Loading...
HomeMy WebLinkAboutContract 46045-CO1 FORTWORTHCITY SECRETARY City of Fort Worth �� Chane Order Request Breakdown CONTRACT N0. L Project Namel E Rsedael Retrofit-IH35 to US 287 City Sec# 46045 Client Project#(s)l 01894 Change Order Submittal# 0 Date 1/20/2017 Contract Time Dept. TPW Totals (CD Original Contract Amount $2,660,128.70 $2,660,128.70 240 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $2,660,128.70 $2,660,128.70U567 Go to ADD&DEL Tabs to Enter CO Backup $86,993.55 $86,993.55 Revised Contract Amount $2,747,122.25 $2,747,122.25 Original Funds Available for Change Orders $665,032.18 $665,032.18 Remaining Funds Available for this CO $665,032.18 $665,032.18 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.27% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25116) $3,325,160.88 JUSTIFICATION(REASONS)FOR CHANGE ORDER *Irrigation system had to be redesigned to accommodate additional bores under the existing roadway. *9 inch Concrete was a field change to match existing joints and repair adjacent panels. The concrete joints were adjusted forcing the pavement section to widen at these areas. *2 street signs were added to clarify the right lane ends. *Landscape Edge Detail was an overrun of the plan quantity, most notably at the bio-swale areas. *Dead End Barricades needed to be added at the 3 south side streets that were blocked off to keep people from driving thought the newly planted sod. *2 Street Light Poles& 1 Sidewalk/Pedestrian Light Pole were hit by traffic&destroyed. All 3 light poles had to be replaced. Arkbyl:-i, i' 6y J. fl', fl acreti o PM � 23 OFFICIAL RECORD CITY SECRETARY o RECEIVED FT.WORTH,TX MAY-3 2017 o co CITYOF FORT FORTH CITY SECRETARy z -tAN FORT WORTH City of Fort Worth Change Order Additions Project Name E Rsedael Retrofit-IH35 to US 287 City Sec# 46045 Client Project# 01894 Change Order Submittal# 0 Date 1/20/2017 ADDITIONS DEH I Qty Unit I Unit os lo ta 1-19 9"Concrete Pavement TPW 243.00 SY $87.60 1-48 Furnish and Install Ground Mounted Street Sign TPW 2.00 Ea $600.00 1-70 Landscaep Edge Detail TPW 657.00 LF 14.00 1-74 2"Bore&Sleeve TPW 715.00 LF $25.80 1-75 4"Bore&Sleeve TPW 720.00 LF $28.60 1-76 6"Bore&Sleeve TPW 415.00 LF $33.70 1-77 Dead End Barricade TPW 3.00 Ea $2,000.00 1-53 F/I Rdwy Illum Assemlby Special TPW 2.00 Ea 5,266.00 1-54. F/I Ped Ilium Assemble Washington TPW 1.00 Ea 2,670.00 TPW $103,887.00 Sub Total Additions Change Order Additions Page 1 of 1 FO_ r�W�oRTH City of Fort Worth Change Order Deletions Project Name E Rsedael Retrofit-IH35 to US 287 City Sec# 46045 Client Project# 01894 Change Order Submittal# 0 Date 1!20/2017 DELETIONS DEKKIH I ION DEPT Qty Unit I Unit Cost ota 1-11 Portable Message Sign TPW 8.00 Wks $450.00 1-15 Bus Shelter TPW 3.00 Ea 950.00 1-24 18"RCP Class III TPW 10.00 LF $105.00 1-25 24"RCP Class 111 TPW 18.00 LF 115.00 1-26 30"RCP Class III JTPW 30.00 LF 135.00 1-27 36"RCP Class III TPW 8.00 LF $165.00 142 4"Brk Pvmt Marking(HAE)(W) TPW 1,150.00 LF 1.25 1-43 4"SLD Pvmt Marking(HAE)(W) TPW 607.00 LF $0.85 TPW $16,893.45 Sub Total Deletions Change Order Deletions Page 1 of 1 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Green Scaping 2"A"&6"Bore&Sleeve, &Landscape Edge $62,222.50 Total $62,222.50 Previous Change Orders co# DATE AMOUNT Total $0.00 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature CFW Change Order Approval St-COApp02 Page 1 of 5 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthaov/Infrastructure Projects/01894 - East Rosedale Street Retrofit - IH35 to US287/Contractor/Change Orders/Change Order Breakdown #1.xls Aftfichj Tjllp L No Attachments have been added to this form. httt)s://DroiectDoint.buzzsaw.com/ bz web/Forms/FonnPrint.asnx?Siteld=51500&ProcessId... 5/3/2017 CFW Change Order Approval St-COApp02 Page 2 of 5 FORT WORTH. C'ty of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 1 Change Order No.: St-COApp02 Date Started: 2017-03-08 City Sec. No.: Date Due: 2017-04-27 Project Name: 01894 - East Rosedale Street Retrofit - IH35 to US287 CO1894 DOE Numbers: Project Numbers::__�_r 6836 Project East Rosedale Street Retrofit - IH35 to US287 Description: Project Manager: Martin Phillips City Inspector: Randy Horton Contractor: McCLENDON CONSTRUCTION COMPANY, INC. COUNCIL ACTION (If Required): M&C Log Name: M&C Number: COST AND DAYS SUMMARY: M&C Date: Requested Department: Cost($) Fund Account Center: Days: 0200431 $ 86,993.55 39001-0200431-5740010-001894-c 327 Total Cost: $ 86,993.55 Total Requested Days: 327 Approval Status: httDs://i)roiectt)oint.buzzsaw.com/ bz web/Forms/FormPrint.as-ox?Siteld=51500&Processld... 5/3/2017 CFW Change Order Approval St-COApp02 Page 4 of 5 Approved: Yes Comments: User: Tara Fishback Date: 2017-03-08 1:34 PM Approved: Yes Comments: User: Justin Blair Date: 2017-03-09 12:03 PM Approved: Yes Comments: User: Martin Phillips Date: 2017-03-09 1:34 PM Approved: Yes Comments: User: Martin Phillips Date: 2017-03-09 3:10 PM Approved: Yes Comments: User: Justin Blair Date: 2017-03-30 4:25 PM Approved: Yes Comments: User: Mitch Aiton Date: 2017-03-31 8:48 AM Approved: Yes Comments: User: Martin Phillips Date: 2017-04-03 7:53 AM Approved: Yes Comments: User: Kim Arnold Date: 2017-04-03 10:12 AM Approved: Yes Comments: User: Doug Wiersig Date: 2017-04-20 12:38 PM Approved: Yes Comments: httns://nroiectnoint.huzzsaw.com/ hz weh/Forms/FormPrint_asnx?SiteTd=51500&,Proce-,sld... 5/3/7017 CFW Change Order Approval St-COApp02 Page 5 of 5 User: Doug Black Date: 2017-04-27 5:08 PM Approved: Yes Comments: User: Jay Chapa Date: 2017-04-28 3:10 PM Approved: Yes Comments: User: Justin Blair Date: 2017-04-28 4:32 PM Approved: Yes Comments: User: Martin Phillips Date: 2017-05-01 8:14 AM Approved: Yes Comments: User: Martin Phillips Date: 2017-05-01 8:16 AM Action Required: Please review, approve and submit. httns://DroiectDoint.buzzsaw.com/ bz web/Forms/FormPrint.asnx?SiteTd=51500&Prcces-,Tc1.._ 5/3/2017