Loading...
HomeMy WebLinkAboutContract 33548 CeONTRANO AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. 33083 (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Teague Nall & Perkins Inc, (Engineer) made and entered into City Secretary Contract No. 33083, (the Contract) which was authorized by the City Council by M&C C-21178 on the 6th day of December 2005 . WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services: Street Reconstruction, on Chapel Creek Boulevard ( Chapin rd to I - 30 ) , Project No. 00139 . WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated May 1 ,2006, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $ 13, 615.00 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by OFF1`21AZ' ' RIGINAL Ali �aCJ�O�� I�dY� the City for all work and services shall not exceed the sum of $ 74, 913 .00 . 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the r day of q—Y1 2006, in Fort Worth, Tarrant County, Texas. ATTEST: Y NO N[&C ItEQ?U1RIEF"; Marty Hendrix City Secretary APPROVAL RECOMMENDED: APPROVED: i Robert A Goode , P.E. Adrc . OA Director, Transportation & Public Works Department Assistant City Manager Teague Nall & Perkins Inc ENGINEER By: Name: Ty Hilton, P.E. Principal 1100 Macon st. Fort Worth, Texas 76102 APPROVED O FORM AND LEGALITY: Assistant i.ty Attorn CRY 6K�^ V Responsive ,� TEAGUE NALL AND PERKINS ENGINEERS ♦ SURVEYORS ♦ CONSULTANTS May 1, 2006 Mr. Khal Jaafari, P.E. Project Manager Transportation/Public Works City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 RE: 2004 (CIP)—Arterial Street Project—Chapel Creek Blvd Fee Proposal for Contract Amendment No. 1 City Contract No. 33083 TNP No. FTW 05221 Dear Mr. Jaafari: Teague Nall and Perkins, Inc. is submitting this fee Amendment to the above referenced contract based on additional services requested. The following is a brief description and cost for the additional services provided on this project: Additional Services to prepare ROW Acquisition Documents Re-alignment of Chapel creek requires acquisition of Right-of-Way along the east side of the roadway. Initially, the need for ROW was uncertain based on a review of TAD maps. However, survey field data combined with deed research indicates a need for the acquisition of additional ROW. The following fees include applicable field survey, preparation of metes and bounds, exhibits, and setting iron rods at property corners. ■ Chapel Creek ROW Documents 5 @ $1,350/ea. _ $ 6,750 Additional Services to prepare Easement Documents Temporary Construction Easement parcels are required to perform grading work outside of the proposed ROW along the east side of the roadway and a small portion along the west ROW just south of Chapin Road. The following fees include preparation of easement exhibits. ■ Temporary Construction Easements 5 @ $375/ea. _ $ 1,875 Additional Services to perform Geotechnical Testing and Report A geotechnical report is required to determine the pavement thickness and base design. The work includes borings,soil evaluation,paving recommendations,and the preparation of a report (3-copies will be provided to the City). ■ Geotechnical Services4,990 Total Contract Amendment No. 1: Ff. W IN, TEK. $ 13,615 1100 Macon Street • Fort Worth,Texas 76102 • 817.336.5773 phone 817.336.2813 fax www.tnp-online.com Mr.Khal Jafaari,PE,May 1,2006,Page 2 of 2 Summary of Contract Fee: Original Contract Amount: $ 61,298 Amendment No. 1: $ 13,615 Revised Contract Amount $ 74,913 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE NALL P RKINS, INC. Mich I Wellba m, P.E. Copy: Mr. Ty Hilton, PE -TNP q:UdtVtw05221\doeskcontrad\_contract amend 01.doc