HomeMy WebLinkAbout031978 - Construction-Related - Contract - Eagleton Construction, Inc. tg 6 CO
,AVT+'t'.1N"Nc
FORT WORTH 3x�
SPECIFICATIONS
AND CITY SECRETARY
CONTRACT DOCUMENTS
FOR CONTRACT NO. '
PLAYGROUND IMPROVEMENTS AT:
SUNSET PARK
DIAMOND HILLS PARK
r
LEONARD PARK
PROJECT NAME PROJECT NUMBER D.O.E. NO.
SUNSET PARK C280/541600/807480005180 4678
DIAMOND HILLS PARK C280/541600/807480005280 4752
LEONARD PARK C280/541600/807480005380 4677
IN
THE CITY OF FORT WORTH
TEXAS
MH"MONCRIEF CHARLES R. BOSWELL
CITY MANAGER
MAYOR
RANDLE HARWOOD, ACTING DIRECTOR
PARKS AND COMMUNITY SERVICES
PARKS AND COMMUNITY SERVICES DEPARTMENT
PLANNING AND RESOURCE MANAGEMENT DIVISION
FUNDING OF PROJECT BY
CITY OF FORT WORTH
2004 CAPITAL IMPROVEMENT PROGRAM
ADDENDUM #1
Playground Renovation at Sunset iamond Hills and Leonard Park
January 11, 2005
TO ALL BIDDERS:
Please attach to your specifications. This addendum is hereby made a part of the
Contract Documents and is issued to modify explain or correct the original drawings
and/or project manual.
PROJECT MANUAL
REFER TO PROPOSAL
Replace Proposal sheet No. 6. Refer to Attached.
CONSTRUCTION DRAWINGS
REFER TO SHEET 2 OF 8.
Add the following statement to Demolition Notes #8 (Sunset Park):
To include removal of Bollards surrounding the proposed demo concrete pad located
on the south section of the park.
END OF ADDENDUM #1
Bid Opening Date: January 20, 2005 -
Acknowledge the receipt of this Addendum on your Proposal.
By: 04"- �'
Carlos GonzaleVroject Manager
Release Date: January 11, 2005
TOL
PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
3. 2 EA Installation of 6' Park Benches with a 3'X 7'
Concrete Pad (sheet 3 of 8) @
Dollars &
Cents per EA $ $
4. I LS Installation of Picnic Station; to include 8'
ADA Picnic Table, 6' Picnic table and 710 SF
of 5" Concrete Sidewalk/Landing (sheet 3 of
8) @ ,At
Dollars &
Cents per LS $ Lump Sum $
5. 1 EA Installation of a 12' X 24' w/an 8' Entrance
Height Sun Port Cantilever Hip Shelter (sheet
3 of 8) @
Dollars &
Cents per EA $ $
6. 1 EA Removal and Installation of two 6' Picnic
Tables (sheet 3 of 8) @
Dollars &
Cents per EA $ $
7. 2 EA Installation of 6' Bench with a 6'X12'
Concrete Pad (sheet 3 of 8) @
Dollars &
Cents per EA $ $
Unit Four Total $
Unit Five—Diamond Hill Park Alternates
1. 2 EA Installation of 6' Park Benches (sheet 4 of 8)
Dollars &
Cents per EA $ $
2. 1 LS Installation of 6' Park Benches with 385 SF of
Concrete Sidewalk (sheet 4 of 8) @
Dollars &
Cents per LS $ Lump Sum $
6
TABLE OF CONTENTS
1. NOTICE TO BIDDERS
2. SPECIAL INSTRUCTIONS TO BIDDERS
3. PROPOSAL
4. CITY OF FORT WORTH M/WBE ENTERPRISE SPECIFICATIONS
5. CITY OF FORT WORTH PREVAILING WAGE RATES or FEDERAL WAGE
RATES-CONTRACTOR'S PACKET
6. WEATHER TABLE
7. VENDOR COMPLIANCE TO STATE LAW
8. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION
9. PROJECT DESIGNATION SIGN
10. TECHNICAL SPECIFICATIONS
DIVISION 1 -GENERAL REQUIREMENTS
SECTION 01100-Summary of Work
SECTION 01135-Contract Time
SECTION 01140-Alternatives
SECTION 01150-Payment To Contractor
SECTION 01300-Submittals
SECTION 01400-Quality Control
SECTION 01410-Testing
SECTION 01500-Temporary Facilities and Controls
SECTION 01640-Product Options
SECTION 01700-Project Closeout
SECTION 01800-Contractor's Responsibility for Damage Claims
DIVISION 2-SITE WORK
Section 02200-Site Preparation
Section 02140-Site Underdrains
Section 02300-Earthwork
Section 02537-Engineered Wood Fiber Playground Surfacing
Section 02545-Interlocking Concrete Pavers
Section 02810-Irrigation
Section 02840-Turf Sodding
Section 02845-Athletic Field Grassing
Section 02860-Playground Equipment
Section 02870-Site Furnishings
Section 02930 Seeding
DIVISION 3-CONCRETE
Section 03300-Cast-in-Place Concrete
Section 03350-Sandblasting
DIVISION 7-THERMAL&MOISTURE PROTECTION
Section 07920-Caulking and Sealants
11. CERTIFICATE OF INSURANCE
12. BIDDER'S STATEMENT OF QUALIFICATIONS
13. PERFORMANCE BOND
14. PAYMENT BOND
15. MAINTENANCE BOND Sr
16. CONTRACTS,
1a
NOTICE TO BIDDERS
Sealed Proposals for the following:
PLAYGROUND IMPROVEMENTS AT:
3
SUNSET PARK C280/541600/807480005180 4678
DIAMOND HILL PARK C280/541600/807480005280 4752
LEONARD PARK C280/541600/807480005380 4677
Addressed to Mr. Charles R. Boswell, City Manager of the City of Fort Worth, Texas, will
be received at the Purchasing Division Office until 1:30 p.m., Thurs., January 20, 2005
and then publicly opened and read aloud at 2:00 p.m. in Council Chambers 2"d floor—
N.E. corner of City Hall. Plans, Specifications and Contract Documents for this project
may be obtained at the Park Planning section, Parks and Community Services
Department, 4200 South Freeway, Suite 2200, Fort Worth, Texas 76115-1499.
Documents will be provided to prospective bidders for a deposit of$50 per set; deposits
shall be made in the form of a check or money order. Each prospective bidder shall
receive a deposit refund on the first two plan sets if the documents are returned in good
condition within 10 days after bids are opened. Any additional plan sets shall require a
non-refundable deposit. These documents contain additional information for
prospective bidders.
All Bidders will be required to comply with Provision 5159a of Vernon's Annotated Civil
Statutes" of the State of Texas with respect to the payment of the prevailing wage rates,
and City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City
Code, Section 13-A-21 through 13-A-29) prohibiting discrimination in employment
practices.
1 Minority/Women's Business Enterprise Participation Goals
In accordance with the City of Fort Worth Ordinance No. 15530, the City of Fort Worth
has goals for the participation of minority business enterprises and women business
enterprises in City contracts. A copy of the Ordinance can be obtained from the MMlBE
Office or from the Office of the City Secretary. The bidder shall submit the MBE/WBE
UTILIZATION FORM, SUBCONTRACTOR/ SUPPLIER UTILIZATION FORM, PRIME
CONTRACTOR WAIVER FORM, GOOD FAITH EFFORT FORM and /or the JOINT
VENTURE FORM ("Documentation) as appropriate and must be received no later than
5:00 P.M., five (5) City business days after the bid opening date, exclusive of the bid
opening date. The bidder shall submit documentation at the reception area of the
managing department, Department of Engineering, 2"d floor, City Hall, and shall obtain a
receipt. Such receipt shall be evidence that the documentation was received by the
City. Failure to comply shall render the bid non-responsive.
The following list is provided to assist bidders in obtaining the services of M/WBE
vendors qualified to provide such services/materials for this project. A listing of qualified
M/WBE vendors may be obtained at the City of Fort Worth MM/BE office, 3rd floor City
Hall.
-- Services/materials for this proiect are as follows:
demolition/site prep clearing/grubbing grading/earthwork
install shelter sodding concrete
seeding steel rebar site furnishings
earthwork flexible base
i
The City's minimum M1WBE goal on this project is 16 % of the total dollar value of this
contract.
2. Prime Bidder Qualification Requirements
The City will evaluate all submitted bids based on criteria and qualifications to determine
award of contract as noted in Item 14. - Bidder's Statement Of Qualifications — Special
Instructions To Bidders and upon receipt of Bidder's Statement Of Qualifications form
included in this construction document. In general:
• The Prime Bidder, as general contractor or sub-contractor, must demonstrate
similar project scope experience on three (3) projects within the last three (3)
years. All subcontractors intended for use on this project shall also demonstrate
similar project scope experience necessary to successfully perform on their
respective portion of work on this project.
• The Prime Bidder must provide a list the surety company(s), which issued bonds
for projects listed above. Additionally, the Prime bidder shall list the surety
company intended for use on this project.
The Prime Bidder must submit a current certified financial statement prepared by
an independent Certified Public Accountant.
• The Prime Bidder shall perform with its own organization and with the assistance
of work crews under its superintendence work of a value not less than fifty
percent (50/0) of the project scope of work as per Section 8.1 of the standard
specifications for Street and Storm Drain Construction for the City of Fort Worth.
Bidder Qualifications submitted to the Parks and Community Service Department
Project Manager must be received no later than 5:00 P.M., five (5) City business days
after the bid opening date, exclusive of the bid opening date.
3. Bid Addendum
Bidders are responsible for obtaining all addenda to the contract documents and
acknowledging receipt of the addenda by initialing the appropriate spaces on the
: Proposal form. Bids that do not acknowledge receipt of all addenda may be rejected as
being non-responsive. Information regarding the status of addenda may be obtained by
contacting the Project Manager.
4. Pre— Bid Conference
A pre-bid conference will be held with prospective bidders at the Parks and Community
Services Offices Conference Room 2 on January 11, 2005 at 9:30 a.m.
5. AWARD OF CONTRACT
The City reserves the right to reject any or all bids and waive any or all formalities.
The City will award one contract with a combination of base bids and/or alternates
which is most advantageous to the City.
No bid may be withdrawn until the expiration of 55 calendar days from the day bids are
opened. The award of contract, if made, will be within 55 calendar days after the
opening of bids, but in no case will the award be made until all necessary investigations
are made as to the responsibility of the bidder to whom the contract will be awarded.
RANDLE HARWOOD, ACTING DIRECTOR CHARLES R. BOSWELL
PARKS AND COMMUNITY SERVICES DEPARTMENT CITY MANAGER
MARTY HENDRIX
CITY SECRETARY
By:
Carlos Gonzalell,00roject Manager
(817) 871- 5734
Thursday December 30, 2004
Thursday January 6, 2005
S
SPECIAL INSTRUCTIONS TO BIDDERS
1. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of
Fort Worth, in an amount of not less than 5 percent of the largest possible total of the bid
submitted must accompany the bid, and is subject to forfeit in the event the successful
bidder fails to execute the contract documents within ten days after the contract has been
awarded.
To be an acceptable surety on the bid bond, the surety must be authorized to do business
in the state of Texas. In addition, the surety must (1) hold a certificate of authority from
the Untied States secretary of the treasury to qualify as a surety on obligations permitted
or required under federal law; or (2) have obtained reinsurance for any liability in excess
of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of
Texas and is the holder of a certificate of authority from the Untied States secretary of the
treasury to qualify as a surety on obligations permitted or required under federal law.
Satisfactory proof of any such reinsurance shall be provided to the City upon request.
The City, in its sole discretion, will determine the adequacy of the proof required herein.
2. PROPOSAL: After proposals have been opened and read aloud, the proposals will be
tabulated on the basis of the quoted prices, the quantities shown in the proposal, and the
application of such formulas or other methods of bringing items to a common basis as
may be established in the Contract Documents.
The total obtained by taking the sum of the products of unit prices quoted and the
estimated quantities plus any lump sum items and such other quoted amounts as may
enter into the cost of the completed project will be considered as the amount of the bid.
Until the award of the contract is made by the Owner, the right will be reserved to reject
any or all proposals and waive technicalities, to re-advertise for new proposals, or to
proceed with the work in any manner as maybe considered for the best interest of the
Owner.
The quantities of work and materials to be furnished as may be listed in the proposal
forms or other parts of the Contract Documents will be considered as approximate only
and will be used for the purpose of comparing bids on a uniform basis. Payment will be
made to the Contractor for only the actual quantities of work performed or materials
furnished in strict accordance with the Contract Documents and Plans. The quantities of
work to be performed and materials to be furnished may be increased or decreased as
hereinafter provided, without in any way invalidating the unit prices bid or any other
requirements of the Contract Documents.
3. ADDENDA: Bidders are responsible for obtaining all addenda to the Contract
Documents prior to the bid receipt. Information regarding the status of addenda may be
obtained by contacting Parks and Community Services Department telephone number
indicated in the Notice to Bidders. Bids that do not acknowledge all applicable addenda
will be rejected as non-responsive. (See Item G in the Proposal.)
4. AWARD OF CONTRACT: The Contract may not necessarily be awarded to the lowest
bidder of the Base Bid. The Parks and Community Services Department shall evaluate
and recommend to the City Council the best bid based on the combined benefits of total
SPECIAL INSTRUCTIONS TO BIDDERS
- I -
bid price and number of contract days allotted, as specified in the Proposal, and which is
considered to be in the best interest of the City.
Regardless of the Alternative chosen, the Contractor agrees to complete the Contract
within the allotted number of days. If the Contractor fails to complete the work within
the number of days specified in the Construction Documents, liquidated damages shall be
charged as outlined in General Provisions, Item 8.6 Failure to Complete Work on Time,
found in the Standard Specifications for Street and Storm Drain Construction of the City
of Fort Worth, Texas.
5. PAYMENT PERFORMANCE AND MAINTENANCE BONDS: The successful bidder
entering into a contract for the work will be required to give the City surety in a sum
equal to the amount of the contract awarded. The successful bidder shall be required to
furnish bonding as applicable in a sum equal to the amount of the contract awarded. The
form of the bond shall be as herein provided and the surety shall be acceptable to the
City. All bonds furnished hereunder shall meet the requirements of Chapter 2253 of the
Texas Government Code, as amended.
A. If the total contract price is $25,000 or less, payment to the contractor shall be
made in one lump sum. Payment shall not be made for a period of 45 calendar
days from the date the work has been completed and accepted by the City.
B. If the contract amount is in excess of$25,000, a Payment Bond shall be
executed, in the amount of the contract, solely for the protection of all claimants
supplying labor and material in the prosecution of the work.
C. If the contract amount is in excess of$100,000, a Performance Bond shall be
executed, in the amount of the contract conditioned ori the faithful performance of
the work in accordance with the plans, specifications, and contract documents.
Said bond shall solely be for the protection of the City of Fort Worth.
D. A Maintenance Bond shall be required for all Parks and Community Sel vices
Department projects to insure the prompt, full and faithful performance of the
general guarantee as set forth in Division 1, Section 01700-Project Closeout, Item
1.02.
In order for a surety to be acceptable to the City, the surety must meet the requirements of
V. A. T. S Insurance Code, art. 7.19-1(c). Satisfactory proof of any such reinsurance
shall be provided to the City as outlined in the Notice To Bidders. The City, in its sole
discretion, will determine the adequacy of the proof required herein.
No sureties will be accepted by the City that are at the time in default or delinquent on
any bonds or which are interested in any litigation against the City. Should any surety on
the contract be determined unsatisfactory at any time by the City, notice will be given to
the contractor to that effect and the contractor shall immediately provide a new surety
satisfactory to the City
6. LIQUIDATED DAMAGES: The Contractor's attention is called to Part 1 - General
Provisions, Item 8, Paragraph 8.6, Standard Specifications for Street and Storm Drain
SPECIAL INSTRUCTIONS TO BIDDERS
-2-
Construction of the City of Fort Worth, Texas, concerning liquidated damages for late
completion of projects.
7 EMPLOYMENT: All bidders will be required to comply with City Ordinance No. 7278
as amended by City Ordinance No. 7400 (Fort Worth City Code Section 13-A-21 through
13-A-29)prohibiting discrimination in employment practices.
8 WAGE RATES: All bidders will be required to comply with provision 5159a of
"Vernons Annotated Civil Statutes" of the State of Texas with respect to the payment of
prevailing wage rates as established by the City of Fort Worth,Texas, and set forth in
Contract Documents for this project. Disregard if Federal Wage Rates are applicable to
this project. If Federal Wage Rates are applicable to a project, the Contractor shall
comply with all items identified in the attached Contractor's Packet. For further
information regarding this packet, contact the Intergovernmental Affairs /Grants
Management Division, Finance Department at(817) 871-8365 or 871-8387
9. FINANCIAL STATEMENT: A current certified financial statement shall be provided to
the City as outlined in the Notice to Bidders for use by the CITY OF FORT WORTH in
determining the successful bidder. This statement is to be prepared by an independent
Public Accountant holding a valid permit issued by an appropriate State Licensing
Agency.
10. INSURANCE: Within ten days of receipt of notice of award of contract, the Contractor
must provide, along with executed contract documents and appropriate bonds, proof of
insurance for Workers Compensation(statutory); Comprehensive General Liability
($1,000,000 per occurrence, $2,000,000 aggregate); and Automobile Insurance
($1,000,000 each accident on a combined single basis or$250,000 property
damage/$500,000 bodily injury per person per occurrence. A commercial business
policy shall provide coverage on"any auto", defined as autos owned, hired, and non-
owned). Additional lines of coverage may be requested. If such a request is made after
bid opening, Contractor shall be entitled to additional compensation equal to 110%of the
additional premium cost. For worker's compensation insurance requirements, see Special
Instructions to Bidders - Item 16,
ADDITIONAL INSURANCE REQUIREMENTS:
A. The City, its officers, employees and servants shall be endorsed as an additional
insured on Contractor's insurance policies excepting employer's liability insurance
coverage under Contractor's workers' compensation insurance policy.
B. Certificates of insurance shall be delivered to the City of Fort Worth, contract
administrator in the respective department as specified in the bid documents, 1000
Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on
the contracted project.
C. Any failure on part of the City to request required insurance documentation shall
not constitute a waiver of the insurance requirements specified herein.
D. Each insurance policy shall be endorsed to provide the City a minimum thirty
days notice of cancellation, non-renewal, and/or material change in policy terms
SPECIAL INSTRUCTIONS TO BIDDERS
3-
or coverage. A ten days notice shall be acceptable in the event of non-payment of
premium.
E. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A: VII or equivalent measure of financial strength and
solvency.
F. Deductible limits, or self-funded retention limits, on each policy must not exceed
$10,000.00 per occurrence unless otherwise approved by the City.
G. Other than worker's compensation insurance, in lieu of traditional insurance, City
may consider alternative coverage or risk treatment measures through insurance
pools or risk retention groups. The City must approve in writing any alternative
coverage.
H. Workers' compensation insurance policy(s) covering employees employed on the
project shall be endorsed with a waiver of subrogation providing rights of
recovery in favor of the City.
I. City shall not be responsible for the direct payment of insurance premium costs
for contractor's insurance.
J. Contractor's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self-funded or commercial coverage
maintained by City shall not be called upon to contribute to loss recovery.
K. In the course of the project, Contractor shall report, in a timely manner, to City's
officially designated contract administrator any known loss occurrence which
could give rise to a liability claim or lawsuit or which could result in a property
loss.
L. Contractor's liability shall not be limited to the specified amounts of insurance
required herein.
M. Upon the request of City, Contractor shall provide complete copies of all
insurance policies required by these contract documents.
11. NON-RESIDENT BIDDERS: Pursuant to Texas Government Code, art. 2252.002, the
City of Fort Worth will not award this contract to a non-resident bidder unless the non-
resident's bid is lower than the lowest bid submitted by a responsible Texas resident
bidder by the same amount that a Texas resident bidder would be required to underbid a
non-resident bidder to obtain a comparable contract in the state in which the non-
resident's principal place of business is located.
"Non-resident bidder" means a bidder whose principal place of business is not in
this state,but excludes a contractor whose ultimate parent company of majority
owner has its principal place of business in this state.
SPECIAL INSTRUCTIONS TO BIDDERS
-4-
"Texas resident bidder" means a bidder whose principal place of business is in this
state, and includes a contractor whose ultimate parent company or majority owner
has its principal place of business in this state.
This provision does not apply if the project is funded in whole or in part with federal
funds.
The appropriate blanks of the Proposal must be filled out by all non-resident bidders in
order for its bid to meet specifications. The failure of a non-resident contractor to do so
will automatically disqualify that bidder.
12. MINORITY/WOMEN BUSINESS ENTERPRISE: In accordance with City of Fort
Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of
minority business enterprises and women business enterprises in City contracts. You may
obtain a copy of the Ordinance from the Office of the City Secretary.
The MEB/WBE Utilization Form, Subcontractor/Supplier Utilization Form, Prime
Contractor/Waiver Form and the Good Faith Effort Form and or the Joint Venture Form,
as applicable, must be submitted no later than 5:00 p. in. five(5) City business days after
the bid opening date, exclusive of the bid opening date. The bidder shall submit the
documentation at the reception area of the Department of Engineering("Managing
Department"), 2nd floor, City Hall, and shall obtain a receipt. Failure to comply shall
render your bid non-responsive.
Upon contract execution between the City of Fort Worth and the successful bidder, now
known as Contractor, a pre-construction meeting will be scheduled at which time the
Contractor is required to submit either Letters of Intent or executed agreements with the
M/WBE firm(s)to be utilized on this project. Such Letters of Intent or executed
agreements shall include the following information:
1. Name of Contract
2. Name of M/WBE firm utilized
3. Scope of Work to be performed by the M/WBE firm
4. Monetary amount of work to be perforined by the M/WBE firm
- 5. Signatures of all parties
A notice to proceed will not be issued until the signed letter(s) or executed
agreement(s) have been received.
Throughout the duration of this project, the Contractor comply with the M/WBE
Ordinance by complying with the following procedures:
• A M/WBE Participation Report Form must be submitted monthly until the contract is
completed. The first report will be due 30 days after commencement of work. The
monthly report MUST have an original signature to ensure accountability for audit
purposes.
• Reports are to be submitted monthly to the M/WBE Office, regardless of whether or
not the M/WBE firm has been utilized. If there was no activity by an M/WBE in a
particular month, place a "0" or "no participation" in the spaces provided, and provide
_ SPECIAL INSTRUCTIONS TO BIDDERS
-5-
a brief explanation.
• The Contractor shall provide the M/WBE Office proof of payment to the M/WBE
subcontractors and suppliers only. The M/WBE Office will accept the following as
proof of payment:
1. Copies of submitted invoices with front and back copies of canceled check(s), OR
2. A notarized letter explaining, in detail:
a Subcontractor/supplier Scope of Work
b. Date when services were received from subcontractor/supplier
c. Amounts paid to the subcontractor/supplier
d. Original signatures from both parties must be included on this letter.
• If the Contractor foresees a problem with submitting participation reports and/or
proof of payment on a monthly basis, the M/WBE Office should be notified.
If the Contractor wishes to change or delete an M/WBE subcontractor or supplier, adhere
to the following:
1. Immediately submit a Request for Approval of Change Form to the M/WBE
Office explaining the request for the change or deletion.
2. If the change affects the committed M/WBE participation goal, state clearly how
and why in documentation.
a. All requests for changes must be reviewed and pre-approved by the M/WBE
Office.
b. If the Contractor makes change(s)prior to approval, the change will not be
considered when performing a post compliance review on this project.
• Upon the Contractor's successful completion of this project, and within ten days after
receipt of final payment from the City of Fort Worth,The Contractor will provide the
M/WBE Office with a Final Participation Report Foran to reflect the total
participation from ALL subcontractors/suppliers utilized on the project.
• All forms are available at the M/WBE Office, 3rd floor- City Hall. For additional
information regarding compliance to the M/WBE Ordinance, call (817) 871-6104.
Upon request, Contractor agrees to provide to Owner Complete and accurate information
regarding actual work performed by a Minority/Women Business Enterprise (M/WBE)
on the contract and payment therefore. Contractor further agrees to permit an audit and/or
examination of any books,records or files in its possession that will substantiate the
actual work performed by an M/WBE. The misrepresentation of facts (other than a
negligent misrepresentation) and/or the commission of fraud by the Contractor will be
grounds for termination of the contract and/or initiating action under appropriate federal,
state or local laws or ordinances relating to false statements; further, any such
misrepresentation(other than a negligent misrepresentation) and/or commission of fraud
SPECIAL INSTRUCTIONS TO BIDDERS
-6-
will result on the Contractor being determined to be irresponsible and barred from
participating in City work for a period of time of not less than three years.
13. PROTECTION OF TREES PLANTS AND SOIL: All property along and adjacent to
the Contractor's operations including lawns, yards, shrubs, trees, etc., shall be preserved
or restored, after completion of the work, to a condition equal or better than existed prior
to start of work.
By ordinance, the Contractor must obtain a permit from the City Forester before any
work(trimming, removal, or root pruning) can be done on trees or shrubs growing on
public property including street Rights-Of-Way and designated alleys. This permit can
be obtained by calling the Forestry Office at 871-5705. All tree work shall be in
compliance with pruning standards for Class II Pruning as described by the National
Arborist Association. A copy of these standards can be provided by calling the above
number. Any damage to public trees due to negligence by the Contractor shall be
assessed using the current formula for Shade Tree Evaluation as defined by the
International Society of Arboriculture. Payment for negligent damage to public trees
shall be made to the City of Fort Worth and may be withheld from funds due the
Contractor by the City.
To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees
shall be immediately sealed using a commercial pruning paint. This is the only instance
when pruning paint is recommended.
14. BIDDER'S STATEMENT OF QUALIFICATIONS
A. QUALIFICATION OF BIDDERS: Prime Bidder and all sub-contractors to be used
by the bidder in the performance of this project shall be required to demonstrate
experience necessary to successfully perform the proposed scope of work. The Prime
Bidders' specific (1) experience, (2) stability and(3) history of performance on
projects of a similar nature and scope will be considered. The BIDDERS
STATEMENT OF QUALIFICATIONS shall be provided to the City as outlined in
the Notice To Bidders and as noted in the specifications for the purpose of evaluating
the Prime bidder/subcontractors qualifications.
B. PRIME BIDDER/SUBCONTRACTOR QUALIFICATIONS
1. Demonstrate experience as either general or sub-contractor on a minimum of
three(3)projects similar in scope within the last three (3) years.
2. Provide listing of surety company(s)which issued bonds for previous projects
identified as demonstrated experience.
3. Provide name of surety company to be used for this project.
4. Provide a current certified financial statement as prepared by an independent
Certified Public Accountant.
5. Name and qualifications for the site superintendence of the work.
6. Identify at least 50% of work which is to performed by the Prime Bidder with its
own organization and work crews under its superintendence.
7. All sub-contractors intended for use on this project shall also demonstrate similar
project scope experience (three similar projects in scope within last three years)
necessary to successfully perform their respective portion of work on this project.
SPECIAL INSTRUCTIONS TO BIDDERS
-7-
8. Submittal of Letters Of Intent for the use of specific subcontractors listed on the
Bidders Statement Of Qualification form. The Prime Bidder shall submit such
Letters of Intent to the City no later than five (5)working days upon being
recognized as the overall qualified bidder by the City. Should the Prime Bidder
subsequently desire to substitute a subcontractor, the Prime Bidder shall notify the
Project Manager in writing along with Letter Of Intent and experience
qualifications for approval prior to commencement of construction.
The documentation required herein shall be received by the Project Manager of the
Parks and Community Services Department no later than five (5) City business days
after the bid opening date, exclusive of the bid opening date.
Recommendation of award of contract shall be contingent upon the Bidder and/or
sub-contractors meeting such qualification requirements.
Location and responsive ability of the firm will be considered.
If your firm anticipates entering into a joint venture with any other film to conduct all
or part of the performance required under the proposed project, that firm should be
specified in your response. For each firm included in the joint venture, please provide
the information required above. Under the Contract executed for this work the City
will require your firm to be completely 100 percent responsible for fulfilling all
aspects of the contract bonds. Other firms and employees that may be involved in
their joint venture will be treated by the City under the contract as if they were
employees or subcontractors of your firm. Other than those firms noted in the
contract as a part of the joint venture,no other firms will be allowed to participate in
the joint venture without written consent from the City.
B. PLAYGROUND INSTALLATION AS PRIME PROJECT SCOPE
1. For projects in which the construction of playground area is the prime scope of
work, bidders must be able to demonstrate the following. Failure to adequately
demonstrate that the bidder meets these requirements may result in a
recommendation that the bid be rejected as non—responsive.
2. The prime bidder shall submit such documents as are necessary to establish that
the bidder has successfully and satisfactorily completed the construction and
installation of at least three (3)playground facilities within the immediate past
three (3) years for the state of Texas or other municipalities within the Dallas/
Fort Worth metroplex, such work to have included grading, sub surface drainage,
playground perimeter concrete edging, equipment and safety surface installation.
The documentation shall also demonstrate that the bidder completed the projects
within the contract time without the assessment of liquidated damages.
3. If the prime bidder has not performed work for the state of Texas or
municipalities within the Dallas/Fort worth metroplex, the bidder may still be
considered if it has completed three (3)park playgrounds within the last three (3)
years for private entities which included work as noted in B.1.
4. The prime bidder in addition shall provide information that discloses or
demonstrates the following:
SPECIAL INSTRUCTIONS TO BIDDERS
-8-
a. Name and qualifications for the site superintendence of the work.
b. Knowledge in appropriate task sequencing.
c. Intended staffing requirements to construct the work within the contract
time allowed.
15. OZONE ALERT DAYS: The Contractor shall be required to observe the following
guidelines relating to working on City construction sites on days designated as "OZONE
ALERT DAYS". Typically, the Ozone Alert season within the Metroplex area runs fiam
May through September, with 6:00 a.m. - 10:00 a.m. being critical ozone forming periods
each day.
The Texas Natural Resource Conservation Commission(TNRCC) in coordination with
the National Weather Service,will issue the Ozone Alert by 3:00 p.m. on the afternoon
prior to the alert day. On designated Ozone Alert Days, the Contractor shall bear the
responsibility of being aware that such days have been designated Ozone Alert Days and
as such shall not begin work until 10:00 a.m. whenever construction phasing requires
substantial use of motorized equipment. However, the Contractor may begin work earlier
if such work minimizes the use of motorized equipment prior to 10:00 a.m.
If the Contractor is unable to perform continuous work for a period of at least seven hours
between the hours of 7:00 a.m. - 6:00 p.m., on a designated Ozone Alert Day, that day
will be considered as a weather day and added onto the allowable weather days of a given
month.
16. WORKERS COMPENSATION INSURANCE COVERAGE: Contractors compliance
with Workers Compensation shall be as follows:
A. Definitions:
Certificate of coverage ("certificate") -A copy of a certificate of insurance, a
certificate of authority to self-insure issued by the commission, or a coverage
agreement(TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory
workers' compensation insurance coverage for the person's or entity employees
providing services on a project, for the duration of the project.
Duration of the project- includes the time from the beginning of the work on the
project until the contractor's/person's work on the proj ect has been completed and
accepted by the governmental entity.
Persons providing services on the project("subcontractor" in 406.096) -includes all
persons or entities performing all or part of the services the contractor has undertaken
to perform on the project, regardless of whether that person has employees. This
includes,without limitation, independent contractors, subcontractors, leasing
companies,motor carriers, owner-operators, employees of any such entity, or
employees of any entity which furnishes persons to provide services on the project.
"Services" include,without limitation, providing, hauling, or delivering equipment or
materials, or providing labor, transportation, or other service related to a project.
"Services" does not include activities unrelated to the project, such as food/beverage
vendors, office supply deliveries, and delivery of portable toilets.
SPECIAL INSTRUCTIONS TO BIDDERS
-9-
B. The contractor shall provide coverage,based on proper reporting of classification
codes and payroll amounts and filing of any coverage agreements, which meets the
statutory requirements of Texas Labor Code, Section 401.011(44) for all employees
of the contractor providing services on the project, for the duration of the project.
C. The Contractor must provide a certificate of coverage to the governmental entity prior
to being awarded the contract.
D. If the coverage period shown on the contractor's current certificate of coverage ends
during the duration of the project, the contractor must,prior to the end of the
coverage period, file a new certificate of coverage with the governmental entity
showing that coverage has been extended.
E. The contractor shall obtain from each person providing services on a project, and
provide to the City:
(1) a certificate of coverage, prior to that person beginning work on the project, so
the City will have on file certificates of coverage showing coverage for all
persons providing services on the project; and
(2) no later than seven days after receipt by the contractor, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project.
E. The contractor shall retain all required certificates of coverage for the duration of the
project and for one year thereafter.
G. The contractor shall notify the governmental entity in writing by certified mail or
personal delivery, within ten days after the contractor knew or should have known, of
any change that materially affects the provision of coverage of any person providing
services on the project.
H. The contractor shall post on each project site a notice, in the text, form and manner
prescribed by the Texas Workers' Compensation Commission, informing all persons
providing services on the project that they are required to be covered, and stating how
a person may verify coverage and report lack of coverage.
I. The contractor shall contractually require each person with whom it contracts to
provide services on a project, to:
(1) provide coverage,based on proper reporting on classification codes and payroll
amounts and filing of any coverage agreements,which meets the statutory
requirements of Texas Labor Code, Section 401.011(44) for all of its employees
providing services on the project, for the duration of the project;
(2) provide to the contractor,prior to that person beginning work on the project, a
certificate of coverage showing that coverage is being provided for all employees
of the person providing services on the project, for the duration of the project;
SPECIAL INSTRUCTIONS TO BIDDERS
- 10-
(3) provide the contractor, prior to the end of the coverage period, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(4) obtain from each other person or entity with whom it contracts, and provide to
the contractor:
(a) a certificate of coverage, prior to the other person or entity beginning work
on the project; and
(b) a new certificate of coverage showing extension of coverage,prior to the end
of the coverage period, if the coverage period shown on the current certificate
of coverage ends during the duration of the project;
(5) retain all required certificates of coverage on file for the duration of the project
and for one year thereafter.
(6) notify the governmental entity in writing by certified mail or personal delivery,
within ten days after the person knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on
the project; and
(7) contractually require each person with whom it contracts, to perform as required
by paragraphs (1) - (7), with the certificates of coverage to be provided to the
person for whom they are providing services.
J. By signing this contract or providing or causing to be provided a certificate of
coverage, the contractor is representing to the governmental entity that all employees
of the contractor who will provide services on the project will be covered by workers'
compensation coverage for the duration of the project, that the coverage will be based
on proper reporting of classification codes and payroll amounts, and that all coverage
agreements will be filed with the appropriate insurance carrier or, in the case of a self-
insured,with the commission's Division of Self-Insurance Regulation. The providing
of false or misleading information may subject the contractor to administrative
penalties, criminal penalties, civil penalties or other civil actions.
K. The contractor's failure to comply with any of these provisions is a breach of contract
- by the contractor which entitles the City to declare the contract terminated if the
contractor does not remedy the breach within ten days after receipt of notice of breach
from the City.
"The contractor shall post a notice on each project site informing all persons
providing services on the project that they are required to be covered, and stating how
a person may verify current coverage and report failure to provide coverage. This
notice does not satisfy other posting requirements imposed by the Texas Workers'
Compensation Act or other Texas Workers' Compensation commission rules. This
notice must be printed with a title in at least 30 point bold type and text in at least 19
point normal type; and shall be in both English and Spanish and any other language
common to the worker population. The text for the notices shall be the following
text,without any additional words or changes:
SPECIAL INSTRUCTIONS TO BIDDERS
- 11 -
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related
to this construction project must be covered by workers' compensation insurance.
This includes persons providing,hauling, or delivering equipment or materials, or
providing labor or transportation or other service related to the project, regardless of
the identity of their employer or status as an employee."
"Call the Texas Workers' Compensation Commission at(512) 440-3789 to receive
information on the legal requirement for coverage, to verify whether your employer
has provided the required coverage, or to report an employer's failure to provide
coverage."
END OF SECTION
SPECIAL INSTRUCTIONS TO BIDDERS
- 12-
t PROPOSAL
TO: MR. CHARLES R. BOSWELL
City Manager
Fort Worth,Texas
FOR: PLAYGROUND RENOVATIONS AT:
SUNSET PARK: C280/541200/807480005180 - DOE No: 4678
DIAMOND HILL: C280/541200/807480005280 - DOE No: 4752
LEONARD PARK: C280/541200/807480005380 - DOE No: 4677
1
i
Pursuant to the foregoing "Notice to Bidders,"the undersigned has thoroughly examined the plans, specifications, and
- the site,understands the amount of work to be done and hereby proposes to do all the work and furnish all labor,
equipment, and materials necessary to fully complete all the work as provided in the plans and specifications, and
subject to the inspection and approval of the Parks and Community Service Department Director of the City of Fort
Worth.
The "approximate quantity" category is for information purposes only. The Contractor shall be paid on the basis of
actual installed quantities on non lump sum items. Additionally, the Contractor shall be aware that the Proposal
contains both Lump Sum and Unit Price items.
If the lowest bid received exceeds the funds budgeted for the project, the City reserves the right to decrease the
quantities contained in any line item or to eliminate any specific line items before award of the contract in order to
bring the work within budget. By submitting a bid,the bidder acknowledges the City's right to adjust or eliminate line
items prior to the award of contract. Further,by submitting a bid,the bidder agrees to honor each line item bid price
without recourse to the City in the event line items are adjusted or eliminated.
Upon acceptance of this proposal by the City Council,the bidder is bound to execute a contract and furnish, if
applicable,Performance,Payment, and Maintenance Bonds approved by the City of Fort Worth for performing and
completing the said work within the time stated and for the following sums,to-wit:
BASE BID
pAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
Unit One—Sunset Park
1. 1 LS Demolition and Removal of Existing
Abandon Bathroom Facility,Post and Cable,
Concrete Slab and Treq(sheet 2 of 8)@
vef --Dollars&
A/0 Cents per LS $ Lump Sum $
2. 1 LS Excavation/Grading(sh,e,eet 3e 8)@
"i '�Uollars&
Cents per LS $ Lump Sum $
1
UNIT TOTAL
YAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICE AMOUNT BID
ITEM QUANTITY PRICE WRITTEN IN WORDS
3. 315 SF Installation of Concrete Landing/Walk(5='
depth) (sheet 3 of 8) @
Dollars&
Cents per SF
4. 1 LS Installation of 575 SF Concrete Parking lot
(5== depth)to include Striping, Wheel stop and i
HC signage(sheet 3 ofXlitak-rs'l&
i r.
Cents per LS $ Lump Sum $
5. 260 LF Concrete Mow Strip (sheet 3 of 8) @
�Tw _ a-X%k Dollars &
Cents
per LF $ .�Z d,�:� $ S"�'yU
6. 1 EA HC accessible Ramp (sheet 7 of 8) @
Dollars &
Nv •
Cents per EA $ $
7. 1 EA Installation of Project Designation Sign @
rz` �•_� Dollars&
Cents per EA $ 7 J $ 3S
8, 1 LS Installation of Safety Surfacing Material w/
Wear Mats (sheet 7 of 8) @
Dollars & Sum $ `7,
Cents per LS $ Lump
9. 1 EA Specified Play Structure Installed/ (sheet 6 Of
P
_ Dollars&
r $ -3(D,,l o Cents per EA $ Q °�'
10. 2 EA Specified Spring Animals Installed (sheet 6
of 8) @
�1J Dollars&
Cents per EA
11. 1 EA
Specified Two(2)Bay Swing Installed(sheet
6 of 8) @ ;J Dollars&
Cents per EA
2
PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM QUANTI'T'Y PRICE WRITTEN IN WORDS PRICE AMOUNT BID
12. 1 LS. Sub Drain/Catch Basin Installation(sheet 6 of
8) @ 1 Dollars&
Cents per LS $ Lump Sum $ t?c�
Unit One Total $
Unit Two—Diamond Hill
1. 1 LS Demolition and Removal of Existing
Playground Facility,Volleyball Court,Water
Fountain and Tree(sheet 2f 8 @
P'fool ars&
�Y'o Cents per LS $ Lump Sum $ 575-6, ,
2. 1 LS Excavation/Grading(sh et�,4 of 8)�®
Tnllarsi
Cents per LS $ Lump Sum $
4. 445 SF Installation of Concrete Landing/Walk(5"
depth) (sheet 4 of 8)@
Dollars&
..(' �. '.;� Cents per SF
5. 260 LF Concrete Mow Strip (sheet 4 of 8)@
Dollars& _
r k Cents per LF
6. 1 EA HC accessible Ramp (sheet 7 of 8)@
a—,LS Dollars&
rCents per EA $ t° $ �
Installation of Project Designation Sign @
7. 1 EA � �
°Dol ars&
Cents per EA $ '�`'` $ '
I
8, 1 LS Installation of Safety Surfacing Material w/
Wear Mats (sheet 7 of 8) @
Dollars&
Cents per LS $ Lump Sum
i
9. 1 EA Specified Play Structure Installed(s eet 6 Of
8)
Dollars&
Cents per EA $ 30, '` $ ' Rey)
3
i
PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
10. 2 EA Specified Spring Animals Installed (sheet 6
of 8) @
i -- -P Dollars & J
11/0 Penta per BA
11. 1 EA Specified Two (2)Bay Swing Installed(sheet
6of8) @
I. &llars &
Cents per EA $
14, 1 ISS; Sub Drain/Catch Basin Installation(sheet 6 of
Dollars &
n/v Cents per LS $ Lump Sum $
Unit Two Total $
Unit Three—Leonard Park
1. 1 LS Demolition and Removal of Existing
Playground Facility and HC Ramp Entrance.
(sheet 2 of 8) @ E
F°
*e %f:nv e;k Dollars &
XC . Cents per LS $ Lump Sum $
2. 1 LS Excavation/Grading(sheet 5 of 8) @
At- i,; bollars&
Xo • Cents per LS $ Lump Sum $ 9, 2 Del,
_4. 560 SF Installation of Concrete Landing/Walk(5"
depth) (sheet 5 of 8) @
Av r Dollars & ;
Cents per SF $ • S $ J 5�q
0
-5 260 LF Concrete Mow Strip (sheet 5 of 8) @ t
Dollars & _
F.r= Cents per LF $ z 1 $ =5, yU
1 EA HC accessible Ramp (sheet 7 of 8) @
Dollars &
Cents per EA $ tau $ � j
i
4 �'
PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT SID
-7. 1 EA Installation of Project Designation Sign @
-- ,ev ��- •1� Dollars &
J /u Cents per EA $ $
1 LS Installation of Safety Surfacing Material w/
J Wear Mats (sheet 7 of 8)
Dollars & .�
Cents per LS $ Lump Sum $ z
91 1 EA Specified Play Structure Installed (sheet 6 Of
8) @ � fDollars &
rho Cents per EA $ -3 °a, $
Y6. 2 EA Specified Spring Animals Installed (sheet 6
of 8) @
Dollars &
Cents per EA $ �
1 EA Specified Two (2)Bay Swing Installed (sheet
6of8) @ A4, J t
Dollars &
Cents per EA $
12. 1 LS. Sub Drain/Head Wall Installation (sheet 4 of 5)
Dollars &
o . Cents per LS $ Lump Sum $
Unit Three Total
Unit Four—Sunset Pai•k Alteinates
1. 390 LF Installation of Post and Cable(sheet 3 of 8) @
Dollars&
.,a
v, Cents per LF $ LSU $ � 1.
2. 2 EA Installation of 6' Park Benches (sheet 3 of 8)
@
Dollars &
Cents per EA $ �M $
5
t-
PAY ' APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
3. 2 EA Installation of 6' Park Benches with a 3'X 7'
Concrete Pad (sheet 3 of 8) @
.',,,,Dollars &
Cents per EA $ 611 161;y6-
4. 1 LS Installation of Picnic Station; to include 8'
ADA Picnic Table, 6' Picnic table and 710 SF
of 5" Concrete Sidewalk/Landing (sheet 3 of
8)
Dalar &
Cents per LS $ Lump Sum $ f '
5. IEA Installation of a 12' X 24' w/an 8' Entrance
Height Sun Port Cantilever Hip Shelter (sheet
3 of 8) @ , j
Dolars &
A1u Cents per EA $ '73 2 c;G9
a 6. 1 EA Removal and Installation of two 6' Picnic
Tables (sheet 3 of 8) /
i � Dollars & _
Cents per EA $ ,� �.=c� $ / %60, `
7. 2 EA Installation of 6' Bench with a 6'X12'
Concret Pad (sheet 3 of 8) @
Dollars & ;.
Cents per EA $ 76'6 $ 45�� '
Unit Four Total $ r sly 2:
Unit Five—Diamond Hill Park Alternates
1. 2 EA Installation of 6' Park Benches (sheet 4 of 8)
IL ����5; �,� Dollars &
A-/t" Cents per EA $ ` (3
2. 1 LS Installation of 6' Park Benches with 385 SF of
Concrete Sidewalk (sheet,4 of i ) @
Cents per LS $ Lump Sum
6
PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM QUANTITY PRICE WRITTEN IN WORDS _ PRICE AMOUNT BID
3. 1 LS Removal and Installation of Picnic Station: to
include one 8' ADA Picnic table and one 6'
Pinic tab (sheet 4 of 8)
o ars &
Cents per SF $ Lump Sum $ ��f
4. 3 EA Installation of 6' Bench with a 6'X12'
Concrete Pad. (shee 4 f 8) a -/
%�i dollars L�
Cents per EA $ X30
5. 3 EA Removal and Installation of 5 Row X 15' /
Length Sturdisteel Aluminum Bleachers
heet 4 of 8) @
ollars�
Cents per EA $ L;
�G a. $
P
6. 1 EA Installation of 12'X34' w/a 10' Entrance
Height Sun Port Cantilever Hip Shelter (sheet
� f8) d ,� �� ��
�w-z�b,X �,��,�„ /" Dollars
Dollars &EA $ Z, 21 U $ z,Tia'
i
Unit Five Total $ ��
Unit Six—Leonard Park Alternates
1. 2 EA Installation of 6' Park Benches (sheet 5 of 8)
@ Dollars & � 4 �
,teN Cents per EA $ G-
2. 2 EA Installation of 6' Park Benches with a 3'X 7'
Concrete Pad (sheet 5 4 8) @
`---� .t,,rY? TroTT'ars &
AI v Cents per EA $
3. 1 LS Installation of Picnic Station; to include 8'
ADA Picnic Table and 225 SF of 5" Concrete
Pad (sheet 5 of 8o,
Dollars &
f x�� Cents per LS $ I`/S
I
I
7
I �
i�
p�;,Y APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
Installation of 6' Bench with a 6'X12'
4 Concrete Pad(sheet 5 of 8) @
�C Dollars &
Cents per LS $ Lump Sum $ _3300
Unit Six Total $ ��'f'' C10
BID-RECAPITULATION
Unit One-Total Base Bid Cost for Sunset Park $ -73, 6-2-3,
Unit Two—Total Base Bid Cost for Diamond Hill Park $ /1, '7116-
Unit Three—Total Base bid Cost for Leonard Park $ JP3 z t; ('
Total Base Bid y�`�' $ ® 8 7
Unit Four-Total Alternate Bid Cost for Sunset Park $ Z/, 6' Z- ,
Unit Five-Total Alternate Bid Cost for Diamond Hill Park $ ze , Y-,?2,
Unit Six-Total Alternate Bid Cost for Leonard Park �C
Total Alternate Bid
Total Base Bid and Alternate
A. This contract is issued by an organization that qualifies for exemption pursuant to the provisions of Article 20.04(F)
of the Texas Limited Sales,Excise and Use Tax Act.
B. The Contractor performing this contract may purchase,rent or lease all materials,supplies,equipment used or
consumed in the performance of the contract by issuing to his supplier an exemption certificate in lieu of the tax,said
exemption certificate complying with State Comptroller's ruling tax,said exemption certificate complying with State
Comptroller's ruling#95-0,07. Any such exemption certificate issued by the Contractor in lieu of the tax shall be
subject to the provisions of the State Comptroller's ruling#95.09 as amended to be effective October 2, 1968.
C. The undersigned assures that its employees and applicants for employment and those of any labor organization,
subcontractor or employment agency in either furnishing or referring employee applicants to the undersigned are not
discriminated against as prohibited by the terms of City Ordinance 7278,as amended by City ordinance 7400(Fort
Worth City Code Sections 13-A-21 through 13-A-29),prohibiting discrimination in employment practices.
8
D. , 4The undersigned agrees to complete all work covered by these contract documents within Fifty Five(55)Working
set forth in the Notice to Proceed to be issued by the Owner and to pay
Days after the date for commencing work as
not less than the 2002 AGC North Texas Construction Industry E. Within ten( ) y receipt Survey..
10 days of t of notice of acceptance of this bid,the undersigned will execute the formal contract
P
and will deliver applicable Surety Bonds for the faithful perfois�to be omethis
the property of the City of Fort Worth, in
the sum of$Dollars($ )
Texas,or the attached Bidder's Bond is to be forfeited in the event the contract and applicable bonds are not executed
within the time set forth,as liquidated damages for delay and additional work caused thereby.
lack of clearness in stating prices in the Proposal,the City reserves the right to adopt the
F In the case of ambiguity or {
most advantageous price for construction thereof to the City or to reject the proposal.
G. Receipt is hereby acknowledged of the following a44OP441
No. No.2 No. 3 No. 4 `
l
f
I
Respectfully submitted,
(Com any Name)
By(Authorized Signature)
Date: (�i �/ 7A 5� _
;� A )A-
Address:
Telephone: V17 )8t,4- 0 i00
SEAL(if corporation)
9
i
ATTACHMENT 1A
Page 1 of 4
FORT WORTH City of Fort Worth
Subcontractors/Suppliers Utilization Form
PRIME COMPANY NAME: j Check applicable block to describe prime
64 r— i 0 L--% j M/VV/DBE ® NON-M/W/DBE
PROJECT AME: BBID DATE
.5L,)-,7sc i e7 � , ( Ji rh,-,�b�, l�� LL , LeA-oe., a i'�.r� t� / SCS ��✓J
City's MMBE Project Goal: Prime's MMBE Project Utilization: PROJECT NUMBER
% %
f
r
Ird¢ntlf�► !! � {at ntr��trar�/�taq�lic�r� you will visa on this projoct i
Failure to complete this form, in its entirety with requested documentation, and received by the Managing
Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date,
will result in the bid being considered non-responsive to bid specifications.
The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this
utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional
and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the
bid being considered non-responsive to bid specifications
i
M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or
currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant,
Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties.
Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct
payment from the prime contractor to a subcontractor is considered 1St tier, a payment by a subcontractor to
its supplier is considered 2nd tier
ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD.
Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have
been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification
Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business
Enterprise (DBE) is synonymous with Minority/Women Business Enterprise (M/WBE).
If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and
operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease
trucks from another M/WBE firm, including M/WBE owner-operators, and receive full M/WBE credit. The
M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for the
fees and commissions earned by the M/WBE as outlined in the lease agreement.
Rev.5/30/03
ATTACHMENT 1A
Page 2 of 4
FORT WORTH I
I
Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority,Women and non-M/WBEs.
Please list M/WBE firms first, use additional sheets if necessary.
N
Certificationo
(check one)
Detail
SUBCONTRACTOR/SUPPLIER T Detail
N T
Company Name i C X M Subcontracting Work Supplies Purchased Dollar Amount
Address e M W T D W
E
Telephone/Fax r B R O B
E E C T E
A
TZ-
6z/9 md��,1 ,� X13. 806,
2 7 SV A/u£ . lint/... k'c� ��47 �u-..
44
ZA
9, v r
/
9_3
Z.7 Z-
-762
762 6 C. e /V l
I t3ou -t/3 3� �3y7
0q 6
.'►1 Lea .0y5c^ _ _ {{ ZZ0
c
,7 2—
Iy-B nJ s cy\, lig)•rL-
1130
Rev.5/30/03
I
ATTACHMENT 1A
Page 4 of 4
FO RT�W�O�RT.H i
Total Dollar Amount of M/WBE Subcontractors/Suppliers $ 09/ g
Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $
TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ y ��
The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval
of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a
Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of
contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor
shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed
M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination.
By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request,
complete and accurate information regarding actual work performed by all subcontractors, including
M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or
examination of any books, records and files held by their company. The bidder agrees to allow the
transmission of interviews with owners, principals, officers, employees and applicable
subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work
performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any
intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment
from City work for a period of not less than three (3) years and for initiating action under Federal, State or
Local laws concerning false statements. Any failure to comply with this ordinance and create a material
breach of contract may result in a determination of an irresponsible Offeror and barred from participating in
City work for a period of time not less than one (1) year.
. � ys•s�Lf✓ � � ��
Aut or
ed Signature Printed Signature
fl — Contact Name/Title(if different)
Title c
Company Name
Telephone and/or Fax
Address / 7 / E-mail Address
City/State/Zip
r Date
i
I
IRev. 5/30/03
Joint Venture
Page 1 of 3
FORT WORTH
CITY OF FORT WORTH
Joint Venture Eligibility Form
All questions must be ansivered,use"NA"if applicable.
Name of City project:
A joint venture form must be completed on each project
RFP/Bid/Purchasing Number:
1. Joint venture information:
Joint Venture Name:
Joint Venture Address:
(If applicable)
Telephone: Facsimile: E-mail address:
Cellular:
Identify the firms that comprise the joint venture:
Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the
joint venture
M/WBE firm Non-M/WBE
name: firm name:
Business Address: Business Address:
City,State,Zip: City,State,Zip:
Telephone Facsimile E-mail Telephone Facsimile
Cellular Cellular
Certification Status: E-mail address
Name of Certifying Agency:
2. Scope of work performed by the Joint Venture:
Describe the scope of work of the M/WBE: Describe the scope of work of the non-M/WBE:
- Rev.5/30/03
Joint Venture
Page 2 of 3
3.What is the percentage of M/WBE participation on this joint venture that you wish to be counted toward
meeting the project goal?
4.Attach a copy of the joint venture agreement.
5.List components of ownership of joint venture: (Do not complete if this inforn:atiorr is described in joint venture agi ewnent)
Profit and loss sharing:
Capital contributions,including
equipment:
Other applicable ownership interests:
6.Identify by name,race,sex and firm those individuals(with titles)who are responsible for the day-to-day
management and decision making of the joint venture:
Financial decisions
- (to include Account Payable and Receivable):
Management decisions:
a. Estimating
- --------------------------------------------
b. Marketing and Sales
---------------------------------------
c. Hiring and Firing of management
personnel
---------------------------------------
d. Purchasing of major equipment
and/or supplies
Supervision of field operations
The City's Minority and Women Business Enterprise Office will review your joint venture submission and
will have final approval of the M/WBE percentage applied toward the goal for the project listed on this
form.
NOTE:
From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar
amounts/percentages change from the originally approved information, then the participants must inform the City's
M/WBE Office immediately for approval. Any unjustified change or deletion shall be a material breach of contract and
may result in debarment in accord with the procedures outlined in the City's M/WBE Ordinance.
Rev.5130/03
Joint Venture
Page 3 of 3
AFFIDAVIT
The undersigned affirms that the foregoing statements are true and correct and include all material information
necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall
agree to provide to the joint venture the stated scope of work, decision-making responsibilities and payments
herein.
The City also reserves the right to request any additional information deemed necessary to determine if the joint
venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds
for termination of the eligibility process.
The undersigned agree to permit audits,interviews with owners and examination of the books,records and files
of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this
provision shall result in the termination of any contract, which may be awarded under the provisions of this joint
venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false
statements or willful misrepresentation of facts.
- -- - - - - of facts. - ----.i-------------------------------------------------------------------------------------------------
Name of M/WBE firm Name of non-M/WBE firm
Printed Name of Owner Printed Name of Owner
Signature of Owner Signature of Owner
Printed Name of Owner Printed Name of Owner
Signature of Owner Signature of Owner
Title Title
Date Date
Notarization
State of County of
On this day of , 20 ,before me appeared
and
to me personally known and who,being duly sworn, did execute the foregoing affidavit and did state that they were
properly authorized to execute this affidavit and did so as their free act and deed.
Notary Public
Print Name
Notary Public
Signature
Commission Expires (seal)
Rev.5/30/03
2002 AGC North Texas Construction Industry Wage Survey
Classification Average Hourly Health & pension Vacation Total
Rate Welfare Package
I'AC Mechanical $17.55 - $1.67 $0.38 $0.21 $19.81
QAC Mechanical Helper $10.74 $1.70 $0.28 $0.18 $12.90
I'Acoustic Ceiling Installer $14.26 $0.38 $0.20 $0.15 $14.99
"Acoustic Ceiling Installer Helper $10.53 $0.20 $0.14 $0.09 $10.96
IyBricklayer/Stone Mason $19.29 $1.62 $0.33 $0.00 $21.24
Bricklayer/Stone Mason Helper $13.07 $0.35 $0.00 $0.00 $13.42
(Carpenter $15.76 $1.17 $0.47 $0.36 $17.76
jCarpenter Helper $11.69 $0.46 $0.27 $0.22 $12.64
!Concrete Finisher $14.29 $0.40 $0.22 $0.00 $14.91
'Concrete Finisher Helper $10.09 $0.20 $0.00 $0.00 $10.29
Concrete Form Builder $12.16 $0.36 $0.03 $0.02 $12.57
Concrete Form Builder Helper $8.81 $0.00 $0.07 $0.04 $8.92
Drywall Taper $13.25 $0.89 $0.68 $0.32 $15.14
Drywall Taper Helper $8.00 $0.00 $0.25 $0.25 $8.50
Electrician $19.79 $1.88 $0.32 $0.61 $22.60
Electrician Helper $12.95 $1.59 $0.13 $0.19 $14.86
7 Electronic Technician $20.06 $1.31 $0.79 $1.34 $23.50
Electronic Technician Helper $12.27 $1.07 $0.79 $1.59 $15.72
Floor Layer(Carpet) $15.17 $0.60 $0.32 $0.17 $16.26
a
Floor Layer(Resilient) $15.94 $0.00 $0.00 $0.00 $15.94
Floor Layer Helper $11.00 $0.00 $0.00 $0.00 $11.00
x
Glazier $14.35 $0.92 $0.16 $0.40 $15.83
3 Glazier Helper $10.32 $0.85 $0.23 $0.21 $11.61
Pipe Insulator $15.05 $0.94 $0.76 $0.14 $16.89
Pipe Insulator Helper $10.12 $1.13 $0.12 $0.00 $11.37
Laborer Common $9.21 $0.54 $0.07 $0.09 $9.91
Laborer Skilled $11.59 $0.82 $0.04 $0.16 $12.61
10/7/2002
G-AGC 2002 Wage Survey.xls 2002 Building Trades 1
1
2002 AGC North Texas Construction Industry Wage Survey
Average Hourly Health & Total
Classification Rate Welfare Pension Vacation package
Lather $15.94 $0.23 $0.02 $0.17 $16.36
ILather Helper $11.12 $0.45 $0.04 $0.33 $11.94
IyMetal Building Assembler $14.29 $5.62 $0.99 $0.49 $21.39
;Metal Building Assembler Helper $9.33 $2.60 $0.04 $0.14 $12.11
J,Painter $12.86 $0.89 $0.62 $0.16 $14.53
Painter Helper $8.66 $0.50 $0.31 $0.06 $9.53
IPipefitter $18.22 $1.59 $0.39 $0.41 $20.61
Pipefitter Helper $12.90 $1.72 $0.09 $0.43 $15.14
,Plasterer $16.16 $0.75 $0.02 $0.18 $17.11
"Plasterer Helper $9.98 $0.29 $0.02 $0.21 $10.50
Plumber $19.25 $1.53 $0.49 $0.20 $21.47
Plumber Helper $11.74 $1.18 $0.18 $0.21 $13.31
Reinforcing Steel Setter $13.00 $0.00 $0.00 $0.00 $13.00
Reinforcing Steel Setter Helper $9.31 $0.00 $0.00 $0.00_ $9.31
Remediation Worker $11.75 $0.00 $0.00 $0.00 $11.75
Roofer $15.33 $0.52 $0.00 $0.06 $15.91
Roofer Helper $10.24 $0.44 $0.00 $0.00 $10.68
Sheet Metal Worker $15.73 $1.62 $0.36 $0.29 $18.00
Sheet Metal Worker Helper $10.53 $1.38 $0.30 $0.24 $12.45
Sheetrock Hanger _ $13.37 $0.43 $0.12 $0.26 $14.18
' Sheet rock Hanger Helper $9.48 $0.16 $0.01 $0.11 $9.76
Fire Sprinkler Fitter $17.86 $2.17 $0.91 $0.30 $21.24
Fire Sprinkler Fitter Helper $13.33 $2.18 $0.66 $0.41 $16.58
Steel Worker Structural $16.20 $1.18 $0.30 $0.15 $17.83
Steel Worker Structural Helper $11.71 $2.05 $0.51 $0.16 $14.43
7
Concrete Pump $17.00 $0.00 $0.00 $0.15 _ $17.15
Crane, Clamshell, Backhoe,
Derrick, D'Line Shovel $16.07 $1.11 $0.30 $0.05 $17.53
10/7/2002
2
G-AGC 2002 Wage Survey.xls 2002 Building Trades
2002 AGC North Texas Construction Industry Wage Survey
Classification Average Hourly Health & pension Vacation Total
Rate Welfare Package
Forklift $12.62 $0.91 $0.36 $0.05 $13.94
Foundation Drill Operator $17.55 $1.23 $0.41 $0.00 $19.19
Front End Loader $13.27 $0.58 $0.00 $0.04 $13.89
Truck Driver $12.66 $0.79 $0.13 $0.11 $13.69
Welder $15.88 $0.93 $0.02 $0.21 $17.04
Welder Helper $11.25 1 $0.45 1 $0.05 1 $0.17 $11.92
10/7/2002
G-AGC 2002 Wage Survey.xls 2002 Building Trades 3
WEATHER TABLE
AVERAGE DAYS INCHES SNOW/ICE
MONTH RAINFALL,(1) RAINFALL(2) PELLETS (3)
JANUARY 7 1.80 1
FEBRUARY 7 2.36
MARCH 7 2.54
APRIL 9 4.30 0
MAY 8 4.47 0
JUNE 6 3.05 0
JULY 5 1.84 0
AUGUST 5 2.26 0
SEPTEMBER 7 3.1.5 0
OCTOBER 6 2.68 0
NOVEMBER 6 2.03 0
DECEMBER 7 1.82
ANNUALLY 80 32.30 1
(1) Average normal number of days rainfall, 0.01" or more.
(2) Average normal precipitation.
(3) One inch (1")or more.
* Less than one-half inch(1/2").
Unseasonable weather is defined for contract purposes as rain/snow days which exceed the average number
of days or inches of rainfall in any given month.
This table is based on information recorded at the former Greater Southwest International Airport, Fort
Worth,Texas, covering a period of 18 years. Latitude 32° 50'N, Longitude 97°03'W, elevation (ground)
537 ft.
�i U 0 5 L t 'J
JUN-08-2005 WED 07:411Ali CITY FA ENGINEERING FAX NO, 817 871 7854 P. 02
VENDOR COMPLIANCE TO STATE LAW
Section 2252.002, Texas Government Code,provides that, in order to be awarded a contract as low
bidder, non-resident bidders(oat-of-state,contractors whose corporate offices or principal place of
business are,outside of the State of Texas)bid projects for construction, improvements, supplies or
services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a
Texas resident bidder would be required to underbid a non-resident bidder in order to obtain a comparable
contract in the State in which the non-resident's principal place of business is located. The appropriate
blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to
meet specifications. The failure of out-of-state or non-resident contractors to do so will automatically
disqualify that bidder. Resident bidders must check the box in Section B.
A. Non-resident vendors in (give state),our principal place of business, are required to
be percent lower than resident bidders by state law. A copy of the statute is
attached.
Non-resident vendors in (give state), our principal place of business, are not required
to underbid resident bidders.
B. Cour principal place of business or corporate office is in the State of Texas.
Please Check or mark with an "xry
BIDDER-
L- By,
(please print) company
Signa
1 4-,
(please print) IZ
Title.
(please print)
City State zip ;?CoZC)
THIS.FORMIEMLST BE RELU—RNED WITHYQLJR QUOTATION
VENDOR COMPLIANCE TO STATE LAW
VENDOR COMPLIANCE TO STATE LAW
Section 2252.002, Texas Government Code,provides that, in order to be awarded a contract as low
bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal place of
business are outside of the State of Texas)bid projects for construction, improvements, supplies or
services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a
Texas resident bidder would be required to underbid a non-resident bidder in order to obtain a comparable
contract in the State in which the non-resident's principal place of business is located. The appropriate
blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to
meet specifications. The failure of out-of-state or non-resident contractors to do so will automatically
disqualify that bidder. Resident bidders must check the box in Section B.
A. Non-resident vendors in (give state), our principal place of business, are required to
be percent lower than resident bidders by state law. A copy of the statute is
attached.
Non-resident vendors in (give state), our principal place of business, are not required
to underbid resident bidders.
B. Our principal place of business or corporate office is in the State of Texas.
Please Check or mark with an "X"
BIDDER:
By: Company
(please print)
Signature:
(please print)
Title:
(please print)
City/ State Zip
THIS FORM MUST BE RETURNED WITH YOUR QUOTATION
VENDOR COMPLIANCE TO STATE LAW
t
JUN-08-2006 WED 07:41 AM CITY F. W. ENGINEERING FAX NO. 817 871 7854 P, 02
VENDOR COMPLIANCE TO STATE LAW
Section 2252.002, Texas Oovemrnaut Code,provides that, in order to be awarded a contract as low
bidder:, non-resident bidders(nut-ofstatecontractors whose corporate,offices or principal place of
business are outside of the State of Texas)bid projects for construction, improvements, supplies or
services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a
Texas resident bidder would be required to underbid a non.-resident bidder in order to obtain a comparable
contract in the State in which the non-resident's principal place of business is located. The appropriate
blanks in Section A must be filled out by all otit-of-state or non-resident bidders in order for your bid to
meet specifications. The failure of out-of-state or non-resident contractors to do so will automatically
disqualify that bidder, Resident bidders must check the box in Section B.
A. Non-resident vendors in (give state),our principal place of business, are required to
be percent lower than resident bidders by state law. A copy of the statute, is
attached.
Non-resident vendors in (give state),our principal place of business, are not required
to underbid resident bidders.
B. Our principal place of business or corporate office is in the State of Texas.
Please Check or mark with an "X"
BIDDER-
B y:
Aon�pany
(please print)
z Signatu
(please print)
Title.
(please print)
City 7-
State zip . 6
THIS,FORM—MU—ST BE RETURNED WITH YOUR QUOTATION
VENDOR COMPLIANCE TO STATE LAW
JUN-08-2005 WED 07:41 AM CITY F. W, ENGINEERING FAX NO. 817 871 7854
CONTRACTOR COMPLIANCE WITH
WORKERS' COMPENSATION LAW
Pursuant to V-T.0,A. Labor Code 9406.96 (2000), as amended, Contractor certifies that
it provides workers' compensation insurance coveragelfor all of its employees employed
on City of Fort Worth Department of Engineering No.&Lk . - and City of Fort
Worth Project 7Y-0-0—cv-z-eev e176--z-
4pcov C, 7
CONTRA
Nat
Title:
Date: 2P 'I
STATE OF TEXAS §
COUNTY OF TAR NT §
Before/m9f', the undersigned authority, on this day personally appeared
d&ow /&- , known to me to be the person whose name is subscribed to the
foregoing ifistrurnent, ndto le Acknow dge1that he executed the same as the, act
s
V,I
and deed of -/, 9,-� �V for the purposes and
consideration therefn expressed and in the capacity therein stated.
GIV,en Under My Hand and Sea[ of Office this Z61ay of 20
Woidl_y Public in and for the State '"I
ARLENE C. HARDY Texas
Notary Public,State of Texas
My Commission expims
August 28, 2007
3
CONTRACTOR COMPLIANCE WITH
WORKERS' COMPENSATION LAW
Pursuant to V.T.C.A. Labor Code §406.96 (2000), as amended, Contractor certifies that
it provides workers' compensation insurance coverage for all of its employees employed
on City of Fort Worth Department of Engineering No. and City of Fort
Worth Project No.
CONTRACTOR
I
:
By.
Name:
Title:
3
Date:
STATE OF TEXAS §
§
COUNTY OF TARRANT §
Before me, the undersigned authority, on this day personally appeared
known to me to be the person whose name is subscribed to the
foregoing instrument, and acknowledged to me that he executed the same as the act
and deed of for the purposes and
consideration therein expressed and in the capacity therein stated.
Given Under My Hand and Seal of Office this day of , 20
Notary Public in and for the State of
Texas
VENDOR COMPLIANCE TO STATE LAW
Section 2252.002, Texas Government Code, provides that, in order to be awarded a contract as low
bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal place of
business are outside of the State of Texas)bid projects for construction, improvements, supplies or
services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a
Texas resident bidder would be required to underbid a non-resident bidder in order to obtain a comparable
contract in the State in which the non-resident's principal place of business is located. The appropriate
blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to
meet specifications. The failure of out-of-state or non-resident contractors to do so will automatically
disqualify that bidder. Resident bidders must check the box in Section B.
A. Non-resident vendors in (give state), our principal place of business, are required to
be percent lower than resident bidders by state law. A copy of the statute is
attached.
Non-resident vendors in (give state), our principal place of business, are not required
to underbid resident bidders.
B. Our principal place of business or corporate office is in the State of Texas.
Please Check or mark with an "X"
BIDDER:
By: Company
(please print)
Signature:
(please print)
Title:
(please print)
City/ State Zip
THIS FORM MUST BE RETURNED WITH YOUR QUOTATION
VENDOR COMPLIANCE TO STATE LAW -
� 6'
+- 4J
O U N _O 'd O O
Ctct
O
O ^
C4
10
ct
rn
•� 4J
rT1 O � p O 0 C� p .
oct
S-i � N N -�•� va +-'
U `h O U, o
h� cn O U ,, C40r)
cn
cn
03 a� o
O >1
0 'b � p C
M 4)
U
N N QJ O O
t
y
0 0
.� 00
Cld
•4-j
O �-+ cC
_r
•� --Cot •O O U
cn
U •� ct N O
A ' ,C! M 0 -C� m
O � Ute-+ .�, v� p •p � �
ct
cn
vN •4� cnCld
C!)
O O N O U B X 0 0
ct U
cn
r ct
ct
ct
Ct U t
ENO
a � C) ct On
to
U ct
cnct
O
Ct U
O U p 'C� cl M
O N U p U c
C'd co
cd cn bb cn �-4 (1) .4 u �>
°'
U �
;U., p O p c'd oo
U � �' �-' •O
•'� O U
Cld
Cld p
PROJECT DESIGNATION SIGN
PMS-288
4
41 "
FORT
W01eTH
1
4 } -f 4
61„
2 PMS-187
3"
Proj' ect Title
1
3" 2ND LINE
4 -p 3„
IF NECESSARY
1 "T--- Contractor: I 1„
2// ontractor's Names
2 2
�C Dill
24
1"T_ FUNDED BY t 1
1"r 2004 CAPITAL IMPROVEMENT PROGRAM 1
4
Scheduled Completion Date 1 1
Year
5//
1°
FONTS:
FORT WORTH LOGO IN CHELTINGHAM BOLD
ALL OTHER LETTERING IN ARIAL BOLD
COLORS:
FORT WORTH-PMS 288
LONGHORN LOGO-PMS 167
LETTERING-PMS 288
BACKGROUND-WHITE PROJECT DESIGNATION SIGN
BORDER-BLUE (Community Development Block Grant projects- only)
CITY OF FORT WORTH—CONSTRUCTION STANDARD
s
DRAWING N0. DATE: 9-20--02
TECHNICAL SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01100- SUMMARY OF WORK
The Contractor shall supply all superintendence and shall perform all work and furnish all labor,
equipment,materials and incidentals necessary and complete all work as described in the plans
and specifications. All construction and other work shall be done by the Contractor in
accordance with the best engineering and construction practices for the skill or trade involved.
The work to be accomplished under these plans and specifications for: Playground
Renovations at Sunset Park (Mapsco No. 47-T),Diamond Hills Park (Mapsco No. 48-Z)
and Leonard Park(Mapsco No. 74-11) includes:
Site/ equipment demolition, site grading and installation of new playground
f equipment and park amenities as per construction documents.
These plans and specifications were prepared by the Parks and Community Services
Department. The Department of Engineering will administer the contract and furnish inspection.
In addition to project performance stated above,the Contractor shall also be responsible for:
1. Setting all project layout dimensions and final finish grade elevations in accordance to plans.
All such survey work shall be performed by a Registered Surveyor in the State of Texas and
verification provided to the City that such survey work complies to plans and specifications.
2. Attend all project progress meetings as scheduled by the City and provide updated project
schedules within 3 calendar days upon request by the City.
The applicable items contained in the Standard Specifications for Street and Storm Drain
Construction for the City of Fort Worth, Texas, shall apply to this contract just as though each
were incorporated in these documents. Where the provisions or specifications contained in those
documents are contrary to this publication, this publication shall govern. In case of conflict
between plans and specifications, the plans shall govern. A copy of the Standard Specifications
for Street and Storm Drain Construction can be purchased at the office of the Transportation and
Public Works Department , 1000 Throclunorton Street, 2nd Floor, Municipal Building, Fort
Worth, Texas.
The Contractor shall provide all permits and licenses and pay all charges and fees, and give all
notices necessary and incidental to the due and lawful prosecution of the work. The Contractor
- shall contact the City of Fort Worth's Development-Plans Exam Section for a determination of
applicable permits or variances required for this project.
GENERAL REQUIREMENTS
- 1 -
SECTION 01135 - CONTRACT TIME
1.01 PROGRESS AND COMPLETION
Upon receipt of a notification letter and the executed construction contract, the
Contractor shall be responsible for scheduling a preconstruction conference,which shall
be held no later than ten working days from the date of the notification letter.
At the time of the preconstruction conference , a construction start date shall be
established and indicated in the Notice to Proceed(Work Order) issued by the
Engineering Department. The Contractor shall begin the work to be performed under the
contract on or before ten working days from the date the Work Order is issued. The
Contractor shall carry the work forward expeditiously with adequate forces and shall
complete it within the period of time stipulated in the contract.
1.02 LIQUIDATED DAMAGES
This project shall be completed within the specified days allowed. If project construction
exceeds the allotted contract time, liquidated damages will be assessed as stipulated in
the City of Fort Worth Standard Specification for Street and Storm Drain Construction. In
the event of a dispute regarding either final quantities or liquidated damages, the parties
shall attempt to resolve the differences within 30 calendar days.
SECTION 01140- ALTERNATIVES
The City reserves the right to abandon, without obligation to the contractor, any part of the
project(subject to conditions set forth in Section 01150 -Payment to Contractor) or the entire
project at any time before the Contractor begins any construction work authorized by the City.
SECTION 01150 -PAYMENT TO CONTRACTOR,PROJECT ACCEPTANCE, &
WARRANTY
1.01 SCOPE OF PAYMENT: The Contractor shall accept the compensation as provided in
the contract in full payment for furnishing and paying for all materials, supplies,
subcontracts, labor, tools and equipment necessary to complete the work of the
contract; for any loss or damage which may arise from the nature of the work from the
action of the elements, or from any unforeseen difficulty which may be encountered in
the prosecution of the work, until the final acceptance of the work by the City; for all
risks of every description connected with the prosecution of the work; for all expenses
and damages which might accrue to the Contractor by reason of delay in the initiation
and prosecution of the work from any cause whatsoever; for any infringement of patent,
trademark or copyright, and for completing the work according to the plans and/or
specifications. The payment of any current or partial estimate shall in no way affect the
obligations of the Contractor to repair or remove, at his own expense, the defective
parts of the construction or to replace any defective materials used in the construction,
GENERAL REQUIREMENTS
-2-
and to be responsible for all damages due to such defects if such defects or damages are
discovered on or before the final inspection and acceptance of the work.
1.02 Partial pay estimates shall be submitted by the Contractor or prepared by the City on
the 1st day and 15th day of each month that the work is in progress. Estimates will be
paid within 25 days following the end of the estimate period, less the appropriate
retainage as set out below. Partial pay estimates may include acceptable nonperishable
materials delivered to the work place which are to be incorporated into the work as a
permanent part thereof, but which at the time of the pay estimate have not been so
installed. If such materials are included within a pay estimate,payment shall be based
upon 85% of the net invoice value thereof. The Contractor will fiimish the Engineer
such information as may be reasonably requested to aid in the verification or the
preparation of the pay estimate.
1.03 It is understood that the partial pay estimate amounts will be approximate only, and all
partial pay estimates and payment of same will be subject to correction in the estimate
rendered following the discovery of the mistake in any previous estimate. Payment of
any partial pay estimates shall not be an admission on the part of the Owner of the
amount of work done or of its quality or sufficiency or as an acceptance of the work
done; nor shall same release the Contractor of any of its responsibilities under the
Contract Documents.
1.04 The City reserves the right to withhold the payment of any partial estimate if the
Contractor fails to perform the work in strict accordance with the specifications or other
provisions of this Contract.
1.05 Retainage- For contracts of less than $400,000 at the time of execution, retainage
shall be 10 percent. For contracts of$400,000 or more at the time of execution,
retainage shall be 5 percent. The Contractor will receive full payment for work,
less retainage, from the City, on each partial payment period.
Payment of the retainage will be included with the final payment after acceptance
of the project being complete.
1.06 Contractor shall pay subcontractors in accord with the subcontract agreement within five
business days after receipt by Contractor of the payment by City. Contractor's failure to
snake the required payment to subcontractors will authorize the City to withhold future
payments from the Contractor until compliance with this paragraph is accomplished.
1.07 Contractor hereby assigns to City any and all claims for overcharges associated with this
contract which arise under the antitrust laws of the United States, 15 U.S.C.A. Sec. 1 et
sec (1973).
1.08 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter
- the quantities of the work to be performed or to extend or shorten the improvements at
any time when and as found to be necessary, and the Contractor shall perform the work
GENERAL REQUIREMENTS
' -3-
as altered, increased or decreased at the unit prices. Such increased or decreased quantity
shall not be more than 25 percent of the contemplated quantity of such item or items.
When such changes increase or decrease the original quantity of any item or items of
work to be done or materials to be furnished by the 25 percent or more, then either party
to the contract shall upon written request to the other party be entitled to a revised
consideration upon that portion of the work above or below the 25 percent of the original
quantity stated in the proposal; such revised consideration to be determined by special
agreement or as hereinafter provided for "Extra Work." No allowance will be made for
any changes in anticipated profits nor shall such changes be considered as waiving or
invalidating any conditions or provisions of the Contract Documents.
1.09 PAYMENT FOR EXTRA WORK: Extra work performed by the Contractor, that is
authorized and approved by the City Engineer, will be paid for under "Change orders"
made in the manner hereinafter described, and the compensation thus provided shall be
accepted by the Contractor as payment in full for all labor, subcontracts, materials, tools,
equipment and incidentals, and for all supervision, insurance,bonds and all other expense
of whatever nature incurred in the prosecution of the extra work. Payment for extra work
will be made under one of the following types of"Change orders" to be selected by the
City:
A. Method "A". By unit prices agreed upon in the contract or in writing by the
Contractor and City Engineer and approved by the City Council before said extra
work is commenced subject to all other conditions of the contract.
B. Method "B". By a lump sum price agreed upon in writing by the Contractor and
City Engineer and approved by the City Council before said extra work is
commenced, subject to all other conditions of the contract.
C. Method"C". By actual field cost of the work, plus 15 percent as described herein
below, agreed upon in writing by the Contractor and City Engineer and approved
by the City Council after said extra work is completed, subject to all other
conditions of the contract.
In the event extra work is to be performed and paid for under Method "C", the actual
field costs of the work will include the cost of all workmen, foremen, timekeepers,
mechanics and laborers working on said project; all used on such extra work only,
plus all power, fuel, lubricants, water and similar operating expenses; and a ratable
proportion of premiums on performance and payment bonds, public liability,
workmen's compensation and all other insurance required by law or ordinance. The
City Engineer will direct the form in which the accounts of actual field cost will be
kept and will recommend in writing the method of doing the work and the type and
kind of equipment to be used,but such extra work will be performed by the
Contractor as an independent contractor and not as an agent or employee of the City.
The 15 percent of the actual field cost to be paid the Contractor shall cover and
compensate him for profit, overhead, general supervision and field office expense,
GENERAL REQUIREMENTS
-4-
and all other elements of cost and expense not embraced within the actual field cost
as herein specified.
The Contractor shall give the City Engineer access to all accounts,bills, invoices and
vouchers relating thereto.
1.10 DELAYS: If delay is caused by specific orders given by the City to stop work, or by the
performance of extra work, or by the failure of the City to provide material or necessary
instructions for carrying on the work,then such delay will entitle the Contractor to an
equivalent extension of time, his application for which shall,however, be subject to the
approval of the City Council; no such extension of time shall release the Contractor or the
surety on his performance bond from all his obligations hereunder which shall remain in
full force until the discharge of the contract.
1.11 CLAIMS AND DAMAGES: Any claims for extra work or for any other related matter
or cause must be made in writing to the City Engineer within seven calendar days from
and after the cause or claim arises. Unless such claim is so presented, it shall be held that
the Contractor has waived the claim, and he shall not be entitled to receive pay thereof.
1.12 TRANSPORTATION: No allowance or deduction will be made for any charge of freight
rates. No allowance for transportation of men, materials or equipment will be allowed.
1.13 ACCEPTANCE AND FINAL PAYMENT: The City, upon receipt of the Director's
"Certificate of Completion" and "Final Estimate" and upon receipt of satisfactory
evidence from the Contractor that all subcontractors and persons furnishing labor or
materials have been paid in full and all claims of damages to property or persons because
of the carrying on of this work have been resolved, or the claims dismissed or the issues
joined, shall certify the estimate for final payment after previous payments have been
deducted and shall notify the Contractor and his surety of the acceptance of the project.
Bills Paid Affidavit and Consent Of Surety shall be required prior to final payment
becoming due and payable. In the event that the Bills Paid Affidavit and Consent Of
Surety have been delivered to the City and there is a dispute regarding (1) final quantities,
or(2) liquidated damages, the City shall make a progress payment in the amount that the
City deems due and payable.
On projects divided into two or more units, the Contractor may request a final payment
on one or more units which have been completed and accepted.
On delivery of the final payment, the Contractor shall sign a written acceptance of the
final estimate as payment in full for the work done. All prior partial estimates shall be
subject to correction in the final estimate and payment.
1.14 WARRANTY: The Contractor shall be responsible for defects in this project due to
faulty workmanship or materials, or both, for a period of two (2) years beginning as of
the date that the final punch list has been completed and the project accepted by the City
as of the date the final punch list has been completed, as evidenced by a written
GENERAL REQUIREMENTS
-5-
statement signed by the Contractor and the City. The contractor will be required to
replace, at own expense, any part, or all, of this project which becomes defective due to
these causes.
SECTION 01300- SUBMITTALS
Prior to construction, the Contractor shall furnish the Parks and Community Services Department
a schedule outlining the anticipated time each phase of construction will begin and be completed,
including sufficient time for turf establishment(if applicable) and project clean-up.
The Contractor shall submit to the Project Manager shop drawings,product data and samples
required in specification sections. Refer to Section 01640— 1.02.
SECTION 01400- QUALITY CONTROL
The Contractor will receive all instructions and approvals from the Director of Engineering
and/or his assigned inspectors. The inspector will be introduced to the contractor prior to
beginning work. Any work done at the direction of any other authority will not be accepted or
paid for. Final approval for the finished project shall be given by the Director of Engineering,
City of Fort Worth.
The Contractor or a competent and reliable superintendent shall oversee the work at all times.
The superintendent shall represent the Contractor in his absence and all directions given to him
shall be binding as if given to the Contractor.
SECTION 01410-TESTING
All tests made by the testing laboratory selected by the City will be paid for by the City. In the
event manufacturing certificates are requested, they shall be paid for by the Contractor.
SECTION 01500-TEMPORARY FACILITIES AND CONTROLS
The Contractor shall take all precautions necessary to protect all existing trees, shrubbery,
sidewalks,buildings, vehicles, utilities, etc., in the area where the work is being done. The
Contractor shall rebuild, restore, and make good at his own expense all injury and damage to
same which may result from work being carried out under this contract.
The utility lines and conduits shown on the plans are for information only and are not guaranteed
by the Owner to be accurate as to location and depth; they are shown on the plans as the best
information available from the owners of the utilities involved and from evidences found on the
ground. The Contractor shall determine the exact location of all existing utilities and conduct his
work to prevent interruption of service or damages.
SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES
GENERAL REQUIREMENTS
-6-
A warning sign not less than five inches by seven inches, painted yellow with black letters that
are legible at twelve feet, shall be placed inside and outside vehicles such as cranes, derricks,
power shovel, drilling rigs,pile drivers, hoisting equipment or similar machinery. The warning
sign shall read as follows:
"WARNING- UNLAWFUL TO OPERATE THIS EQUIPMENT
WITHIN SIX FEET OF HIGH VOLTAGE LINES."
Equipment that may be operated within six feet of high voltage lines shall have an insulating
cage-type guard about the boom or arm, except backhoes or dippers, and insulator links on the
lift hood connections.
h
When necessary to work within six feet of high voltage electric lines,the Contractor shall notify
power company(TU Electric or the appropriate power supplier) to erect temporary mechanical
barriers, de-energize the line, or raise or lower the line. The contractor shall maintain a log of all
such correspondence. The Contractor is responsible for all costs incurred.
SECTION 01640 - PRODUCT OPTIONS
1.01 GENERAL,
For review and approval of products to be used on this project, send submittals to:
Carlos Gonzalez, Project Manager (817) 871-5734
Parks and Community Services Department
4200 S. Freeway Suite 2200
Fort Worth, Texas 76115-1499
1.02 PRODUCTS LIST
A. Within five (5) Working Days after commencement of work, the Contractor shall
submit to the Project Manager two (2) copies of complete list of all specified
products and submittals for review and approval.
B. All specified manufacturer's products listed in the Equipment Schedule in the
construction plans have been previously reviewed and approved in conformance to
playground prototype designs approved for use in the City of Fort Worth.
C. All equipment specified(composite play structures, arch swings,buck-a-bouts,
spring animals,whirls) which comprise the various playground prototype options
has been designed to conform to both the Consumer Product Safety Commission
(CPSC) guidelines and Americans With Disabilities Act (ADA) requirements and
as such, no other product equipment shall be considered.
GENERAL REQUIREMENTS
-7-
C. For products specified under reference standards, include with listing of each
product:
1. Name and address of manufacturer
2. Trade name
3. Model or catalog designation
4. Manufacturer's data
a. Performance and test data
b. Reference standards
D. Specified material shall not be ordered by the Contractor until such time product
material submittals have been received, reviewed and approved by the project
consultant and/or City.
SECTION 01700-PROJECT CLOSEOUT
1.01 CLEAN-UP
The Contractor shall make final clean-up of the construction area, to the satisfaction of
the Parks and Community Services Department, as soon as construction in that area is
completed. Clean-up shall include removal of all construction materials, pieces of
concrete, equipment and/or other rubbish. No more than five (5) days shall elapse after
the completion of construction before the area is cleaned. Surplus materials shall be
disposed of by the Contractor, at this own expense, and as directed by the Parks and
Community Services Department. Cleaning of equipment by Contractor or
Subcontractor, such equipment as cement mixers, ready-mix bucks, tools, etc., shall take
place in an area designated by the Parks and Community Services Department.
SECTION 01800 - CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS
Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel
at the project site for contractor's sole negligence. In addition, Contractor covenants and agrees
to indemnify,hold harmless and defend, at its own expense, the Owner, its officers, servants and
employees, from and against any and all claims or suits for property loss, property damage,
personal injury, including death, arising out of, or alleged to arise out of, the work and services
to be performed hereunder by Contractor, its officers, agents, employees, subcontractors,
licensees or invitees, whether or not any such injury, damage or death is caused, in whole or
in part, by the negligence or alleged negligence of Owner, its officers, servants or
employees. Contractor likewise covenants and agrees to indernnify and hold harmless the Owner
from and against any and all injuries to Owner's officers, servants and employees and any
damage, loss or destruction to property of the Owner arising from the performance of any of the
terms and conditions of this Contract, whether or not any such injury or damage is caused in
whole or in part by the negligence or alleged negligence of Owner, its officers, servants or
employees.
GENERAL REQUIREMENTS
-8-
In the event Owner receives a written claim for damages against the Contractor or its
subcontractors prior to final payment, final payment shall not be made until Contractor either(a)
submits to Owner satisfactory evidence that the claim has been settled and/or a release from the
claimant involved, or(b) provides Owner with a letter from Contractor's liability insurance
carrier that the claim has been referred to the insurance carrier.
The Director may, if he deems appropriate,refuse to accept bids on any other City of Fort Worth
public work from a Contractor against whom a claim for damages is outstanding as a result of
work performed under a City Contract.
END OF DIVISION
GENERAL REQUIREMENTS
-9-
SECTION 02140 - SITE UNDERDRAINS
PART I- GENERAL
1.01 SCOPE: Work in this section includes famishing all labor, materials, equipment, and services
required to construct underdrains to the required lines, grades, and cross sections as specified
herein and on the plans.
1.02 RELATED WORK SPECIFIED ELSEWHERE:
A. Section 02300-Earthwork.
B. Section 03300 - Cast-in-Place Concrete
PART 2 - PRODUCTS
2.01 UNDERDRAIN PIPE: Pipe and fittings shall be flexible, corrugated tubing manufactured of
high-density polyethylene resins and conforming to ASTM Product Specifications F-405 and
F-667. Drainage tubing shall be as manufactured by Advanced Drainage Systems (ADS), Inc.,
of Columbus, Ohio. The local manufacturing plant which will provide a list of suppliers is in
Ennis, Texas - telephone(972) 878-9600.
A. Perforated Pipe: Perforations shall be linear slots cut radially into the tubing wall
between corrugations. Perforated pipe will be famished complete with the Cerex nylon
"Drain Guard" screen. The screen will completely surround the pipe and will have a
lapped,welded longitudinal joint.
B. Non-Perforated Pipe: Non-perforated pipe shall be used for collector lines which
convey the water from perforated pipe to the concrete inlet or outfall.
C. Fittings: All couplings, reducers,tees, ells,plugs, caps, and other fittings shall be non-
perforated and shall be of the same manufacturer as the drainage tubing. A fitting shall
be used at each pipe junction/termination, as appropriate.
2.02 FILTER MATERIAL: Filter material for use in backfilling trenches over and around
underdrains shall consist of 1/2" to 1" washed stone free of organic or other deleterious matter.
2.03 FILTER FABRIC: Filter fabric to line and lap over gravel filled subdrain trench shall be
Mirafi 140N drainage fabric as manufactured by Celanese Corporation, (800) 223-9811, or
approved equal.
PART 3 - EXECUTION
3.01 VERTICAL,AND HORIZONTAL CONTROLS:
A. The Contractor shall establish or shall employ a licensed surveyor to establish all lines
and grades necessary for each stage of the work described herein.
SITE UNDERDRAINS
02140
B. Provide blue tops for reference in dressing trench bottoms at intervals not to exceed 30
feet along the centerline of each trench.
3.02 UNDERDRAINS: Trenches for underdrains shall be dug after the subgrade is prepared. The
excavation of each trench shall begin at its outlet and proceed toward its upper end. The trench
must not be excavated below the proposed grade line. Trenches will be cleaned of all loose
material and their bottoms will be dressed and fine graded to blue tops set as previously
described. Trenches shall be lined with filter fabric and underdrain pipe shall be set on the
trench bottom. All fittings shall be securely coupled and all open ends will be capped. The
pipe shall be carefully covered with the gravel filter material and the filter fabric shall be
lapped over the trench.
Care shall be taken not to damage the pipe or its fabric filter screen. Underdrain pipe shall be
connected to solid pipe joints and to outfall at the concrete structure/collar as indicated in the
plans. Care shall be taken not to loosen or cave-in the trench walls. Any such damage will be
excavated and will be backfilled in mechanically tamped lifts not to exceed eight inches and
will be re-constructed.
3.03 SETTLEMENT: After the trench has been backfilled it shall be thoroughly soaked. This
process shall be repeated two times allowing the backfill material to dry twenty-four hours
before wetting again.
END OF SECTION
SITE UNDERDRAINS
02140
-2-
SECTION 02200- SITE PREPARATION
PART 1 - GENERAL.
1.01 SCOPE: Work in this section includes furnishing all labor, materials, equipment and services
required for clearing and grubbing, demolition, and removal and disposal of items as specified
herein and on the plans.
1.02 RELATED WORK SPECIFIED ELSEWHERE:
A. Section 02300 - Earthwork
B. Existing Conditions,Removal and Demolition Items.
PART 2—PRODUCTS
2.01 No products are required to execute this work, except as the Contractor may deem necessary.
PART 3 —EXECUTION
3.01 CLEARING AND GRUBBING:
A. Clearing and grubbing shall consist of removing all natural and artificial objectionable
materials from the project site or from limited areas of construction specified within the
site.
B. In general, clearing and grubbing shall be performed in advance of grading and
earthwork operations and shall be performed over the entire area of earthwork
operations.
C. Unless otherwise specified on the plans, all trees and shrubs of three inch(3") caliper or
less (caliper is the diameter as measured twelve inches (12") above the ground) and all
scrub growth, such as cactus, yucca, vines, and shrub thickets, shall be cleared. All
dead trees, logs, stumps, rubbish of any nature, and other surface debris shall also be
cleared.
D. Buried material such as logs, stumps, roots of downed trees that are greater than one
and one half inches (1-1/2") in diameter,matted roots,rubbish, and foreign debris shall
be grubbed and removed to a minimum depth of twenty four inches (24")below
proposed finished grades.
E. Ground cover consisting of weeds, grass, and other herbaceous vegetation shall be
removed prior to stripping and stockpiling topsoil from areas of earthwork operations.
Such removal shall be accomplished by "blading" off the uppermost layers of sod or
root-matted soil for removal.
SITE PREPARATION
02200
- 1 -
3.02 PAVEMENT REMOVAL:
A. Bituminous and concrete pavements shall be removed to neatly sawed edges. Saw cuts
shall be full depth. If a saw cut in concrete pavement falls within three feet(3') of an en
existing score joint, construction joint, saw joint, cold joint, expansion joint, or edge,
the concrete shall be removed to that joint or edge. All saw cuts shall be parallel and/or
perpendicular to the line of existing pavement. If an edge of a cut is damaged
subsequent to saw cutting, the concrete shall again be sawed to a neat, straight line for
the purpose of removing the damaged area.
B. Concrete curb and gutter shall be removed as specified above. No section to be replaced
shall be smaller than thirty inches (30") in length or width.
3.03 UTILITIES REMOVAL: In general, those utilities on the site that are to be removed and that
belong to the Owner shall be removed by the Contractor. The Owner is responsible for
arranging the relocation or removal of other utilities owned by utility companies or other
parties.
3.04 MINOR DEMOLITION: There may be certain items on the site such as old building
foundations, fences, and other undetermined structures and improvements that must be
removed before construction can commence. Unless otherwise specified, such items become
the property of the Contractor for subsequent disposal.
3.05 USE OF EXPLOSIVES: The use of explosives will not be permitted in site preparation
operations.
3.06 BACKFILLING: All holes, cavities, and depressions in the ground caused by site preparation
operations will be backfilled and tamped to normal compaction and will be graded to prevent
ponding of water and to promote drainage. Should any excavated hole or cavity be required
to be left open over night, the Contractor shall be responsible to provide barriers and/or
coverings to enhance on site accident prevention measures.
3.07 DISPOSAL OF WASTE MATERIALS:
A. Unless otherwise stated, materials generated by clearing, grubbing, removal, and
demolition shall be known as "waste" or "spoils" and shall be removed from the site and
disposed of by the Contractor. Similar materials may be unearthed or generated by
earthwork operations or by subgrade preparation. Unless otherwise specified any
merchantable items become the property of the Contractor.
END OF SECTION
SITE PREPARATION
02200
-2-
SECTION 02300-EARTHWORK
PART I -GENERAL.
1.01 SCOPE: Work in this section includes furnishing all labor,materials, equipment, and services
required to construct, shape, and finish earthwork to the required lines, grades, and cross
sections as specified herein and on the plans.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Section 02200 - Site Preparation.
B. Grading Plan: Refer to plan sheets.
1.03 METHOD OF PAYMENT: Earthwork is a necessary and incidental part of the work. The
total cost will be included in the Bid Proposal. Payment will be made on a Lump Sum basis
only.
PART 2 - PRODUCTS
2.01 UNCLASSIFIED EXCAVATION: Unclassified excavation shall consist of all excavation,
unless separately designated,within the limits of the work. Unclassified excavation includes
all material encountered regardless of its nature or the manner in which it is to be excavated.
2.02 UNCLASSIFIED FILL
A. Unclassified fill shall consist of all fill within the limits of the work. All suitable native
materials removed in unclassified excavation, or similar imported materials, shall be
used insofar as practicable as unclassified fill. Properly deposited, conditioned, and
compacted fill is hereinafter referred to as "earth embankment."
B. Rock: Minor quantities of rock not greater than four inches in greatest dimension are
permissible in fill materials used to construct earth embanlunent. Minor quantities of
rock of greater dimensions may be placed in the deeper fills in accordance with the
State Department of Highways and Public Transportation requirements for construction
of rock embankments, provided such placement of rock is not immediately adjacent to
structures or piers. Also, rock may be placed in the portions of embankments outside
the limits of the completed graded width where the size of the rock prohibits their
incorporation in the normal embankment layers.
2.03 TOPSOIL
On-Site Topsoil: Topsoil shall consist of an average depth of six inches (6") of native surface
soil left in place after the ground cover of herbaceous vegetation and other objectionable matter
has been cleared by"blading," as specified in Section 02200, "Site Preparation." Topsoil may
be greater or less, than the upper six inches (6") in depth.
EARTHWORK
02300
2.04 IlVIPORTED FILL
A. Imported fill materials shall be used for the construction of earth embankment in the
event that(1)the volume of unclassified excavation is less than the volume of fill
required for earth embankment and/or(2) the condition of materials removed in
unclassified excavation makes them unsuitable for use in the construction of earth
embankment.
B. The Contractor shall haul and place imported fill obtained from off-site sources as
necessary to construct the embankment and various other details of the construction
plans. All costs related to such imported fill will be included in the contract price, and
no additional or separate payment for imported fill will be due the Contractor.
C. A sample of the proposed imported fill must be provided by the Contractor and be
approved by the Owner. In general, imported material must be equal to or better than
native material in quality and engineering characteristics. The Architect/Engineer may
also require the Contractor to provided a material analysis test of the proposed fill.
2.05 SELECT MATERIALS
A. Select materials shall be imported from offsite sources, unless they are available from
specifically designated areas on the site as marked on the plans.
2.06 UNSUITABLE MATERIALS
A. Topsoil, select material, imported fill, or unclassified fill will be declared as
"'unsuitable" by the Owner if, in his opinion, any of the following conditions or matter
and particles are present to a degree that is judged detrimental to the proposed use of the
material.
1. Moisture
2. Decayed or undecayed vegetation
3. Hardpan clay,heavy clay, or clay balls
4. Rubbish
5. Construction rubble
6. Sand or gravel
7. Rocks, cobbles, or boulders
8. Cementious matter
9. Foreign matter of any kind
B. Unsuitable materials will be disposed of as "waste" as specified in Section 02200.
C. Wet Material: If fill material is unsatisfactory for use as embankment solely because of
high moisture content, the Architect/Engineer may grant the Contractor permission to
process the material to reduce the moisture content to a usable optimum condition.
EARTHWORK
02300
-2-
PART 3 - EXECUTION
3.01 SITE PREPARATION: In general, "site preparation," as specified in Section 02200, shall be
performed in advance of grading and earthwork operations and shall be completed over the
entire area of earthwork operations.
3.02 TOPSOIL
A. The removal and storage of topsoil shall occur after site preparation is complete and
before excavation and embankment construction begin. Likewise, topsoil will be
replaced after excavation and embankment construction are complete.
B. Removal: Topsoil shall be stripped to an average depth of six inches (6") from areas
where excavation and embankment construction are planned. Topsoil may be obtained
from greater depths if it is uncontaminated by the substratum and it is of good quality,
in the opinion of the Architect/Engineer.
C. Storage: Topsoil shall be stored in stockpiles conveniently located to areas that will
later receive the topsoil. Stockpiles shall be out of the way of earthwork operations in
locations approved by the Owner or Architect/Engineer. Stored topsoil shall be kept
separate from other excavated materials and shall be protected from contamination by
objectionable materials that would render it unsuitable.
D. Timing: Topsoil will not be replaced (deposited) until construction activities are
complete that would create undesirable conditions in the topsoil, such as
overcompaction or contamination. Trenching for items such as electrical conduit and
irrigation pressure lines must be complete before topsoil replacement may begin.
D. Replacement: Topsoil will be deposited in a single layer or lift. It will be placed,
processed, compacted, and graded to leave a finished layer of topsoil not less than five
inches in depth. Unless otherwise indicated, topsoil will be replaced over all areas of
earthwork (including slopes), except where pavement is plamled.
F. Grading: Topsoil will be final graded to the elevations shown on the plans. Fine
grading will be accomplished with a weighted spike harrow, weighted drag, tractor box
blade, light maintainer, or other acceptable machinery. All particles of the finish grade
shall be reduced to less than one inch in diameter or they shall be removed. All rocks of
one inch or greater shall also be removed. Grading operations and equipment will be
such that topsoil does not become overcompacted. Bulldozer blades and front-end
loader buckets are not acceptable devices for topsoil grading operations. Final grading
within five feet of constructed or installed elements shall be hand raked.
G. Acceptability: Finished areas of topsoil are satisfactory if they are true to grade, true in
plane, even in gradient(slope), uniform in surface texture, and of normal compaction.
Areas of loose granular pockets or of overcompacted soils are not acceptable and will
be reworked. Finished areas will promote surface drainage and will be ready for
turfgrass planting. _
EARTHWORK
02300
-3-
3.03 UNCLASSIFIED EXCAVATION
A. All excavated areas shall be maintained in a condition to assure proper drainage at all
times, and ditches and sumps shall be constructed and maintained to avoid damage to
the areas under construction.
B. Surplus Material:
1. Surplus excavation is that quantity of material that may be left over after the
grading plan is executed, and all earthwork operations, including excavation,
embankment construction, topsoil replacement, and final grading, are
completed. Any other surplus material shall be disposed of as "waste" as
specified in Section 02200. All such cost for removal shall be considered as
incorporated into Earthwork costs
C. Excavation in Rock: The use of explosives will not be permitted. Unless otherwise
indicated on the plans, excavation in solid rock shall extend six inches (6") below
required subgrade elevation for the entire width of the area under construction and shall
be backfilled with suitable materials as indicated on the plans.
3.04 EARTH EMBANKMENT
A. Earth embankment is defined as embankment composed of suitable materials removed
in unclassified excavation and/or imported fill. The construction of embankment
includes preparing the area on which fill is to be placed and the depositing,
conditioning, and compaction of fill material.
B. General: Except as otherwise required by the plans, all embankment shall be
constructed in layers approximately parallel to the finished grade of the graded area, and
each layer shall be so constructed as to provide a uniform slope as shown on the grading
plan. Embankments shall be constructed to correspond to the general shape of the
typical sections shown on the plans, and each section of the embankment shall
correspond to the detailed section or slopes established by the drawings. After
completion of the graded area, embankment shall be continuously maintained to its
finished section and grade until the project is accepted.
C. Preparation: Prior to placing any embankment, all preparatory operations will have
been completed on the excavation sources and areas over which the embankment is to
be placed. The subgrade shall be proof rolled to detect soft spots,which if exist, should
be reworked. Proof rolling shall be performed using a heavy pneumatc tired roller,
loaded dump truck, or similar piece of equipment weighing approximately twenty five
(25)tons except as otherwise specified for tree protection and areas inaccessible to
vehicular compactors. Stump holes or other small excavations in the limits of the
embankments shall be backfilled with suitable material and thoroughly tamped by
approved methods before commencing embankment construction. The surface of the
ground, including plowed, loosened ground, or surfaces roughened by small washes or
otherwise, shall be restored to approximately its original slope by blading or other
methods, and, where indicated on the plans or required by the Owner, the ground
surface,thus prepared, shall be compacted by sprinkling and rolling.
EARTHWORK
02300
-4-
D. Scarification: The surface of all areas and slopes over which fill is to be placed, other
than rock, shall be scarified to a depth of approximately six (6") inches to provide a
bond between the existing surface and the proposed embankment. Scarification shall be
accomplished by plowing, discing, or other approved means. Prior to fill placement, the
loosened material shall be adjusted to the proper moisture content and recompacted to
the density specified herein for fill.
E. Benching: Scarification is normally adequate for sloping surfaces. However, in certain
cases where fill is to be placed against hillsides or existing embankment with slopes
greater than 4:1, the Owner may direct the Contractor to key the fill material to the
existing slopes by benching. A minimum of two feet(2')normal to the slope shall be
removed and recompacted to insure that the new work is constructed on a firm
foundation free of loose or disturbed material.
F. Depositing: Fill material shall be placed in horizontal layers or lifts, evenly spread, not
to exceed eight(8") inches in loose depth before conditioning and compaction. Unless
otherwise permitted, each layer of fill material shall cover the length and width of the
area to be filled and shall be conditioned and compacted before the next higher layer of
fill is placed. Adequate drainage shall be maintained at all times.
G. Watering: At the time of compaction,the moisture content of fill material shall be such
that the specified compaction will be obtained, and the fill will be firm, hard, and
unyielding. Fill material which contains excessive moisture shall not be compacted
until it is dry enough to obtain the specified compaction.
H. Compacting: Each layer of earth fill shall be compacted by approved tamping or
sheepsfoot rollers,pneumatic tire rollers, or other mechanical means acceptable to the
Owner. Hand-directed compaction equipment shall be used in areas inaccessible to
vehicular compactors.
I. Grading: Embankments shall be constructed in proper sequence and at proper
densities for their respective functions. All embankment serves in one capacity
or another as subgrade(e.g., under topsoil, under concrete and asphalt pavement,
under structures, etc.). Accordingly, the upper layer of embankment shall be
graded to within plus or minus 0.10 foot of proper subgrade elevation prior to
depositing topsoil, and prior to the construction of pavements, slabs, etc.
3.05 DENSITY CONTROL,
A. Earth Embankment in General: Earth embankment shall be compacted in lifts at a
minimum of ninety percent(90%) of Standard Density ASTM D698 with plus four
percent (4%) or minus two percent (2%) percentage points of optimum moisture
content.
B. Earth Embankment Under Structures and Pavement: The top six (6") inches of natural
earth comprising the subgrade for structural slabs or for areas of pavement shall be
ninety five percent(95%) to ninety eight percent (98%) of Standard Density ASTM
EARTHWORK
02300
-5
D698 with the moisture content at minus two percent (2%) to plus four percent(4%) of
optimum moisture content.
3.06 MOISTURE MAINTENANCE: The specified moisture content shall be maintained in all
embankments that are to function as subgrade for structures, areas of pavement, or for select
embankment. After completion of the embankment, the Contractor shall prevent excessive loss
of moisture in the embankment by sprinkling as required. Loss of moisture in excess of two
percent (2%)below optimum in the top twelve inches (12") of the fill will require that the top
twelve inches (12") of the embankment be scarified,wetted, and recompacted prior to
placement of the structure, select fill or pavement. If desired,the Contractor may place an
asphalt membrane of emulsified or cutback asphalt over the completed embankment and thus
eliminate the sprinkling requirement.
3.08 TOPSOIL REPLACEMENT: Topsoil shall be carefully placed to avoid any displacement or
damage to the subgrade. If any of the subgrade is rutted, damaged or displaced it shall be
restored prior to placing topsoil. Topsoil shall be replaced as specified herein per Item 3.02.
END OF SECTION
EARTHWORK
02300
-6-
SECTION 02537 - WOOD FIBER PLAYGROUND SURFACING
PART I—GENERAL
1.01 SCOPE
Surfacing tasks for wood fiber surfacing with drainage system includes all labor,
materials and equipment necessary for, and pertinent to,the work to be done. Work will
be accomplished in a thorough and workmanlike manner. The specified product will be
applied strictly in accordance with the manufacturer's recommendations.
1.02 DESCRIPTION OF SYSTEM
A. Wood fiber playground surfacing material to be Zaeger Bros. provided by The
Playwell Group,Inc., 2750 Northaven Road, Suite 103,Dallas, Tx 75229,
1-800-726-1816, or approved equal.
PART 2—PRODUCTS
2.01 MATERIALS
A. WOOD FIBRE SURFACING
1. Surfacing shall be a mix of random-sized hardwood fibres selected from
durable hardwood tree stock. Softwood fibres, standard wood chips or
bark mulch will not be acceptable.
2. To allow for compaction,the following formulas must be used to
determine the correct number of cubic yards: 8" deep: Sq. ft. of
playground x 0.0375. Twelve inches deep: Sq. ft. of playground x 0.05.
3. Bidder will guarantee sieve analysis of wood fibre as follows: Greater
than 85 percent passing 3/8" sieve. Less than 50 percent passing#60
sieve.
4. Wood fibre shall have no recycled wood from pallets or waste wood and
no twigs, bark, leaf debris or other organic material incorporated within.
B. DRAINAGE FABRIC
I. Product used shall be FibarFelt,DuraLiner, or aproved equal polyester
nonwoven engineering geotextile fabric.
2. Bidder will provide enough material to allow for 12" overlap on all seams.
C. DRAINAGE MATRIX
I. 4"diameter ADS perforated pipe with sock installed within the subgrade
gravel trench as indicated on plans.
WOOD FIBER PLAYGROUND SURFACING
02537
- I -
D. WEAR MATS
I. Product used shall be per playground equipment manufacturer's
recommendation and meet ASTM F1292-91 playground surfacing
standard for a drop height not to exceed 3.5 feet. Must be installed under
all swings and slides to preserve warranty. Method of installation/
anchorage shall be per manufacturer's recommendations.
PART 3 - SPECIAL REQUIREMENTS
3.01 QUALITY CONTROL
A. The Bidder will provide the engineered wood fiber system to be constructed
exactly according to manufacturer's installation instructions.
B. The Bidder will provide the owner or its designated contractor with all necessary
licenses prior to start of construction in accordance with U. S. Patents.
C. Supplier must provide test results for impact attenuation in accordance with
ASTM F1292-93; Standard Specification for Impact Attenuation of Surface
Systems Under and Around Playground Equipment. Results must be provided for
new material and for 5-year-old material.
D. Testing must show "g" ratings of not more than 155g for the 8" thick system, or
120g for the 12" system at 12' fall heights, and HIC values of less than 1,000 for
both new and 8-year-old material.
E. Product must be wheelchair accessible and meet the requirements of the 1990
Americans with Disabilities Act(ADA) in accordance with ASTM PS83-97.
F. The Bidder will provide copies of flammability testing procedures and results
using(i) Section 1500.44 of the Federal Hazardous Substance Act, Title 16,
Chapter II, Subchapter C, for rigid and pliable solids, and(ii) 16 CFR Part 1630
Standard for the Surface Flammability of Carpets and Rugs (FF 1-70), Modified
Procedure. Testing should be performed by an independent testing laboratory.
G. The Bidder will provide copies of testing procedures and results of(i)new
shredded wood fibre, and(ii) shredded wood fibre not less than five years old
taken from an existing site,performed by an independent testing source using the
ASTM F1292-91 playground safety surfacing standard.
H. The Bidder will provide at least three references of handicapped-accessible
playgrounds that have been installed with said surface.
WOOD FIBER PLAYGROUND SURFACING
025.37
-2-
3.02 WARRANTY
All materials and labor under this Section shall be installed by a contractor authorized by
the manufacturer. Safety surface shall be warranted for labor and materials for a period
of no less than two years. Written warranty must be submitted by the manufacturer and
the authorized installer.
PART 4—EXECUTION
A. PREPARATION
Installer shall thoroughly examine the site and specifications, carefully checking
the dimensions before starting work.
B. SUBGRADE
1. The subgrade shall be graded a minimum of 1 percent. It is not
recommended that the surfacing system be installed on a grade greater
than 10 percent. All roots, stones, and vegetation shall be removed.
2. The drainage matrix must be connected to the drainage system.
3. The first 6" of subgrade shall be compacted to at least 95 percent of the dry
density, as determined by the provisions of AASHTO or T 205, as
modified in 203.24.
C. APPLICATION:
1. Wood fiber surfacing system with gravel and subdrain. Install per plans
and specifications.
a. Aggregate Drainage Material
1. Install subdrain trench per plan.
2. Cover subgrade with washed stone, 1/2" to 3/4" diameter, at a
uniform depth of three inches.
3. Install drainage fabric over drainage aggregate, overlapping all
seams by at least 12". Cut to fit around equipment as necessary and
overlap seams as previously mentioned.
4. Install wood fiber safety surfacing at a uniformed compacted
depth of 9". Contractor shall be responsible for applying
additional material as required in order to maintain safety surface
finish elevation and anticipated settling for a period of sixty(60)
days following project acceptance.
END OF SECTION
,'
WOOD FIBER PLAYGROUND SURFACING
02537
-3 IL
_�
SECTION 02840-TURF SODDING
PART 1 - GENERAL
1.01 DESCRIPTION
A. Work Included: This work includes all labor, materials and equipment for soil
preparation, fertilization,planting and other requirements regarding turfgr ass sodding
shown on the plans.
B. Related Work Specified Elsewhere: Section 02300, Earthwork.
1.02 REFERENCE STANDARDS
A. For exotic plant materials: American Joint Committee of Horticultural Nomenclature,
Second Edition, 1942.
B. For native materials
a. Manual of the Vascular Plants of Texas by Correll and Johnston
b. Check List of Vascular Plants of Texas by Hatch
c. Flora of North Central Texas by Shinners and Moller
1.03 SUBMITTALS
Samples, certificates and specifications of sod, fertilizer, compost, soil amendments or other
materials may be requested by the Project Manager.
All delivery receipts and copies of invoices for materials used for this work shall be subject to
verification by the Project Manager.
1.04 PRODUCT DELIVERY, STORAGE AND HANDLING
V A. Sod: Harvesting and planting operations shall be coordinated with not more than forty
eight hours elapsing between the harvesting and planting.
B. Fertilizer
1. Unopened bags labeled with the analysis.
2. Conform to Texas Fertilizer Law.
1.05 QUALITY CONTROL
The contractor who plants the sod is responsible for supervision of his crew,while planting the
sod and maintaining the sod until the project is accepted by the City.
}
SECTION 02840-TURF SODDING
PART 2—PRODUCTS
2.01 SOD
A. The sod shall be"Common Bermuda" and shall consist of stolons, leaf blades,rhizomes
and roots with a healthy, virile system of dense,thickly matted roots throughout the soil of
the sod for a thickness not less than one inch. Sod shall be alive,healthy and vigorous and
shall be free of insects, disease, stones and undesirable foreign materials and grasses. Sod
shall have been produced on growing beds of clay or clay-loam topsoil. The sod shall not
be harvested or planted when its moisture condition is so excessively wet or dry that its
survival will be affected. If sod is stacked, it shall be kept moist and shall be stacked
roots-to-roots and grass-to-grass.
B. The sod shall be cut in strips four feet wide, or as called for on plan, to be laid parallel
with the contours.
2.02 FERTILIZER
A. All fertilizer shall be delivered in bags or containers clearly labeled showing the analysis.
B. All fertilizer shall be in acceptable condition for distribution and shall be applied
uniformly over the planted area two weeks after sodding.
C. All fertilizer shall have an analysis of 3-1-2 or as designated on the plans. The fertilizer
rate shall be 45 pounds of nitrogen per acre.
2.03 WATER
The water shall be furnished by the Contractor and shall be clean and free of industrial wastes or
other substances harmful to the germination of the seed or to the growth of the vegetation. The
amount of water will vary according to the weather variables. Generally, the sod should be
soaked one time per day for three weeks or until established. Soaking is mandatory after
spreading the fertilizer.
2.04 COMPOST
All compost material is to be totally organic and decomposed for at lease nine months. All
compost is to be clean and free of fungus, disease, live plants, seed, excessive cotton lint and any
harmful chemicals. "New Life Soil Conditioner" or"Perma Green Compost", as specified below
or an approved equal, shall be used. Raw organics are not acceptable.
A. For soil with an alkaline pH condition: Use "New Life Acid Gro" (acid pH) soil
conditioner as produced by Soil Building Systems of Dallas, or an approved equal.
B. For soil with an acidic pH condition: Use "Perma Green Compost" by Texas Earth
Resources, Inc. of Dallas, or "New Life Natural Grower" (ph 8.0 to 9.0)by Soil Building
Systems, Inc., of Dallas.
C. Sample and Specification Submittal: Submit a producer's specification and a quart
sample of the compost proposed for the Project Manager's approval.
SECTION 02840-TURF SODDING
-2-
PART 3 - EXECUTION
3.01 GENERAL
All turfing operations are to be executed across the slope,parallel to finished grade contours.
3.02 SOIL,PREPARATION
A. Scarify subgrade to a depth of three inches (3")before depositing the required topsoil.
B. Tillage shall be accomplished to loosen the topsoil, destroy existing vegetation and
prepare an acceptable sod bed. All areas shall be tilled with a heavy duty disc or a chisel-
type breaking plow, chisels set not more than ten inches apart. Initial tillage shall be done
in a crossing pattern for double coverage, then followed by a disc harrow. Depth of
tillage shall be five inches. A heavy duty rototiller may be used for areas to be planted
with sod.
C. Cleaning: Soil shall be further prepared by the removal of debris,building materials,
rubbish, weeds and stones larger than one inch in diameter.
D Fine Grading: After tillage and cleaning, all areas to be planted shall be topdressed with
one-half inch compost and then shall be leveled, fine graded, and drug with a weighted
spike harrow or float drag. The required result shall be the elimination of ruts,
depressions,humps and objectionable soil clods. This shall be the final soil preparation
step to be completed before planting.
3.03 PLANTING
Prior to laying the sod, the planting bed shall be raked smooth to true grade and moistened to a
depth of four inches,but not to the extent causing puddling. The sod shall be laid smoothly,
tightly butted edge to edge, and with staggered joints. The sod shall be pressed firmly into the
sod bed by mechanical roller so as to eliminate all air pockets,provide a true and even surface,
and insure knitting without displacement of the sod or deformation of the surfaces of sodded
areas. Following compaction, compost shall be used to fill all cracks between sods. Excess
compost shall be worked into the grass with suitable equipment and shall be well watered. The
quantity of compost shall be such that it will cause no smothering or burning of the grass.
3.04 FERTILIZING
Twenty-one days after planting, turfgrass areas shall receive an application of 3-1-2 fertilizer at
the rate of 45 pounds of nitrogen per acre. Water well after application to prevent burning as per
requirements indicated in Part 2—2.03 Water
END OF SECTION
SECTION 02840-TURF SODDING
-3-
-SECTION 02860 - PLAYGROUND EQUIPMENT
PART1 - GENERAL
1.01 DESCRIPTION
A. This section shall include all materials, labor, tools, equipment, transportation and
supervision required for the installation of new playground equipment.
1.02 RELATED WORK
A. Section 02140—Site Under drains
B. Section 02537 - Engineered Wood Fibar Playground Surfacing
C. Section 02870 - Site Furnishings
B. Section 03300 - Cast-In-Place Concrete
1.03 QUALITY ASSURANCE/PRODUCTS
A. Codes and Standards:
1 .All equipment and materials shall comply to the following standards:
a. U. S. Consumer Product Safety Commission (CPSC)
b. ASTM Designation F1487 (Standard Consumer Safety Performance
Specification for Playground Equipment for Public Use)
c. International Play Equipment Manufacturers Association (IPEMA)
2. All equipment shall be new and conform to equipment standards as noted in
Part 2—2.02.
3. The Bidder shall be responsible for defects in equipment due to faulty material
or manufacturing, darnage or loss.
B. Submittals:
1. Submittals must be received and approved by the Project Manager prior to
ordering equipment. Refer to General Requirements—Section 01640— 1.02.
2. Submittals Prior to Construction - Submit manufacturers' documentation of
product compliance with CPSC and ASTM F1487 Standards including:
a. All paints and other similar finishes must meet the current CPSC
regulation for lead in paint (0.06 percent maximum lead by dry
weight).
PLAYGROUND EQUIPMENT
02860
I _
t' Imo' •.,
I 4
b. Regardless of the material or the treatment process, the
manufacturer shall ensure that the users of the playground
equipment cannot ingest, inhale, or absorb any potentially
hazardous amounts of substances through body surfaces as a result
of contact with the equipment.
C. Submittals must be received and approved by the Project Manager
prior to ordering equipment. Refer to General Requirements—
Section 01640— 1.02
3. Submittals Prior to Project Acceptance—Contractor shall submit all
manufacturers' literature to the Project Manager prior to acceptance of the
proj ect.
1.04 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Protect frons inclement weather: wet, damp, extreme heat or cold.
B. Store in a manner to prevent warpage,bowing or damage.
C. All construction material such as subsurface drain gravel and play surface material
may not be delivered to the site until installation of such material.
D. Operation and Maintenance Manuals—Prepare and deliver to the Owner within ten
(10) calendar days prior to completion of construction; two (2)hard cover and three
(3)ring binders containing the following information:
1. Index sheet stating Contractor's address,telephone and fax number, e-mail address
and listing of equipment with the name and addresses of the local equipment
manufacturer's representative.
2. Catalog and parts sheets on each product and equipment type installed under contract
3. Guarantee Statement.
4. Complete operating and maintenance instruction on all major equipment.
PLAYGROUND EQUIPMENT
02860
2
1.05 JOB CONDITIONS
A. The Contractor shall be responsible for the protection of unfinished work and
shall be responsible for the safety of the park users utilizing unfinished
equipment.
B. The Contractor shall be required to submit a Safety Plan indicating the use of
temporary construction fencing, signage and barriers necessary to prevent park
users from utilizing unfinished equipment for Owner approval at the Pre-
Construction meeting. At any time during construction non compliance to the
Safety Plan or any other safety hazard is found to exist on the construction site,
The Contractor shall be required to correct any and all non compliance issues and
/or safety hazards immediately within the same day of notification.
C. All cost incurred be the Contractor to insure compliance to this specification shall
be subsidiary to the cost of purchase and installation of equipment.
PART 2—PRODUCTS
2.01 Approved play component structures for each playground prototype option (see below)
and ancillary equipment shall consist of equipment supplied by pre-approved equipment
manufacturers/vendors and as noted on the Equipment Schedule of the plans.
1. Prototype Option No. 1
A- Gametime -Model No. TFVINP403C (Southwest Parks and Playgrounds, Inc.
1- 800-433-5347)
B - Playworld Systems—Model No. P24423F (The Playwell Group 1-800-726-1816
C -Burke—Model No. 57-8 (Child's Play, Inc. 1-972-484-0600)
2. Prototype Option No. 2
A- Gametime--Model No. TFWNP503C
" B—Playworld Systems - Model No. P24424C
3. Prototype Option.No. 3
A—Gametime—Model No. TFWNP603C
B - Playworld Systems—Model No. P23318B
C - Burke—Model No. 56-8
PART 3 - EXECUTION
3.01 GENERAL: All items shall be supplied by Contractor and installed as per
manufacturer's recommendations.
PLAYGROUND EQUIPMENT
02860
3
3.02 FALL,ZONES: Contractor shall verify all fall zone clearances onsite prior to installing
the equipment. Notify the Landscape Architect of any conflicts or discrepancies. The
Contractor will be required to remove and reinstall any mow strips/hardscape at own
expense and at no additional contract time if fall zone discrepancies are found and require
remedy
2.03 CONCRETE FOOTINGS: The finished grade of all concrete footings shall be set a
minimum twelve inches below the finish grade of surfacing material.
2.04 FASTENERS: All nuts and bolts shall be upset and tack welded to prevent disassembly
on all equipment that is not installed with specialized fasteners.
2.05 INSTALLATION SEQUENCING: The Contractor will not be allowed to deliver on
site and install any playground equipment until gradework, mow strip, subsurface
drainage and all other hardscape items have been installed and approved by the
Project Manager. The Contractor will be required to remove any equipment from
the site at own expense and at no additional contract time if found to be in non-
compliance to this specification note.
END OF SECTION
PLAYGROUND EQUIPMENT
02860
4
SECTION 02870- SITE FURNISHINGS
PART I- GENERAL,
1.01 DESCRIPTION
Furnish and supply all labor, equipment, materials and incidentals necessary to assemble,
install and otherwise construct park equipment as listed under products.
1.02 RELATED WORK
A. Section 03300 - Cast-in-Place Concrete.
B. Section 07920 - Caulking and Sealants
1.03 QUALITY ASSURANCE
A. All equipment shall be free of sharp edges and corners, or extremely rough
surfaces.
C. All materials shall be new and conform to all standards per specified product or
aproved equal (see Division I—Section 01640/ Substitutions And Product
Options
D. The bidder shall be responsible for defects in equipment due to faulty materials or
manufacturing, damage or loss.
E. Metal shall be straight or at design radii or bends,without kinks, and shall be true
to shape.
` E. Codes and Standards: All "accessible" site furnishings shall comply with the
current Texas Accessibility Standards (TAS) of the Architectural Barriers Act,
Article 9102, Texas Civil Statutes (512) 453-3211.
1.04 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Protect from inclement weather: wet, damp, extreme heat or cold.
B. Store in a manner to prevent warpage and/or bowing.
1.05 JOB CONDITIONS
The contractor shall be responsible for protection of unfinished work and shall be
responsible for the safety of park users utilizing unfinished equipment.
SITE FURNISHINGS
02870
- I -
PART 2 - PRODUCTS
2.01 Equipment as specified on plans or approved eaqual.
PART 3 -EXECUTION
3.01 INSTALLATION
A. Fasteners: All nuts and bolts shall be upset and tack welded to prevent
disassembly.
B. Manufacturer's Installation Instructions: The Contractor shall follow the
manufacturer's installation instructions and give the Landscape Architect the
instructions for filing, unless otherwise stated. Set benches and picnic tables
level.
END OF SECTION
SITE FURNISHINGS
02870
-2-
SECTION 02930 - SEEDING
PART I - GENERAL
1.01 DESCRIPTION
A. Work Included: Seeding of grass seed or wildflower seed, as specified on the plans.
B. Related Work Specified Elsewhere: Section 02300, Earthwork.
1.02 REFERENCE STANDARDS
A. Standardized Plant Names
1. For exotic plant materials: American Joint Committee of Horticultural
Nomenclature, Second Edition, 1942.
2. For native materials
a. Manual of the Vascular Plants of Texas by Correll and Johnston
b. Check List of Vascular Plants of Texas by Hatch
c. Flora of North Central Texas by Shinners and Moller
B. Texas Highway Department: Standard Specifications for Construction, Item 164,
"Seeding for Erosion Control" and Item 180, "Wildflower Seeding".
1.03 SUBMITTALS
A. Seed
1. Vendors' certification that seeds meet Texas State seed law including:
a. Testing and labeling for pure live seed(PLS)
b. Name and type of seed
2. If using native grass or wildflower seed, seed must have been harvested within one
hundred(100)miles of the construction site.
3. All seed shall be tested in a laboratory with certified results presented to the City, in
writing,prior to planting.
4. All seed to be of the previous season's crop and the date on the container shall be
within twelve months of the seeding date.
5. Each species of seed shall be supplied in a separate, labeled container for acceptance
by the City.
B. Fertilizer
1. Unopened bags labeled with the analysis
2. Conform to Texas fertilizer law
1.04 JOB CONDITIONS
A. Planting Season: The season varies according to species (see Part 2 - Products). Do not
seed when soil is excessively wet or dry or when wind exceeds ten (10)miles per hour.
B. Schedule After All Other Construction and planting is complete.
SECTION 02930-SEEDING
- I -
C. Protect and Maintain Seeded Areas
1. From erosion
2. From traffic and all other use
3. Until seeding is complete and accepted
1.05 QUALITY CONTROL
The contractor who plants the seeds,whether the general contractor or a subcontractor, is
responsible for daily supervision of his crew, and for the planting and maintaining of seedlings
until acceptable, viable growth is achieved and the project accepted by the City.
PART 2—PRODUCTS
2.01 MATERIALS
A. Seed
All seed shall be planted at rates based on pure live seed (PLS =purity x germination)per
acre.
Substitution of individual seed types due to lack of availability shall be made only by the
City at the time of planting. The Contractor shall notify the City,prior to bidding, of
difficulties locating certain species. Only those areas indicated on the plans and areas
disturbed by construction shall be seeded. Prior to seeding, each area shall be marked in
the field and approved by the City. Any adjustment of area location by the City shall be
considered incidental and shall not entitle the Contractor to additional compensation.
Weed seed shall not exceed ten percent(10%) by weight of the total of pure live seed
(PLS) and other material in the mixture. Johnsongrass and nutgrass seed shall not be
allowed.
The seed shall be clean, dry and harvested within one year of planting.
1. Non-native grass seed shall consist of:
If planted between April 15 and September 10:
Lbs./Acre Common Name Scientific Naive Purity Germination
25 Bermuda(unhulled) Cynodon dactylolz 85% 90%
75 Bermuda(hulled) Cynodon dactylon 95% 90%
Substitute the following if planted between September 10 and April 15:
220 Rye Grass Lolfta;i nlGdtiflorwiz 82% 80%
40 Bermuda(unhulled) Cy7zodo7i dactyl011 84% 85%
SECTION 02930-SEEDING
-2-
2 Native grass seed-The seed shall be planted between February 1 and October 1
and shall consist of.
Lbs. PLS/Acre Common Name Botanical Name
1.6 Green Sprangletop Leptochloa dubia
5.5 Sideoats Grama* Bouteloua curtipendula
3.7 Little Bluestein* Schizachyrium scoparium
17.0 Buffalograss Buchloe dactyloides
1.8 Indian Grass* Sorghastrum nutans
0.5 Sand Lovegrass* Eragrostis trichodes
6.0 Big Bluestein Andropogon gerardii
8.0 Eastern Grama Tripscacunt dactyloides
1.2 Blue Grama Bouteloua gracilis
1.8 Switchgrass Panicum virgatum
10.0 Prairie Wildrye* Elyntus canadensis
*These grasses are not to be planted within ten feet of a road or parking lot or
within three(3) feet of a walkway.
3 Wildflower seed - All wildflower seeds are to be hand broadcast, (see 3.02,A).
The seed shall be planted between March 5 and May 31 or between September 1
and December 1 and shall consist of.
Lbs. PLS/Acre Common Name Botanical Name
3.0 Bush Sunflower Sinsia calva
5.0 Butterfly Weed Asclepias tuberosa
2.0 Clasping Coneflower* Rudbeckia amplexicaulis
3.0 Golden- Wave Coreopsis basalis
13.4 Illinois Bundleflower Desmanthus illinoensis
13.6 Partridge Pea Cassia fasciculata
2.0 Prairie Verbena Verbena bipinnatifida
8.0 Texas Yellow Star Lindheinteri texana
8.0 Winecup Callirhoe involcrata
2.0 Black-eyed Susan Rudbeclda hirta
18.0 Cutleaf Daisy Engelniannia pinnatifida
2.0 Obedient Plant Physostegia intermedia
3.0 Pitcher Sage Salvia azurea
2.0 Plains Coreopsis Coreopsis tinctoria
8.0 Scarlet Sage Salvia coccinea
*These wildflowers are not to be planted within ten feet of a road or parking lot or
within three feet of a walkway.
4. Temporary erosion control seed
When specified on the plans, temporary control measures shall be performed.
These measures shall consist of the sowing of cool season plant seeds and the
work and materials as required in this section.
i
SECTION 02930-SEEDING
-3-
B. Mulch
1. Mulch should be designed for use with conventional mechanical or hydraulic
planting of seed, either alone or with fertilizer.
2. Mulch should be wood cellulose fiber produced from virgin wood or recycled
paper-by-products (waste products from paper mills or recycled newspaper).
3. Mulch should contain no growth or germination inhibiting factors.
4. Mulch should contain no more than ten percent(10%)moisture, air dry weight
basis.
5. Additives shall include a binder in powder form.
6. Material shall form a strong moisture retaining mat.
C. Fertilizer
1. All fertilizer shall be delivered in bags or containers clearly labeled showing the
analysis.
2. All fertilizer shall be in acceptable condition for distribution and shall be applied
uniformly over the planted area.
3. Analysis of 16-20-0, 16-8-8, or as designated on the plans. Fertilizer rate:
a. No fertilizer is required for wildflower seeding.
b. Where applying fertilizer on newly established seeding areas - 100 pounds
of Nitrogen per acre.
C. Where applying fertilizer on established seeding areas - 150 pounds of
Nitrogen per acre.
D. Water: Shall be furnished by the Contractor by means of temporary metering/irrigation,
water truck or by any other method necessary to achieve viable, acceptable stand of turf
as noted in 3.04.13.2. of this specification. The water source shall be clean and free of
industrial wastes or other substances harmful to the germination of the seed or to the
growth of the vegetation. The amount of water will vary according to the weather
variables. Generally, an amount of water that is equal to the average amount of rainfall
plus one half inch(1/2") per week should be applied for approximately three weeks or
until project is accepted by the City.
E. Erosion Control Measures
1. For seeding application in areas up to 3:1 slope, use cellulose, fiber or recycled
paper mulch, (see 2.01,B. Mulch and 3.03).
2. For seeding application in areas 3:1 slope or greater,use the following soil
retention blanket(Follow the manufacturer's directions):
"Curlex I" from American Excelsior, 900 Ave. H East, Post Office Box 5624,
Arlington, Texas 76001, 1-800-777-SOIL.,.
2.02 MIXING
Seed, mulch, fertilizer and water may be mixed provided that:
1. Mixture is uniformly suspended to form a homogenous slurry.
2. Mixture forms a blotter-like ground cover impregnated uniformly with grass seed.
3. Mixture is applied within thirty(30)minutes after placed in the equipment.
SECTION 02930-SEEDING
-4-
PART 3—EXECUTION
3.01 SEEDED PREPARATION
A. Clear Surface of All Materials, Such As:
1. Stumps, stones, and other objects larger than one inch.
2. Roots, brush, wire, stakes, etc.
3. Any objects that may interfere with seeding or maintenance.
B. Tilling
1. In all compacted areas till one inch(1") deep.
2. If area is sloped greater than 3:1,run a tractor parallel to slope to provide less
seed/water run-off.
3. In areas near trees: Do not till deeper than one half(1/2") inch inside "drip line"
of trees.
C. Watering: Soil should be watered to a minimum depth of four inches within forty eight
(48) hours of seeding.
3.02 SEEDING
A. If Sowing Seed By Hand
1. Broadcast seed in two directions at right angles to each other.
2. Harrow or rake lightly to cover seed.
3. Never cover seed with more soil than twice its diameter.
4. For wildflower plantings, scalp existing grasses to one (I") inch, remove grass
clippings, so seed can make contact with the soil.
B. Mechanically Seeding(Drilling):
If mechanically seeding(drilling) the seed or seed mixture, the quantity specified shall be
uniformly distributed over the areas shown on the plans or where directed. All varieties
of seed, as well as fertilizer,may be distributed at the same time provided that each
component is uniformly applied at the specified rate. Seed shall be drilled at a depth of
from one quarter inch to three eighth inch(1/4"-3/8") utilizing a pasture or rangeland type
drill. All drilling is to be on the contour. After planting, the area shall be rolled with a
roller integral to the seed drill, or a corrugated roller of the "Cultipacker" type. All rolling
of slope areas shall be on the contour.
3.03 MULCHING
A. Apply uniformly after completion of seeding in areas up to 3:1 slope. Mulch may be
applied concurrently with fertilizer and seed, if desired.
B. Apply at the following rates unless otherwise shown on plans:
1. Sandy soils, flat surfaces - minimum 1,500 lbs./acre.
2. Sandy soils, sloping surfaces -minimum 1,800 lbs./acre.
3. Clay soils, flat surfaces -minimum 2,500 lbs./acre.
4. Clay soils, sloping surfaces -minimum 3,000 lbs./acre.
SECTION 02930-SEEDING
-5-
S. "Flat" and"sloping" surfaces will be shown on the plans if not visually obvious.
C. Apply within thirty(30) minutes after placement in equipment. Keep mulch moist,by
daily water application, if necessary:
1. For approximately twenty-one(2 1) days, or
2. Until seeds have germinated and have rooted in soil, (see 3.04.B.2.) and project
has been accepted by the City.
3.04 MAINTENANCE AND MANAGEMENT
A. Includes protection,replanting, maintaining grades and immediate repair of erosion
damage until the project receives final acceptance. Refer to Part 2—2.01 —D. for
watering requirements to be executed by the contractor.
B. Replanting
1. Replant areas where a stand of grass or wildflowers are not present in a reasonable
length of time, as determined by the City.
2. A "stand" shall be defined as:
a. Bermuda/Rye grasses: Full coverage per square foot established within
two to three(2-3)weeks of seeding date on a smooth bed free of foreign
material and rocks or clods larger than one inch diameter.
b. Native grass and wildflowers: eighty percent(80%) coverage of growing
plants within seeded area within twenty-one days of seeding date on a
smooth bed flee of foreign material and rocks or clods larger than one inch
diameter.
END OF SECTION
SECTION 02930-SEEDING
-6-
SECTION 03300—CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.01 SCOPE OF WORK
A. Concrete Sidewalk
B. Concrete Handicap Ramps
C. Picnic Table Slabs
D. Playground Edging
E. Concrete Walls and Footings
F. Related work elsewhere: Section 07920_Caulking and Sealants
1.02 QUALITY ASSURANCE
Reference Specifications: The work under this division of the Specifications shall
conform generally to the requirements of Item 314 - "Concrete Pavement", Item 406 -
"Concrete for Structures", and Item 410—"Concrete Structures" of the City of Fort
Worth's Standard Specifications for Street and Storm Drain Construction.
PART 2 - MATERIALS
2.01 FORMS
Forms shall be of ample strength, adequately braced,joined neatly and tightly and set
exactly to established line and grade.
2.02 REINFORCING MATERIALS
Reinforcing Bars: Reinforcing bars shall be round deformed bars meeting the
requirements of the current standard Specifications for Intermediate Grade Billet Steel
Concrete Reinforcing Bars of the A.S.T.M. Designation A-615. Reinforcing bars at the
time the concrete is placed shall be free from rust, scale or other coatings that will destroy
or reduce the bond. General reinforcing bars shall be number three bars spaced 18 inches
on center in walks and 12 inches in slabs as shown on Plans.
2.03 CONCRETE MATERIALS
A. Cement: Portland cement shall meet the requirements of A.S.T.M. Specifications
Designation C-150 and shall be Type 1.
B. Aggregates: Concrete aggregates shall consist of gravel or crushed stone and
shall be free from any excess amount of salt, alkali, vegetative matter or other
objectionable materials. The aggregate shall be well graded from fine to course
and the maximum size shall be one inch . Fine aggregate shall consist of sand
C. Water: Water used in mixing concrete shall be clean and free from deleterious
amounts of acids, alkalies,vegetative matter or organic material. The concrete
shall be mixed in an approved batch mixer. The mixing time shall not be less
than one minute after all the batch materials are in the mixer. Cement content
CAST-IN-PLACE CONCRETE
03300
shall be not less than five sacks per cubic yard of concrete and shall have a
minimum 28 day compressive strength of 3,000 psi.
D. Mixing: Transit mixed concrete shall meet all the requirements for concrete as
specified above. Sufficient transit mix equipment shall be assigned exclusively to
the project as required for continuous pours at regular intervals without stopping
or interrupting. Concrete shall not be placed on the job after a period of 1 112
hours after the cement has been placed in the mixer.
2.04 RELATED MATERIAL
A. Expansion Joint Filler: Expansion joint material shall be one inch clear heart
redwood with cap and paved cross section as shown on the plans
B. Dowels: Dowels for expansion joints shall be number four smooth round steel
bars with expansion tubes as shown on Plans. Dowels shall be placed eighteen
inches on center or as shown on Plans.
C. Curing Compound: The membranous curing compound shall comply with the
requirements of A.S.T.M., Designation C-309, Type 2, white pigmented.
D. PVC Sleeves: The Contractor shall furnish and install four inch class 200 PVC
pipe sleeves under concrete walk as shown on plans and details.
E. Caulking and Sealants—See Section 07920
2.05 CONCRETE MIX DESIGN AND CONTROL
A. Mix Design: The concrete shall contain not less than five sacks of cement per
cubic yard. Total water shall not exceed seven gallons per sack of cement. The
mix shall be uniform and workable. The amount of course aggregate(dry-loose
volume) shall not be more than 85 percent per cubic yard of concrete.
The net amount of water will be the amount added at the mixer plus the free water
in the aggregate or minus the amount of water needed to compensate for
absorption by the aggregates. Free water or absorption determinations will be
based on the condition of the aggregates at the time used. The absorption test will
be based on a thirty minute absorption period. No water allowance will be made
for evaporation after batching.
B. Slump: When gauged by the standard slump test, the settlement of the concrete
shall not be less than 3 inches nor more than 5 inches, unless otherwise indicated.
C. Quality: The concrete shall be designed for a minimum compressive strength of
3,000 pounds per square inch at the age of twenty-eight days using a 5 sack mix.
CAST-IN-PLACE CONCRETE
03300
-2-
D. Control-Submittal: Within a period of not less than ten days prior to the start of
concrete operations, the Contractor shall submit to the Engineer a design of the
concrete mix proposed to be used together with samples of all materials to be
incorporated into the mix and a full description of the source of supply of each
material component. The design of the concrete mix shall conform with the
provisions and limitation requirements of these specifications. All material
samples submitted to the Engineer shall be sufficiently large to permit laboratory
batching for the construction of test beams to check the adequacy of the design.
When the design mix has been approved by the Engineer, there shall be no change
or deviation from the proportions thereof or sources of supply except as
hereinafter provided. No concrete maybe placed on the job site until the mix
design has been approved by the Engineer in writing to the Contractor.
PART 3 -EXECUTION
3.01 REINFORCING
Metal reinforcing shall be accurately placed in accordance with the Plans and shall be
adequately secured in position by concrete, metal, or plastic chairs and spacers. Bar
splices shall overlap at least twelve inches. The re-bars shall be bent cold.
3.02 JOINTS
A. Expansion Joints: Expansion joint materials shall be installed perpendicular to
the surface. The bottom edge of the material shall extend to or slightly below the
- bottom edge of the slab and the top edge shall be held approximately 1/2 inch
below the surface of the slab. The edge of joints shall be tooled with an edging
tool having a 1/2 inch radius.
B. Contraction Joints: Contraction joints shall be 1/4 inch wide by 3/4 inch deep,
tooled joints placed on six foot centers,unless otherwise indicated. Contraction
joints will not be required to be sealed. Sawed joints maybe allowed only if
specifically approved by the Engineer. Joints will be sawed as soon as sawing
can be performed without stripping aggregate from the concrete, generally within
twelve to twenty-four hours after placement, and they shall be completed before
uncontrolled cracking of the pavement takes place.
C. Construction Joints: Construction joints shall be installed in all concrete work at
the locations shown on the Plans. Construction joints formed at the close of each
day's work shall be located at any of the control joints designated on the Plans.
Joints may be constructed by use of wood or preformed metal bulkheads set true
to the section of the finished concrete and cleaned and oiled. Surplus concrete on
the subgrade shall be removed before resuming concreting operations.
3.03 PLACING CONCRETE
Placement of Concrete: The concrete shall be rapidly deposited on the subgrade
immediately after mixing is completed. Subgrade and forms shall be dampened prior to
placement of the concrete. The concrete shall be transported, placed and spread in such a
CAST-IN-PLACE CONCRETE
03300
-3-
manner as to prevent segregation of the aggregate or an excess amount of water and fine
materials to be brought to the surface. No concrete shall be placed when the air
temperature is less than forty degrees Fahrenheit nor when the temperature of the
concrete is eighty-five degrees Fahrenheit or higher,without approval of Construction
Inspector.
Placement shall be carried on at such a rate that the concrete is at all times plastic and
flows readily into the space between the bars. No concrete that has partially hardened or
that has been contaminated by foreign material shall be deposited in the work nor shall
retempered concrete be used. Each section of pavement between expansion and
construction joints shall be placed monolithically.
All concrete shall be thoroughly compacted by suitable means during the operation of
placing and shall be thoroughly worked around reinforcement and embedded fixtures and
into the corners of the forms. Special care shall be taken to prevent voids and
honeycombing. The concrete shall then be struck off and bull-floated to the grade shown
on the Plans before bleed water has an opportunity to collect on the surface.
3.04 FINISHING
All concrete shall be finished by experienced, qualified concrete finishers. All concrete
shall have a neat,rounded edge. Edging and jointing (radius described on Plans) shall be
accomplished with care so as not to leave deep impressions in the concrete surface
adjacent to edges and joints. After the concrete has been floated and has set sufficiently
to support the weight of cement finishers, a smooth steel trowel will be used to produce
hard surface. The entire surface will then be brushed with a stiff bristle broom to produce
a uniform textured finish. All edges and sides of concrete exposed to view shall be free
of warp and blemishes with a uniform texture and smoothness as described in Plans.
3.05 CURING
Curing Compound: Immediately after the finishing operations,the concrete shall be
completely covered with a curing compound. The concrete surface shall be kept moist
between finishing operations and the application of the curing compound. The curing
compound shall be applied under pressure by means of a spray nozzle at a rate not to
exceed 200 square feet per gallon. A minimum of 72 hours curing time will be required.
3.06 CONCRETE WALLS
A. Placing Concrete
1. Where tremies are used, or where the free drop is 5'-0" or more, and
through reinforcement, use a dumping box or board, moving the concrete
therefrom by shovels or hoes.
2. Deposit concrete so that the surface is kept level throughout, a minimum
being permitted to flow from one position to another, and place as rapidly
as practicable after mixing.
3. Do not use in this Work any concrete not placed within 30 minutes after
leaving the mixer.
CAST-IN-PLACE CONCRETE
03300
-4-
4. Thoroughly work concrete around reinforcement and embedded fixtures,
and into corners of forms, during placing operations.
5. Completely compact with tamping poles and by tapping forms until the
concrete is thoroughly compact and without voids. Determine the number
of tampers needed by the amount and method of placing concrete.
6. Exercise care to tamp concrete vigorously and thoroughly to obtain
maximum density.
7. Use manual tampers as well as mechanical vibrators.
a. Exercise care to direct the quick handling of vibrators from one
position to another.
b. Do not over-vibrate concrete.
C. Do not move concrete by use of vibrator.
B. Finishing
1. All formed surfaces exposed to view shall have a smooth form finish.
2. After concrete has been properly placed and cured, sandblast finish if
indicated on the plans and per specification Section 03350.
j 3.07 PROTECTION
After concrete is placed, finished and cured as required, permit no traffic thereon for
three days thereafter and further protect the surface from damage due to other causes.
END OF SECTION
CAST-IN-PLACE CONCRETE
03300
-5-
5
{
BIDDER'S STATEMENT OF QUALIFICATIONS
Firm Name: Date Organized:
❑ PARTNERSHIP ❑ CORPORATION
Address:
City: State: Zip:
Telephone Number: Fax Number:
Number of years in business under present name:
Former name(s) of organization:
CLASSIFICATION: ❑ General ❑ Building ❑ Electrical ❑ Plumbing ❑ HVAC
❑ Utilities ❑ Earthwork ❑ Paving ❑ Other
LIST A MINIMUM OF THREE SIMILAR COMPLETED PROJECTS WITHIN LAST THREE
YEARS
PROJECT NAME AND LOCATION
NAME/TELEPHONE NUMBER OF OWNER
NAME/TELEPHONE NUMBER OF SURETY
AMOUNT OF CONTRACT
- COMPLETION DATE
SCOPE OF WORK DESCRIPTION
PROJECT NAME AND LOCATION
3 NAME/TELEPHONE NUMBER OF OWNER
NAME/TELEPHONE NUMBER OF SURETY
AMOUNT OF CONTRACT
COMPLETION DATE
BIDDER'S STATEMENT OF QUALIFICATIONS
- 1 -
SCOPE OF WORK DESCRIPTION
PROJECT NAME AND LOCATION
NAME/TELEPHONE NUMBER OF OWNER
NAME/TELEPHONE NUMBER OF SURETY
AMOUNT OF CONTRACT
COMPLETION DATE
SCOPE OF WORK DESCRIPTION
PROJECT NAME AND LOCATION
NAME/TELEPHONE NUMBER OF OWNER
NAME/TELEPHONE NUMBER OF SURETY
AMOUNT OF CONTRACT
COMPLETION DATE
SCOPE OF WORK DESCRIPTION
PROJECT NAME AND LOCATION
NAME/TELEPHONE NUMBER OF OWNER
NAME/TELEPHONE NUMBER OF SURETY
AMOUNT OF CONTRACT
COMPLETION DATE
SCOPE OF WORK DESCRIPTION
BIDDER'S STATEMENT OF QUALIFICATIONS
-2-
2. LIST CONSTRUCTION SUPERINTENDENT'S NAME AND CONSTRUCTION EXPERIENCE:
3. LIST ALL LABOR SUBCONTRACTORS (attach additional pages as needed)
SUBCONTRACTOR NAME
TRADE
PREVIOUS PROJECT EXPERIENCE/CONTACT NAME/TELEPHONE NUMBER
A.
B.
C.
SUBCONTRACTOR NAME
TRADE
PREVIOUS PROJECT EXPERIENCE/CONTACT NAME/TELEPHONE NUMBER
A.
B.
C.
BIDDER'S STATEMENT OF QUALIFICATIONS
-3 -
SUBCONTRACTOR NAME
TRADE
PREVIOUS PROJECT EXPERIENCE CONTACT NAME/TELEPHONE NUMBER
A.
B.
C.
SUBCONTRACTOR NAME
TRADE
PREVIOUS PROJECT EXPERIENCE CONTACT NAME/TELEPHONE NUMBER
A.
B.
C.
SUBCONTRACTOR NAME
TRADE
PREVIOUS PROJECT EXPERIENCE CONTACT NAME/TELEPHONE NUMBER
A.
B.
C.
Note
1. Section 8.1 of the Standard Specifications for Street and Storm Drain Construction for
the City of Fort Worth will be enforced.
2. The Prime Bidder selected for this project shall submit Letters Of Intent executed
between the Prime Bidder and any and all subcontractors to be utilized on this project
within five working days of being recognized as the overall qualified low Prime Bidder by
the City. Subsequent substitution of sub-contractors must be approved by the City.
3. Prime Bidder shall include financial statement in this submittal.
BIDDER'S STATEMENT OF QUALIFICATIONS
-4-
CERTIFICATE OF INSURANCE
TO: CITY OF FORT WORTH Date: G S 0.2
NAME OF PROJECT: PLAYGROUND RENOVATIONS AT SUNSET,DIAMOND HILL AND LEONARD
PARKS
PROJECT NUMBER: C280-807480005180/C280-807480005280/C280-807480005380
IS TO CERTIFY THAT: EAGLETON CONSTRUCTION,INC
jis,at the date of this certificate,Insured by this Company with respect to the business operations hereinafter described,for
9 the type of insurance and accordance with provisions of the standard policies used by this Company,and further
hereinafter described. Exceptions to standard policy noted on reverse side hereof.
TYPE OF INSURANCE
Policy Effective Expires Limits of Liability
1Worker's Compensation SF 60 b l(3 604 z u,-)-3-0+ 9 -2 3 S 4 i, 0 00, 000
Comprehensive General Nquh'l u �
F Sa, Bodily Injury:
Liability Insurance(PublicEa.Occurrence: $ 1 M i 11 C fL
Liability) NC 3 5z�`t� � -30- 0-f- (� -�0 -U S
Y) Property Damage:
j Ea.Occurrence: $
II Blasting Ea.Occurrence: $
Collapse of Building or
structures adjacent to Ea. Occurrence: $
excavations
DamageDamage to Underground
Utilities Ea.Occurrence: $
builder's Risk
Comprehensive `Tvm cu 41'4S Bodily Injury:
Automobiic,?,iability Ea.Person: $ / th 0 C SL
Ea.Occurrence:$
$ U QZp 5 0 27 I f n i " �'`,( (- -O S Property Damage:
Ea.Occurrence:$
Bodily Injury:
Contractual Liability Ea.Occurrence: $
Property Damage:
Ea.Occurrence: $
Other
* ill Atilt 1%ye�4t GS(.
i Ct
Locations covered: f(.t hSt4-., ttit 0 c 1f j I(� l�gyp( LQ pVt41�1� /-�trlCS
Description of operations covered: Pav K
The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or
canceled by the insurer in less than five(5)days after the insured has received written notice of such change/or
cancellation.
I Where applicable local laws or regulations require more than five(5)days actual notice of change or cancellation to be
assured,the above policies contain such special requirements,either in the body thereof or by appropriate endorsement
thereto attached.
The City,its officers,employees and servants shall be endorsed as an additional insured on Contractor's insurance policies
excepting employer's liability insurance coverage under Contractor's workers'compensation insurance policy.
Agency Sl<� Y��'+� r SVLf Insurance Co M p'"e
I
Fort Worth Agent S-
V" r" �A 1'v&e- By
q9Z -R (�t.iKSt0f1 _
Address_�l �Q� TK'74 Title A9eH�Y
INOrK 1• /kUtluel ( $ CV vt' V °;l 1•:�L.1'JJ:U
} PERFORMANCE BOND
Bond No. 902 8911
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
- COUNTY OF TARRANT §
k
That we, (1)EAGLETON CONSTRUCTION, INC, as Principal herein, and(2)Washington International
Insurance
company a corporation organized under the laws of the State of(3) Arizona , and who is authorized to
' issue surety bonds in the State of Texas, Surety herein, are held and firmly bound unto the City of Fort Worth, a
municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the sum of TWO
HUNDRED TWENTY-FOUR THOUSAND FOUR HUNDRED FIFTY-THREE AND
N0/100................................................ Dollars ($224,453.00) for the payment of which sum we,bind ourselves,.our
heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these presents.
WHEREAS, Principal has entered into a certain written contract with the Obligee dated the 26th day of
Anril, 2005, a copy of which is attached hereto and made a part hereof for all purposes, for the construction of
PLAYGROUND RENOVATI.ONS AT SUNSET,DIAMOND HILL AND LEONARD PARKS
NOW, THEREFORE, the condition of this obligation is such, if the said Principal shall faithfully perform
the work in accordance with the plans, specifications, and contract documents and shall fully indemnify and hold
harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal's default, and
reimburse and repay Obligee for all outlay and expense that Obligee may incur in making good such default, then
this obligation shall be void; otherwise,to remain in full force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government
Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of such
statute, to the same extent as if it were copied at length herein.
IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have
executed this instrument.
SIGNED and SEALED this 26th day of A212,2005.
3
1
EAGLETON CONSTRUCTION, INC
PRINCIPAL
ATTEST:
�--- Name:
(Principal) Secretary
(S E A L) Address: PO BOX
FORT WORTH, , TX 76101
Witness as to Principal
Washington International Insurance Company
SURETY/
ATTEST: By:
l
Y
Name: Thomas D. Moore
Secretary Attorney in Fact
(S E �, Address: 301-1 Internet Blvd., #116
Frisco, Texas 74034
/11vfitness as to Surety Telephone Number: 469-633-7000
NOTE: (1) Correct name of Principal (Contractor).
(2) Correct name of Surety.
(3) State of incorporation of Surety
Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be
attached to Bond by the Attorney-in-Fact.
The date of bond shall not be prior to date of Contract.
PAYMENT BOND
Bond No. 902 8911
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we, (1)EAGLETON CONSTRUCTION, INC, as Principal herein, and(2)Washington International
Insurance
Co upauy , a corporation organized and existing under the laws of the State of(3) Arizona as surety, are
held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties,
Texas, Obligee herein, in the amount of TWO HUNDRED TWENTY-FOUR THOUSAND FOUR HUNDRED
FIFTY-THREE AND NO/100................................................ Dollars ($224,453.00) for the payment whereof, the
said Principal and Surety bind themselves and their heirs, executors, administrators, successors and assigns,jointly
_i
and severally, firmly by these presents:
WHEREAS, the Principal has entered into a certain written contract with the Obligee dated the 26th day of
A212, 2005, which contract is hereby referred to and made a part hereof as if fully and to the same extent as if
copied at length, for the following project:
PLAYGROUND RENOVATIONS AT SUNSET,DIAMOND HILL AND LEONARD PARKS
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal
shall faithfully make payment to each and every claimant(as defined in Chapter 2253, Texas Government Code, as
amended)supplying labor or materials in the prosecution of the work under the contract,then this obligation shall be
void; otherwise,to remain in full force and effect.
i
PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government
Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said
statute, to the same extent as if it were copied at length herein.
f
IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have
executed this instrument.
SIGNED and SEALED this 26thday of April, 2005.
EAGLETON CONSTRUCTION, INC
P L
ATTEST: By;` / GL- �
Namev;
(Principal) Secretary/
Title��,3:
(S E A L) Address: PO BOX
FORT WORTH, , TX 76101
Witness as to Principal
Washington International Insurance Company
SURETY /
ATTEST: By ') ' tl-
Name: Thomas D. Moore
Secretaryr Attorney in Fact
(S 1=IA. L)l Address:3011 Internet Blvd., #116
Frisco, Texas 74034
Witness as to Sure Telephone Number:469-6-3-3-7000
NOTE: (1) Correct name of Principal (Contractor).
(4) Correct name of Surety.
(5) State of incorporation of Surety
Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be
attached to Bond by the Attorney-in-Fact,
The date of bond shall not be prior to date of Contract.
11 .
MAINTENANCE BOND
Bond No. 902 8911
THE STATE OF TEXAS §
COUNTY OF TARRANT §
KNOW ALL BY THESE PRESENTS:
That EAGLETON CONSTRUCTION INC("Contractor"), as principal, and Washington International
'
Insurance a corporation organized under the laws of the State of Arizona ("Surety"), do hereby
acknowledge themselves to be held and bound to pay unto the City of Fort Worth, a Municipal
Corporation chartered by virtue of Constitution and laws of the State of Texas, ("City") in Tarrant
County, Texas, the sum of TWO HUNDRED TWENTY-FOUR THOUSAND FOUR HUNDRED FIFTY-
THREEAND NO/100......................................................................................................... Dollars
($224,453.00), lawful money of the United States, for payment of which sum well and truly be made
unto said City and its successors, said Contractor and Surety do hereby bind themselves, their heirs,
executors, administrators, assigns and successors, jointly and severally.
This obligation is conditioned, however, that:
WHEREAS, said Contractor has this day entered into a written Contract with the City of Fort
Worth, dated the 26th of April, 2005, a copy of which is hereto attached and made a part hereof, for
the performance of the following described public improvements:
PLAYGROUND RENOVATIONS AT SUNSET DIAMOND HILL AND LEONARD PARKS
the same being referred to herein and in said contract as the Work and being designated as project
number(s) C280-807480005180/C280-807480005280/C280-807480005380 and said contract,
including all of the specifications, conditions, addenda, change orders and written instruments referred
to therein as Contract Documents being incorporated herein and being made a part hereof; and,
t
WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct
the work that it will remain in good repair and condition for and during a period of after the date of the
final acceptance of the work by the City; and
WHEREAS, said Contractor binds itself to maintain said work in good repair and
condition for said term of Two (2) years; and
WHEREAS, said Contractor binds itself to repair or reconstruct the Work in whole or in
part at any time within said period, if in the opinion of the Director of the City of Fort Worth
Department of Engineering, it be necessary; and,
WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to
repair or reconstruct said Work as herein provided.
NOW THEREFORE, if said Contractor shall keep and perform its said agreement to
maintain, repair or reconstruct said Work in accordance with all the terms and conditions of said
Contract, these presents shall be null and void, and have no force or effect, Otherwise, this
Bond shall be and remain in full force and effect, and the City shall have and recover from
Contractor and Surety damages in the premises as prescribed by said Contract.
This obligation shall be a continuing one and successive recoveries may be had hereon
for successive breaches until the full amount hereof is exhausted.
IN WITNESS WHEREOF, this instrument is executed in 6 counterparts, each of which shall be deemed an
original, this 26th day of April, A.D. 2005.
ATTEST: EAGLETON CONSTRUCTION, INC
(S E A L) Contractor
Secretary Name: C.-L
Title: ?
ATTEWashington International Insurance Company
(S EXL) Surety
By:
Thomas D. Moore
Secretary Name:
Title: Atttorney-in-Fact
Address
3b11 Internet Blvd., #116
Frisco, Texas 75034
NAS SURETY GROUP
NORTH AMERICAN SPECIALTY INSURANCE COMPANY
WASHINGTON INTERNATIONAL INSURANCE COMPANY
GENERAL POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS,THAT North American Specialty Insurance Company,a corporation duly organized and existing under
laws of the State of New Hampshire,and having its principal office in the City of Manchester,New Hampshire,and Washington International
Insurance Company,a corporation organized and existing under the laws of the State of Arizona and having its principal office in the City of Itasca,
Illinois,each does hereby make,constitute and appoint:
John R.Ward,Thomas D.Moore,
Eva 0.Limmer,Sherry Mesquita and Emily Mikeska
jointly or severally
- Its true and lawful Attorney(s)-in-Fact,to make,execute,seal and deliver,for and on its behalf and as its act and deed,bonds or other writings
obligatory in the nature of a bond on behalf of each of said Companies,as surety,on contracts of suretyship as are or may be required or permitted by
law,regulation,contract or otherwise,provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the
amount of: TEN MILLION(10,000,000.00)DOLLARS
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of both North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held
on the 24`h of March,2000:
"RESOLVED,that any two of the President,any Executive Vice President,any Vice President,any Assistant Vice President,the Secretary or any
Assistant Secretary be,and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named in the given Power
of Attorney to execute on behalf of the Company bonds,undertakings and all contracts of surety,and that each or any of them hereby is authorized to
attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is
FURTHER RESOLVED,that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to ally
certificate relating thereto by facsimile,and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
binding upon the Company when so affixed and in the future with regard to any bond,undertaking or contract of surety to which it is attached."
By
C�r SEAL i n= Paul D.Amslut,f resident&Chief Executive Officer of Washington International Insurance Company& o•COIIflORATI:i M1
,W•+>i. 1973 errs;q a Vice President of North American Specialty Insurance Company x S 4 AL v?
A killalBy
lA
(.� 1 �..e__...,...�...
rrJ,
Steven P.Anderson,Executive Vice President of Washington Interna tonal Insurance Company&
Vice President of North American Specialty Insurance Company
IN WITNESS WHEREOF,North American Specialty Insurance Company and Washington International Insurance Company have caused their
official seals to be hereunto affixed,and these presents to be signed by their authorized officers this 23 day of February '2004 .
North American Specialty Insurance Company
Washington International Insurance Company
State of Illinois
County of Du Page ss:
On this 23 day of February 20 04 before me,a Notary Public personally appeared Paul D.Amstutz President and CEO of
Washington International Insurance Company and Vice President of North American Specialty Insurance Company and Steven P.Anderson
Executive Vice President of Washington International Insurance Company and Vice President of North American Specialty Insurance Company,
personally known to me,who being by me duly swom,acknowledged that they signed the above Power of Attorney as officers of and
acknowledged said instrument to be the voluntary act and deed of their respective companies.OFFKA4 SEAL
/J
—" YAS{t-AiMTEt
ttOTAhY"Lot•11TA1li#ItlrNOrS
'Trra'ONE �g O"iD°° Yasmin A.Patel,Notary Public
I, James A.Carpenter the duly elected Assistant Secretary of North American Specialty Insurance Company and Washington
International Insurance Company,do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said North
American Specialty Insurance Company and Washington International Insurance Company,which is still in full force and effect.
IN WITNESS WHEREOF,I have set my hand and affixed the seals of the Companies this 26t day of April20 05
James A.Carpenter,Vice President&Assistant Secretary of Washington International Laurance Company&
Assistant Secretary of North American Specialty Insurance Company
i
IMPORTANT NOTICE
In order to Obtain Information or Make a Complaint:
You may call Washington International Insurance Company and/or North
American Specialty Insurance Company at the following toll-free number:
800/338-0753
or
You may write to them at the following address:
Washington International Insurance Company
NAS Surety Group
1200 Arlington Heights Road #400
Itasca, IL 60143
You may also contact the Texas Department of Insurance to obtain information on
companies, coverages, rights or complaints at:
800/252-3439
You may write to the Texas Department of Insurance at the following address:
P.O. Box 149104
Austin, TX 78714-9104
hnportantNoticeNAS
POLICYHOLDER DISCLOSURE
NOTICE OF TERRORISM INSURANCE COVERAGE
ENDORSEMENT
Coverage for acts of terrorism as defined in § 102(1) of the Terrorism Risk Insurance
Act of 2002 ("the Act") is already included in this surety bond. You should know that,
effective November 26, 2002, under your existing coverage, any losses caused by
certified acts of terrorism would be partially reimbursed by the United States under a
formula established by federal law. Under this formula, the United States pays 90%
of covered terrorism losses exceeding the statutorily established deductible paid by
the insurance company providing the coverage. The portion of your annual premium
y that is attributable to coverage for acts of terrorism is $0.
As your insurance/surety company we are sending you this notice to comply with the Terrorism Risk
Insurance Act of 2002.
For questions regarding this notice please visit our website www.nassuretv.com or you may call our office
at 630-227-4825.
REV: 2/03 agent notice
F
CITY OF FORT WORTH,TEXAS
CONTRACT
STATE OF TEXAS §
KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That this agreement,made and entered into this the 26th day of April,A.D.2005,by and between the
CITY OF FORT WORTH, a municipal corporation of Tarrant County,Texas, organized and existing under and by
virtue of a special charter adopted by the qualified voters within said City on the 11th day of December,A.D. 1924,
under the authority of the Constitution of Texas, and in accordance with a resolution duly passed at a regular
meeting of the City Council of said City,and the City of Fort Worth being hereafter termed Owner, and
EAGLETON CONSTRUCTION INC.,hereinafter called Contractor.
WITNESSETH: That said parties have agreed as follows:
1
That for and in consideration of the payments and agreements hereinafter mentioned to be made and
performed by the Owner, and under the conditions expressed in the bond bearing even date herewith,the said
Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements
described as follows:
2.
That the work herein contemplated shall consist of furnishing all labor,tools, appliances and materials
necessary for the construction and completion of said project in accordance with the Plans and Specifications
heretofore prepared by the Parks and Community Services Department of the City of Fort Worth and adopted by the
City Council of said City,as an independent contractor, and which plans and specifications are incorporated herein
by reference.
3.
The Contractor hereby agrees and binds himself to commence the construction of said work within ten
(10)days after being notified in writing to do so by the Department of Engineering Director of the City of Fort
Worth.
4.
The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement
thereof and to fully complete and finish the same ready for the inspection and approval of the Department of
Engineering Director of the City of Fort Worth and the City Council of the City of Fort Worth within a period of
55 working days from the time of commencing said work;that said Contractor shall be entitled to an extension of
said time for doing said work for such time as he may necessarily lose or be delayed by unavoidable accidents
caused by unforeseen matters over which said Contractor has no control, such as inclemency in the weather,acts of
Providence, labor strikes and delivery of materials, in all of which cases the negligence or carelessness of the
Contractor is not contributing to such delay.
5.
Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry
on and complete the same according to the true meaning of the intent and terms of said specifications,then the City
shall have the right to take charge of and complete the work in such a manner as it may deem proper, and if,in the
completion thereof,the cost to the said City shall exceed the contract price or prices set forth in the said plans and
specifications made a part hereof,the Contractor shall pay said City on demand in writing, setting forth and
specifying an itemized statement of the total cost thereof,said excess cost.
6.
Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the
project site for Contractor's sole negligence. In addition,Contractor covenants and agrees to indemnify,hold
harmless and defend, at its own expense,the Owner, its officers,servants and employees,from and against any and
all claims or suits for property loss,property damage,personal injury, including death, arising out of, or alleged to
arise out of,the work and services to be performed hereunder by Contractor, its officers,agents,employees,
subcontractors,licensees or invitees,whether or not any such injury,damage or death is caused,in whole or in
part by the negligence or alleged negligence of Owner,its officers,servants,or employees. Contractor likewise
covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's
officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the
performance of any of the terms and conditions of this contract,whether or not any such injury or damage is
caused in whole or in part by the negligence or alleged negligence of Owner,its officers,servants or
employees.
In the event Owner receives a written claim for damages against the Contractor or its subcontractors
prior to final payment,final payment shall not be made until Contractor either(a)submits to Owner satisfactory
evidence that the claim has been settled and/or a release from the claimant involved,or(b)provides Owner with a
letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier.
The Director may, if he deems it appropriate,refuse to accept bids on other City of Fort Worth public
work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City
Contract.
7.
The Contractor agrees,on the execution of this Contract,and before beginning work,to make,execute
and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful performance of the terms and
stipulations of the contract, including the exhibit attached hereto and made a part hereof and such bonds shall be 100
percent of the total contract price, and the said surety shall be a surety company duly and legally authorized to do
business in the State of Texas,and acceptable to the City Council of the City of Fort Worth.
8.
Said City agrees and binds itself to pay,and the said Contractor agrees to receive,for all of the aforesaid
work, and for all additions thereto or deductions therefrom,the price shown on the proposal submitted by the
successful bidder hereto attached and made a part hereof.
9.
It is further agreed that the performance of this Contract, either in whole or in part,shall not be sublet or
assigned to anyone else by said Contractor without the written consent of the Department of Engineering Director of
said City of Fort Worth.
i
10.
The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified,
promulgated and set out by the City of Fort Worth,Texas,a copy of which is attached hereto and made a part hereof
the same as if it were copied verbatim herein.
11.
It is mutually agreed and understood that this agreement is made and entered into by the parties hereto
with reference to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas
with reference to and governing all matters affecting this Contract,and the Contractor agrees to fully comply with
- all the provisions of the same.
3
i
1
IN WITNESS WHEREOF,the City of Fort Worth has caused this instrument to be signed in triplicate in
its name and on its behalf by the City Manager and attested by its Secretary,with the corporate seal of the City of
Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in three
counterparts with its corporate seal attached.
Done in Fort Worth,Texas,this the 26th day of AR!2,A.D.2005
RECOMMENDED BY: APP VED B /
i
E TMENT OF ENGINEERING PARK AND O ITY SERVICES
DIRECTOR DIRECTOR
CITY OF WORTH ATTEST:
By:
CIT MANAGER CITY SECRETARY
IL)IAEAGLETON CONSTRUCTION, INC Contra t Authorizatioxi
CONTRACTOR
1-'410
SEAL
i
TITLE
PO BOX.Uft— /PI O
FORT WORTH, TX 76101
ADDRESS APPROVE S TO FO N LEGALITY
A T T CITY ATTO
November 1960
Revised November 1982
Revised May 1986
Revised October 1989
I
l
Fo wr Wuxi,ii
wwwWCFWK0wQr9
AgendaHome I Council I M&C I Employee Directory I Morning .,. Departments
Print M&C
COUNCIL ACTION: Approved on 4/26/2005
DATE: 4/26/2005 REFERENCE NO.: **C-20674 LOG NAME: 80CIPSDL
CODE: C TYPE: CONSENT PUBLIC HEARING: NO
SUBJECT: Authorize Execution of Contract with Eagleton Construction, Inc. for Playground Renovation at
Sunset, Diamond Hill and Leonard Parks
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a contract with Eagleton
Construction, Inc. in the amount of$224,453.00 for playground renovations at Sunset, Diamond Hill and
Leonard Parks.
DISCUSSION:
Proposition Two (Parks, Recreation and Community Services Improvements) of the 2004 Capital
Improvement Program allocated $3,226,800 for the replacement of deteriorating playgrounds at 36 park
sites, of which $262,500.00 was allocated to Sunset, Diamond Hill and Leonard Parks. The Playground
Renovations include site/equipment demolition, site grading and installation of new playground equipment
and park amenities as per construction documents.
The Parks and Community Services Department (PACS) held public meetings with neighborhood groups for
each park site on July 19, 20 & 22, 2004, to receive input and selection of the preferred playground
prototype. Upon selection of the preferred prototype, PACS staff proceeded with preparation of the
construction documents. This project was advertised for bid on December 30, 2004 and January 6,
2005. On January 20, 2005, the following bids were received:
Bidders Base Bid Bid Alts. Total
Eagleton Construction, Inc $218,708.00 $5,745.00 $224,453.00
Parks for Play, Inc. $230,163.00 $6,365.00 $236,528.00
J&J Hardscape Const. Inc. $239,805.00 $6,495.00 $246,300.00
Cole Construction $251,813.00 $10,676.00 $262,489.00
Walk in the Park Construction $262,854.42 $7,333.25 $270,187.67
AOC Contracting $267,360.00 $6,960.00 $274,320.00
Hardscape Cons. Specialites, Inc. $278,217.25 $7,872.74 $286,089.99
Base Bid - (Units 1, 2, and 3)
Consist of site grading, demolition of existing facilities, and installation of new playground facilities at Sunset,
Diamond Hill and Leonard Parks.
Bid Alternate - Unit 4 - 2 (Sunset Park)
Installation of two 6-foot park benches next to the playground area.
Bid Alternate - Unit 5 - 1 and 3(Diamond Hill Park)
S1N3WHOViIV
(t'OLS) (6u!loy) pooMaeH alpMd :;oeJu00 uolJeuaaoJul leuolIlppy
(t'O1-9) (6ulloy) pooMaeH alpue�J :peaH Juawliedea ful;eui6po
(£869) uosle/N Aqq!-i q ao.110 s,aa eueW 110 aol p9jjjwgnS
00.6819E 08£500081L08 009615 08Zo
5L•89£ 1L 08Z900081Z08 009615 08Zo
5Z•969 1L 086500081L08 009615 08Z:D
saajuaoqun000y/puna WON= sialuaogun000y/pun j Ol
-punct loafoad sluauaanoadwj Need
ayl jo 'paleudoidde se `labpnq 6ulleaado luaiino ayl u! elgel!ene We spun] leyl sallllaao aoloaa!Q aoueu!d ay1
NO11`d01d112130/NO VWN/W21OdNl MSid
'AIan!loadsai Z 1O12j1S1a
-11ONnoo ul paieool s! II!H puouae!Q pue L 1O12JIS1a -11ONno:D ui paleool aae sNied pieuoe-I pue 49sunS
•900Z aagwaldas ui paleldwoo aq pue '9002 aunt ui eouawwoo of paledlollue s! uo!lonilsuo0
•loafoid s!yl yl!M paleloosse loedwi 1a6pnq Ienuue ou aq ll!M eiayl
%96 si loefo.id slyl uo Ieo6 s,Al!O ay1 uo!ledio!laed 38M/W
%Ls of 6uill!wwoo Aq eoueulpap 38M/W Al!O ayl ul!M eoue!Idwoo u! s! •oul 'uo!lonilsuo0 uolal6e3 - 38M/W
•00.090'ZZ$ s! (%9) siapio 96ueyo alq!ssod pue '(%9•L) luawabeuew
loefoid `(%9•£) uo!loadsui uollon.ilsuoo aol 6u!punj Aoua6ul4uoo pale!oosse 'lsoo loeiluoo ayl of uo!1!ppe ul
•sAep 6ul�joM 99 sl awil loeiluoo ay1 •loe.iluoo jo p.ieMe
ao} panoidde aq '•oul 'uo!lonilsuo0 u01916e3 Aq pell!wgns se '00•£Sb'j7ZZ$ 6ullelol '00•LOZ'Z$,lo lunowe
ayl u! £ pue 6-g i!un pue 00•ZZ9'Z$jo lunowe ayl u! £ pue L-91!un '00'ZZ6$do lunowe ayl u! 'Z-17 sl!un
saleuially p!8 pUe '00.80L'86Z$,lo lunowe ayl u! £ pue Z ,6 4!un - p!8 ese8 ayl leyl Papua
uauaooaa s! li
-gels alaaouoo uo elgel oluo!d elq!sseooe loot-g auo apnloui
of uollels o!uold jo uollellelsui pue eaae punoa6Aeld ayl of lxau sayouaq Need loot-g oMl jo uo!lellelsul
Jed paeuoa-1 £ pue L- 9 On - aleuaally pie
-gels laaouoo 6u!lslxe ue uo algel o!uold loot-g auo pue algel alq!sseooe loot-g auo yl!M
uollels o!uold a jo uollellelsu! pue 'ease punoibAeld ayl of lxau sayouaq Need loot-g oMl jo uo!lellelsul