of any Bidder if City believes that it would not be in the best 16 interest of the Project to make an award to that Bidder,whether because the Bid is 17 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 18 meet any other pertinent standard or criteria established by City. City also reserves 19 the right to waive informalities not involving price,contract time or changes in the 20 Work with the Successful Bidder. Discrepancies between the multiplication of units 21 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 22 between the indicated sum of any column of figures and the correct sum thereof will 23 be resolved in favor of the correct sum. Discrepancies between words and figures 24 will be resolved in favor of the words. 25 26 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 27 among the Bidders,Bidder is an interested party to any litigation against City, 28 City or Bidder may have a claim against the other or be engaged in litigation, 29 Bidder is in arrears on any existing contract or has defaulted on a previous 30 contract,Bidder has performed a prior contract in an unsatisfactory manner, or 31 Bidder has uncompleted work which in the judgment of the City will prevent or 32 hinder the prompt completion of additional work if awarded. 33 34 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers,and 35 other persons and organizations proposed for those portions of the Work as to which 36 the identity of Subcontractors, Suppliers,and other persons and organizations must 37 be submitted as provided in the Contract Documents or upon the request of the City. 38 City also may consider the operating costs,maintenance requirements,performance 39 data and guarantees of major items of materials and equipment proposed for 40 incorporation in the Work when such data is required to be submitted prior to the 41 Notice of Award. 42 43 17.3. City may conduct such investigations as City deems necessary to assist in the 44 evaluation of any Bid and to establish the responsibility,qualifications,and financial 45 ability of Bidders,proposed Subcontractors,Suppliers and other persons and 46 organizations to perform and furnish the Work in accordance with the Contract 47 Documents to City's satisfaction within the prescribed time. 48 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 27,2012 0021 13-9 INSTRUCTIONS TO BIDDERS Page 9 of 9 1 17.4. Contractor shall perform with his own organization,work of a value not less than 2 35%of the value embraced on the Contract,unless otherwise approved by the City. 3 4 17.5. If the Contract is to be awarded,it will be awarded to lowest responsible and 5 responsive Bidder whose evaluation by City indicates that the award will be in the 6 best interests of the City. 7 8 17.6. Pursuant to Texas Government Code Chapter 2252.001,the City will not award 9 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 10 the lowest bid submitted by a responsible Texas Bidder by the same amount that a 11 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 12 comparable contract in the state in which the nonresident's principal place of 13 business is located. 14 15 17.7. A contract is not awarded until formal City Council authorization. If the Contract is 16 to be awarded,City will award the Contract within 90 days after the day of the Bid 17 opening unless extended in writing. No other act of City or others will constitute 18 acceptance of a Bid.Upon the contractor award a Notice of Award will be issued by 19 the City. 20 21 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 22 23 18. Signing of Agreement 24 When City issues a Notice of Award to the Successful Bidder,it will be accompanied by the 25 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 26 Contractor shall sign and deliver the required number of counterparts of the Agreement to 27 City with the required Bonds,Certificates of Insurance,and all other required documentation. 28 City shall thereafter deliver one fully signed counterpart to Contractor. 29 30 31 32 END OF SECTION CrrY OF FORT WORTH CONCRETE RESTORATION(2017-I) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 27,2012 003513-1 CONFLICT OF INTEREST AFFIDAVIT Page 1 of 1 I SECTION 00 3513 2 CONFLICT OF INTEREST AFFIDAVIT 3 4 Each bidder,offeror,or respondent(hereinafter also referred to as"you')to a City of Fort Worth 5 (also referred to as"City")procurement are required to complete Conflict of Interest 6 Questionnaire(the attached CIQ Form)and Local Government Officer Conflicts Disclosure 7 Statement(the attached CIS Form)below pursuant to state law. This affidavit will certify that the 8 Bidder has on file with the City Secretary the required documentation and is eligible to bid on 9 City Work.The referenced forms may be downloaded from the website links provided below. 10 * { 12 13 ja` �: �,tr .t .us'foizns/i.iS.paf 14 15 ® CIQ Form is on file with City Secretary 16 17 Q CIQ Form is being provided to the City Secretary 18 19 ® CIS Form is on File with City Secretary 20 21 Q CIS Form is being provided to the City Secretary 22 23 24 25 BIDDER: 26 By:&min tion 27 Com Please Print) 28 G�'"—�� 29 � - _ Si ature. may' 30 Address 31 32Title: 33 City/State/Zip (Please Print) 34 35 36 END OF SECTION CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised March 27,2012 004100 BID FORM Page I of 3 SECTION 00 4100 BID FORM TO: The City Manager c/o:The Purchasing Department 1000 Throckmorton Street City of Fort Worth,Texas 76102 FOR: Concrete Restoration(2017-1) City Project No.: 100630 Units/Sections: CONCRETE PAVING 1, Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid,Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS,including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance,will do so pending contract award,and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group,association,organization,or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5.Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt,fraudulent,collusive,or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice"means the offering,giving,receiving,or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process to the detriment of City(b)to establish Bid prices at artificial non-competitive levels,or(c)to deprive City of the benefits of free and open competition. c. 'collusive practice"means a scheme or arrangement between two or more Bidders,with or without the knowledge of City,a purpose of which is to establish Bid prices at artificial,non-competitive levels. d. 'coercive practice"means harming or threatening to harm,directly or indirectly,persons or their property to influence their participation in the bidding process or affect the execution of the Contract. CITY OF FORT WORTH Form CONSTRUCTION sPEC>FICAT1ox vocuMEi`rrs 00 41000042_ _43_00_43 13 00_43 37_Bid Form-Pro osal-Bond Vendor Com Nance 0 1 Forth Revised 20110627 _ _ _ _ p — p O( ) G 00 41 00 BID FORM Page 2 of 3 3.Pfequelifieetien a. b. C. d. 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 150 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work(and/or achievement of Milestones)within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form b. Required Bid Bond,Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form Section d. Vendor Compliance to State Law Non Resident Bidder,Section 00 43 37 e. MWBE Forms(optional at time of bid) f. g. Conflict of Interest Affidavit,Section 00 35 13 h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below,please enter the total bid amount for this project.Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. Total Bid $818,975.00 7. Bid Submittal This Bid is submitted on NOVEMBER 10,2016 by the entity named below. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT'S Form Revised 201 10627 00 41 00_00 42_43_00_43_13_00_43_37 Bid_Form-Proposal-Bond Vendor Compliance(0)(1) 00 41 00 BID FORM Page 3 of 3 Resp 'lted, / Receipt is acknowledged of the Initial following Addenda: By: Addendum No. 1: ( Iafore) Addendum No.2: Addendum No.3: VALENTIN ARREGUIN Addendum No.4: (Printed Name) Title: PRESIDENT Company: ARREGUIN GROUP,INC. Corporate Seal: Address: 8204 ELNIBROOK DRIVE SUITE 192 DALLAS,TEXAS 75247 State of Incorporation: TEXAS Email: B!DSCZDARREGUINGROURCOM Phone: 214-484-3139 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Fortn Revised 20110627 00 41 00_00_42_43_00_43_13_00_43_37 Bid Form-Proposal-Bond Vendor_Compliance(0)(1) W 43 SO PROPOSAL Pop 1orI SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application ARREG['tN GRO['P INC. Project Item Information Bidder's Proposal Bidlist Description Specification Unit of Bid Unit Price Bid Value Item No. Section No. Measure Quantity 1 0135.0201 Remobilization 01 70 00 EA 1 $500.00 $500.00 2 3305.0108 Miscellaneous Adjustment(Utilities) 33 05 14 LS 1 $5,000.00 $5,000.00 3 9999.0000 Remove and Replace 6"Concrete Driveway 02 41 13132 13 20 SF 2,800 $9.50 $26,600.00 4 9999.0000 Remove Concrete and Replace with 7"Concrete Pavement HES 02 41 15/32 13 13 SY 7,916 $83.75 $662,965.00 5 3123.0101 Unclassified Excavation 31 23 16 CY 100 $45.00 $4,500.00 6 3211.0122 Flex Base,Type A,GR-2 32 11 23 CY 770 $45.00 $34,650.00 7 3213.0208 Concrete HES(extra depth) 32 13 13 CY 100 $180.00 $18,000.00 8 3292.0100 Block Sod Placement 32 92 13 SY 345 $13.00 $4,485.00 9 3213.0700 Joint Sealant 32 13 73 LF 2,000 $1.75 $3,500.00 10 9999.0000 Geogrid Tenser(TRIAX 140-475)or Approved Equal 999900 SY 3,500 $4.25 $14,875.00 11 9999.0000 Remove and Replace 4"Sidewalk 02 41 13/32 13 20 SF 200 $8.50 $1,700.00 12 3217.5001 Curb Address Painting 32 17 25 EA 20 $150.00 $3,000.00 13 0241.0300 Remove ADA Ramp 0241 13 EA 2 $800.00 $1,600.00 14 3213.0501 Install Barrer Free Ramp 32 13 20 EA 2 $2,500.00 $5,000.00 15 3346.0108 6"Pipe Underdrain,Type 8 33 46 00 LF 100 $40.00 $4,000.00 16 3217.2001 Raised Marker TY W 32 17 23 EA 100 $6.50 $650.00 17 3217.2002 Raised Marker TY Y 32 17 23 EA 100 $7.50 $750.00 18 3217.2101 REFL Raised Marker TY I-A 321723 EA 20 $7.50 $150.00 19 3217.2102 REFL Raised Marker TY I-C 32 17 23 EA 20 $7.50 $150.00 20 3217.2103 REFL Raised Marker TY II-A-A 321723 EA 20 $7.50 $150.00 21 3217.2104 REFL Raised Marker TY II-C-R 32 17 23 EA 20 $7.50 $150.00 22 3441.1301 Loop Detector Cable Sawcut 3441 10 LF 200 $16.50 $3,300.00 23 3441.1302 14 AWG Loop Detect Cable 3441 10 LF 200 $16.50 $3,300.00 24 3217.0305 Stop Bars Pavement Markings 32 17 23 LF 200 $10.50 $2,100.00 25 3217.0501 24"Solid White Thermoplastic(HAE)Crosswalk Lines 32 17 23 LF 200 $14.50 $2,900.00 26 9999.0096 Paving Construction Allowance EA 1 $15,000.00 $15,000.00 Toatl Bid $818,97li.00 CITY OF FLIRT WORTH STANDARD CONRTRDC'IION 9PECQ'ICAlION DOCUIdF3lIS Fm"Rewed mslaan W 4100-911-42439043 1)_ 43_37B4 Fa Pmpwd-Bmd Vmtiv CwpGm(0)(1) Bond No: 1001060105-10 TM _ = L Document A310 2010 Mdeiond CONTRACTOR: SURETY: (Name, legal status-and'address) (Naive legal.status:and principal place Arreguin Group,Inc. of butiiness) American Contractors Indemnity Company dba Texas Bonding Company 8204 Elmbrook Drive,#192 Tfgiis.document has important legal 601 S.Figueroa St.,Ste.1600 conse4 uences.Consultation with Dallas,TX 75247 Los Angeles,CA 90017 OWNER: nn atantsy is trntvuiagtrd with (Name,legal status and address) respect to its completion or modification. City of:Fort Worth 1000 Throckmorton.St.,Purchasing Division Any:cin0ular rPfprwnrp to party Fort Worth, shall be considered Contractor,Surety,Owner or , 7'X 76.102 BOND AMOUNT: 5%of Total Amount Bid Not to exceed:Forty Nine Thousand Five Hundred and 00/100 other Dollars($49,540:00) plural where applicable. (PRROJECjT: a(� � Q �T ���� �f p�►r Come e' R4e�storahoa 017-1)EAt Van�iu L6catGions'�t Wo'r15,TX) The Contractor and Surety are bound to the Owner in the amount set forth above,:for the payment of which the Contractor and Surety bind themselves.iherr.l eim,executors,administrators.successors and assigns,jointly and severally,.as.provided herein..The coriditions.of this Bond are such that:if the,Owner accepts the bid of the Contractor within the time specified in the bid documents,or within.sueh time period as:may be agreed to by.the Owner and Contractor,.and the Contractor either(1)enters into a contract with the Owner in accordance with the terms of such bid,and gives such bond or bonds as may be specified in.the bidding or ConuactDocuments,with a,surety admitted in the jurisdiction of the:Project and otherwiseacceptableto the Owner,for.the faithful performance of such Contract and for the.prampt payment of labor aril material fiunished in the prosecution;tliereof;or.(2)pays to the Owner the difference,rtnt to exceed the amnuiut.of thi.-Bond,het.wiP:n the amonnt.�pectfied in said hid.nnd such liugrr amount for which the Owner may in good faith contract with another party to perform the work,covered by said bid,then this obligation shall be null and:void,otherwise to remain in:full force and effect.The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in:which the Owner may accept the bid.Waiver of notice by the Surety shall not apply to any extension exceeding sixty(60)days In the aggregate beyond the time.tbr acceptance of bids specified in the bid documents,and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty(60)days. If this Bored is;'issued.in connection with,a subcontractor's bid to,a Contractor,the term Contractor in this Bond shall be deemed to be'Subcontractor and the term Owner shall be deemed.to be Contractor. When this.Bond.has been furnlshed.to comply with a statutoryor'other Iegal requirementinthe location of the Project, any provision in this Bond corlfhcfing with said statutory or legal.requitement shall'be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement.shall be deemed incorporated herein.When so famished,the intent is that this Bond shall be construed as a statutory bond and not as a common law bond Sip and sealed this 2nd day.of November, 2016 A)TTh egum Group,Inc. (Seal) itness) h ^ (Title) Valentin Arregu ,President American C n e i man dba Texas Bonding Com an� f,wo, {'S ) ('Seal) fitness emy Crawford,Attorney-In-Fact AIA d6cumerit'A310T"—2010L Co ht;o 1963,1910 and 2010 b g pyrig by InstituteotArchiteefs.A11 rights rrserved.NltAitNIC�IG.TllisAt/1 Init: OocurnertiS protected byU S:Copyright Law and fnteiimational Treaties.Unauthorized reproduction or.distribution of thisA10 Document,or oily 11Uftttlt/'Uf tl,Iif'dy vejult hi"suv6it'dill Aid utiill"al 0emdltle5'wid Nltt be rnutiewted to the ttiilxliuum eattid pusstWe uidei Um taw.'M6 docum"ent:was created on 011/V&1012 07-23:12 under the terns of AIA Documents-0n-DemandT1"order no. 2008397493,and is riot for resale.This documenf 19 licensed by The American Institute of Architects for one-time use only,and may not be reproduced prior to its completion.celiu'L Aj 62&0%k vu POWER OF ATTORNEY AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED STATES SURETY COMPANY U.S.SPECIALTY INSURANCE COMPANY ALL IVIEN BY THESE IU—ZFSBNTE='--'L]Mr-MrMican Contr-9nl.; ctors tndeniy Cornrmiv, a Califbmi&�1W*ff1d&1ftaX! rat.Z-g Company, an assumed ri��Q-UNA-M—M— actors Indc-ii ii ity Compi2q, I:rij-ej Slflec Surety CO—M &M s make; " W —wft t0i'lioration and U.S. Specialty Insurg—me Mmany, a Texas corporation(L-ollcccivel , the CA)m p ail i do by thpr&-s- , constitute and appoint: Jeremy Crawford,Michael D.Williams,William J.Nemec,Tanya Fukushima, William Gerber or 's-]i c h ai!l E.Konzen of Golden Valley,NImijesota its thie ouch tll lheirseparkqte capacity ifn -effi�rlt � ve,with fi,-roh. Lill"I'El 'i- 'i, Dame,7! '111d to cxocutQ, atkilowledge an via mdsll reCogniz.Aricts, Oil' usher iiistj mucii is or C0111TJ Ul� L-JJ tiL3 r0vship tip include riders, amMdme—n-rs-, and consents of surety, providirig IIIc I wrld penalty does not exceed *****Five Million***** Dollars (S ) This Power of Attorney shall expire without further action on December 20,2017. This Power of Attorney is granted under and by authority n f to t2 f6l low I ag resolutions adopted by fte Birds of Directors of the Cf)MP@ilje5: I P lva that QhL Ilrcs.dQni,any any Se.retzrX ox % shall be an,; qi I-�i4;Try'vC5.0d with bill' _ffile 6m X 'r Z7�'d1tkPrlV.I Ll AP,;10 li 0 any one or �o�py(s)-in-Fact to reprLsod ai 4.1 2.4z To igLd tqi,Iiv[ol J'of the Comm!ry 511 iject to I PtiQviil mvisions, Attorney-in-Fact may be given fill power and authority for and in the name of and on behalf of the Company,to execute,acknowledge and d-'.ivcr,any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings, including any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts,and any and all notices and documents canceling or terminating the Company's liability thereunder,and any such instruments so executed by any such Alrorriq-ln-re,'l shall be binding upon the Company as if signed by the President and sealed and effected 'il Resvived0hat I I of any auLbOdWdG0'1,17 aft�J'Icill�f tbc,Compa_�-r he,el4Fottr U�,I F Fifitd-41Tja4�d T&WLY-"cr o:LiLbor ncy oi craff.bWo rejotilig Com Ai 10,11, bj&ftL%1jP�'any power of artncrlOy')I"qif�wW signai ure or sWl k binding upon the Wj -7- ' l wk s'nGt sir 101M ufRIM K into which it is imic,OkL IN WITNESS WHEREOF,The Companies have caused this instrument to be signed and their corporate seals to be hereto affixed,this I st day of'December,2014. - XAS 1 0 N K% 1C(j r I-A y AMERICAN CQNTRACTURSIMEWNITY COMPANY 1F 'fro UNITEMM&P MMMNY U.S.61'EC311-1a ......... . -7 X--1 ... 4 By: Daniel P.Aguila Vice President X.acvA;i!.I I I.. ?", I .............. ... .......... I 1 afI 11'nly the identi tWMiv-dfia�gW the Q-Qffnefflt clDki�certificate I g t ess,accuracy,oiw�� �M turf ( lw ,,I I Wkfl ifi- ji, officer compit Mateeof-California County of Los Angeles SS: On this Istdzi) of December,2014, before me,Maria G.Rodriguez-Wong,anotary public, V:-iscwllly appeared Dan P.Aguilar,Vice President of American C'un lravw; I Fi,1cTn"ql:y t r+tnpany.Texas Bon-diji -Ciamparr 9 DUIftle"tates Surety Compri n :,;I Li � 13pe6MTy'TnSL1nUlVe CCMP�iny Who p rov c:-d ro=oll=-:7- Ilik! 1-.1;kLLL-ryr4' L,,Ho.,',rc to be k nmd&scribed to the within inslmmcm Tinili acknilwlizt!g:d to me thal heawcmcd thcI,iaw.jli izal ezipauji.y,aiic�that by his sir0W&-WthMsWu-wAKfiw— 11,1 U'C-f W-i-171"U'l LI 10 in9t me person,or atiOn b� person acted,exim440d i L rum I under PENALTY OF PERJURY dWer the taws of the State of California that ffic rfwcLx)m; paragraph is true and correct. WIT'N'F.L;ti my hand and official seal. MARIA G.RODRIGUEZ-wo" A co mrnission#2049771;,, fornia z z dm�ty MMY NUM-1—M 0,2017 1,Kio Lo,Assistant Secretary of American Contractors Indemnity Company,Texas Bonding Company,United States Surety Company and U.S. Specialty Insurance Company,do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney,executed by said Companies,which is still in full force and effect;furthermore,the resolutions of the Boards of Directors,set out in the Power ofAttomey are in full In WitllaFq I have hereuriftaffiffhM WW"the seals of Said (-'0jljr);Jjl ll-!ti {Lk ljry ,t i i-.z Califon� %wf ',4ovembpe-wr,- 2016— Corporate 9'als ......... N -ML Elt Kio Lo, Ass istan t Sec rets r) boad No. 194 06 0 1'05 ; 4 ��% om gA b.,J ME Acknowledgment of Surety State of Minnesota County of Hennepin On this 2nd day of November, 2016 before me personally appeared Jeremy Crawford who acknowledged that he or she is the attorney in fact who is authorized to sign on behalf OfAmerican Contractors Indemnity Company dba Texas Bonding Company](surety company) 6se. oing instrument, and he thereupon duly acknowledged to me that he e e h of ublic \�.�'�NQv��� ��� aj,BYtATC�O� `eta��e�P 004337 VENDOR COMPLIANCE TO STATE LAW Page I of I SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that,in order to be awarded a contract as low bidder,nonresident bidders(out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder.Resident bidders must check the box in Section B. A. Nonresident bidders in the State of our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. BIDDER: Company:ARREGUIN GROUP,INC. By: VALENTIN ARREGUIN Address: 8204 ELMBROOK DRIVE ` SUITE 192 (Signature) DALLAS,TEXAS 75247 Title: PRESIDENT Date: 1' �101 ;W1 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20110627 00 41 00_00_42_43_00_43_1 3 00_43_37 Bid Form-Proposal-Boo_V-dor_Complim3*o)(1) 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a),as amended,Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. GGO1-539590-0202003 Contractor further certifies that,pursuant to Texas Labor 6 Code, Section 406.096(b),as amended,it will provide to City its subcontractor's certificates of 7 compliance with worker's compensation coverage. 8 9 CONTRACTOR: to 11 By: Ih/ff_ 12 Comp (Please Pri 13 hi AA 14 0 �7- �9o'Z Signature: 15 Address ,/ 7 /� 17 �(.�l��S i T,)( Title: AO- , 18 City/State/Zip (Please Print) 19 20 21 THE STATE OF TEXAS § 22 23 COUNTY OF TARRANT § 24 25 BEFORE ME,the undersigned authority, on this day personally appeared 261 &J ,known to me to be the person whose name is 27 subscribed to the forgeoing instrument, and acknowledged to me that he/she executed the same as 28 the act and deed of Q for the purposes and 29 consideration therein expre ed and in the capacity therein stated. 30 31 GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 32 (�1� z ,20_. 33 34 35 r u JESSICA CASTORENA 36 , , NOTARY PUBLIC STATE OF TEXAS Notary Public in and for the State of e MY COMM.EXP.12/8/2019 37 NOTARY ID 13004650-0 38 END OF SECTION 39 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 00 43 37 VENDOR COMPLLINCE TO STATE LAW Page 1 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON SIDENT BIDDER Texas Government C Chapter 2252 was adopted for the award of c tracts to nonresident bidders. This law provides that,in order to be award contract as low bidder,nonresident bidder (out-of-state contractors whose corporate offices or principal place of business are utside the State of Texas)bid projects or construction,improvements, supplies or services in Texas at an amount lower than lowest Texas resident bidder b the same amount that a Texas resident bidder would be required to underbid a nonresident idder in order to obtain a mparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be ed out by all n esident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will a omatically isqualify that bidder.Resident bidders must check the box in Section B. A. Nonresident bidders in the State of our principal place of business, are required to be ffi,Fit- ' percen ow than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of our principal place of business, are not required to underbid resident b'dders. B.The principal place of business of r company or our parent co m y or majority owner is in the State of Texas ❑ BIDDER: Company:Company Name Here By:Printed N e Here Address: Address Here Address Here or Spa (Signa e) City,State Zip Cod Here Title:Title Here Date: END OF SECTION CrrY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20110627 00 4100_00_42 43_00_43_13_00 43_37_Bid_)FocmProposal-Bond Vendor_Compliawe(0).xb 005243-3 Agreement Page 3 of 4 74 Article 6.INDEMNIFICATION 75 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 76 expense, the city, its officers, servants and employees, from and against any and all 77 claims arising out of, or alleged to arise out of, the work and services to be performed 78 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 79 under this contract. This indemnification provision is specifically intended to operate 80 and be effective even if it is alleged or proven that all or some of the damages being 81 sought were caused,in whole or in part, by any act,omission or negligence of the city. 82 This indemnity provision is intended to include, without limitation, indemnity for 83 costs,expenses and legal fees incurred by the city in defending against such claims and 84 causes of actions. 85 86 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 87 the city,its officers,servants and employees,from and against any and all loss,damage 88 or destruction of property of the city,arising out of,or alleged to arise out of,the work 89 and services to be performed by the contractor, its officers, agents, employees, 90 subcontractors, licensees or invitees under this contract. This indemnification 91 provision is specifically intended to operate and be effective even if it is alleged or 92 proven that all or some of the damages being sought were caused, in whole or in part, 93 by any act,omission or negligence of the city. 94 95 Article 7.MISCELLANEOUS 96 7.1 Terms. 97 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 98 have the meanings indicated in the General Conditions. 99 7.2 Assignment of Contract. 100 This Agreement, including all of the Contract Documents may not be assigned by the 101 Contractor without the advanced express written consent of the City. 102 7.3 Successors and Assigns. 103 City and Contractor each binds itself, its partners, successors, assigns and legal 104 representatives to the other party hereto, in respect to all covenants, agreements and 105 obligations contained in the Contract Documents. 106 7.4 Severability. 107 Any provision or part of the Contract Documents held to be unconstitutional, void or 108 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 109 remaining provisions shall continue to be valid and binding upon CITY and 110 CONTRACTOR. 111 7.5 Governing Law and Venue. 112 This Agreement, including all of the Contract Documents is performable in the State of 113 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 114 Northern District of Texas,Fort Worth Division. CITY OF FORT WORTH Concrete Restoration 2017-1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100630 Revised August 17,2012 005243-4 Agreement Page 4 of 4 115 7.6 Other Provisions. 116 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is 117 classified, promulgated and set out by the City, a copy of which is attached hereto and 118 made a part hereof the same as if it were copied verbatim herein. 119 7.7 Authority to Sign. 120 Contractor shall attach evidence of authority to sign Agreement, if other than duly 121 authorized signatory of the Contractor. 122 123 IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple 124 counterparts. 125 126 This Agreement is effective as of the last date signed by the Parties("Effective Date"). 127 Contractor: City of Fort h rrcQUi n GM UAO . n B : Jay Chapa Assistant City Manager (Signature) �f Date i/ayn- i n ,eau . Attest:�—1 �, (Printed Name) City Secretary Title: (Seal) OF/c0 ... Address: '7 ' M&C C• ?O Date: �1 �.�� IZ4 0zarIT ... Ci /State/Zi Ak rove as to Form and Legall h' p•� � �� 7527 g s' �Wr o�� Or✓� 7 Date Douglas W. Black Assistant City Attorney 128 129 130 APPROVAL RECOMMENDED: 131 132 u. 133 134 Douglas Ifiersig, P.E. 135 DIRECT R, 136 Department of Transportation&Public Works 137 CITY OF FORT WORTH Concrete Restoration 2017-1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS ®" CIA„RECORD City Project Number 100630 Revised August 17,2012 !�'V',-CITY SIORF"w- WORM TX Contract Compliance Manager: By signing I acknowledge that 1 am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Tariqul Islam Title 006113-1 PP,RFARMMU f OND Pop 1 of 2 Bond No.1017192 1 SECTION 00 6113 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY TUE SE PRESENTS: 6 COUNTY OF TARRANT § 7 That we,AAREGUTA'GROIrPk NC, known as"Principal herein and S Oklahoma Surety Company a corporate surety(sureties,,ifinore than 9 one)duly authorized to do business in the State of Texas,known as"Suroty"herein(whether one 10 or more),are held and firmly bound unto the City of Fort Worth,a municipal corporation created 11 pursuant to the laws of Texas,known as"City"herein,in the penal sum of,EIIGl3'.7'HIIlYDR!<b 12 EIGH`TtsENTHtJiISAND,NI11tF,HUNDRED S'EVE1�'!Y-FIt�AND 00/1#0 dollars 13 {l;Slg 9� T5.t101�lawful nwney of the United States,to be paid in Fort Wortli,Tarrant County, 14 Texas for the payment of which sum well and truly to be made,we bind ourselves,our heirs, 15 executors,administrators,successors and assigns,jointly and severally, firmly by these Presents. 16 WHEREAS,the Principal has entered into a certain written contract with the City 17 awarded the 7th day of March,2017 which Contract is hereby referred to and made a part hereof 18 for all purposes at iffully set forth."herein,to furnish all materials,equipment labor and other 19 accessories defined by law,in the prosccution of the Work,including any Change Orders,as 20 provided for in said Contract designated as Concrete Restortniun{21117-I)ae VaHOus Locatinrrs, 21 L&Psroieet ftmber:100630, 22 NOW,THEREFORE,the condition of this obligation is such that if the said Principal shall 23 faithfully perform:it obligations under the Contract and shall in all respects duly and faithfully 24 perform the Work,including Chante Orders,under the Contract,according to the plans, 25 specifications,and c ontmt documents therein referred to,and as well during any period of 26 extension or the Contract that may be granted on the part of the City,then.this obligation:shall be 27 and become null and void,otherwise to remain in full force and effect. 28 PROVIDED FURTI FR,that if any legal action be filed on this Bond,venue Shall lie in 29 Tarrant County,Texas or the.United States District Court for the Northern District of Texas,Fort 30 Worth Division. 31 This bored is made and executed in compliance with the provisions of Chapter 2253 of the 32 "Texas Government Cade,a.3 amended,and all liabilities an this bond shall be determined in 33 accordance with the provisions of said statue. 34 IN WMESS WHEREOF,the Principal and the Surety have SIGNED and SEALED 35 this instrument by duly authorbwd.agents and officers on this 7tb day of March,201.7. CrrY OF FORT WARM l'arecrrdr Rrxtoratl"2017-1 3TAhti7ARD C ONSTRUC'1'lUN SI'1=Cli-'IC ATION TWI MNITS City Project Na..100630 Revised July 1.2011 0061 13-2. PERMKMANCE BOND P*e 2 uP2 1. 2 PRINCfi/1i.: 3 Arreguin Croup,Inc. 4 5 � b 13 7 8 1l.TTEST: 9 10 Valentin Arreguln,President 11 (Principal)Secretary Name and Title 12 )y 13 Address; 8204 Eimbrook Dr.,#192 14 Dallas,TX 75247 15 16 VN" 17 Witness as to Principal 18 SURETY: 19 Oklahoma Sur4t Company 20 21 22 14y: 23 Sid*_ Lure 24 25 Brent M.Blonigan,Attomey-in-Fact 26 Mame and'Title 27 28 Address:1437 South Boulder,Suite 2LVJ= ~ \l V 29 P.O.Box 1409 Tulsa,Oldahoma 7410130 31 - 3I 32 Witness as to Surety "Telephone Number, 918-568-1253 . v 33 34 35 36 *Note: If signed by an officcr of the Surety Company,there must be on file a certified extrdct 37 from the by-lacus showing that this person has authority to sign such obligation. J:f' 38 Surety's physical address is different from its mailing address,bath must be provided. 39 The dates of the bond shall not be prior to the data the Contract is awarded. 40 L T1'Y t}k I Xr WORTII c®mcrrie Rerromtfon 2017-1 STANDARD CONSTRIIMON SPECIFICATION IFICA'i ION W)C:ttMENTS city,PkOd No.,100630 Rmiscd Ady 1,301 i 006114-1 PAYM1:'��tT BOND Psi 1 ort Bond No. 1017192 1 SECTION 00 611.4 2 PAYMENT BLIND 3 4 THE STATE UE TEXAS 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, A.R.REGUIN GROUP, INC. known as "Principal" herein, and g Oklahoma Surety Company a corporate surety 9 (sureties), duly authorized to do business in the State of Texas, known as "Surety" herein 10 (whether one or more),.are held and firmly bound unto the City of FortWorth, a municipal I l corporation created pursuant to the laws of the State of Texas, known as "City'herein, in the 12 penal sum of FIGHT HVN)RED EIGHTEEP THOUSAND, NINE HUNDRED SEVENTT- 13 FIVE AND 00/100 dollars{$818,975.00) lawful money of the United States, to be paid in Fort 14 Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we bind 15 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 16 firmly by these presents. 17 WHEREAS,Principal has entered into a certain written Contract with City,awarded the 18 7th day of March,2017 which Contract is hereby referred to and made a part hereof for all 1.9 purposes as if fully set forth herein,to furnish all materials,equipment,labor and other 20 accessories as defined by law,in the prosecution of the Work as provided for in said Contract and 21 designated as Concrete Restoration(2017-1)at t V mv Locatians,City Proieel14umber. 22 100630.- 23 NOW,THEREFORE,T fl E CONDITION'OF THIS OBLIGATION is such that if 24 Principal shall pay all monies owing to any(pend all)payment bond benefteiary(as defined in 25 Chapter 2253 of the Texas Government.Code,as amended)in the prosecution.of the Work under 26 the Contract,then this obligation shall be and become null and void,otherwise to remain in full 27 force and effect. 28 This.bond is made and executed in compliance with the provisions of Chapter 2253 of the 29 Texas Government Code, as amended, and all liabilities on this bond shall be dete mined in 30 accordance with the provisions of said statute. 31 CITY OF I-VI T WORTH c'mmie Resrorx4an 20.17-1 STANDARD COWTRUMON SPFCIFICA1ION DOCU1M1E 13 C7ryProee1 No;100630 Revigcd Tidy 1,2011 0061 14-2 PAYMEITT BOND Nage 2 oft 1 IN WITNESS '6VNFRF,OF,the Principal and Surety have each SIGNED and SEALED 2 this instrument by duly authorized agents and officers on this the 7th day of Marcs,2017. 3 4 PRINCIPAL: Arreguln Group,Inc. _. Signature ale tin Arleguln.President ( )Se"otary Name aril Title Address: 8204 Elmbrook Dr.,#192 Dallas,TX 75247 WiYness as to Principal SURETY= Oklahoma Surety Company ATTEST: BY: Sature , Brent M.Blonigan,Attorney-in-Fad (Surety)Secretary Name and"Title Address: 1437 South Boulder,Sule 200 _ P_.O.Box 1409 Tulsa,OK 74101wit-ness as to Surety "Telephone Number: 918-587-7221 S 6 Note. If signed by an officer of the Surety; there must be on file a emlified extract from dee 7 bylaws showing that this person has authority to sign such obligation. If Surety's physical 8 address is different ftom its mailing address,both must be provided. 9 10 The date of the bund shat l riot be prior to the date the Contract is awarded. I 1 END OF SECTION 12 Cr"01,VORT WORTH ronmir P-em ation 2017-1 STANDARUCA) SrRi)c:n(M SPECIFICA110N DOCUMENTS Q&,Fr4=1No;M630 koiwd MY 1,1011 066119-1 MATNTVNANCC UOND Page 1 of 3 Bond No. 1017192 1 SECTION 00 6119 2 MAINTINANCE BUND 3 4 THE STATE OF TEXAS § 5 § KNOW A;I.L BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we AR"GUIX GROM ING known as"Principal"herein and 9 01dahoma Surety Company a corporate surety(sureties, if more than 10 one)duly authorized to do business in the State of Texas}known as"Surety'herein(whether one 11 or mate),are held and.firmly bound unto the City of Fort Worth,a municipal corporation cruaWd 12 pursuant to the laws of the State of Texas,known as"City„herein,in the sura of FIGHT 13 HUNIVED EIGIITE.N THOU, ND NINE IIUNDRED SEVENTY-FIVE,AND 811/1110 14 dollars(ML 975.00),lawful money of the United States,to be paid in.Fort Worth,Tarrant 15 County,Texas,for payment of which sum well and truly be made unto the City and its 16 successors,we bind ourselves,our heir%executors,administrators,successors and assigns,jointly 17 and severally, firmly by these presents. 18 14 WHEREAS,the Principal has entered into a certain written contract with the City awarded the 20 7th day of March,2017 which Contract is hereby referred to and a.made part hereof for all 21 purposes as if fully set forth herein,to furnish all materials,.cgtuipment labor and other accessories 22 as defined by law,in the prosecution of the Workincluding any Work resulting from a duly 23 authorized Change Order(collectively herein,the"Work")ai provided for in said contract and 24 designated as Concrete Restoration 2017-1 at. Various Log0eg C#v Pro'ect Number: 25 100639,-and 26 27 WHEREAS,Principal binds itself to use;such materials and to so construct the Work in 28 accordance with the plans,specifications and Contract Documents that the Work is and wit] 29 remain free from defects,in materials or workmanship for and during the period oftwo.(2)years 30 after the date of Final Acceptance of the Mork by the City("Maintenance Period);and 31 32 WHEREAS,Principal binds itself to repair or reconstruct the Work in whole or in part 33 upon receiving notice from the City of the need therefor at any time within the Maintenance 34 Period. 35 er1"Y0?`Von WoFall C:omnt,Rato+aU 2017-1 SrANTKOD'CC7NS'[7tt1f TION S1 WA770N DOC[lMPN'N 00I t h*ecr No:100630 Rcttis�sd July t,2{�1 t 0061 19-2 MAlh WWANCE BOND Pagc 2 00 1, NOW TI3EREFORF,,the condition of this obligation is such that if Principal shall 2 remedy any defective Work,for rvtlich timely notice was provided by City,to a completion 3 satisfactory to the City,then this obligation shall become null and void;otherwise to remain in 4 full forts and effect. 5 6 PROVIDED,HOWEVER, if Principal shrill fail so to repair or reconstruct any timely 7 noticed defective Work,it is agreed that the City may cause;any and all such defective Work to 8 be repaired and/or reconstructed with all associated casts thereof being borne by the Principal and 9 the Surety under this Maintenance bonds and 10 11 PROVIDED]FURTIIIFX Oust if any legal action be filed on this gond,venue shall lie in 12 Tarrant County,"texas or the United States District:Court for the Northern District of Texas,Fort 13 'Worth Division;and. 14 13 PROVIDED FURTHER,that:this obligation shall be continuous in nature and 16 successive;recoveries, may be had hereott for successive breaches, 17 18 19 C: ri(-*foo `WORTH Cate Ne uomfom 20174 .0ANr*kD'COntSTtLDCI7ON SPE-CMCATION WC7.MENTS CdYPAIJeO N&-100630 revised July t.2011 0061 t9-3 MAINTENANCE BOND FW 3 ce 3 1 IN NVITWE&S WHEREOF,the Principal and the Surcty have each SIGNED and SEALED this 2 insUv=nt by duly authorized agents and officers on this the 7th day of March,2017 3 4 PRINCIPAL: 5 Arreguin Group,Inc. 6 7 8 B 10 ATI EST- 11 12 Valentin Arreguln,President 13 (Prkcipal)Somtary Name and Title 14 15 Address: 8204EImbrookDr.,#192 17 18 luaja 19 Witness as to Principal 20 SURETY: 21 Oklahoma Surety Company 22 23 24 BY: 25 signa ure 26 27 Brent M.Blonigan,Attorney-in-Fact 28 ATTEST: Name and Title 29 30 Address: 1437South Boulder,Suite 200 31CC= ry 32 .-Tvisp.—OK-MI-01 ry 33 34 Wit=s as lo 5urei Telopbone Numbm-. 918-587-7221 35 36 eNote: If signed by an officer of the Surety Company,there must be on file a ciztffled exUact 37 from the by-tows showing that this person has authority to sign such obligation. If 38 Surety's physical addreLm,is different from.its mailing addruss,both in ust be provided. 39 'Me date of the bond shall not be prior to the date the Contract is awarded. 40 ary(W FORI,WoR*tH Cawmk Restamlion 201.7-1 Si-AN6ART)CONSTRUCMON SPECIFICAIWN IXX;WMKNIS OoPr4feaJft�100630 Revised July 1,2011 111ID-CONTINENT CASUALTY COMPANY OKLAHO�ZA SURETY COMPA��7Y STATE OF TEXAS CLXIDI NOTICE EN-DORSEMENT In accordance -with Section 225 1.021 (f) of the Texas Government Code and Section 53.202(6) of the Texas Property-Code, any notice of claim to the named surety under this bond(s) should be sent to: Mailing: 1IID-CO\TI\-E\T CASUALTY COMPANY OKLAHOMA SURETY COMPANY P.O. BOX 1. 09 TL-LSA. OK 74101 TELEPHO\'E\O. 1-800-722-4994 FAX NO. 1-918-586-0810 E-MAIL: CLAI%IS C%1CG-I\S.CON1 Phi sical: 1137 S. BOULDER SUITE 200 TULSA. OKLAHOMA 71119 ATTACH THIS NOTICE TO YOUR BOND UPON EXECUTION OF THE BOND OKLAHOMA SURETY COMPANY 1437 SOUTH BOULDER,SUITE 200 -TULSA, OKLAHOMA 74119 - 918-587-7221 FAX 918-588-1253 P ► kI R OF ATTf3 wey KNOW ALL MEN BY THESE PRESENTS, That the OKLAHOMA SURETY COMPANY ,a corporation organized and existing under and by virtue of the laws of the State of Ohio,does hereby nominate,constitute and appoint the person or persons named below,each individually if more than one is named,its true and lawful attorney-in-fact,for it and in its name,place and stead to execute on behalf of the said Company,as surety, any and all bonds,undertakings and contracts of suretyship,or other written obligations in the nature thereof. Brent M. Blonigan, Rob Dreiling, Debbie Palmer and Kara Pierce,aN of RICHARDSON,TX IN WITNESS WHEREOF,the OKLAHOMA SURETY COMPANY has caused these presents to be signed-sno.attestett by its appropriate officers and' orporate seal hereunto affixed this 23 day of February ,'21J17 ;r ,���PyURETy4. S0 ?on -.0. apow of°SEAL OKLAHOMA SURETY COMPANY OHIO ATTEST. 'Z"j4' SHARON HAOM" Secretary TODD BAZATA VICE PRESIDENT On this 23 day of February 2017 before me personally appeared TODD BAZATA to me known,being duly swum,deposes and says that s/he resides in Broken Arrow,Oklahoma,that s/he is a Vice President of Oklahoma Surety Company,the company described in and which executed the above instrument;that s/he knows the seal of the said Company;that the seal affixed to the said instrument is such corporate seal;that it was so affixed by authority of her/his office under the By-Laws of said Company,and that s/he signed his name thereto by like authority. �rrrrrrrrrii���. r,P, � Commission# 11008253 STATE OF OKLAHOMAJ17�.`�'� •''tAq`•• y;, COUNTY OF TULSA SS `"•P�}� p My C ion expire4s: 0 —08-19 e.gktAt��•.��.`t►. :gGCp Gi►�� JULIE AL MAN Notary Public .t/./1171 This Power of Attorney is granted by authorityof the follow ktg reschMons armed by the.$oerd of Directors of Oldaltom Surety Camparry by unanimous written consent dated September 25,2009. RESOLVED: That the President,the Executive Vice President,the several Senior Vice Presidents and Vice Presidents or any one of them, be and hereby is authorized,from time to time,to appoint one or more Attorneys-In-Fact to execute on behalf of the Company,as surety,any and all bonds,undertakings and contracts of suretyship,or other written obligations in the nature thereof;to prescribe their respective duties and the respective limits of their authority;and to revoke any such appointment at any time. RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond,undertaking,contract of suretyship,or other written obligation in the nature thereof,such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company,to be valid and binding upon the Company with the same force and effect as though manually affixed. CERTIFICATION 1, SHARON HACKL Secretary of Oklahoma Surety Company,do hereby certify that the foregoing Power of Attorney and the Resolutions of the Board of Directors of September 25,20D9 have not been revoked and are now to full force and effect. r Signed and sealed this 2/�day of 20L� SHARON HACKL Secretary = ^ ` "VOID IF BOX IS EMPTY ARRECON-01 EMARQUEZ ACOI�0 DATE(MWDDM'Y1) CERTIFICATE OF LIABILITY INSURANCE 03/14/2017 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(les)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WANED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: TexCap Insurance �PHONE FAx t (972)720-5340 F Noy(972)934-8226 13465 Midway Road,Ste.200,L89 E �� Dallas,TX 75244 i_4D%RESs-- -- INSURER(S)AFFORDING COVERAGE NAIC 11 INSURER A:Ohio Sectkft Insurance Company_ 24082 INSURED _ i INSURER S:The Ohio Casualty Insurance Company ;24074_ Arreguin Construction Group,Inc. INSURER C: 8240 ElmBrook Ste.192INSUR Dallas,TX 75247 ERD,. - INSURER E:__----._..._..-- -- !INSURER F• --_— COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILT R TYPE OF INSURANCE 'INSD;W D I POLICY NUMBER I POLICY EFF POLICY EXP LIMITS ACOMMERCIAL GENERAL UA131UTY 1,00 ,000 _ _ _ CLAIMS-MADE OCCUR 'BKS57215060 041011201610410112017.�AMAGETORENTED i 1,000,000 _ PREMISES� iccurrancel ,I$ An one--- ' 15,000 ' -(-Y- PersunL_s _—------ �___� f I PERSONALS ADV INJURY - _S 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: ! GENERAL AGGREGATE $ _ 2,000,000 X POLICY JECT LOC RODUCTS-COMPIOPAGG S _ 2,000,000 OTHER: I i is AUTOMOBILE LIABILITY COMBINED SINGLE OMIT I -(Ea ANY AUTO i � � ,_BODILY INJURY(Per person) `;$ _ OWNED SCHEDULED ! I AUTOS ONLY i—J AUTOS i - j I BODILY INJURY(Per accident);$ —�HIREp NON AWNED ( PROPERTY GE AUTOS ONLY AUTOS ONLY (Per aaident $ B4,,000,,000 EXCESS LIAB UMBRELLA LIAR CLAIMS-MADE: E.S057215060 04/01/2016 0410112017OCCUR j EACH OCCURRENCE_ _ $, 4,000000,000 : 000 AGGREGATE — t_$_--- 4 -_- t DED X;RETENTION$ 10,0001 ! ! I $ WORKERS COMPENSATION l PER 0TH 1AND EMPLOYERS'LIASIUTY YIN ! STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE EL EACH ACCIDENT .$_ FFiCER/ME,M R EXCLUDED? i N I A I ggE Mandatory m N II E.L.DISEASE-EA EMPLOYEE$ Ityes,describe under DESCRIPTION OF OPERATIONS below 7 E.L.DISEASE-POLICY LIMIT 1$ A Scheduled 30,000 1BKS57215060 04/01/2016 04/0112017{Rental 100,000 ' i I i r I DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attaehad if mon space is required The General Liability policy includes a blanket automatic additional insured endorsement that provides additional Lsured status to the certificate holder only when there is a written contract between the named insured and the certificate holder that requires such status. The General Liability policy contains a special endorsement with"Primary and Noncontrlbutory"wording The General Liability policy includes a blanket automatic waiver of subrogation endorsement that provides this feature only when there is a written contract between the named insured and the certificate holder. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE City of Fort Worth ACCORDANCE WITH THE POLICYTION DATE RPROVISIONSCE WILL BE DELIVERED IN 1000 Throckmorton Street Fort Worth,TX 76102 AUTHORIZED REPRESENTATIVE ACORD 25(2016103) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD - CERTIFICATE OF LIABILITY INSURANCE "�`'�"'�°°"''�' THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFOR13 ED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURERIS), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER i Ir,,PORTANT: If the certificate holder is an ADDITIONAL INSURED,the pol)cyties)must have ADDITIONAL INSURED provisions or be endorsed. WBROGATION IS WAIVED,subject to the terns and conditions of the policy,certain policies may require an endorsement A statement on ergs certificate does notroffietrl bts to the certificate holder in lieu of such endorseme 8 JCFR NAw SHARA MANDUJANQ xdrefdrm IMELDA MENDOZA PHONE 214-324-0324_ _ � 214.242-2280 IAOG.ittr.E)uY -_M1 8789 FERGUSON RD STE 130 �Eshara.mandujana.f8&waatatefaTm t-am DALLAS,TX 75228 INSURER{5f 1tFFQKIGUIfitDlfElkAGE ,k!stC�t INSURERA ...._.._. -- INSURED INSURER 6......... _ Stale Farm Mutual Automobile ItIsLnanoe Company 25178 ARREGUIN GROUP INC, )WHIR c_— PO BOX 211391 INSURER6 State Farmeneral GklwranoeCampatty -25151 DALLAS,TX 75211-+1305 INSURER E _ f ----- INSURER F COVERAGES CERTIFICATE NUMBER; REVISION NUMBER: THIS IS TO CERTIFY THAT THE POUCIES OF INSURANCE LISTED BELOW HAVE BEEN WUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REOUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO V*#CH TRIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY 17HE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOO MAY HAVE BEEN REDUCED BY PAID CLAIMS. rLTR TYMHOfDISURA►!CE NLAl16ER POLICY6fF'M nCu1^rVY~ LIMITS CQMlfllkgALGENERAL LIABILITY icACHCCGVRRchCF ! � MIVGC t-1 nENT€D CLADA&MADE .occur OREMIStfi1,Ee a»ic9 i<k1... I f I ' MED>~X USM MR pers:n: 3 . T'E3is NAL 4.AOV INJI W` S 13ENL AGGREGATE LIMIT KPPL I TER � 3 � i�AfieRE(+AFE S I POLIO JEC7 11CJC I S PRODLTS-CUr�aaCP ,; .� _. 1 t'I+f^lEFI � i 1 II AUTOM083 E UABAM C)Af INED SINGLE UMI s 1.{1{14.ODLS Y Y 376'5997-D31 ;04-MI12W7 1=1r2017 `faac+ �__ AHY AUrO f 334-5534-001 04101=17 I OM112047 - B C.1tlE0 SCHEDLAGG I eUbILY WF1RY n¢i09tt1 i 3 P rr Mae av+NEo I _ — ' �NK:J�RIY D•SNjJiE � huros] y AUrOSONLY � r I UNBRE44A LIA6OCc R I f EACH OCCL�RRrM,^.ES— _- fmo K rEYTi�r S VIORKERSC41NPftN3A11OW i 'EA'—Tl I[-, I AND E1fAf„oYETI$'LLA983TY z.+..�.—..__.�.� E) 1ANY PR.METVR.PARrtlER ExcctjirvE I E�.EACH ArCIDFNT T 1,000 O00 0MCEP"EMBER f JP`-J-Umc� NIA I Y DOD1307096 dw7I20t6 05127.+2017 — - (Mwst"inMiq j E��isEaul--�.EA1F'_6'� E 1.1)W-000 �U en deterlo�maer f E s.13FA SE O6U--Y LIt17 I T 1,OOD,OOD SCRIPTI4N F ftA $ aA 7 1 I I i 1 DESCFWTMN OF OP11R "MS I LOCATMS I VEWLES(ACORD IOf,A&IfflonAr its 8ebeduu,Hue be ARaehad M ms.s sines I.ogl7Nadi ALL POLICIES INMUDE A BLANNKET AUTOMATIC WAIVER OF SUBROGATION ENDQRSF-.AtENT&THE LCL,AUTO R UMe POLICIES iNCLUS)E A BLANKET AUTOMATIC ADDITIONAL INSURED ENDORSEMENT PROVIDING ADDITIONAL INSURES}&WAIVER OF SUBROGATION STATUS TO THE CERT►PICATE HOLDER ONLY WHEN THERE IS A WRITTEN CONTRACT BETWEEN THE NAMED INSURED&THE CERTIFICATE HOLDER THAT REQUIRES SUCH STATUS,THE GL ADDITIONAL INSURED ENDORSEMENT CONTAINS SPECIAL PRIMARY&NONCONTRIBUTORY WORDING,THE POLICIES INCLUDE AN ENDORSEMENT PROVIDING 30 DAYS NOTICE OF CANCELLATION(10 FOR NON-PAY OF PREMIUM)TO THE CERTIFICATE HOLDER-EXCESS UMBRELLA LtAB APPLIES TO GL,AL&EL. f CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE: EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Fort Wor'h ACCORDANCE WITH THE POLICY PROVISIONS. 1000 Throckmadon St. AUTHORIZED REPREUNTAT1VE Fart worth,Taxa:76102 I �- Q1988-2 S ACORD CORPORATION. All rights reserved- ACORD 25(2015103) The ACORD name and logo are registared marks of ACORD 1Wi4W 112849.12 m-lr-2owo STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Felmary Z 2016 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1 —Definitions and Terminology..........................................................................................................1 1.01 Defined Terms..... .............:........................................................................................................1 1.02 Terminology..................................................................................................................................6 Article2—Preliminary Matters.........................................................................................................................7 2.01 Copies of Documents....................................................................................................................7 2.02 Commencement of Contract Time;Notice to Proceed................................................................7 2.03 Starting the Work..........................................................................................................................8 2.04 Before Starting Construction........................................................................................................8 2.05 Preconstruction Conference..........................................................................................................8 2.06 Public Meeting..............................................................................................................................8 2.07 Initial Acceptance of Schedules....................................................................................................8 Article 3—Contract Documents: Intent,Amending, Reuse............................................................................8 3.01 Intent..............................................................................................................................................8 3.02 Reference Standards......................................................................................................................9 3.03 Reporting and Resolving Discrepancies.......................................................................................9 3.04 Amending and Supplementing Contract Documents.................................................................10 3.05 Reuse of Documents...................................................................................................................10 3.06 Electronic Data............................................................................................................................11 Article 4—Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions;Reference Points...........................................................................................................11 4.01 Availability of Lands..................................................................................................................11 4.02 Subsurface and Physical Conditions ..........................................................................................12 4.03 Differing Subsurface or Physical Conditions.............................................................................12 4.04 Underground Facilities...............................................................................................................13 4.05 Reference Points .........................................................................................................................14 4.06 Hazardous Environmental Condition at Site..............................................................................14 Article 5—Bonds and Insurance.....................................................................................................................16 5.01 Licensed Sureties and Insurers...................................................................................................16 5.02 Performance,Payment, and Maintenance Bonds.......................................................................16 5.03 Certificates of Insurance.............................................................................................................16 5.04 Contractor's Insurance................................................................................................................18 5.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................19 Article 6—Contractor's Responsibilities........................................................................................................19 6.01 Supervision and Superintendence...............................................................................................19 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F imy Z 2016 6.02 Labor;Working Hours................................................................................................................20 6.03 Services,Materials, and Equipment...........................................................................................20 6.04 Project Schedule..........................................................................................................................21 6.05 Substitutes and"Or-Equals".......................................................................................................21 6.06 Concerning Subcontractors, Suppliers, and Others....................................................................24 6.07 Wage Rates..................................................................................................................................25 6.08 Patent Fees and Royalties...........................................................................................................26 6.09 Permits and Utilities....................................................................................................................27 6.10 Laws and Regulations....................................:......................................... ...............................27 6.11 Taxes ...........................................................................................................................................28 6.12 Use of Site and Other Areas.......................................................................................................28 6.13 Record Documents............................................................................................................... ...29 6.14 Safety and Protection..................................................................................................................29 6.15 Safety Representative... ....................................... . ................................. ...........................30 6.16 Hazard Communication Programs .............................................................................................30 6.17 Emergencies and/or Rectification...............................................................................................30 6.18 Submittals....................................................................................................................................31 6.19 Continuing the Work...................................................................................................................32 6.20 Contractor's General Warranty and Guarantee..........................................................................32 6.21 Indemnification.........................................................................................................................33 6.22 Delegation of Professional Design Services..............................................................................34 6.23 Right to Audit..............................................................................................................................34 6.24 Nondiscrimination.......................................................................................................................35 Article7-Other Work at the Site...................................................................................................................35 7.01 Related Work at Site...................................................................................................................35 7.02 Coordination................................................................................................................................36 Article 8-City's Responsibilities...................................................................................................................36 8.01 Communications to Contractor...................................................................................................36 8.02 Furnish Data............................................................:...................................................................36 8.03 Pay When Due ............................................................................................................................36 8.04 Lands and Easements; Reports and Tests...................................................................................36 8.05 Change Orders.............................................................................................................................36 8.06 Inspections, Tests, and Approvals..............................................................................................36 8.07 Limitations on City's Responsibilities.......................................................................................37 8.08 Undisclosed Hazardous Environmental Condition....................................................................37 8.09 Compliance with Safety Program...............................................................................................37 Article 9-City's Observation Status During Construction...........................................................................37 9.01 City's Project Manager............................................................................................................37 9.02 Visits to Site................................................................................................................................37 9.03 Authorized Variations in Work..................................................................................................38 9.04 Rejecting Defective Work..........................................................................................................38 9.05 Determinations for Work Performed..........................................................................................38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work.....................38 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmayZ 2016 Article 10-Changes in the Work; Claims;Extra Work................................................................................38 10.01 Authorized Changes in the Work...............................................................................................38 10.02 Unauthorized Changes in the Work...........................................................................................39 10.03 Execution of Change Orders.......................................................................................................39 10.04 Extra Work..................................................................................................................................39 10.05 Notification to Surety..................................................................................................................39 10.06 Contract Claims Process................................................. 40 ............................................................ Article 11 -Cost of the Work;Allowances; Unit Price Work;Plans Quantity Measurement......................41 11.01 Cost of the Work.........................................................................................................................41 11.02 Allowances.....................................................................................................:............................43 11.03 Unit Price Work..........................................................................................................................44 11.04 Plans Quantity Measurement......................................................................................................45 Article 12-Change of Contract Price;Change of Contract Time.................................................................46 12.01 Change of Contract Price............................................................................................................46 12.02 Change of Contract Time............................................................................................................47 12.03 Delays..........................................................................................................................................47 Article 13-Tests and Inspections;Correction,Removal or Acceptance of Defective Work......................48 13.01 Notice of Defects ........................................................................................................................48 13.02 Access to Work...........................................................................................................................48 13.03 Tests and Inspections..................................................................................................................48 13.04 Uncovering Work........................................................................................................................49 13.05 City May Stop the Work.............................................................................................................49 13.06 Correction or Removal of Defective Work................................................................................50 13.07 Correction Period........................................................................................................................50 13.08 Acceptance of Defective Work...................................................................................................51 13.09 City May Correct Defective Work.............................................................................................51 Article 14-Payments to Contractor and Completion....................................................................................52 14.01 Schedule of Values......................................................................................................................52 14.02 Progress Payments......................................................................................................................52 14.03 Contractor's Warranty of Title...................................................................................................54 14.04 Partial Utilization........................................................................................................................55 14.05 Final Inspection...........................................................................................................................55 14.06 Final Acceptance..........................................................................................:..............................55 14.07 Final Payment..............................................................................................................................56 14.08 Final Completion Delayed and Partial Retainage Release........................................................56 14.09 Waiver of Claims........................................................................................................................57 Article 15-Suspension of Work and Termination........................................................................................57 15.01 City May Suspend Work............................................................................................................57 15.02 City May Terminate for Cause...................................................................................................58 15.03 City May Terminate For Convenience.......................................................................................60 Article 16-Dispute Resolution......................................................................................................................61 16.01 Methods and Procedures.............................................................................................................61 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FPbmmyZ 2016 Article17—Miscellaneous..............................................................................................................................62 17.01 Giving Notice..............................................................................................................................62 17.02 Computation of Times................................................................................................................62 17.03 Cumulative Remedies.................................................................................................................62 17.04 Survival of Obligations...............................................................................................................63 17.05 Headings......................................................................................................................................63 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdmu<yZ 2016 007200-1 GENERAL CONDITIONS Page 1 of 63 ARTICLE 1–DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda—Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement—The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment—The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award–Authorization by the City Council for the City to enter into an Agreement. 6. Bid—The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder—The individual or entity who submits a Bid directly to City. 8. Bidding Documents—The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements—The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day – A business day is defined as a day that the City conducts normal business, generally Monday through Friday,except for federal or state holidays observed by the City. 11.Buzzsaw–City's on-line, electronic document management and collaboration system. 12. Calendar Day–A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F xuaryZ2016 007200-1 GENERAL CONDITIONS Page 2 of 63 13. Change Order—A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 14. City— The City of Fort Worth, Texas, a home-rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 15. City Attorney – The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 16. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 17. City Manager – The officially appointed and authorized City Manager of the City of Fort Worth,Texas,or his duly authorized representative. 18. Contract Claim—A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract.A demand for money or services by a third party is not a Contract Claim. 19. Contract—The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations,representations,or agreements,whether written or oral. 20. Contract Documents—Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 21. Contract Price—The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 22. Contract Time—The number of days or the dates stated in the Agreement to: (i) achieve Milestones,if any and(ii)complete the Work so that it is ready for Final Acceptance. 23. Contractor—The individual or entity with whom City has entered into the Agreement. 24. Cost of the Work—See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febmtny 2,2016 007200-1 GENERAL CONDITIONS Page 3 of 63 25. Damage Claims — A demand for money or services arising from the Project or Site from a third party,City or Contractor exclusive of a Contract Claim. 26.Day or day—A day, unless otherwise defined, shall mean a Calendar Day. 27.Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth,Texas, or his duly appointed representative, assistant, or agents. 28. Director of Parks and Community Services — The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Planning and Development — The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant,or agents. 30.Director of Transportation Public Works — The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant,or agents. 31. Director of Water Department— The officially appointed Director of the Water Department of the City of Fort Worth,Texas, or his duly appointed representative, assistant, or agents. 32. Drawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 33. Effective Date of the Agreement—The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 34. Engineer—The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 35. Extra Work — Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents.Extra work shall be part of the Work. 36. Field Order—A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 37. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fetmiary2,2016 007200-1 GENERAL CONDITIONS Page 4 of 63 38. Final Inspection – Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 39. General Requirements—Sections of Division 1 of the Contract Documents. 40. Hazardous Environmental Condition—The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 41. Hazardous Waste—Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 42. Laws and Regulations—Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 43. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 44. Major Item–An Item of work included in the Contract Documents that has a total cost equal to or greater than 5%of the original Contract Price or$25,000 whichever is less. 45.Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 46. Notice of Award—The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 47. Notice to Proceed—A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 48. PCBs—Polychlorinated biphenyls. 49. Petroleum—Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non-Hazardous Waste and crude oils. 50. Plans–See definition of Drawings. MY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdm=y Z 2016 007200-1 GENERAL CONDITIONS Page 5 of 63 51. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 52. Project—The Work to be performed under the Contract Documents. 53. Project Manager—The authorized representative of the City who will be assigned to the Site. 54. Public Meeting – An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 55.Radioactive Material—Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954(42 USC Section 2011 et seq.) as amended from time to time. 56.Regular Working Hours – Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday(excluding legal holidays). 57. Samples—Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 58. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 59. Schedule of Values—A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 60. Site—Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights-of-way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 61. Specifications—That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 62. Subcontractor—An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmazyZ 2016 007200-1 GENERAL CONDITIONS Page 6 of 63 63. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 64. Successful Bidder—The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent— The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions—That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier—A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities—All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water,other liquids or chemicals, or traffic or other control systems. 69. Unit Price Work—See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours— Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day—A working day is defined as a day, not including Saturdays,Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.023 through E are not defined but, when used in the Bidding Requirements or Contract Documents,have the indicated meaning. B. Intent of Certain Terms or Adjectives: C1TY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F mwyZ 2016 00 72 00-1 GENERAL CONDITIONS Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory,faulty,or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2—PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time;Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 14 days after the Effective Date of the Agreement. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FtbruuyZ 2016 007200-1 GENERAL CONDITIONS Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3—CONTRACT DOCUMENTS: INTENT,AMENDING,REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Felxumy2.2016 007200-1 GENERAL CONDITIONS Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications,Codes,Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids),except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work. If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation , (b) any standard, specification, manual, or code, or(c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdxuary Z 2016 007200-1 GENERAL CONDITIONS Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized,by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subject to the provisions of Paragraph 6.18.C);or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. MY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febnwy Z 2016 007200-1 GENERAL CONDITIONS Page 11 of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's Buzzsaw site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4—AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FekmuazyZ 2016 00 72 00-1 GENERAL CONDITIONS Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site(except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members,partners, employees, agents,consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings;or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data,interpretations,opinions,or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents;or 3. differs materially from that shown or indicated in the Contract Documents;or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdxuazy 2,2016 00 7200-1 GENERAL CONDITIONS Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities,including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated: 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FdmayZ 2016 007200-1 GENERAL CONDITIONS Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members,partners, employees, agents,consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdxumy2,2016 007200-1 GENERAL CONDITIONS Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings;or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data,interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City,from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febnay Z 2016 007200-1 GENERAL CONDITIONS Page 16 of 63 ARTICLE 5—BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by City or any other additional insured)which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febnjmy Z 2016 007200-1 GENERAL CONDITIONS Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement,which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property&Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required,written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmatyZ 2016 00 72 00-1 GENERAL CONDITIONS Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups,must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first-dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmaryZ 2016 007200-1 GENERAL CONDITIONS Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured.There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6—CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means,methods,techniques, sequences, and procedures of construction. CM OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FAY 2,2016 00 7200-1 GENERAL CONDITIONS Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor, Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication)to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests)as to the source,kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdmwy Z 2016 00 7200-1 GENERAL CONDITIONS Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid,unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 0132 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or-Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or-equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or-Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or-equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febma y Z 2016 00 7200-1 GENERAL CONDITIONS Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that,if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or-equal" item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmaryZ 2016 007200-1 GENERAL CONDITIONS Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering,sales,maintenance,repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or-equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an"or-equal."City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or-equal" at Contractor's expense. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F mwy2,2016 007200-1 GENERAL CONDITIONS Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions: No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Minority Business Enterprise Compliance: It is City policy to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE goal, Contractor is required to comply with the intent of the City's MBE Ordinance(as amended)by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE. Material misrepresentation of any nature will be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdxuary Z 2016 007200-1 GENERAL CONDITIONS Page 25 of 63 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs,pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F mwy Z 2016 00 7200-1 GENERAL CONDITIONS Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258,Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City,from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from CrN OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdnixy2,2016 007200-1 GENERAL CONDITIONS Page 27 of 63 the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.B. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S.Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Felxuuy 2,2016 007200-1 GENERAL CONDITIONS Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: 1. Comptroller of Public Accounts Sales Tax Division Capitol Station Austin,TX 78711; or 2. http://www.window.state.tx.us/taxinfo/taxforms/93-forms.html 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febnoy2,2016 00 7200-1 GENERAL CONDITIONS Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City,from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Per of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febmazy2,2016 007200-1 GENERAL CONDITIONS Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal,relocation,or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal,relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs,if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work,or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F bmay Z 2016 007200-1 GENERAL CONDITIONS Page 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For-Information-Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier,pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F2lnuazy2,2016 00 7200-1 GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible;or CrfY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febn Z 2016 007200-1 GENERAL CONDITIONS Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection,test,or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.13. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART. BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS CrrY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FdmwyZ 2016 007200-1 GENERAL CONDITIONS Page 34 of 63 SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART. BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febmmy 2.2016 00 7200-1 GENERAL CONDITIONS Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended. Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7—OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F b mary2,2016 00 72 00-1 GENERAL CONDITIONS Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site,the following will be set forth in Supplementary Conditions: 1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8—CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements;Reports and Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febnjay Z 2016 007200-1 GENERAL CONDITIONS Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9—CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Project Manager City will provide one or more Project Manager(s) during the construction period. The duties and responsibilities and the limitations of authority of City's Project Manager during construction are set forth in the Contract Documents. The City's Project Manager for this Contract is < insert name here >, or his/her successor pursuant to written notification from the Director of < insert managing department here>. 9.02 Visits to Site A. City's Project Manager will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Manager will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Manager will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Manager's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Manager's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FtbnkvyZ 2016 007200-1 GENERAL CONDITIONS Page 38 of 63 9.03 Authorized Variations in Work City's Project Manager may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Manager believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Manager will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10—CHANGES IN THE WORK; CLAIMS;EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fly Z 2016 007200-1 GENERAL CONDITIONS Page 39 of 63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or(iii) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdawy2,2016 007200-1 GENERAL CONDITIONS Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor,if any,take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim;or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febmary Z 2016 0072 00-1 GENERAL CONDITIONS Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11 —COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Costs Included. The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.01.B, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.013, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55%markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdmwy Z 2016 007200-1 GENERAL CONDITIONS Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities,fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FPbma y Z 2016 00 72 00-1 GENERAL CONDITIONS Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded:The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.0I.A.1 or specifically covered by Paragraph 11.0I.A.4, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied,and making good any damage to property. S. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work,Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.01.A and 11.0l.B, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre-bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febmary 2,2016 007200-1 GENERAL CONDITIONS Page 44 of 63 a. the pre-bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre-bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. 1. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. MY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdmay 2,2016 007200-1 GENERAL CONDITIONS Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outlined under"Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CPPD OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Ftbway2,2016 00 7200-1 GENERAL CONDITIONS Page 46 of 63 E. For callout work or non-site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12—CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.0l.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.0l.B.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit(determined as provided in Paragraph 12.01.C). C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon,then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.0l.A.1, 11.0l.A.2. and 11.0l.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 11.01.A.4 and 11.0l.A.5, the Contractor's fee shall be five percent(5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.0l.C.2.a and 12.0l.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F mimy Z 2016 0072 00-1 GENERAL CONDITIONS Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.0l.A.1 and 11.0l.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.0l.A.6, and 11.01.B; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material,if any,which is to be furnished by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdxuay Z 2016 007200-1 GENERAL CONDITIONS Page 48 of 63 ARTICLE 13—TESTS AND INSPECTIONS; CORRECTION,REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected,corrected,or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections,which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Felxuazy2,2016 007200-1 GENERAL CONDITIONS Page 49 of 63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor,material, and equipment. 1. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation,inspection,testing,replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F mwy2.2016 00 7200-1 GENERAL CONDITIONS Page SO of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas;or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective,and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. CITY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebnjmyZ 2016 007200-1 GENERAL CONDITIONS Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim,pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of,the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven(7)days written notice to Contractor,correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F I umy Z 2016 007200-1 GENERAL CONDITIONS Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14—PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: 1. Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment,Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as stipulated in the Contract Documents. C11Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fd mi&yZ 2016 007200-1 GENERAL CONDITIONS Page 53 of 63 B. Review of Applications. 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules,that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents;or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor,or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective, or the completed Work has been damaged by the Contractor or his subcontractors,requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdnuvy2,2016 007200-1 GENERAL CONDITIONS Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages suffered by the City. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment. 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F mxwy2,2016 007200-1 GENERAL CONDITIONS Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification of the City and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FdDnimyZ2016 007200-1 GENERAL CONDITIONS Page 56 of 63 14.07 Final Payment A. Application for Payment. 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied(except as previously delivered)by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any,to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febmay 2,2016 007200-1 GENERAL CONDITIONS Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15—SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time,directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FdxuaryZ2016 007200-1 GENERAL CONDITIONS Page 58 of 63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-2011 established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature,the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily;or 8. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febn&y 2,2016 007200-1 GENERAL CONDITIONS Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.023, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. C=OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febnmy Z 2016 00 72 00-1 GENERAL CONDITIONS Page 60 of 63 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim,demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febnjary 2,2016 00 72 00-1 GENERAL CONDITIONS Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case,Contractor shall be paid for(without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work,plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16—DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.D shall become final and binding 30 days after termination of the mediation unless, within that time period,City or Contractor: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmaryZ 2016 00 72 00-1 GENERAL CONDITIONS Page 62 of 63 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17—MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if. 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other'provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febnimy 2,2016 007200-1 GENERAL CONDITIONS Page 63 of 63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FdnuyZ 2016 007300-1 SUPPLEMENTARY CONDITIONS Page 1 of 5 1 SECTION 00 73 00 2 SUPPLEMENTARY CONDITIONS 3 TO 4 GENERAL CONDITIONS 5 6 Supplementary Conditions 7 8 These Supplementary Conditions modify and supplement Section 00 72 00-General Conditions,and other 9 provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are 10 modified or supplemented remain in full force and effect as so modified or supplemented. All provisions 11 of the General Conditions which are not so modified or supplemented remain in full force and effect. 12 13 Defined Terms 14 15 The terms used in these Supplementary Conditions which are defined in the General Conditions have the 16 meaning assigned to them in the General Conditions,unless specifically noted herein. 17 18 Modifications and Supplements 19 20 The following are instructions that modify or supplement specific paragraphs in the General Conditions and 21 other Contract Documents. 22 23 SC-3.03B.2,"Resolving Discrepancies" 24 25 Plans govern over Specifications. 26 27 SC-4.01A 28 29 Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. 30 Upon receiving the final easements descriptions,Contractor shall compare them to the lines shown on the 31 Contract Drawings. 32 33 SC-4.01A.1.,"Availability of Lands" 34 35 The following is a list of known outstanding right-of-way,and/or easements to be acquired,if any as of 36 October 12,2016: 37 38 Outstanding Right-Of-Way,and/or Easements to Be Acquired PARCEL OWNER TARGET DATE NUMBER OF POSSESSION NONE 39 The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, 40 and do not bind the City. 41 42 If Contractor considers the final easements provided to differ materially from the representations on the 43 Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, 44 notify City in writing associated with the differing easement line locations. 45 46 SC-4.01A.2,"Availability of Lands" 47 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised January 22,2016 007300-2 SUPPLEMENTARY CONDITIONS Page 2 of 5 1 Utilities or obstructions to be removed,adjusted,and/or relocated 2 3 The following is list of utilities and/or obstructions that have not been removed,adjusted,and/or relocated 4 as of October 12,2016: 5 EXPECTED UTILITY AND LOCATION TARGET DATE OF OWNER ADJUSTMENT NONE 6 The Contractor understands and agrees that the dates listed above are estimates only,are not guaranteed, 7 and do not bind the City. 8 9 SC-4.02A.,"Subsurface and Physical Conditions" 10 11 The following are reports of explorations and tests of subsurface conditions at the site of the Work: 12 13 A"None"Report No. ,dated ,prepared by"None"a sub-consultant of[name of the 14 prime designer],a consultant of the City,providing additional information on"None" 15 16 The following are drawings of physical conditions in or relating to existing surface and subsurface 17 structures(except Underground Facilities)which are at or contiguous to the site of the Work: 18 19 SC-4.06A.,"Hazardous Environmental Conditions at Site" 20 21 The following are reports and drawings of existing hazardous environmental conditions known to the City: 22 "None" 23 SC-5.03A.,"Certificates of Insurance" 24 25 The entities listed below are"additional insureds as their interest may appear"including their respective 26 officers,directors,agents and employees. 27 28 (1) City 29 (2) Consultant: "None" 30 (3) Other: "None" 31 32 SC-5.04A.,"Contractor's Insurance" 33 34 The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following 35 coverages for not less than the following amounts or greater where required by laws and regulations: 36 37 5.04A.Workers'Compensation,under Paragraph GC-5.04A. 38 39 Statutory limits 40 Employer's liability 41 $100,000 each accidentloccurrence 42 $100,000 Disease-each employee 43 $500,000 Disease-policy limit 44 45 SC-5.04B.,"Contractor's Insurance" 46 47 5.04B.Commercial General Liability,under Paragraph GC-5.0413.Contractor's Liability Insurance 48 under Paragraph GC-5.04B.,which shall be on a per project basis covering the Contractor with 49 minimum limits of: CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised January 22,2016 007300-3 SUPPLEMENTARY CONDITIONS Page 3 of 5 1 2 $1,000,000 each occurrence 3 $2,000,000 aggregate limit 4 5 The policy must have an endorsement(Amendment—Aggregate Limits of Insurance)making the 6 General Aggregate Limits apply separately to each job site. 7 8 The Commercial General Liability Insurance policies shall provide"X","C",and"U'coverage's. 9 Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. 10 11 SC 5.04C.,"Contractor's Insurance" 12 5.04C. Automobile Liability,under Paragraph GC-5.04C.Contractor's Liability Insurance under 13 Paragraph GC-5.04C.,which shall be in an amount not less than the following amounts: 14 15 (1) Automobile Liability-a commercial business policy shall provide coverage on"Any Auto", 16 defined as autos owned,hired and non-owned. 17 18 $1,000,000 each accident on a combined single limit basis.Split limits are acceptable if limits are at 19 least: 20 21 $250,000 Bodily Injury per person/ 22 $500,000 Bodily Injury per accident/ 23 $100,000 Property Damage 24 25 SC-5.04D.,"Contractor's Insurance" 26 27 The Contractor's construction activities will require its employees,agents,subcontractors,equipment,and 28 material deliveries to cross railroad properties and tracks"None" 29 30 The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, 31 hinder,or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains 32 or other property. Such operations on railroad properties may require that Contractor to execute a"Right of 33 Entry Agreement"with the particular railroad company or companies involved,and to this end the 34 Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute 35 the right-of-entry(if any)required by a railroad company.The requirements specified herein likewise relate 36 to the Contractor's use of private and/or construction access roads crossing said railroad company's 37 properties. 38 39 The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide 40 coverage for not less than the following amounts,issued by companies satisfactory to the City and to the 41 Railroad Company for a term that continues for so long as the Contractor's operations and work cross, 42 occupy,or touch railroad property: 43 44 (1) General Aggregate: N/A 45 46 (2) Each Occurrence: N/A 47 48 _Required for this Contract X Not required for this Contract 49 50 With respect to the above outlined insurance requirements,the following shall govern: 51 52 1. Where a single railroad company is involved,the Contractor shall provide one insurance policy in 53 the name of the railroad company. However, if more than one grade separation or at-grade 54 crossing is affected by the Project at entirely separate locations on the line or lines of the same 55 railroad company,separate coverage may be required,each in the amount stated above. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised January 22,2016 007300-4 SUPPLEMENTARY CONDITIONS Page 4 of 5 1 2 2. Where more than one railroad company is operating on the same right-of-way or where several 3 railroad companies are involved and operated on their own separate rights-of-way, the Contractor 4 may be required to provide separate insurance policies in the name of each railroad company. 5 6 3. If,in addition to a grade separation or an at-grade crossing,other work or activity is proposed on a 7 railroad company's right-of-way at a location entirely separate from the grade separation or at- 8 grade crossing,insurance coverage for this work must be included in the policy covering the grade 9 separation. 10 11 4. If no grade separation is involved but other work is proposed on a railroad company's right-of- 12 way,all such other work may be covered in a single policy for that railroad,even though the work 13 may be at two or more separate locations. 14 15 No work or activities on a railroad company's property to be performed by the Contractor shall be 16 commenced until the Contractor has furnished the City with an original policy or policies of the insurance 17 for each railroad company named,as required above. All such insurance must be approved by the City and 18 each affected Railroad Company prior to the Contractor's beginning work. 19 20 The insurance specified above must be carried until all Work to be performed on the railroad right-of-way 21 has been completed and the grade crossing,if any,is no longer used by the Contractor. In addition, 22 insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. 23 Such insurance must name the railroad company as the insured,together with any tenant or lessee of the 24 railroad company operating over tracks involved in the Project. 25 26 SC-6.04.,"Project Schedule" 27 28 Project schedule shall be tier 3 for the project. 29 30 SC-6.07.,"Wage Rates" 31 32 The following is the prevailing wage rate table(s)applicable to this project and is provided in the 33 Appendixes:GC 6.07 34 35 SC-6.09.,"Permits and Utilities" 36 37 SC-6.09A.,"Contractor obtained permits and licenses" 38 The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: 39 "None" 40 41 SC-6.09B."City obtained permits and licenses" 42 The following are known permits and/or licenses required by the Contract to be acquired by the City: 43 "None". 44 45 SC-6.09C."Outstanding permits and licenses" 46 47 The following is a list of known outstanding permits and/or licenses to be acquired,if any as of 48 49 Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION "None" 50 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised January 22,2016 007300-5 SUPPLEMENTARY CONDITIONS Page 5 of 5 1 SC-7.02.,"Coordination" 2 3 The individuals or entities listed below have contracts with the City for the performance of other work at 4 the Site: 5 Vendor Scope of Work Coordination Authority NONE NONE NONE 6 7 8 SC-8.01,"Communications to Contractor" 9 10 Street sections shall be minimum 7inch thick HES concrete.The use of Flex Bae and or Geogrid shall 11 be determined by the engineer. 12 13 SC-9.01.,"City's Project Manager" 14 15 The City's Project Manager for this Contract is Tariqul Islam or his/her successor pursuant to written 16 notification from the Director of Transportation and Public Works. 17 18 SC-13.03C.,"Tests and Inspections" 19 20 "None" 21 22 SC-16.01C.1,"Methods and Procedures" 23 24 "None" 25 26 27 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1/22/2016 F.Griffin SC-9.01., "City's Project Representative"warding changed to City's Project Manager. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised January 22,2016 011100-1 SUMMARY OF WORK Page 1 of 3 1 SECTION 011100 2 SUMMARY OF WORK 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 I. NiO11ILVA`1'ION AND DEMOBU,,IZATION SHALL BE SUBSIDIARY To 9 T11IS PIiOJ1JC"1' PAY I I'L:NIS, NO SLI'ARATE PAY. N() 11.'1Y:1°`1[ NT WILL BE 10 MAI)I l OR M( BIL[ ATTON AND DEN,:10BILIZATION FERC Ti l ONE 11 LOC ATION ` O ANOTI If-"k FN ( 11'4'4'Ai. 1'Iz()(il ESS OF P17R[-'0RN41NCJ T11 12 WOR K. RE110081i iZATION PAY l;fE1vi ltAl.,Ir 111 TIAID FOR S1-1Y11--.NS10NI 13 0WORi< SPLC I[-ICA 1_1-Y RbQ111RT.T) 1N TI II:(.'0IN'' P.AC'T D0('L.1N-11:;NTS 14 OR AS RIQUIRI:aID 13Y TI-11;to II-Y. 15 C. Related Specification Sections include,but are not necessarily limited to: 16 1. Division 0-Bidding Requirements,Contract Forms,and Conditions of the Contract 17 2. Division 1 -General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Work Covered by Contract Documents 25 1. Work is to include furnishing all labor,materials,and equipment,and performing 26 all Work necessary for this construction project as detailed in the Drawings and 27 Specifications. 28 B. Subsidiary Work 29 1. Any and all Work specifically governed by documentary requirements for the 30 project, such as conditions imposed by the Drawings or Contract Documents in 31 which no specific item for bid has been provided for in the Proposal and the item is 32 not a typical unit bid item included on the standard bid item list,then the item shall 33 be considered as a subsidiary item of Work,the cost of which shall be included in 34 the price bid in the Proposal for various bid items. 35 2. MOBILIZATION AND DEMOBILIZATION SHALL NOT BE PAID DIRECTLY 36 BUT SHALL BE CONSIDERED SUBSIDIARY TO THE MAJOR ITEMS OF 37 WORK.NO PAYMENT WILL BE MADE FOR MOBILIZATION AND 38 DEMIBILIZATION FROM ONE LOCATION TO ANOTHER IN NORMAL 39 PROGRESS OF PERFORMING THE WORK. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 01 1100-2 SUMMARY OF WORK Page 2 of 3 1 C. Use of Premises 2 1. Coordinate uses of premises under direction of the City. 3 2. Assume full responsibility for protection and safekeeping of materials and 4 equipment stored on the Site. 5 3. Use and occupy only portions of the public streets and alleys,or other public places 6 or other rights-of-way as provided for in the ordinances of the City,as shown in the 7 Contract Documents,or as may be specifically authorized in writing by the City. 8 a. A reasonable amount of tools,materials,and equipment for construction 9 purposes may be stored in such space,but no more than is necessary to avoid 10 delay in the construction operations. 11 b. Excavated and waste materials shall be stored in such a way as not to interfere 12 with the use of spaces that may be designated to be left free and unobstructed 13 and so as not to inconvenience occupants of adjacent property. 14 c. If the street is occupied by railroad tracks,the Work shall be carried on in such 15 manner as not to interfere with the operation of the railroad. 16 1) All Work shall be in accordance with railroad requirements set forth in 17 Division 0 as well as the railroad permit. 18 D. Work within Easements 19 1. Do not enter upon private property for any purpose without having previously 20 obtained permission from the owner of such property. 21 2. Do not store equipment or material on private property unless and until the 22 specified approval of the property owner has been secured in writing by the 23 Contractor and a copy furnished to the City. 24 3. Unless specifically provided otherwise,clear all rights-of-way or easements of 25 obstructions which must be removed to make possible proper prosecution of the 26 Work as a part of the project construction operations. 27 4. Preserve and use every precaution to prevent damage to,all trees, shrubbery,plants, 28 lawns,fences,culverts,curbing,and all other types of structures or improvements, 29 to all water, sewer,and gas lines,to all conduits, overhead pole lines,or 30 appurtenances thereof,including the construction of temporary fences and to all 31 other public or private property adjacent to the Work. 32 5. Notify the proper representatives of the owners or occupants of the public or private 33 lands of interest in lands which might be affected by the Work. 34 a. Such notice shall be made at least 48 hours in advance of the beginning of the 35 Work. 36 b. Notices shall be applicable to both public and private utility companies and any 37 corporation,company,individual,or other,either as owners or occupants, 38 whose land or interest in land might be affected by the Work. 39 c. Be responsible for all damage or injury to property of any character resulting 40 from any act,omission,neglect, or misconduct in the manner or method or 41 execution of the Work,or at any time due to defective work,material,or 42 equipment. 43 6. Fence 44 a. Restore all fences encountered and removed during construction of the Project 45 to the original or a better than original condition. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 011100-3 SUMMARY OF WORK Page 3 of 3 1 b. Erect temporary fencing in place of the fencing removed whenever the Work is 2 not in progress and when the site is vacated overnight,and/or at all times to 3 provide site security. 4 c. The cost for all fence work within easements,including removal,temporary 5 closures and replacement, shall be subsidiary to the various items bid in the 6 project proposal,unless a bid item is specifically provided in the proposal. 7 1.5 SUBMITTALS[NOT USED] 8 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 9 1.7 CLOSEOUT SUBMITTALS [NOT USED] 10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11 1.9 QUALITY ASSURANCE[NOT USED] 12 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 13 1.11 FIELD [SITE] CONDITIONS [NOT USED] 14 1.12 WARRANTY [NOT USED] 15 PART 2- PRODUCTS [NOT USED] 16 PART 3- EXECUTION [NOT USED] 17 END OF SECTION 18 Revision Log DATE NAME SUMMARY OF CHANGE 19 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 012500-1 SUBSTITUTION PROCEDURES Page 1 of 4 1 SECTION 0125 00 2 SUBSTITUTION PROCEDURES 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specified by descriptive or performance criteria or 8 defined by reference to 1 or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor 11 c. Trade name 12 d. Catalog number 13 2. Substitutions are not "or-equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include,but are not necessarily limited to: 17 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 18 2. Division 1 —General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. 22 No separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A. Request for Substitution-General 26 1. Within 30 days after award of Contract(unless noted otherwise),the City will 27 consider formal requests from Contractor for substitution of products in place of 28 those specked. 29 2. Certain types of equipment and kinds of material are described in Specifications by 30 means of references to names of manufacturers and vendors,trade names, or 31 catalog numbers. 32 a. When this method of specifying is used,it is not intended to exclude from 33 consideration other products bearing other manufacturer's or vendor's names, 34 trade names,or catalog numbers,provided said products are"or-equals," as 35 determined by City. 36 3. Other types of equipment and kinds of material may be acceptable substitutions 37 under the following conditions: 38 a. Or-equals are unavailable due to strike,discontinued production of products 39 meeting specified requirements,or other factors beyond control of Contractor; 40 or, CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 012500-2 SUBSTITUTION PROCEDURES Page 2 of 4 1 b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form(attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 2. Submit 3 copies of each written request for substitution,including: 9 a. Documentation 10 1) Complete data substantiating compliance of proposed substitution with 11 Contract Documents 12 2) Data relating to changes in construction schedule,when a reduction is 13 proposed 14 3) Data relating to changes in cost 15 b. For products 16 1) Product identification 17 a) Manufacturer's name 18 b) Telephone number and representative contact name 19 c) Specification Section or Drawing reference of originally specified 20 product,including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2) Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3) Itemized comparison of original and proposed product addressing product 25 characteristics including,but not necessarily limited to: 26 a) Size 27 b) Composition or materials of construction 28 c) Weight 29 d) Electrical or mechanical requirements 30 4) Product experience 31 a) Location of past projects utilizing product 32 b) Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c) Available field data and reports associated with proposed product 35 5) Samples 36 a) Provide at request of City. 37 b) Samples become the property of the City. 38 c. For construction methods: 39 1) Detailed description of proposed method 40 2) Illustration drawings 41 C. Approval or Rejection 42 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved,the resulting cost and/or time reduction 46 will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 012500-3 SUBSTITUTION PROCEDURES Page 3 of 4 1 4. No additional contract time will be given for substitution. 2 5. Substitution will be rejected if: 3 a. Submittal is not through the Contractor with his stamp of approval 4 b. Request is not made in accordance with this Specification Section 5 c. In the City's opinion,acceptance will require substantial revision of the original 6 design 7 d. In the City's opinion, substitution will not perform adequately the function 8 consistent with the design intent 9 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS[NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE 13 A. In making request for substitution or in using an approved product,the Contractor 14 represents that the Contractor: 15 1. Has investigated proposed product,and has determined that it is adequate or 16 superior in all respects to that specified, and that it will perform function for which 17 it is intended 18 2. Will provide same guarantee for substitute item as for product specified 19 3. Will coordinate installation of accepted substitution into Work,to include building 20 modifications if necessary,making such changes as may be required for Work to be 21 complete in all respects 22 4. Waives all claims for additional costs related to substitution which subsequently 23 arise 24 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 25 1.11 FIELD [SITE] CONDITIONS [NOT USED] 26 1.12 WARRANTY [NOT USED] 27 PART 2- PRODUCTS [NOT USED] 28 PART 3- EXECUTION[NOT USED] 29 END OF SECTION 30 Revision Log DATE NAME SUMMARY OF CHANGE 31 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 012500-4 SUBSTITUTION PROCEDURES Page 4 of 4 1 EXHIBIT A 2 REQUEST FOR SUBSTITUTION FORM: 3 4 TO: 5 PROJECT: DATE: 6 We hereby submit for your consideration the following product instead of the specified item for 7 the above project: 8 SECTION PARAGRAPH SPECIFIED ITEM 9 10 11 Proposed Substitution: 12 Reason for Substitution: 13 Include complete information on changes to Drawings and/or Specifications which proposed 14 substitution will require for its proper installation. 15 16 Fill in Blanks Below: 17 A. Will the undersigned contractor pay for changes to the building design,including engineering 18 and detailing costs caused by the requested substitution? 19 20 21 B. What effect does substitution have on other trades? 22 23 24 C. Differences between proposed substitution and specified item? 25 26 27 D. Differences in product cost or product delivery time? 28 29 30 E. Manufacturer's guarantees of the proposed and specified items are: 31 32 Equal Better(explain on attachment) 33 The undersigned states that the function, appearance and quality are equivalent or superior to the 34 specified item. 35 Submitted By: For Use by City 36 37 Signature _Recommended _Recommended 38 as noted 39 40 Firm _Not recommended _Received late 41 Address By 42 Date 43 Date Remarks 44 Telephone 45 46 For Use by City: 47 48 Approved Rejected 49 City Date CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 013119-1 PRECONSTRUCTION MEETING Page 1 of 3 1 SECTION 013119 2 PRECONSTRUCTION MEETING 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 12 2. Division 1 —General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Coordination 20 1. Attend preconstruction meeting. 21 2. Representatives of Contractor,subcontractors and suppliers attending meetings 22 shall be qualified and authorized to act on behalf of the entity each represents. 23 3. Meeting administered by City may be tape recorded. 24 a. If recorded,tapes will be used to prepare minutes and retained by City for 25 future reference. 26 B. Preconstruction Meeting 27 1. A preconstruction meeting will be held within 14 days after the execution of the 28 Agreement and before Work is started. 29 a. The meeting will be scheduled and administered by the City. 30 2. The Project Representative will preside at the meeting,prepare the notes of the 31 meeting and distribute copies of same to all participants who so request by fully 32 completing the attendance form to be circulated at the beginning of the meeting. 33 3. Attendance shall include: 34 a. Project Representative 35 b. Contractor's project manager 36 c. Contractor's superintendent 37 d. Any subcontractor or supplier representatives whom the Contractor may desire 38 to invite or the City may request CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised August 17,2012 013119-2 PRECONSTRUCTION MEETING Page 2 of 3 1 e. Other City representatives 2 f. Others as appropriate 3 4. Construction Schedule 4 a. Prepare baseline construction schedule in accordance with Section 0132 16 and 5 provide at Preconstruction Meeting. 6 b. City will notify Contractor of any schedule changes upon Notice of 7 Preconstruction Meeting. 8 5. Preliminary Agenda may include: 9 a. Introduction of Project Personnel 10 b. General Description of Project 11 c. Status of right-of-way,utility clearances,easements or other pertinent permits 12 d. Contractor's work plan and schedule 13 e. Contract Time 14 f. Notice to Proceed 15 g. Construction Staking 16 h. Progress Payments 17 i. Extra Work and Change Order Procedures 18 j. Field Orders 19 k. Disposal Site Letter for Waste Material 20 1. Insurance Renewals 21 m. Payroll Certification 22 n. Material Certifications and Quality Control Testing 23 o. Public Safety and Convenience 24 p. Documentation of Pre-Construction Conditions 25 q. Weekend Work Notification 26 r. Legal Holidays 27 s. Trench Safety Plans 28 t. Confined Space Entry Standards 29 u. Coordination with the City's representative for operations of existing water 30 systems 31 v. Storm Water Pollution Prevention Plan 32 w. Coordination with other Contractors 33 x. Early Warning System 34 y. Contractor Evaluation 35 z. Special Conditions applicable to the project 36 aa. Damages Claims 37 bb. Submittal Procedures 38 cc. Substitution Procedures 39 dd. Correspondence Routing 40 ee. Record Drawings 41 ff. Temporary construction facilities 42 gg. M/WBE or MBE/SBE procedures 43 hh. Final Acceptance 44 ii. Final Payment 45 jj. Questions or Comments CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised August 17,2012 013119-3 PRECONSTRUCTION MEETING Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE[NOT USED] 6 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 7 1.11 FIELD[SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY[NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION[NOT USED] 11 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 13 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised August 17,2012 013120-1 PROJECT MEETINGS Page 1 of 3 1 SECTION 013120 2 PROJECT MEETINGS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for project meetings throughout the construction period to enable orderly 7 review of the progress of the Work and to provide for systematic discussion of 8 potential problems 9 B. Deviations this City of Fort Worth Standard Specification 10 1. None. 11 C. Related Specification Sections include,but are not necessarily limited to: 12 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 13 2. Division 1 —General Requirements 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Coordination 21 1. Schedule, attend and administer as specified,periodic progress meetings, and 22 specially called meetings throughout progress of the Work. 23 2. Representatives of Contractor, subcontractors and suppliers attending meetings 24 shall be qualified and authorized to act on behalf of the entity each represents. 25 3. Meetings administered by City may be tape recorded. 26 a. If recorded,tapes will be used to prepare minutes and retained by City for 27 future reference. 28 4. Meetings,in addition to those specified in this Section,may be held when requested 29 by the City,Engineer or Contractor. 30 B. Pre-Construction Neighborhood Meeting 31 1. After the execution of the Agreement,but before construction is allowed to begin, 32 attend 1 Public Meeting with affected residents to: 33 a. Present projected schedule,including construction start date 34 b. Answer any construction related questions 35 2. Meeting Location 36 a. Location of meeting to be determined by the City. 37 3. Attendees 38 a. Contractor CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 013120-2 PROJECT MEETINGS Page 2 of 3 1 b. Project Representative 2 c. Other City representatives 3 4. Meeting Schedule 4 a. In general,the neighborhood meeting will occur within the 2 weeks following 5 the pre-construction conference. 6 b. In no case will construction be allowed to begin until this meeting is held. 7 C. Progress Meetings 8 1. Formal project coordination meetings will be held periodically. Meetings will be 9 scheduled and administered by Project Representative. 10 2. Additional progress meetings to discuss specific topics will be conducted on an as- 11 needed basis. Such additional meetings shall include,but not be limited to: 12 a. Coordinating shutdowns 13 b. Installation of piping and equipment 14 c. Coordination between other construction projects 15 d. Resolution of construction issues 16 e. Equipment approval 17 3. The Project Representative will preside at progress meetings,prepare the notes of 18 the meeting and distribute copies of the same to all participants who so request by 19 fully completing the attendance form to be circulated at the beginning of each 20 meeting. 21 4. Attendance shall include: 22 a. Contractor's project manager 23 b. Contractor's superintendent 24 c. Any subcontractor or supplier representatives whom the Contractor may desire 25 to invite or the City may request 26 d. Engineer's representatives 27 e. City's representatives 28 f. Others,as requested by the Project Representative 29 5. Preliminary Agenda may include: 30 a. Review of Work progress since previous meeting 31 b. Field observations,problems,conflicts 32 c. Items which impede construction schedule 33 d. Review of off-site fabrication,delivery schedules 34 e. Review of construction interfacing and sequencing requirements with other 35 construction contracts 36 f. Corrective measures and procedures to regain projected schedule 37 g. Revisions to construction schedule 38 h. Progress, schedule,during succeeding Work period 39 i. Coordination of schedules 40 j. Review submittal schedules 41 k. Maintenance of quality standards 42 1. Pending changes and substitutions 43 m. Review proposed changes for: 44 1) Effect on construction schedule and on completion date 45 2) Effect on other contracts of the Project 46 n. Review Record Documents 47 o. Review monthly pay request 48 p. Review status of Requests for Information CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 013120-3 PROJECT MEETINGS Page 3 of 3 1 6. Meeting Schedule 2 a. Progress meetings will be held periodically as determined by the Project 3 Representative. 4 1) Additional meetings may be held at the request of the: 5 a) City 6 b) Engineer 7 c) Contractor 8 7. Meeting Location 9 a. The City will establish a meeting location. 10 1) To the extent practicable,meetings will be held at the Site. 11 1.5 SUBMITTALS [NOT USED] 12 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 13 1.7 CLOSEOUT SUBMITTALS [NOT USED] 14 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 15 1.9 QUALITY ASSURANCE [NOT USED] 16 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 17 1.11 FIELD[SITE] CONDITIONS [NOT USED] 18 1.12 WARRANTY [NOT USED] 19 PART 2- PRODUCTS [NOT USED] 20 PART 3- EXECUTION [NOT USED] 21 END OF SECTION 22 Revision Log DATE NAME SUMMARY OF CHANGE 23 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 013216-1 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 5 1 SECTION 013216 2 CONSTRUCTION PROGRESS SCHEDULE 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General requirements for the preparation, submittal,updating, status reporting and 7 management of the Construction Progress Schedule 8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance 9 Document 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include,but are not necessarily limited to: 13 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 14 2. Division 1—General Requirements 15 1.2 PRICE AND PAYMENT PROCEDURES 16 A. Measurement and Payment 17 1. Work associated with this Item is considered subsidiary to the various items bid. 18 No separate payment will be allowed for this Item. 19 1.3 REFERENCES 20 A. Definitions 21 1. Schedule Tiers 22 a. Tier 1-No schedule submittal required by contract. Small,brief duration 23 projects 24 b. Tier 2-No schedule submittal required by contract,but will require some 25 milestone dates. Small,brief duration projects 26 c. Tier 3-Schedule submittal required by contract as described in the 27 Specification and herein.Majority of City projects,including all bond program 28 projects 29 d. Tier 4-Schedule submittal required by contract as described in the 30 Specification and herein.Large and/or complex projects with long durations 31 1) Examples:large water pump station project and associated pipeline with 32 interconnection to another governmental entity 33 e. Tier 5-Schedule submittal required by contract as described in the 34 Specification and herein.Large and/or very complex projects with long 35 durations,high public visibility 36 1) Examples might include a water or wastewater treatment plant 37 2. Baseline Schedule-Initial schedule submitted before work begins that will serve 38 as the baseline for measuring progress and departures from the schedule. 39 3. Progress Schedule-Monthly submittal of a progress schedule documenting 40 progress on the project and any changes anticipated. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 100630 Revised July 1,2011 013216-2 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 5 1 4. Schedule Narrative-Concise narrative of the schedule including schedule 2 changes,expected delays,key schedule issues,critical path items,etc 3 B. Reference Standards 4 1. City of Fort Worth Schedule Guidance Document 5 1.4 ADMINISTRATIVE REQUIREMENTS 6 A. Baseline Schedule 7 1. General 8 a. Prepare a cost-loaded baseline Schedule using approved software and the 9 Critical Path Method(CPM)as required in the City of Fort Worth Schedule 10 Guidance Document. 11 b. Review the draft cost-loaded baseline Schedule with the City to demonstrate 12 understanding of the work to be performed and known issues and constraints 13 related to the schedule. 14 c. Designate an authorized representative(Project Scheduler)responsible for 15 developing and updating the schedule and preparing reports. 16 B. Progress Schedule 17 1. Update the progress Schedule monthly as required in the City of Fort Worth 18 Schedule Guidance Document. 19 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 20 3. Change Orders 21 a. Incorporate approved change orders,resulting in a change of contract time, in 22 the baseline Schedule in accordance with City of Fort Worth Schedule 23 Guidance Document. 24 C. Responsibility for Schedule Compliance 25 1. Whenever it becomes apparent from the current progress Schedule and CPM Status 26 Report that delays to the critical path have resulted and the Contract completion 27 date will not be met,or when so directed by the City,make some or all of the 28 following actions at no additional cost to the City 29 a. Submit a Recovery Plan to the City for approval revised baseline Schedule 30 outlining: 31 1) A written statement of the steps intended to take to remove or arrest the 32 delay to the critical path in the approved schedule 33 2) Increase construction manpower in such quantities and crafts as will 34 substantially eliminate the backlog of work and return current Schedule to 35 meet projected baseline completion dates 36 3) Increase the number of working hours per shift, shifts per day,working 37 days per week,the amount of construction equipment,or any combination 38 of the foregoing, sufficiently to substantially eliminate the backlog of work 39 4) Reschedule activities to achieve maximum practical concurrency of 40 accomplishment of activities,and comply with the revised schedule 41 2. If no written statement of the steps intended to take is submitted when so requested 42 by the City,the City may direct the Contractor to increase the level of effort in 43 manpower(trades),equipment and work schedule(overtime,weekend and holiday 44 work,etc.)to be employed by the Contractor in order to remove or arrest the delay 45 to the critical path in the approved schedule. 46 a. No additional cost for such work will be considered. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 100630 Revised July 1,2011 013216-3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 5 1 D. The Contract completion time will be adjusted only for causes specified in this 2 Contract. 3 a. Requests for an extension of any Contract completion date must be 4 supplemented with the following: 5 1) Furnish justification and supporting evidence as the City may deem 6 necessary to determine whether the requested extension of time is entitled 7 under the provisions of this Contract. 8 a) The City will,after receipt of such justification and supporting 9 evidence,make findings of fact and will advise the Contractor,in 10 writing thereof. 11 2) If the City finds that the requested extension of time is entitled,the City's 12 determination as to the total number of days allowed for the extensions 13 shall be based upon the approved total baseline schedule and on all data 14 relevant to the extension. 15 a) Such data shall be included in the next updating of the Progress 16 schedule. 17 b) Actual delays in activities which, according to the Baseline schedule, 18 do not affect any Contract completion date shown by the critical path in 19 the network will not be the basis for a change therein. 20 2. Submit each request for change in Contract completion date to the City within 30 21 days after the beginning of the delay for which a time extension is requested but 22 before the date of final payment under this Contract. 23 a. No time extension will be granted for requests which are not submitted within 24 the foregoing time limit. 25 b. From time to time,it may be necessary for the Contract schedule or completion 26 time to be adjusted by the City to reflect the effects of job conditions,weather, 27 technical difficulties,strikes,unavoidable delays on the part of the City or its 28 representatives,and other unforeseeable conditions which may indicate 29 schedule adjustments or completion time extensions. 30 1) Under such conditions,the City will direct the Contractor to reschedule the 31 work or Contract completion time to reflect the changed conditions and the 32 Contractor shall revise his schedule accordingly. 33 a) No additional compensation will be made to the Contractor for such 34 schedule changes except for unavoidable overall contract time 35 extensions beyond the actual completion of unaffected work, in which 36 case the Contractor shall take all possible action to minimize any time 37 extension and any additional cost to the City. 38 b) Available float time in the Baseline schedule may be used by the City 39 as well as by the Contractor. 40 3. Float or slack time is defined as the amount of time between the earliest start date 41 and the latest start date or between the earliest finish date and the latest finish date 42 of a chain of activities on the Baseline Schedule. 43 a. Float or slack time is not for the exclusive use or benefit of either the 44 Contractor or the City. 45 b. Proceed with work according to early start dates,and the City shall have the 46 right to reserve and apportion float time according to the needs of the project. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 100630 Revised July 1,2011 013216-4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 5 1 c. Acknowledge and agree that actual delays,affecting paths of activities 2 containing float time,will not have any effect upon contract completion times, 3 providing that the actual delay does not exceed the float time associated with 4 those activities. 5 E. Coordinating Schedule with Other Contract Schedules 6 1. Where work is to be performed under this Contract concurrently with or contingent 7 upon work performed on the same facilities or area under other contracts,the 8 Baseline Schedule shall be coordinated with the schedules of the other contracts. 9 a. Obtain the schedules of the other appropriate contracts from the City for the 10 preparation and updating of Baseline schedule and make the required changes 11 in his schedule when indicated by changes in corresponding schedules. 12 2. In case of interference between the operations of different contractors,the City will 13 determine the work priority of each contractor and the sequence of work necessary 14 to expedite the completion of the entire Project. 15 a. In such cases,the decision of the City shall be accepted as final. 16 b. The temporary delay of any work due to such circumstances shall not be 17 considered as justification for claims for additional compensation. 18 1.5 SUBMITTALS 19 A. Baseline Schedule 20 1. Submit Schedule in native file format and pdf format as required in the City of Fort 21 Worth Schedule Guidance Document. 22 a. Native file format includes: 23 1) Primavera(P6 or Primavera Contractor) 24 2. Submit draft baseline Schedule to City prior to the pre-construction meeting and 25 bring in hard copy to the meeting for review and discussion. 26 B. Progress Schedule 27 1. Submit progress Schedule in native file format and pdf format as required in the 28 City of Fort Worth Schedule Guidance Document. 29 2. Submit progress Schedule monthly no later than the last day of the month. 30 C. Schedule Narrative 31 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth 32 Schedule Guidance Document. 33 2. Submit schedule narrative monthly no later than the last day of the month. 34 D. Submittal Process 35 1. The City administers and manages schedules through Buzzsaw. 36 2. Contractor shall submit documents as required in the City of Fort Worth Schedule 37 Guidance Document. 38 3. Once the project has been completed and Final Acceptance has been issued by the 39 City,no further progress schedules are required. CrrY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 100630 Revised July 1,2011 013216-5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 5 1 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4 1.9 QUALITY ASSURANCE 5 A. The person preparing and revising the construction Progress Schedule shall be 6 experienced in the preparation of schedules of similar complexity. 7 B. Schedule and supporting documents addressed in this Specification shall be prepared, 8 updated and revised to accurately reflect the performance of the construction. 9 C. Contractor is responsible for the quality of all submittals in this section meeting the 10 standard of care for the construction industry for similar projects. 11 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 12 1.11 FIELD[SITE] CONDITIONS [NOT USED] 13 1.12 WARRANTY [NOT USED] 14 PART 2- PRODUCTS [NOT USED] 15 PART 3- EXECUTION [NOT USED] 16 END OF SECTION 17 Revision Log DATE NAME SUMMARY OF CHANGE 18 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 100630 Revised July 1,2011 013233-1 PRECONSTRUCTION VIDEO Page 1 of 2 1 SECTION 0132 33 2 PRECONSTRUCTION VIDEO 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative and procedural requirements for: 7 a. Preconstruction Videos 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 12 2. Division 1—General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Preconstruction Video 20 1. Produce a preconstruction video of the site/alignment,including all areas in the 21 vicinity of and to be affected by construction. 22 a. Provide digital copy of video upon request by the City. 23 2. Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE[NOT USED] 30 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WARRANTY [NOT USED] 33 PART 2- PRODUCTS [NOT USED] CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 013233-2 PRECONSTRUCTION VIDEO Page 2 of 2 1 PART 3- EXECUTION[NOT USED] 2 END OF SECTION 3 Revision Log DATE NAME SUMMARY OF CHANGE 4 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 013300-1 SUBMITTALS Page 1 of 8 1 SECTION 0133 00 2 SUBMITTALS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following 7 Work-related submittals: 8 a. Shop Drawings 9 b. Product Data(including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 16 2. Division 1—General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES[NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Coordination 24 1. Notify the City in writing,at the time of submittal,of any deviations in the 25 submittals from the requirements of the Contract Documents. 26 2. Coordination of Submittal Times 27 a. Prepare,prioritize and transmit each submittal sufficiently in advance of 28 performing the related Work or other applicable activities,or within the time 29 specified in the individual Work Sections, of the Specifications. 30 b. Contractor is responsible such that the installation will not be delayed by 31 processing times including,but not limited to: 32 a) Disapproval and resubmittal(if required) 33 b) Coordination with other submittals 34 c) Testing 35 d) Purchasing 36 e) Fabrication 37 f) Delivery 38 g) Similar sequenced activities 39 c. No extension of time will be authorized because of the Contractor's failure to 40 transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013300-2 SUBMITTAI.S Page 2 of 8 1 d. Make submittals promptly in accordance with approved schedule,and in such 2 sequence as to cause no delay in the Work or in the work of any other 3 contractor. 4 B. Submittal Numbering 5 1. When submitting shop drawings or samples,utilize a 9-character submittal cross- 6 reference identification numbering system in the following manner: 7 a. Use the first 6 digits of the applicable Specification Section Number. 8 b. For the next 2 digits number use numbers 01-99 to sequentially number each 9 initial separate item or drawing submitted under each specific Section number. 10 c. Last use a letter,A-Z,indicating the resubmission of the same drawing(i.e. 11 A=2nd submission,B=3rd submission,C=4th submission,etc.). A typical 12 submittal number would be as follows: 13 14 03 30 00-08-B 15 16 1) 03 30 00 is the Specification Section for Concrete 17 2) 08 is the eighth initial submittal under this Specification Section 18 3) B is the third submission(second resubmission)of that particular shop 19 drawing 20 C. Contractor Certification 21 1. Review shop drawings,product data and samples,including those by 22 subcontractors,prior to submission to determine and verify the following: 23 a. Field measurements 24 b. Field construction criteria 25 c. Catalog numbers and similar data 26 d. Conformance with the Contract Documents 27 2. Provide each shop drawing,sample and product data submitted by the Contractor 28 with a Certification Statement affixed including: 29 a. The Contractor's Company name 30 b. Signature of submittal reviewer 31 c. Certification Statement 32 1) `By this submittal,I hereby represent that I have determined and verified 33 field measurements,field construction criteria,materials,dimensions, 34 catalog numbers and similar data and I have checked and coordinated each 35 item with other applicable approved shop drawings." 36 D. Submittal Format 37 1. Fold shop drawings larger than 8 t/2 inches x 11 inches to 8'/2 inches x l Iinches. 38 2. Bind shop drawings and product data sheets together. 39 3. Order 40 a. Cover Sheet 41 1) Description of Packet 42 2) Contractor Certification 43 b. List of items/Table of Contents 44 c. Product Data/Shop Drawings/Samples/Calculations 45 E. Submittal Content 46 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013300-3 SUBMITTALS Page 3 of 8 1 2. The Project title and number 2 3. Contractor identification 3 4. The names of- 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product,with the Specification Section number,page and 8 paragraph(s) 9 6. Field dimensions,clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 8. Applicable standards, such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch x 3-inch blank space for Contractor and City stamps 15 F. Shop Drawings 16 1. As specified in individual Work Sections includes,but is not necessarily limited to: 17 a. Custom-prepared data such as fabrication and erection/installation(working) 18 drawings 19 b. Scheduled information 20 c. Setting diagrams 21 d. Actual shopwork manufacturing instructions 22 e. Custom templates 23 f. Special wiring diagrams 24 g. Coordination drawings 25 h. Individual system or equipment inspection and test reports including: 26 1) Performance curves and certifications 27 i. As applicable to the Work 28 2. Details 29 a. Relation of the various parts to the main members and lines of the structure 30 b. Where correct fabrication of the Work depends upon field measurements 31 1) Provide such measurements and note on the drawings prior to submitting 32 for approval. 33 G. Product Data 34 1. For submittals of product data for products included on the City's Standard Product 35 List,clearly identify each item selected for use on the Project. 36 2. For submittals of product data for products not included on the City's Standard 37 Product List,submittal data may include,but is not necessarily limited to: 38 a. Standard prepared data for manufactured products(sometimes referred to as 39 catalog data) 40 1) Such as the manufacturer's product specification and installation 41 instructions 42 2) Availability of colors and patterns 43 3) Manufacturer's printed statements of compliances and applicability 44 4) Roughing-in diagrams and templates 45 5) Catalog cuts 46 6) Product photographs CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013300-4 SUBMITTALS Page 4 of 8 1 7) Standard wiring diagrams 2 8) Printed performance curves and operational-range diagrams 3 9) Production or quality control inspection and test reports and certifications 4 10) Mill reports 5 11) Product operating and maintenance instructions and recommended 6 spare-parts listing and printed product warranties 7 12) As applicable to the Work 8 H. Samples 9 1. As specified in individual Sections,include,but are not necessarily limited to: 10 a. Physical examples of the Work such as: 11 1) Sections of manufactured or fabricated Work 12 2) Small cuts or containers of materials 13 3) Complete units of repetitively used products color/texture/pattem swatches 14 and range sets 15 4) Specimens for coordination of visual effect 16 5) Graphic symbols and units of Work to be used by the City for independent 17 inspection and testing, as applicable to the Work 18 I. Do not start Work requiring a shop drawing, sample or product data nor any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 20 1. Fabrication performed,materials purchased or on-site construction accomplished 21 which does not conform to approved shop drawings and data is at the Contractor's 22 risk. 23 2. The City will not be liable for any expense or delay due to corrections or remedies 24 required to accomplish conformity. 25 3. Complete project Work,materials,fabrication,and installations in conformance 26 with approved shop drawings,applicable samples,and product data. 27 J. Submittal Distribution 28 1. Electronic Distribution 29 a. Confirm development of Project directory for electronic submittals to be 30 uploaded to City's Buzzsaw site,or another external FTP site approved by the. 31 City. 32 b. Shop Drawings 33 1) Upload submittal to designated project directory and notify appropriate 34 City representatives via email of submittal posting. 35 2) Hard Copies 36 a) 3 copies for all submittals 37 b) If Contractor requires more than 1 hard copy of Shop Drawings 38 returned,Contractor shall submit more than the number of copies listed 39 above. 40 c. Product Data 41 1) Upload submittal to designated project directory and notify appropriate 42 City representatives via email of submittal posting. 43 2) Hard Copies 44 a) 3 copies for all submittals 45 d. Samples 46 1) Distributed to the Project Representative 47 2. Hard Copy Distribution(if required in lieu of electronic distribution) CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013300-5 SUBMITTALS Page 5 of 8 1 a. Shop Drawings 2 1) Distributed to the City 3 2) Copies 4 a) 8 copies for mechanical submittals 5 b) 7 copies for all other submittals 6 c) If Contractor requires more than 3 copies of Shop Drawings returned, 7 Contractor shall submit more than the number of copies listed above. 8 b. Product Data 9 1) Distributed to the City 10 2) Copies 11 a) 4 copies 12 c. Samples 13 1) Distributed to the Project Representative 14 2) Copies 15 a) Submit the number stated in the respective Specification Sections. 16 3. Distribute reproductions of approved shop drawings and copies of approved 17 product data and samples,where required,to the job site file and elsewhere as 18 directed by the City. 19 a. Provide number of copies as directed by the City but not exceeding the number 20 previously specified. 21 K. Submittal Review 22 1. The review of shop drawings,data and samples will be for general conformance 23 with the design concept and Contract Documents. This is not to be construed as: 24 a. Permitting any departure from the Contract requirements 25 b. Relieving the Contractor of responsibility for any errors,including details, 26 dimensions,and materials 27 c. Approving departures from details furnished by the City,except as otherwise 28 provided herein 29 2. The review and approval of shop drawings, samples or product data by the City 30 does not relieve the Contractor from his/her responsibility with regard to the 31 fulfillment of the terms of the Contract. 32 a. All risks of error and omission are assumed by the Contractor,and the City will 33 have no responsibility therefore. 34 3. The Contractor remains responsible for details and accuracy,for coordinating the 35 Work with all other associated work and trades,for selecting fabrication processes, 36 for techniques of assembly and for performing Work in a safe manner. 37 4. If the shop drawings,data or samples as submitted describe variations and show a 38 departure from the Contract requirements which City finds to be in the interest of 39 the City and to be so minor as not to involve a change in Contract Price or time for 40 performance,the City may return the reviewed drawings without noting an 41 exception. 42 5. Submittals will be returned to the Contractor under 1 of the following codes: 43 a. Code 1 44 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or 45 comments on the submittal. 46 a) When returned under this code the Contractor may release the 47 equipment and/or material for manufacture. 48 b. Code 2 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013300-6 SUBMITTALS Page 6 of 8 1 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of 2 the notations and comments IS NOT required by the Contractor. 3 a) The Contractor may release the equipment or material for manufacture; 4 however,all notations and comments must be incorporated into the 5 final product. 6 c. Code 3 7 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is 8 assigned when notations and comments are extensive enough to require a 9 resubmittal of the package. 10 a) The Contractor may release the equipment or material for manufacture; 11 however,all notations and comments must be incorporated into the 12 final product. 13 b) This resubmittal is to address all comments,omissions and 14 non-conforming items that were noted. 15 c) Resubmittal is to be received by the City within 15 Calendar Days of 16 the date of the City's transmittal requiring the resubmittal. 17 d. Code 4 18 1) "NOT APPROVED" is assigned when the submittal does not meet the 19 intent of the Contract Documents. 20 a) The Contractor must resubmit the entire package revised to bring the 21 submittal into conformance. 22 b) It may be necessary to resubmit using a different manufacturer/vendor 23 to meet the Contract Documents. 24 6. Resubmittals 25 a. Handled in the same manner as first submittals 26 1) Corrections other than requested by the City 27 2) Marked with revision triangle or other similar method 28 a) At Contractor's risk if not marked 29 b. Submittals for each item will be reviewed no more than twice at the City's 30 expense. 31 1) All subsequent reviews will be performed at times convenient to the City 32 and at the Contractor's expense,based on the City's or City 33 Representative's then prevailing rates. 34 2) Provide Contractor reimbursement to the City within 30 Calendar Days for 35 all such fees invoiced by the City. 36 c. The need for more than 1 resubmission or any other delay in obtaining City's 37 review of submittals,will not entitle the Contractor to an extension of Contract 38 Time. 39 7. Partial Submittals 40 a. City reserves the right to not review submittals deemed partial,at the City's 41 discretion. 42 b. Submittals deemed by the City to be not complete will be returned to the 43 Contractor,and will be considered"Not Approved"until resubmitted. 44 c. The City may at its option provide a list or mark the submittal directing the 45 Contractor to the areas that are incomplete. 46 8. If the Contractor considers any correction indicated on the shop drawings to 47 constitute a change to the Contract Documents,then written notice must be 48 provided thereof to the City at least 7 Calendar Days prior to release for 49 manufacture. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013300-7 SUBMITTALS Page 7 of 8 1 9. When the shop drawings have been completed to the satisfaction of the City,the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal,appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections,include,but are not necessarily 8 limited to,complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. 10 M. Qualifications 11 1. If specifically required in other Sections of these Specifications, submit a P.E. 12 Certification for each item required. 13 N. Request for Information(RFI) 14 1. Contractor Request for additional information 15 a. Clarification or interpretation of the contract documents 16 b. When the Contractor believes there is a conflict between Contract Documents 17 c. When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 1) Identify the conflict and request clarification 20 2. Use the Request for Information(RFI)form provided by the City. 21 3. Numbering of RFI 22 a. Prefix with"RFI"followed by series number, "-xxx",beginning with"01"and 23 increasing sequentially with each additional transmittal. 24 4. Sufficient information shall be attached to permit a written response without further 25 information. 26 5. The City will log each request and will review the request. 27 a. If review of the project information request indicates that a change to the 28 Contract Documents is required,the City will issue a Field Order or Change 29 Order,as appropriate. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS[NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] 35 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 36 1.11 FIELD [SITE] CONDITIONS [NOT USED] 37 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013300-8 SUBMITTALS Page 8 of 8 1 PART 2- PRODUCTS [NOT USED] 2 PART 3- EXECUTION [NOT USED] 3 END OF SECTION 4 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.4.K.8.Working Days modified to Calendar Days 5 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013513-1 SPECIAL PROJECT PROCEDURES Page 1 of 8 1 SECTION 013513 2 SPECIAL PROJECT PROCEDURES 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes,but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives,Drop Weight,Etc. 12 f. Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include,but are not necessarily limited to: 21 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 22 2. Division 1 —General Requirements 23 3. Section 33 12 25—Connection to Existing Water Mains 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Coordination within Railroad permit areas 27 a. Measurement 28 1) Measurement for this Item will be by lump sum. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 will be paid for at the lump sum price bid for Railroad Coordination. 32 c. The price bid shall include: 33 1) Mobilization 34 2) Inspection 35 3) Safety training 36 4) Additional Insurance 37 5) Insurance Certificates 38 6) Other requirements associated with general coordination with Railroad, 39 including additional employees required to protect the right-of-way and 40 property of the Railroad from damage arising out of and/or from the 41 construction of the Project. 42 2. Railroad Flagmen CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013513-2 SPECIAL PROJECT PROCEDURES Page 2 of 8 1 a. Measurement 2 1) Measurement for this Item will be per working day. 3 b. Payment 4 1) The work performed and materials furnished in accordance with this Item 5 will be paid for each working day that Railroad Flagmen are present at the 6 Site. 7 c. The price bid shall include: 8 1) Coordination for scheduling flagmen 9 2) Flagmen 10 3) Other requirements associated with Railroad 11 3. All other items 12 a. Work associated with these Items is considered subsidiary to the various Items 13 bid. No separate payment will be allowed for this Item. 14 1.3 REFERENCES 15 A. Reference Standards 16 1. Reference standards cited in this Specification refer to the current reference 17 standard published at the time of the latest revision date logged at the end of this 18 Specification,unless a date is specifically cited. 19 2. Health and Safety Code,Title 9. Safety,Subtitle A.Public Safety,Chapter 752. 20 High Voltage Overhead Lines. 21 3. North Central Texas Council of Governments(NCTCOG)—Clean Construction 22 Specification 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Coordination with the Texas Department of Transportation 25 1. When work in the right-of-way which is under the jurisdiction of the Texas 26 Department of Transportation(TxDOT): 27 a. Notify the Texas Department of Transportation prior to commencing any work 28 therein in accordance with the provisions of the permit 29 b. All work performed in the TxDOT right-of-way shall be performed in 30 compliance with and subject to approval from the Texas Department of 31 Transportation 32 B. Work near High Voltage Lines 33 1. Regulatory Requirements 34 a. All Work near High Voltage Lines (more than 600 volts measured between 35 conductors or between a conductor and the ground) shall be in accordance with 36 Health and Safety Code,Title 9, Subtitle A,Chapter 752. 37 2. Warning sign 38 a. Provide sign of sufficient size meeting all OSHA requirements. 39 3. Equipment operating within 10 feet of high voltage lines will require the following 40 safety features 41 a. Insulating cage-type of guard about the boom or arm 42 b. Insulator links on the lift hook connections for back hoes or dippers 43 c. Equipment must meet the safety requirements as set forth by OSHA and the 44 safety requirements of the owner of the high voltage lines 45 4. Work within 6 feet of high voltage electric lines CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013513-3 SPECIAL PROJECT PROCEDURES Page 3 of 8 1 a. Notification shall be given to: 2 1) The power company(example: ONCOR) 3 a) Maintain an accurate log of all such calls to power company and record 4 action taken in each case. 5 b. Coordination with power company 6 1) After notification coordinate with the power company to: 7 a) Erect temporary mechanical barriers,de-energize the lines,or raise or 8 lower the lines 9 c. No personnel may work within 6 feet of a high voltage line before the above 10 requirements have been met. 11 C. Confined Space Entry Program 12 1. Provide and follow approved Confined Space Entry Program in accordance with 13 OSHA requirements. 14 2. Confined Spaces include: 15 a. Manholes 16 b. All other confined spaces in accordance with OSHA's Permit Required for 17 Confined Spaces 18 D. Air Pollution Watch Days 19 1. General 20 a. Observe the following guidelines relating to working on City construction sites 21 on days designated as"AIR POLLUTION WATCH DAYS". 22 b. Typical Ozone Season 23 1) May 1 through October 31. 24 c. Critical Emission Time 25 1) 6:00 a.m.to 10:00 a.m. 26 2. Watch Days 27 a. The Texas Commission on Environmental Quality(TCEQ),in coordination 28 with the National Weather Service,will issue the Air Pollution Watch by 3:00 29 p.m. on the afternoon prior to the WATCH day. 30 b. Requirements 31 1) Begin work after 10:00 a.m. whenever_construction phasing requires the 32 use of motorized equipment for periods in excess of 1 hour. 33 2) However,the Contractor may begin work prior to 10:00 a.m.if: 34 a) Use of motorized equipment is less than 1 hour,or 35 b) If equipment is new and certified by EPA as "Low Emitting",or 36 equipment burns Ultra Low Sulfur Diesel(ULSD),diesel emulsions,or 37 alternative fuels such as CNG. 38 E. TCEQ Air Permit 39 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. 40 F. Use of Explosives,Drop Weight,Etc. 41 1. When Contract Documents permit on the project the following will apply: 42 a. Public Notification 43 1) Submit notice to City and proof of adequate insurance coverage,24 hours 44 prior to commencing. 45 2) Minimum 24 hour public notification in accordance with Section 0131 13 46 G. Water Department Coordination CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013513-4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1 1. During the construction of this project,it will be necessary to deactivate,for a 2 period of time,existing lines. The Contractor shall be required to coordinate with 3 the Water Department to determine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an existing 6 City water line system with the City's representative. 7 a. Coordination shall be in accordance with Section 33 12 25. 8 b. If needed, obtain a hydrant water meter from the Water Department for use 9 during the life of named project. 10 c. In the event that a water valve on an existing live system be turned off and on 11 to accommodate the construction of the project is required,coordinate this 12 activity through the appropriate City representative. 13 1) Do not operate water line valves of existing water system. 14 a) Failure to comply will render the Contractor in violation of Texas Penal 15 Code Title 7,Chapter 28.03(Criminal Mischief)and the Contractor 16 will be prosecuted to the full extent of the law. 17 b) In addition,the Contractor will assume all liabilities and 18 responsibilities as a result of these actions. 19 H. Public Notification Prior to Beginning Construction 20 1. Prior to beginning construction on any block in the project, on a block by block 21 basis,prepare and deliver a notice or flyer of the pending construction to the front 22 door of each residence or business that will be impacted by construction.The notice 23 shall be prepared as follows: 24 a. Post notice or flyer 7 days prior to beginning any construction activity on each 25 block in the project area. 26 1) Prepare flyer on the Contractor's letterhead and include the following 27 information: 28 a) Name of Project 29 b) City Project No(CPN) 30 c) Scope of Project(i.e.type of construction activity) 31 d) Actual construction duration within the block 32 e) Name of the contractor's foreman and phone number 33 f) Name of the City's inspector and phone number 34 g) City's after-hours phone number 35 2) A sample of the `pre-construction notification' flyer is attached as Exhibit 36 A. 37 3) Submit schedule showing the construction start and finish time for each 38 block of the project to the inspector. 39 4) Deliver flyer to the City Inspector for review prior to distribution. 40 b. No construction will be allowed to begin on any block until the flyer is 41 delivered to all residents of the block. 42 I. Public Notification of Temporary Water Service Interruption during Construction 43 1. In the event it becomes necessary to temporarily shut down water service to 44 residents or businesses during construction,prepare and deliver a notice or flyer of 45 the pending interruption to the front door of each affected resident. 46 2. Prepared notice as follows: 47 a. The notification or flyer shall be posted 24 hours prior to the temporary 48 interruption. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013513-5 SPECIAL PROJECT PROCEDURES Page 5 of 8 1 b. Prepare flyer on the contractor's letterhead and include the following 2 information: 3 1) Name of the project 4 2) City Project Number 5 3) Date of the interruption of service 6 4) Period the interruption will take place 7 5) Name of the contractor's foreman and phone number 8 6) Name of the City's inspector and phone number 9 c. A sample of the temporary water service interruption notification is attached as 10 Exhibit B. 11 d. Deliver a copy of the temporary interruption notification to the City inspector 12 for review prior to being distributed. 13 e. No interruption of water service can occur until the flyer has been delivered to 14 all affected residents and businesses. 15 f. Electronic versions of the sample flyers can be obtained from the Project 16 Construction Inspector. 17 J. Coordination with United States Army Corps of Engineers(USACE) 18 1. At locations in the Project where construction activities occur in areas where 19 USACE permits are required,meet all requirements set forth in each designated 20 permit. 21 K. Coordination within Railroad Permit Areas 22 1. At locations in the project where construction activities occur in areas where 23 railroad permits are required,meet all requirements set forth in each designated 24 railroad permit. This includes,but is not limited to,provisions for: 25 a. Flagmen 26 b. Inspectors 27 c. Safety training 28 d. Additional insurance 29 e. Insurance certificates 30 f. Other employees required to protect the right-of-way and property of the 31 Railroad Company from damage arising out of and/or from the construction of 32 the project. Proper utility clearance procedures shall be used in accordance 33 with the permit guidelines. 34 2. Obtain any supplemental information needed to comply with the railroad's 35 requirements. 36 3. Railroad Flagmen 37 a. Submit receipts to City for verification of working days that railroad flagmen 38 were present on Site. 39 L. Dust Control 40 1. Use acceptable measures to control dust at the Site. 41 a. If water is used to control dust,capture and properly dispose of waste water. 42 b. If wet saw cutting is performed,capture and properly dispose of slurry. 43 M. Employee Parking 44 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013513-6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 1.4.13—Added requirement of compliance with Health and Safety Code,Title 9. 8/31/2012 D.Johnson Safety,Subtitle A.Public Safety,Chapter 752.High Voltage Overhead Lines. 1.4.E—Added Contractor responsibility for obtaining a TCEQ Air Permit 13 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013513-7 SPECIAL PROJECT PROCEDURES Page 7 of 8 1 EXHIBIT A 2 (To be printed on Contractor's Letterhead) 3 4 5 6 Date: 7 8 CPN No.: 9 Project Name: 10 Mapsco Location: 11 Limits of Construction: 12 13 14 15 16 17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 18 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 19 PROPERTY. 20 21 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 22 OF THIS NOTICE. 23 24 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 25 ISSUE, PLEASE CALL: 26 27 28 Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> 29 30 OR 31 32 Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 33 34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 35 36 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 37 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 013513-8 SPECIAL PROJECT PROCEDURES Page 8 of 8 1 EXHIBIT B 2 FORT WORTH Date: DOE NO.xxxx Pmject[lame: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT,PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, CONTRACTOR 3 _ ._ _ . _......---- 4 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 014523-1 TESTING AND INSPECTION SERVICES Page 1 of 2 1 SECTION 0145 23 2 TESTING AND INSPECTION SERVICES 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 11 2. Division 1—General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing,coordinating,and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails,the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City,notify City, sufficiently 31 in advance,when testing is needed. 32 b. When testing is required to be completed by the Contractor,notify City, 33 sufficiently in advance,that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site,or another external FTP site approved by 38 the City. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 014523-2 TESTING AND INSPECTION SERVICES Page 2 of 2 1 2) Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3) Hard Copies 4 a) 1 copy for all submittals submitted to the Project Representative 5 b. Hard Copy Distribution(if required in lieu of electronic distribution) 6 1) Tests performed by City 7 a) Distribute 1 hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered load of 11 Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2- PRODUCTS [NOT USED] 27 PART 3- EXECUTION [NOT USED] 28 END OF SECTION 29 Revision Log DATE NAME SUMMARY OF CHANGE 30 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 015000-1 TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 1 SECTION 0150 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including,but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include,but are not necessarily limited to: 16 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 17 2. Division 1 —General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Temporary Utilities 25 1. Obtaining Temporary Service 26 a. Make arrangements with utility service companies for temporary services. 27 b. Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c. Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 1) Included are fuel,power,light,heat and other utility services necessary for 32 execution,completion,testing and initial operation of Work. 33 2. Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping,equipment,devices or other use as 36 required for the completion of the Work. 37 b. Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c. Coordination 40 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 015000-2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 1 d. Contractor Payment for Construction Water 2 1) Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3. Electricity and Lighting 5 a. Provide and pay for electric powered service as required for Work,including 6 testing of Work. 7 1) Provide power for lighting,operation of equipment,or other use. 8 b. Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4. Telephone 11 a. Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5. Temporary Heat and Ventilation 14 a. Provide temporary heat as necessary for protection or completion of Work. 15 b. Provide temporary heat and ventilation to assure safe working conditions. 16 B. Sanitary Facilities 17 1. Provide and maintain sanitary facilities for persons on Site. 18 a. Comply with regulations of State and local departments of health. 19 2. Enforce use of sanitary facilities by construction personnel at job site. 20 a. Enclose and anchor sanitary facilities. 21 b. No discharge will be allowed from these facilities. 22 c. Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d. Haul sewage and waste off-site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4. Remove facilities at completion of Project 28 C. Storage Sheds and Buildings 29 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2. Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3. Store materials in a neat and orderly manner. 34 a. Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4. Equip building with lockable doors and lighting,and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5. Fill and grade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 015000-3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1 1. Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a. Contractor remains on-call at all times 4 b. Must respond in a timely manner 5 F. Temporary Protection of Construction 6 1. Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS[NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE[NOT USED] 13 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2 - PRODUCTS[NOT USED] 17 PART 3- EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION[NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR]/[RESTORATION] 25 3.6 RE-INSTALLATION 26 3.7 FIELD[OR] SITE QUALITY CONTROL[NOT USED] 27 3.8 SYSTEM STARTUP[NOT USED] 28 3.9 ADJUSTING[NOT USED] 29 3.10 CLEANING[NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 015000-4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work,to a 2 condition equal to or better than prior to start of Work. 3 3.12 PROTECTION[NOT USED] 4 3.13 MAINTENANCE[NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 8 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 015526-1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 1 SECTION 0155 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include,but are not necessarily limited to: 13 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 14 2. Division 1 —General Requirements 15 3. Section 34 71 13—Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification,unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices(TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Traffic Control 28 1. General 29 a. When traffic control plans are included in the Drawings,provide Traffic 30 Control in accordance with Drawings and Section 34 71 13. 31 b. When traffic control plans are not included in the Drawings,prepare traffic 32 control plans in accordance with Section 34 71 13 and submit to City for 33 review. 34 1) Allow minimum 10 working days for review of proposed Traffic Control. 35 B. Street Use Permit 36 1. Prior to installation of Traffic Control,a City Street Use Permit is required. 37 a. To obtain Street Use Permit,submit Traffic Control Plans to City 38 Transportation and Public Works Department. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 015526-2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1 1) Allow a minimum of 5 working days for permit review. 2 2) Contractor's responsibility to coordinate review of Traffic Control plans for 3 Street Use Permit, such that construction is not delayed. 4 C. Modification to Approved Traffic Control 5 1. Prior to installation traffic control: 6 a. Submit revised traffic control plans to City Department Transportation and 7 Public Works Department. 8 1) Revise Traffic Control plans in accordance with Section 34 71 13. 9 2) Allow minimum 5 working days for review of revised Traffic Control. 10 3) It is the Contractor's responsibility to coordinate review of Traffic Control 11 plans for Street Use Permit,such that construction is not delayed. 12 D. Removal of Street Sign 13 1. If it is determined that a street sign must be removed for construction, then contact 14 City Transportation and Public Works Department,Signs and Markings Division to 15 remove the sign. 16 E. Temporary Signage 17 1. In the case of regulatory signs,replace permanent sign with temporary sign meeting 18 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 19 Devices(MUTCD). 20 2. Install temporary sign before the removal of permanent sign. 21 3. When construction is complete,to the extent that the permanent sign can be 22 reinstalled,contact the City Transportation and Public Works Department,Signs 23 and Markings Division,to reinstall the permanent sign. 24 F. Traffic Control Standards 25 1. Traffic Control Standards can be found on the City's Buzzsaw website. 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE[NOT USED] 31 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 32 1.11 FIELD[SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] 34 PART 2- PRODUCTS [NOT USED] 35 PART 3- EXECUTION [NOT USED] 36 END OF SECTION CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 015526-3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 1 Revision Log DATE NAME SUMMARY OF CHANGE 2 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,20I1 015713-1 STORM WATER POLLUTION PREVENTION Page 1 of 3 1 SECTION 015713 2 STORM WATER POLLUTION PREVENTION 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Procedures for Storm Water Pollution Prevention Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0— Bidding Requirements,Contract Forms and Conditions of the 11 Contract 12 2. Division 1 —General Requirements 13 3. Section 3125 00—Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in less than 1 acre of disturbance 17 a. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 a. Measurement and Payment shall be in accordance with Section 3125 00. 21 1.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent:NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality:TCEQ 27 5. Notice of Change: NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification,unless a date is specifically cited. 32 2. Integrated Storm Management(iSWM)Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 015713-2 STORM WATER POLLUTION PREVENTION Page 2 of 3 1 B. Construction Activities resulting in: 2 1. Less than 1 acre of disturbance 3 a. Provide erosion and sediment control in accordance with Section 3125 00 and 4 Drawings. 5 2. 1 to less than 5 acres of disturbance 6 a. Texas Pollutant Discharge Elimination System(TPDES)General Construction 7 Permit is required 8 b. Complete SWPPP in accordance with TCEQ requirements 9 1) TCEQ Small Construction Site Notice Required under general permit 10 TXR150000 11 a) Sign and post at job site 12 b) Prior to Preconstruction Meeting, send 1 copy to City Department of 13 Transportation and Public Works,Environmental Division,(817)392- 14 6088. 15 2) Provide erosion and sediment control in accordance with: 16 a) Section 3125 00 17 b) The Drawings 18 c) TXR150000 General Permit 19 d) SWPPP 20 e) TCEQ requirements 21 3. 5 acres or more of Disturbance 22 a. Texas Pollutant Discharge Elimination System(TPDES)General Construction 23 Permit is required 24 b. Complete SWPPP in accordance with TCEQ requirements 25 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee 26 a) Sign and post at job site 27 b) Send copy to City Department of Transportation and Public Works, 28 Environmental Division,(817) 392-6088. 29 2) TCEQ Notice of Change required if making changes or updates to NOI 30 3) Provide erosion and sediment control in accordance with: 31 a) Section 3125 00 32 b) The Drawings 33 c) TXR150000 General Permit 34 d) SWPPP 35 e) TCEQ requirements 36 4) Once the project has been completed and all the closeout requirements of 37 TCEQ have been met a TCEQ Notice of Termination can be submitted. 38 a) Send copy to City Department of Transportation and Public Works, 39 Environmental Division,(817) 392-6088. 40 1.5 SUBMITTALS 41 A. SWPPP 42 1. Submit in accordance with Section 0133 00,except as stated herein. 43 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows: 45 1) 1 copy to the City Project Manager 46 a) City Project Manager will forward to the City Department of 47 Transportation and Public Works,Environmental Division for review CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 015713-3 STORM WATER POLLUTION PREVENTION Page 3 of 3 1 B. Modified SWPPP 2 1. If the SWPPP is revised during construction,resubmit modified SWPPP to the City 3 in accordance with Section 0133 00. 4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY,STORAGE,AND kIANDLING [NOT USED] 9 1.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2- PRODUCTS [NOT USED] 12 PART 3- EXECUTION[NOT USED] 13 END OF SECTION 14 Revision Log DATE NAME SUMMARY OF CHANGE 15 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 015813-1 TEMPORARY PROJECT SIGNAGE Page 1 of 3 1 SECTION 0158 13 2 TEMPORARY PROJECT SIGNAGE 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Temporary Project Signage Requirements 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 11 2. Division 1—General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 18 1.5 SUBMITTALS[NOT USED] 19 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2- PRODUCTS 27 2.1 OWNER-FURNISHED[OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 28 2.2 EQUIPMENT,PRODUCT TYPES,AND MATERIALS 29 A. Design Criteria 30 1. Provide free standing Project Designation Sign in accordance with City's Standard 31 Details for project signs. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 015813-2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 1 B. Materials 2 1. Sign 3 a. Constructed of 3/4-inch fir plywood,grade A-C(exterior)or better 4 2.3 ACCESSORIES[NOT USED] 5 2.4 SOURCE QUALITY CONTROL [NOT USED] 6 PART 3- EXECUTION 7 3.1 INSTALLERS [NOT USED] 8 3.2 EXAMINATION [NOT USED] 9 3.3 PREPARATION[NOT USED] 10 3.4 INSTALLATION 11 A. General 12 1. Provide vertical installation at extents of project. 13 2. Relocate sign as needed,upon request of the City. 14 B. Mounting options 15 a. Skids 16 b. Posts 17 c. Barricade 18 3.5 REPAIR/RESTORATION [NOT USED] 19 3.6 RE-INSTALLATION [NOT USED] 20 3.7 FIELD[OR]SITE QUALITY CONTROL[NOT USED] 21 3.8 SYSTEM STARTUP[NOT USED] 22 3.9 ADJUSTING[NOT USED] 23 3.10 CLEANING[NOT USED] 24 3.11 CLOSEOUT ACTIVITIES [NOT USED] 25 3.12 PROTECTION [NOT USED] 26 3.13 MAINTENANCE 27 A. General 28 1. Maintenance will include painting and repairs as needed or directed by the City. 29 3.14 ATTACHMENTS [NOT USED] 30 END OF SECTION 31 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 015813-3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 1 Revision Log DATE NAME SUMMARY OF CHANGE 2 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 016000-1 PRODUCT REQUIREMENTS Page 1 of 2 1 SECTION 0160 00 2 PRODUCT REQUIREMENTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. References for Product Requirements and City Standard Products List 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 11 2. Division 1—General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES [NOT USED] 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 A. A list of City approved products for use is located on Buzzsaw as follows: 16 1. Resources\02-Construction Documents\Standard Products List 17 B. Only products specifically included on City's Standard Product List in these Contract 18 Documents shall be allowed for use on the Project. 19 1. Any subsequently approved products will only be allowed for use upon specific 20 approval by the City. 21 C. Any specific product requirements in the Contract Documents supersede similar 22 products included on the City's Standard Product List. 23 1. The City reserves the right to not allow products to be used for certain projects even 24 though the product is listed on the City's Standard Product List. 25 D. Although a specific product is included on City's Standard Product List,not all 26 products from that manufacturer are approved for use,including but not limited to,that 27 manufacturer's standard product. 28 E. See Section 0133 00 for submittal requirements of Product Data included on City's 29 Standard Product List. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 016000-2 PRODUCT REQUIREMENTS Page 2 of 2 1 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2- PRODUCTS [NOT USED] 5 PART 3- EXECUTION [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D.Johnson Modified Location of City's Standard Product List 8 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017000-1 MOBILIZATION AND REMOBILIZATION Page 1 of 4 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Mobilization and Demobilization 7 a. Mobilization 8 1) Transportation of Contractor's personnel,equipment, and operating supplies 9 to the Site 10 2) Establishment of necessary general facilities for the Contractor's operation 11 at the Site 12 3) Premiums paid for performance and payment bonds 13 4) Transportation of Contractor's personnel,equipment, and operating supplies 14 to another location within the designated Site 15 5) Relocation of necessary general facilities for the Contractor's operation 16 from 1 location to another location on the Site. 17 b. Demobilization 18 1) Transportation of Contractor's personnel,equipment,and operating supplies 19 away from the Site including disassembly 20 2) Site Clean-up 21 3) Removal of all buildings and/or other facilities assembled at the Site for this 22 Contract 23 c. Mobilization and Demobilization do not include activities for specific items of 24 work that are for which payment is provided elsewhere in the contract. 25 2. Remobilization 26 a. Remobilization for Suspension of Work specifically required in the Contract 27 Documents or as required by City includes: 28 1) Demobilization 29 a) Transportation of Contractor's personnel,equipment,and operating 30 supplies from the Site including disassembly or temporarily securing 31 equipment,supplies,and other facilities as designated by the Contract 32 Documents necessary to suspend the Work. 33 b) Site Clean-up as designated in the Contract Documents 34 2) Remobilization 35 a) Transportation of Contractor's personnel,equipment,and operating 36 supplies to the Site necessary to resume the Work. 37 b) Establishment of necessary general facilities for the Contractor's 38 operation at the Site necessary to resume the Work. 39 3) No Payments will be made for: 40 a) Mobilization and Demobilization from one location to another on the 41 Site in the normal progress of performing the Work. 42 b) Stand-by or idle time 43 c) Lost profits 44 3. Mobilizations and Demobilization for Miscellaneous Projects 45 a. Mobilization and Demobilization CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017000-2 MOBMIZATION AND REMOBMIZATION Page 2 of 4 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel,equipment,and operating 4 supplies to the Site for the issued Work Order. 5 b) Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for: 8 a) Transportation of Contractor's personnel,equipment,and operating 9 supplies from the Site including disassembly for each issued Work 10 Order 11 b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include,but are not necessarily limited to: 22 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 23 2. Division 1 —General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Mobilization and Demobilization 27 a. Measure 28 1) This Item is considered subsidiary to the various Items bid. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 are subsidiary to the various Items bid and no other compensation will be 32 allowed. 33 2. Remobilization for suspension of Work as specifically required in the Contract 34 Documents 35 a. Measurement 36 1) Measurement for this Item shall be per each remobilization performed. 37 b. Payment 38 1) The work performed and materials furnished in accordance with this Item 39 and measured as provided under"Measurement"will be paid for at the unit 40 price per each"Specified Remobilization"in accordance with Contract 41 Documents. 42 c. The price shall include: 43 1) Demobilization as described in Section 1.1.A.2.a.1) 44 2) Remobilization as described in Section 1.1.A.2.a.2) 45 d. No payments will be made for standby,idle time,or lost profits associated this 46 Item. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017000-3 MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 3. Remobilization for suspension of Work as required by City 2 a. Measurement and Payment 3 1) This shall be submitted as a Contract Claim in accordance with Article 10 4 of Section 00 72 00. 5 2) No payments will be made for standby,idle time,or lost profits associated 6 with this Item. 7 4. Mobilizations and Demobilizations for Miscellaneous Projects 8 a. Measurement 9 1) Measurement for this Item shall be for each Mobilization and 10 Demobilization required by the Contract Documents 11 b. Payment 12 1) The Work performed and materials furnished in accordance with this Item 13 and measured as provided under"Measurement"will be paid for at the unit 14 price per each"Work Order Mobilization"in accordance with Contract 15 Documents. Demobilization shall be considered subsidiary to mobilization 16 and shall not be paid for separately. 17 c. The price shall include: 18 1) Mobilization as described in Section 1.1.A.3.a.1) 19 2) Demobilization as described in Section 1.1.A.3.a.2) 20 d. No payments will be made for standby,idle time,or lost profits associated this 21 Item. 22 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 23 a. Measurement 24 1) Measurement for this Item shall be for each Mobilization and 25 Demobilization required by the Contract Documents 26 b. Payment 27 1) The Work performed and materials furnished in accordance with this Item 28 and measured as provided under"Measurement"will be paid for at the unit 29 price per each"Work Order Emergency Mobilization"in accordance with 30 Contract Documents. Demobilization shall be considered subsidiary to 31 mobilization and shall not be paid for separately. 32 c. The price shall include 33 1) Mobilization as described in Section 1.1.A.4.a) 34 2) Demobilization as described in Section 1.1.A.3.a.2) 35 d. No payments will be made for standby,idle time,or lost profits associated this 36 Item. 37 1.3 REFERENCES [NOT USED] 38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 39 1.5 SUBMITTALS [NOT USED] 40 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 41 1.7 CLOSEOUT SUBMITTALS [NOT USED] 42 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 43 1.9 QUALITY ASSURANCE[NOT USED] 44 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017000-4 MOBILIZATION AND REMOBMIZATION Page 4 of 4 1 1.11 FIELD[SITE] CONDITIONS[NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3- EXECUTION [NOT USED] 5 END OF SECTION 6 Revision Log DATE NAME SUMMARY OF CHANGE 7 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 4 1 SECTION 017123 2 CONSTRUCTION STAKING AND SURVEY 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 11 2. Division 1 —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Construction Staking 15 a. Measurement 16 1) This Item is considered subsidiary to the various Items bid. 17 b. Payment 18 1) The work performed and the materials furnished in accordance with this 19 Item are subsidiary to the various Items bid and no other compensation will 20 be allowed. 21 2. Construction Survey 22 a. Measurement 23 1) This Item is considered subsidiary to the various Items bid. 24 b. Payment 25 1) The work performed and the materials furnished in accordance with this 26 Item are subsidiary to the various Items bid and no other compensation will 27 be allowed. 28 1.3 REFERENCES [NOT USED] 29 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 30 1.5 SUBMITTALS 31 A. Submittals, if required, shall be in accordance with Section 0133 00. 32 B. All submittals shall be approved by the City prior to delivery. 33 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS 34 A. Certificates 35 1. Provide certificate certifying that elevations and locations of improvements are in 36 conformance or non-conformance with requirements of the Contract Documents. 37 a. Certificate must be sealed by a registered professional land surveyor in the 38 State of Texas. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 4 1 B. Field Quality Control Submittals 2 1. Documentation verifying accuracy of field engineering work. 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS[NOT USED] 5 1.9 QUALITY ASSURANCE 6 A. Construction Staking 7 1. Construction staking will be performed by the City. 8 2. Coordination 9 a. Contact City's Project Representative at least 2 weeks in advance for 10 scheduling of Construction Staking. 11 b. It is the Contractor's responsibility to coordinate staking such that construction 12 activities are not delayed or negatively impacted. 13 3. General 14 a. Contractor is responsible for preserving and maintaining stakes furnished by 15 City. 16 b. If in the opinion of the City,a sufficient number of stakes or markings have 17 been lost,destroyed or disturbed,by Contractor's neglect, such that the 18 contracted Work cannot take place,then the Contractor will be required to pay 19 the City for new staking with a 25 percent markup.The cost for staking will be 20 deducted from the payment due to the Contractor for the Project. 21 B. Construction Survey 22 1. Construction Survey will be performed by the City. 23 2. Coordination 24 a. Contractor to verify that control data established in the design survey remains 25 intact. 26 b. Coordinate with the City prior to field investigation to determine which 27 horizontal and vertical control data will be required for construction survey. 28 c. It is the Contractor's responsibility to coordinate Construction Survey such that 29 construction activities are not delayed or negatively impacted. 30 d. Notify City if any control data needs to be restored or replaced due to damage 31 caused during construction operations. 32 1) City shall perform replacements and/or restorations. 33 3. General 34 a. Construction survey will be performed in order to maintain complete and 35 accurate logs of control and survey work as it progresses for Project Records. 36 b. The Contractor will need to ensure coordination is maintained with the City to 37 perform construction survey to obtain construction features,including but not 38 limited to the following: 39 1) All Utility Lines 40 a) Rim and flowline elevations and coordinates for each manhole or 41 junction structure 42 2) Water Lines 43 a) Top of pipe elevations and coordinates for waterlines at the following 44 locations: 45 (1) Every 250 linear feet CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 4 1 (2) Horizontal and vertical points of inflection,curvature,etc.(All 2 Fittings) 3 (3) Cathodic protection test stations 4 (4) Sampling stations 5 (5) Meter boxes/vaults(All sizes) 6 (6) Fire lines 7 (7) Fire hydrants 8 (8) Gate valves 9 (9) Plugs, stubouts,dead-end lines 10 (10) Air Release valves(Manhole rim and vent pipe) 11 (11) Blow off valves(Manhole rim and valve lid) 12 (12) Pressure plane valves 13 (13) Cleaning wyes 14 (14) Casing pipe(each end) 15 b) Storm Sewer 16 (1) Top of pipe elevations and coordinates at the following locations: 17 (a) Every 250 linear feet 18 (b) Horizontal and vertical points of inflection,curvature,etc. 19 c) Sanitary Sewer 20 (1) Top of pipe elevations and coordinates for sanitary sewer lines at 21 the following locations: 22 (a) Every 250 linear feet 23 (b) Horizontal and vertical points of inflection,curvature,etc. 24 (c) Cleanouts 25 c. Construction survey will be performed in order to maintain complete and 26 accurate logs of control and survey work associated with meeting or exceeding 27 the line and grade required by these Specifications. 28 d. The Contractor will need to ensure coordination is maintained with the City to 29 perform construction survey and to verify control data,including but not 30 limited to the following: 31 1) Established benchmarks and control points provided for the Contractor's 32 use are accurate 33 2) Benchmarks were used to furnish and maintain all reference lines and 34 grades for tunneling 35 3) Lines and grades were used to establish the location of the pipe 36 4) Submit to the City copies of field*rotes used to establish all lines and 37 grades and allow the City to check guidance system setup prior to 38 beginning each tunneling drive. 39 5) Provide access for the City to verify the guidance system and the line and 40 grade of the carrier pipe on a daily basis. 41 6) The Contractor remains fully responsible for the accuracy of the work and 42 the correction of it,as required. 43 7) Monitor line and grade continuously during construction. 44 8) Record deviation with respect to design line and grade once at each pipe 45 joint and submit daily records to City. 46 9) If the installation does not meet the specified tolerances,immediately notify 47 the City and correct the installation in accordance with the Contract 48 Documents. 49 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017123-4 CONSTRUCTION STAKING AND SURVEY Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS[NOT USED] 4 PART 3- EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION[NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 APPLICATION 9 3.5 REPAIR/RESTORATION[NOT USED] 10 3.6 RE-INSTALLATION[NOT USED] 11 3.7 FIELD[OR]SITE QUALITY CONTROL 12 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 13 City in accordance with this Specification. 14 B. Do not change or relocate stakes or control data without approval from the City. 15 3.8 SYSTEM STARTUP[NOT USED] 16 3.9 ADJUSTING[NOT USED] 17 3.10 CLEANING[NOT USED] 18 3.11 CLOSEOUT ACTIVITIES [NOT USED] 19 3.12 PROTECTION[NOT USED] 20 3.13 MAINTENANCE[NOT USED] 21 3.14 ATTACHMENTS[NOT USED] 22 END OF SECTION 23 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D.Johnson 24 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017423-1 CLEANING Page 1 of 4 1 SECTION 0174 23 2 CLEANING 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Intermediate and final cleaning for Work not including special cleaning of closed 7 systems specified elsewhere 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 12 2. Division 1—General Requirements 13 3. Section 32 92 13—Hydro-Mulching,Seeding and Sodding 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various Items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Scheduling 21 1. Schedule cleaning operations so that dust and other contaminants disturbed by 22 cleaning process will not fall on newly painted surfaces. 23 2. Schedule final cleaning upon completion of Work and immediately prior to final 24 inspection. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 STORAGE,AND HANDLING 31 A. Storage and Handling Requirements 32 1. Store cleaning products and cleaning wastes in containers specifically designed for 33 those materials. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 017423-2 CLEANING Page 2 of 4 1 1.11 FIELD[SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS 4 2.1 OWNER-FURNISHED[OR]OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 MATERIALS 6 A. Cleaning Agents 7 1. Compatible with surface being cleaned 8 2. New and uncontaminated 9 3. For manufactured surfaces 10 a. Material recommended by manufacturer 11 2.3 ACCESSORIES [NOT USED] 12 2.4 SOURCE QUALITY CONTROL[NOT USED] 13 PART 3- EXECUTION 14 3.1 INSTALLERS [NOT USED] 15 3.2 EXAMINATION [NOT USED] 16 3.3 PREPARATION[NOT USED] 17 3.4 APPLICATION[NOT USED] 18 3.5 REPAIR/RESTORATION [NOT USED] 19 3.6 RE-INSTALLATION[NOT USED] 20 3.7 FIELD[OR]SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP[NOT USED] 22 3.9 ADJUSTING[NOT USED] 23 3.10 CLEANING 24 A. General 25 1. Prevent accumulation of wastes that create hazardous conditions. 26 2. Conduct cleaning and disposal operations to comply with laws and safety orders of 27 governing authorities. 28 3. Do not dispose of volatile wastes such as mineral spirits,oil or paint thinner in 29 storm or sanitary drains or sewers. 30 4. Dispose of degradable debris at an approved solid waste disposal site. 31 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an 32 alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 017423-3 CLEANING Page 3 of 4 1 6. Handle materials in a controlled manner with as few handlings as possible. 2 7. Thoroughly clean, sweep,wash and polish all Work and equipment associated with 3 this project. 4 8. Remove all signs of temporary construction and activities incidental to construction 5 of required permanent Work. 6 9. If project is not cleaned to the satisfaction of the City,the City reserves the right to 7 have the cleaning completed at the expense of the Contractor. 8 10. Do not burn on-site. 9 B. Intermediate Cleaning during Construction 10 1. Keep Work areas clean so as not to hinder health, safety or convenience of 11 personnel in existing facility operations. 12 2. At maximum weekly intervals,dispose of waste materials,debris and rubbish. 13 3. Confine construction debris daily in strategically located container(s): 14 a. Cover to prevent blowing by wind 15 b. Store debris away from construction or operational activities 16 c. Haul from site at a minimum of once per week 17 4. Vacuum clean interior areas When ready to receive finish painting. 18 a. Continue vacuum cleaning on an as-needed basis,until Final Acceptance. 19 5. Prior to storm events,thoroughly clean site of all loose or unsecured items,which 20 may become airborne or transported by flowing water during the storm. 21 C. Interior Final Cleaning 22 1. Remove grease,mastic,adhesives,dust,dirt, stains,fingerprints,labels and other 23 foreign materials from sight-exposed surfaces. 24 2. Wipe all lighting fixture reflectors,lenses,lamps and trims clean. 25 3. Wash and shine glazing and mirrors. 26 4. Polish glossy surfaces to a clear shine. 27 5. Ventilating systems 28 a. Clean permanent filters and replace disposable filters if units were operated 29 during construction. 30 b. Clean ducts,blowers and coils if units were operated without filters during 31 construction. 32 6. Replace all burned out lamps. 33 7. Broom clean process area floors. 34 8. Mop office and control room floors. 35 D. Exterior(Site or Right of Way)Final Cleaning 36 1. Remove trash and debris containers from site. 37 a. Re-seed areas disturbed by location of trash and debris containers in accordance 38 with Section 32 92 13. 39 2. Sweep roadway to remove all rocks,pieces of asphalt,concrete or any other object 40 that may hinder or disrupt the flow of traffic along the roadway. 41 3. Clean any interior areas including,but not limited to,vaults,manholes, structures, 42 junction boxes and inlets. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 017423-4 CLEANING Page 4 of 4 1 4. If no longer required for maintenance of erosion facilities,and upon approval by 2 City,remove erosion control from site. 3 5. Clean signs,lights, signals,etc. 4 3.11 CLOSEOUT ACTIVITIES [NOT USED] 5 3.12 PROTECTION [NOT USED] 6 3.13 MAINTENANCE[NOT USED] 7 3.14 ATTACHMENTS [NOT USED] 8 END OF SECTION 9 Revision Log DATE NAME SUMMARY OF CHANGE 10 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 017719-1 CLOSEOUT REQUIREMENTS Page 1 of 3 1 SECTION 017719 2 CLOSEOUT REQUIREMENTS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 11 2. Division 1 —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees,Bonds and Affidavits 19 1. No application for final payment will be accepted until all guarantees,bonds, 20 certificates,licenses and affidavits required for Work or equipment as specified are 21. satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 017719-2 CLOSEOUT REQUIREMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS[NOT USED] 3 PART 2- PRODUCTS[NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION[NOT USED] 8 3.4 CLOSEOUT PROCEDURE 9 A. Prior to requesting Final Inspection, submit: 10 1. Project Record Documents in accordance with Section 0178 39 11 2. Operation and Maintenance Data,if required,in accordance with Section 0178 23 12 B. Prior to requesting Final Inspection,perform final cleaning in accordance with Section 13 01 74 23. 14 C. Final Inspection 15 1. After final cleaning,provide notice to the City Project Representative that the Work 16 is completed. 17 a. The City will make an initial Final Inspection with the Contractor present. 18 b. Upon completion of this inspection,the City will notify the Contractor,in 19 writing within 10 business days,of any particulars in which this inspection 20 reveals that the Work is defective or incomplete. 21 2. Upon receiving written notice from the City,immediately undertake the Work 22 required to remedy deficiencies and complete the Work to the satisfaction of the 23 City. 24 3. Upon completion of Work associated with the items listed in the City's written 25 notice,inform the City,that the required Work has been completed. Upon receipt 26 of this notice,the City,in the presence of the Contractor,will make a subsequent 27 Final Inspection of the project. 28 4. Provide all special accessories required to place each item of equipment in full 29 operation. These special accessory items include,but are not limited to: 30 a. Specified spare parts 31 b. Adequate oil and grease as required for the first lubrication of the equipment 32 c. Initial fill up of all chemical tanks and fuel tanks 33 d. Light bulbs 34 e. Fuses 35 f. Vault keys 36 g. Handwheels 37 h. Other expendable items as required for initial start-up and operation of all 38 equipment 39 D. Notice of Project Completion CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 017719-3 CLOSEOUT REQUIREMENTS Page 3 of 3 1 1. Once the City Project Representative finds the Work subsequent to Final Inspection 2 to be satisfactory,the City will issue a Notice of Project Completion(Green Sheet). 3 E. Supporting Documentation 4 1. Coordinate with the City Project Representative to complete the following 5 additional forms: 6 a. Final Payment Request 7 b. Statement of Contract Time 8 c. Affidavit of Payment and Release of Liens 9 d. Consent of Surety to Final Payment 10 e. Pipe Report(if required) 11 f. Contractor's Evaluation of City 12 g. Performance Evaluation of Contractor 13 F. Letter of Final Acceptance 14 1. Upon review and acceptance of Notice of Project Completion and Supporting 15 Documentation,in accordance with General Conditions,City will issue Letter of 16 Final Acceptance and release the Final Payment Request for payment. 17 3.5 REPAIR/RESTORATION[NOT USED] 18 3.6 RE-INSTALLATION[NOT USED] 19 3.7 FIELD[OR] SITE QUALITY CONTROL[NOT USED] 20 3.8 SYSTEM STARTUP[NOT USED] 21 3.9 ADJUSTING[NOT USED] 22 3.10 CLEANING[NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION[NOT USED] 25 3.13 MAINTENANCE[NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 Revision Log DATE NAME SUMMARY OF CHANGE 29 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 017823-1 OPERATION AND MAINTENANCE DATA Page 1 of 5 1 SECTION 0178 23 2 OPERATION AND MAINTENANCE DATA 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Product data and related information appropriate for City's maintenance and 7 operation of products furnished under Contract 8 2. Such products may include,but are not limited to: 9 a. Traffic Controllers 10 b. Irrigation Controllers(to be operated by the City) 11 c. Butterfly Valves 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 16 2. Division 1—General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Schedule 24 1. Submit manuals in final form to the City within 30 calendar days of product 25 shipment to the project site. 26 1.5 SUBMITTALS 27 A. Submittals shall be in accordance with Section 0133 00. All submittals shall be 28 approved by the City prior to delivery. 29 1.6 INFORMATIONAL SUBMITTALS 30 A. Submittal Form 31 1. Prepare data in form of an instructional manual for use by City personnel. 32 2. Format 33 a. Size: 8 t/2 inches x 11 inches 34 b. Paper 35 1) 40 pound minimum,white,for typed pages 36 2) Holes reinforced with plastic,cloth or metal 37 c. Text: Manufacturer's printed data,or neatly typewritten CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017823-2 OPERATION AND MAINTENANCE DATA Page 2 of 5 1 d. Drawings 2 1) Provide reinforced punched binder tab,bind in with text 3 2) Reduce larger drawings and fold to size of text pages. 4 e. Provide fly-leaf for each separate product,or each piece of operating 5 equipment. 6 1) Provide typed description of product,and major component parts of 7 equipment. 8 2) Provide indexed tabs. 9 f. Cover 10 1) Identify each volume with typed or printed title "OPERATING AND 11 MAINTENANCE INSTRUCTIONS". 12 2) List: 13 a) Title of Project 14 b) Identity of separate structure as applicable 15 c) Identity of general subject matter covered in the manual 16 3. Binders 17 a. Commercial quality 3-ring binders with durable and cleanable plastic covers 18 b. When multiple binders are used,correlate the data into related consistent 19 groupings. 20 4. If available,provide an electronic form of the O&M Manual. 21 B. Manual Content 22 1. Neatly typewritten table of contents for each volume,arranged in systematic order 23 a. Contractor,name of responsible principal,address and telephone number 24 b. A list of each product required to be included,indexed to content of the volume 25 c. List,with each product: 26 1) The name,address and telephone number of the subcontractor or installer 27 2) A list of each product required to be included,indexed to content of the 28 volume 29 3) Identify area of responsibility of each 30 4) Local source of supply for parts and replacement 31 d. Identify each product by product name and other identifying symbols as set 32 forth in Contract Documents. 33 2. Product Data 34 a. Include only those sheets which are pertinent to the specific product. 35 b. Annotate each sheet to: 36 1) Clearly identify specific product or part installed 37 2) Clearly identify data applicable to installation 38 3) Delete references to inapplicable information 39 3. Drawings 40 a. Supplement product data with drawings as necessary to clearly illustrate: 41 1) Relations of component parts of equipment and systems 42 2) Control and flow diagrams 43 b. Coordinate drawings with information in Project Record Documents to assure 44 correct illustration of completed installation. 45 c. Do not use Project Record Drawings as maintenance drawings. 46 4. Written text,as required to supplement product data for the particular installation: 47 a. Organize in consistent format under separate headings for different procedures. 48 b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017823-3 OPERATION AND MAINTENANCE DATA Page 3 of 5 1 5. Copy of each warranty,bond and service contract issued 2 a. Provide information sheet for City personnel giving: 3 1) Proper procedures in event of failure 4 2) Instances which might affect validity of warranties or bonds 5 C. Manual for Materials and Finishes 6 1. Submit 5 copies of complete manual in final form. 7 2. Content,for architectural products,applied materials and finishes: 8 a. Manufacturer's data,giving full information on products 9 1) Catalog number,size,composition 10 2) Color and texture designations 11 3) Information required for reordering special manufactured products 12 b. Instructions for care and maintenance 13 1) Manufacturer's recommendation for types of cleaning agents and methods 14 2) Cautions against cleaning agents and methods which are detrimental to 15 product 16 3) Recommended schedule for cleaning and maintenance 17 3. Content,for moisture protection and weather exposure products: 18 a. Manufacturer's data,giving full information on products 19 1) Applicable standards 20 2) Chemical composition 21 3) Details of installation 22 b. Instructions for inspection,maintenance and repair 23 D. Manual for Equipment and Systems 24 1. Submit 5 copies of complete manual in final form. 25 2. Content,for each unit of equipment and system,as appropriate: 26 a. Description of unit and component parts 27 1) Function,normal operating characteristics and limiting conditions 28 2) Performance curves,engineering data and tests 29 3) Complete nomenclature and commercial number of replaceable parts 30 b. Operating procedures 31 1) Start-up,break-in,routine and normal operating instructions 32 2) Regulation,control,stopping,shut-down and emergency instructions 33 3) Summer and winter operating instructions 34 4) Special operating instructions 35 c. Maintenance procedures 36 1) Routine operations 37 2) Guide to "trouble shooting" 38 3) Disassembly,repair and reassembly 39 4) Alignment, adjusting and checking 40 d. Servicing and lubrication schedule 41 1) List of lubricants required 42 e. Manufacturer's printed operating and maintenance instructions 43 f. Description of sequence of operation by control manufacturer 44 1) Predicted life of parts subject to wear 45 2) Items recommended to be stocked as spare parts 46 g. As installed control diagrams by controls manufacturer 47 h. Each contractor's coordination drawings 48 1) As installed color coded piping diagrams CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017823-4 OPERATION AND MAINTENANCE DATA Page 4 of 5 1 i. Charts of valve tag numbers,with location and function of each valve 2 j. List of original manufacturer's spare parts,manufacturer's current prices,and 3 recommended quantities to be maintained in storage 4 k. Other data as required under pertinent Sections of Specifications 5 3. Content, for each electric and electronic system,as appropriate: 6 a. Description of system and component parts 7 1) Function,normal operating characteristics,and limiting conditions 8 2) Performance curves,engineering data and tests 9 3) Complete nomenclature and commercial number of replaceable parts 10 b. Circuit directories of panelboards 11 1) Electrical service 12 2) Controls 13 3) Communications 14 c. As installed color coded wiring diagrams 15 d. Operating procedures 16 1) Routine and normal operating instructions 17 2) Sequences required 18 3) Special operating instructions 19 e. Maintenance procedures 20 1) Routine operations 21 2) Guide to"trouble shooting" 22 3) Disassembly,repair and reassembly 23 4) Adjustment and checking 24 f. Manufacturer's printed operating and maintenance instructions 25 g. List of original manufacturer's spare parts,manufacturer's current prices,and 26 recommended quantities to be maintained in storage 27 h. Other data as required under pertinent Sections of Specifications 28 4. Prepare and include additional data when the need for such data becomes apparent 29 during instruction of City's personnel. 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 A. Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017823-5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2- PRODUCTS[NOT USED] 5 PART 3- EXECUTION [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D.Johnson 1.5.A.I—title of section removed 8 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 017839-1 PROJECT RECORD DOCUMENTS Page 1 of 4 1 SECTION 0178 39 2 PROJECT RECORD DOCUMENTS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Work associated with the documenting the project and recording changes to project 7 documents,including: 8 a. Record Drawings 9 b. Water Meter Service Reports 10 c. Sanitary Sewer Service Reports 11 d. Large Water Meter Reports 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 16 2. Division 1 —General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 23 1.5 SUBMITTALS 24 A. Prior to submitting a request for Final Inspection,deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE 30 A. Accuracy of Records 31 1. Thoroughly coordinate changes within the Record Documents, making adequate 32 and proper entries on each page of Specifications and each sheet of Drawings and 33 other Documents where such entry is required to show the change properly. 34 2. Accuracy of records shall be such that future search for items shown in the Contract 35 Documents may rely reasonably on information obtained from the approved Project 36 Record Documents. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 017839-2 PROJECT RECORD DOCUMENTS Page 2 of 4 1 3. To facilitate accuracy of records,make entries within 24 hours after receipt of 2 information that the change has occurred. 3 4. Provide factual information regarding all aspects of the Work, both concealed and 4 visible,to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A. Storage and Handling Requirements 8 1. Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2. In the event of loss of recorded data, use means necessary to again secure the data 12 to the City's approval. 13 a. In such case,provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY[NOT USED] 17 PART 2- PRODUCTS 18 2.1 OWNER-FURNISHED[OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A. Job set 21 1. Promptly following receipt of the Notice to Proceed, secure from the City,at no 22 charge to the Contractor, 1 complete set of all Documents comprising the Contract. 23 B. Final Record Documents 24 1. At a time nearing the completion of the Work and prior to Final Inspection,provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3- EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION[NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A. Maintenance of Job Set 34 1. Immediately upon receipt of the job set,identify each of the Documents with the 35 title, "RECORD DOCUMENTS -JOB SET". CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 017839-3 PROJECT RECORD DOCUMENTS Page 3 of 4 1 2. Preservation 2 a. Considering the Contract completion time,the probable number of occasions 3 upon which the job set must be taken out for new entries and for examination, 4 and the conditions under which these activities will be performed,devise a 5 suitable method for protecting the job set. 6 b. Do not use the job set for any purpose except entry of new data and for review 7 by the City,until start of transfer of data to final Project Record Documents. 8 c. Maintain the job set at the site of work. 9 3. Coordination with Construction Survey 10 a. At a minimum,in accordance with the intervals set forth in Section 017123, 11 clearly mark any deviations from Contract Documents associated with 12 installation of the infrastructure. 13 4. Making entries on Drawings 14 a. Record any deviations from Contract Documents. 15 b. Use an erasable colored pencil(not ink or indelible pencil),clearly describe the 16 change by graphic line and note as required. 17 c. Date all entries. 18 d. Call attention to the entry by a"cloud" drawn around the area or areas affected. 19 e. In the event of overlapping changes,use different colors for the overlapping 20 changes. 21 5. Conversion of schematic layouts 22 a. In some cases on the Drawings,arrangements of conduits,circuits,piping, 23 ducts,and similar items,are shown schematically and are not intended to 24 portray precise physical layout. 25 1) Final physical arrangement is determined by the Contractor, subject to the 26 City's approval. 27 2) However,design of future modifications of the facility may require 28 accurate information as to the final physical layout of items which are 29 shown only schematically on the Drawings. 30 b. Show on the job set of Record Drawings,by dimension accurate to within 1 31 inch,the centerline of each run of items. 32 1) Final physical arrangement is determined by the Contractor,subject to the 33 City's approval. 34 2) Show,by symbol or note,the vertical location of the Item("under slab", "in 35 ceiling plenum", "exposed",and the like). 36 3) Make all identification sufficiently descriptive that it may be related 37 reliably to the Specifications. 38 c. The City may waive the requirements for conversion of schematic layouts 39 where,in the City's judgment,conversion serves no useful purpose. However, 40 do not rely upon waivers being issued except as specifically issued in writing 41 by the City. 42 B. Final Project Record Documents 43 1. Transfer of data to Drawings 44 a. Carefully transfer change data shown on the job set of Record Drawings to the 45 corresponding final documents,coordinating the changes as required. 46 b. Clearly indicate at each affected detail and other Drawing a full description of 47 changes made during construction,and the actual location of items. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.J00630 Revised July 1,2011 017839-4 PROJECT RECORD DOCUMENTS Page 4 of 4 1 c. Call attention to each entry by drawing a"cloud" around the area or areas 2 affected. 3 d. Make changes neatly,consistently and with the proper media to assure 4 longevity and clear reproduction. 5 2. Transfer of data to other Documents 6 a. If the Documents,other than Drawings,have been kept clean during progress of 7 the Work,and if entries thereon have been orderly to the approval of the City, 8 the job set of those Documents,other than Drawings,will be accepted as final 9 Record Documents. 10 b. If any such Document is not so approved by the City, secure a new copy of that 11 Document from the City at the City's usual charge for reproduction and 12 handling,and carefully transfer the change data to the new copy to the approval 13 of the City. 14 3.5 REPAIR/RESTORATION [NOT USED] 15 3.6 RE-INSTALLATION [NOT USED] 16 3.7 FIELD[OR] SITE QUALITY CONTROL[NOT USED] 17 3.8 SYSTEM STARTUP[NOT USED] 18 3.9 ADJUSTING[NOT USED] 19 3.10 CLEANING[NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION[NOT USED] 22 3.13 MAINTENANCE[NOT USED] 23 3.14 ATTACHMENTS [NOT USED] 24 END OF SECTION 25 Revision Log DATE NAME SUMMARY OF CHANGE 26 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 024113-1 SELECTIVE SITE DEMOLITION Page 1 of 5 1 SECTION 02 4113 2 SELECTIVE SITE DEMOLITION 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Removing sidewalks and steps 7 2. Removing ADA ramps and landings 8 3. Removing driveways 9 4. Removing fences 10 5. Removing guardrail 11 6. Removing retaining walls(less than 4 feet tall) 12 7. Removing mailboxes 13 8. Removing rip rap 14 9. Removing miscellaneous concrete structures including porches and foundations 15 10. Disposal of removed materials 16 B. Deviations this from City of Fort Worth Standard Specification 17 1. None. 18 C. Related Specification Sections include,but are not necessarily limited to: 19 1. Division 0—Bidding Requirements,Contract Forms, and Conditions of the 20 Contract 21 2. Division 1—General Requirements 22 3. Section 3123 23—Borrow 23 1.2 PRICE AND PAYMENT PROCEDURES 24 A. Measurement and Payment 25 1. Measurement 26 a. Remove Sidewalk: Measure by square foot. 27 b. Remove Steps: measure by the square foot as seen in the plan view only. 28 c. Remove ADA Ramp: measure by each. 29 d. Remove Driveway: measure by the square foot by type. 30 e. Remove Fence: measure by the linear foot. 31 f. Remove Guardrail: measure by the linear foot along the face of the rail in place 32 including metal beam guard fence transitions and single guard rail terminal 33 sections from the center of end posts. 34 g. Remove Retaining Wall(less than 4 feet tall): measure by the linear foot 35 h. Remove Mailbox:measure by each. 36 i. Remove Rip Rap: measure by the square foot. 37 j. Remove Miscellaneous Concrete Structure: measure by the lump sum. 38 2. Payment CITY OF FORT WORTH CONCRETE RESTORATION(2016-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100065 Revised December 20,2012 0241 13-2 SELECTIVE SITE DEMOLITION Page 2 of 5 1 a. Remove Sidewalk: full compensation for saw cutting,removal,hauling, 2 disposal,tools,equipment,labor and incidentals needed to execute work. 3 Sidewalk adjacent to or attached to retaining wall(including sidewalk that acts 4 as a wall footing) shall be paid as sidewalk removal. For utility projects,this 5 Item shall be considered subsidiary to the trench and no other compensation 6 will be allowed. 7 b. Remove Steps:full compensation for saw cutting,removal,hauling,disposal, 8 tools,equipment,labor and incidentals needed to execute work.For utility 9 projects,this Item shall be considered subsidiary to the trench and no other 10 compensation will be allowed. 11 c. Remove ADA Ramp and landing: full compensation for saw cutting,removal, 12 hauling,disposal,tools,equipment,labor and incidentals needed to execute 13 work. Work includes ramp landing removal.For utility projects,this Item shall 14 be considered subsidiary to the trench and no other compensation will be 15 allowed. 16 d. Remove Driveway: full compensation for saw cutting,removal,hauling, 17 disposal,tools,equipment,labor and incidentals needed to remove improved 18 driveway by type. For utility projects,this Item shall be considered subsidiary 19 to the trench and no other compensation will be allowed. 20 e. Remove Fence: full compensation for removal,hauling,disposal,tools, 21 equipment,labor and incidentals needed to remove fence.For utility projects, 22 this Item shall be considered subsidiary to the trench and no other 23 compensation will be allowed. 24 f. Remove Guardrail: full compensation for removing materials,loading,hauling, 25 unloading,and storing or disposal;furnishing backfill material;backfilling the 26 postholes; and equipment,labor,tools,and incidentals.For utility projects,this 27 Item shall be considered subsidiary to the trench and no other compensation 28 will be allowed. 29 g. Remove Retaining Wall(less than 4 feet tall): full compensation for saw 30 cutting,removal,hauling,disposal,tools,equipment,labor and incidentals 31 needed to execute work. Sidewalk adjacent to or attached to retaining wall 32 (including sidewalk that acts as a wall footing) shall be paid as sidewalk 33 removal.For utility projects,this Item shall be considered subsidiary to the 34 trench and no other compensation will be allowed. 35 h. Remove Mailbox:full compensation for removal,hauling,disposal,tools, 36 equipment,labor and incidentals needed to execute work.For utility projects, 37 this Item shall be considered subsidiary to the trench and no other 38 compensation will be allowed. 39 i. Remove Rip Rap: full compensation for saw cutting,removal,hauling, 40 disposal,tools,equipment,labor and incidentals needed to execute work. For 41 utility projects,this Item shall be considered subsidiary to the trench and no 42 other compensation will be allowed. 43 j. Remove Miscellaneous Concrete Structure: full compensation for saw cutting, 44 removal,hauling,disposal,tools,equipment,labor and incidentals needed to 45 execute work. For utility projects,this Item shall be considered subsidiary to 46 the trench and no other compensation will be allowed. 47 1.3 REFERENCES 48 A. Definitions CITY OF FORT WORTH CONCRETE RESTORATION(2016-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100065 Revised December 20,2012 024113-3 SELECTIVE SITE DEMOLITION Page 3 of 5 1 1. Improved Driveway: Driveway constructed of concrete, asphalt paving or brick unit 2 pavers. 3 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 4 1.5 SUBMITTALS [NOT USED] 5 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 6 1.7 CLOSEOUT SUBMITTALS [NOT USED] 7 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 8 1.9 QUALITY ASSURANCE[NOT USED] 9 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 10 1.11 FIELD [SITE] CONDITIONS [NOT USED] 11 1.12 WARRANTY [NOT USED] 12 PART 2- PRODUCTS 13 2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 14 2.2 MATERIALS 15 A. Fill Material: See Section 3123 23. 16 2.3 ACCESSORIES [NOT USED] 17 2.4 SOURCE QUALITY CONTROL [NOT USED] 18 PART 3- EXECUTION 19 3.1 INSTALLERS [NOT USED] 20 3.2 EXAMINATION [NOT USED] 21 3.3 PREPARATION [NOT USED] 22 3.4 REMOVAL 23 A. Remove Sidewalk 24 1. Remove sidewalk to nearest existing dummy,expansion or construction joint. 25 2. Sawcut when removing to nearest joint is not practical. See 3A.K. 26 B. Remove Steps 27 1. Remove step to nearest existing dummy,expansion or construction joint. 28 2. Sawcut when removing to nearest joint is not practical. See 3.4.K. 29 C. Remove ADA Ramp 30 1. Sawcut existing curb and gutter and pavement prior to wheel chair ramp removal. 31 See 3.4.K. 32 2. Remove ramp to nearest existing dummy,expansion or construction joint on 33 existing sidewalk. 34 D. Remove Driveway CITY OF FORT WORTH CONCRETE RESTORATION(2016-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100065 Revised December 20,2012 0241 13-4 SELECTIVE SITE DEMOLITION Page 4 of 5 1 1. Sawcut existing drive,curb and gutter and pavement prior to drive removal. See 2 3.4.K. 3 2. Remove drive to nearest existing dummy,expansion or construction joint. 4 3. Sawcut when removing to nearest joint is not practical. See 3.4.K. 5 4. Remove adjacent sidewalk to nearest existing dummy,expansion or construction 6 joint on existing sidewalk. 7 E. Remove Fence 8 1. Remove all fence components above and below ground and backfill with acceptable 9 fill material. 10 2. Use caution in removing and salvaging fence materials. 11 3. Salvaged materials may be used to reconstruct fence as approved by City or as 12 shown on Drawings. 13 4. Contractor responsible for keeping animals(livestock,pets,etc.)within the fenced 14 areas during construction operation and while removing fences. 15 F. Remove Guardrail 16 1. Remove rail elements in original lengths. 17 2. Remove fittings from the posts and the metal rail and then pull the posts. 18 3. Do not mar or damage salvageable materials during removal. 19 4. Completely remove posts and any concrete surrounding the posts. 20 5. Furnish backfill material and backfill the hole with material equal in composition 21 and density to the surrounding soil unless otherwise directed. 22 6. Cut off or bend down eyebolts anchored to the dead man to an elevation at least 1- 23 foot below the new subgrade elevation and leave in place along with the dead man. 24 G. Remove Retaining Wall(less than 4 feet tall) 25 1. Remove wall to nearest existing joint. 26 2. Sawcut when removing to nearest joint is not practical. See 3.4.K. 27 3. Removal includes all components of the retaining wall including footings. 28 4. Sidewalk adjacent to or attached to retaining wall: See 3.4.A 29 H. Remove Mailbox 30 1. Salvage existing materials for reuse. Mailbox materials may need to be used for 31 reconstruction. 32 I. Remove Rip Rap 33 1. Remove rip rap to nearest existing dummy,expansion or construction joint. 34 2. Sawcut when removing to nearest joint is not practical. See 3.4.K. 35 J. Remove Miscellaneous Concrete Structure 36 1. Remove portions of miscellaneous concrete structures including foundations and 37 slabs that do not interfere with proposed construction to 2 feet below the finished 38 ground line. 39 2. Cut reinforcement close to the portion of the concrete to remain in place. 40 3. Break or perforate the bottom of structures to remain to prevent the entrapment of 41 water. CITY OF FORT WORTH CONCRETE RESTORATION(2016-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100065 Revised December 20,2012 0241 13-5 SELECTIVE SITE DEMOLITION Page 5 of 5 1 K. Sawcut 2 1. Sawing Equipment 3 a. Power-driven 4 b. Manufactured for the purpose of sawing pavement 5 c. In good operating condition 6 d. Shall not spall or fracture the pavement to the removal area 7 2. Sawcut perpendicular to the surface completely through existing pavement. 8 3.5 REPAIR [NOT USED] 9 3.6 RE-INSTALLATION[NOT USED] 10 3.7 SITE QUALITY CONTROL [NOT USED] 11 3.8 SYSTEM STARTUP[NOT USED] 12 3.9 ADJUSTING [NOT USED] 13 3.10 CLEANING [NOT USED] 14 3.11 CLOSEOUT ACTIVITIES [NOT USED] 15 3.12 PROTECTION [NOT USED] 16 3.13 MAINTENANCE[NOT USED] 17 3.14 ATTACHMENTS [NOT USED] 18 END OF SECTION 19 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.2.A.2.Modified Payment-Items will be subsidiary to trench on utility projects 20 CITY OF FORT WORTH CONCRETE RESTORATION(2016-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100065 Revised December 20,2012 024115-1 PAVING REMOVAL Page 1 of 6 1 SECTION 02 4115 2 PAVING REMOVAL 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Removing concrete paving,asphalt paving and brick paving 7 2. Removing concrete curb and gutter 8 3. Removing concrete valley gutter 9 4. Milling roadway paving 10 5. Pulverization of existing pavement 11 6. Disposal of removed materials 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0-Bidding Requirements,Contract Forms,and Conditions of the Contract 16 2. Division 1 -General Requirements 17 3. Section 32 1133 -Cement Treated Base Courses 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Measurement 21 a. Remove Concrete Paving: measure by the square yard from back-to-back of 22 curbs. 23 b. Remove Asphalt Paving: measure by the square yard between the lips of 24 gutters. 25 c. Remove Brick Paving: measure by the square yard. 26 d. Remove Concrete Curb and Gutter: measure by the linear foot. 27 e. Remove Concrete Valley Gutter: measure by the square yard 28 f. Wedge Milling: measure by the square yard for varying thickness. 29 g. Surface Milling: measure by the square yard for varying thickness. 30 h. Butt Milling: measured by the linear foot. 31 i. Pavement Pulverization: measure by the square yard. 32 j. Remove Speed Cushion: measure by each. 33 2. Payment 34 a. Remove Concrete Paving: full compensation for saw cutting,removal,hauling, 35 disposal,tools,equipment,labor and incidentals needed to execute work.For 36 utility projects,this Item shall be considered subsidiary to the trench and no 37 other compensation will be allowed. 38 b. Remove Asphalt Paving: full compensation for saw cutting,removal,hauling, 39 disposal,tools,equipment,labor and incidentals needed to execute work.For 40 utility projects,this Item shall be considered subsidiary to the trench and no 41 other compensation will be allowed. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised February 2,2016 024115-2 PAVING REMOVAL Page 2 of 6 1 c. Remove Brick Paving: full compensation for saw cutting,removal, salvaging, 2 cleaning,hauling,disposal,tools,equipment,labor and incidentals needed to 3 execute work.For utility projects,this Item shall be considered subsidiary to 4 the trench and no other compensation will be allowed. 5 d. Remove Concrete Curb and Gutter: full compensation for saw cutting,removal, 6 hauling,disposal,tools,equipment,labor and incidentals needed to execute 7 work.For utility projects,this Item shall be considered subsidiary to the trench 8 and no other compensation will be allowed. 9 e. Remove Concrete Valley Gutter: full compensation for saw cutting,removal, 10 hauling,disposal,tools,equipment,labor and incidentals needed to execute 11 work. 12 f. Wedge Milling: full compensation for all milling,hauling milled material to 13 salvage stockpile or disposal,tools,labor,equipment and incidentals necessary 14 to execute the work. 15 g. Surface Milling: full compensation for all milling,hauling milled material to 16 salvage stockpile or disposal,tools,labor,equipment and incidentals necessary 17 to execute the work. 18 h. Butt Milling: full compensation for all milling,hauling milled material to 19 salvage stockpile or disposal,tools,labor,equipment and incidentals necessary 20 to execute the work. 21 i. Pavement Pulverization: full compensation for all labor, material,equipment, 22 tools and incidentals necessary to pulverize,remove and store the pulverized 23 material,undercut the base,mixing,compaction,haul off,sweep,and dispose 24 of the undercut material. 25 j. Remove speed cushion: full compensation for removal,hauling,disposal, 26 tools,equipment,labor, and incidentals needed to execute the work.For utility 27 projects,this Item shall be considered subsidiary to the trench and no other 28 compensation will be allowed. 29 k. No payment for saw cutting of pavement or curbs and gutters will be made 30 under this section.Include cost of such work in unit prices for items listed in 31 bid form requiring saw cutting. 32 1. No payment will be made for work outside maximum payment limits indicated 33 on plans,or for pavements or structures removed for CONTRACTOR'S 34 convenience. 35 1.3 REFERENCES 36 A. ASTM International(ASTM): 37 a. D698, Standard Test Methods for Laboratory Compaction Characteristics of 38 Soil Using Standard Effort(12 400 ft-1bf/ft3(600 kN-m/m3)) 39 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 40 1.5 SUBMITTALS [NOT USED] 41 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 42 1.7 CLOSEOUT SUBMITTALS [NOT USED] 43 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 44 1.9 QUALITY ASSURANCE [NOT USED] 45 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised February 2,2016 024115-3 PAVING REMOVAL Page 3 of 6 1 1.11 FIELD CONDITIONS[NOT USED] 2 1.12 WARRANTY[NOT USED] 3 PART 2- PRODUCTS 4 2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 5 2.2 EQUIPMENT [NOT USED] 6 2.3 ACCESSORIES [NOT USED] 7 2.4 SOURCE QUALITY CONTROL[NOT USED] 8 PART 3- EXECUTION 9 3.1 EXAMINATION[NOT USED] 10 3.2 INSTALLERS [NOT USED] 11 3.3 PREPARATION 12 A. General: 13 1. Mark paving removal limits for City approval prior to beginning removal. 14 2. Identify known utilities below grade-Stake and flag locations. 15 3.4 PAVEMENT REMOVAL 16 A. General. 17 1. Exercise caution to minimize damage to underground utilities. 18 2. Minimize amount of earth removed. 19 3. Remove paving to neatly sawed joints. 20 4. Use care to prevent fracturing adjacent,existing pavement. 21 B. Sawing 22 1. Sawing Equipment. 23 a. Power-driven. 24 b. Manufactured for the purpose of sawing pavement. 25 c. In good operating condition. 26 d. Shall not spall or fracture the pavement structure adjacent to the removal area. 27 2. Sawcut perpendicular to the surface to full pavement depth,parallel and 28 perpendicular to existing joint. 29 3. Sawcut parallel to the original sawcut in square or rectangular fashion. 30 4. If a sawcut falls within 5 feet of an en existing dummy joint,construction joint, saw 31 joint,cold joint,expansion joint,edge of paving or gutter lip,remove paving to that 32 joint,edge or lip. 33 5. If a pavement edge of a cut is damaged subsequent to saw cutting, saw to a new, 34 neat,straight line for the purpose of removing the damaged area. 35 C. Remove Concrete Paving and Concrete Valley Gutter 36 1. Sawcut: See 3.4.13. 37 2. Remove concrete to the nearest expansion joint or vertical saw cut. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised February 2,2016 0241 15-14 PAVING REMOVAL Page 4 of 6 1 D. Remove Concrete Curb and Gutter 2 1. Sawcut: See 3A.B. 3 2. Minimum limits of removal: 30 inches in length. 4 E. Remove Asphalt Paving 5 1. Sawcut: See 3A.B. 6 2. Remove pavement without disturbing the base material. 7 3. When shown on the plans or as directed,stockpile materials designated as 8 salvageable at designated sites. 9 4. Prepare stockpile area by removing vegetation and trash and by providing for 10 proper drainage. 11 F. Milling 12 1. General 13 a. Mill surfaces to the depth shown in the plans or as directed. 14 b. Do not damage or disfigure adjacent work or existing surface improvements. 15 c. If milling exposes smooth underlying pavement surfaces,mill the smooth 16 surface to make rough. 17 d. Provide safe temporary transition where vehicles or pedestrians must pass over 18 the milled edges. 19 e. Remove excess material and clean milled surfaces. 20 f. Stockpiling of planed material will not be permitted within the right of way 21 unless approved by the City. 22 g. If the existing base is brick and cannot be milled,remove a 5 foot width of the 23 existing brick base. See 3.3.G. for brick paving removal. 24 2. Milling Equipment 25 a. Power operated milling machine capable of removing,in one pass or two 26 passes,the necessary pavement thickness in a five-foot minimum width. 27 b. Self-propelled with sufficient power,traction and stability to maintain accurate 28 depth of cut and slope. 29 c. Equipped with an integral loading and reclaiming means to immediately 30 remove material cut from the surface of the roadway and discharge the cuttings 31 into a truck,all in one operation. 32 d. Equipped with means to control dust created by the cutting action. 33 e. Equipped with a manual system providing for uniformly varying the depth of 34 cut while the machine is in motion making it possible to cut flush to all inlets, 35 manholes,or other obstructions within the paved area. 36 f. Variable Speed in order to leave the specified grid pattern. 37 g. Equipped to minimize air pollution. 38 3. Wedge Milling and Surface Milling 39 a. Wedge Mill existing asphalt,concrete or brick pavement from the lip of gutter 40 at a depth of 2 inches and transitioning to match the existing pavement(0-inch 41 cut)at a minimum width of 5 feet. 42 b. Surface Mill existing asphalt pavement to the depth specified, 43 c. Provide a milled surface that provides a uniform surface free from gouges, 44 ridges,oil film, and other imperfections of workmanship with a uniform 45 textured appearance. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised February 2,2016 0241 15-5 PAVING REMOVAL Page 5 of 6 1 d. In all situations where the existing H.M.A.C. surface contacts the curb face,the 2 wedge milling includes the removal of the existing asphalt covering the gutter 3 up to and along the face of curb. 4 e. Perform wedge or surface milling operation in a continuous manner along both 5 sides of the street or as directed. 6 4. Butt Joint Milling 7 a. Mill butt joints into the existing surface,in association with the wedge milling 8 operation. 9 b. Butt joint will provide a full width transition section and a constant depth at the 10 point where the new overlay is terminated. 11 c. Typical locations for butt joints are at all beginning and ending points of streets 12 where paving material is removed. Prior to the milling of the butt joints, 13 consult with the City for proper location and limits of these joints. 14 d. Butt Milled joints are required on both sides of all railroad tracks and concrete 15 valley gutters,bridge decks and culverts and all other items which transverse 16 the street and end the continuity of the asphalt surface. 17 e. Make each butt joint 20 feet long and milled out across the full width of the 18 street section to a tapered depth of 2 inch. 19 f. Taper the milled area within the 20-feet to a depth from 0-inch to 2-inch at a 20 line adjacent to the beginning and ending points or intermediate transverse 21 items. 22 g. Provide a temporary wedge of asphalt at all butt joints to provide a smooth ride 23 over the bump. 24 G. Remove Brick Paving 25 1. Remove masonry paving units to the limits specified in the plans or as directed by 26 the City. 27 2. Salvage existing bricks for re-use,clean,palletize,and deliver to the City Stock pile 28 yard at 3300 Yuma Street or as directed. 29 H. Pavement Pulverization 30 1. Pulverization 31 a. Pulverize the existing pavement to depth of 8 inches. See Section 32 1133. 32 b. Temporarily remove and store the 8-inch deep pulverized material,then cut the 33 base 2 inches. 34 c. Start 2-inch base cut at a depth of 8 inches from the existing pulverized surface. 35 2. Cement Application 36 a. Use 3.5%Portland cement. 37 b. See Section 32 1133. 38 3. Mixing: see Section 32 1133. 39 4. Compaction: see Section 32 1133. 40 5. Finishing: see Section 32 1133. 41 6. Curing: see Section 32 1133. 42 7. If the existing pavement has a combination of 10 inches of H.M.A.C. and crushed 43 stone/gravel: 44 a. Undercut not required 45 b. Pulverize 10 inches deep. 46 c. Remove 2-inch the total pulverized amount. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised February 2,2016 024115-6 PAVING REMOVAL Page 6 of 6 1 I. Remove speed cushion 2 1. Scrape or sawcut speed cushion from existing pavement without damaging existing 3 pavement. 4 3.5 REPAIR[NOT USED] 5 3.6 RE-INSTALLATION[NOT USED] 6 3.7 FIELD QUALITY CONTROL[NOT USED] 7 3.8 SYSTEM STARTUP[NOT USED] 8 3.9 ADJUSTING [NOT USED] 9 3.10 CLEANING [NOT USED] 10 3.11 CLOSEOUT ACTIVITIES [NOT USED] 11 3.12 PROTECTION [NOT USED] 12 3.13 MAINTENANCE[NOT USED] 13 3.14 ATTACHMENTS [NOT USED] 14 END OF SECTION 15 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.2.A—modified payment requirements on utility projects 2/2/2016 F.Griffin 1.2.A.2.b.—Removed duplicate last sentence. 16 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised February 2,2016 312316-1 UNCLASSIFIED EXCAVATION Pagel of 5 1 SECTION 312316 2 UNCLASSIFIED EXCAVATION 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Excavate areas as shown on the Drawings or as directed.Removal of materials 7 encountered to the lines,grades,and typical sections shown on the Drawings and 8 removal from site.Excavations may include construction of 9 a. Roadways 10 b. Drainage Channels 11 c. Site Excavation 12 d. Excavation for Structures 13 e. Or any other operation involving the excavation of on-site materials 14 B. Deviations from this City of Fort Worth Standard Specification 15 P. FOR 1115 PROJECT L? (."I-ASSIFTTLD -Xf'A VATiONr 31 13 16,SIJALL BE 16 PAYABLE'I C7 R1:NN1()V 1- C'1;SS S..if [.;f2A[ 1: �4'}Afl h'lr l_ WHERE 17 RE PLACED CONCRETE PAVEMENT THICKNESS IS MORE TI IAN 7 INC, 18 2. 1,TN1AS,1FTED EXCAVATTONT TO PLACE FLEXIBLE BASE COURSE SHALL 19 0EC0[ S11)1:.RFDSUBSIMr"tRY, NO SERARo,I'-' PAS'. 20 C. Related Specification Sections include,but are not necessarily limited to: 21 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 22 2. Division 1—General Requirements 23 3. Section 3123 23—Borrow 24 4. Section 3124 00—Embankments 25 1.2 PRICE AND PAYMENT PROCEDURES 26 A. Measurement and Payment: UNCLASSIFIED EXCAVATION SHALL BE PAYABLE 27 TO REMOVE EXCESS SUBGRADE MATERIAL WHERE REPLACED CONCRETE 28 PAVEMENT THICKNESS IS MORE THAN 7 INCH. 29 a. Excavation by Plan Quantity Measurement 30 1) Measurement for this Item shall be by the cubic yard in its final position 31 using the average end area method.Limits of measurement are shown on 32 the Drawings. 33 2) When measured by the cubic yard in its final position,this is a plans 34 quantity measurement Item.The quantity to be paid is the quantity shown 35 in the proposal,unless modified by Article 11.04 of the General 36 Conditions.Additional measurements or calculations will be made if 37 adjustments of quantities are required. 38 b. Payment CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised January 28,2013 3123 16-2 UNCLASSIFIED EXCAVATION Page 2 of 5 1 1) The work performed and materials furnished in accordance with this Item 2 and measured as provided under"Measurement"will be paid for at the unit 3 price bid per cubic yard of"Unclassified Excavation by Plan". No additional 4 compensation will be allowed for rock or shrinkage/swell factors,as these are 5 the Contractor's responsibility. 6 c. The price bid shall include: 7 1) Excavation 8 2) Excavation Safety 9 3) Drying 10 4) Dust Control 11 5) Reworking or replacing the over excavated material in rock cuts 12 6) Hauling 13 7) Disposal of excess material not used elsewhere onsite 14 8) Scarification 15 9) Clean-up 16 10) UNLASSIFIED EXCAVATION TO PLACE FLEXIBLE BASE COURSE 17 2. Excavation by Surveyed Quantity 18 a. Measurement 19 1) Measurement for this Item shall be by the cubic yard in its final position 20 calculated using the average end area or composite method. 21 a) The City will perform a reference survey once the Site has been cleared 22 to obtain existing ground conditions. 23 b) The City will perform a final post-construction survey. 24 c) The Contractor will be paid for the cubic yardage of Excavated material 25 calculated as the difference between the two surveys. 26 d) Partial payments will be based on estimated plan quantity 27 measurements calculated by the Engineer. 28 b. Payment 29 1) The work performed and materials furnished in accordance with this Item 30 and measured as provided under"Measurement"will be paid for at the unit 31 price bid per cubic yard of"Unclassified Excavation by Survey". 32 c. The price bid shall include: 33 1) Excavation 34 2) Excavation Safety 35 3) Drying 36 4) Dust Control 37 5) Reworking or replacing the over excavated material in rock cuts 38 6) Hauling 39 7) Disposal of excess material not used elsewhere onsite 40 8) Scarification 41 9) Clean-up 42 10) UNLASSIFIED EXCAVATION TO PLACE FLEXIBLE BASE COURSE 43 44 1.3 REFERENCES [NOT USED] 45 A. Definitions CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised January 28,2013 312316-3 UNCLASSIFIED EXCAVATION Page 3 of 5 1 1. Unclassified Excavation—Without regard to materials,all excavations shall be 2 considered unclassified and shall include all materials excavated. Any reference to 3 Rock or other materials on the Drawings or in the specifications is solely for the 4 City and the Contractor's information and is not to be taken as a classification of 5 the excavation. 6 1.4 ADMINSTRATIVE REQUIREMENTS 7 A. The Contractor will provide the City with a Disposal Letter in accordance to Division 8 01. 9 1.5 SUBMITTALS [NOT USED] 10 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 11 1.7 CLOSEOUT SUBMITTALS [NOT USED] 12 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 13 1.9 QUALITY ASSURANCE 14 A. Excavation Safety 15 1. The Contractor shall be solely responsible for making all excavations in a safe 16 manner. 17 2. All excavation and related sheeting and bracing shall comply with the requirements 18 of OSHA excavation safety standards 29 CFR part 1926 and state requirements. 19 1.10 DELIVERY,STORAGE,AND HANDLING 20 A. Storage 21 1. Within Existing Rights-of-Way(ROW) 22 a. Soil may be stored within existing ROW, easements or temporary construction 23 easements,unless specifically disallowed in the Contract Documents. 24 b. Do not block drainage ways,inlets or driveways. 25 c. Provide erosion control in accordance with Section 3125 00. 26 d. When the Work is performed in active traffic areas,store materials only in 27 areas barricaded as provided in the traffic control plans. 28 e. In non-paved areas,do not store material on the root zone of any trees or in 29 landscaped areas. 30 2. Designated Storage Areas 31 a. If the Contract Documents do not allow the storage of spoils within the ROW, 32 easement or temporary construction easement,then secure and maintain an 33 adequate storage location. 34 b. Provide an affidavit that rights have been secured to store the materials on 35 private property. 36 c. Provide erosion control in accordance with Section 3125 00. 37 d. Do not block drainage ways. 38 1.11 FIELD CONDITIONS 39 A. Existing Conditions CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised January 28,2013 312316-4 UNCLASSIFIED EXCAVATION Page 4 of 5 1 1. Any data which has been or may be provided on subsurface conditions is not 2 intended as a representation or warranty of accuracy or continuity between soils.It 3 is expressly understood that neither the City nor the Engineer will be responsible 4 for interpretations or conclusions drawn there from by the Contractor. 5 2. Data is.made available for the convenience of the Contractor. 6 1.12 WARRANTY [NOT USED] 7 PART 2- PRODUCTS [NOT USED] 8 2.1 OWNER-FURNISHED[NOT USED] 9 2.2 PRODUCT TYPES AND MATERIALS 10 A. Materials 11 1. Unacceptable Fill Material 12 a. In-situ soils classified as ML,MH,PT,OL or OH in accordance with ASTM 13 D2487 14 PART 3- EXECUTION 15 3.1 INSTALLERS [NOT USED] 16 3.2 EXAMINATION [NOT USED] 17 3.3 PREPARATION[NOT USED] 18 3.4 CONSTRUCTION 19 A. Accept ownership of unsuitable or excess material and dispose of material off-site 20 accordance with local,state,and federal regulations at locations. 21 B. Excavations shall be performed in the dry,and kept free from water, snow and ice 22 during construction with eh exception of water that is applied for dust control. 23 C. Separate Unacceptable Fill Material from other materials,remove from the Site and 24 properly dispose according to disposal plan. 25 D. Maintain drainage in the excavated area to avoid damage to the roadway sections and 26 proposed or existing structures. 27 E. Correct any damage to the subgrade caused by weather,at no additional cost to the 28 city. 29 F. Shape slopes to avoid loosening material below or outside the proposed grades. 30 Remove and dispose of slides as directed. 31 G. Rock Cuts 32 1. Excavate to finish grades. 33 2. In the event of over excavation due to contractor error below the lines and grades 34 established in the Drawings,use approved embankment material compacted in 35 accordance with Section 3124 00 to replace the over excavated at no additional 36 cost to City. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised January 28,2013 312316-5 UNCLASSIFIED EXCAVATION Page 5 of 5 1 H. Earth Cuts 2 1. Excavate to finish subgrade 3 2. In the event of over excavation due to contractor error below the lines and grades 4 established in the Drawings,use approved embankment material compacted in 5 accordance with Section 3124 00 to replace the over excavated at no additional 6 cost to City. 7 3. Manipulate and compact subgrade in accordance with Section 3124 00. 8 3.5 REPAIR[NOT USED] 9 3.6 RE-INSTALLATION [NOT USED] 10 3.7 FIELD QUALITY CONTROL 11 A. Subgrade Tolerances 12 1. Excavate to within 0.1 foot in all directions. 13 2. In areas of over excavation,Contractor provides fill material approved by the City 14 at no expense to the City. 15 3.8 SYSTEM STARTUP[NOT USED] 16 3.9 ADJUSTING[NOT USED] 17 3.10 CLEANING[NOT USED] 18 3.11 CLOSEOUT ACTIVITIES [NOT USED] 19 3.12 PROTECTION[NOT USED] 20 3.13 MAINTENANCE[NOT USED] 21 3.14 ATTACHMENTS [NOT USED] 22 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.2-Measurement and Payment Section modified;Blue Text added for clarification 1/28/13 D.Johnson 1.2—Modified Bid Item names in payment section to differentiate between Payment Methods on bid list. 23 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised January 28,2013 321123-1 FLEXIBLE BASE COURSES Page 1 of 7 1 SECTION 321123 2 FLEXIBLE BASE COURSES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Foundation course for surface course or for other base course composed of flexible 7 base constructed in one or more courses in conformity with the typical section. 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. FOR THIS l'R()_EC7 FLE 1111_l" 13ASF COURSES S1r'C TION 32 11 23 SHAIJ. 10 l31~ MIJASIIdI I) ll ' I'VE: =[Jlil[_: r" tI rel C•C) 1 'l.L'C" l Q�IT[[ ', 11 2 (114CLASSI F, CAVATION ANI) I JAI.;l:l (= R.EQL IR.1:'3-(l fel,A(`iv 12 I;IMI BASE COURSE SHALL13hCONS II)F'IZI' ) SUBSIDIARY, N(? 13 SLl'AlZATL PAY. 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0—Bidding Requirements,Contract Forms, and Conditions of the 16 Contract 17 2. Division 1 —General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Measurement 21 a. Measurement for this Item will be by the squam CUBIC yard of Flexible Base 22 Course for various: 23 1) Depths 24 2) Types 25 3) Gradations 26 2. Payment 27 a. The work performed and materials furnished in accordance with this Item and 28 measured as provided under"Measurement"will be paid for at the unit price 29 bid per s"are CUBIC yard of Flexible Base Course. 30 3. The price bid shall include: 31 a. Preparation and correction of subgrade 32 b. Furnishing of material 33 c. Hauling 34 d. Blading 35 e. Sprinkling 36 f. Compacting 37 g. UNCLASSIFIED EXCAVATION AND HAULING REQUIRE TO PLACE 38 FLEXIBLE BASE COURSE 39 1.3 REFERENCES 40 A. Definitions 41 1. RAP—Recycled Asphalt Pavement. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321123-2 FLEXIBLE BASE COURSES Page 2 of 7 1 B. Reference Standards 2 1. Reference standards cited in this specification refer to the current reference standard 3 published at the time of the latest revision date logged at the end of this 4 specification,unless a date is specifically cited. 5 2. ASTM International(ASTM): 6 a. D698,Standard Test Methods for Laboratory Compaction Characteristics of 7 Soil Using Standard Effort(12 400 ft-lbf/ft3 (600 kN-m/m3)) 8 3. Texas Department of Transportation(TXDOT): 9 a. Tex-104-E,Determining Liquid Limits of Soils 10 b. Tex-106-E,Calculating the Plasticity Index of Soils 11 c. Tex-107-E,Determining the Bar Linear Shrinkage of Soils 12 d. Tex-110-E,Particle Size Analysis of Soils 13 e. Tex-116-E,Ball Mill Method for Determining the Disintegration of Flexible 14 Base Material 15 f. Tex-117-E,Triaxial Compression for Disturbed Soils and Base Materials 16 g. Tex-411-A,Soundness of Aggregate Using Sodium Sulfate or Magnesium 17 Sulfate 18 h. Tex-413-A,Determining Deleterious Material in Mineral Aggregate 19 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 20 1.5 ACTION SUBMITTALS [NOT USED] 21 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 22 1.7 CLOSEOUT SUBMITTALS [NOT USED] 23 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 24 1.9 QUALITY ASSURANCE[NOT USED] 25 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 26 1.11 FIELD [SITE] CONDITIONS [NOT USED] 27 1.12 WARRANTY [NOT USED] 28 PART 2- PRODUCTS [NOT USED] 29 2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 30 2.2 MATERIALS 31 A. General 32 1. Furnish uncontaminated materials of uniform quality that meet the requirements of 33 the Drawings and specifications. 34 2. Obtain materials from approved sources. 35 3. Notify City of changes to material sources. 36 4. The City may sample and test project materials at any time before compaction 37 throughout the duration of the project to assure specification compliance. 38 B. Aggregate 39 1. Furnish aggregate of the type and grade shown on the Drawings and conforming to 40 the requirements of Table 1. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321123-3 FLEXIBLE BASE COURSES Page 3 of 7 1 2. Each source must meet Table 1 requirements for liquid limit,plastiCity index,and 2 wet ball mill for the grade specified. 3 3. Do not use additives such as but not limited to lime,cement,or fly ash to modify 4 aggregates to meet the requirements of Table 1,unless shown on the Drawings. 5 6 Table 1 7 Material Require nts Property Test Method Grade 1 Grade 2 Master gradation sieve size(%retained) 2-1/2 in. - 0 1-3/4 in. 0 0-10 7/8 in. Tex-1 10-E 10-35 - 3/8 in. 30-50 - No.4 45-65 45-75 No.40 70-85 60-85 Liquid limit,%max. Tex-104-E 35 40 PlastiCity index,max. Tex-106-E 10 12 Wet ball mill,%max. 40 45 Wet ball mill,%max. Tex-116-E increase passing the 20 20 No.40 sieve Classification 1.0 1.1-2.3 Min.compressive strength 3,psi Tex-117-E lateral pressure 0 psi 45 35 lateral pressure 15 psi 175 175 1.Determine plastic index in accordance with Tex-107-E(linear shrinkage)when liquid limit is unattainable as defined in Tex-104-E. 2.When a soundness value is required by the Drawings,test material in accordance with Tex-411-A. 3.Meet both the classification and the minimum compressive strength,unless otherwise shown on the Drawings. 8 9 4. Material Tolerances 10 a. The City may accept material if no more than 1 of the 5 most recent gradation 11 tests has an individual sieve outside the specified limits of the gradation. 12 b. When target grading is required by the Drawings,no single failing test may 13 exceed the master grading by more than 5 percentage points on sieves No.4 14 and larger or 3 percentage points on sieves smaller than No.4. 15 c. The City may accept material if no more than 1 of the 5 most recent plasticity 16 index tests is outside the specified limit.No single failing test may exceed the 17 allowable limit by more than 2 points. 18 5. Material Types 19 a. Do not use fillers or binders unless approved. 20 b. Furnish the type specified on the Drawings in accordance with the following: 21 1) Type A 22 a) Crushed stone produced and graded from oversize quarried aggregate 23 that originates from a single,naturally occurring source. 24 b) Do not use gravel or multiple sources. 25 2) Type B 26 a) Only for use as base material for temporary pavement repairs. 27 b) Do not exceed 20 percent RAP by weight unless shown on Drawings. 28 3) Type D CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321123-4 FLEXIBLE BASE COURSES Page 4 of 7 1 a) Type A material or crushed concrete. 2 b) Crushed concrete containing gravel will be considered Type D 3 material. 4 c) The City may require separate dedicated stockpiles in order to verify 5 compliance. 6 d) Crushed concrete must meet the following requirements: 7 (1) Table 1 for the grade specified. 8 (2) Recycled materials must be free from reinforcing steel and other 9 objectionable material and have at most 1.5 percent deleterious 10 material when tested in accordance with TEX413-A. 11 C. Water 12 1. Furnish water free of industrial wastes and other objectionable matter. 13 2.3 ACCESSORIES [NOT USED] 14 2.4 SOURCE QUALITY CONTROL[NOT USED] 15 PART 3- EXECUTION 16 3.1 INSTALLERS [NOT USED] 17 3.2 EXAMINATION [NOT USED] 18 3.3 PREPARATION 19 A. General 20 1. Shape the subgrade or existing base to conform to the typical sections shown on the 21 Drawings or as directed. 22 2. When new base is required to be mixed with existing base: 23 a. Deliver,place, and spread the new flexible base in the required amount. 24 b. Manipulate and thoroughly mix the new base with existing material to provide 25 a uniform mixture to the specified depth before shaping. 26 B. Subgrade Compaction 27 1. Proof roll the roadbed before pulverizing or scarifying in accordance with the 28 following: 29 a. Proof Rolling 30 1) City Project Representative must be on-site during proof rolling operations. 31 2) Use equipment that will apply sufficient load to identify soft spots that rut 32 or pump. 33 a) Acceptable equipment includes fully loaded single-axle water truck 34 with a 1500 gallon capacity. 35 3) Make at least 2 passes with the proof roller(down and back= 1 pass). 36 4) Offset each trip by at most 1 tire width. 37 5) If an unstable or non-uniform area is found,correct the area. 38 b. Correct 39 1) Soft spots that rut or pump greater than 3/4 inch 40 2) Areas that are unstable or non-uniform 41 2. Installation of base material cannot proceed until compacted subgrade approved by 42 the City. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321123-5 FLEXIBLE BASE COURSES Page 5 of 7 1 3.4 INSTALLATION 2 A. General 3 1. Construct each layer uniformly,free of loose or segregated areas,and with the 4 required density and moisture content. 5 2. Provide a smooth surface that conforms to the typical sections,lines,and grades 6 shown on the Drawings or as directed. 7 3. Haul approved flexible base in clean,covered trucks. 8 B. Equipment 9 1. General 10 a. Provide machinery,tools,and equipment necessary for proper execution of the 11 work. 12 2. Rollers 13 a. The Contractor may use any type of roller to meet the production rates and 14 quality requirements of the Contract unless otherwise shown on the Drawings 15 or directed. 16 b. When specific types of equipment are required,use equipment that meets the 17 specified requirements. 18 c. Alternate Equipment. 19 1) Instead of the specified equipment,the Contractor may,as approved, 20 operate other compaction equipment that produces equivalent results. 21 2) Discontinue the use of the alternate equipment and furnish the specified 22 equipment if the desired results are not achieved. 23 d. City may require Contractor to substitute equipment if production rate and 24 quality requirements of the Contract are not met. 25 C. Placing 26 1. Spread and shape flexible base into a uniform layer by approved means the same 27 day as delivered unless otherwise approved. 28 2. Place material such that it is mixed to minimize segregation. 29 3. Construct layers to the thickness shown on the Drawings,while maintaining the 30 shape of the course. 31 4. Where subbase or base course exceeds 6 inches in thickness,construct in 2 or more 32 courses of equal thickness. 33 5. Minimum lift depth: 3 inches 34 6. Control dust by sprinkling. 35 7. Correct or replace segregated areas as directed. 36 8. Place successive base courses and finish courses using the same construction 37 methods required for the first course. 38 D. Compaction 39 1. General 40 a. Compact using density control unless otherwise shown on the Drawings. 41 b. Multiple lifts are permitted when shown on the Drawings or approved. 42 c. Bring each layer to the moisture content directed.When necessary,sprinkle the 43 material to the extent necessary to provide not less than the required density. 44 d. Compact the full depth of the subbase or base to the extent necessary to remain 45 firm and stable under construction equipment. CrrY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321123-6 FLEXIBLE BASE COURSES Page 6 of 7 1 2. Rolling 2 a. Begin rolling longitudinally at the sides and proceed towards the center, 3 overlapping on successive trips by at least 1/2 the width of the roller unit. 4 b. On superelevated curves,begin rolling at the low side and progress toward the 5 high side. 6 c. Offset alternate trips of the roller. 7 d. Operate rollers at a speed between 2 and 6 mph as directed. 8 e. Rework,recompact,and refinish material that fails to meet or that loses 9 required moisture, density, stability,or finish before the next course is placed or 10 the project is accepted. 11 f. Continue work until specification requirements are met. 12 g. Proof roll the compacted flexible base in accordance with the following: 13 1) Proof Rolling 14 a) City Project Representative must be on-site during proof rolling 15 operations. 16 b) Use equipment that will apply sufficient load to identify soft spots that 17 rut or pump. 18 (1) Acceptable equipment includes fully loaded single-axle water truck 19 with a 1500 gallon capacity. 20 c) Make at least 2 passes with the proof roller(down and back= 1 pass). 21 d) Offset each trip by at most 1 tire width. 22 e) If an unstable or non-uniform area is found,correct the area. 23 2) Correct 24 a) Soft spots that rut or pump greater than 3/4 inch. 25 b) Areas that are unstable or non-uniform. 26 3. Tolerances 27 a. Maintain the shape of the course by blading. 28 b. Completed surface shall be smooth and in conformity with the typical sections 29 shown on the Drawings to the established lines and grades. 30 c. For subgrade beneath paving surfaces,correct any deviation in excess of 1/4 31 inch in cross section in length greater than 16 feet measured longitudinally by 32 loosening,adding or removing material. Reshape and recompact by sprinkling 33 and rolling. 34 d. Correct all fractures, settlement or segregation immediately by scarifying the 35 areas affected,adding suitable material as required. Reshape and recompact by 36 sprinkling and rolling. 37 e. Should the subbase or base course,due to any reason,lose the required 38 stability,density and finish before the surfacing is complete,it shall be 39 recompacted at the sole expense of the Contractor. 40 4. Density Control 41 a. Minimum Density: 95 percent compaction as determined by ASTM D698. 42 b. Moisture content: minus 2 to plus 4 of optimum. 43 E. Finishing 44 1. After completing compaction,clip, skin,or tight-blade the surface with a 45 maintainer or subgrade trimmer to a depth of approximately 1/4 inch. 46 2. Remove loosened material and dispose of it at an approved location. 47 3. Seal the clipped surface immediately by rolling with an appropriate size pneumatic 48 tire roller until a smooth surface is attained. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321123-7 FLEXIBLE BASE COURSES Page 7 of 7 1 4. Add small increments of water as needed during rolling. 2 5. Shape and maintain the course and surface in conformity with the typical sections, 3 lines,and grades as shown on the Drawings or as directed. 4 6. In areas where surfacing is to be placed,correct grade deviations greater than 1/4 5 inch in 16 feet measured longitudinally or greater than 1/4 inch over the entire 6 width of the cross-section. 7 7. Correct by loosening,adding,or removing material. 8 8. Reshape and recompact in accordance with 3A.C. 9 3.5 REPAIR/RESTORATION [NOT USED] 10 3.6 RE-INSTALLATION [NOT USED] 11 3.7 QUALITY CONTROL 12 A. Density Test 13 1. City to measure density of flexible base course. 14 a. Notify City Project Representative when flexible base ready for density testing. 15 b. Spacing directed by City(1 per block minimum). 16 c. City Project Representative determines location of density testing. 17 3.8 SYSTEM STARTUP[NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING[NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION [NOT USED] 22 3.13 MAINTENANCE[NOT USED] 23 3.14 ATTACHMENTS[NOT USED] 24 END OF SECTION 25 Revision Log DATE NAME SUMMARY OF CHANGE 26 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 32 13 13-1 CONCRETE PAVING Page 1 of 22 1 SECTION 32 13 13 2 CONCRETE PAVING 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section includes: 6 1. Finished pavement constructed of portland cement concrete including 7 monolithically poured curb on the prepared subgrade or other base course. 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. I''OR'TIATS Pr,()JE,(7 C (1 C"TtETE PAVI1'*II i Sl`C""TI[7N ' 3 1-:� P2r] 11)ES 10 T�INi 111=D ('1.1!` CRETI (A, INI)TVII31_TA.L PANEL ORIAND F'�t.SE L W1 CI1 11 ,140NO[A l 1{ICAL.LY P013RED CAA-RD, 12 17.1t`ST 11rhf-T OF 1 AN1 1InT-F COVERAND WATER VALVE BOX M ALL 13 �CWiDibRfG13 SUWiID IAKY 'M'+r';.RK.,NO SEPARATE PAY 14 MA C KF1L_l.ir'w G AND FINIS HINQ 6RADE BEHIND C'1JRB INCLUDINCi 15 ;11-N1,�IIIi*1GAN'DI'L.ACINCi 1'()P ',411, SHAl,1, IBECONS iDF'REn 16 SUBS I1-iJAJ �, 'bY01ZV , NO 5I f'A17..-HTE PAY. 17 4, SA\kfNt;_ c Lf®vA NMI ANIS A PFL YL%'Ci JuINT SEAiAl V'S WITH 18 1-IiRNIS111N(.3 AND INSTAI.I1NG MATERIA)-S gHAI_L I11 CONS IDE RED 19 Sk113SIDIARY 1V(')1�K-NO SEPARATE PAY. 20 ie UNCLASSII--Ii-D EXCAVATION (IFNEEI`JL-D) 1 ()I1 (:'() (1' I'AE PAVING UP 21 gW INCH SHALT- 13EX3 SIDERED U-BSIDIAk) NO SEPARATE PAY_ 22 ANSMIA1LT COAVRESSIAIF STRENGTH OF f-ARL Y STFREN(ITH (HES) 23 EL ASS CONC RETE SUA LL 13 3,000 PSI AT 7 2110L�RS, 24 7. T( f flf;I IC THE C'{J +11'i:ISSIE 4'Ilh, G"E'H OF fE11, t't 'rCliE.`!`E.13 25 PI-A('[-;D CINE CYLLN I R TO BE TESTED AT 3 DAYS BY 26 A►DL)I HON TO TEST AT 7 DAYS AND 28 DAYS, 27 C. Related Specification Sections include,but are not necessarily limited to: 28 1. Division 0-Bidding Requirements,Contract Forms,and Conditions of the Contract 29 2. Division 1 -General Requirements 30 3. Section 32 0129-Concrete Paving Repair 31 4. Section 32 13 73 -Concrete Paving Joint Sealants 32 1.2 PRICE AND PAYMENT PROCEDURES 33 A. Measurement 34 1. Measurement 35 a. Measurement for this Item shall be by the square yard of completed and 36 accepted Concrete Pavement in its final position as measured from back of curb 37 for various: 38 1) Classes 39 2) Thicknesses 40 2. Payment CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321313-2 CONCRETE PAVING Page 2 of 22 1 a. The work performed and materials furnished in accordance with this Item will 2 be paid for at the unit price bid per square yard of Concrete Pavement. 3 3. The price bid shall include: 4 a. Shaping and fine grading the placement area 5 b. Furnishing and applying all water required 6 c. Furnishing,loading and unloading, storing,hauling and handling all concrete 7 ingredients including all freight and royalty involved 8 d. Mixing,placing,finishing and curing all concrete 9 e. Furnishing and installing all reinforcing steel 10 f. Furnishing all materials and placing longitudinal,warping,expansion, and 11 contraction joints,including all steel dowels,dowel caps and load transmission 12 units required,wire and devices for placing,holding and supporting the steel 13 bar,load transmission units,and joint filler material in the proper position;for 14 coating steel bars where required by the Drawings 15 g. Sealing joints 16 h. Monolithically poured curb 17 i. Cleanup 18 j. MAKING ADJUSTMENT OF EXISTING MANHOLE COVER AND 19 WATER VALVE BOX 20 k. BACKFILLING AND FINISHING GRADE BEHIND CURB INCLUDING 21 FURNISHING AND PLACING OF TOP SOIL PER SECTION 32 9119 22 1. UNCLASSIFIED EXCAVATION(IF NEEDED)FOR CONCRETE PAVING 23 UP TO 7 INCH 24 25 1.3 REFERENCES 26 A. Reference Standards 27 1. Reference standards cited in this specification refer to the current reference standard 28 published at the time of the latest revision date logged at the end of this 29 specification,unless a date is specifically cited. 30 2. ASTM International(ASTM): 31 a. A615/A615M,Deformed and Plain Billet-Steel Bars for Concrete 32 Reinforcement 33 b. C31,Standard Practice for Making and Curing Concrete Test Specimens in the 34 Field 35 c. C33,Concrete Aggregates 36 d. C39, Standard Test Method for Compressive Strength of Cylindrical Concrete 37 Specimens 38 e. C42, Standard Test Method for Obtaining and Testing Drilled Cores and Sawed 39 Beams of Concrete 40 f. C94/C94M, Standard Specifications for Ready-Mixed Concrete 41 g. C150,Portland Cement 42 h. C 156,Water Retention by Concrete Curing Materials 43 i. C172, Standard Practice for Sampling Freshly Mixed Concrete 44 j. C260,Air Entraining Admixtures for Concrete 45 k. C309,Liquid Membrane-Forming Compounds for Curing Concrete,Type 2 46 1. C494,Chemical Admixtures for Concrete,Types"A", "D","F"and"G" 47 in. C618,Coal Fly Ash and Raw or Calcined Natural Pozzolan for use as a Mineral 48 Admixture in Concrete CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321313-3 CONCRETE PAVING Page 3 of 22 1 n. C881,Standard Specification for Epoxy-Resin-Base Bonding Systems for 2 Concrete 3 o. C1064,Standard Test Method for Temperature of Freshly Mixed Hydraulic- 4 Cement Concrete 5 p. C1602, Standard Specification for Mixing Water Used in the Production of 6 Hydraulic Cement Concrete. 7 q. D698,Laboratory Compaction Characteristics of Soil Using Standard Effort 8 (12,400 ft-lbf/ft3) 9 3. American Concrete Institute(ACI): 10 a. ACI 305.1-06 Specification for Hot Weather Concreting 11 b. ACI 306.1-90, Standard Specification for Cold Weather Concreting 12 c. ACI 318 13 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 14 1.5 SUBMITTALS [NOT USED] 15 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS 16 A. Mix Design: submit for approval. See Item 2A.A. 17 1.7 CLOSEOUT SUBMITTALS [NOT USED] 18 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 19 1.9 QUALITY ASSURANCE[NOT USED] 20 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 21 1.11 FIELD CONDITIONS 22 A. Weather Conditions 23 1. Place concrete when concrete temperature is between 40 and 100 degrees when 24 measured in accordance with ASTM C1064 at point of placement. 25 2. Hot Weather Concreting 26 a. Take immediate corrective action or cease paving when the ambient 27 temperature exceeds 95 degrees. 28 b. Concrete paving operations shall be approved by the City when the concrete 29 temperature exceeds 100 degrees. See Standard Specification for Hot Weather 30 Concreting(ACI 305.1-06). 31 3. Cold Weather Concreting 32 a. Do not place when ambient temp in shade is below 40 degrees and falling. 33 Concrete may be placed when ambient temp is above 35 degrees and rising or 34 above 40 degrees. 35 b. Concrete paving operations shall be approved by the City when ambient 36 temperature is below 40 degrees. See Standard Specification for Cold Weather 37 Concreting(ACI 306.1-90). 38 B. Time: Place concrete after sunrise and no later than shall permit the finishing of the 39 pavement in natural light,or as directed by the City. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321313-4 CONCRETE PAVING Page 4 of 22 1 1.12 WARRANTY [NOT USED] 2 PART 2- PRODUCTS 3 2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 4 2.2 MATERIALS 5 A. Cementitious Material: ASTM C150. 6 B. Aggregates: ASTM C33. 7 C. Water: ASTM C1602. 8 D. Admixtures: When admixtures are used,conform to the appropriate specification: 9 1. Air-Entraining Admixtures for Concrete: ASTM C260. 10 2. Chemical Admixtures for Concrete: ASTM C494,Types "A", "D", "F"and"G." 11 3. Fly Ash 12 a. Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete: 13 ASTM C618. 14 b. Fly ash may be substituted at one pound per pound of cement up to 25% of the 15 specified cement content when such batch design is approved by the Engineer. 16 E. Steel Reinforcement: ASTM A615. 17 F. Steel Wire Reinforcement: Not used for concrete pavement. 18 G. Dowels and Tie Bars 19 1. Dowel and tie bars: ASTM A615. 20 2. Dowel Caps 21 a. Provide dowel caps with enough range of movement to allow complete closure 22 of the expansion joint. 23 b. Caps for dowel bars shall be of the length shown on the Drawings and shall 24 have an internal diameter sufficient to permit the cap to freely slip over the bar. 25 c. In no case shall the internal diameter exceed the bar diameter by more 1/8 inch, 26 and one end of the cap shall be rightly closed. 27 3. Epoxy for Dowel and Tie Bars: ASTM C881. 28 a. See following table for approved producers of epoxies and adhesives 29 Pre-Qualified Producers of Epoxies and Adhesives Product Name Producer Concresive 1420 BASF HTE-50 Hilti T 308+ Powers Fasteners P E 1000+ Powers Fasteners C-6 Ramset-Redhead Epcon G-5 Ramset-Redhead Pro-Poxy-300 Fast Tube Unitex CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 3213 13-5 CONCRETE PAVING Page 5 of 22 Shep-Poxy TxIII CMC Construction Services Ultrabond 1300 Tubes Adhesives Technology Ultrabone 2300 N.S.A-22-2300 Adhesives Technology Slow Set Dynapoxy EP-430 Pecora Corp. EDOT Simpson Strong Tie ET22 Simpson Strong Tie SET 22 Simpson Strong Tie SpecPoxy 3000FS SpecChem 1 2 b. Epoxy Use,Storage and Handling 3 1) Package components in airtight containers and protect from light and 4 moisture. 5 2) Include detailed instructions for the application of the material and all 6 safety information and warnings regarding contact with the components. 7 3) Epoxy label requirements 8 a) Resin or hardener components 9 b) Brand name 10 c) Name of manufacturer 11 d) Lot or batch number 12 e) Temperature range for storage 13 f) Date of manufacture 14 g) Expiration date 15 h) Quantity contained 16 4) Store epoxy and adhesive components at temperatures recommended by the 17 manufacturer. 18 5) Do not use damaged or previously opened containers and any material that 19 shows evidence of crystallization,lumps skinning,extreme thickening, or 20 settling of pigments that cannot be readily dispersed with normal agitation. 21 6) Follow sound environmental practices when disposing of epoxy and 22 adhesive wastes. 23 7) Dispose of all empty containers separately. 24 8) Dispose of epoxy by completely emptying and mixing the epoxy before 25 disposal 26 H. Reinforcement Bar Chairs 27 1. Reinforcement bar chairs or supports shall be of adequate strength to support the 28 reinforcement bars and shall not bend or break under the weight of the 29 reinforcement bars or Contractor's personnel walking on the reinforcing bars. 30 2. Bar chairs may be made of metal(free of rust),precast mortar or concrete blocks or 31 plastic. 32 3. For approval of plastic chairs,representative samples of the plastic shall show no 33 visible indications of deterioration after immersion in a 5-percent solution of 34 sodium hydroxide for 120-hours. 35 4. Bar chairs may be rejected for failure to meet any of the requirements of this 36 specification. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321313-6 CONCRETE PAVING Page 6 of 22 1 I. Joint Filler 2 1. Joint filler is the material placed in concrete pavement and concrete structures to 3 allow for the expansion and contraction of the concrete. 4 2. Wood Boards: Used as joint filler for concrete paving. 5 a. Boards for expansion joint filler shall be of the required size, shape and type 6 indicated on the Drawings or required in the specifications. 7 1) Boards shall be of selected stock of redwood or cypress.The boards shall 8 be sound heartwood and shall be free from sapwood,knots,clustered 9 birdseyes,checks and splits. 10 2) Joint filler,boards, shall be smooth,flat and straight throughout,and shall 11 be sufficiently rigid to permit ease of installation. 12 3) Boards shall be furnished in lengths equal to the width between 13 longitudinal joints,and may be furnished in strips or scored sheet of the 14 required shape. 15 3. Dimensions.The thickness of the expansion joint filler shall be shown on the 16 Drawings;the width shall be not less than that shown on the Drawings,providing 17 for the top seal space. 18 4. Rejection.Expansion joint filler may be rejected for failure to meet any of the 19 requirements of this specification. 20 J. Joint Sealants. Provide Joint Sealants in accordance with Section 32 13 73. 21 K. Curing Materials 22 1. Membrane-Forming Compounds. 23 a. Conform to the requirements of ASTM C309,Type 2,white pigmented 24 compound and be of such nature that it shall not produce permanent 25 discoloration of concrete surfaces nor react deleteriously with the concrete. 26 b. The compound shall produce a firm,continuous uniform moisture-impermeable 27 film free from pinholes and shall adhere satisfactorily to the surfaces of damp 28 concrete. 29 c. It shall, when applied to the damp concrete surface at the specified rate of 30 coverage,dry to touch in 1 hour and dry through in not more than 4 hours under 31 normal conditions suitable for concrete operations. 32 d. It shall adhere in a tenacious film without running off or appreciably sagging. 33 e. It shall not disintegrate,check,peel or crack during the required curing period. 34 f. The compound shall not peel or pick up under traffic and shall disappear from 35 the surface of the concrete by gradual disintegration. 36 g. The compound shall be delivered to the job site in the manufacturer's original 37 containers only, which shall be clearly labeled with the manufacturer's name, 38 the trade name of the material and a batch number or symbol with which test 39 samples may be correlated. 40 h. When tested in accordance with ASTM C156 Water Retention by Concrete 41 Curing Materials,the liquid membrane-forming compound shall restrict the loss 42 of water present in the test specimen at the time of application of the curing 43 compound to not more than 0.01-oz.-per-2 inches of surface. 44 2.3 ACCESSORIES [NOT USED] 45 2.4 SOURCE QUALITY CONTROL 46 A. Mix Design CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321313-7 CONCRETE PAVING Page 7 of 22 1 1. Concrete Mix Design and Control 2 a. At least 10 calendar days prior to the start of concrete paving operations,the 3 Contractor shall submit a design of the concrete mix it proposes to use and a 4 full description of the source of supply of each material component. 5 b. The design of the concrete mix shall produce a quality concrete complying with 6 these specifications and shall include the following information: 7 1) Design Requirements and Design Summary 8 2) Material source 9 3) Dry weight of cement/cubic yard and type 10 4) Dry weight of fly ash/cubic yard and type,if used 11 5) Saturated surface dry weight of fine and coarse aggregates/cubic yard 12 6) Design water/cubic yard 13 7) Quantities,type,and name of admixtures with manufacturer's data sheets 14 8) Current strength tests or strength tests in accordance with ACI 318 15 9) Current Sieve Analysis and-200 Decantation of fine and coarse aggregates 16 and date of tests 17 10)Fineness modulus of fine aggregate 18 11) Specific Gravity and Absorption Values of fine and coarse aggregates 19 12)L.A.Abrasion of coarse aggregates 20 c. Once mix design approved by City, maintain intent of mix design and 21 maximum water to cement ratio. 22 d. No concrete may be placed on the job site until the mix design has been 23 approved by the City. 24 2. Quality of Concrete 25 a. Consistency 26 1) In general,the consistency of concrete mixtures shall be such that: 27 a) Mortar shall cling to the coarse aggregate 28 b) Aggregate shall not segregate in concrete when it is transported to the 29 place of deposit 30 c) Concrete,when dropped directly from the discharge chute of the mixer, 31 shall flatten out at the center of the pile,but the edges of the pile shall 32 stand and not flow 33 d) Concrete and mortar shall show no free water when removed from the 34 mixer 35 e) Concrete shall slide and not flow into place when transported in metal 36 chutes at an angle of 30 degrees with the horizontal 37 f) Surface of the finished concrete shall be free from a surface film or 38 laitance 39 2) When field conditions are such that additional moisture is needed for the 40 final concrete surface finishing operation,the required water shall be 41 applied to the surface by hand sprayer only and be held to a minimum 42 amount. 43 3) The concrete shall be workable,cohesive,possess satisfactory finishing 44 qualities and be of the stiffest consistency that can be placed and vibrated 45 into a homogeneous mass. 46 4) Excessive bleeding shall be avoided. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321313-8 CONCRETE PAVING Page 8 of 22 1 5) If the strength or consistency required for the class of concrete being 2 produced is not secured with the minimum cement specified or without 3 exceeding the maximum water/cement ratio,the Contractor may use,or the 4 City may require, an approved cement dispersing agent(water reducer); or 5 the Contractor shall furnish additional aggregates, or aggregates with 6 different characteristics,or the Contractor may use additional cement in 7 order to produce the required results. 8 6) The additional cement may be permitted as a temporary measure,until 9 aggregates are changed and designs checked with the different aggregates 10 or cement dispersing agent. 11 7) The Contractor is solely responsible for the quality of the concrete 12 produced. 13 8) The City reserves the right to independently verify the quality of the 14 concrete through inspection of the batch plant,testing of the various 15 materials used in the concrete and by casting and testing concrete cylinders 16 or beams on the concrete actually incorporated in the pavement. 17 b. Standard Class 18 1) Unless otherwise shown on the Drawings or detailed specifications,the 19 standard class for concrete paving for streets and alleys is shown in the 20 following table: 21 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321313-9 CONCRETE PAVING Page 9 of 22 1 Standard Classes of Pavement Concrete Class of Minimum 28 Day Min. Maximum Course Concrete' Cementitious, Compressive, Water/ Aggregate Lb./CY Strength Cementitious, Maximum psi Ratio Size inch P 1 517 3600 0.49 1-1/2 H 1 564 4500 1 0.45 1-1/2 2 1.All exposed horizontal concrete shall have entrained-air. 3 2.Minimum Compressive Strength Required. 4 5 2) Machine-Laid concrete: Class P 6 3) Hand-Laid concrete: Class H 7 c. High Early Strength Concrete(HES) 8 1) When shown on the Drawings or allowed,provide Class HES concrete for 9 very early opening of pavements area or leaveouts to traffic. 10 2) Design class HES to meet the requirements of class specified for concrete 11 pavement and a minimum compressive strength of 1,608 3,000ysi in-24 72 12 his,unless other early strength and time requirements are shown on the 13 Drawings allowed. 14 3) No strength overdesign is required. 15 16 Standard Classes of Pavement Concrete Class of Minimum 28 Day Min. Maximum Course Concrete' Cementitious Compressive Water/ Aggregate Lb./CY Strength2 Cementitious Maximum psi Ratio Size, inch HES 564 4500 0.45 1-1/2 17 18 d. Slump 19 1) Slump requirements for pavement and related concrete shall be as specified 20 in the following table: 21 22 Concrete Pavement Slump Requirements Concrete Use Recommended Maximum Design Acceptable and Placement Placement Slump, Slump, inch inch Slip-Form/Form-Riding Paving 1-1/2 3 Hand Formed Paving 4 5 Sidewalk,Curb and Gutter,Concrete 4 5 Valley Gutter and Other Miscellaneous Concrete 23 24 2) No concrete shall be permitted with slump in excess of the maximums 25 shown. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 32 13 13-10 CONCRETE PAVING Page 10 of 22 1 3) Any concrete mix failing to meet the above consistency requirements, 2 although meeting the slump requirements,shall be considered 3 unsatisfactory, and the mix shall be changed to correct such unsatisfactory 4 conditions. 5 PART 3- EXECUTION 6 3.1 INSTALLERS [NOT USED] 7 3.2 EXAMINATION [NOT USED] 8 3.3 PREPARATION [NOT USED] 9 3.4 INSTALLATION 10 A. Equipment 11 1. All equipment necessary for the construction of this item shall be on the project. 12 2. The equipment shall include spreading devices(augers),internal vibration, 13 tamping,and surface floating necessary to finish the freshly placed concrete in such 14 a manner as to provide a dense and homogeneous pavement. 15 3. Machine-Laid Concrete Pavement 16 a. Fixed-Form Paver. Fixed-form paving equipment shall be provided with forms 17 that are uniformly supported on a very firm subbase to prevent sagging under 18 the weight of machine. 19 b. Slip-Form Paver 20 1) Slip-form paving equipment shall be provided with traveling side forms of 21 sufficient dimensions,shape and strength so as to support the concrete 22 laterally for a sufficient length of time during placement. 23 2) City may reject use of Slip-Form Paver if paver requires over-digging and 24 impacts trees,mailboxes or other improvements. 25 4. Hand-Laid Concrete Pavement 26 a. Machines that do not incorporate these features,such as roller screeds or 27 vibrating screeds, shall be considered tools to be used in hand-laid concrete 28 construction,as slumps,spreading methods,vibration,and other procedures are 29 more common to hand methods than to machine methods. 30 5. City may reject equipment and stop operation if equipment does not meet 31 requirements. 32 B. Concrete Mixing and Delivery 33 1. Transit Batching: shall not be used—onsite mixing not permitted 34 2. Ready Mixed Concrete 35 a. The concrete shall be produced in an approved method conforming to the 36 requirements of this specification and ASTM C94/C94M. City shall have access 37 ready mix to get samples of materials. 38 b. City shall have access to ready mix plant to obtain material samples. 39 c. When ready-mix concrete is used, sample concrete per ASTM C94 Alternate 40 Procedure 2: 41 1) As the mixer is being emptied,individual samples shall be taken after the 42 discharge of approximately 15 percent and 85 percent of the load. CrrY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 32 13 13-11 CONCRETE PAVING Page 11 of 22 1 2) The method of sampling shall provide that the samples are representative of 2 widely separated portions,but not from the very ends of the batch. 3 d. The mixing of each batch,after all materials are in the drum, shall continue until 4 it produces a thoroughly mixed concrete of uniform mass as determined by 5 established mixer performance ratings and inspection,or appropriate uniformity 6 tests as described in ASTM C94. 7 e. The entire contents of the drum shall be discharged before any materials are 8 placed therein for the succeeding batch. 9 f. Retempering or remixing shall not be permitted. 10 3. Delivery 11 a. Deliver concrete at an interval not exceeding 30 minutes or as determined by 12 City to prevent cold joint. 13 4. Delivery Tickets 14 a. For all operations,the manufacturer of the concrete shall,before unloading, 15 furnish to the purchaser with each batch of concrete at the site a delivery ticket 16 on which is printed, stamped,or written,the following information to determine 17 that the concrete was proportioned in accordance with the approved mix design: 18 1) Name of concrete supplier 19 2) Serial number of ticket 20 3) Date 21 4) Truck number 22 5) Name of purchaser 23 6) Specific designation of job(name and location) 24 7) Specific class,design identification and designation of the concrete in 25 conformance with that employed in job specifications 26 8) Amount of concrete in cubic yards 27 9) Time loaded or of first mixing of cement and aggregates 28 10) Water added by receiver of concrete 29 11) Type and amount of admixtures 30 C. Subgrade 31 1. When manipulation or treatment of subgrade is required on the Drawings,the work 32 shall be performed in proper sequence with the preparation of the subgrade for 33 pavement. 34 2. The roadbed shall be excavated and shaped in conformity with the typical sections 35 and to the lines and grades shown on the Drawings or established by the City. 36 3. All holes,ruts and depressions shall be filled and compacted with suitable material 37 and,if required,the subgrade shall be thoroughly wetted and reshaped. 38 4. Irregularities of more than 1/2 inch.,as shown by straightedge or template, shall be 39 corrected. 40 5. The subgrade shall be uniformly compacted to at least 95 percent of the maximum 41 density as determined by ASTM D698. 42 6. Moisture content shall be within minus 2 percent to plus 4 percent of optimum. 43 7. The prepared subgrade shall be wetted down sufficiently in advance of placing the 44 pavement to ensure its being in a firm and moist condition. 45 8. Sufficient subgrade shall be prepared in advance to ensure satisfactory prosecution 46 of the work. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 3213 13-12 CONCRETE PAVING Page 12 of 22 1 9. The Contractor shall notify the City at least 24 hours in advance of its intention to 2 place concrete pavement. 3 10. After the specified moisture and density are achieved,the Contractor shall maintain 4 the subgrade moisture and density in accordance with this Section. 5 11. In the event that rain or other conditions may have adversely affected the condition 6 of the subgrade or base,additional tests may be required as directed by the City. 7 D. Placing and Removing Forms 8 1. Placing Forms 9 a. Forms for machine-laid concrete 10 1) The side forms shall be metal,of approved cross section and bracing, of a 11 height no less than the prescribed edge thickness of the concrete section, 12 and a minimum of 10 feet in length for each individual form. 13 2) Forms shall be of ample strength and staked with adequate number of pins 14 capable of resisting the pressure of concrete placed against them and the 15 thrust and the vibration of the construction equipment operating upon them 16 without appreciable springing, settling or deflection. 17 3) The forms shall be free from warps,bends or kinks and shall show no 18 variation from the true plane for face or top. 19 4) Forms shall be jointed neatly and tightly and set with exactness to the 20 established grade and alignment. 21 5) Forms shall be set to line and grade at least 200 feet,where practicable,in 22 advance of the paving operations. 23 6) In no case shall the base width be less than 8 inches for a form 8 inches or 24 more in height. 25 7) Forms must be in firm contact with the subgrade throughout their length 26 and base width. 27 8) If the subgrade becomes unstable,forms shall be reset,using heavy stakes 28 or other additional supports may be necessary to provide the required 29 stability. 30 b. Forms for hand-laid concrete 31 1) Forms shall extend the full depth of concrete and be a minimum of 1-1/2 32 inches in thickness or equivalent when wooden forms are used, or be of a 33 gauge that shall provide equivalent rigidity and strength when metal forms 34 are used. 35 2) For curves with a radius of less than 250 feet,acceptable flexible metal or 36 wood forms shall be used. 37 3) All forms showing a deviation of 1/8 inch in 10 feet from a straight line 38 shall be rejected. 39 2. Settling. When forms settle over 1/8 inch under finishing operations,paving 40 operations shall be stopped the forms reset to line and grade and the pavement then 41 brought to the required section and thickness. 42 3. Cleaning. Forms shall be thoroughly cleaned after each use. 43 4. Removal. 44 a. Forms shall remain in place until the concrete has taken its final set. 45 b. Avoid damage to the edge of the pavement when removing forms. 46 c. Repair damage resulting from form removal and honeycombed areas with a 47 mortar mix within 24 hours after form removal unless otherwise approved. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 3213 13-13 CONCRETE PAVING Page 13 of 22 1 d. Clean joint face and repair honeycombed or damaged areas within 24 hours 2 after a bulkhead for a transverse construction joint has been removed unless 3 otherwise approved. 4 e. When forms are removed before 72 hours after concrete placement,promptly 5 apply membrane curing compound to the edge of the concrete pavement. 6 E. Placing Reinforcing Steel,Tie,and Dowel Bars 7 1. General 8 a. When reinforcing steel tie bars,dowels,etc.,are required they shall be placed 9 as shown on the Drawings. 10 b. All reinforcing steel shall be clean,free from rust in the form of loose or 11 objectionable scale,and of the type, size and dimensions shown on the 12 Drawings. 13 c. Reinforcing bars shall be securely wired together at the alternate intersections 14 and all splices and shall be securely wired at each intersection dowel and load- 15 transmission unit intersected. 16 d. All bars shall be installed in their required position as shown on the Drawings. 17 e. The storing of reinforcing or structural steel on completed roadway slabs 18 generally shall be avoided and, where permitted, such storage shall be limited 19 to quantities and distribution that shall not induce excessive stresses. 20 2. Splices 21 a. Provide standard reinforcement splices by lapping and tying ends. 22 b. Comply with ACI 318 for minimum lap of spliced bars where not specified on 23 the Drawings. 24 3. Installation of Reinforcing Steel 25 a. All reinforcing bars and bar mats shall be installed in the slab at the required 26 depth below the finished surface and supported by and securely attached to bar 27 chairs installed on prescribed longitudinal and transverse centers as shown by 28 sectional and detailed drawings on the Drawings. 29 b. Chairs Assembly. The chair assembly shall be similar and equal to that shown 30 on the Drawings and shall be approved by the City prior to extensive 31 fabrication. 32 c. After the reinforcing steel is securely installed above the subgrade as specified 33 in Drawings and as herein prescribed,no loading shall be imposed upon the 34 bar mats or individual bars before or during the placing or finishing of the 35 concrete. 36 4. Installation of Dowel Bars 37 a. Install through the predrilled joint filler and rigidly support in true horizontal 38 and vertical positions by an assembly of bar chairs and dowel baskets. 39 b. Dowel Baskets 40 1) The dowels shall be held in position exactly parallel to surface and 41 centerline of the slab,by a dowel basket that is left in the pavement. 42 2) The dowel basket shall hold each dowel in exactly the correct position so 43 firmly that the dowel's position cannot be altered by concreting operations. 44 c. Dowel Caps 45 1) Install cap to allow the bar to move not less than 1-1/4 inch in either 46 direction. 47 5. Tie Bar and Dowel Placement 48 a. Place at mid-depth of the pavement slab,parallel to the surface. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 32 13 13-14 CONCRETE PAVING Page 14 of 22 1 b. Place as shown on the Drawings. 2 6. Epoxy for Tie and Dowel Bar Installation 3 1) Epoxy bars as shown on the Drawings. 4 2) Use only drilling operations that do not damage the surrounding operations. 5 3) Blow out drilled holes with compressed air. 6 4) Completely fill the drilled hole with approved epoxy before inserting the tie 7 bar into the hole. 8 5) Install epoxy grout and bar at least 6 inches embedded into concrete. 9 F. Joints 10 1. Joints shall be placed where shown on the Drawings or where directed by the City. 11 2. The plane of all joints shall make a right angle with the surface of the pavement. 12 3. No joints shall have an error in alignment of more than 1/2 inch at any point. 13 4. Joint Dimensions 14 a. The width of the joint shall be shown on the Drawings,creating the joint 15 sealant reservoir. 16 b. The depth of the joint shall be shown on the Drawings. 17 c. Dimensions of the sealant reservoir shall be in accordance with manufacturer's 18 recommendations. 19 d. After curing,the joint sealant shall be 1/8 inch to 1/4 inch below the pavement 20 surface at the center of the joint. 21 5. Transverse Expansion Joints 22 a. Expansion joints shall be installed perpendicularly to the surface and to the 23 centerline of the pavement at the locations shown on the Drawings,or as 24 approved by the City. 25 b. Joints shall be of the design width,and spacing shown on the Drawings,or as 26 approved by the City. 27 c. Dowel bars, shall be of the size and type shown on the Drawings, or as 28 approved by the City, and shall be installed at the specified spacing. 29 d. Support dowel bars with dowel baskets. 30 e. Dowels shall restrict the free opening and closing of the expansion join and 31 shall not make planes of weaknesses in the pavement. 32 f. Greased Dowels for Expansion Joints. 33 1) Coat dowels with a thin film of grease or other approved de-bonding 34 material. 35 2) Provide dowel caps on the lubricated end of each dowel bar. 36 g. Proximity to Existing Structures. When the pavement is adjacent to or around 37 existing structures,expansions joints shall be constructed in accordance with 38 the details shown on the Drawings. 39 6. Transverse Contraction Joints 40 a. Contraction or dummy joints shall be installed at the locations and at the 41 intervals shown on the Drawings. 42 b. Joints shall be of the design width,and spacing shown on the Drawings,or as 43 approved by the City. 44 c. Dowel bars,shall be of the size and type shown on the Drawings,or as 45 approved by the City, and shall be installed at the specified spacing. 46 d. Joints shall be sawed into the completed pavement surface as soon after initial 47 concrete set as possible so that some raveling of the concrete is observed in 48 order for the sawing process to prevent uncontrolled shrinkage cracking. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 3213 13-15 CONCRETE PAVING Page 15 of 22 1 e. The joints shall be constructed by sawing to a 1/4 inch width and to a depth of 2 1/3 inch(1/4 inch permitted if limestone aggregate used)of the actual 3 pavement thickness,or deeper if so indicated on the Drawings. 4 f. Complete sawing as soon as possible in hot weather conditions and within a 5 maximum of 24 hours after saw cutting begins under cool weather conditions. 6 g. If sharp edge joints are being obtained,the sawing process shall be sped up to 7 the point where some raveling is observed. 8 h. Damage by blade action to the slab surface and to the concrete immediately 9 adjacent to the joint shall be minimized. 10 i. Any portion of the curing membrane which has been disturbed by sawing 11 operations shall be restored by spraying the areas with additional curing 12 compound. 13 7. Transverse Construction Joints 14 a. Construction joints formed at the close of each day's work or when the placing 15 of concrete has been stopped for 30-minutes or longer shall be constructed by 16 use of metal or wooden bulkheads cut true to the section of the finished 17 pavement and cleaned. 18 b. Wooden bulkheads shall have a thickness of not less than 2-inch stock material. 19 c. Longitudinal bars shall be held securely in place in a plane perpendicular to the 20 surface and at right angles to the centerline of the pavement. 21 d. Edges shall be rounded to 1/4 inch radius. 22 e. Any surplus concrete on the subgrade shall be removed upon the resumption of 23 the work. 24 8. Longitudinal Construction Joints 25 a. Longitudinal construction joints shall be of the type shown on the Drawings. 26 9. Joint Filler 27 a. Joint filler shall be as specified in 2.2.I of the size and shape shown on the 28 Drawings. 29 b. Redwood Board joints shall be used for all pavement joints except for 30 expansion joints that are coincident with a butt joint against existing 31 pavements. 32 c. Boards with less than 25-percent of moisture at the time of installation shall be 33 thoroughly wetted on the job. 34 d. Green lumber of much higher moisture content is desirable and acceptable. 35 e. The joint filler shall be appropriately drilled to admit the dowel bars when 36 required. 37 f. The bottom edge of the filler shall extend to or slightly below the bottom of the 38 slab. The top edge shall be held approximately 1/2 inch below the finished 39 surface of the pavement in order to allow the finishing operations to be 40 continuous. 41 g. The joint filler may be composed of more than one length of board in the 42 length of joint,but no board of a length less than 6 foot may be used unless 43 otherwise shown on the Drawings. 44 h. After the removal of the side forms,the ends of the joints at the edges of the 45 slab shall be carefully opened for the entire depth of the slab. 46 10. Joint Sealing. Routine pavement joints shall be filled consistent with paving details 47 and as specified in Section 32 13 73. Materials shall generally be handled and 48 applied according to the manufacturer's recommendations as specified in Section 49 32 13 73. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 3213 13-16 CONCRETE PAVING Page 16 of 22 1 G. Placing Concrete 2 1. Unless otherwise specified in the Drawings,the finished pavement shall be 3 constructed monolithically and constructed by machined laid method unless 4 impractical. 5 2. The concrete shall be rapidly deposited on the subgrade in successive batches and 6 shall be distributed to the required depth and for the entire width of the pavement 7 by shoveling or other approved methods. 8 3. Any concrete not placed as herein prescribed within the time limits in the following 9 table will be rejected. Time begins when the water is added to the mixer. 10 Tem erature—Time Requirements Concrete Temperature Max Time—minutes Max Time—minutes (at point ofplacement) (no retarding a ent) (with retarding agent)' Non-Agitated Concrete All temperatures 45 45 Agitated Concrete Above 90°F Time may be reduced by 75 Cit Above 75°F thru 90°F 60 90 75°F and Below 60 120 11 1 Normal dosage of retarder. 12 13 4. Rakes shall not be used in handling concrete. 14 5. At the end of the day,or in case of unavoidable interruption or delay of more than 15 30 minutes or longer to prevent cold joints,a transverse construction joint shall be 16 placed in accordance with 3.4.F.7 of this Section. 17 6. Honeycombing 18 a. Special care shall be taken in placing and spading the concrete against the 19 forms and at all joints and assemblies so as to prevent honeycombing. 20 b. Excessive voids and honeycombing in the edge of the pavement,revealed by 21 the removal of the side forms, may be cause for rejection of the section of slab 22 in which the defect occurs. 23 H. Finishing 24 1. Machine 25 a. Tolerance Limits 26 1) While the concrete is still workable,it shall be tested for irregularities with 27 a 10 foot straightedge placed parallel to the centerline of the pavement so as 28 to bridge depressions and to touch all high spots. 29 2) Ordinates measured from the face of the straightedge to the surface of the 30 pavement shall at no place exceed 1/16 inch-per-foot from the nearest point 31 of contact. 32 3) In no case shall the maximum ordinate to a 10 foot straightedge be greater 33 than 1/8 inch. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 32 13 13-17 CONCRETE PAVING Page 17 of 22 1 4) Any surface not within the tolerance limits shall be reworked and 2 refinished. 3 b. Edging 4 1) The edges of slabs and all joints requiring edging shall be carefully tooled 5 with an edger of the radius required by the Drawings at the time the 6 concrete begins to take its"set"and becomes non-workable. 7 2) All such work shall be left smooth and true to lines. 8 2. Hand 9 a. Hand finishing permitted only in intersections and areas inaccessible to a 10 finishing machine. 11 b. When the hand method of striking off and consolidating is permitted,the 12 concrete,as soon as placed, shall be approximately leveled and then struck off 13 with screed bar to such elevation above grade that, when consolidated and 14 finished, the surface of the pavement shall be at the grade elevation shown on 15 the Drawings. 16 c. A slight excess of material shall be kept in front of the cutting edge at all times. 17 d. The straightedge and joint finishing shall be as prescribed herein. 18 I. Curing 19 1. The curing of concrete pavement shall be thorough and continuous throughout the 20 entire curing period. 21 2. Failure to provide proper curing as herein prescribed shall be considered as 22 sufficient cause for immediate suspension of the paving operations. 23 3. The curing method as herein specified does not preclude the use of any of the other 24 commonly used methods of curing,and the City may approve another method of 25 curing if so requested by the Contractor. 26 4. If any selected method of curing does not afford the desired results,the City shall 27 have the right to order that another method of curing be instituted. 28 5. After removal of the side forms,the sides of the slab shall receive a like coating 29 before earth is banked against them. 30 6. The solution shall be applied,under pressure with a spray nozzle, in such a manner 31 as to cover the entire surfaces thoroughly and completely with a uniform film. 32 7. The rate of application shall be such as to ensure complete coverage and shall not 33 exceed 20-square-yards-per-gallon of curing compound. 34 8. When thoroughly dry,it shall provide a continuous and flexible membrane,free 35 from cracks or pinholes, and shall not disintegrate,check,peel or crack during the 36 curing period. 37 9. If for any reason the seal is broken during the curing period,it shall be immediately 38 repaired with additional sealing solution. 39 10. When tested in accordance with ASTM C156 Water Retention by Concrete Curing 40 Materials,the curing compound shall provide a film which shall have retained 41 within the test specimen a percentage of the moisture present in the specimen when 42 the curing compound was applied according to the following. 43 11. Contractor shall maintain and properly repair damage to curing materials on 44 exposed surfaces of concrete pavement continuously for a least 72 hours. 45 J. Monolithic Curbs CrrY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 3213 13-18 CONCRETE PAVING Page 18 of 22 1 1. Concrete for monolithic curb shall be the same as for the pavement and,if carried 2 back from the paving mixer,shall be placed within 20-minutes after being mixed. 3 2. After the concrete has been struck off and sufficiently set,the exposed surfaces 4 shall be thoroughly worked with a wooden flat. 5 3. The exposed edges shall be rounded by the use of an edging tool to the radius 6 indicated on the Drawings. 7 4. All exposed surfaces of curb shall be brushed to a smooth and uniform surface. 8 K. Alley Paving 9 1. Alley paving shall be constructed in accordance with the specifications for concrete 10 paving hereinbefore described,in accordance with the details shown on the 11 Drawings,and with the following additional provisions: 12 a. Alley paving shall be constructed to the typical cross sections shown on the 13 Drawings. 14 b. Transverse expansion joints of the type shown on the Drawings shall be 15 constructed at the property line on each end of the alley with a maximum 16 spacing of 600 feet. 17 c. Transverse contraction and dummy joints shall be placed at the spacing shown 18 on the Drawings. 19 d. Contraction and dummy joints shall be formed in such a manner that the 20 required joints shall be produced to the satisfaction of the City. 21 e. All joints shall be constructed in accordance with this specification and filled 22 in accordance with the requirement of Section 32 13 73. 23 L. Pavement Leaveouts 24 1. Pavement leaveouts as necessary to maintain and provide for local traffic shall be 25 provided at location indicated on the Drawings or as directed by the City. 26 2. The extent and location of each leaveout required and a suitable crossover 27 connection to provide for traffic movements shall be determined in the field by the 28 City. 29 3.5 REPAIR 30 A. Repair of concrete pavement concrete shall be consistent with the Drawings and as 31 specified in Section 32 0129. 32 3.6 RE-INSTALLATION [NOT USED] 33 3.7 SITE QUALITY CONTROL 34 A. Concrete Placement 35 1. Place concrete using a fully automated paving machine. Hand paving only 36 permitted in areas such as intersections where use of paving machine is not 37 practical 38 a. All concrete pavement not placed by hand shall be placed using a fully 39 automated paving machine as approved by the City. 40 b. Screeds will not be allowed except if approved by the City. 41 B. Testing of Materials 42 1. Samples of all materials for test shall be made at the expense of the City,unless 43 otherwise specified in the special provisions or in the Drawings. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321313-19 CONCRETE PAVING Page 19 of 22 1 2. In the event the initial sampling and testing does not comply with the specifications, 2 all subsequent testing of the material in order to determine if the material is 3 acceptable shall be at the Contractor's expense at the same rate charged by the 4 commercial laboratories. 5 3. All testing shall be in accordance with applicable ASTM Standards and concrete 6 testing technician must be ACI certified or equivalent. 7 C. Pavement Thickness Test 8 1. Upon completion of the work and before final acceptance and final payment shall 9 be made,pavement thickness test shall be made by the City. 10 2. The number of tests and location shall be at the discretion of the City, unless 11 otherwise specified in the special provisions or on the Drawings. 12 3. The cost for the initial pavement thickness test shall be the expense of the City. 13 4. In the event a deficiency in the thickness of pavement is revealed during normal 14 testing operations, subsequent tests necessary to isolate the deficiency shall be at 15 the Contractor's expense. 16 5. The cost for additional coring test shall be at the same rate charged by commercial 17 laboratories. 18 6. Where the average thickness of pavement in the area found to be deficient in 19 thickness by more than 0.20 inch,but not more than 0.50 inch,payment shall be 20 made at an adjusted price as specified in the following table. 21 Deficiency in Thickness Proportional Part Determined by Cores Of Contract Price Inches Allowed 0.00-0.20 100 percent 0.21-0.30 80 percent 0.31-0.40 70 percent 0.41-0.50 60 percent 22 23 7. Any area of pavement found deficient in thickness by more than 0.50 inch but not 24 more than 0.75 inch or 1/10 of the thickness specified on the Drawings, whichever 25 is greater, shall be evaluated by the City. 26 8. If,in the judgment of the City the area of such deficiency should not be removed 27 and replaced,there shall be no payment for the area retained. 28 9. If,in the judgment of the City,the area of such deficiency warrants removal,the 29 area shall be removed and replaced,at the Contractor's entire expense,with 30 concrete of the thickness shown on the Drawings. 31 10. Any area of pavement found deficient in thickness by more than 0.75 inch or more 32 than 1/10 of the plan thickness,whichever is greater, shall be removed and 33 replaced,at the Contractor's entire expense,with concrete of the thickness shown 34 on the Drawings. 35 11. No additional payment over the contract unit price shall be made for any pavement 36 of a thickness exceeding that required by the Drawings. 37 D. Pavement Strength Test CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321313-20 CONCRETE PAVING Page 20 of 22 1 1. During the progress of the work the City shall provide trained technicians to cast 2 test cylinders for conforming to ASTM C31,to maintain a check on the 3 compressive strengths of the concrete being placed. 4 2. After the cylinders have been cast,they shall remain on the job site and then 5 transported,moist cured,and tested by the City in accordance with ASTM C31 and 6 ASTM C39. 7 3. In each set, 1 of the cylinders shall be tested at 2 DAYS/3 DAYS,TWO 8 CYLINDERS SHALL BE TESTED AT 7 days;two cylinders shall be tested at 28 9 days. ,if fleeaessffy. 10 4. IF 2 DAYS/3 DAYS TEST RESULT INDICATE DEFICIENT STRENGTH,THE 11 OPENING OF PAVEMENT TO TRAFFIC SHALL NOT BE PERMITTED AND 12 PROJECT INSPECTOR MAY ASK THE CONTRACTOR TO RESUBMIT THE 13 CONCRETE MIX DESIGN TO MEET THE MINIMUM SPECIFIED 14 STRENGTH.If the 28 day test results indicate deficient strength,the Contractor 15 may,at its option and expense,core the pavement in question and have the cores 16 tested by an approved laboratory,in accordance with ASTM C42 and ACI 318 17 protocol,except the average of all cores must meet 100 percent of the minimum 18 specified strength, with no individual core resulting in less than 90 percent of 19 design strength,to override the results of the cylinder tests. 20 5. Cylinders and/or cores must meet minimum specified strength. If cylinders do not 21 meet minimum specified strength,additional cores shall be taken to identify the 22 limits of deficient concrete pavement at the expense of the Contractor. 23 6. Cylinders and/or cores must meet minimum specified strength. Pavement not 24 meeting the minimum specified strength shall be subject to the money penalties or 25 removal and placement at the Contractor's expense as show in the following table. 26 Percent Deficient Percent of Contract Price Allowed Greater Than 0 percent-Not More Than 10 percent 90-percent Greater Than 10 percent-Not More Than 15 percent 80-percent Greater Than 15 percent 0-percent or removed and replaced at the entire cost and expense of Contractor as directed by Cit 27 28 7. The amount of penalty shall be deducted from payment due to Contractor; such as 29 penalty deducted is to defray the cost of extra maintenance. 30 8. The strength requirements for structures and other concrete work are not altered by 31 the special provision. 32 9. No additional payment over the contract unit price shall be made for any pavement 33 of strength exceeding that required by the Drawings and/or specifications. 34 E. Cracked Concrete Acceptance Policy 35 1. If cracks exist in concrete pavement upon completion of the project,the Project 36 Inspector shall make a determination as to the need for action to address the 37 cracking as to its cause and recommended remedial work. 38 2. If the recommended remedial work is routing and sealing of the cracks to protect 39 the subgrade,the Inspector shall make the determination as to whether to rout and 40 seal the cracks at the time of final inspection and acceptance or at any time prior to 41 the end of the project maintenance period. The Contractor shall perform the routing 42 and sealing work as directed by the Project Inspector,at no cost to the City, 43 regardless of the cause of the cracking. CTP]'OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 3213 13-21 CONCRETE PAVING Page 21 of 22 1 3. If remedial work beyond routing and sealing is determined to be necessary,the 2 Inspector and the Contractor will attempt to agree on the cause of the cracking. If 3 agreement is reached that the cracking is due to deficient materials or workmanship, 4 the Contractor shall perform the remedial work at no cost to the City. Remedial 5 work in this case shall be limited to removing and replacing the deficient work with 6 new material and workmanship that meets the requirements of the contract. 7 4. If remedial work beyond routing and sealing is determined to be necessary,and the 8 Inspector and the Contractor agree that the cause of the cracking is not deficient 9 materials or workmanship,the City may request the Contractor to provide an 10 estimate of the cost of the necessary remedial work and/or additional work to 11 address the cause of the cracking,and the Contractor will perform that work at the 12 agreed-upon price if the City elects to do so. 13 5. If remedial work is necessary,and the Inspector and the Contractor cannot agree on 14 the cause of the cracking,the City may hire an independent geotechnical engineer 15 to perform testing and analysis to determine the cause of the cracking. The 16 contractor will escrow 50 percent of the proposed costs of the geotechnical contract 17 with the City. The Contractor and the City shall use the services of a geotechnical 18 firm acceptable to both parties. 19 6. If the geotechnical engineer determines that the primary cause of the cracking is the 20 Contractor's deficient material or workmanship, the remedial work will be 21 performed at the Contractor's entire expense and the Contractor will also reimburse 22 the City for the balance of the cost of the geotechnical investigation over and above 23 the amount that has previously been escrowed. Remedial work in this case shall be 24 limited to removing and replacing the deficient work with new material and 25 workmanship that meets the requirements of the contract. 26 7. If the geotechnical engineer determines that the primary cause of the cracking is not 27 the Contractor's deficient material or workmanship,the City will return the 28 escrowed funds to the Contractor. The Contractor,on request,will provide the City 29 an estimate of the costs of the necessary remedial work and/or additional work and 30 will perform the work at the agreed-upon price as directed by the City. 31 3.8 SYSTEM STARTUP[NOT USED] 32 3.9 ADJUSTING[NOT USED] 33 3.10 CLEANING[NOT USED] 34 3.11 CLOSEOUT ACTIVITIES [NOT USED] 35 3.12 PROTECTION [NOT USED] 36 3.13 MAINTENANCE[NOT USED] 37 3.14 ATTACHMENTS [NOT USED] 38 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321313-22 CONCRETE PAVING Page 22 of 22 1 END OF SECTION 2 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 1.2.A—Modified items to be included in price bid 05/21/2014 Doug Rademaker 2.2.D—Modified to clarify acceptable fly ash substitution in concrete paving 3 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321320-1 CONCRETE SIDEWALKS,DRIVEWAYS AND BARRIER FREE RAMPS Page 1 of 5 1 SECTION 3213 20 2 CONCRETE SIDEWALKS,DRIVEWAYS AND BARRIER FREE RAMPS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Concrete sidewalks 7 2. Driveways 8 3. Barrier free ramps 9 B. Deviations from this City of Fort Worth Standard Specification 10 1. None. 11 C. Related Specification Sections include,but are not necessarily limited to: 12 1. Division 0-Bidding Requirements,Contract Forms, and Conditions of the Contract 13 2. Division 1 -General Requirements 14 3. Section 02 41 13-Selective Site Demolition 15 4. Section 32 13 13 -Concrete Paving 16 5. Section 32 13 73 -Concrete Paving Joint Sealants 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Concrete Sidewalk 20 a. Measurement 21 1) Measurement for this Item shall be by the square foot of completed and 22 accepted Concrete Sidewalk in its final position for various: 23 a) Thicknesses 24 b) Types 25 b. Payment 26 1) The work performed and materials furnished in accordance with this Item 27 and measured as provided under"Measurement" will be paid for at the unit 28 price bid per square foot of Concrete Sidewalk. 29 c. The price bid shall include: 30 1) Excavating and preparing the subgrade 31 2) Furnishing and placing all materials 32 2. Concrete Driveway 33 a. Measurement 34 1) Measurement for this Item shall be by the square foot of completed and 35 accepted Concrete Driveway in its final position for various: 36 a) Thicknesses 37 b) Types 38 2) Dimensions will be taken from the back of the projected curb,including the 39 area of the curb radii and will extend to the limits specified in the 40 Drawings. 41 3) Sidewalk portion of drive will be included in driveway measurement. 42 4) Curb on drive will be included in the driveway measurement. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised April 30,2013 321320-2 CONCRETE SIDEWALKS,DRIVEWAYS AND BARRIER FREE RAMPS Page 2 of 5 1 b. Payment 2 1) The work performed and materials furnished in accordance with this Item 3 and measured as provided under"Measurement"will be paid for at the unit 4 price bid per square foot of Concrete Driveway. 5 c. The price bid shall include: 6 1) Excavating and preparing the subgrade 7 2) Furnishing and placing all materials 8 3. Barrier Free Ramps 9 a. Measurement 10 1) Measurement for this Item shall be per each Barrier Free Ramp completed 11 and accepted for various: 12 a) Types 13 b. Payment 14 1) The work performed and materials furnished in accordance with this Item 15 and measured as provided under"Measurement"will be paid for at the unit 16 price bid per each"Barrier Free Ramp"installed. 17 c. The price bid shall include: 18 1) Excavating and preparing the subgrade 19 2) Furnishing and placing all materials 20 3) Curb Ramp 21 4) Landing and detectable warning surface as shown on the Drawings 22 5) Adjacent flares or side curb 23 1.3 REFERENCES 24 A. Abbreviations and Acronyms 25 1. TAS—Texas Accessibility Standards 26 2. TDLR—Texas Department of Licensing and Regulation 27 B. Reference Standards 28 1. Reference standards cited in this Specification refer to the current reference 29 standard published at the time of the latest revision date logged at the end of this 30 Specification,unless a date is specifically cited. 31 2. American Society for Testing and Materials(ASTM) 32 a. D545,Test Methods for Preformed Expansion Joint Fillers for Concrete 33 Construction(Non-extruding and Resilient Types) 34 b. D698,Test Methods for Laboratory Compaction Characteristics of Soil Using 35 Standard Effort(12,400 ft-lbf/ft3) 36 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 37 1.5 SUBMITTALS [NOT USED] 38 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS 39 A. Mix Design: submit for approval. Section 32 13 13. 40 B. Product Data: submit product data and sample for pre-cast detectable wanting for 41 barrier free ramp. 42 1.7 CLOSEOUT SUBMITTALS[NOT USED] 43 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised April 30,2013 321320-3 CONCRETE SIDEWALKS,DRIVEWAYS AND BARRIER FREE RAMPS Page 3 of 5 1 1.9 QUALITY ASSURANCE [NOT USED] 2 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 3 1.11 FIELD CONDITIONS 4 A. Weather Conditions: Placement of concrete shall be as specified in Section 32 13 13. 5 1.12 WARRANTY [NOT USED] 6 PART 2 - PRODUCTS 7 2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 8 2.2 EQUIPMENT AND MATERIALS 9 A. Forms: wood or metal straight,free from warp and of a depth equal to the thickness of 10 the finished work. 11 B. Concrete: see Section 32 13 13. 12 1. Unless otherwise shown on the Drawings or detailed specifications,the standard 13 class for concrete sidewalks,driveways and barrier free ramps is shown in the 14 following table: 15 Standard Classes of Pavement Concrete Class of Minimum 28 Day Min. Maximum Course Concrete' Cementitious, Compressive Water/ Aggregate Lb./CY Strength Cementitious Maximum psi Ratio Size, inch A 470 3000 0.58 1-1/2 16 C. Reinforcement: see Section 32 13 13. 17 1. Sidewalk,driveway and barrier free ramp reinforcing steel shall be#3 deformed 18 bars at 18 inches on-center-both-ways at the center plane of all slabs,unless 19 otherwise shown on the Drawings or detailed specifications. 20 D. Joint Filler 21 1. Wood Filler: see Section 32 13 13. 22 2. Pre-Molded Asphalt Board Filler 23 a. Use only in areas where not practical for wood boards. 24 b. Pre-molded asphalt board filler: ASTM D545. 25 c. Install the required size and uniform thickness and as specified in Drawings. 26 d. Include 2 liners of 0.016 asphalt impregnated kraft paper filled with a mastic 27 mixture of asphalt and vegetable fiber and/or mineral filler. 28 E. Expansion Joint Sealant: see Section 32 13 73 where shown on the Drawings. 29 2.3 ACCESSORIES [NOT USED] 30 2.4 SOURCE QUALITY CONTROL[NOT USED] 31 PART 3- EXECUTION 32 3.1 INSTALLERS [NOT USED] 33 3.2 EXAMINATION [NOT USED] CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised April 30,2013 321320-4 CONCRETE SIDEWALKS,DRIVEWAYS AND BARRIER FREE RAMPS Page 4 of 5 1 3.3 PREPARATION 2 A. Surface Preparation 3 1. Excavation: Excavation required for the construction of sidewalks,driveways and 4 barrier free ramps shall be to the lines and grades as shown on the Drawings or as 5 established by the City. 6 2. Fine Grading 7 a. The Contractor shall do all necessary filling,leveling and fine grading required 8 to bring the subgrade to the exact grades specified and compacted to at least 90 9 percent of maximum density as determined by ASTM D698. 10 b. Moisture content shall be within minus 2 to plus 4 of optimum. 11 c. Any over-excavation shall be repaired to the satisfaction of the City. 12 B. Demolition/Removal 13 1. Sidewalk,Driveway and/or Barrier Free Ramp Removal: see Section 02 41 13. 14 3.4 INSTALLATION 15 A. General 16 1. Concrete sidewalks shall have a minimum thickness of 4 inches. 17 2. Sidewalks constructed in driveway approach sections shall have a minimum 18 thickness equal to that of driveway approach or as called for by Drawings and 19 specifications within the limits of the driveway approach. 20 3. Driveways shall have a minimum thickness of 6 inches. Standard cross-slopes for 21 walks shall be 2 percent max in accordance with current TAS/TDLR guidelines. 22 The construction of the driveway approach shall include the variable height radius 23 curb in accordance with the Drawings. 24 4. All pedestrian facilities shall comply with provisions of TAS including location, 25 slope,width, shapes,texture and coloring. Pedestrian facilities installed by the 26 Contractor and not meeting TAS must be removed and replaced to meet TAS(no 27 separate pay). 28 B. Forms: Forms shall be securely staked to line and grade and maintained in a true 29 position during the depositing of concrete. 30 C. Reinforcement: see Section 32 13 13. 31 D. Concrete Placement: see Section 32 13 13. 32 E. Finishing 33 1. Concrete sidewalks,driveways and barrier free ramps shall be finished to a true, 34 even surface. 35 2. Trowel and then brush transversely to obtain a smooth uniform brush finish. 36 3. Provide exposed aggregate finish if specified. 37 4. Edge joints and sides shall with suitable tools. 38 F. Joints 39 1. Expansion joints for sidewalks,driveways and barrier free ramps shall be formed 40 using redwood. 41 2. Expansion joints shall be placed at 40 foot intervals for 4 foot wide sidewalk and 50 42 foot intervals for 5 foot wide and greater sidewalk. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised April 30,2013 321320-5 CONCRETE SIDEWALKS,DRIVEWAYS AND BARRIER FREE RAMPS Page 5 of 5 1 3. Expansion joints shall also be placed at all intersections, sidewalks with concrete 2 driveways,curbs,formations,other sidewalks and other adjacent old concrete work. 3 Similar material shall be placed around all obstructions protruding into or through 4 sidewalks or driveways. 5 4. All expansion joints shall be 1/2 inch in thickness. 6 5. Edges of all construction and expansion joints and outer edges of all sidewalks shall 7 be finished to approximately a 1/2 inch radius with a suitable finishing tool. 8 6. Sidewalks shall be marked at intervals equal to the width of the walk with a 9 marking tool. 10 7. When sidewalk is against the curb,expansion joints shall match those in the curb. 11 G. Barrier Free Ramp 12 1. Furnish and install brick red color pre-cast detectable warning Dome-Tile, 13 manufactured by StrongGo Industries or approved equal by the City. 14 2. Detectable warning surface shall be a minimum of 24-inch in depth in the direction 15 of pedestrian travel,and extend to a minimum of 48-inch along the curb ramp or 16 landing where the pedestrian access route enters the street. 17 3. Locate detectable warning surface so that the edge nearest the curb line is a 18 minimum of 6-inch and maximum of 8-inch from the extension of the face of the 19 curb. 20 4. Detectable warning Dome-Tile surface may be curved along the corner radius. 21 5. Install detectable warning surface according to manufacturer's instructions. 22 3.5 REPAIR/RESTORATION[NOT USED] 23 3.6 RE-INSTALLATION[NOT USED] 24 3.7 FIELD QUALITY CONTROL [NOT USED] 25 3.8 SYSTEM STARTUP[NOT USED] 26 3.9 ADJUSTING[NOT USED] 27 3.10 CLEANING[NOT USED] 28 3.11 CLOSEOUT ACTIVITIES [NOT USED] 29 3.12 PROTECTION [NOT USED] 30 3.13 MAINTENANCE [NOT USED] 31 3.14 ATTACHMENTS [NOT USED] 32 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.2.A.3—Measurement and Payment for Barrier Free Ramps modified to match updated City Details 4/30/2013 F.Griffin Corrected Part 1,1.2,A,3,b,1 to read;from...square foot of Concrete Sidewalk. to...each"Barrier Free Ramp installed. 33 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised April 30,2013 321373-1 CONCRETE PAVING JOINT SEALANTS Page 1 of 5 1 SECTION 3213 73 2 CONCRETE PAVING JOINT SEALANTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Specification for silicone joint sealing for concrete pavement and curbs. 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. FOR TFUS PROJECT CONCRFTF PAWING RYINI'SF.AI-ANTS SECTION 32 9 13 73 SHA1.I, 13E P A Y13LL f-'OR 41 A1.IN(r CO R'1 ESE J()INT ON' EXIS TING 10 PA VE�vIENT ONLY. SEAL]N6 JOIIN'F ON RI-PLACE[)C()N('R171? 1"AV INC, 11 SIIAL,L BE C:ONSIDERFD SUBSIDIARY -r() CONCRLTL PA INC SECT]0N 12 32, 13 13, 13 Amw.SAAI, G. CLI`AN T C AN,L) APPLYING .IC)INT SI:AL A_NTS UPON PI-AC'ING 14 I' RO N 1.7 B A FCE 1 BPEA .ER"-'APE SHAJ.T 13FSIv13S[I)IAIZY TO 15 4rJ44 1T 16 C. Related Specification Sections include,but are not necessarily limited to: 17 1. Division 0-Bidding Requirements,Contract Forms,and Conditions of the Contract 18 2. Division 1 -General Requirements 19 3. Section 32 13 13-Concrete Paving 20 1.2 PRICE AND PAYMENT PROCEDURES 21 A. Measurement and Payment 22 1. Measurement 23 a. Measurement for this Item shall be by the linear foot of Joint Sealant completed 24 and accepted only FOR COURTESY JOINT ON EXISTING PAVEMENT 25 26 2. Payment 27 3. The work performed and materials furnished in accordance with this Item WILL 28 BE PAID FOR AT THE UNIT PRICE BID PER LINEAR FOOT OF"JOINT 29 SEALANT"COMPLETED 30 eemponsatien will be allowed,efiless spoeifieaUy speeified on PffiWifigs. . 31 SUBSIDIARY WORK AND MATERIALS INCLUDE: 32 a. SAWING JOINTS 33 b. CLEANING JOINTS 34 c. APPLYING JOINT SEALANTS UPON PLACING OF BOND BREAKER 35 ROD AND BREAKER TAPE 36 d. FURNISHING AND INSTALLING ALL MATERIALS 37 e. ALL MANIPULATIONS, LABOR,EQUIPMENT, APPLIANCES,TOOLS, 38 AND INCIDENTALS NECESSARY TO COMPLETE THE WORK. 39 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321373-2 CONCRETE PAVING JOINT SEALANTS Page 2 of 5 1 1.3 REFERENCES 2 A. Reference Standards 3 1. Reference standards cited in this Specification refer to the current reference 4 standard published at the time of the latest revision date logged at the end of this 5 Specification,unless a date is specifically cited. 6 2. ASTM International(ASTM): 7 a. D5893, Standard Specification for Cold Applied,Single Component, 8 Chemically Curing Silicone Joint Sealant for Portland Cement Concrete 9 Pavements 10 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 11 1.5 ACTION SUBMITTALS [NOT USED] 12 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 13 A. Test and Evaluation Reports 14 1. Prior to installation,furnish certification by an independent testing laboratory that 15 the silicone joint sealant meets the requirements of this Section. 16 2. Submit verifiable documentation that the manufacturer of the silicone joint sealant 17 has a minimum 2-year demonstrated,documented successful field performance 18 with concrete pavement silicone joint sealant systems. 19 1.7 CLOSEOUT SUBMITTALS [NOT USED] 20 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 21 1.9 QUALITY ASSURANCE [NOT USED] 22 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 23 1.11 FIELD CONDITIONS 24 A. Do not apply joint sealant when the air and pavement temperature is less than 35 25 degrees F 26 B. Concrete surface must be clean,dry and frost free. 27 C. Do not place sealant in an expansion-type joint if surface temperature is below 35 28 degrees F or above 90 degrees F. 29 1.12 WARRANTY [NOT USED] 30 PART 2- PRODUCTS 31 2.1 OWNER FURNISHED PRODUCTS [NOT USED] 32 2.2 MATERIALS &EQUIPMENT 33 A. Materials 34 1. Joint Sealant: ASTM D5893. 35 2. Joint Filler, Backer Rod and Breaker Tape CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321373-3 CONCRETE PAVING JOINT SEALANTS Page 3 of 5 1 a. The joint filler sop shall be of a closed cell expanded polyethylene foam backer 2 rod and polyethylene bond breaker tape of sufficient size to provide a tight seal. 3 b. The back rod and breaker tape shall be installed in the saw-cut joint to prevent 4 the joint sealant from flowing to the bottom of the joint. 5 c. The backer rod and breaker tape shall be compatible with the silicone joint 6 sealant and no bond or reaction shall occur between them. 7 2.3 ACCESSORIES [NOT USED] 8 2.4 SOURCE QUALITY CONTROL[NOT USED] 9 PART 3- EXECUTION 10 3.1 INSTALLERS [NOT USED] 11 3.2 EXAMINATION [NOT USED] 12 3.3 PREPARATION [NOT USED] 13 3.4 INSTALLATION 14 A. General 15 1. The silicone sealant shall be cold applied. 16 2. Allow concrete to cure for a minimum of 7 days to ensure it has sufficient strength 17 prior to sealing joints. 18 3. Perform joint reservoir saw cutting,cleaning,bond breaker installation,and joint 19 sealant placement in a continuous sequence of operations. 20 4. See Drawings for the various joint details with their respective dimensions. 21 B. Equipment 22 1. Provide all necessary equipment and keep equipment in a satisfactory working 23 condition. 24 2. Equipment shall be inspected by the City prior to the beginning of the work. 25 3. The minimum requirements for construction equipment shall be as follows: 26 a. Concrete Saw. The sawing equipment shall be adequate in size and power to 27 complete the joint sawing to the required dimensions. 28 b. Air Compressors. The delivered compressed air shall have a pressure in excess 29 of 90 psi and shall be suitable for the removal of all free water and oil from the 30 compressed air. 31 c. Extrusion Pump. The output shall be capable of supplying a sufficient volume 32 of sealant to the joint. 33 d. Injection Tool. This mechanical device shall apply the sealant uniformly into 34 the joint. 35 e. Sandblaster. The design shall be for commercial use with air compressors as 36 specified in this Section. 37 f. Backer Rod Roller and Tooling Instrument. These devices shall be clean and 38 free of contamination. They shall be compatible with the joint depth and width 39 requirements. 40 C. Sawing Joints: see Section 32 13 13. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321373-4 CONCRETE PAVING JOINT SEALANTS Page 4 of 5 1 D. Cleaning joints 2 1. Dry saw in 1 direction with reverse cutting blade then sand blast. 3 2. Use compressed air to remove the resulting dust from the joint. 4 3. Sandblast joints after complete drying. 5 a. Attach nozzle to a mechanical aiming device so that the sand blast will be 6 directed at an angle of 45 degrees and at a distance of 1 to 2 inches from the 7 face of the joint. 8 b. Sandblast both joint faces sandblasted in separate, 1 directional passes. 9 c. When sandblasting is complete,blow-out using compressed air. 10 d. The blow tube shall fit into the joints. 11 4. Check the blown joint for residual dust or other contamination. 12 a. If any dust or contamination is found,repeat sandblasting and blowing until the 13 joint is cleaned. 14 b. Do not use solvents to remove stains and contamination. 15 5. Place the bond breaker and sealant in the joint immediately upon cleaning. 16 6. Bond Breaker Rod and Tape: install in the cleaned joint prior to the application of 17 the joint sealant. 18 7. Do not leave open,cleaned joints unsealed overnight. 19 E. Joint Sealant 20 1. Apply the joint sealant upon placement of the bond breaker rod and tape,using the 21 mechanical injection tool. 22 2. Do not seal joints unless they are clean and dry. 23 3. Remove and discard excess sealant left on the pavement surface. 24 a. Do not excess use to seal the joints. 25 4. The pavement surface shall present a clean final condition as determined by City. 26 5. Do not allow traffic on the fresh sealant until it becomes tack-free. 27 F. Approval of Joints 28 1. The City may request a representative of the sealant manufacturer to be present at 29 the job site at the beginning of the final cleaning and sealing of joints. 30 a. The representative shall demonstrate to the Contractor and the City the 31 acceptable method for sealant installation. 32 b. The representative shall approve the clean,dry joints before the sealing 33 operation commences. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321373-5 CONCRETE PAVING JOINT SEALANTS Page 5 of 5 1 3.5 REPAIR/RESTORATION[NOT USED] 2 3.6 RE-INSTALLATION[NOT USED] 3 3.7 FIELD QUALITY CONTROL [NOT USED] 4 3.8 SYSTEM STARTUP[NOT USED] 5 3.9 ADJUSTING [NOT USED] 6 3.10 CLEANING [NOT USED] 7 3.11 CLOSEOUT ACTIVITIES [NOT USED] 8 3.12 PROTECTION[NOT USED] 9 3.13 MAINTENANCE [NOT USED] 10 3.14 ATTACHMENTS [NOT USED] 11 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 13 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 321723-1 PAVEMENT MARKINGS Page 1 of 11 1 SECTION 3217 23 2 PAVEMENT MARKINGS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Pavement Markings 7 a. Thermoplastic,hot-applied, spray(HAS)pavement markings 8 b. Thermoplastic,hot-applied,extruded(RAE)pavement markings 9 c. Preformed polymer tape 10 d. Preformed heat-activated thermoplastic tape 11 2. Raised markers 12 3. Work zone markings 13 4. Removal of pavement markings and markers 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include,but are not necessarily limited to: 17 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 18 2. Division 1 —General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Pavement Markings 22 a. Measurement 23 1) Measurement for this Item shall be per linear foot of material placed. 24 b. Payment 25 1) The work performed and materials furnished in accordance with this Item 26 and measured as provided under"Measurement"shall be paid for at the 27 unit price bid per linear foot of"Pvmt Marking"installed for: 28 a) Various Widths 29 b) Various Types 30 c) Various Materials 31 d) Various Colors 32 c. The price bid shall include: 33 1) Installation of Pavement Marking 34 2) Glass beads,when required 35 3) Surface preparation 36 4) Clean-up 37 5) Testing(when required) 38 2. Legends 39 a. Measurement 40 1) Measurement for this Item shall be per each Legend installed. 41 b. Payment CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 321723-2 PAVEMENT MARKINGS Page 2 of 11 1 1) The work performed and materials furnished in accordance with this Item 2 shall be paid for at the unit price bid per each"Legend"installed for: 3 a) Various types 4 b) Various applications 5 c. The price bid shall include: 6 1) Installation of Pavement Marking 7 2) Glass beads, when required 8 3) Surface preparation 9 4) Clean-up 10 5) Testing 11 3. Raised Markers 12 a. Measurement 13 1) Measurement for this Item shall be per each Raised Marker installed. 14 b. Payment 15 1) The work performed and materials furnished in accordance with this Item 16 shall be paid for at the unit price bid per each"Raised Marker"installed 17 for: 18 a) Various types 19 c. The price bid shall include: 20 1) Installation of Raised Markers 21 2) Surface preparation 22 3) Clean-up 23 4) Testing 24 4. Work Zone Tab Markers 25 a. Measurement 26 1) Measurement for this Item shall be per each Tab Marker installed. 27 b. Payment 28 1) The work performed and materials furnished in accordance with this Item 29 shall be paid for at the unit price bid per each"Tab Marker"installed for: 30 a) Various types 31 c. The price bid shall include: 32 1) Installation of Tab Work Zone Markers 33 5. Fire Lane Markings 34 a. Measurement 35 1) Measurement for this Item shall be per the linear foot. 36 b. Payment 37 1) The work performed and materials furnished in accordance with this Item 38 and measured as provided under"Measurement" shall be paid for at the 39 unit price bid per linear foot of"Fire Lane Marking"installed. 40 c. The price bid shall include: 41 1) Surface preparation 42 2) Clean-up 43 3) Testing 44 6. Pavement Marking Removal 45 a. Measurement 46 1) Measure for this Item shall be per linear foot. 47 b. Payment CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 321723-3 PAVEMENT MARKINGS Page 3 of 11 1 1) The work performed and materials furnished in accordance with this Item 2 and measured as provided under"Measurement" shall be paid for at the 3 unit price bid per linear foot of"Remove Pvmt Marking"performed for: 4 a) Various widths 5 c. The price bid shall include: 6 1) Removal of Pavement Markings 7 2) Clean-up 8 7. Raised Marker Removal 9 a. Measurement 10 1) Measurement for this Item shall be per each Pavement Marker removed. 11 b. Payment 12 1) The work performed and materials furnished in accordance with this Item 13 shall be paid for at the unit price bid per each"Remove Raised Marker" 14 performed. 15 c. The price bid shall include: 16 1) Removal of each Marker 17 2) Disposal of removed materials 18 3) Clean-up 19 8. Legend Removal 20 a. Measurement 21 1) Measure for this Item shall be per each Legend removed. 22 b. Payment 23 1) The work performed and materials furnished in accordance with this Item 24 and measured as provided under"Measurement"shall be paid for at the 25 unit price bid per linear foot of"Remove Legend"performed for: 26 a) Various types 27 b) Various applications 28 c. The price bid shall include: 29 1) Removal of Pavement Markings 30 2) Clean-up 31 1.3 REFERENCES 32 A. Reference Standards 33 1. Reference standards cited in this Specification refer to the current reference 34 standard published at the time of the latest revision date logged at the end of this 35 Specification,unless a date is specifically cited. 36 2. Texas Manual on Uniform Traffic Control Devices(MUTCD),2011 Edition 37 a. Part 3,Markings 38 3. American Association of State Highway and Transportation Officials(AASHTO) 39 a. Standard Specification for Glass Beads Used in Pavement Markings,M 247-09 40 4. Federal Highway Administration(FHWA) 41 a. 23 CFR Part 655,FHWA Docket No.FHWA-2009-0139 42 5. Texas Department of Transportation(TxDOT) 43 a. DMS-4200,Pavement Markers(Reflectorized) 44 b. DMS-4300,Traffic Buttons 45 c. DMS-8220,Hot Applied Thermoplastic 46 d. DMS-8240,Permanent Prefabricated Pavement Markings 47 e. DMS-8241,Removable Prefabricated Pavement Markings CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 321723-4 PAVEMENT MARKINGS Page 4 of 11 1 f. DMS-8242,Temporary Flexible-Reflective Road Marker Tabs 2 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 3 1.5 SUBMITTALS 4 A. Submittals shall be in accordance with Section 0133 00. 5 B. All submittals shall be approved by the City prior to delivery and/or fabrication for 6 specials. 7 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 8 1.7 CLOSEOUT SUBMITTALS [NOT USED] 9 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 10 1.9 QUALITY ASSURANCE [NOT USED] 11 1.10 DELIVERY,STORAGE,AND HANDLING 12 A. Storage and Handling Requirements 13 1. The Contractor shall secure and maintain a location to store the material in 14 accordance with Section 0150 00. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2- PRODUCTS 18 2.1 OWNER-SUPPLIED PRODUCTS 19 A. New Products 20 1. Refer to Drawings to determine if there are owner-supplied products for the Project. 21 2.2 MATERIALS 22 A. Manufacturers 23 1. Only the manufacturers as listed in the City's Standard Products List will be 24 considered as shown in Section 0160 00. 25 a. The manufacturer must comply with this Specification and related Sections. 26 2. Any product that is not listed on the Standard Products List is considered a 27 substitution and shall be submitted in accordance with Section 0125 00. 28 B. Materials 29 1. Pavement Markings 30 a. Thermoplastic,hot applied, spray 31 1) Refer to Drawings and City Standard Detail Drawings for width of 32 longitudinal lines. 33 2) Product shall be especially compounded for traffic markings. 34 3) When placed on the roadway,the markings shall not be slippery when wet, 35 lift from pavement under normal weather conditions nor exhibit a tacky 36 exposed surface. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 321723-5 PAVEMENT MARKINGS Page 5 of 11 1 4) Cold ductility of the material shall permit normal road surface expansion 2 and contraction without chipping or cracking. 3 5) The markings shall retain their original color,dimensions and placement 4 under normal traffic conditions at road surface temperatures of 158 degrees 5 Fahrenheit and below. 6 6) Markings shall have uniform cross-section,clean edges, square ends and no 7 evidence of tracking. 8 7) The density and quality of the material shall be uniform throughout the 9 markings. 10 8) The thickness shall be uniform throughout the length and width of the 11 markings. 12 9) The markings shall be 95 percent free of holes and voids,and free of 13 blisters for a minimum of 60 days after application. 14 10) The material shall not deteriorate by contact with sodium chloride,calcium 15 chloride or other chemicals used to prevent roadway ice or because of the 16 oil content of pavement markings or from oil droppings or other effects of 17 traffic. 18 11) The material shall not prohibit adhesion of other thermoplastic markings if, 19 at some future time,new markings are placed over existing material. 20 a) New material shall bond itself to the old line in such a manner that no 21 splitting or separation takes place. 22 12) The markings placed on the roadway shall be completely retroreflective 23 both internally and externally with traffic beads and shall exhibit uniform 24 retro-directive reflectance. 25 13) Traffic beads 26 a) Manufactured from glass 27 b) Spherical in shape 28 c) Essentially free of sharp angular particles 29 d) Essentially free of particles showing cloudiness,surface scoring or 30 surface scratching 31 e) Water white in color 32 f) Applied at a uniform rate 33 g) Meet or exceed Specifications shown in AASHTO Standard 34 Specification for Glass Beads Used in Pavement Markings,AASHTO 35 Designation: M 247-09. 36 b. Thermoplastic,hot applied,extruded 37 1) Product shall be especially compounded for traffic markings 38 2) When placed on the roadway,the markings shall not be slippery when wet, 39 lift from pavement under normal weather conditions nor exhibit a tacky 40 exposed surface. 41 3) Cold ductility of the material shall permit normal road surface expansion 42 and contraction without chipping or cracking. 43 4) The markings shall retain their original color,dimensions and placement 44 under normal traffic conditions at road surface temperatures of 158 degrees 45 Fahrenheit and below. 46 5) Markings shall have uniform cross-section,clean edges, square ends and no 47 evidence of tracking. 48 6) The density and quality of the material shall be uniform throughout the 49 markings. Cn'Y OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 321723-6 PAVEMENT MARKINGS Page 6 of 11 1 7) The thickness shall be uniform throughout the length and width of the 2 markings. 3 8) The markings shall be 95 percent free of holes and voids,and free of 4 blisters for a minimum of 60 days after application. 5 9) The minimum thickness of the marking,as measured above the plane 6 formed by the pavement surface, shall not be less than 1/8 inch in the center 7 of the marking and 3/32 inch at a distance of t/2 inch from the edge. 8 10)Maximum thickness shall be 3/16 inch. 9 11) The material shall not deteriorate by contact with sodium chloride,calcium 10 chloride or other chemicals used to prevent roadway ice or because of the 11 oil content of pavement markings or from oil droppings or other effects of 12 traffic. 13 12) The material shall not prohibit adhesion of other thermoplastic markings if, 14 at some future time,new markings are placed over existing material. New 15 material shall bond itself to the old line in such a manner that no splitting or 16 separation takes place. 17 13) The markings placed on the roadway shall be completely retroreflective 18 both internally and externally with traffic beads and shall exhibit uniform 19 retro-directive reflectance. 20 14) Traffic beads 21 a) Manufactured from glass 22 b) Spherical in shape 23 c) Essentially free of sharp angular particles 24 d) Essentially free of particles showing cloudiness,surface scoring or 25 surface scratching 26 e) Water white in color 27 f) Applied at a uniform rate 28 g) Meet or exceed Specifications shown in AASHTO Standard 29 Specification for Glass Beads Used in Pavement Markings,AASHTO 30 Designation:M 247-09. 31 c. Preformed Polymer Tape 32 1) Material shall meet or exceed the Specifications for SWARCO Director 35, 33 3M High Performance Tape Series 3801 ES,or approved equal. 34 d. Preformed Heat-Activated Thermoplastic Tape 35 1) Material shall meet or exceed the Specifications for HOT Tape Brand 0.125 36 mil preformed thermoplastic or approved equal. 37 2. Raised Markers 38 a. Markers shall meet the requirements of the Texas Manual on Uniform Traffic 39 Control Devices. 40 b. Non-reflective markers shall be Type Y(yellow body)and Type W(white 41 body)round ceramic markers and shall meet or exceed the TxDOT 42 Specification DMS-4300. 43 c. The reflective markers shall be plastic,meet or exceed the TxDOT 44 Specification DMS-4200 for high-volume retroreflective raised markers and be 45 available in the following types: 46 1) Type I-C,white body, 1 face reflects white 47 2) Type 11-A-A,yellow body,2 faces reflect amber 48 3) Type II-C-R,white body, 1 face reflects white,the other red 49 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 321723-7 PAVEMENT MARKINGS Page 7 of 11 1 3. Work Zone Markings 2 a. Tabs 3 1) Temporary flexible-reflective roadway marker tabs shall meet requirements 4 of TxDOT DMS-8242,"Temporary Flexible-Reflective Road Marker 5 Tabs." 6 2) Removable markings shall not be used to simulate edge lines. 7 3) No segment of roadway open to traffic shall remain without permanent 8 pavement markings for a period greater than 14 calendar days. 9 b. Raised Markers 10 1) All raised pavement markers shall meet the requirements of DMS-4200. 11 c. Striping 12 1) Work Zone striping shall meet or exceed the TxDOT Specification DMS- 13 8200. 14 2.3 ACCESSORIES [NOT USED] 15 2.4 SOURCE QUALITY CONTROL 16 A. Performance 17 1. Minimum maintained retroreflectivity levels for longitudinal markings shall meet 18 the requirements detailed in the table below for a minimum of 30 calendar days. Posted Speed(m h) <_30 35-50 >55 2-lane roads with centerline n/a 100 250 markings only(1) All other roads(2) n/a 50 100 19 (1)Measured at standard 30-m geometry in units of mcd/m/tux. 20 (2)Exceptions: 21 A.When raised reflective pavement markings(RRPMs)supplement or substitute for a 22 longitudinal line,minimum pavement marking retroreflectivity levels are not applicable as 23 long as the RRPMs are maintained so that at least 3 are visible from any position along that 24 line during nighttime conditions. 25 B.When continuous roadway lighting assures that the markings are visible,minimum 26 pavement marking retroreflectivity levels are not applicable. 27 PART 3- EXECUTION 28 3.1 EXAMINATION [NOT USED] 29 3.2 PREPARATION 30 A. Pavement Conditions 31 1. Roadway surfaces shall be free of dirt,grease,loose and/or flaking existing 32 markings and other forms of contamination. 33 2. New Portland cement concrete surfaces shall be cleaned sufficiently to remove the 34 curing membrane. 35 3. Pavement to which material is to be applied shall be completely dry. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 321723-8 PAVEMENT MARKINGS Page 8 of 11 1 4. Pavement shall be considered dry,if, on a sunny day after observation for 15 2 minutes,no condensation develops on the underside of a 1 square foot piece of 3 clear plastic that has been placed on the pavement and weighted on the edges. 4 5. Equipment and methods used for surface preparation shall not damage the 5 pavement or present a hazard to motorists or pedestrians. 6 3.3 INSTALLATION 7 A. General 8 1. The materials shall be applied according to the manufacturer's recommendations. 9 2. Markings and markers shall be applied within temperature limits recommended by 10 the material manufacturer,and shall be applied on clean,dry pavement having a 11 surface temperature above 50 degrees Fahrenheit. 12 3. Markings that are not properly applied due to faulty application methods or being 13 placed in the wrong position or alignment shall be removed and replaced by the 14 Contractor at the Contractor's expense. If the mistake is such that it would be 15 confusing or hazardous to motorists,it shall be remedied the same day of 16 notification. Notification will be made by phone and confirmed by fax. Other 17 mistakes shall be remedied within 5 days of written notification. 18 4. When markings are applied on roadways open to traffic,care will be taken to 19 ensure that proper safety precautions are followed,including the use of signs, 20 cones,barricades,flaggers,etc. 21 5. Freshly applied markings shall be protected from traffic damage and disfigurement. 22 6. Temperature of the material must be equal to the temperature of the road surface 23 before allowing traffic to travel on it. 24 B. Pavement Markings 25 1. Thermoplastic,hot applied,spray 26 a. This method shall be used to install and replace long lines—centerlines,lane 27 lines,edge lines,turn lanes,and dots. 28 b. Markings shall be applied at a 110 mil thickness. 29 c. Markings shall be applied at a 90 mil thickness when placed over existing 30 markings. 31 d. A sealer shall be used if concrete or asphalt is older than three(3)years. 32 e. Typical setting time shall be between 4 minutes and 10 minutes depending 33 upon the roadway surface temperature and the humidity factor. 34 f. Retroreflective raised markers shall be used to supplement the centerlines,lane 35 lines,and turn lanes. Refer to City Standard Detail Drawings for placement. 36 g. Minimum retroreflectivity of markings shall meet or exceed values shown in 37 subparagraph 2.4.A.1 of this Specification. 38 2. Thermoplastic,hot applied,extruded 39 a. This method shall be used to install and replace crosswalks and stop-lines. 40 b. Markings shall be applied at a 125 mil thickness. 41 c. Minimum retroreflectivity of markings shall meet or exceed values shown in 42 this Specification. 43 3. Preformed Polymer Tape 44 a. This method shall be used to install and replace crosswalks, stop-lines,and 45 legends. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 321723-9 PAVEMENT MARKINGS Page 9 of 11 1 b. The applied marking shall adhere to the pavement surface with no slippage or 2 lifting and have square ends, straight lines and clean edges. 3 c. Minimum retroreflectivity of markings shall meet or exceed values shown in 4 this Specification. 5 4. Preformed Heat-Activated Thermoplastic Tape 6 a. This method shall be used to install and replace crosswalks, stop-lines,and 7 legends. 8 b. The applied marking shall adhere to the pavement surface with no slippage or 9 lifting and have square ends, straight lines and clean edges. 10 c. Minimum retroreflectivity of markings shall meet or exceed values shown in 11 this Specification. 12 C. Raised Markers 13 1. All permanent raised pavement markers on Portland Cement roadways shall be 14 installed with epoxy adhesive. Bituminous adhesive is not acceptable. 15 2. All permanent raised pavement markers on new asphalt roadways may be installed 16 with epoxy or bituminous adhesive. 17 3. A chalk line,chain or equivalent shall be used during layout to ensure that 18 individual markers are properly aligned. All markers shall be placed uniformly 19 along the line to achieve a smooth continuous appearance. 20 D. Work Zone Markings 21 1. Work shall be performed with as little disruption to traffic as possible. 22 2. Install longitudinal markings on pavement surfaces before opening to traffic. 23 3. Maintain lane alignment traffic control devices and operations until markings are 24 installed. 25 4. Install markings in proper alignment in accordance with the Texas MUTCD and as 26 shown on the Drawings. 27 5. Place standard longitudinal lines no sooner than 3 calendar days after the placement 28 of a surface treatment,unless otherwise shown on the Drawings. 29 6. Place markings in proper alignment with the location of the final pavement 30 markings. 31 7. Do not use raised pavement markers for words, symbols, shapes, or diagonal or 32 transverse lines. 33 8. All markings shall be visible from a distance of 300 feet in daylight conditions and 34 from a distance of at least 160 feet in nighttime conditions,illuminated by low- 35 beam automobile headlight. 36 9. The daytime and nighttime reflected color of the markings must be distinctly white 37 or yellow. 38 10. The markings must exhibit uniform retroreflective characteristics. 39 11. Epoxy adhesives shall not be used to work zone markings. 40 3.4 REMOVALS 41 1. Pavement Marking and Marker Removal 42 a. The industry's best practice shall be used to remove existing pavement 43 markings and markers. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 321723-10 PAVEMENT MARKINGS Page 10 of 11 1 b. If the roadway is being damaged during the marker removal,Work shall be 2 halted until consultation with the City. 3 c. Removals shall be done in such a matter that color and texture contrast of the 4 pavement surface will be held to a minimum. 5 d. Repair damage to asphaltic surfaces, such as spalling, shelling,etc.,greater than 6 1/a inch in depth resulting from the removal of pavement markings and markers. 7 Driveway patch asphalt emulsion may be broom applied to reseal damage to 8 asphaltic surfaces. 9 e. Dispose of markers in accordance with federal, state, and local regulations. 10 f. Use any of the following methods unless otherwise shown on the Drawings. 11 1) Surface Treatment Method 12 a) Apply surface treatment at rates shown on the Drawings or as directed. 13 Place a surface treatment a minimum of 2 feet wide to cover the 14 existing marking. 15 b) Place a surface treatment,thin overlay,or microsurfacing a minimum 16 of 1 lane in width in areas where directional changes of traffic are 17 involved or in other areas as directed by the City. 18 2) Burn Method 19 a) Use an approved burning method. 20 b) For thermoplastic pavement markings or prefabricated pavement 21 markings,heat may be applied to remove the bulk of the marking 22 material prior to blast cleaning. 23 c) When using heat,avoid spalling pavement surfaces. 24 d) Sweeping or light blast cleaning may be used to remove minor residue. 25 3) Blasting Method 26 a) Use a blasting method such as water blasting,abrasive blasting,water 27 abrasive blasting,shot blasting, slurry blasting,water-injected abrasive 28 blasting, or brush blasting as approved. 29 b) Remove pavement markings on concrete surfaces by a blasting method 30 only. 31 4) Mechanical Method 32 a) Use any mechanical method except grinding. 33 b) Flail milling is acceptable in the removal of markings on asphalt and 34 concrete surfaces. 35 2. If a location is to be paved over,no additional compensation will be allowed for 36 marking or marker removal. 37 3.5 REPAIR/RESTORATION[NOT USED] 38 3.6 RE-INSTALLATION[NOT USED] 39 3.7 FIELD QUALITY CONTROL 40 A. All lines must have clean edges,square ends,and be uniform cross-section. 41 B. The density and quality of markings shall be uniform throughout their thickness. 42 C. The applied markings shall have no more than 5 percent,by area,of holes or voids and 43 shall be free of blisters. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 32 17 23-11 PAVEMENT MARKINGS Page 11 of 11 1 3.8 SYSTEM STARTUP[NOT USED] 2 3.9 ADJUSTING[NOT USED] 3 3.10 CLEANING 4 A. Contractor shall clean up and remove all loose material resulting from construction 5 operations. 6 3.11 CLOSEOUT ACTIVITIES [NOT USED] 7 3.12 PROTECTION [NOT USED] 8 3.13 MAINTENANCE [NOT USED] 9 3.14 ATTACHMENTS [NOT USED] 10 END OF SECTION 11 Revision Log DATE NAME SUMMARY OF CHANGE 11/22/13 S.Arnold Removed paint type marking,updated references,added sealer language 12 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 321725-1 CURB ADDRESS PAINTING Page 1 of 3 1 SECTION 3217 25 2 CURB ADDRESS PAINTING 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Painting of house addresses on curb of driveway radiuses that are removed and 7 replaced as shown on the Drawings 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0-Bidding Requirements,Contract Forms,and Conditions of the 12 Contract. 13 2. Division 1 -General Requirements. 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Measurement 17 a. Measurement for this Item shall include two curb faces. Both curb faces shall 18 be paid for as a single bid item. 19 2. Payment 20 a. The work performed and the materials furnished in accordance with this Item 21 shall be paid for at the unit price bid per each"Curb Address Painting" 22 completed per address. 23 3. The price bid shall include: 24 a. Furnishing all labor,materials and equipment 25 b. Any incidentals necessary to complete Curb Address Painting 26 1.3 REFERENCES 27 A. Reference Standards 28 1. Reference standards cited in this Specification refer to the latest revision date 29 logged at the end of this Specification,unless a date is specifically cited. 30 1.4 —1.12[NOT USED] 31 PART 2- PRODUCTS 32 2.1 OWNER-FURNISHED[NOT USED] 33 2.2 EQUIPMENT,PRODUCT TYPES,MATERIALS 34 A. Materials 35 1. All materials shall be of recent product and suitable for its intended purpose. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Version November 4,2013 321725-2 CURB ADDRESS PAINTING Page 2 of 3 1 2. Background paint shall be 7100 Series 100%Acrylic Satin White paint 2 manufactured by Kwal Paint,or approved equal. 3 3. Lettering paint shall be 7100 Series 100%Acrylic Satin Black paint manufactured 4 by Kwal Paint,or approved equal. 5 B. Size Requirements 6 1. The minimum size for the background shall be 6-inches wide by 16-inches long, or 7 as directed in the Drawings. 8 2. The minimum size for letters shall be 4-inches high,or as directed in the Drawings. 9 2.3 ACCESSORIES[NOT USED] 10 2.4 SOURCE QUALITY CONTROL [NOT USED] 11 PART 3 - EXECUTION 12 3.1 INSTALLERS [NOT USED] 13 3.2 EXAMINATION[NOT USED] 14 3.3 PREPARATION 15 A. Surface Preparation 16 1. Provide surface preparation in accordance with manufacturer's recommendations. 17 B. Surface Conditions 18 1. Unless approved otherwise by the City, surface conditions must meet the following 19 minimum requirements: 20 a. Concrete has cured for a minimum of 28-days 21 b. Surface temperature greater than 50°F and less than 95°F 22 2. No work shall occur if weather conditions may harm or damage the final finished 23 surface. 24 3.4 APPLICATION 25 A. Apply in accordance with the manufacturer's recommendations. 26 B. Background Application 27 1. Apply the background with 3-or 4-inch roller with th-inch nap,unless otherwise 28 approved by the City. 29 C. Letter Application 30 1. Apply the lettering with 1-or th-inch artificial nylon or polyester or combination 31 brush and stencils,unless otherwise approved by the City. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Version November 4,2013 321725-3 CURB ADDRESS PAINTING Page 3 of 3 1 3.5 REPAIR/RESTORATION[NOT USED] 2 3.6 RE-INSTALLATION [NOT USED] 3 3.7 FIELD QUALITY CONTROL [NOT USED] 4 3.8 SYSTEM STARTUP [NOT USED] 5 3.9 ADJUSTING[NOT USED] 6 3.10 CLEANING[NOT USED] 7 3.11 CLOSEOUT ACTIVITIES [NOT USED] 8 3.12 PROTECTION [NOT USED] 9 3.13 MAINTENANCE [NOT USED] 10 3.14 ATTACHMENTS [NOT USED] 11 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 11/4/2013 Fred Griffin Clarified 1.2.A.La—to show bid item includes two curb faces. And 1.2.A.2.a— includes per address. 13 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Version November 4,2013 3291 19-1 TOPSOIL PLACEMENT AND FINISHING OF PARKWAYS Page 1 of 3 1 SECTION 32 9119 2 TOPSOIL PLACEMENT AND FINISHING OF PARKWAYS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Furnish and place topsoil to the depths and on the areas shown on the Drawings. 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. FOR THIS PROJT ("1- Fl,R I IIIN6. fIAI-r.r (_t, i.c)MAN6, AND I'LACI NC 9 TOf' SOIL BE1-1INI) Till= C'l..R11 S1IALL .131: C'C7NSII)L-R1_D S1F1#SID[Ali� 1'0 10 CONCRETE tIAVIN6 SLCTION 32. 13 13. 11 C. Related Specification Sections include but are not necessarily limited to 12 1. Division 0-Bidding Requirements,Contract Forms,and Conditions of the Contract 13 2. Division 1 -General Requirements 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment SUBSIDIARY TO CONCRETE PAVING 16 4—Measafefaeft 17 . 18 2. Payment 19 20 "will be paid for-at the unit pr-iee 21 22 b. All e*eavatiea f;e"ir-ed by this Rem in eut seetions shall be ffleaser-ed in 23 aeeerdanee with provisions fef the va6ees exeavatieft itefas involved with the 24 ,r-egaf&ess of the 25 manipulatiens invelved. 26 . 27 a. Famishing TOPS84 28 b. bead4fig 29 e. 14auh*g 30 d. P4 ig 31 1.3 REFERENCES [NOT USED] 32 1.4 ADMINISTRATIVE REQUIREMENTS[NOT USED] 33 1.5 ACTION SUBMITTALS [NOT USED] 34 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 35 1.7 CLOSEOUT SUBMITTALS [NOT USED] 36 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 37 1.9 QUALITY ASSURANCE [NOT USED] 38 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 39 1.11 FIELD [SITE] CONDITIONS [NOT USED] CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Proejct No.100630 Revised December 20,2012 3291 19-2 TOPSOIL PLACEMENT AND FINISHING OF PARKWAYS Page 2 of 3 1 1.12 WARRANTY [NOT USED] 2 PART 2- PRODUCTS 3 2.1 OWNER-FURNISHED[OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 4 2.2 MATERIALS 5 A. Topsoil 6 1. Use easily cultivated,fertile topsoil that: 7 a. Is free from objectionable material including subsoil,weeds,clay lumps,non- 8 soil materials,roots, stumps or stones larger than 1.5 inches 9 b. Has a high resistance to erosion 10 c. Is able to support plant growth 11 2. Secure topsoil from approved sources. 12 3. Topsoil is subject to testing by the City. 13 4. pH: 5.5 to 8.5. 14 5. Liquid Limit: 50 or less 15 6. Plasticity Index: 20 or less 16 7. Gradation: maximum of 10 percent passing No. 200 sieve 17 B. Water: Clean and free of industrial wastes and other substances harmful to the growth 18 of vegetation 19 2.3 ACCESSORIES [NOT USED] 20 2.4 SOURCE QUALITY CONTROL [NOT USED] 21 PART 3- EXECUTION 22 3.1 INSTALLERS [NOT USED] 23 3.2 EXAMINATION [NOT USED] 24 3.3 PREPARATION[NOT USED] 25 3.4 INSTALLATION 26 A. Finishing of Parkways 27 1. Smoothly shape parkways,shoulders,slopes,and ditches. 28 2. Cut parkways to finish grade prior to the placing of any improvements in or 29 adjacent to the roadway. 30 3. In the event that unsuitable material for parkways is encountered,extend the depth 31 of excavation in the parkways 6 inches and backfill with top soil. 32 4. Make standard parkway grade perpendicular to and draining to the curb line. 33 a. Minimum: 1l4 inch per foot 34 b. Maximum: 4:1 35 c. City may approve variations from these requirements in special cases. 36 5. Whenever the adjacent property is lower than the design curb grade and runoff 37 drains away from the street,the parkway grade must be set level with the top of the 38 curb. 39 6. The design grade from the parkway extends to the back of the walk line. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Proejct No.100630 Revised December 20,2012 3291 19-3 TOPSOIL PLACEMENT AND FINISHING OF PARKWAYS Page 3 of 3 1 7. From that point(behind the walk),the grade may slope up or down at maximum 2 slope of 4:1. 3 B. Placing of Topsoil 4 1. Spread the topsoil to a uniform loose cover at the thickness specified. 5 2. Place and shape the topsoil as directed. 6 3. Hand rake finish a minimum of 5 feet from all flatwork. 7 4. Tamp the topsoil with a light roller or other suitable equipment. 8 3.5 REPAIR/RESTORATION] [NOT USED] 9 3.6 RE-INSTALLATION[NOT USED] 10 3.7 FIELD QUALITY CONTROL[NOT USED] 11 3.8 SYSTEM STARTUP[NOT USED] 12 3.9 ADJUSTING[NOT USED] 13 3.10 CLEANING[NOT USED] 14 3.11 CLOSEOUT ACTIVITIES [NOT USED] 15 3.12 PROTECTION [NOT USED] 16 3.13 MAINTENANCE[NOT USED] 17 3.14 ATTACHMENTS [NOT USED] 18 END OF SECTION 19 Revision Log DATE NAME SUMMARY OF CHANGE 20 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Proejct No.100630 Revised December 20,2012 329213-1 HYDROMULCHING,SEEDING AND SODDING Page 1 of 8 1 SECTION 32 9213 2 HYDROMULCHING, SEEDING AND SODDING 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Furnishing and installing grass sod and permanent seeding as shown on Drawings, 7 or as directed. 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0-Bidding Requirements,Contract Forms, and Conditions of the Contract 12 2. Division 1 -General Requirements 13 3. Section 32 91 19—Topsoil Placement and Finishing of Parkways 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Block Sod Placement 17 a. Measurement 18 1) Measurement for this Item shall be by the square yard of Block Sod placed. 19 b. Payment 20 1) The work performed and materials furnished in accordance with this Item 21 and measured as provided under"Measurement"will be paid for at the unit 22 price bid per square yard of Block Sod placed. 23 c. The price bid shall include: 24 1) Furnishing and placing all sod 25 2) Rolling and tamping 26 3) Watering(until established) 27 4) Disposal of surplus materials 28 2. Seeding 29 a. Measurement 30 1) Measurement for this Item shall be by the square yard of Seed spread. 31 b. Payment 32 1) The work performed and materials furnished in accordance with this Item 33 and measured as provided under"Measurement"will be paid for at the unit 34 price bid per square yard of Seed placed for various installation methods. 35 c. The price bid shall include: 36 1) Furnishing and placing all Seed 37 2) Furnishing and applying water for seed fertilizer 38 3) Slurry and hydraulic mulching 39 4) Fertilizer 40 5) Watering and mowing(until established) 41 6) Disposal of surplus materials 42 3. Mowing 43 a. Measurement CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 329213-2 HYDROMULCHING,SEEDING AND SODDING Page 2 of 8 1 1) Measurement for this Item shall per each. 2 b. Payment 3 1) The work performed and materials furnished in accordance with this Item 4 and measured as provided under"Measurement"will be paid for at the unit 5 price bid per each. 6 1.3 REFERENCES [NOT USED] 7 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 8 1.5 ACTION SUBMITTALS [NOT USED] 9 1.6 INFORMATIONAL SUBMITTALS 10 A. Seed 11 1. Vendors' certification that seeds meet Texas State seed law including: 12 a. Testing and labeling for pure live seed(PLS) 13 b. Name and type of seed 14 2. All seed shall be tested in a laboratory with certified results presented to the City in 15 writing,prior to planting. 16 3. All seed to be of the previous season's crop and the date on the container shall be 17 within 12 months of the seeding date. 18 1.7 CLOSEOUT SUBMITTALS [NOT USED] 19 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 20 1.9 QUALITY ASSURANCE [NOT USED] 21 1.10 DELIVERY,STORAGE,AND HANDLING 22 A. Block Sod 23 1. Protect from exposure to wind, sun and freezing. 24 2. Keep stacked sod moist. 25 B. Seed 26 1. If using native grass or wildflower seed,seed must have been harvested within 100 27 miles of the construction site. 28 2. Each species of seed shall be supplied in a separate,labeled container for 29 acceptance by the City. 30 C. Fertilizer 31 1. Provide fertilizer labeled with the analysis. 32 2. Conform to Texas fertilizer law. 33 1.11 FIELD [SITE] CONDITIONS [NOT USED] 34 1.12 WARRANTY [NOT USED] 35 PART 2- PRODUCTS [NOT USED] 36 2.1 OWNER-FURNISHED PRODUCTS[NOT USED] 37 2.2 MATERIALS AND EQUIPMENT 38 A. Materials CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 329213-3 HYDROMULCHING,SEEDING AND SODDING Page 3 of 8 1 1. Block Sod 2 a. Sod Varieties(match existing if applicable) 3 1) "Stenotaphrum secundatum" (St.Augustine grass) 4 2) "Cynodon dactylon" (Common Bermudagrass) 5 3) "Buchloe dactyloides" (Buffalograss) 6 4) an approved hybrid of Common Bermudagrass 7 5) or an approved Zoysiagrass 8 b. Sod must contain stolons,leaf blades,rhizomes and roots. 9 c. Sod shall be alive,healthy and free of insects,disease, stones,undesirable 10 foreign materials and weeds and grasses deleterious to its growth or which 11 might affect its subsistence or hardiness when transplanted. 12 d. Minimum sod thickness: 3/4 inch 13 e. Maximum grass height: 2 inches 14 f. Acceptable growing beds 15 1) St.Augustine grass sod: clay or clay loam topsoil 16 2) Bermuda grasses and zoysia grasses: sand or sandy loam soils 17 g. Dimensions 18 1) Machine cut to uniform soil thickness. 19 2) Sod shall be of equal width and of a size that permits the sod to be lifted, 20 handled and rolled without breaking. 21 h. Broken or tom sod or sod with uneven ends shall be rejected. 22 2. Seed 23 a. General 24 1) Plant all seed at rates based on pure live seed(PLS) 25 a) Pure Live Seed(PLS)determined using the formula: 26 (1) Percent Pure Live Seed=Percent Purity x [(Percent Germination+ 27 Percent Firm or Hard Seed)+ 100] 28 2) Availability of Seed 29 a) Substitution of individual seed types due to lack of availability may be 30 permitted by the City at the time of planting. 31 b) Notify the City prior to bidding of difficulties locating certain species. 32 3) Weed seed 33 a) Not exceed ten percent by weight of the total of pure live seed(PLS) 34 and other material in the mixture 35 b) Seed not allowed: 36 (1) Johnsongrass 37 (2) Nutgrass seed 38 4) Harvest seed within 1-year prior to planting 39 b. Non-native Grass Seed 40 1) Plant between April 15 and September 10 41 Lbs. Common Name Botanical Name Purity Germination PLS/Acre (percent) (percent) 25 Bermuda(unhulled) cynodon dactylon 85 90 75 Bermuda(hulled) cynodon dactylon 95 90 42 43 2) Plant between September 10 and April 15 44 Lbs. Common Name Botanical Name Purity Germination PLS/Acre (percent) (percent) CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 329213-4 HYDROMULCHING,SEEDING AND SODDING Page 4 of 8 220 Rye Grass lolium multiflorum 85 90 75 Bermuda(unhulled) cynodon dactylon 95 90 1 2 c. Native Grass Seed 3 1) Plant between February 1 and October 1. 4 Lbs.PLS/Acre Common Name Botanical Name 1.6 Green Sprangletop Leptochloa dubia 5.5 Sideoats Grama* Bouteloua curtipendula 3.7 Little Bluestem* Schizachyrium scoparium 17.0 Buffalograss Buchloe dactyloides 1.8 Indian Grass* Sorghastrum nutans 0.5 Sand Lovegrass* Eragrostis trichodes 6.0 Big Bluestem Andropogon gerardii 8.0 Eastern Grama Tripscacum dactyloides 1.2 Blue Grama Bouteloua gracilis 1.8 Switchgrass Panicum virgatum 10.0 Prairie Wildrye* Elymus canadensis 5 6 d. Wildflower Seed 7 1) Plant between the following: 8 a) March 5 and May 31 9 b) September 1 and December 1 10 Lbs.PLS/Acre Common Name Botanical Name 3.0 Bush Sunflower Sinsia calva 5.0 Butterfly Weed Asclepias tuberosa 2.0 Clasping Coneflower* Rudbeckia amplexicaulis 3.0 Golden-Wave Coreopsis basalis 13.4 Illinois Bundleflower Desmanthus illinoensis 13.6 Partridge Pea Cassia fasciculata 2.0 Prairie Verbena Verbena bipinnatifida 8.0 Texas Yellow Star Lindheimeri texana 8.0 Winecup Callirhoe involcrata 2.0 Black-eyed Susan Rudbeckia hirta 18.0 Cutleaf Daisy Engelmannia pinnatifida 2.0 Obedient Plant Physostegia intermedia 3.0 Pitcher Sage Salvia azurea 2.0 Plains Coreopsis Coreopsis tinctoria 8.0 Scarlet Sage Salvia coccinea 11 *not to be planted within ten feet of a road or parking lot or within three feet of a 12 walkway 13 14 e. Temporary Erosion Control Seed 15 1) Consist of the sowing of cool season plant seeds. 16 3. Mulch 17 a. For use with conventional mechanical or hydraulic planting of seed. 18 b. Wood cellulose fiber produced from virgin wood or recycled paper-by-products 19 (waste products from paper mills or recycled newspaper). 20 c. No growth or germination inhibiting factors. 21 d. No more than ten percent moisture,air dry weight basis. 22 e. Additives: binder in powder form. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 329213-5 HYDROMULCHING,SEEDING AND SODDING Page 5 of 8 1 f. Form a strong moisture retaining mat. 2 4. Fertilizer 3 a. Acceptable condition for distribution 4 b. Applied uniformly over the planted area 5 c. Analysis 6 1) 16-20-0 7 2) 16-8-8 8 d. Fertilizer rate: 9 1) Not required for wildflower seeding 10 2) Newly established seeding areas - 100 pounds of nitrogen per acre 11 3) Established seeding areas- 150 pounds of nitrogen per acre 12 5. Topsoil: See Section 32 9119. 13 6. Water: clean and free of industrial wastes or other substances harmful to the 14 germination of the seed or to the growth of the vegetation. 15 7. Soil Retention Blanket 16 a. "Curlex I" from American Excelsior,900 Ave.H East,Post Office Box 5624, 17 Arlington,Texas 76001, 1-800-777-SOIL or approved equal. 18 19 2.3 ACCESSORIES [NOT USED] 20 2.4 SOURCE QUALITY CONTROL [NOT USED] 21 PART 3- EXECUTION [NOT USED] 22 3.1 INSTALLERS [NOT USED] 23 3.2 EXAMINATION [NOT USED] 24 3.3 PREPARATION 25 A. Surface Preparation:clear surface of all material including: 26 1. Stumps, stones,and other objects larger than one inch. 27 2. Roots,brush,wire,stakes,etc. 28 3. Any objects that may interfere with seeding or maintenance. 29 B. Tilling 30 1. Compacted areas: till 1 inch deep 31 2. Areas sloped greater than 3:1: run a tractor parallel to slope to provide less 32 seed/water run-off 33 3. Areas near trees: Do not till deeper than 1/2 inch inside "drip line" of trees. 34 3.4 INSTALLATION 35 A. Block Sodding 36 1. General 37 a. Place sod between curb and walk and on terraces that is the same type grass as 38 adjacent grass or existing lawn. 39 b. Plant between the average last freeze date in the spring and 6 weeks prior to the 40 average first freeze in the fall. 41 2. Installation CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 329213-6 HYDROMULCHING,SEEDING AND SODDING Page 6 of 8 1 a. Plant sod specified after the area has been completed to the lines and grades 2 shown on the Drawings with 6 inches of topsoil. 3 b. Use care to retain native soil on the roots of the sod during the process of 4 excavating,hauling and planting. 5 c. Keep sod material moist from the time it is dug until planted. 6 d. Place sod so that the entire area designated for sodding is covered. 7 e. Fill voids left in the solid sodding with additional sod and tamp. 8 f. Roll and tamp sod so that sod is in complete contact with topsoil at a uniform 9 slope. 10 g. Peg sod with wooden pegs(or wire staple)driven through the sod block to the 11 firm earth in areas that may slide due to the height or slope of the surface or 12 nature of the soil. 13 3. Watering and Finishing 14 a. Furnish water as an ancillary cost to Contractor by means of temporary 15 metering/irrigation,water truck or by any other method necessary to achieve 16 an acceptable stand of turf as defined in 3.13.B. 17 b. Thoroughly water sod immediately after planted. 18 c. Water until established. 19 d. Generally,an amount of water that is equal to the average amount of rainfall 20 plus 1/2 inch per week should be applied until accepted. If applicable,plant 21 large areas by irrigation zones to ensure areas are watered as soon as they are 22 planted. 23 B. Seeding 24 1. General 25 a. Seed only those areas indicated on the Drawings and areas disturbed by 26 construction. 27 b. Mark each area to be seeded in the field prior to seeding for City approval. 28 2. Broadcast Seeding 29 a. Broadcast seed in 2 directions at right angles to each other. 30 b. Harrow or rake lightly to cover seed. 31 c. Never cover seed with more soil than twice its diameter. 32 d. For wildflower plantings: 33 1) Scalp existing grasses to 1 inch 34 2) Remove grass clippings, so seed can make contact with the soil. 35 3. Mechanically Seeding(Drilling): 36 a. Uniformly distribute seed over the areas shown on the Drawings or as directed. 37 b. All varieties of seed and fertilizer may be distributed at the same time provided 38 that each component is uniformly applied at the specified rate. 39 c. Drill seed at a depth of 1/4 inch to 3/8 inch utilizing a pasture or rangeland type 40 drill. 41 d. Drill on the contour of slopes 42 e. After planting roll with a roller integral to the seed drill,or a corrugated roller 43 of the "Cultipacker"type. 44 f. Roll slope areas on the contour. 45 4. Hydromulching 46 a. Mixing: Seed,mulch,fertilizer and water may be mixed provided that: 47 1) Mixture is uniformly suspended to form a homogenous slurry. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 329213-7 HYDROMULCHING,SEEDING AND SODDING Page 7 of 8 1 2) Mixture forms a blotter-like ground cover impregnated uniformly with 2 grass seed. 3 3) Mixture is applied within 30 minutes after placed in the equipment. 4 b. Placing 5 1) Uniformly distribute in the quantity specified over the areas shown on the 6 Drawings or as directed. 7 5. Fertilizing: uniformly apply fertilizer over seeded area. 8 6. Watering 9 a. Furnish water by means of temporary metering/irrigation, water truck or by 10 any other method necessary to achieve an acceptable stand of turf as defined in 11 3.13.B. 12 b. Water soil to a minimum depth of 4 inches within 48 hours of seeding. 13 c. Water as direct by the City at least twice daily for 14 days after seeding in such 14 a manner as to prevent washing of the slopes or dislodgement of the seed. 15 d. Water until final acceptance. 16 e. Generally, an amount of water that is equal to the average amount of rainfall 17 plus 1/2 inch per week should be applied until accepted. 18 3.5 REPAIR/RESTORATION[NOT USED] 19 3.6 RE-INSTALLATION[NOT USED] 20 3.7 FIELD QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP[NOT USED] 22 3.9 ADJUSTING[NOT USED] 23 3.10 CLEANING[NOT USED] 24 3.11 CLOSEOUT ACTIVITIES 25 3.12 PROTECTION[NOT USED] 26 3.13 MAINTENANCE 27 A. Block Sodding 28 1. Water and mow sod until completion and final acceptance of the Project or as 29 directed by the City. 30 2. Sod shall not be considered finally accepted until the sod has started to peg down 31 (roots growing into the soil) and is free from dead blocks of sod. 32 B. Seeding 33 1. Water and mow sod until completion and final acceptance of the Project or as 34 directed by the City. 35 2. Maintain the seeded area until each of the following is achieved: 36 a. Vegetation is evenly distributed 37 b. Vegetation is free from bare areas 38 3. Turf will be accepted once fully established. 39 a. Seeded area must have 100 percent growth to a height of 3 inches with 1 mow 40 cycle performed by the Contractor prior to consideration of acceptance by the 41 City. 42 C. Rejection CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 329213-8 HYDROMULCHING,SEEDING AND SODDING Page 8 of 8 1 1. City may reject block sod or seeded area on the basis of weed populations. 2 3.14 ATTACHMENTS [NOT USED] 3 END OF SECTION 4 Revision Log DATE NAME SUMMARY OF CHANGE 5 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 330510-1 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 1 of 19 1 SECTION 33 05 10 2 UTILITY TRENCH EXCAVATION,EMBEDMENT AND BACKFILL 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Excavation,Embedment and Backfill for: 7 a. Pressure Applications 8 1) Water Distribution or Transmission Main 9 2) Wastewater Force Main 10 3) Reclaimed Water Main 11 b. Gravity Applications 12 1) Wastewater Gravity Mains 13 2) Storm Sewer Pipe and Culverts 14 3) Storm Sewer Precast Box and Culverts 15 2. Including: 16 a. Excavation of all material encountered, including rock and unsuitable materials 17 b. Disposal of excess unsuitable material 18 c. Site specific trench safety 19 d. Pumping and dewatering 20 e. Embedment 21 f. Concrete encasement for utility lines 22 g. Backfill 23 h. Compaction 24 B. Deviations from this City of Fort Worth Standard Specification 25 1. None. 26 C. Related Specification Sections include,but are not necessarily limited to: 27 1. Division 0—Bidding Requirements,Contract Forms,and Conditions of the 28 Contract 29 2. Division 1 —General Requirements 30 3. Section 02 41 13—Selective Site Demolition 31 4. Section 02 41 15—Paving Removal 32 5. Section 02 41 14—Utility Removal/Abandonment 33 6. Section 03 30 00—Cast-in-place Concrete 34 7. Section 03 34 13—Controlled Low Strength Material(CLSM) 35 8. Section 31 10 00—Site Clearing 36 9. Section 3125 00—Erosion and Sediment Control 37 10. Section 33 05 26—Utility Markers/Locators 38 11. Section 34 71 13—Traffic Control 39 1.2 PRICE AND PAYMENT PROCEDURES 40 A. Measurement and Payment CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 330510-2 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 2 of 19 1 1. Trench Excavation,Embedment and Backfill associated with the installation of an 2 underground utility or excavation 3 a. Measurement 4 1) This Item is considered subsidiary to the installation of the utility pipe line 5 as designated in the Drawings. 6 b. Payment 7 1) The work performed and the materials furnished in accordance with this 8 Item are considered subsidiary to the installation of the utility pipe for the 9 type of embedment and backfill as indicated on the plans.No other 10 compensation will be allowed. 11 2. Imported Embedment or Backfill 12 a. Measurement 13 1) Measured by the cubic yard as delivered to the site and recorded by truck 14 ticket provided to the City 15 b. Payment 16 1) Imported fill shall only be paid when using materials for embedment and 17 backfill other than those identified in the Drawings.The work performed 18 and materials furnished in accordance with pre-bid item and measured as 19 provided under"Measurement"will be paid for at the unit price bid per 20 cubic yard of"Imported Embedment/Backfill'delivered to the Site for: 21 a) Various embedment/backfill materials 22 c. The price bid shall include: 23 1) Furnishing backfill or embedment as specified by this Specification 24 2) Hauling to the site 25 3) Placement and compaction of backfill or embedment 26 3. Concrete Encasement for Utility Lines 27 a. Measurement 28 1) Measured by the cubic yard per plan quantity. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 and measured as provided under"Measurement"will be paid for at the unit 32 price bid per cubic yard of"Concrete Encasement for Utility Lines"per 33 plan quantity. 34 c. The price bid shall include: 35 1) Furnishing,hauling,placing and finishing concrete in accordance with 36 Section 03 30 00 37 2) Clean-up 38 4. Ground Water Control 39 a. Measurement 40 1) Measurement shall be lump sum when a ground water control plan is 41 specifically required by the Contract Documents. 42 b. Payment 43 1) Payment shall be per the lump sum price bid for"Ground Water Control' 44 including: 45 a) Submittals 46 b) Additional Testing 47 c) Ground water control system installation 48 d) Ground water control system operations and maintenance 49 e) Disposal of water CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 330510-3 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 3 of 19 1 f) Removal of ground water control system 2 5. Trench Safety 3 a. Measurement 4 1) Measured per linear foot of excavation for all trenches that require trench 5 safety in accordance with OSHA excavation safety standards(29 CFR Part 6 1926 Subpart P Safety and Health regulations for Construction) 7 b. Payment 8 1) The work performed and materials furnished in accordance with this Item 9 and measured as provided under"Measurement"will be paid for at the unit 10 price bid per linear foot of excavation to comply with OSHA excavation 11 safety standards (29 CFR Part 1926.650 Subpart P),including,but not 12 limited to,all submittals,labor and equipment. 13 1.3 REFERENCES 14 A. Definitions 15 1. General—Definitions used in this section are in accordance with Terminologies 16 ASTM F412 and ASTM D8 and Terminology ASTM D653,unless otherwise 17 noted. 18 2. Definitions for trench width,backfill,embedment,initial backfill,pipe zone, 19 haunching bedding, springline,pipe zone and foundation are defined as shown in 20 the following schematic: ✓ ' � PA�f MEAS UNPA>!EE[? AREASXN N115 N\1 � f z INITIAL f Ld m SPRINGLINE tai. w. HAUNCHING BEDDING FOUNDATION \' \\. OD CLEARANCE EXCAVATED TRENCH W DDH 21 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,20I3 330510-4 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 4 of 19 1 3. Deleterious materials—Harmful materials such as clay lumps, silts and organic 2 material 3 4. Excavated Trench Depth—Distance from the surface to the bottom of the bedding 4 or the trench foundation 5 5. Final Backfill Depth 6 a. Unpaved Areas—The depth of the final backfill measured from the top of the 7 initial backfill to the surface 8 b. Paved Areas—The depth of the final backfill measured from the top of the 9 initial backfill to bottom of permanent or temporary pavement repair 10 B. Reference Standards 11 1. Reference standards cited in this Specification refer to the current reference 12 standard published at the time of the latest revision date logged at the end of this 13 Specification,unless a date is specifically cited. 14 2. ASTM Standards: 15 a. ASTM C33-08 Standard Specifications for Concrete Aggregates 16 b. ASTM C88-05 Soundness of Aggregate by Use of Sodium Sulfate or 17 Magnesium Sulfate 18 c. ASTM C 136-01 Test Method for Sieve Analysis of Fine and Coarse Aggregate 19 d. ASTM D448-08 Standard Classification for Sizes of Aggregate for Road and 20 Bridge Construction. 21 e. ASTM C535-09 Standard Test Method for Resistance to Degradation of Large- 22 Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine 23 f. ASTM D588—Standard Test method for Moisture-Density Relations of Soil- 24 Cement Mixture 25 g. ASTM D698-07 Test Method for Laboratory Compaction Characteristics of 26 Soil Using Stand Efforts(12,400 ft-lb/ft3 600 Kn-m/M3)). 27 h. ASTM 1556 Standard Test Methods for Density and Unit Weight of Soils in 28 Place by Sand Cone Method. 29 i. ASTM 2487— 10 Standard Classification of Soils for Engineering Purposes 30 (Unified Soil Classification System) 31 j. ASTM 2321-09 Underground Installation of Thermoplastic Pipe for Sewers 32 and Other Gravity-Flow Applications 33 k. ASTM D2922—Standard Test Methods for Density of Soils and Soil 34 Aggregate in Place by Nuclear Methods(Shallow Depth) 35 1. ASTM 3017-Standard Test Method for Water Content of Soil and Rock in 36 place by Nuclear Methods(Shallow Depth) 37 in. ASTM D4254 -Standard Test Method for Minimum Index Density and Unit 38 Weight of Soils and Calculations of Relative Density 39 3. OSHA 40 a. Occupational Safety and Health Administration CFR 29,Part 1926-Safety 41 Regulations for Construction,Subpart P-Excavations 42 1.4 ADMINISTRATIVE REQUIREMENTS 43 A. Coordination 44 1. Utility Company Notification 45 a. Notify area utility companies at least 48 hours in advance,excluding weekends 46 and holidays,before starting excavation. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 330510-5 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 5 of 19 1 b. Request the location of buried lines and cables in the vicinity of the proposed 2 work. 3 B. Sequencing 4 1. Sequence work for each section of the pipe installed to complete the embedment 5 and backfill placement on the day the pipe foundation is complete. 6 2. Sequence work such that proctors are complete in accordance with ASTM D698 7 prior to commencement of construction activities. 8 1.5 SUBMITTALS 9 A. Submittals shall be in accordance with Section 0133 00. 10 B. All submittals shall be approved by the City prior to construction. 11 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS 12 A. Shop Drawings 13 1. Provide detailed drawings and explanation for ground water and surface water 14 control,if required. 15 2. Trench Safety Plan in accordance with Occupational Safety and Health 16 Administration CFR 29,Part 1926-Safety Regulations for Construction, Subpart P- 17 Excavations 18 3. Stockpiled excavation and/or backfill material 19 a. Provide a description of the storage of the excavated material only if the 20 Contract Documents do not allow storage of materials in the right-of-way of the 21 easement. 22 1.7 CLOSEOUT SUBMITTALS [NOT USED] 23 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 24 1.9 QUALITY ASSURANCE[NOT USED] 25 1.10 DELIVERY,STORAGE,AND HANDLING 26 A. Storage 27 1. Within Existing Rights-of-Way(ROW) 28 a. Spoil,imported embedment and backfill materials may be stored within 29 existing ROW,easements or temporary construction easements,unless 30 specifically disallowed in the Contract Documents. 31 b. Do not block drainage ways,inlets or driveways. 32 c. Provide erosion control in accordance with Section 3125 00. 33 d. Store materials only in areas barricaded as provided in the traffic control plans. 34 e. In non-paved areas,do not store material on the root zone of any trees or in 35 landscaped areas. 36 2. Designated Storage Areas 37 a. If the Contract Documents do not allow the storage of spoils,embedment or 38 backfill materials within the ROW,easement or temporary construction 39 easement,then secure and maintain an adequate storage location. 40 b. Provide an affidavit that rights have been secured to store the materials on 41 private property. 42 c. Provide erosion control in accordance with Section 3125 00. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 330510-6 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 6 of 19 1 d. Do not block drainage ways. 2 e. Only materials used for 1 working day will be allowed to be stored in the work 3 zone. 4 B. Deliveries and haul-off-Coordinate all deliveries and haul-off. 5 1.11 FIELD [SITE] CONDITIONS 6 A. Existing Conditions 7 1. Any data which has been or may be provided on subsurface conditions is not 8 intended as a representation or warranty of accuracy or continuity between soils. It 9 is expressly understood that neither the City nor the Engineer will be responsible 10 for interpretations or conclusions drawn there from by the Contractor. 11 2. Data is made available for the convenience of the Contractor. 12 1.12 WARRANTY [NOT USED] 13 PART 2- PRODUCTS 14 2.1 OWNER-FURNISHED[OR] OWNER-SUPPLIED PRODUCTS 15 2.2 MATERIALS 16 A. Materials 17 1. Utility Sand 18 a. Granular and free flowing 19 b. Generally meets or exceeds the limits on deleterious substances per Table 1 for 20 fine aggregate according to ASTM C 33 21 c. Reasonably free of organic material 22 d. Gradation: Sieve Size Percent Retained 1 inch 0 3/8 inch 0-10 #40 20-60 #100 95 23 2. Crushed Rock 24 a. Durable crushed rock or recycled concrete 25 b. Meets the gradation of ASTM D448 size numbers 56,57 or 67 26 c. May be unwashed 27 d. Free from significant silt clay or unsuitable materials 28 e. Percentage of wear not more than 40 percent per ASTM C131 or C535 29 f. Not more than a 12 percent maximum loss when subjective to 5 cycles of 30 sodium sulfate soundness per ASTM C88 31 3. Fine Crushed Rock 32 a. Durable crushed rock 33 b. Meets the gradation of ASTM D448 size numbers 8 or 89 34 c. May be unwashed 35 d. Free from significant silt clay or unsuitable materials. 36 e. Have a percentage of wear not more than 40 percent per ASTM C 131 or C535 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 330510-7 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 7 of 19 1 f. Not more than a 12 percent maximum loss when subjective to 5 cycles of 2 sodium sulfate soundness per ASTM C88 3 4. Ballast Stone 4 a. Stone ranging from 3 inches to 6 inches in greatest dimension. 5 b. May be unwashed 6 c. Free from significant silt clay or unsuitable materials 7 d. Percentage of wear not more than 40 percent per ASTM C131 or C535 8 e. Not more than a 12 percent maximum loss when subjected to 5 cycles of 9 sodium sulfate soundness per ASTM C88 10 5. Acceptable Backfill Material 11 a. In-situ or imported soils classified as CL,CH, SC or GC in accordance with 12 ASTM D2487 13 b. Free from deleterious materials,boulders over 6 inches in size and organics 14 c. Can be placed free from voids 15 d. Must have 20 percent passing the number 200 sieve 16 6. Blended Backfill Material 17 a. In-situ soils classified as SP, SM, GP or GM in accordance with ASTM D2487 18 b. Blended with in-situ or imported acceptable backfill material to meet the 19 requirements of an Acceptable Backfill Material 20 c. Free from deleterious materials,boulders over 6 inches in size and organics 21 d. Must have 20 percent passing the number 200 sieve 22 7. Unacceptable Backfill Material 23 a. In-situ soils classified as ML,MH,PT,OL or OH in accordance with ASTM 24 D2487 25 8. Select Fill 26 a. Classified as SC or CL in accordance with ASTM D2487 27 b. Liquid limit less than 35 28 c. Plasticity index between 8 and 20 29 9. Cement Stabilized Sand(CSS) 30 a. Sand 31 1) Shall be clean,durable sand meeting grading requirements for fine 32 aggregates of ASTM C33 and the following requirements: 33 a) Classified as SW,SP, or SM by the United Soil Classification System 34 of ASTM D2487 35 b) Deleterious materials 36 (1) Clay lumps,ASTM C142,less than 0.5 percent 37 (2) Lightweight pieces,ASTM C 123,less than 5.0 percent 38 (3) Organic impurities,ASTM C40,color no darker than standard 39 color 40 (4) Plasticity index of 4 or less when tested in accordance with ASTM 41 D4318. 42 b. Minimum of 4 percent cement content of Type 1/11 portland cement 43 c. Water 44 1) Potable water, free of soils,acids,alkalis,organic matter or other 45 deleterious substances,meeting requirements of ASTM C94 46 d. Mix in a stationary pug mill, weigh-batch or continuous mixing plant. 47 e. Strength CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 330510-8 UTII.rrY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 8 of 19 1 1) 50 to 150 psi compressive strength at 2 days in accordance with ASTM 2 D1633,Method A 3 2) 200 to 250 psi compressive strength at 28 days in accordance with ASTM 4 D 1633,Method A 5 3) The maximum compressive strength in 7 days shall be 400 psi. Backfill 6 that exceeds the maximum compressive strength shall be removed by the 7 Contractor for no additional compensation. 8 f. Random samples of delivered product will be taken in the field at point of 9 delivery for each day of placement in the work area.Specimens will be 10 prepared in accordance with ASTM D1632. 11 10. Controlled Low Strength Material(CLSM) 12 a. Conform to Section 03 34 13 13 11. Trench Geotextile Fabric 14 a. Soils other than ML or OH in accordance with ASTM D2487 15 1) Needle punch,nonwoven geotextile composed of polypropylene fibers 16 2) Fibers shall retain their relative position 17 3) Inert to biological degradation 18 4) Resist naturally occurring chemicals 19 5) UV Resistant 20 6) Mirafi 140N by Tencate,or approved equal 21 b. Soils Classified as ML or OH in accordance with ASTM D2487 22 1) High-tenacity monofilament polypropylene woven yarn 23 2) Percent open area of 8 percent to10 percent 24 3) Fibers shall retain their relative position 25 4) Inert to biological degradation 26 5) Resist naturally occurring chemicals 27 6) UV Resistant 28 7) Mirafi FW402 by Tencate,or approved equal 29 12. Concrete Encasement 30 a. Conform to Section 03 30 00. 31 2.3 ACCESSORIES [NOT USED] 32 2.4 SOURCE QUALITY CONTROL[NOT USED] 33 PART 3- EXECUTION 34 3.1 INSTALLERS [NOT USED] 35 3.2 EXAMINATION 36 A. Verification of Conditions 37 1. Review all known,identified or marked utilities,whether public or private,prior to 38 excavation. 39 2. Locate and protect all known,identified and marked utilities or underground 40 facilities as excavation progresses. 41 3. Notify all utility owners within the project limits 48 hours prior to beginning 42 excavation. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,20I3 330510-9 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 9 of 19 1 4. The information and data shown in the Drawings with respect to utilities is 2 approximate and based on record information or on physical appurtenances 3 observed within the project limits. 4 5. Coordinate with the Owner(s)of underground facilities. 5 6. Immediately notify any utility owner of damages to underground facilities resulting 6 from construction activities. 7 7. Repair any damages resulting from the construction activities. 8 B. Notify the City immediately of any changed condition that impacts excavation and 9 installation of the proposed utility. 10 3.3 PREPARATION 11 A. Protection of In-Place Conditions 12 1. Pavement 13 a. Conduct activities in such a way that does not damage existing pavement that is 14 designated to remain. 15 1) Where desired to move equipment not licensed for operation on public 16 roads or across pavement,provide means to protect the pavement from all 17 damage. 18 b. Repair or replace any pavement damaged due to the negligence of the 19 contractor outside the limits designated for pavement removal at no additional 20 cost to the City. 21 2. Drainage 22 a. Maintain positive drainage during construction and re-establish drainage for all 23 swales and culverts affected by construction. 24 3. Trees 25 a. When operating outside of existing ROW,stake permanent and temporary 26 construction easements. 27 b. Restrict all construction activities to the designated easements and ROW. 28 c. Flag and protect all trees designated to remain in accordance with Section 31 10 29 00. 30 d. Conduct excavation,embedment and backfill in a manner such that there is no 31 damage to the tree canopy. 32 e. Prune or trim tree limbs as specifically allowed by the Drawings or as 33 specifically allowed by the City. 34 1) Pruning or trimming may only be accomplished with equipments 35 specifically designed for tree pruning or trimming. 36 f. Remove trees specifically designated to be removed in the Drawings in 37 accordance with Section 31 10 00. 38 4. Above ground Structures 39 a. Protect all above ground structures adjacent to the construction. 40 b. Remove above ground structures designated for removal in the Drawings in 41 accordance with Section 02 41 13 42 5. Traffic 43 a. Maintain existing traffic,except as modified by the traffic control plan,and in 44 accordance with Section 34 71 13. 45 b. Do not block access to driveways or alleys for extended periods of time unless: 46 1) Alternative access has been provided CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 330510-10 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 10 of 19 1 2) Proper notification has been provided to the property owner or resident 2 3) It is specifically allowed in the traffic control plan 3 c. Use traffic rated plates to maintain access until access is restored. 4 6. Traffic Signal—Poles,Mast Arms,Pull boxes,Detector loops 5 a. Notify the City's Traffic Services Division a minimum of 48 hours prior to any 6 excavation that could impact the operations of an existing traffic signal. 7 b. Protect all traffic signal poles, mast arms,pull boxes,traffic cabinets,conduit 8 and detector loops. 9 c. Immediately notify the City's Traffic Services Division if any damage occurs to 10 any component of the traffic signal due to the contractors activities. 11 d. Repair any damage to the traffic signal poles,mast arms,pull boxes,traffic 12 cabinets,conduit and detector loops as a result of the construction activities. 13 7. Fences 14 a. Protect all fences designated to remain. 15 b. Leave fence in the equal or better condition as prior to construction. 16 3.4 INSTALLATION 17 A. Excavation 18 1. Excavate to a depth indicated on the Drawings. 19 2. Trench excavations are defined as unclassified. No additional payment shall be 20 granted for rock or other in-situ materials encountered in the trench. 21 3. Excavate to a width sufficient for laying the pipe in accordance with the Drawings 22 and bracing in accordance with the Excavation Safety Plan. 23 4. The bottom of the excavation shall be firm and free from standing water. 24 a. Notify the City immediately if the water and/or the in-situ soils do not provide 25 for a firm trench bottom. 26 b. The City will determine if any changes are required in the pipe foundation or 27 bedding. 28 5. Unless otherwise permitted by the Drawings or by the City,the limits of the 29 excavation shall not advance beyond the pipe placement so that the trench may be 30 backfilled in the same day. 31 6. Over Excavation 32 a. Fill over excavated areas with the specified bedding material as specified for 33 the specific pipe to be installed. 34 b. No additional payment will be made for over excavation or additional bedding 35 material. 36 7. Unacceptable Backfill Materials 37 a. In-situ soils classified as unacceptable backfill material shall be separated from 38 acceptable backfill materials. 39 b. If the unacceptable backfill material is to be blended in accordance with this 40 Specification,then store material in a suitable location until the material is 41 blended. 42 c. Remove all unacceptable material from the project site that is not intended to be 43 blended or modified. 44 8. Rock—No additional compensation will be paid for rock excavation or other 45 changed field conditions. 46 B. Shoring,Sheeting and Bracing CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 330510-11 UTII.rrY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 11 of 19 1 1. Engage a Licensed Professional Engineer in the State of Texas to design a site 2 specific excavation safety system in accordance with Federal and State 3 requirements. 4 2. Excavation protection systems shall be designed according to the space limitations 5 as indicated in the Drawings. 6 3. Furnish,put in place and maintain a trench safety system in accordance with the 7 Excavation Safety Plan and required by Federal, State or local safety requirements. 8 4. If soil or water conditions are encountered that are not addressed by the current 9 Excavation Safety Plan,engage a Licensed Professional Engineer in the State of 10 Texas to modify the Excavation Safety Plan and provide a revised submittal to the 11 City. 12 5. Do not allow soil,or water containing soil,to migrate through the Excavation 13 Safety System in sufficient quantities to adversely affect the suitability of the 14 Excavation Protection System.Movable bracing, shoring plates or trench boxes 15 used to support the sides of the trench excavation shall not: 16 a. Disturb the embedment located in the pipe zone or lower 17 b. Alter the pipe's line and grade after the Excavation Protection System is 18 removed 19 c. Compromise the compaction of the embedment located below the spring line of 20 the pipe and in the haunching 21 C. Water Control 22 1. Surface Water 23 a. Furnish all materials and equipment and perform all incidental work required to 24 direct surface water away from the excavation. 25 2. Ground Water 26 a. Furnish all materials and equipment to dewater ground water by a method 27 which preserves the undisturbed state of the subgrade soils. 28 b. Do not allow the pipe to be submerged within 24 hours after placement. 29 c. Do not allow water to flow over concrete until it has sufficiently cured. 30 d. Engage a Licensed Engineer in the State of Texas to prepare a Ground Water 31 Control Plan if any of the following conditions are encountered: 32 1) A Ground Water Control Plan is specifically required by the Contract 33 Documents 34 2) If in the sole judgment of the City,ground water is so severe that an 35 Engineered Ground Water Control Plan is required to protect the trench or 36 the installation of the pipe which may include: 37 a) Ground water levels in the trench are unable to be maintained below 38 the top of the bedding 39 b) A firm trench bottom cannot be maintained due to ground water 40 c) Ground water entering the excavation undermines the stability of the 41 excavation. 42 d) Ground water entering the excavation is transporting unacceptable 43 quantities of soils through the Excavation Safety System. 44 e. In the event that there is no bid item for a Ground Water Control and the City 45 requires an Engineered Ground Water Control Plan due to conditions 46 discovered at the site,the contractor will be eligible to submit a change order. 47 f. Control of ground water shall be considered subsidiary to the excavation when: CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 33 05 10-12 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 12 of 19 1 1) No Ground Water Control Plan is specifically identified and required in the 2 Contract Documents 3 g. Ground Water Control Plan installation,operation and maintenance 4 1) Furnish all materials and equipment necessary to implement,operate and 5 maintain the Ground Water Control Plan. 6 2) Once the excavation is complete,remove all ground water control 7 equipment not called to be incorporated into the work. 8 h. Water Disposal 9 1) Dispose of ground water in accordance with City policy or Ordinance. 10 2) Do not discharge ground water onto or across private property without 11 written permission. 12 3) Permission from the City is required prior to disposal into the Sanitary 13 Sewer. 14 4) Disposal shall not violate any Federal,State or local regulations. 15 D. Embedment and Pipe Placement 16 1. Water Lines less than,or equal to, 12 inches in diameter: 17 a. The entire embedment zone shall be of uniform material. 18 b. Utility sand shall be generally used for embedment. 19 c. If ground water is in sufficient quantity to cause sand to pump,then use 20 crushed rock as embedment. 21 1) If crushed rock is not specifically identified in the Contract Documents, 22 then crushed rock shall be paid by the pre-bid unit price. 23 d. Place evenly spread bedding material on a firm trench bottom. 24 e. Provide firm,uniform bedding. 25 f. Place pipe on the bedding in accordance with the alignment of the Drawings. 26 g. In no case shall the top of the pipe be less than 42 inches from the surface of the 27 proposed grade,unless specifically called for in the Drawings. 28 h. Place embedment,including initial backfill,to a minimum of 6 inches,but not 29 more than 12 inches,above the pipe. 30 i. Where gate valves are present,the initial backfill shall extend to 6 inches above 31 the elevation of the valve nut. 32 j. Form all blocking against undisturbed trench wall to the dimensions in the 33 Drawings. 34 k. Compact embedment and initial backfill. 35 1. Place marker tape on top of the initial trench backfill in accordance with 36 Section 33 05 26. 37 2. Water Lines 16-inches through 24-inches in diameter: 38 a. The entire embedment zone shall be of uniform material. 39 b. Utility sand may be used for embedment when the excavated trench depth is 40 less than 15 feet deep. 41 c. Crushed rock or fine crushed rock shall be used for embedment for excavated 42 trench depths 15 feet,or greater. 43 d. Crushed rock shall be used for embedment for steel pipe. 44 e. Provide trench geotextile fabric at any location where crushed rock or fine 45 crushed rock come into contact with utility sand 46 f. Place evenly spread bedding material on a firm trench bottom. 47 g. Provide firm,uniform bedding. 48 1) Additional bedding may be required if ground water is present in the 49 trench. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 33 05 10-13 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 13 of 19 1 2) If additional crushed rock is required not specifically identified in the 2 Contract Documents,then crushed rock shall be paid by the pre-bid unit 3 price. 4 h. Place pipe on the bedding according to the alignment shown on the Drawings. 5 i. The pipe line shall be within: 6 1) ±3 inches of the elevation on the Drawings for 16-inch and 24-inch water 7 lines 8 j. Place and compact embedment material to adequately support haunches in 9 accordance with the pipe manufacturer's recommendations. 10 k. Place remaining embedment including initial backfill to a minimum of 6 inches, 11 but not more than 12 inches,above the pipe. 12 1. Where gate valves are present,the initial backfill shall extend to up to the valve 13 nut. 14 in. Compact the embedment and initial backfill to 95 percent Standard Proctor 15 ASTM D 698. 16 n. Density test may be performed by City to verify that the compaction of 17 embedment meets requirements. 18 o. Place trench geotextile fabric on top of the initial backfill. 19 p. Place marker tape on top of the trench geotextile fabric in accordance with 20 Section 33 05 26. 21 3. Water Lines 30-inches and greater in diameter 22 a. The entire embedment zone shall be of uniform material. 23 b. Crushed rock shall be used for embedment. 24 c. Provide trench geotextile fabric at any location where crushed rock or fine 25 crushed rock come into contact with utility sand. 26 d. Place evenly spread bedding material on a firm trench bottom. 27 e. Provide firm,uniform bedding. 28 1) Additional bedding may be required if ground water is present in the 29 trench. 30 2) If additional crushed rock is required which is not specifically identified in 31 the Contract Documents,then crushed rock shall be paid by the pre-bid unit 32 price. 33 f. Place pipe on the bedding according to the alignment shown on the Drawings. 34 g. The pipe line shall be within: 35 1) ±1 inch of the elevation on the Drawings for 30-inch and larger water lines 36 h. Place and compact embedment material to adequately support haunches in 37 accordance with the pipe manufacturer's recommendations. 38 i. For steel pipe greater than 30 inches in diameter,the initial embedment lift shall 39 not exceed the spring line prior to compaction. 40 j. Place remaining embedment,including initial backfill,to a minimum of 6 41 inches,but not more than 12 inches,above the pipe. 42 k. Where gate valves are present,the initial backfill shall extend to up to the valve 43 nut. 44 1. Compact the embedment and initial backfill to 95 percent Standard Proctor 45 ASTM D 698. 46 in. Density test may be performed by City to verify that the compaction of 47 embedment meets requirements. 48 n. Place trench geotextile fabric on top of the initial backfill. 49 o. Place marker tape on top of the trench geotextile fabric in accordance with 50 Section 33 05 26. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 330510-14 UTIL,rrY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 14 of 19 1 4. Sanitary Sewer Lines and Storm Sewer Lines(HDPE) 2 a. The entire embedment zone shall be of uniform material. 3 b. Crushed rock shall be used for embedment. 4 c. Place evenly spread bedding material on a firm trench bottom. 5 d. Spread bedding so that lines and grades are maintained and that there are no 6 sags in the sanitary sewer pipe line. 7 e. Provide firm,uniform bedding. 8 1) Additional bedding may be required if ground water is present in the 9 trench. 10 2) If additional crushed rock is required which is not specifically identified in 11 the Contract Documents,then crushed rock shall be paid by the pre-bid unit 12 price. 13 f. Place pipe on the bedding according to the alignment shown in the Drawings. 14 g. The pipe line shall be within±0.1 inches of the elevation,and be consistent 15 with the grade shown on the Drawings. 16 h. Place and compact embedment material to adequately support haunches in 17 accordance with the pipe manufacturer's recommendations. 18 i. For sewer lines greater than 30 inches in diameter,the embedment lift shall not 19 exceed the spring line prior to compaction. 20 j. Place remaining embedment including initial backfill to a minimum of 6 inches, 21 but not more than 12 inches,above the pipe. 22 k. Compact the embedment and initial backfill to 95 percent Standard Proctor 23 ASTM D 698. 24 1. Density test may be performed by City to verify that the compaction of 25 embedment meets requirements. 26 In. Place trench geotextile fabric on top of the initial backfill. 27 n. Place marker tape on top of the trench geotextile fabric in accordance with 28 Section 33 05 26. 29 5. Storm Sewer(RCP) 30 a. The bedding and the pipe zone up to the spring line shall be of uniform 31 material. 32 b. Crushed rock shall be used for embedment up to the spring line. 33 c. The specified backfill material may be used above the spring line. 34 d. Place evenly spread bedding material on a firm trench bottom. 35 e. Spread bedding so that lines and grades are maintained and that there are no 36 sags in the storm sewer pipe line. 37 f. Provide firm,uniform bedding. 38 1) Additional bedding may be required if ground water is present in the 39 trench. 40 2) If additional crushed rock is required which is not specifically identified in 41 the Contract Documents,then crushed rock shall be paid by the pre-bid unit 42 price. 43 g. Place pipe on the bedding according to the alignment of the Drawings. 44 h. The pipe line shall be within±0.1 inches of the elevation, and be consistent 45 with the grade, shown on the Drawings. 46 i. Place embedment material up to the spring line. 47 1) Place embedment to ensure that adequate support is obtained in the haunch. 48 j. Compact the embedment and initial backfill to 95 percent Standard Proctor 49 ASTM D 698. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 3305 10-15 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 15 of 19 1 k. Density test may be performed by City to verify that the compaction of 2 embedment meets requirements. 3 1. Placexrench geotextile fabric on top of pipe and crushed rock. 4 6. Storm Sewer Reinforced Concrete Box 5 a. Crushed rock shall be used for bedding. 6 b. The pipe zone and the initial backfill shall be: 7 1) Crushed rock,or 8 2) Acceptable backfill material compacted to 95 percent Standard Proctor 9 density 10 c. Place evenly spread compacted bedding material on a firm trench bottom. 11 d. Spread bedding so that lines and grades are maintained and that there are no 12 sags in the storm sewer pipe line. 13 e. Provide firm,uniform bedding. 14 1) Additional bedding may be required if ground water is present in the 15 trench. 16 2) If additional crushed rock is required which is not specifically identified in 17 the Contract Documents,then crushed rock shall be paid by the pre-bid unit 18 price. 19 f. Fill the annular space between multiple boxes with crushed rock,CLSM 20 according to 03 34 13. 21 g. Place pipe on the bedding according to the alignment of the Drawings. 22 h. The pipe shall be within±0.1 inches of the elevation,and be consistent with the 23 grade, shown on the Drawings. 24 i. Compact the embedment initial backfill to 95 percent Standard Proctor ASTM 25 D698. 26 7. Water Services(Less than 2 Inches in Diameter) 27 a. The entire embedment zone shall be of uniform material. 28 b. Utility sand shall be generally used for embedment. 29 c. Place evenly spread bedding material on a firm trench bottom. 30 d. Provide firm,uniform bedding. 31 e. Place pipe on the bedding according to the alignment of the Plans. 32 f. Compact the initial backfill to 95 percent Standard Proctor ASTM D698. 33 8. Sanitary Sewer Services 34 a. The entire embedment zone shall be of uniform material. 35 b. Crushed rock shall be used for embedment. 36 c. Place evenly spread bedding material on a firm trench bottom. 37 d. Spread bedding so that lines and grades are maintained and that there are no 38 sags in the sanitary sewer pipe line. 39 e. Provide firm,uniform bedding. 40 1) Additional bedding may be required if ground water is present in the 41 trench. 42 2) If additional crushed rock is required which is not specifically identified in 43 the Contract Documents,then crushed rock shall be paid by the pre-bid unit 44 price. 45 L Place pipe on the bedding according to the alignment of the Drawings. 46 g. Place remaining embedment,including initial backfill,to a minimum of 6 47 inches,but not more than 12 inches,above the pipe. 48 h. Compact the initial backfill to 95 percent Standard Proctor ASTM D698. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 330510-16 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 16 of 19 1 i. Density test may be required to verify that the compaction meets the density 2 requirements. 3 E. Trench Backfill 4 1. At a minimum,place backfill in such a manner that the required in-place density 5 and moisture content is obtained,and so that there will be no damage to the surface, 6 pavement or structures due to any trench settlement or trench movement. 7 a. Meeting the requirement herein does not relieve the responsibility to damages 8 associated with the Work. 9 2. Backfill Material 10 a. Final backfill depth less than 15 feet 11 1) Backfill with: 12 a) Acceptable backfill material 13 b) Blended backfill material,or 14 c) Select backfill material,CSS,or CLSM when specifically required 15 b. Final backfill depth 15 feet or greater: (under pavement or future pavement) 16 1) Backfill depth from 0 tol5 feet deep 17 a) Backfill with: 18 (1) Acceptable backfill material 19 (2) Blended backfill material,or 20 (3) Select backfill material,CSS,or CLSM when specifically required 21 2) Backfill depth from 15 feet and greater 22 a) Backfill with: 23 (1) Select Fill 24 (2) CSS, or 25 (3) CLSM when specifically required 26 c. Final backfill depth 15 feet or greater: not under pavement or future pavement) 27 1) Backfill with: 28 a) Acceptable backfill material,or 29 b) Blended backfill material 30 d. Backfill for service lines: 31 1) Backfill for water or sewer service lines shall be the same as the 32 requirement of the main that the service is connected to. 33 3. Required Compaction and Density 34 a. Final backfill(depths less than 15 feet) 35 1) Compact acceptable backfill material,blended backfill material or select 36 backfill to a minimum of 95 percent Standard Proctor per ASTM D698 at 37 moisture content within-2 to+5 percent of the optimum moisture. 38 2) CSS or CLSM requires no compaction. 39 b. Final backfill(depths 15 feet and greater/under existing or future pavement) 40 1) Compact select backfill to a minimum of 98 percent Standard Proctor per 41 ASTM D 698 at moisture content within-2 to+5 percent of the optimum 42 moisture. 43 2) CSS or CLSM requires no compaction. 44 c. Final backfill(depths 15 feet and greater/not under existing or future pavement) 45 1) Compact acceptable backfill material blended backfill material,or select 46 backfill to a minimum of 95 percent Standard Proctor per ASTM D 698 at 47 moisture content within-2 to+5 percent of the optimum moisture. 48 4. Saturated Soils CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 330510-17 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 17 of 19 1 a. If in-situ soils consistently demonstrate that they are greater than 5 percent over 2 optimum moisture content,the soils are considered saturated. 3 b. Flooding the trench or water jetting is strictly prohibited. 4 c. If saturated soils are identified in the Drawings or Geotechnical Report in the 5 Appendix,Contractor shall proceed with Work following all backfill 6 procedures outlined in the Drawings for areas of soil saturation greater than 5 7 percent. 8 d. If saturated soils are encountered during Work but not identified in Drawings or 9 Geotechnical Report in the Appendix: 10 1) The Contractor shall: 11 a) Immediately notify the City. 12 b) Submit a Contract Claim for Extra Work associated with direction from 13 City. 14 2) The City shall: 15 a) Investigate soils and determine if Work can proceed in the identified 16 location. 17 b) Direct the Contractor of changed backfill procedures associated with 18 the saturated soils that may include: 19 (1) Imported backfill 20 (2) A site specific backfill design 21 5. Placement of Backfill 22 a. Use only compaction equipment specifically designed for compaction of a 23 particular soil type and within the space and depth limitation experienced in the 24 trench. 25 b. Flooding the trench or water setting is strictly prohibited. 26 c. Place in loose lifts not to exceed 12 inches. 27 d. Compact to specified densities. 28 e. Compact only on top of initial backfill,undisturbed trench or previously 29 compacted backfill. 30 f. Remove any loose materials due to the movement of any trench box or shoring 31 or due to sloughing of the trench wall. 32 g. Install appropriate tracking balls for water and sanitary sewer trenches in 33 accordance with Section 33 05 26. 34 6. Backfill Means and Methods Demonstration 35 a. Notify the City in writing with sufficient time for the City to obtain samples 36 and perform standard proctor test in accordance with ASTM D698. 37 b. The results of the standard proctor test must be received prior to beginning 38 excavation. 39 c. Upon commencing of backfill placement for the project the Contractor shall 40 demonstrate means and methods to obtain the required densities. 41 d. Demonstrate Means and Methods for compaction including: 42 1) Depth of lifts for backfill which shall not exceed 12 inches 43 2) Method of moisture control for excessively dry or wet backfill 44 3) Placement and moving trench box,if used 45 4) Compaction techniques in an open trench 46 5) Compaction techniques around structure 47 e. Provide a testing trench box to provide access to the recently backfilled. 48 material. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 33 05 10-18 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 18 of 19 1 f. The City will provide a qualified testing lab full time during this period to 2 randomly test density and moisture continent. 3 1) The testing lab will provide results as available on the job site. 4 7. Varying Ground Conditions 5 a. Notify the City of varying ground conditions and the need for additional 6 proctors. 7 b. Request additional proctors when soil conditions change. 8 c. The City may acquire additional proctors at its discretion. 9 d. Significant changes in soil conditions will require an additional Means and 10 Methods demonstration. 11 3.5 REPAIR[NOT USED] 12 3.6 RE-INSTALLATION[NOT USED] 13 3.7 FIELD QUALITY CONTROL 14 A. Field Tests and Inspections 15 1. Proctors 16 a. The City will perform Proctors in accordance with ASTM D698. 17 b. Test results will generally be available to within 4 calendar days and distributed 18 to: 19 1) Contractor 20 2) City Project Manager 21 3) City Inspector 22 4) Engineer 23 c. Notify the City if the characteristic of the soil changes. 24 d. City will perform new proctors for varying soils: 25 1) When indicated in the geotechnical investigation in the Appendix 26 2) If notified by the Contractor 27 3) At the convenience of the City 28 e. Trenches where different soil types are present at different depths,the proctors 29 shall be based on the mixture of those soils. 30 2. Density Testing of Backfill 31 a. Density Tests shall be in conformance with ASTM D2922. 32 b. Provide a testing trench protection for trench depths in excess of 5 feet. 33 c. Place, move and remove testing trench protection as necessary to facilitate all 34 test conducted by the City. 35 d. For final backfill depths less than 15 feet and trenches of any depth not under 36 existing or future pavement: 37 1) The City will perform density testing twice per working day when 38 backfilling operations are being conducted. 39 2) The testing lab shall take a minimum of 3 density tests of the current lift in 40 the available trench. 41 e. For final backfill depths 15 feet and greater deep and under existing or future 42 pavement: 43 1) The City will perform density testing twice per working day when 44 backfilling operations are being conducted. 45 2) The testing lab shall take a minimum of 3 density tests of the current lift in 46 the available trench. 47 3) The testing lab will remain onsite sufficient time to test 2 additional lifts. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 330510-19 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 19 of 19 1 f. Make the excavation available for testing. 2 g. The City will determine the location of the test. 3 h. The City testing lab will provide results to Contractor and the City's Inspector 4 upon completion of the testing. 5 i. A formal report will be posted to the City's Buzzsaw site within 48 hours. 6 j. Test reports shall include: 7 1) Location of test by station number 8 2) Time and date of test 9 3) Depth of testing 10 4) Field moisture 11 5) Dry density 12 6) Proctor identifier 13 7) Percent Proctor Density 14 3. Density of Embedment 15 a. Storm sewer boxes that are embedded with acceptable backfill material, 16 blended backfill material,cement modified backfill material or select material 17 will follow the same testing procedure as backfill. 18 b. The City may test fine crushed rock or crushed rock embedment in accordance 19 with ASTM D2922 or ASTM 1556. 20 B. Non-Conforming Work 21 1. All non-conforming work shall be removed and replaced. 22 3.8 SYSTEM STARTUP[NOT USED] 23 3.9 ADJUSTING[NOT USED] 24 3.10 CLEANING[NOT USED] 25 3.11 CLOSEOUT ACTIVITIES[NOT USED] 26 3.12 PROTECTION[NOT USED] 27 3.13 MAINTENANCE [NOT USED] 28 3.14 ATTACHMENTS [NOT USED] 29 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.2—Added Item for Concrete Encasement for Utility Lines Various Sections—Revised Depths to Include 15'and greater 12/20/2012 D.Johnson 3.3.A—Additional notes for pavement protection and positive drainage. 3.4.E.2—Added requirements for backfill of service lines. 3.4.E.5—Added language prohibiting flooding of trench 1.2.A.3—Clarified measurement and payment for concrete encasement as per plan 6/18/2013 D.Johnson quantity 2.2.A—Added language for concrete encasement 30 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised June 19,2013 330514-1 ADJUSTING MANHOLES,INLETS,VALVE BOXES,AND OTHER STRUCTURES TO GRADE Page 1 of 8 1 SECTION 33 05 14 2 ADJUSTING MANHOLES,INLETS,VALVE BOXES,AND OTHER STRUCTURES TO 3 GRADE 4 PART1 - GENERAL 5 1.1 SUMMARY 6 A. Section Includes: 7 1. Vertical adjustments to manholes,drop inlets, valve boxes,cathodic protection test 8 stations and other miscellaneous structures to a new grade 9 B. Deviations from this City of Fort Worth Standard Specification 10 I, F-0 R, TUTS PROJECT AD-11;STING MANR 101,E COV 1'.RS.. \kATY;R IMhTER 11 BOX AND VAI,VF 11()X 51111,1. BF (:'ONSI ER1,T) S1AISI1D[ARY "TO 12 C ONC.'RETF•: PAVING SI'CT10N _Q 13 vi, 13 2, ADJL1STN'[E=N'1fREi-\PIR {)F L'XISTIN Ci IkRIGA'1'0IN I..EM: A T) 14 A)11'I,.JRT1;N`ANC'FS RY A LJCI--NSF.D T1;`XL.IS 11LI BIR %IIAl-L. 11 I, PAT 1) 15 P1-R ACItAL COST Of AW tJSTN-1 LIN*I' 1'LLaSTEN 1%RL:1=1N'1' C3VE^' 1TI:,kI-) 16 C. Related Specification Sections include,but are not necessarily limited to: 17 1. Division 0—Bidding Requirements,Contract Forms,and Conditions of the 18 Contract 19 2. Division 1 —General Requirements 20 3. Section 32 01 17—Permanent Asphalt paving Repair 21 4. Section 32 0129—Concrete Paving Repair 22 5. Section 33 05 10—Utility Trench Excavation,Embedment and Backfill 23 6. Section 33 05 13—Frame,Cover and Grade Rings 24 7. Section 33 39 10—Cast-in-Place Concrete Manholes 25 8. Section 33 39 20—Precast Concrete Manholes 26 9. Section 33 12 20—Resilient Seated(Wedge)Gate Valve 27 10. Section 33 12 21 —AWWA Rubber-Seated Butterfly Valve 28 11. Section 33 04 11—Corrosion Control Test Station 29 12. Section 33 04 12—Magnesium Anode Cathodic Protection System 30 1.2 PRICE AND PAYMENT PROCEDURES 31 A. Measurement and Payment 32 1. Manhole—Minor Adjustment: SUBSIDIARY TO CONCRETE PAVING 33 MeasaFeffiefit 34 1) MOaSeFeffWfit feF diis Item shall be per-eaeh adjastfaeM using enly gmde 35 36 grade as speeified oft the DMwifigs. 37 b. Payment CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 330514-2 ADJUSTING MANHOLES,INLETS,VALVE BOXES,AND OTHER STRUCTURES TO GRADE Page 2 of 8 1 1) The work pe&fmed and the ffwer-ials fumished in aeeefdanee with this 2 "MaMele Adjustment, 3 Minor-"eempleted-. 4 e. The p6ee bid shall ifielude.: 5 1) Pavement mffteval 6 Exeavatieft 7 3}-14euha 8 4) Disposal of exeess mateFW 9 5) grade fings or-ether-Austment deviee 10 6) Reuse of the existing ffwahele hwm and eeYff 11 ,plaeiag and eempaetion of embedment and bael 12 8) Genefete base ffwefi-I 13 , 14 10) Clean up 15 2. Manhole-Major Adjustment 16 a. Measurement 17 1) Measurement for this Item shall be per each adjustment requiring structural 18 modifications to raise or lower a manhole to a grade as specified on the 19 Drawings. 20 b. Payment 21 1) The work performed and the materials furnished in accordance with this 22 Item will be paid for at the unit price bid per each"Manhole Adjustment, 23 Major"completed. 24 c. The price bid shall include: 25 1) Pavement removal 26 2) Excavation 27 3) Hauling 28 4) Disposal of excess material 29 5) Structural modifications,grade rings or other adjustment device 30 6) Reuse of the existing manhole frame and cover 31 7) Furnishing,placing and compaction of embedment and backfill 32 8) Concrete base material 33 9) Permanent asphalt patch or concrete paving repair,as required 34 10) Clean-up 35 3. Manhole-Major Adjustment with Frame and Cover 36 a. Measurement 37 1) Measurement for this Item shall be per each adjustment requiring structural 38 modifications to raise or lower a manhole to a grade specified on the 39 Drawings or structural modifications for a manhole requiring a new frame 40 and cover,often for changes to cover diameter. 41 b. Payment 42 1) The work performed and the materials furnished in accordance with this 43 Item will be paid for at the unit price bid per each"Manhole Adjustment, 44 Major w/Cover"completed. 45 c. The price bid shall include: 46 1) Pavement removal 47 2) Excavation 48 3) Hauling 49 4) Disposal of excess material CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 330514-3 ADJUSTING MANHOLES,INLETS,VALVE BOXES,AND OTHER STRUCTURES TO GRADE Page 3 of 8 1 5) Structural modifications,grade rings or other adjustment device 2 6) Frame and cover 3 7) Furnishing,placing and compaction of embedment and backfill 4 8) Concrete base material 5 9) Permanent asphalt patch or concrete paving repair,as required 6 10) Clean-up 7 4. Inlet 8 a. Measurement 9 1) Measurement for this Item shall be per each adjustment requiring structural 10 modifications to inlet to a grade specified on the Drawings. 11 b. Payment 12 1) The work performed and the materials furnished in accordance with this 13 Item will be paid for at the unit price bid per each"Inlet Adjustment" 14 completed. 15 c. The price bid shall include: 16 1) Pavement removal 17 2) Excavation 18 3) Hauling 19 4) Disposal of excess material 20 5) Structural modifications 21 6) Furnishing,placing and compaction of embedment and backfill 22 7) Concrete base material,as required 23 8) Surface restoration,permanent asphalt patch or concrete paving repair,as 24 required 25 9) Clean-up 26 5. Valve Box: SUBSIDIARY TO CONCRETE PAVING 27 a. Me o n 28 1) MeasaFefaent for-d*is Item sha4l be per-eaeb adjustment to a gmde speeified. 29 on the Dr-&w* gs 30 b. gayfnefi4 31 1) The work petf-emed and the fnater-ials fumished in aeeefdanee with this 32 " 33 34 . 35 1) Pavement r- .,t 36 2) ENeavatien 37 9) waling 38 4) Disposal of exeess augefW 39 5) Adjustment deviee 40 , 41 ,as r-equke 42 , 43 r-e"ir-ed 44 9) Clean 45 6. Cathodic Protection Test Station 46 a. Measurement 47 1) Measurement for this Item shall be per each adjustment to a grade specified 48 on the Drawings. 49 b. Payment CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 330514-4 ADJUSTING MANHOLES,INLETS,VALVE BOXES,AND OTHER STRUCTURES TO GRADE Page 4 of 8 1 1) The work performed and the materials furnished in accordance with this 2 Item will be paid for at the unit price bid per each"Cathodic Protection 3 Test Station Adjustment"completed. 4 c. The price bid shall include: 5 1) Pavement removal 6 2) Excavation 7 3) Hauling 8 4) Disposal of excess material 9 5) Adjustment device 10 6) Furnishing,placing and compaction of embedment and backfill 11 7) Concrete base material,as required 12 8) Surface restoration,permanent asphalt patch or concrete paving repair,as 13 required 14 9) Clean-up 15 7. Fire Hydrant 16 a. Measurement 17 1) Measurement for this Item shall be per each adjustment requiring stem 18 extensions to meet a grade specified by the Drawings. 19 b. Payment 20 1) The work performed and the materials furnished in accordance with this 21 Item will be paid for at the unit price bid per each"Fire Hydrant Stem 22 Extension"completed. 23 c. The price bid shall include: 24 1) Pavement removal 25 2) Excavation 26 3) Hauling 27 4) Disposal of excess material 28 5) Adjustment materials 29 6) Furnishing,placing and compaction of embedment and backfill 30 7) Concrete base material, as required 31 8) Surface restoration,permanent asphalt patch or concrete paving repair,as 32 required 33 9) Clean-up 34 8. Miscellaneous-94%w-P&r-e UTILITY ADJUSTMENT 35 a. Measurement 36 4-) Measurement for this Item shall be per each adjustment requiring structural 37 modifications to UTILITYARRIGATON LINE AND APPURTENANCES 38 WHERE SUCH UTILITY/IRRIGATION LINE ARE THE PROPERTY 39 OWNER'S RESPONSIBILITY TO MAINTAIN 40 speeified on the Dfliwiftgs.- 41 b. Payment 42 1) The work performed and the materials furnished in accordance with this 43 Item will be paid PER ACTUAL COST OF THE ADJUSTMENTS PLUS 44 TEN PERCENT TO COVER THE COST OF BOND AND OVERHEAD 45 INCURRED BY THE CONTRACTOR IN HANDLING THE UTILITY 46 ADJUSTMNETS "Miseellaneeas 47 . 48 c. The price bid shall include: 49 1) Pavement removal CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 330514-5 ADJUSTING MANHOLES,INLETS,VALVE BOXES,AND OTHER STRUCTURES TO GRADE Page 5 of 8 1 2) Excavation 2 3) Hauling 3 4) Disposal of excess material 4 5) StnaewER4 UTILITY modifications 5 6) Furnishing,placing and compaction of embedment and backfill 6 7) Concrete base material 7 8) Permanent asphalt patch or concrete paving repair,as required 8 9) Clean-up 9 1.3 REFERENCES 10 A. Definitions 11 1, Minor Adjustment 12 a. Refers to a small elevation change performed on an existing manhole where the 13 existing frame and cover are reused. 14 2. Major Adjustment 15 a. Refers to a significant elevation change performed on an existing manhole 16 which requires structural modification or when a 24-inch ring is changed to a 17 30-inch ring. 18 B. Reference Standards 19 1. Reference standards cited in this Specification refer to the current reference 20 standard published at the time of the latest revision date logged at the end of this 21 Specification,unless a date is specifically cited. 22 2. Texas Commission on Environmental Quality(TCEQ): 23 a. Title 30,Part I,Chapter 217, Subchapter C,Rule 217.55—Manholes and 24 Related Structures. 25 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 28 1,7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE[NOT USED] 31 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 32 1.11 FIELD[SITE] CONDITIONS[NOT USED] 33 1,12 WARRANTY [NOT USED] 34 PART 2- PRODUCTS 35 2.1 OWNER-FURNISHED[OR]OWNER-SUPPLIED PRODUCTS [NOT USED] 36 2.2 MATERIALS 37 A. Cast-in-Place Concrete CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 330514-6 ADJUSTING MANHOLES,INLETS,VALVE BOXES,AND OTHER STRUCTURES TO GRADE Page 6 of 8 1 1. See Section 03 30 00. 2 B. Modifications to Existing Concrete Structures 3 1. See Section 03 80 00. 4 C. Grade Rings 5 1. See Section 33 05 13. 6 D. Frame and Cover 7 1. See Section 33 05 13. 8 E. Backfill material 9 1. See Section 33 05 10. 10 F. Water valve box extension 11 1. See Section 33 12 20. 12 G. Corrosion Protection Test Station 13 1. See Section 33 04 11. 14 H. Cast-in-Place Concrete Manholes 15 1. See Section 33 39 10. 16 I. Precast Concrete Manholes 17 1. See Section 33 39 20. 18 2.3 ACCESSORIES [NOT USED] 19 2.4 SOURCE QUALITY CONTROL[NOT USED] 20 PART 3- EXECUTION 21 3.1 INSTALLERS [NOT USED] 22 3.2 EXAMINATION 23 A. Verification of Conditions 24 1. Examine existing structure to be adjusted,for damage or defects that may affect 25 grade adjustment. 26 a. Report issue to City for consideration before beginning adjustment. 27 3.3 PREPARATION 28 A. Grade Verification 29 1. On major adjustments confirm any grade change noted on Drawings is consistent 30 with field measurements. 31 a. If not,coordinate with City to verify final grade before beginning adjustment. 32 3.4 ADJUSTMENT 33 A. Manholes,Inlets,and MiscellaneousStmetwes UTILITY ADJUSTMENT 34 1. On any sanitary sewer adjustment replace 24-inch frame and cover assembly with 35 30-inch frame and cover assembly per TCEQ requirement. CrrY OF FORT WORTH CONCRETE RESTORATION(20I7-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 330514-7 ADJUSTING MANHOLES,INLETS,VALVE BOXES,AND OTHER STRUCTURES TO GRADE Page 7 of 8 1 2. On manhole major adjustments,inlets and miscellaneous structures protect the 2 bottom using wood forms shaped to fit so that no debris blocks the invert or the 3 inlet or outlet piping in during adjustments. 4 a. Do not use any more than a 2-piece bottom. 5 3. Do not extend chimney portion of the manhole beyond 24 inches. 6 4. Use the least number of grade rings necessary to meet required grade. 7 a. For example,if a 1-foot adjustment is required,use 2 6-inch rings,not 6 2-inch 8 rings. 9 5. A LICENSED TEXUS PLUMBER SHALL BE RESPONSIBLE FOR 10 REPAIR/ADJUSTMENT OF UTILITY/IRRIGATION LINE AND 11 APPURTENANCES 12 B. Valve Boxes 13 1. Utilize typical 3 piece adjustable valve box for adjusting to final grade as shown on 14 the Drawings. 15 C. Backfill and Grading 16 1. Backfill area of excavation surrounding each adjustment in accordance to Section 17 33 05 10. 18 D. Pavement Repair 19 1. If required pavement repair is to be performed in accordance with Section 32 01 17 20 or Section 32 0129. 21 3.5 REPAIR/RESTORATION [NOT USED] 22 3.6 RE-INSTALLATION [NOT USED] 23 3.7 FIELD [OR]SITE QUALITY CONTROL[NOT USED] 24 3.8 SYSTEM STARTUP [NOT USED] 25 3.9 ADJUSTING[NOT USED] 26 3.10 CLEANING[NOT USED] 27 3.11 CLOSEOUT ACTIVITIES [NOT USED] 28 3.12 PROTECTION [NOT USED] 29 3.13 MAINTENANCE [NOT USED] 30 3.14 ATTACHMENTS [NOT USED] 31 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.2.A—Pay item added for a major manhole adjustment which reuses the existing frame and cover and a major adjustment requiring a new frame and cover;Added 12/20/2012 D.Johnson items to be included in price bids; Blue text added for clarification for miscellaneous structure adjustments 3.4—Pavement repair requirements were added CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 330514-8 ADJUSTING MANHOLES,INLETS,VALVE BOXES,AND OTHER STRUCTURES TO GRADE Page 8 of 8 I I I I 1 CITY OF FORT WORTH CONCRETE RESTORATION(20I7-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised December 20,2012 3471 13-1 TRAFFIC CONTROL Page 1 of 6 1 SECTION 34 7113 2 TRAFFIC CONTROL 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Installation of Traffic Control Devices and preparation of Traffic Control Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. FOR THIS PRO.IEtT TRAFFIC t'OiV7'1 OL SECTION 34'71' 13 SliAIJ. BE 9 CONS Ii:ki.11ET) S1 TBS 11)l.r R Y WORK. NO SEPARATE,PAY. 10 2. f1tAFTIC. (v )i `I Rt)I. 141i'lylyl 1'E i 'i , 7"G(.}' , TNS'FA1,1 .A'r1('N, 11 MA1NT1-,AN1 (1'.': A17J1.1'SIA11":' I-S, RI:PLAC'HMl:d" TS AN[) REA-10 AL OF 12 I-12A1.FIC c.ON l"R01. F)T' IC L' S SHALL ISL CONSIDERED SUBSIDIARY 13 WORK, NO SIrPARA'fly ?AY. 14 3, PREPAR.,I T ON 0 F -l` AFFTC CONTROL. PLAIN iDF7TA►fl.5, ADHrRE[NCE 'ft_) 15 CITE' AN1) T1-1,V-\S N-'i.' , l;F' L ON l"NI'R()L I)FVl(-[-S 16 (1101-,-I"t'[?i, Oi1TAI IN(-j SI(j-NA`1.I'121: L) 'ST7AT. X91- A I.ICJ--�NSl'1)-1I XS 17 PFSOIT."SSI(}*:ALSllALLBEC NS11 I-']�l.:L) SI_!I3SI.L}IAI� Y 18 1V()KK, N() Sf.PAI;'ATE 11A+ *. 19 C. Related Specification Sections include,but are not necessarily limited to: 20 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 21 2. Division 1—General Requirements 22 1.2 PRICE AND PAYMENT PROCEDURES 23 A. Measurement and Payment 24 1. Installation of Traffic Control Devices: SUBSIDIARY NO SEPARATE PAY 25 a. me a n 26 1\ A,re.,..we...efA COO T...,ff;e CW4Fel PeN46e shall be pe ffiefith f..«the PFE, eer 27 Katie". 28 . 29 b. Payment 30 31 "shall be paid for-at the 32 " 33 e. The pfiee bid shall inekHle-i. 34 35 2) Installation 36 3) maintea ee 37 4}Adjustments 38 5) Replaeelflents 39 6) Remeval 41 2. Portable Message Signs CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 3471 13-2 TRAFFIC CONTROL Page 2 of 6 1 a. Measurement 2 1) Measurement for this Item shall be per week for the duration of use. 3 b. Payment 4 1) The work performed and materials furnished in accordance to this Item and 5 measured as provided under"Measurement" shall be paid for at the unit 6 price bid per week for"Portable Message Sign'rental. 7 c. The price bid shall include: 8 1) Delivery of Portable Message Sign to Site 9 2) Message updating 10 3) Sign movement throughout construction 11 4) Return of the Portable Message Sign post-construction 12 3. Preparation of Traffic Control Plan Details: SUBSIDIARY NO SEPARATE PAY 13 a. Me a nt 14 . 15 b. Payffien 16 17 shaI4 be paid fef eA the u&pfiee bid pef eaeh" 18 premed. 19 . 20 21 lea� 22 23 q r te) 24 25 4) lneefper-afiea of City eewiments 26 1.3 REFERENCES 27 A. Reference Standards 28 1. Reference standards cited in this Specification refer to the current reference 29 standard published at the time of the latest revision date logged at the end of this 30 Specification,unless a date is specifically cited. 31 2. Texas Manual on Uniform Traffic Control Devices(TMUTCD). 32 3. Item 502,Barricades,Signs,and Traffic Handling of the Texas Department of 33 Transportation, Standard Specifications for Construction and Maintenance of 34 Highways,Streets,and Bridges. 35 1.4 ADMINISTRATIVE REQUIREMENTS 36 A. Coordination 37 1. Contact Traffic Services Division(817-392-7738) a minimum of 48 hours prior to 38 implementing Traffic Control within 500 feet of a traffic signal. 39 B. Sequencing 40 1. Any deviations to the Traffic Control Plan included in the Drawings must be first 41 approved by the City and design Engineer before implementation. 42 1.5 SUBMITTALS 43 A. Provide the City with a current list of qualified flaggers before beginning flagging 44 activities. Use only flaggers on the qualified list. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 3471 13-3 TRAFFIC CONTROL Page 3 of 6 1 B. Obtain a Street Use Permit from the Street Management Section of the Traffic 2 Engineering Division,311 W. le Street. The Traffic Control Plan(TCP)for the 3 Project shall be as detailed on the Traffic Control Plan Detail sheets of the Drawing set. 4 A copy of this Traffic Control Plan shall be submitted with the Street Use Permit. 5 C. Traffic Control Plans shall be signed and sealed by a licensed Texas Professional 6 Engineer. 7 D. Contractor shall prepare Traffic Control Plans if required by the Drawings or 8 Specifications. The Contractor will be responsible for having a licensed Texas 9 Professional Engineer sign and seal the Traffic Control Plan sheets. 10 E. Lane closures 24 hours or longer shall require a site-specific traffic control plan. 11 F. Contractor responsible for having a licensed Texas Professional Engineer sign and seal 12 changes to the Traffic Control Plan(s)developed by the Design Engineer. 13 G. Design Engineer will furnish standard details for Traffic Control. 14 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 15 1.7 CLOSEOUT SUBMITTALS [NOT USED] 16 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 17 1.9 QUALITY ASSURANCE[NOT USED] 18 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 19 1.11 FIELD [SITE] CONDITIONS [NOT USED] 20 1.12 WARRANTY [NOT USED] 21 PART 2- PRODUCTS 22 2.1 OWNER-FURNISHED[OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 23 2.2 ASSEMBLIES AND MATERIALS 24 A. Description 25 1. Regulatory Requirements 26 a. Provide Traffic Control Devices that conform to details shown on the 27 Drawings,the TMUTCD, and TxDOT's Compliant Work Zone Traffic Control 28 Device List(CWZTCDL). 29 2. Materials 30 a. Traffic Control Devices must meet all reflectivity requirements included in the 31 TMUTCD and TxDOT Specifications—Item 502 at all times during 32 construction. 33 b. Electronic message boards shall be provided in accordance with the TMUTCD. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 347113-4 TRAFFIC CONTROL Page 4 of 6 1 2.3 ACCESSORIES [NOT USED] 2 2.4 SOURCE QUALITY CONTROL[NOT USED] 3 PART 3 - EXECUTION 4 3.1 EXAMINATION [NOT USED] 5 3.2 PREPARATION 6 A. Protection of In-Place Conditions 7 1. Protect existing traffic signal equipment. 8 3.3 INSTALLATION 9 A. Follow the Traffic Control Plan(TCP)and install Traffic Control Devices as shown on 10 the Drawings and as directed. 11 B. Install Traffic Control Devices straight and plumb. 12 C. Do not make changes to the location of any device or implement any other changes to 13 the Traffic Control Plan without the approval of the Engineer. 14 1. Minor adjustments to meet field constructability and visibility are allowed. 15 D. Maintain Traffic Control Devices by taking corrective action as soon as possible. 16 1. Corrective action includes but is not limited to cleaning,replacing, straightening, 17 covering,or removing Devices. 18 2. Maintain the Devices such that they are properly positioned, spaced,and legible, 19 and that retroreflective characteristics meet requirements during darkness and rain. 20 E. If the Inspector discovers that the Contractor has failed to comply with applicable federal 21 and state laws(by failing to furnish the necessary flagmen,warning devices,barricades, 22 lights,signs,or other precautionary measures for the protection of persons or property),the 23 Inspector may order such additional precautionary measures be taken to protect persons 24 and property. 25 F. Subject to the approval of the Inspector,portions of this Project,which are not affected by 26 or in conflict with the proposed method of handling traffic or utility adjustments,can be 27 constructed during any phase. 28 G. Barricades and signs shall be placed in such a manner as to not interfere with the sight 29 distance of drivers entering the highway from driveways or side streets. 30 H. To facilitate shifting,barricades and signs used in lane closures or traffic staging may 31 be erected and mounted on portable supports. 32 1. The support design is subject to the approval of the Engineer. 33 I. Lane closures shall be in accordance with the approved Traffic Control Plans. 34 J. If at any time the existing traffic signals become inoperable as a result of construction 35 operations,the Contractor shall provide portable stop signs with 2 orange flags,as 36 approved by the Engineer,to be used for Traffic Control. CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 347113-5 TRAFFIC CONTROL Page 5 of 6 1 K. Contractor shall make arrangements for police assistance to direct traffic if traffic signal 2 tum-ons, street light pole installation,or other construction will be done during peak traffic 3 times(AM:7 am—9 am,PM:4 pm-6 pm). 4 L. Flaggers 5 1. Provide a Contractor representative who has been certified as a flagging instructor 6 through courses offered by the Texas Engineering Extension Service,the American 7 Traffic Safety Services Association,the National Safety Council, or other approved 8 organizations. 9 a. Provide the certificate indicating course completion when requested. 10 b. This representative is responsible for training and assuring that all flaggers are 11 qualified to perform flagging duties. 12 2. A qualified flagger must be independently certified by 1 of the organizations listed 13 above or trained by the Contractor's certified flagging instructor. 14 3. Flaggers must be courteous and able to effectively communicate with the public. 15 4. When directing traffic,flaggers must use standard attire,flags, signs,and signals 16 and follow the flagging procedures set forth in the TMUTCD. 17 5. Provide and maintain flaggers at such points and for such periods of time as may be 18 required to provide for the safety and convenience of public travel and Contractor's 19 personnel,and as shown on the Drawings or as directed by the Engineer. 20 a. These flaggers shall be located at each end of the lane closure. 21 M. Removal 22 1. Upon completion of Work,remove from the Site all barricades, signs,cones,lights 23 and other Traffic Control Devices used for work-zone traffic handling in a timely 24 manner,unless otherwise shown on the Drawings. 25 3.4 REPAIR/RESTORATION[NOT USED] 26 3.5 RE-INSTALLATION[NOT USED] 27 3.6 FIELD[oR] SITE QUALITY CONTROL[NOT USED] 28 3.7 SYSTEM STARTUP[NOT USED] 29 3.8 ADJUSTING[NOT USED] 30 3.9 CLEANING[NOT USED] 31 3.10 CLOSEOUT ACTIVITIES [NOT USED] 32 3.11 PROTECTION [NOT USED] 33 3.12 MAINTENANCE[NOT USED] 34 3.13 ATTACHMENTS [NOT USED] 35 END OF SECTION 36 Revision Log CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 347113-6 TRAFFIC CONTROL Page 6 of 6 DATE NAME SUMMARY OF CHANGE 11/22/13 S.Arnold Added police assistance,requirement for when a site specific TCP is required 1 CITY OF FORT WORTH CONCRETE RESTORATION(2017-1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised November 22,2013 SECTION 99 99 00 SPECIAL SPECIFICATION Geogrid,Tensar TriAX140-475 1. Description:Furnish and place geogrid in accordance with the lines and grades shown on the plans or as directed. 2. Materials: Geogrid,a synthetic planar structure formed by a regular network of integrally connected polymeric tensile elements with triangular apertures designed to interlock with the surrounding fill material.Geogrid is used for the reinforcement of roadway base or embankment materials.Furnish geogrid that meets the requirements of Table 1.Use roll widths and lengths shown on the plans or as approved.Deliver each roll of geogrid in suitable packaging to protect it from environmental degradation;each roll will be one continuous piece without discontinuities in the ribs.The Engineer will obtain at least one(1)sample of the geogrid per project for testing,as needed,to verify compliance with Table 1. Table 1 Geogrid Requirements TX140 Index Properties Longitudinal Diagonal Transverse General Rib pitch,mm(in) 40(l.60) 40(l.60) - Mid-rib depth,mm(in) - 1.2(0.05) 1.2(0.05) Mid-rib width,mm(in) - 1.1 (0.04) 1.1 (0.04) Nodal thickness,mm(in) 3.1 (0.12) Rib shape rectangular Aperture shape triangular Rib Aspect Ratio(depth:width) > 1.0 Structural Integrity Junction efficiency, % 93 Aperture stability,(2)kg-cm/deg @ 5.Okg-cm 3.0 Radial stiffness at low strain,(3) kN/m @ 0.5%strain 225 Radial stiffness at low strain,(3) (lb/ft @ 0.5%strain) 15,430 Durability Resistance to chemical degradation 100% Resistance to ultra-violet light and 100% weathering(5) Notes: 1. Load transfer capability determined in accordance with GRI-GG2-87 and GRI-GG1-87 and expressed as a percentage of ultimate tensile strength. 1 2. In-plane torsional rigidity measured by applying a moment to the central junction of a 225mm x 225mm specimen restrained at its perimeter in accordance with U.S.Army Corps of Engineers Methodology for Measurement of Torsional Rigidity,(Kinney,T.C.Aperture stability Modulus ref 3,3-1-2000). 3. Radial stiffness is determined from tensile stiffness measured in any in-plane axis from testing in accordance with the scope of ISO 10319:1996. 4. Resistance to loss of load capacity when subjected to chemically aggressive environments in accordance with testing to ISO 12960 as part of a durability assessment in accordance with ISO 13434:1999 7.3 5. Resistance to loss of load capacity when subjected to ultra-violet light and weathering in accordance with testing to EN12224 as part of a durability assessment in accordance with IS013434:1999 7.2 6. All dimensions and values are typical unless otherwise stated. 3. Identification:Identify each roll with a tag or label securely affixed to the outside of the roll on one end.List the following information on the label: • unique roll number,serially designated; • lot number or control number; • name of producer; • style or catalog designation of product;and • roll width and length. 4. Construction:Prepare the subgrade as indicated on the plans or as directed.Set string lines for alignment,if directed.Install geogrid in accordance with lines and grades as shown on the plans or as directed.Place base material in lift thicknesses and compact as shown on the plans or as directed.Do not operate tracked construction equipment on the geogrid without a minimum fill cover of six(6)inches.Rubber tire construction equipment may operate directly on the geogrid at speeds less than five(5)mph if the underlying material supports the loads.Where excessive substructure deformation is apparent,correct the grid placement operations as recommended by the manufacturers or as directed. A. Placement:Orient the geogrid length as unrolled parallel to the direction of roadway. Overlap geogrid sections as shown on the plans or as directed.Use plastic ties at overlap joints or as directed.Placement of geogrid around corners may require cutting and diagonal lapping.Pin geogrid at the beginning of the backfill section as directed.Keep geogrid taut at the beginning of the backfilling section but not restrained from stretching or flattening. 1. Longitudinal Joints:Overlap longitudinal joints by a minimum of 1 ft.Space longitudinal ties 10 ft.to 15 ft.or as directed. 2. Transverse Joints:Overlap transverse joints by a minimum of 1 ft.Space transverse ties 4 ft.to 5 ft. or as directed. B. Damage Repair:As directed,remove and replace contractor damaged or excessively deformed areal without additional compensation.Lap repair areas a minimum of 3 ft.in all directions.Tie each side of repair grid in at least three(3)locations but do not exceed normal construction spacing;tie spacing for odd shapes will be as directed.Repair excessively deformed materials underlying the grid as directed. 5. Measurement: Geogrid will be measured by the square yard of roadway placement as shown in the plans with no allowance for overlapping at transverse and longitudinal joints. 2 6. Payment:The work performed and materials furnished in accordance with this item,as measured, will be paid for at the unit price bid for"Geogrid,Tensar TriAX140-475".This price is full compensation for furnishing,preparing,hauling and placing materials including labor,materials, freight,tools,equipment and incidentals. 3 ATTACHMENT 1C Page 1 of 4 FORT WORTH City of Fort Worth !� Minority Business Enterprise MBE Good Faith Effort Form OFFEROR COMPANY NAME: Check applicable block to describe Arreguin Group, Inc. Offeror PROJECT NAME: 2017-1 concrete restorationBID DATE 11-10-2016 City's MBE Project Goal: Offeror's MBE Project Commitment: PROJECT NUMBER 9 ors 9 % 100630 If the Offeror did not meet or exceed the MBE subcontracting goal for this project, the Offeror must complete this form. If the Offeror's method of compliance with the MBE goal is based upon demonstration of a "good faith effort", the Offeror will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 11 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Offeror. Failure to complete this form, in its entirety with supporting documentation, and received by the Purchasing Division no later than 2:00 p.m. on the second City business day after bid opening, exclusive of bid opening date,will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a MBE or non-MBE. (DO NOT LIST NAMES OF FIRMS) On all projects, the Offeror must list each subcontracting and or supplier opportunity regardless of tier. (Use additional sheets,if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Galindo Trucking, Inc. INH Concrete Cutting Rev.2110/15 ATTACHMENT 1C Page 2 of 4 2.) Obtain a current(not more than two(2)months old from the bid open date)list of MBE subcontractors and/or suppliers from the City's M/WBE Office. Yes Date of Listing / / K No 3.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail,exclusive of the day the bids are opened? Yes (If yes,attach MBE mail listing to include name of firm and address and a dated copy of letter mailed.) X No 4.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone,exclusive of the day the bids are opened? X Yes (If yes,attach list to include name of MBE firm,person contacted,phone number and date and time of contact) No 6.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by facsimile(fax),exclusive of the day the bids are opened? Yes (If yes,attach list to include name of MBE firm,fax number and date and time of contact In addition,if the fax is returned as undeliverable,then that"undeliverable confirmation"received must be printed directly from the facsimile for proper documentation. Failure to submit confirmation and/or"undeliverable confirmation" documentation may render the GFE non-responsive.) X No 6.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email,exclusive of the day the bids are opened? Yes (If yes,attach email confirmation to include name of MBE firm,date and time.In addition,if an email is returned as undeliverable,then that"undeliverable message"receipt must be printed directly from the email system for proper documentation. Failure to submit confirmation and/or"undeliverable message"documentation may render the GFE non-responsive.) X No NOTE: The four methods identified above are acceptable for soliciting bids, and each selected method must be applied to the applicable contract. The Offeror must document that either at least two attempts were made using two of the four methods or that at least one successful contact was made using one of the four methods in order to be deemed responsive to the Good Faith Effort requirement. NOTE: The Offeror must contact the entire MBE list specific to each subcontracting and supplier opportunity to be in compliance with questions 3 through 6. 7.) Did you provide plans and specifications to potential MBEs? Yes X No 8.) Did you provide the information regarding the location of plans and specifications in order to assist the MBEs? X Yes No Rev.2/10/15 ATTACHMENT 1C Page 3 of 4 9.) Did you prepare a quotation for the MBEs to bid on goods/services specific to their skill set? Yes (If yes,attach all copies of quotations.) X No 10.) Was the contact information on any of the listings not valid? Yes (if yes,attach the information that was not valid in order for the MIWBE Office to address the corrections needed.) X No 11.)Submit documentation if MBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the MBE was rejected and any supporting documentation the Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Offeror will provide for confidential in-camera access to an inspection of any relevant documentation by City personnel. (Please use additional sheets,if necessary,and attach. Company Name Telephone Contact Person Scope of Work Reason for Rejection ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain MBE participation on this project. The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance shall create a material breach of contract and may result in a determination of an irresponsible Offeror and debarment from participating in City work for a period of time not less than one (1) year. Rev.2110115 ATTACHMENT 1C Page 4 of 4 The undersigned certifies that the information provided and the MBEs) listed was/were contacted in good faith. It is understood that any MBE(s) listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City's MIWBE O e. VC&AI-1 (, Authorized Signature Printed Signature President Title Contact Name and Title(if different) Arreguin Group, Inc. 214-484-3139 214-484-3305 Company Name Phone Number Fax Number 8204 Elmbrook Dr. #192 varreguin@arreguingroup.com Address Email Address Dallas, Texas 75247 11-10-2016 City/State/Zip Date Rev.2/10/15 ATTACHMENT 1 B FORT WORTH Page 1 of 1 City of Fort Worth Minority Business Enterprise Specifications Prime Contractor Waiver Form OFFEROR COMPAN NAME: Check applicable block to describe prime PROJECT NAME: MNV/DBE NON-M/w/DBE r BID DATE City's MBE Project Goal: Offeror's MBE Project Co 4 fitment: PROJECT NUMBER % °A If both answers to this forma YES, do not complete ATTACHMENT 1C (Good Faith Effort Form). All questions on this form must be completed a d a detailed explanati� provided, if applicable. If the answer to either question is T NO, then you must complete ATTACHMENT 1 C. This orm is only applicable if both answers are yes. Failure to complete this form in k entifre y at i received by the Purchasin,�Division no later than 2:00 .m.,on the sec rid Ci bushe �v I after bi .,x shin 'exclusive of thw bid opening date,will result in the bid being corrsid#red non-resp sive to t specifications. P Will you perform this entire contract.w thout subcontractors? YES If yes, please provide a detailed explanati n`that proves based on the size and scope of this NO project, this is your normal business pragtice and provide an operational profile of your business. Will you perform this entire contct without suppliers? r YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and pr"pvide an inventory profile of your business. NO p`✓ The Offeror further agrees toprovide, directly to th City upon request, complete and accurate information regarding actual work perform�d by all subcontractors, including MBE(s)on this contract, the payment thereof and any proposed changes to thoriginal MBE(s) arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examilhation of any books, records and files held by their company that will substantiate the actual work performed by °the MBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowin misrepresentation of facts will be' rounds for terminating the contract or debarment from City work for a periid of not less than three (3) years ancrJor initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this.ordinance creates a material breach of contract and may result in a d termination of an irresponsible Offeror ari)d barred from participating in City work for a period of time not les than one 1 year. 1 Authorized Signature Printed Signature\ Title Contact Name(if differeN) Company Name Phone Number Nx Number Address Email Address Gty/State2ip Date Rev.2/10/15 IVIM%- i%c vic W i agc i vi i Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA F0 COUNCIL ACTION: Approved on 10/29/2013 REFERENCE ** 20PREVAILING WAGE DATE: 10/29/2013 NO.: C-26534 LOG NAME. RATES 2013 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Adopt 2013 Prevailing Wage Rates for City Awarded Public Works Projects (ALL COUNCIL DISTRICTS) RECOMMENDATION: It is recommended that the City Council adopt the attached 2013 Prevailing Wage Rates for City- awarded Public Works projects. DISCUSSION: Texas Government Code Chapter 2258 requires that a public body awarding a contract for Public Works shall determine the general prevailing rate of per diem wages for each craft or type of worker needed to execute the contract. The public body is required to specify in the bid documents for any Public Works contract, and in the contract itself, the wages as determined and adopted by the public body. The attached 2013 Prevailing Wage Rates data for Heavy and Highway Construction projects identifies the current Davis-Bacon Act prevailing wages for heavy and highway construction projects applicable to the local wage rate zone. The attached 2013 Prevailing Wage Rates data for Commercial Construction projects identifies average wage rates based on a salary survey conducted and published by the North Texas Construction Industry(Fall 2012). The 2013 Prevailing Wage Rates will be included in future City-awarded infrastructure bid documents and contracts once adopted. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that this action will have no material effect on City funds. TO Fund/Account/Centers FROM Fund/Account/Centers Submitted for City Manager's Office by: Fernando Costa (6122) Oriainatina Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Roy Teal (7958) ATTACHMENTS NewCOFW Hor.pdf NewCOFW Vert.pdf 2013 PREVAILING WAGE RATES (Heavy and Highway Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate Asphalt Distributor Operator $ 15.32 Asphalt Paving Machine Operator $ 13.99 Asphalt Raker $ 12.69 Broom or Sweeper Operator $ 11.74 Concrete Finisher, Paving and Structures $ 14.12 Concrete Pavement Finishing Machine Operator $ 16.05 Concrete Saw Operator $ 14.48 Crane Operator,Hydraulic 80 tons or less $ 18.12 Crane Operator,Lattice Boom 80 Tons or Less $ 17.27 Crane Operator, Lattice Boom Over 80 Tons $ 20.52 Crawler Tractor Operator $ 14.07 Electrician $ 19.80 Excavator Operator,50,000 pounds or less $ 17.19 Excavator Operator,Over 50,000 pounds $ 16.99 Flagger $ 10.06 Form Builder/Setter,Structures $ 13.84 Form Setter, Paving&Curb $ 13.16 Foundation Drill Operator,Crawler Mounted $ 17.99 Foundation Drill Operator,Truck Mounted $ 21.07 Front End Loader Operator,3 CY or Less $ 13.69 Front End Loader Operator,Over 3 CY $ 14.72 Laborer,Common $ 10.72 Laborer,Utility $ 12.32 Loader/Backhoe Operator $ 15.18 Mechanic $ 17.68 Milling Machine Operator $ 14.32 Motor Grader Operator,Fine Grade $ 17.19 Motor Grader Operator, Rough $ 16.02 Off Road Hauler $ 12.25 Pavement Marking Machine Operator $ 13.63 Pipelayer $ 13.24 Reclaimer/Pulverizer Operator $ 11.01 Reinforcing Steel Worker $ 16.18 Roller Operator,Asphalt $ 13.08 Roller Operator,Other $ 11.51 Scraper Operator $ 12.96 Servicer $ 14.58 Small Slipform Machine Operator $ 15.96 Spreader Box Operator $ 14.73 Truck Driver Lowboy-Float $ 16.24 Truck Driver Transit-Mix $ 14.14 Truck Driver,Single Axle $ 12.31 Truck Driver,Single or Tandem Axle Dump Truck $ 12.62 Truck Driver,Tandem Axle Tractor with Semi Trailer $ 12.86 Welder $ 14.84 Work Zone Barricade Servicer $ 11.68 The Davis-Bacon Act prevailing wage rates shown for Heavy and Highway construction projects were determined by the United States Department of Labor and current as of September 2013. The titles and descriptions for the classifications listed are detailed in the AGC of Texas'Standard Job Classifications and Descriptions for Highway, Heavy,Utilities,and Industrial Construction in Texas. Page 1 of 1 2013 PREVAILING WAGE RATES (Commercial Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate AC Mechanic $ 25.24 AC Mechanic Helper $ 13.67 Acoustical Ceiling Installer $ 16.83 Acoustical Ceiling Installer Helper $ 12.70 Bricklayer/Stone Mason $ 19.45 Bricklayer/Stone Mason Trainee $ 13.31 Bricklayer/Stone Mason Helper $ 10.91 Carpenter $ 17.75 Carpenter Helper $ 14.32 Concrete Cutter/Sawer $ 17.00 Concrete Cutter/Sawer Helper $ 11.00 Concrete Finisher $ 15.77 Concrete Finisher.Helper $ 11.00 Concrete Form Builder $ 15.27 Concrete Form Builder Helper $ 11.00 Drywall Mechanic $ 15.36 Drywall Helper $ 12.54 Drywall Taper $ 15.00 Drywall Taper Helper $ 11.50 Electrician(Journeyman) $ 19.63 Electrician Apprentice(Helper) $ 15.64 Electronic Technician $ 20.00 Floor Layer $ 18.00 Floor Layer Helper $ 10.00 Glazier $ 21.03 Glazier Helper $ 12.81 Insulator $ 16.59 Insulator Helper $ 11.21 Laborer Common $ 10.89 Laborer Skilled $ 14.15 Lather $ 12.99 Metal Building Assembler $ 16.00 Metal Building Assembler Helper $ 12.00 Metal Installer(Miscellaneous) $ 13.00 Metal Installer Helper(Miscellaneous) $ 11.00 Metal Stud Framer $ 16.12 Metal Stud Framer Helper $ 12.54 Painter $ 16.44 Painter Helper $ 9.98 Pipefitter $ 21.22 Pipefitter Helper $ 15.39 Plasterer $ 16.17 Plasterer Helper $ 12.85 Plumber $ 21.98 Plumber Helper $ 15.85 Reinforcing Steel Setter $ 12.87 Page 1 of 2 Reinforcing Steel Setter Helper $ 11.08 Roofer $ 16.90 Roofer Helper $ 11.15 Sheet Metal Worker $ 16.35 Sheet Metal Worker Helper $ 13.11 Sprinkler System Installer $ 19.17 Sprinkler System Installer Helper $ 14.15 Steel Worker Structural $ 17.00 Steel Worker Structural Helper $ 13.74 Waterproofer $ 15.00 Equipment Operators Concrete Pump $ 18.50 Crane,Clamsheel,Backhoe,Derrick,D'Line Shovel $ 19.31 Forklift $ 16.45 Foundation Drill Operator $ 22.50 Front End Loader $ 16.97 Truck Driver $ 16.77 Welder $ 19.96 Welder Helper $ 13.00 The prevailing wage rates shown for Commercial construction projects were based on a salary survey conducted and published by the North Texas Construction Industry(Fall 2012)Independently compiled by the Lane Gorman Trubitt,PLLC Construction Group. The descriptions for the classifications listed are provided on the TEXO's(The Construction Association)website. www.texoassociation.org/Chapter/wagerates.asp Page 2 of 2 APPENDIX A: STREET LIST U) 2 = m o w $ C 2 G C \ u I 2 2 CL f G 7 f 0 u # o = _CC # � c Ir (D E 0 .2 o w mm c \ � 2 / / R _ R - / 2 f \ . 2 / w LU y 43 > > w c 3 w c d L-uj 0 V > F-A k R w 2 m yIr > / _ 15e E « Ir F- 3� 0 �_ / a « w w cn Ir Ir / ƒ c k m E E / $ G \ m f \ \ \ / - L Q q r- APPENDIX B: STANDARDS 4' 12,. FORTWORTH s �4 I 3" X J Pro`ect Title 1" 4. Funding 2 3" 12 Contractor: 1 22 Contractor's Name 2 T 12., 12° Questions on this Project Call: 1' 12 (817) 392 - XXXX 1' 12° After Hours Call: (817) 392 - XXXX 2" Ri`TYP. 1"TYP. FONTS: NOTES: FORT WORTH LOGO IN CHELTINGHAM BOLD IF APPLICABLE TO THE PROJECT, ALL OTHER LETTERING IN ARIAL BOLD CONTRACTOR SHALL OBTAIN VINYL STICKER"CITY GAS LEASE REVENUE COLORS: IN ACTION"/LOGO AT CDR SIGN AND FORT WORTH-PMS 288-BLUE ENGRAVING,6311 EAST LANCASTER LONGHORN LOGO-PMS 725-BROWN AVE(817451-4684),PEEL AND PLACE LETTERING-PMS 288-BLUE IN FUNDING SECTION. BACKGROUND-WHITE BORDER-BLUE PROJECT DESIGNATION SIGN CITY OF FORT WORTH - CONSTRUCTION STANDARD DRAWING NO. I — H DATE: COLLAR CONFIGURATIONCOLLAR CONFIGURATION FOR PAVED AREA --do* I — FOR UNPAVED AREA V-00 MANHOLE FRAME AND 32" DIA. DUCTILE IRON COVER. (REFER TO STD. PRODUCT LIST) 30 Typ. A A 4000 PSI CONCRETE 8—#4 REBARS TYP. 12* 32" MIN. CHAMFER (TYP.) vi .......... ...............PVMT GROUND.... ................ . ............. ............................... -30. . 27; 1�lf I I 30" CLEAR I -;��•, _T OPENING L CONCRETE COLLAR 1 2 ROWS OF RAM—NSEAL 44 HEIGHT VARIES 20 x 8" x 30" I.D. w/STAGGERED JOINTS OR CONCRETE PRECAST -X APPROVE) EQUAL. GRADE RINGS PER ASTM C478. SECTION A-A REBAR SHALL BE PLACED 3" r) WHERE MANHOLES ARE IN HINGED LIDS ARE REQUIRED MIN. FROM TOP AND BOTTOM THE STREET, INSTALL 2 OR ON 'ALL ELEVATED MANHOLES. OF CONCRETE COLLAR. MORE GRADE RINGS, AS JUNCTION BOXES AND WHERE NEEDED, BETWEEN CASTING SPECIFIED ON PLANS. (REFER AND TOP OF PAVEMENT. TO STD. PRODUCTS LIST) O LOCKS TO BE INSTALLED ON HINGED LIDS INSTALLED IN ALL MANHOLE LIDS BELOW E1-14, El-20. E1-21 MATERIAL STREETS SHALL OPEN THE 100—YEAR FLOOD ELEV. E2-14. E2-20, E2-21 CONSTRUCTION AGAINST THE FLOW OF AND WHERE SPECIFIED ON AFRC. PLANS. CITY OF FORT WORTH, TEXAS DATE:OCT.2009 MANHOLE FRAME, COVER,- GRADE SAN-009 L RINGS AND CONCRETE COLLAR Water. Valve Riser Cross Section view 12 gage G90 galvanized steel . o l 1 1--•-�,� Height nt:w asphalt overlay - 3 �--^— 3/3"D.O.M.Tube Item Item Material Description Tensile Tensile Plumber Description Yield Ultimate I Steel Skirt 12 gage A.I.S.I. 1020 Steel (A-36) 33.000 P.S.I. 60,000 P.S.I. G-90 Galvanized 2 Weld Lincoln Outersheild 71 Elite.045 75 000 P.S.I. 35 000 P.S.I. 3 330"wide D.O M Tube D.O.M.Tube A.I.S.I.1026 A513 iype S 72,000 P.S.1. 87.000 P.S.I. Manhole Riser 3/8" Dia. Hole With 302 Stainless Steel Roll Pin Cross Section view 10 or 12 gage G90 galvanized steel --To Height I new"Ptwt overlay 4 �— 3/4"thick riser bar Exnandine Linkage ��1l.4' �. 17/64"Diameter holes b 5 3/4" O.D. 518 Tla 4 t(4" � 3/8 I. D.7 3/8"- 16 Thread Item Item Material Description Tensile Tensile Number Muription Yield Ultimate I 3/g"Roll Pins 302 Stainks Steil j 14,000 13 Double Stvw Sham 2 Steel Skirt 12 or 10 gage A.I.11. 1020 Sind (A-36) 33.000 P.S.I. 60,000 P.S.I. G-90 Golvani.aod 3 Weld 65'/.70%circurrihmice welded 75,000 P.S.I. 53 000 P.S.I. 4 314"wide Riser Bar HolRolled Steil A1.11. 1020 M36 33.000 P.S.I. 60,000 P.S.I. S Rod Emb For&I ALS.I. C-1030 Stat Hat Trated BHN 240 70,000 P.M. 92,000 P S.l. Zinc Plated with DicInni ie Finish 6 Turnbuckle kLS.1. 1020 BHN 149 70.000 P S.l I 80.000 P S I Line Plated dipped in lirebndrer nill inhibitor Owner: vnguyen File Name: 204419 OP DIGI 1 to 326 8.5x11 Date: October 17, 2016 4:14:20 p.m. Hostname: DHV9110 Copies: 1 Images Processed: 327 Total Images: 327 Operator Message: Printed Sides: 2—Sided Collate: On Stack: Offset Staple: None Fold: None Document Exit: Stacker Format/PDL: PDF %!PS-Adobe-3.0 %%Emulation: pdf %KDKJobId: 50103252 %KDKSource: remove file:/var/spool/kodak resources/rip—data/hch.17005.58053f2c-37 %!PS-Adobe-3.0 %%StartKPDComments %EK-JSE-3-0-Build: 07.00.00.0000 96KDKBody: (Letter) on %KDKPrintMethod: print %KDKOutputMedia: stacker Mequirements: numcopies(1) staple(none) fold(none) duplex(on) collate jog(alternate) 96KDKRequirements: numcopies(1) staple(none) fold(none) duplex(longedge) collate jog(altei $KDKCovers: (Letter) none %KDKRotation: 0 %KDKError: 1page (Letter) %KDKSlip: (Color) duplex 25 $4+ (Color) duplex 305..315 %KDKActOn: %%Title: (204419 OP DIGI 1 to 326 8.5x11) %%For: (vnguyen) %%Emulation: pdf %%DocumentPrinterRequired: () (DS9110) MocumentMedia: (Letter) 612 792 75 (white) (plain) %$+ (Color) 612 792 75 (any) (color) %KDKMedia: (Letter) sides(2) %$+ (Color) sides(2) %KDKEngineGRET: off %KDKPDFVersion: usepol %KDKPDFAutoCenter: off %KDKPDFBinaryOK: on %KDKPDFMediaMatchAll: on %KDKPDFPrintAnnotations: off %KDKPDFFitToPage: off I U I '-b uj gy � x 14 )z 4 4 4 x < u Z Us co x R )k v )I )t it t NQ LU N is ------ z0f= z 8 on w op a ou wo gas ou LL F71 u ui it Zo r :32 0 z z all Us 08 CO. z a ui 5 zo g� a �I n: 0 ul z �!aq Us 8 0 z 0 C, w 0 ta 5 co z 1511N.2 ........ ........ F-O !!' z F- 0 7-1 i R:1 < 1 z i ; Z 0 oi 4e� Cgig F-k F- Zo R 120 0 z Q ON -T ii U Z L Ig z ISE 9 F-