HomeMy WebLinkAboutContract 31905 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Omni-Risinger 04, L.P., hereinafter called "Developer", desires to
make certain improvements to South Hulen Street, an addition to the City of Fort Worth,
Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through The 6000 Camp Bowie, Inc., A
Texas Corporation, its duly authorized General Partner, and the City, acting herein by and
through Marc Ott, its duly authorized Assistant City Manager, for and iii consideration of
the covenants and conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth, is hereby incorporated into this Community Facilities Contract
as if copy herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and
obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy. _.
t
South Hulen Street-New CFA 4% and Utilitibs 03 29 05.doc _�_
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
F. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged nekli'qence of
the City of Fort Worth, its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
South Hulen Street-New CFA 4% and Utilitls 03 29 05.doc �hIII ` ,;= ,;,U "�
construct current and future improvements provided for in this
agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain(B-1) Attached; Street Lights and Signs (C) Attached.
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B 1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $80,946.16.
South Hulen Street-New CFA 4% and Utilitils 03 29 05.doc
SUMMARY OF
COST
South Hulen Street
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $75,779.00 75,779.00
2. Storm Drainage $1,525.00 1,525.00
3. Street Lights $550.00 550.00
4. Street Name Signs $0.00 $ -
B. Engineering Design $ -
C. Construction Engineering
and Management by DOE $ $
4% 3,092.16 31092.16
TOTALS 80,946.16 $ - 80,946.16
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
South Hulen Street-New CFA 4% and Utilities 03 29 05.doc
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth,Texas this the 911—iday of � 1-
52005.
Approval Recommended:
Transportation and Public Works
Department
Robert Goode, P. E.
Director
City of Fort Worth
N M&C RE-QUIRE,
Marc Ott
Assistant City Manager
VTTT:
V
Marty Hendrix
City Secretary
Approved as to Form:
n
` /
Assistant itAttorney
ATTEST: DEVELOPER
Omni-Risinger 04, L.P.
By: The 6000 Camp Bowie, Inc.
A Texas Corporation
Corporate Secretary It's General P ner
By:
D e dner - Preside
South Hulen Street-New CFA 4% and Utilitiis 03 29 05.doc 7.
ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
ITEM DESCRIPTION QTY. UNIT PRICE AMOUNT
I. PAVING - EXHIBIT B
1 6-inch lime stabilized subgrade 1,272 SY $3.50 $4,452.00
2 Lime @ 30 lbs. per SY 20.7 TN $120.00 $2,484.00
3 7-inch concrete paving, complete in place with silicone 1,379 SY $42.00 $57,918.00
joint sealing, including 7-inch curbs
4 Saw and remove existing concrete curb and gutter 890 LF $7.50 $6,675.00
5 Saw cut and remove existing temporary asphalt curb 300 LF $7.50 $2,250.00
6 Traffic Control 1 LS $2,000.00 $2,000.00
PAVEMENT SUBTOTAL: $75,779.00
II. STORM DRAIN - EXHIBIT B-1
1 21-Inch Class III RCP 25 LF $40.00 $1,000.00
2 Trench Safety 25 LF $1.00 $25.00
3 Connect to existing storm drain 1 LS $500.00 $500.00
STORM DRAIN SUBTOTAL: $1,525.00
SUBTOTAL: $77,304.00
INSPECTION FEE (4%): $3,092.16
TOTAL: $80,396.16
2003205 OPCC 020905 PEK.xis Page 1 of 1
I . STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00
LOWER EXISTING CONDUIT 0 EA $500 $500 . 00
Subtotal $500. 00
City's Cost $00,000.00
Developer's Subtotal $500 . 00
10% Contingencies $50. 00
Project Total $550. 00
Adjacent Developer's Cost $00,000 . 00
Developer's Cost $550 . 00
2% Inspection Fee $00,000. 00
CFA CODE #2005027
DEVELOPER' S COST: $550 . 00
SOUTH HULEN ST & RISINGER RD
March 4, 2005
Fort Worth, Texas
March 9, 2005
PAGE I OF Exhibit C
II . STREET LIGHTS WORK DESCRIPTION:
1 . The . Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C", immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department.
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3 . The City will install all the streetlights that use overhead or
underground conductors on residential, and collector streets. the
developer agrees to pay the city the amount shown below prior to the
City starting it' s design efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
5 . The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for
the installation of any electrical transformers required for the
proper operation of the street lights
6. The estimated cost of this street light installation is detailed on
page 1 of exhibit C and is summarized below, the street lights will
remain the property of, and will be maintained by the City of Fort
Worth.
DEVELOPER' S COST: $550.00
SOUTH HULEN ST & RISINGER RD
March 4, 2005
FORT WORTH, TEXAS
CFA CODE #2005027
Page II of Exhibit C
-j u
III .
"STREETLIGHTS"
LOWER EXISTING CONDUIT FOR TURN LANE
SOUTH HULEN & RISINGER RD
SOUTH HULEN ST & RISINGER RD
Page III of Exhibit C
r• 1,SG �jr`?I' ,q1
�U3
k
IV
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following zero (0) intersections at a cost
to the Developer of $0.00:
(Private {retail, Walgreens})
South Hulen Street
CFA code: 2005027 March 2, 2005
�1 P�
o MgRk
�p w SWEET UM w
BEE r TREE >
z 3 >
0
m U JF,
COLUMBUS 3 A,
BROOKWAY
w
BLUE
� Y
m
Ld LIJ F W O
J J to N o
O
� U
o a w
J
m0 mac'
WEST RISINGER ROAD C vo
PROJ.h-7CT
LOCATION
cyz
m NORTH CROWLEY CLEBURNE
LU
J
U
J
O
VICINITY MAP
FOR0
SOUTH. II ULEN STREET SGALE: NTS
Dunaway Engineers
Planners
Surveyors
Associates, Inc. Landscape Architects
IWI M.ninvo Grd.,91..IW Port WoM.T 76107 M:W.�.1121 M.tro:817..29.2M Fu en.3M.1u7
iadz
Cee2��
Q 4 W
E� 9 -1
y _ Z�
��
0
_ of g wu �W
LLJ
1 I
I o ;
I r
------ - I AIR,
I I I a>a
1 �
I
I 17 ?l
I !r
I
�Q,
ti �.1 � (n
I (
C>w
J 8 F N
ZLo0
J ( z no
a I z
wo
zm
J < zm
C3
wZ
OZ J
9
J
Woaw <
J e I KNOLL
( � Z o K
�.
Ikz �R
w��a.
z
rC'mm U) -
a vi- - '-R-_
Z��WK ➢ c - 's a
a'9eay
r
_ o"+�O1p �u iY• N
a SIS � �z�
ai �]to o'-�= °
e � 5 im -I o u° F u t� ;t� .} 4 f <�rw- o N w CC3►-i? iC�tf to 0
9 �� ado`
o�,�z„� woo
u y___ m� u x zLL¢um uwF JWW
aE3°.- z w rc� o "xw1�-Z 1••-'1�1 X
e-Ec�t< "W w z y" '"w 'u<x�� LL�Z
impl� w§e - iLo L33 zmpiQ .-uc�i�a m .wi,m� WW
Aic��°.�: '�
z 3 u rc `�a •`�"uN 6
o`
a 3 E
�~Nptt w mn—iw,n� w h oL
s
e 3
tt
(AVM—AO—IHJIH HAVA 318VNVA)
133231S N3-inH Hinos --- --`--"–
o M d W
: OO
ct "`
ZZILL l 3 ZV W.00S
-––—––––––
baa — ---- ----r _ i
smiuo ns nnses.�vnrod -.�.. I
1
w ! I
:i:;........'63-------
o----v---v----c7 i I
IQ t la „a I a rn
Icr- 2
f I IN
80� w
Oct -
I
`o w 1
1 _ `eo
ON
in
I�a to
'I � ISIII rn�I 1 I � sxatuo Ae wsis aernrad00
I I 1 I I t o 15
b= �m
oj�a
`aW�Ar; ��_