HomeMy WebLinkAboutContract 33538 L
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, All Storage GB, LP , hereinafter called "Developer", desires to
make certain improvements to GranbM Station Addition, Block 3, Lot 2R2, an addition
to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II,of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
OFFlC1wI ,Rob
FT. ` '° ,
l
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in Part, by the alleged negligence of
the City of Fort Worth, its ofrcers, servants, or employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to _
construct current and future improvements provided for in this
agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain (B-I)-Attached; Street Lights and Signs (C)Attached.
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $123,561.02.
3
SUMMARY OF
COST
Granbury Station
Item Developer City Cost Total Cost
Cost
A. Construction a -
1. Streets $0.00 $ -
2. Storm Drainage $116,567.00 $ 116,567.00
3. Street Lights $0.00 $ -
4. Street Name Signs $0.00 $ 0.00
B. Engineering Design I $ -
C. Construction Engineering
and Management by DOE 4% $ 4,662.68 $ 4,662.68
D. Materials Testing by DOE 2% $ 2,331.34 $ 2,331.34
TOTALS $ 123,561.02 $ - $ 123,561.02
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent(4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent(2%)of paving and storm drain
costs for materials testing.
0HIC,h=`.I 1�
4 cily r.. PF
(�Q c Q ,
1nI bV..
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
ffi
its City Secretary, with the corporate seal of the City affixed, and, said D v 1 er has
executed this instrument in triplicate, at Fort Worth, Texas this the ay of
52006.
Approval Recommended:
Transportation and Public Works
Department
Robert Goode, P. E.
Director
City of rth
� �._ �=�i�.a1SDMar tt
[N:0:�&
•._ _.
Assistant City Manager
ATTEST:
Marty Hendrix
City Secretary
Approve as to Form.
Assista ity Attorney
ATTEST: DEVELOPER
All Storage , LP
By
Corporate Secretary Ike Sc uminsky
ALL. SToRA6 E' G S C-1 t', LL L
KANA6E.P-
5 CIE
UNIT III: STORM DRAINAGE
APPROX. DESCRIPTION OF ITEMS WITH BID TOTAL
ITEM NO. UANTITY UNIT PRICES WRITTEN IN WORDS UNIT PRICE AMOUNT
(Furnish& install, including all appurtenant work,complete in place,the following items)
54" Class III Reinforced Concrete Pipe,
Complete and in place. ONE HUNDRED
THIRTY FIVE DOLLARS AND ZERO
1 682 LF CENTS PER LINEAR FEET. $ 135.00L$ 92,070.00
54" Class V Reinforced Concrete Pipe,
Complete and in place. ONE HUNDRED
THIRTY FIVE DOLLARS AND ZERO
2 48 LF CENTS PER LINEAR FEET. $ 145.00 $ 6,960.00
36" Reinforced Concrete Pipe, Complete
and in place. SIXTY FOUR DOLLARS
3 25 LF AND ZERO CENTS PER LINEAR FEET. $ 64.00 $ 1,600.00
24" Reinforced Concrete Pipe, Complete
and in place. FORTY FOUR DOLLARS
4 28 LF AND ZERO CENTS PER LINEAR FEET. $ 44.00 $ 1,232.00
20'Recessed Curb Inlet, Complete and in
place. THREE THOUSAND SIX
HUNDRED DOLLARS AND ZERO
5 1 11 EA CENTS PER EACH. $ 3,600.00 $ 3,600.00
4'diameter standard City of Fort Worth
storm sewer manhole, Complete and in
place. TWO THOUSAND FIVE
HUNDRED DOLLARS AND ZERO
6 2 ICENTS PER EACH. $ 2,500.00 $ 5,000.00
Rock Rip Rap with minimum 18" rock
size, Complete and in place. THIRTY
FIVE DOLLARS AND ZERO CENTS
7 83 SY PER SQUARE YARD. $ 35.00 $ 2,905.00
Public Infrastructure Cost Estimate-BMW4028
STORM Granbury Station Addition (Phase III) Page 3 of 6
54"Headwall, Complete and in place.
THREE THOUSAND TWO HUNDRED
DOLLARS AND ZERO CENTS PER
8 1 EA EACH. $ 3,200.00 $ 3,200.00
TOTAL AMOUNT BID STORM DRAINAGE: $116,567.00
Public Infrastructure Cost Estimate-BMW4028
STORM Granbury Station Addition (Phase III) Page 4 of 6
FLCL- IVED
C
eRq y
m °
� o
CD
HASTINGS
DIRkS
SITE
ALTAMESA
VICINITY MAP
(NTS / MAPSCOPE 102D)
O
M OD WN
Q
W
LL
z aFW-ul
int .L W co Q v
=- ® ISL in z w
00 000
r c�zmf-
�.J ("N W a� -to
` < >-X awzot°
oCzwmC-4
Z DF— O— ON
m F-O -W o►
Of co
mow2-
Q� JO-UJ
® J .O-W
W Z N QUrq¢i—
�'_' Lr) g O
'Q .U w
—F z
Z ®- 3
Q ('0O�dk
F—L)
'n N
ZN1-!rN m
Ocr-WOO WWON
F—Z(/):a O O
tnQ=l�r.v) Nom
= —F-- LL >-W cr-
N
Q ��Q�. ' o:» -a
mN=O 0 y~Wv
z(/) >-W W W U) :)W
Q F-LL F--a) -i W r__a z
Wo -Q a W z-U)
C7-F7UU N ai�m�a
zO O O o 0 0 0 0
0 0 0 0 0 0 o Q O
N N N N N N N N
— to t0 to 111 M Ln t\ N
> — c_j O O
W N N' th v v Ln c0 t,-
O O O O O O O O
WW
RECEIVED z Zo
co W
- <N of cnx�
O— W— WO Qo
mN CL cn 3Z
C\j z cv>--cc 04
oN>3o osow tw--u0i�
• c F- - OG
QO�F-O vmiwt1n.;
Z
tnQ=ILL
( a wow-
0. >-—F- - w-.
Li
N✓ M)-rcr
—J N W Q # _ OE-w--
�-•-
//�� Q�--w�--N cz wr.OZ
CL CCO �Q V �Q-W2
� v- v v v v v v
Z o o o 0 0 0 o o
0 0 0 o 0 0 0 o o
N N N N N N N N
tp n N M Ln 1� N
> — N 0 O — O — 0
N N n Q- v Ln to I�
010101010 , 000
WW
Z z O
J F-
or` 0 M- LU
<t�\ w z cn x= F-f-- '
o- w-- w Qo
w N a.z CO 3 z
o wz -
�-cD Wry �Q� D o
w
�CL QS- 1---w3 NQ J
cn ZN tnw >>to Op
CD Q Ln Y o ox O !- 1->
Z cr o (-).3: F-• >-Z Z J
er mF- �WQM ocrw cn
—m •
a Q LL J F-LL F-F-F-W to Q <
Q
m OHO a WV) wnz<QW �" w
' w ZO OMU QHtanw F-7 F-
h '
m Q —W ZQZ WQ
JW •• —UQ WZ -F- UF- y
c F--0U WC)JZ CLOW-...1 >Q ~
(n WXF- F--G..a F-- Cr w
CL
Q www oDa-w ow<F wz zo
r m 3a.[] ZM<O Zm3n 0—
L
O m
v Q F-
m Uzz
m z
m Q
■
c 0 F-
w
J
D E -•W
c
LL 0
7 � m
F-O
-- d
w U
o _ ui
a 4 ck
fn F-
-Q
2 J
F-a
•r '�S4�n.^a�F� .��6�
m�
< m N h O
�y I IN/l
m v n I1Qm— 1
m �naer
N
^fin00
six
Don
�__ r� � �1 •
o,Zop Olaf ! I II t ' I' I' . ► �.I
i< c o• s F �
422 Fo=
� YII w-ZU
F I �•)
Z J 0-1=W m
1 I
La
03Im
3 ►W-<�< cc. � ! ► I Cd
I
YZ W <; = Z C
W=oo SE: 3�=y I .I I
=m42 JprA • hW
noam
0: Ix IMP
33•WzBra cL>
M H W
• m d Z\ O• v I 4 tl '." p 17 • I J
O"C W ow 01a
c� I LK
La1
It
•. a� I "a I• Q I. I� �
so ace — a .00,o>i.►L s v I I
„ LL Il '9d 'scsoL ion to,
'01l NOIltl1S 1�Mf18N'd219
i £ A00-18 ILNZ 10l
S3MOtl 4LZ'6 !p G) .p Q ii
i • , I .I
omamns HOY ois o aLsm e • ► p• �' I •I.I
•