WHEREAS, the City of Fort Worth (City) and Parsons Water and
Infrastructure, Inc. (Engineer) made and entered into City
Secretary Contract No. 31257, (the Contract) which was authorized
by the City Council by MSC C-20470 on the 4th day of January, 2005
and subsequently revised by four previous amendments;
WHEREAS, the Contract involves engineering services for the
following project:
Water and Sanitary Sewer Main Replacements on Throckmorton
Street and 14th Street
WHEREAS, it has become necessary to execute Amendment No. 5 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated May 2,
2006, a copy of which is attached hereto and incorporated herein.
The cost to City for the additional design services to be performed
by Engineer total $12,432.78.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $133,677.47.
OM71AL
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the ' flay of 2006, in Fort Worth,
Tarrant County, Texas.
ATTEST:
L-NVN(Lia,
Marty Hendrix NO M&C REQUIRED
City Secretary
APPROVAL RECOMMENDED: APPROVED:
A. Douglas Rademaker, P.E. rc t
Director, Department of Assis t City Manager
Engineering
PARSONS WATER AND INFRASTRUCTURE, INC.
ENGINEER
By:
Of
Name: Gregory J. Wieland P.E .
Division Director Vice President
4500 Mercantile Plaza Dr. , STE 235
Fort Worth, TX 76137
APPROVED TO FORM AND LEGALITY:
-ze-?'Z�
� 1Z
Assistant C ty A orney
PARSONS
4500 Mercantile Plaza Drive•Suite 228•Fort Worth,Texas 76137•(817)759-4820•Fax:(817)834-2165•www.parsons.com
May 2, 2006
Mr. Rakesh Chaubey, P.E.
Engineering Services
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas 76102-6311
Re: Request for Amendment No. 5 -Project No. 00136
Water and Sanitary Sewer Replacement -Throckmorton St. and 14th St.
Dear Mr. Chaubey:
We are submitting this contract amendment request to cover the cost of out-of-
scope services including: (1) design of water line relocation in Throckmorton St. to
remove a conflict with the proposed storm drain and a new TXU manhole; (2) design
costs associated with the required sanitary sewer service relocations to remove a conflict
with the location of the transformer vault in the Omni Hotel selected by HOK and TXU;
and (3) attendance at weekly utility coordination meetings through August 2005. The cost
for the additional engineering services is $12,432.78. Of this amount, $4,670.98 is for
additional engineering services related to the water line, and $7,761.80 is for additional
engineering services related to the sanitary sewer. A breakdown of the costs is attached.
Therefore, we request an amendment in this amount to cover the costs of the additional
engineering.
Original Contract Amount $81,319.98
Amendment No. 1 $ 3,205.00
Amendment No. 2 $10,132.98
Amendment No. 3 $10,046.19
Amendment No. 4 $16,540.54
Amendment No. 5 $12,432.78
Total Contract Amount $133,677.47
Please do not hesitate to contact me via e-mail at jack.thibodeau&,Pgsons.com or
on my cell phone at (972) 898-3462 if you have any questions or need additional
information.
Sincerely,
J k Thibodeau, P.E.
Se for Project Manager
Attachment
c i �
/ / \ \ %f 2 %
4) 0 \ � � � kk \ �
2UCin net- P
caa ¥ 6q6qm ma _ 4a _
27 7 2 It qt co 0 co
" ¥ ¥ � o �
/ o - CLO- \ / k t
Ci # q
aa � maw mm_ to _
,7 7 qg3 / 2 � / § �
0 u / � \ \ (0 00 0 \ 0 0 / k 04
le
0U C4 C — n nC � o
mam � (.Sm mom _ m _ a
qle leqk B / C / \ CL
\
_ .
R
M ~ co ® co c o aLO w
\
k M \
E °
= 6 r
Ew Z 2 — _ _ _ � # # o o
r IL Lu
§ u .
« CL
10 2 f # # Go # # Go \ q
a2 �
■
�
� c
0 'n m
R
. 2 \ m
IM
§ 2 $ 2 S
% Ib $ � � o ®
0f ■ / � / U d
4) \ / z
w
_jc \ \ c \ 0 k (n LIJ
n o
CL $ ƒ \ � kQM0 � § w 2
ta M 'n 4t0 E a r � ) a % f % \ D k
U _ 7 CL e � 7 � e = e
0 Q) 2 ® U 2 ® E ® k k Q
� � � ƒ 4g (n" (n kw MI w w
- � 1- � O 0 O O
\(\//�/\
d