Loading...
HomeMy WebLinkAboutContract 33540 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary ;a dr COUNTY OF TARRANT § Contract No.\��`J WHEREAS, Pulte Homes of Texas, L.P. , hereinafter called "Developer", desires to make certain improvements to Lasater Addition,Phase I, Section 5 , an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE,KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through PNI, Inc., a Nevada Corporation, its: General Partner , its duly authorized , and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein,do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section H,paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section H, of tt. R`r 05-25-06 PO4 : 04 IN '� &,\A ENT CFA REVISED FORMAT WITH 4%.doc 1 Cirf MIC-HI k@, F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a pa ' hereof:_ officl- 1A END CFA REVISED FORMAT WITH 4%.doc 2 CITY MUSHY Water(A)None; Sewer(A-1)None;Paving(B) attached; Storm Drain(13- 1)attached; Street Lights and Signs (C) attached. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed,.the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, 131, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $101,778.00. Item Developer City Cost Total Cost Cost A. Construction 1. Streets $ 71,779.00 $ - $ 71,779.00 2. Storm Drainage $ 21,661.00 $ - $ 21,661.00 3. Street Lights $ 4,400.00 $ 4,400.00 4. Street Name Signs $ 200.00 $ 200.00 B. Engineering Design $ C. Construction Engineering and Management by DOE 4% $ 3,738.00 $ 3,738.00 TOTALS $101,778.00 1 $ - 1$101,778.00 Notes: 1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets. Sidewalk cost is included under street cost. The developer is responsible for installation of sidewalk. 2. Developer's column for Item C represents four percent(4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. CFA REVISED FORMAT WITH 4%.doc 3 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary,with the corporate seal of the City affixed, said D velae has executed this instrument in triplicate,at Fort Worth,Texas this the 2 yo f 200 Approval Recommended: Transportation and Public Works Department Ei M&C RE-QUIRM Robert Goode,P. E. Director ATTEST: City Of F rth B rnG�r�� ��YI rl Marc Ott City Secretary Assistant City Manager Appr ed to Fo Assistant dity Attorney ATTEST: Pulte Homes of Texas, L.P. A Texas Limited Partnership Corporate Secretary By: PNI, Inc. A Nevada Corporation It Lral Part er By: RECEIVED V P (Print name an'l title) JUN 10 2004 t (Date WFICIA RIM CFA REVISED FORMAT WITH 4%.doc 4 n �Yo."i T H' T E K. CB 010825.010 Page3 R BURGESS,` 'SS INC..E °77T IfI ASN STE ET,:.':FORT WORT I TEXA 7�a10 :'.........................." 1 -6 LASATER ADDITION PHASE I, SECTION 5 25-Feb-2004 PAVING ITEM# DESCRIPTION QTY UNIT PRICE AMOUNT 1 6" R.C. STREET PVMT W/7" CURB 2,215 S.Y. 21.00 46,515.00 2 6" LIME STABALIZED SUBGRADE 2,290 S.Y. 1.80 4,122.00 3 HYDRATED LIME 30#/SY 34 TON 90.00 3,096.00 4 4' SIDEWALK 1,289 L.F. 14.00 18,046.00 TOTAL PAVING $71,779.00 G:\JOB\010825\EST\Lasater CFA Ph1 Sect 5.XLS CB 010825.010 Page4 = � - � STRET FRT W O T SES 7�" ,. LASATER ADDITION PHASE I, SECTION 5 25-Feb-2004 STORM DRAIN SYSTEM ITEM# IDESCRIPTION QTY UNIT PRICE AMOUNT 1 39" RCP 67 L.F. 75.00 5,025.00 2 30" RCP 144 L.F. 55.00 7,920.00 3 24" RCP 29 L.F. 44.00 1,276.00 4 39" HEADWALL 1 EA. 2,800.00 2,800.00 5 STD 10' CURB INLET 2 EA. 2,200.00 4,400.00 6 TRENCH SAFETY 240 L.F. 1.001 240.00 TOTAL STORM DRAIN SYSTEM $21,6:61.00 WNIM Mob G:\JOB\010825\EST\Lasater CFA Ph1 Sect 5.XLS CRY MIRETAly FY. woffl, TEX. CB 010825.010 Page5 ARE B U' GCS INC. �.��` T O R T ASN S REED Q T WORTH. E ... AA F 5-6 . .. C :.::. 3 :. #. .... :. , ...:.:... .....:.:.:.:.:.:.:.:.:...:.....:.:.:.:...:.:.:.:.:.:.:.:.:.:.....::................................... LASATER ADDITION PHASE I, SECTION 5 25-Feb-2004 STREET LIGHTS & SIGNS ITEM# DESCRIPTION QTY UNIT PRICE AMOUNT 1 STREET LIGHTS 2 EA. 2,200.00 4,400.00 2 STREET SIGNS 2 EA. 100.00 200.00 TOTAL STREET LIGHTS/SIGNS $4,600.00 OFFICIwlIs OD G:\JOB\010825\EST\Lasater CFA Ph1 Sect 5.XLS OR W,521 ky IT. N,p7R,I y�"'. t. I. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 0 EA $ 2, 000 $0, 000. 00 MID-BLOCK RESIDENTIAL 1 EA $ 2, 000 $2, 000.00 CHANGE OF DIRECTION RESIDENTIAL 1 EA $ 2, 000 $2, 000.00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000. 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000.00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000.00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000. 00 Subtotal $4,000.00- City's 4,000.00City's Cost $00, 000.00 Developer's Subtotal $4,000.00 10% Contingencies $0,400.00 Project Total $4,400.00 Adjacent Developer's Cost $0,000.00 Developer's Cost $4,400.00 2% Inspection Fee $0,00.00 DEVELOPER'S COST: $4,400.00 LASATER ADDITION PHASE I- SECTION V March 4, 2004 Fort Worth, Texas April 29, 2004 PAGE 1 OF Exhibit C �FF1CMAd REM N 1Tf 2 �7 �n� 2V II. STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works. 3. The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the City the amount shown below prior to the City starting its design effort. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors. 5 . The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this streetlight installation is detailed on page 1 of exhibit C and is summarized below, the streetlights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER'S COST: $4,400.00 LASATER ADDITION PHASE I-SECTION V FORT WORTH, TEXAS March 4, 2004 Page 2 of Exhibit C 1 �t; �, III. "STREET LIGHTS" MID - BLOCK DESPERADO RD 1 CHANGE OF DIRECTIONS DESPERADO RD 1 LASATER ADDITION PHASE I - SECTION V Page 3 of Exhibit C IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following one (1) intersections (that require street name signs) at a cost to the Developer of $100.00: Desperado Rd & Minturn Dr (Desperado Rd & Buffalo Creek Dr signed by Phase by phase I Section 3) Lasater Addition Phase I section 5 CFA code: 2004015 Date: April 29, 2004 1I I I Ry VVHTE 7Ml �� II II nar\Gess . II II II I S*TR Lu \ ; RAY WHTE un e1\ THOMP" � o _ _ I PROJECT BALEY BOWM ` LOCATION I 2 L0 WAT WESfFRN CFMER o NOT TO SCALE of IC, LOCATION MAP CI LASATER ADDITION , PHASE I - SECTION 5 - Carter::,burgess CARTER & BURGESS,INC. M AMR! SVW FORE WORTH,1%76107 P17)735-6000 PROJECT NO. 010825.010.0.0001 N SCALEo l" = 2001 t— T -°'T--- RkMON ROAD ---- ct J s � s s Ta It 12 a 14 is 16 n �I D PE O R AD < / f23"* I 5 6 ! 9 ZO® ddd0 Ix µy{ CACFUS PATCH WAY US — — r. F................ ----- �.__ __..__..I STREETS EXHIBIT 'B' LEGEND LASATER ADDITION g( T T pASE I - SECTION 5 )ADWAY/50/ROWF�m OFFICIAL WON Cly � tRr . Carter Burgess 20P. 4' S I DEWALK CARTER & BURGESS,INC. m M04 5TFW I M I TS OF PROJECT ———-- 9nn 76 PROJECT NO. 010825.010.0.0001 *� N SCALES 1" = 200' ---- --L- -- -- - N\ H-4HMON ROADdip Y o \ s s a s �o i1 \- DEW — AD G la � 19 C I 3 ' s e y 10' " of 39"H Wl l w g zi cm— ri s - <I ------ STORM DRAIN LEGEND EXHIBIT '13-1' OP. STORM DRAIN LINE LASATER ADDITION 'OP. INLET T PHASE I - SECTION 5 OP. MANHOLE OP. HEADWALL --{ Carter x Burgess 0 IST. STORM DRAIN LINE CARTER & BURGESS,INC. T"nw+MUT M I TS OF PROJECT FOU W K 'X7°1°` PROJECT NO. 010825.010.0.0001 r 1 N SCALE) 1" = 200' r- -- ----HARAION ROAD ----- J5�� loo oe.- a ° I /7 D P R AD C s 7 B 9 70 10 od --------- STREET LIGHTS LEGEND EXHIBIT 'C' OP. SINGLE STREET LIGHT • LASATER ADDITION IST. SINGLE STREET LIGHT O PHASE I — SECTION 5 1 STEEL POLE WITH STREET D STOP SIGNS ATTACHED) 7P. STREET SIGN Carte Burgess IST. STREET SIGN Q CARTER & BURGESS,INC. m MAN STREET 4I TS OF PROJECT —— FORT WORTH,TX 76172 (W)735_6000 PROJECT NO. 010825.010.0.0001