HomeMy WebLinkAboutContract 47873-CO1 CITY SECRETARY FORT WORTH® City of Fort Worth CONTRACTNO. Change Order Request Breakdown Project Namel HMAC 2016-6 CDBG Street Rehab City Sec# 1 47873 Client Project#(s)l 100124 Contractor Advanced Paving PM Kristian Sugrim Inspector Gary Deyon Change Order Submittal# 0 Date 3/13/2017 Contract Time Dept. TlPW Totals CD) Original Contract Amount $985,718.25 $985,718.25 80 Extras to Date Credits to Date _I Pending Change Orders(in M&C Process) Contract Cost to Date $985,718.25 $985,718.25 80 Amount of Proposed Change Order $26,607.05 $26,607.05 66 Revised Contract Amount $1,012,325.30 $1,012,325.30 14`,RA Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $26,607.05 $26,607.05 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.700/10 MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $1,232,147,81 JUSTIFICATION (REASONS) FOR CHANGE ORDER This change order is necessary to cover over-runs on various line items based on actual quantities installed. Items that were not utilized are being reduced in order to offset costs.Also,additional time is being added to the contract for extra work and unforeseen delays incurred during the project.9 days are being added due to delays related to the gas and water leaks on NW 14th Street. 18 days are being added for work stoppage while waiting for funding to be allocated so that work may continue, 14 days for extra excavation and haul off on Robert's Cut-Off and 25 days are being added for the extra work outlined within this change order. A �oF EORT� 2 creta y XAS. 264 5678 RECEIVED OFFICIAL RECORD a CITY SECRETARY N MAY - 12017 3 f:G WORTI�I,TX � CITY OF FORT WORTH o CITY SECRETARY y�'a - ----- - �_ �'8 9 S ti 2 FORT WORTH City of Fort Worth Change Order Additions Project Name NMAC 2016-6 CDBG Street Rehab City Sec# 47873 Client Project# 100124 Contractor Advanced Paving PM Kristian Sugr m InspectorF Gary Deyon Change Order Submittal# Date 3/13/2017 ADDITIONS ty Unit Unit Cost Total 4 241.0401 Remove Concrete Unveway 7 0241.0100 Remove Sidewalk T/PW 9,401.90000000 SF 1.38 8 32123.03114'Concrete Sidewalk T/PW 5,528.90000000 SF $7.15 12 0241.0300 Remove ADA Ramp T/PW 27.00000000 EA $110.00 13 9999.0000 ADA Ramp T/PW 28.00000000 EA 1,485.00 16 0241.1700 8°Pavement Pulverization T/PW 2,863.33000000 SY $5.97 17 3211.0600 Cement Modification.13 lbs/sy T/PW 18.18000000 TN $131.00 18 9999.0000 Roadbond ENI T/PW 21.00000000 GA 120.00 19 3212.0302 2°Asphalt Pavement,Type D T/PW 2,863.33000000 SY 9.90 30 3232.0100 Concrete Retaining Wall with Sidewalk,Face T/PW 3.50000000 SF $25.00 3441.1301 Traffic Loop Detector Cable Swa-Cut T/PW 23.44000000 LF $24.00 3305.0 12 Manhole Adjustment(with Concrete Collar) T/PW 2.00000000 EA 465.00 T/PW $149,404.65 Sub Total Additions149,404.65 Change Order Additions Page 1 of 1 FORT WORTH City of Fort Worth Change Order Deletions Project Name HMAC 2016-6 CDBG Street Rehab City Sec# 47873 Client Project# 100124 Contractor Advanced Paving PM Kristian Sugrim Inspector Gary Deycn Change Order Submittal# 0 Date 3113/2017 DELETIONS -ITEM DESCRIPTION DEPT Qty unit Unit Cost Total 5.0108 Misce aneous Adjustments(Utilities) / 2 0241.1300 Remove Concrete Curb&Gutter T/PW 4,832.49000000 LF 3.85 , 5. 3 3216.0102 7°Concrete Curb&Gutter TIPW 2,330.80000000 LF $25.30 5, 5 3213.04016'Concrete Driveway T/PW 111.20000000 SF 5.78 PT7.77 6 3213.04516'Concrete Driveway,Exposed Aggregate T/PW 60.00000000 SF $11.55 9 3213.0351 4"Concrete Sidewalk,Exposed Aggregate TIPW 10.00000000 SF $9.36 7 n-57 10 0241.1400 Remove Concrete Valley Gutter TIPW 137.60000000 SY $25.30 11 3216.0302 7°Concrete Valley Gutter T/PW 256.60000000 SY 82.50 .5 14 9999.0000 5'Curb Inlet Top T/PW 1.00000000 EA $2,000.00 15 99990.000010'Curb Inlet Top TIPW 2.00000000 EA $2,500.00 5, 20 3217.0001 4'Solid White Thermoplastic(HAS)Lane Line T/PW 100.00000000 LF 10.00 21 3217.0002 4"Solid Yellow Thermoplastic(HAS)Center Line TIPW 250.00000000 LF $10.00 5 22 3217.0305 Stop Bars Pavement Markings T/PW 268.00000000 LF 10.00 23 3217.030112'Solid Pavement Markings(Cross-Walk,White) TIPW 45.00000000 LF $8.00 T/PW LF 25 3441.1302 AWG Loop Doctor Cable T/PW 7.50000000 LF $12.00 26 3305.0112 Water Valve-Box Adjustment(Wth Concrete Collar) T/PW 3.00000000 EA 265M 77-95-7 27 T/PW EA 28 3217.0100 Curb Address Painting T/PW 113.00000000 EA13.00 29 3292.0100 Block Sod Replacement TIPW 295.00000000 SY $7.15 $2,109.25 TIPW $122,797.60 Sub Total Deletions $122,797.60 Change Order Deletions Page 1 of 1 M/SBE Breakdown for this Change Order MISBE Sub Typ'eof Service Amount Ior this CO Total Previous Change Orders Co# QATE Total CFW Change Order Approval St-COApp01 Page 1 of 5 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Projects/100124 - HMAC 2016-6 CDBG Street Rehab/Contractor/Change Orders/Copy of Copy of Change Order 1 Breakdown 100124.xls Attachments(0) No Attachments have been added to this form. https://projeetpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 4/28/2017 CFW Change Order Approval St-COApp01 Page 2 of 5 FOR- - WORTH, "Y of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 01 Change Order No.: St-COApp01 Date Started: 2017-04-04 City Sec. No.: :47873 Date Due: 2017-05-24 Project Name: 100124 - HMAC 2016-6 CDBG Street Rehab :100124 DOE Numbers: Project Numbers: Project Removal and replacement of nonfunctional curb and gutter, Description: driveways and sidewalks; pulverization and stabilization of ;the existing pavement, folowed by an 2" HMAC overlay. Project Manager: Kristian Sugrim City Inspector: Gary Deyon Contractor: 'Advanced Paving COUNCIL ACTION (If Required): M&C Log Name: M&C Number: ' M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: Neighborhood Services $ 26,607.05 21001-0200431-5740010-G00259-9 66 Total Cost: $ 26,607.05 Total Requested Days: 66 Approval Status: https://projectpoint.buzzsaw.com/ bz_web/Forms/FoimPrint.aspx?SiteId=51500&ProcessI... 4/28/2017 CFW Change Order Approval St-COApp01 Page 3 of 5 https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&Processl... 4/28/2017 CFW Change Order Approval St-COApp01 Page 4 of 5 :Approved: Yes Comments: 'User: Becky Garrett Date: 2017-04-04 2:21 PM Approved: Yes "Comments: .User: Kristian Sugrim Date: 2017-04-04 2:53 PM ;Approved: Yes Comments: 'User: Najib Fares Date: 2017-04-07 8:30 AM Approved: Yes Comments: User: Kim Arnold 'Date: 2017-04-10 12:25 PM Approved: Yes Comments: ';User: Becky Garrett ,Date: 2017-04-18 4:00 PM .IlApproved: Yes Comments: ,User: Kristian Sugrim "!Date: 2017-04-18 4:27 PM Approved: Yes 'Comments: User: Najib Fares Date: 2017-04-18 4:36 PM Approved: Yes Comments: User: Kim Arnold Date: 2017-04-20 3:50 PM ;Approved: Yes Comments: 'User: Doug Wiersig Date: 2017-04-20 10:56 PM ;Approved: Yes Comments: https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&ProcessI... 4/28/2017 CFW Change Order Approval St-COApp01 Page 5 of 5 User: Doug Black Date: 2017-04-27 5:16 PM Approved: Yes Comments: User: Jay Chapa !Date: 2017-04-28 3:08 PM Action Required: https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&Processl... 4/28/2017 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee k m Title