HomeMy WebLinkAboutContract 43816-A1 ,. 67 89�0� - j RNA r ,� /(-()-►fl AMENDMENT No . 1 eC ?6 FO���Ry TO CITY SECRETARY CONTRACT _ . -r WHF.RF.AiS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc. (ENGINEER) made and entered into City Secretary Contract No. 43816, (the CONTRACT) which was authorized by M&C C-25847 on the 18th day of September, 2012 in the amount of $410, 620.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Southeast Water Main Extensions including a twenty-four inch water main extension along Anglin Drive, Timberview Drive and Shelby Road to Fossil Hill Drive and a similar extension along Joel East Road and Wichita Street; and WHEREAIS, it has become necessary to execute Amendment No.1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal September 22, 2016 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $64,860.00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $475,507.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Page -1- EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Teague Nall and Perkins, Inc. c� Jesus J. Chapa Ty ilton, P.E. Assistant City Manager Principal DATE: / DATE: Z / 17 APPROVAL RECOMMENDED: Chris Harder, P.E. Assistant Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A Doug as W. Black Senior Assistant City Attorney ATTEST: O� OR 1114 A. O� ry J.!� r () _ City Se etary .�L'XAS Page -2- � tnp www.fipinc.com engineers surveyors landscape architects September 22, 2016 Mr. Rakesh Chaubey, P.E. City of Fort Worth Water Department 311 W Tenth Street Fort Worth, Texas 76102 Re: Fee Proposal for Contract Amendment No. 1 — Southeast Water Main Extensions City of Fort Worth Project No. 01985 (TNP Project No. FTW 12183) Dear Mr. Chaubey: Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract based on additional services required.The following is a brief description and cost for the additional services to be provided on this project: I. Realignment of Water Main 1 A. Additional Survey When the Southeast Water Main Extensions project originally began in 2012, the "Main 1" water line was designed such that it would be located within the existing right of way of Shelby Drive and Timberview Drive, outside of the Timberview Golf Course. Plans and specifications reached 90% completion with this alignment before the project was put on indefinite hold in July of 2014 due to Bethesda's lack of commitment to purchasing water from the City of Fort Worth. In April of 2016, the City contacted Teague Nall and Perkins(TNP) stating that the City wanted to proceed with completing the plans and to construct Main 1. Between the time the project was put on hold in July 2014 and work on the project resumed this year, the Timberview Golf Course was sold in December 2015. When the golf course sold,the property was platted and a thirty(30)foot water line easement was dedicated within the property. The City has directed TNP to revise the alignment of the water line such that it will now be located in the water line easement and outside of Shelby Drive and Timberview Drive right of way. This will require surveying the area within the thirty foot easement, a total length of 3,400', see Attachment A. B. Revise Water Line Alignment and Plan Sheets Once the additional survey is complete,additional effort will be required to revise the alignment and profile. The additional survey will also have to be incorporated into the design CAD base file and sheets will have to be re-cut for the new alignment. C. Additional Submittal and City Review(95% Submittal) TNP had already received and addressed the City's 90%comments for the original design in 2014. The design was at a point where the plans were ready to be Fort Worth-5237 N Riverside Drive,SuBe 100-FortWorth,Texas 76137-817.336.577 Dallas-17304 Preston Rood,Suite 1340-Dallas,Texas 75252-214.461.9867 Denton-1517 Centre Place Drive,Suite 320-Denton,Texas 76205-940.383.4177 Sherman-200 North Travis Street,Suite 500-Sherman,Texas 75090-903.870.1089 Registered by the Texas Board of Professional Engineers,Finn No.F-230- Registered by the Texas Board of Professional Surveyors,Firm No.100116-00 Mr.Rakesh Chaubey,PE September 22,2016 Page 2 of 3 sealed and advertised. By revising the alignment and profile, another (95%) submittal will be required to allow for City review and addressing of those additional comments. II. Control Valve Design The original intent of the Southeast Water Main extensions project was to loop Southside 2 pressure plane water lines by constructing Water Mains 1 and 2 and moving an area of Eastside 2 into Southside 2. Due to concerns over pressure increases associated with moving the area of Eastside 2 into Southside 2 calculated during the water modeling process, the decision was made to instead backfeed Eastside 2 with Southside 2 water at a location near the intersection of Everman- Kennedale Rd and Anglin Rd. This backfeed will require the design of a transfer valve, valve vault, and electrical components related to the pressure transmitters, flowmeter, and SCADA that was not within the scope of the original Contract. The design will be for a transfer valve of similar design to one used in the Westside III& IV Improvements Project, City Project No. 01988,and Morning Mist Trail and Indigo Sky Drive, City Project No. 02688, that was cited by City Staff as the preferred option. 111 A.d.1'4i�r.�1 Cac.�mPreparation .-dudiflwon 1, E.s-.Imen� There are six (6) additional easements (12 total) required for construction of the proposed water lines in the Southeast Water Main Extensions project. The project was originally scoped such that Gorrondona and Associates would provide four (4) easements within the area they provided topographic and design survey along Shelby Rd.and Timberview Drive.The Contractwas also scoped such that ANA Consultants would provide two (2) easements within the area they provided topographic and design survey along Joel East. It has been determined that twelve (12) easements will be required within the area Gorrondona surveyed and none within the area ANA surveyed. This results in eight (8) additional easements to be prepared by Gorrondona and two (2) less easements to be prepared by ANA. It is proposed that the money originally committed to ANA for easement preparation ($2500) be reallocated to Gorrondona and an additional $5300 is requested for Gorrondona to prepare the six (6) additional easements, see attached M/WBE Request for Approval of Change Form. Fee Proposal for Contract Amendment No. 1: $64,860 TNP proposes a fixed fee of$64,860 to accomplish the scope of services described above. MIWBE Utilization: TNP commits 51%of the work covered under this amendment to a certified M/WBE firm. With this amendment, the overall M/WBE commitment will now be 26.8%, above the City's M/WBE goal of 17%. Total Contract Amendment No. 1: $64,860 Mr.Rakesh Chaubey,PE September 22,2016 Page 3 of 3 Summary of Contract Fee: Original Contract Amount: $410,647 Amendment No. 1 $ 64.860 Revised Contract Amount $475,507 Thank you for consideration of this contract amendment request. If you have any questions,please do not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. Andrew Luce, P.E. Senior Project Manager Attachments: 1)Level of Effort Spreadsheet 2)Additional Survey Exhibit 3)Gupta and Associates Proposal 4)Gorrondona and Associate,Inc. Proposal 5) M/ BE Request for Approval of Change Form City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 4/18/2017 - Ordinance No. 22679-04-2017 DATE: Tuesday,April 18, 2017 REFERENCE NO.: **C-28192 LOG NAME: 60ESWMEXTAlTNPFUNDING SUBJECT: Adopt Appropriation Ordinance in the Amount of$94,860.00 for Increased Project Management and Material Testing Costs on Southeast Water Main Extensions Project (COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Fund in the amount of$94,860.00 from available funds for the purpose of funding the Southeast Water Main Extensions project. DISCUSSION: On September 18, 2012, Mayor and Council Communication (M&C C-25847), the City Council authorized the execution of an Engineering Agreement with Teague Nall and Perkins, Inc., in the amount of $410,620.00, for the Southeast Water Mains Extension Project. This agreement requires additional funding for project management material testing and to cover costs associated with Amendment No. 1, in the amount of$64,860.00, that will provide for additional design and survey services on the project. In addition to the amendment amount, $30,000.00 is required for project management and material testing. This project will have no impact on the Water Department's operating budget when completed. Design is expected to be completed by March 2018. Construction is expected to start in August 2018 and be completed by May 2019. The total cost for the Southeast Water Main Extensions project is estimated to be$2,830,000.00. The project is located in COUNCIL DISTRICT 5, Mapsco 106Q, 106R, 107E, 107J, 107N. and 107T. This M&C does not request approval of a contract with a business entity. FISCAL INFORMATION /CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendation and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Water Capital Fund. The Fiscal Year 2017 Water Operating Budget includes appropriations of $21,060,000.00 for the purpose of providing Pay-As-You-Go Funding for Capital Projects. After this transfer for Fiscal Year 2017, the balance will be $12,906,270.00. Funding for the Southeast Water Main Extensions project is as depicted below: I lFund Existing ( Additional Project Appropriations I Appropriations Total* I Logname: 60ESWMEXTAlTNPFUNDING Page 1 of 2 Water Capital Fund 59601 , $540,620.00 $94,860.00 $635,480.00 Project Total 1 $540,620.00 $94,860.00 1$635,480.00 * Numbers rounded for presentation purposes. FUND IDENTIFIERS (FIDs): TO Fund Department ccoun Project Program ctivity Budget Reference # moun ID ID Year Chartfield 2 FROM Fund Department Accoun Project lProgramrctivity Budget Reference # moun ID ID Year Chartfield 2 CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: John Carman (8246) Additional Information Contact: Rakesh Chaubey (6051) ATTACHMENTS 1. 60ESWMEXTAl TNPFUN DING FID Tables.pdf (CFW Internal) 2. 60ESWMEXTAITNPFUNDING MAP01.pdf (Public) 3. 60ESWMEXTAITNPFUNDING MAP02.pdf (Public) 4. 60ESWMXTAlTNPFUNDING WATER CAP FUND A017 .docx (Public) 5. SAM Teague Nall and Perkins Inc.pdf (CFW Internal) Logname: 60ES WMEXTA 1 TNPFUNDING Page 2 of 2 v ¢ i I� C � a a a I i j r+ • • i • • • E � o E I I ¢ IE oA o 0 0 a` a L L AW W f 41 m m W ' � } i'Y m � "Ocm O I a n Co '^ 0 v T � i Y • Q S � • C � 7 ILL .« • I`rO '«-. u Q A H � � LL ' I o o g Q ',a �a I — j � Baa w 3 • � ILL � iLL • � a r a I,■■■ .... 1. �■., Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. &v- Signature\ 1z AKESH C+1AIL)C3i✓y Name of Employee Title