Loading...
HomeMy WebLinkAboutContract 49027 CITY SECRETARYL/Cq' CONTRACT NO. l 'It)Z Developer and Project Information Cover Sheet: Developer Company Name: Cook Children's Medical Center Address, State,Zip Code: 801 70'Avenue,Fort Worth,TX 76104 Phone&Email: 682-885-1614,George.Montague@cookchildrens.org Authorized Signatory,Title: George Montague,Vice President of Real Estate Project Name and Brief 70'Avenue and W Pulaski Street Description: Project Location: 801 70'Avenue Fort Worth TX 76104 Plat Case Number: None Plat Name: None Mapsco: 76L Council District: 9 City Project Number: 100009 CFA Number: 2016-001 DOE Number: None To be completed b taff. Received by:. Date: ZI/773 Q� pM r 12 Q CIO a, N 00 53 O J SO OD rr,, „+ City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement CITY SECRETARY CFA Official Release Date:07.30.2015 Page 1 of 11 FT.WORTH,TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Cook Children's Medical Center, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as 7a'Avenue and W Pulaski Street ("Project")within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractors) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) D, Sewer(A-1) n. Paving(B) 0, Storm Drain(B-1) ®, Street Lights & Signs (C) Q. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured,licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 3 of 11 iii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 4 of 11 I Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 7 of 11 Cost Summary Sheet Project Name: 7d'Avenue and W Pulaski St CFA No.: 2016-001 DOE No.: None An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. A. Water and Sewer Construction 1. Water Construction $ 2.Sewer Construction $ - Water and Sewer Construction Total $ - B. TPW Construction 1.Street $ 937,529.85 2.Storm Drain $ 67,457.00 3.Street Lights Installed by Developer $ - 4. Signals $ TPW Construction Cost Total $ 1,004,986.85 Total Construction Cost(excluding the fees): $ 1,004,986.85 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ D. Water/Sewer Material Testing Fee(2%) $ - Sub-Total for Water Construction Fees $ - E. TPW Inspection Fee(4%) $ 40,199.47 F. TPW Material Testing(2%) $ 20,099.74 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 60,299.21 Total Construction Fees: $ 60,299.21 Choice Financia/Guarantee Options,choose one Amount Mark one' Bond=100% $ 1,004,986.85 Completion Agreement= 100%/Holds Plat $ 1,004,986.85 Cash Escrow Water/Sanity Sewer=125% $ - Cash Escrow Paving/Storm Drain= 125% $ 1,256,233.56 Letter of Credit=125%w/2yr expiration period $ 1,256,233.56 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Cook Children's Medical Center Jesus J. Chapa Assistant City Manager Name: George Montague Title: Vice President of Real Estate Date: `f r�� —"17 �1 Date: "/ Recommended by: ATTEST: (Only if required by Developer) Wendy Chi-Babulal, EMBA, P.E. Development Engineering Manager Signature Water Department Name: /, � ci- tj FFO Douglas )#. Wiersig, P.E. A.,�� .RTlZ Director A. Transportation & Public Works Department V .� Approved as to Form &Legality: ATTEST: n,.,,�.ias w rzt4�>> Mary J. s r Assistant City Attorney �•�� City Sec tary M&C No. 1 A Date: 1+h-6!17 F*.-, 17-95 OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement FT WORTH TX CFA Official Release Date:07.30.2015 Page 9 of 11 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. _ L) Date: Janie S. Morales Development Maner r � Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 -Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvments Water Cost Estimate 0 Exhibit A-1: Sewer Improvements Q Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100009 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 11 of 11 Harmon t Field O Park Par O SC Trinity Park Q, V Texas - O UP RR O ciente _ ter , PROJECT SITE Trinity Park iQ PE M i LV c � O Q Pk- C Cem - Hiusid Park C a o � 'c ❑ Forest Park t m tI n 0 0 o _ m o' o - - n o - 0 o - o - o - 3 VICINITY MAP NOT TO SCALE W W 7TH AVENUE & W. PULASKI STREET FILE # K-2444 0 CITY PROJECT # 100009 f �W DU NAWA v A 550 Bailey Avenue • suite 400 a Fon worth,Texas 76107 Te1:817.338.1121 9 Fax:217.338.7437 o (TX REO.F-1114) W f O J a LOT 37 iflT 38 `' 24"" WHITE STOP BAR (T)P. ') PROPOSED BORDERS WEST TERRELL AVENUE coNCRETE PAI/EMENr PROPOSED CROSSWALK- CONCRETE PA VEMEN T EX-11 -- . Lu z L Z PROPOSED TYPE PROPOSED TYPE ' WP-2 RAMP ; ;' R-1 RAMP ° Q PROPOSED 7 j2» 3600 PSI CONCRETE w PROPOSED PRI V E Y Z OWNED LIGHTS ( Y ' SEPARA TE CON A T) Q PROPOSE +' I � I = CONCRETE SIDEWALK 1 :+ COOK CHILDRENS MEDICAL CENTER 8017TH AVE FORT WORTH,TX +trPROPOSED 4" O 76104 + CONCRETE SIDEWALK a N BLOCK 10 +' I +r LOT 25R ' +� I O i Jill g + I J µ +� j, rn 0 MATCH LINE SHEET 2 OF 3 m 0 0 0 a EXHIBIT B PAVING LEGEND 0 Q7TH AVE & W. PULASKI ST PROPERTY BOUNDARY 1 OF 3 1"=60 ft EXISTING CURB v EXISTING SIGN EXISTING STORM DRAIN INLET lz EXISTING TREE N _ `_ ~ PROPOSED 7 1/2"3,600 PSI PORTLAND a O CEMENT CONCRETE W/#3 BARS @ 18" O.C.E.W ON 8"SUITABLE FLEXBASE SUBGRADE N (TXDOT ITEM 247,TYPE A,GRADE 1). $ +0 60 120 PROPOSED 4"CONCRETE SIDEWALK PROPOSED CROSSWALK-CONCRETE PAVING, "LIGHT PEACH"COLOR WITH SALT FINISH TO SCALE: 1"= 60 ft. MATCH EXISTING AT PRUITTSTREET SIDEWALK zo ® PROPOSED " RDERSCOLOR TO MATCH PAVING, "LIGHT BLUE"COLOR TO MATCH EXISTING � /~ D NAWA ACCENT COLOR AT PRUITT STREET SIDEWALK Y u PROPOSED CURB v 771 PROPOSED CURB INLET m 550 50ilay Avenua ■ SUM 400 0 Farr worth,TexOC 76107 Tal:817.335.1121 —— — — ——— — — SAWCUT(TYP.) w (TX RES.F-1114) 24"WHITE STOP BAR O J d MATCH LINE SHEET 1 OF 3 + PROPOSED TYPE ' _-P 2_RAMP, ' IPROPOSED 7 j2,. --— 3600 PSI CONCRETE #, PROPOSED CROSSWALK— PROPOSED TYPE ' k �- EX-GAS _ P-1 RAMP ; PROPOSED BORDERS CONCRETE PA VEMENT m �JPROPOSED TYPE' - - 4 WHITE STOP j� « P RAMP i r PROPOSED BORDERS CONCRETE PAVEMEIsIT gI PROPOSED TYPE ROPOSED CROSSWALK— + M-2 MID—BLOCK ONCRETE PAVEMENT , RAMP PROPOSED TYPE - 4 P-1 RAMP PROPOSED 7' in Y i r 1 l s O COOK CHILDRE ONCRETE SIDEWALK - I «# =J K F a 801 �i C + Itt t+ po�oe a 3 n FORT WC�R�Ij a Iii + Q WM3 gg RONALD 6MRc D0SA,.i� � H O N " tts c MATCH LINE SHEET 3 OF 3 0 a EXHIBIT B PAVING Q 7TH AVE & W. PULASKI ST LEGEND 2 OF 3 1'=60 ft e — PROPERTY BOUNDARY EXISTING CURB EXISTING SIGN W —j EXISTING STORM DRAIN INLET ti EXISTING TREE in PROPOSED 7 1/2"3,600 PSI PORTLAND a O CEMENT CONCRETE W/#3 BARS @ 18" 0 60 120 O.C.E.W ON 8"SUITABLE FLEXBASE SUBGRADE 9 (TXDOT ITEM 247,TYPE A,GRADE 1). $ r PROPOSED 4"CONCRETE SIDEWALK + + SCALE: 1"= 60 ft. r�r PROPOSED CROSSWALK-CONCRETE PAVING, A "LIGHT PEACH"COLOR WITH SALT FINISH TO MATCH EXISTING AT PRUITT STREET SIDEWALK z ® PROPOSED BORDERS-CONCRETE PAVING, "LIGHT BLUE"COLOR TO MATCH EXISTING z ~ ACCENT COLOR AT PRUITT STREET SIDEWALK 1r DUNAWAY — PROPOSED CURB 2 PROPOSED CURB INLET m 350 Baiiay AVOMUO I SUita 400•Fort worth,TexCC 76107 Ta1:1117-335.1131 —— ————— — — SAWCUT(TYP.) c (Tx MEG. -111a) 24"WHITE STOP BAR W G 0 J a N Y QuZi0ZZ3 azul>� 0 JW W Lua — V) F W d — C Q F W W W W W o oFru 'n Ln 2 FFJr w Y3zu0 � J W J a FLU —i w u 3oa� oa z a J d' co 0 Ln U000 a co m d U O. zzuz 0: 0: —0 "v u V)Co uu 0 u u �, Q O oaRoD0 0 0 W LULu p Ln Ln a u'L,) m F Lf) Lf)ZUCL F~ O F- x0 z O O x a M U CL LU a s �3 '^ ccd cdJ0azde� uzzW 2av Q dd V1N W ® .+.+ G EF + + + + ++++ J � + Q gLn A/ZW omWF C J J O WQ Ll rn aas xW z WWF 5 Lu + $ � Q � V—� � �p ao o `�,°-3 `^ Q � _ - W 40 ® � _� 4J cc 0O z z z W �-1z0co Nip 4 � V � k -CLV u � o 003 � � + # � O - Q) LL; Lli 0 W z z z z Lu 0z � N W (LV CLC) o 02 W co X W W W a w w w W aU° LLQ W _ Z =i �uI 4 x W ` m Qa W' 7 J — CA t W ~ ^ HN Q W-4 -4(6 _ �_; ; ^ �� LU a>`^ Q 'ALL a Qi oCL oW° °m � ' oOE..a --- Ji 4. Vom —^ o �X � � � � _ 13 T � I as X o N 6MP'6uVWd 9]!q!W(3\V=E)90T0•LT\sW 4x3\s6u,MeJO\TZO\u6,saO\65[0009\00[000\OOSuo,pnpad\:9:HiVd3lId WV ZS:S:1V LTOZ'01 A+enue['Aepsanl:NO auuaLqe)l'jaunjg:,fig O311Old WEST TERRELL AVENUE WATER, SEWER, PAVING, & DRAINAGE IMPROVEMENTS-CITY PROJECT NO. CFA QUANTITY MATRIX HEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST ITEM NO. BID ITEM UNIT 4 5 15 32 PAVING 1 0241.0100 Remove Sidewalk S.F. 7786 7786 $3.00 $23,358.00 2 0241.0200 Remove Step EA. 20 20 $145.00 $2,900.00 3 0241.0300 Remove ADA Ram EA. 12 12 $1,165.00 $13,980.00 4 0241.0401 Remove Concrete Drive S.F. 3268 3268 $6.30 $20,588.40 5 0241.1100 Remove As haltPvmi S.Y. 2781 2781 $28.95 $80,509.95 6 0241.1300 Remove Conc Curb&Gutter L,F. 1624 1624 $12.25 1 $19,894.00 7 3213.0501 Barrier Free Ram,Type R-1 EA. 4 4 $4,885.00 $19,540.00 8 3213.0506 Barrier Free Ram,Type P-I EA. 5 5 $3,840.00 $19,200.00 9 3213.0504 Barrier Free Ramp,Type M-2 EA. 1 1 $4,655.00 $4,655.00 10 3213.0301 4"Conc Sidewalk S.F. 11152 11152 $11.15 1 $124,344.80 I I 3217.0501 24"SLD Pvmt M!pg HAE(W) L.F. 112 112 $16.35 $1,831.20 12 3441.4004 Furnish/Install Alum Sign Ex.Pole Mount EA. 1 1 $685.00 $685.00 13 3441,4003 Fumish/Install Alum Sign Ground Mount City Std. EA. 3 3 $775.00 $2,325.00 14 3441.4110 Remove and Reinstall Sign Panel and Post EA. 4 4 $300.00 $1,200.00 15 3211.0502 8"Lime Treatment S.Y. 3380 3380 $17.85 $60,333.00 16 9999.0001 7 1/2"Conc Pvmt S.Y. 2474 2474 $137.75 $340,793.50 17 9999.0002 ConcreteCrossf Pavm "Light Peach" S.Y. 254 254 $283.00 $71,882.00 18 9999.0003 Concrete Crosswalk Border Paving"Light Blue" S.Y. 270 270 $291.00 $78,570.00 19 9999.0004 SWPPPDevices(SWPPP plan by others) LS 1 1 $8,500.00 $8,500.00 20 3212.0401 HMAC Transition TN 20 20 $205.00 $4,100.00 21 9999.0005 Remove Street Li is(8 each) S.Y. 1 1 $6,320.00 $6,320.00 22 3213.0507 Barrier IF Ramp,Type P-2 S.Y 3 3 $3,840.00 $11,520.00 23 3471.0001 Barricades and Traffice Control s.Y. 4 4 $5,125.00 $20,500.00 PAVING TOTAL $937,529.85 00 42 43 DAP-BID PROPOSAL Page 2 of 3 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Section Unit of Bid No. Description No. Measure Quantity Unit Price Bid Value UNIT II:PAVING IMPROVEMENTS 1 0241.0100 Remove Sidewalk 0241 13 SF 7786 $3.00 $23,358.00 2 0241.0200 Remove Step 0241 13 SF 20 $145.00 $2,900.00 3 0241.0300 Remove ADA Ramp 0241 13 EA 12 $1,165.00 $13,980.00 4 0241.0401 Remove Concrete Drive 0241 13 SF 3268 $6.30 $20,588.40 5 0241.1100 Remove Asphalt Pvmt 0241 15 SY 2781 $28.95 $80,509.95 6 0241.1300 Remove Conc CurbBGutter 0241 15 LF 1624 $12.25 $19,894.00 7 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 4 $4,885.00 $19,540.00 8 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 5 $3,840.00 $19,200.00 9 3213.0504 Barrier Free Ramp,Type M-2 32 13 20 EA 1 $4,655.00 $4,655.00 10 3213.0301 4'Conc Sidewalk 32 13 20 SF 11152 $11.15 $124,344.80 11 3217.0501 24"SLD Pvmt Marking HAE(W) 32 17 23 LF 112 $16.35 $1,831.20 12 3441.4004 Furnish/Install Alum Sign Ex.Pole Mount 34 41 30 EA 1 $685.00 $685.00 13 3441.4003 Furnish/Install Alum Sign Ground Mount City Std. 34 41 30 EA 3 $775.00 $2,325.00 14 3441.4110 Remove and Reinstall Sign Panel and Post 3441 30 EA 4 $300.00 $1,200.00 15 3211.0502 8'Lime Treatment 32 11 29 SY 3380 $17.85 $60,333.00 16 9999.0001 7 1/2"Conc Pvmt 32 13 13 SY 2474 $137.75 $340,793.50 17 9999.0002 Concrete Crosswalk Paving'Light Peach" 32 13 13 SY 254 $283.00 $71,882.00 18 9999.0003 Concrete Crosswalk Border Paving"Light Blue' 32 13 13 SY 270 $291.00 $78,570.00 19 9999.0004 SWPPP Devices(SWPPP plan by others) LS 1 $8,500.00 $8,500.00 20 3212.0401 HMAC Transition 32 12 16 TN 20 $205.00 $4,100.00 22 9999.0005 Remove Street Lights(8 each) EA 1 $6,320.00 $6,320.00 23 3213.0507 Barrier Free Ramp,Type P-2 32 13 20 EA 3 $3,840.00 $11,520.00 24 3471.0001 Barricades and Traffic Control 3471 13 EA 4 $5,125.00 $20,500.00 TOTAL UNIT II:PAVING IMPROVEMENT $937,529.85 CrrY OF FORT WORTH STANDARD CONSTRUCTTON SPECIFICATTON DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 004243_Bid Proposal_DA P.xls J W m n W Z W �- Z > wLU 3 u ? Lou JQ 3 Q c z W � > W O K LA O W LA 0 J J p Z w a 2 > L n cr oC j Z Z w H Z 0 w w w L Q F F w F co C3 as * EDZ a ao (DQ o � 3 3CC u r a 3 Lm c� LL D 3 3 v~i of Ln L (A Lu 0 n n o n n o r (D (D (D (D (D u O O (J (D (D JO J LLJ LLL Lu Lu Lu Lu LLI I!1 VI V) V1 V1 Vt VS 0 W Z Z Z Z Z ZOCZ Z Z Z Z = Z � O O O O O O O w Q G� � F= � PZ � Zo m a m a a m II O �n 'n 'n 'n 'n 'n W D L N LA D a Q O O O O O O O oc x x x is x x _j x x x x x x oc z o z z oc Z a w uu uu LU LU uu W w w W W LU CL a s a a a a LU v W 3 N Q 0 W I I I aXXOLL ® gil O I x W W X x X W W W W II I ui —� — w, w J Sa O F C m W N 0 N v —�r N W _ �X CAC R� 5- V `i 0 , 0 5 -- O W N _N _ N I ) CAD. LL � ? � - c� W � � m O ( moo p ? � O I ii m� i oc � On CL (i - � �0 W � V mW F LL13 Q ___�_ ----- - -- -- - � ---- --- it i O (n u Z O V O � W 11 1 i " � p ? Y � p � O = o has O 2 � oo p � O 2 „ � 11 I! Z WQ c) cc et VCt2 ..o O � (/� W Q� � Q U. y p a VNOa w 01VNC M --- O 05 c 0 r 1 Q 1 � e BMP'WJXS 18 XPP(3\WO 9010-LI\SZ.W3\s6uIMeJO\IZO\u6,sa0\65L0009\OOL000\OoSuo,pnpoJd\:D: LVd3lld WV£0:6:ltl LIOZ'60 Nene['AepuoW:NO auuaige)l'jaurug:,(g 03L Old ID WEST TERRELL AVENUE WATER, SEWER, PAVING, &DRAINAGE IMPROVEMENTS-CITY PROJECT NO. CFA QUANTITY MATRIX HEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST ITEM NO. BID ITEM UNIT 4 5 15 32 STORM 1 0241.4001 Remove I O'Curb Inlet EA. 2 2 $1,550.00 $3,100.00 1 0241.4003 Remove 20'Curb wet EA. 1 1 $2,530.00 $2,530.00 3 0241.3013 Remove 18"Storm Line L.F. 24 24 $75.00 $1,800.00 4 0241.3014 Remove 21"Storm Line L.F. 29 29 $80.00 $2,320.00 5 99940001 Remove Storm Drain Manhole EA. 1 1 $2,340.00 $2,340.00 6 3341.0201 21"RC P,Class 111 L.F. 46 46 $230.00 $10,580.00 7 3341.0205 24"RCP,Class III L.F. 29 29 $243.00 $7,047.00 B 3349.5001 10'Crab Inlet EA. 3 3 $7,800.00 $23,400.00 9 13349,5003 20'CurbInlet EA. 1 1 $13,500.00 $13,500.00 10 9999.0002 Wet Silt Protection Devices EA. 4 4 $210.00 $840.00 STORM TOTALI $67,457.00 PROJECT TOTAL $1,004,986.85 00 42 43 DAP-BID PROPOSAL Page 1 of 3 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Section Unit of Bid Description Unit Price Bid Value No. I No. Measure Quantity UNIT 1:DRAINAGE IMPROVEMENTS 1 0241.4001 Remove 10'Curb Inlet 0241 14 EA 2 $1,550.00 $3,100.00 2 0241.4003 Remove 20'Curb Inlet 0241 14 EA 1 $2,530.00 $2,530.00 3 0241.3013 Remove 18"Storrs Line 0241 14 LF 24 $75.00 $1,800.00 4 0241.3014 Remove 21"Storm Line 0241 14 LF 29 $80.00 $2,320.00 5 9999.0001 Remove Storrs Drain Manhole EA 1 $2,340.00 $2,340.00 6 3341.0201 21"RCP,Class 111 3341 10 LF 46 $230.00 $10,580.00 7 3341.0205 24"RCP,Class 111 3341 10 LF 29 $243.00 $7,047.00 8 3349.5001 10'Curb Inlet 33 49 20 EA 3 $7,800.00 $23,400.00 9 3349.5003 20'Curb Inlet 33 49 20 EA 1 $13,500.00 $13,500.00 10 9999.0002 Inlet Silt Protection Devices EA 4 $210.00 $840.00 TOTAL UNIT I:DRAINAGE IMPR—O—VLEMENT_4 $67,457.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43—Bid ProposalOAP,x1s 00 42 43 DAP-BID PROPOSAL Page 3 of 3 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Section Unit of Bid No. Description No: Measure Quantity Unit Price Bid Value Bid Summary UNIT I:DRAINAGE IMPROVEMENTS $67,457.00 UNIT II:PAVING IMPROVEMENTS $937,529.85 Total Construction Bid $1,004,986.85 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 150 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CrrY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43—Bid Proposal_DAP.xis