Loading...
HomeMy WebLinkAboutContract 33530 AMENDMENT NO. 1 CITY SECRETARY /,2, CONTRACT NO. TO LOAN NO. 03-001814-028-0 BETWEEN City of Fort Worth, ("Borrower") 319 West 10th Street Fort Worth, Texas 76102 AND The Comptroller of Public Accounts, ("Agency") State Energy Conservation Office 111 E. 17 Street, Room 1114 Austin, Texas 78774 Recitals WHEREAS,the State Energy Conservation Office ("SECO")of Agency and Borrower entered into a Loan Agreement No. 03-001814-028-0 (CL181), ("Loan Agreement") effective August 5, 2003 for a Loan to public sector institutions for energy efficient projects related to the LoanSTAR Revolving Loan Program. WHEREAS, Agency and Borrower desire to execute an Amendment No. 1 to amend the Loan Agreement by modifying the Budget and extending the construction completion date to March 1, 2007 and making other changes as set forth below; Agency and Borrower hereby agree as follows: Amendment Agreement The terms set forth in this Amendment No.l shall be in addition to and construed together with the terms of the Loan Agreement between Borrower and Agency. The parties acknowledge that amendments are subject to the terms and conditions of the Loan Agreement. In the event of conflicting language between the Loan Agreement and this Amendment No. 1,the language in this Amendment No. 1 shall control as follows: 1. This Amendment modifies Attachment A, Budget adding $2,395,659.00 to the loan agreement for a new total of $4,992,128.00 and extends the construction period to 3/1/2007. The revised Attachment B is attached hereto and incorporated herein. All other provisions of the Loan Agreement shall remain the same. II. Incorporation of Amendments Upon and after the date of execution of this Amendment No. 1 to the Loan Agreement, all references to the Loan Agreement in that document and any related document shall mean the Loan Agreement as modified by this document and previous amendments. That Loan Agreement shall consist of the original Loan Agreement, together with all documents incorporated therein, executed on or about August 5, 2003; and this Amendment No. 1, together with all documents incorporated herein. These documents shall constitute the entire agreement of the parties. Pagel of 4 Except as provided in this Amendment No. 1, execution and delivery of this Amendment No. 1 shall not amend, modify, or supplement any provision of, or constitute a consent to, or waiver of, any noncompliance with the provisions of the original Loan Agreement and except as specifically provided in this Amendment No. 1,the Loan Agreement shall remain in full force and effect. AGENCY: BORROWER: Comptroller of Public Accounts City of Fort Worth By By4 Billy C. H ilto 4Ott Deputy C ptroller Assistant City Manager Date I/ "/� Date 7 H:\Ioanstar\loan documents\city of fort worth amendment# 1 (CL 181)2-06 Revised 07/25/2001 APPROVE TO FOR4M AN Ty. A.sststant '4 tt 1LLCsted B. I'�P Marty HendriT; City Secretary _'ortrar'- Authorization VC�r Date Page 2 of 4 HX y ATTACHMENT A,Loan No. 03-00181-4-028-0 LOAN APPROVAL STATEMENT For Energy Conservation Measures Agency: City of Fort Worth Address: 319 West 10th Street City: Fort Worth,Texas 76102 Loan Coordinator: Sam Steele Title: Conservation Specialist Phone: (817)392-1276 E Description of Estimated Annual Pay- ECM C Energy Conservation Measure ECM Energy Cost back Loan Building a M ECM b Cost c Savings (yrs) Amount d City of Fort Total from original loan $2,596,469.00 $259,647.00 0.0 $2,596,469.00 Worth Will Rogers 1 DD C Control System $342,322.00 $205,073.00 1.7 $342,322.00 Memorial Improvements Center Will Rogers 2 Power Factor Correction $46,628.00 $15,935.00 2.9 $46,628.00 Memorial Center Will Rogers 3 Central Plan,New Cillers& $608,197.00 $26,272.00 23.2 $608,197.00 Memorial Pumps Center Central Library 4 DDC Control System $222,278.00 $35,993.00 6.2 $222,278.00 Improvements Central Library 5 Power Factor Correction $16,219.00 $5,935.00 2.7 $16,219.00 Central Library 6 Cenral Plan,New Chillers& $643,951.00 $32,016.00 17.9 $643,951.00 Pumps Fort Worth 7 Power Factor Correction $52,508.00 $17,985.00 2.9 $52,508.00 Convention Center Ci Hall 8 Pwer Factor Correction $12,840.00 $3,646.00 3.5 $12,840.00 $4,541,412.00 $602,502.00 7.6 $4,541,412.00 Engineering Audit Expense $133,766.00 Metering and Monitoring $40,130.00 Construction Bonding,Construction $276,820.00 Monitoring&Training,and Final Design& Engineering TOTAL LOAN $4,992,128.00 Anticipated Substantial Completion Time 12 months Payback(with allowance) 8.3 years Comments: This loan is beinp,amendment to add an additional$2,395,659 to the existing loan amount of $2,596,469.00. Borrowers agrees to start repaying the loan based on the amount reimbursed to date. (a) A description of the building/facility and individual ECM is contained in the engineering report whme incorporated herein by reference and included as a part of this Attachment A. Page 3 of 4 (b) No ECMs may be canceled after loan is granted without prior written Lender approval. (c) ECM includes cost of detail engineering design, labor,and materials to implement retrofit. Cost of individual ECM projects may not exceed 120%of approved loan amount.Any individual variance exceeding this amount must be submitted in a change of scope and receive written approval from Lender. Page 4 of 4 � Ff. MKI Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 2/7/2006 DATE: Tuesday, February 07, 2006 LOG NAME: 20ESPCII REFERENCE NO.: C-21289 SUBJECT: Authorize Execution of a Loan Agreement with the Texas State Energy Conservation Office (SECO) to Finance the Implementation of the City's Phase II Energy Savings Performance Contract (ESPC) with Johnson Controls, Inc., and Authorize Amendment Number 1 to the Existing ESPC with JCI to Included the Scope of the Phase II Project RECOMMENDATION: It is recommended that the City Council: 1. Authorize the City Manager to execute a loan agreement in the amount of $2,395,659 from the Texas State Energy Conservation Office (SECO) to finance the implementation of Phase II of the City's Energy Savings Performance Contract (ESPC) with Johnson Controls, Inc. pending approval of the SECO LoanSTAR Loan Application; and 2. Authorize the City Manager to execute amendment number 1 to City Secretary Contract No.29110 with Johnson Controls, Inc., in the amount of$2,375,659 for the implementation of the ESPC's Phase II. DISCUSSION: On September 2, 2003, (M&C C-19739) the City Council authorized execution of a contract with Johnson Controls Inc., to implement a Phase I ESPC. Completed in September 2004, that initial phase resulted in the implementation of a $3,063,090 project at the City's downtown Municipal Complex (City Hall, Public Safety Building, Municipal Annex) and Meacham International Airport's Terminal Building. To date, the City's ESPC Phase I energy savings guarantee has been exceeded based on the latest available Measurement and Verification report from Johnson Controls, Inc. Additionally, the City received a utilities incentive rebate from TXU of approximately $300,000 as a result of the ESPC Phase I project. The contract for Phase I allows for the execution of subsequent phases of work with Johnson Controls, Inc., as the City's competitively selected energy services company via contract amendment. On July 26, 2005, (M&C C-20867) the City Council authorized the execution of a contract with Johnson Controls, Inc., to conduct a detailed energy audit and engineering evaluation of the City's Will Rogers Memorial Center (WRMC), Fort Worth Convention Center (FWCC), Police Administration Building and Central Library in development of energy savings equipment retrofits to develop Phase II project under the existing ESPC. The resulting Utility Assessment Report (UAR) has been submitted to the City, reviewed and approved by City staff. The UAR recommends a $2,395,659 infrastructure improvement project that, if implemented through an ESPC, would pay for itself from the estimated energy cost savings generated in less than the 10-year simple-payback term required by SECO and the City. The project scope includes HVAC, Energy Management Control and Power Factor (PF) Correction system measures. The cost also includes $20,000 for City staff management of the project. City facilities affected include WRMC, FWCC, Central Library and City Hall. The UAR has also been reviewed and endorsed by Kinsman and Associates, an independent engineering firm, retained by the City under a separate professional services agreement. Johnson Controls Inc., guarantees the City energy savings of $342,855 in Year 1 after implementation of the Phase II ESPC. http://www.cfwnet.org/council_packet/Reports/mc_print.asp 7/31/2006 Page 2 of 2 Upfront financing for this project will come through SECO's LoanSTAR program. LoanSTAR's revolving fund offers financing of such projects that indicate a maximum 10-year simple payback at an interest rate of 3%. The annual loan payment is estimated to be $278,185, payable quarterly in arrears, with the first payment due after project completion, probably in the first quarter of the City's next fiscal year, FY2006-07. In addition to turnkey design, installation and management, the ESPC incorporates two annual service agreements in support of the project. The first agreement is for Johnson Controls, Inc., to provide the City Measurement & Verification (M&V) Services for reporting of actual energy savings, as required by law for such projects. The first year cost for the ESPC M&V Services contract is $42,500. The second agreement is for Johnson Controls, Inc., to provide the City Preventative Maintenance (PM) Services for the Chiller Equipment installed as part of the project at a first year cost of$9,030. Johnson Controls, Inc., is in compliance with the City's M/WBE ordinance by committing to 13% M/WBE participation from the total award for construction and supplies. The City facilities involved in this project are in COUNCIL DISTRICTS 7 and 9, but serve the entire City. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that this action will have no material effect on City funds at this time. However, sufficient funds will be available in future operating budgets, as appropriated from the City's General Fund. TO Fund/Account/Centers FROM Fund/Account/Centers Submitted for City Manger's Office by: Marc Ott (6122) Originating Department Head: Robert Goode (7801) Additional Information Contact: Greg Simmons (7862) http://www.cfwnet.org/council_packet/Reports/mc_print.asp 7/31/2006