HomeMy WebLinkAboutContract 49040 CITY SECRETARY
CONTRACT NO. C�
Developer and Project Information Cover Sheet:
Developer Company Name: D.R. Horton-Texas,Ltd
Address, State,Zip Code- 6751 N. Freeway,Fort Worth,TX 76131
1 -
Phone&Email: 817-230-0800,mpallen@drhorton.com
Authorized Signatory, Title: i Mark Allen,Assistant Secretary
Project Name: Trinity Oaks
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights l
Project Location: 650 John T White Rd.North
T
Plat Case Number: FP-16-042 Plat Name: 1 Trinity Oaks
Mapsco: 67P Council District: 5 City Project Number: 100466
CFA Number: 2017-044 DOE Number: None
To be completed by staff
Received by: Date: j
L�
CO 11
g 9 10 11 y2q�
�J
co
N
It Les
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Trinity Oaks CITY SECRETARY
CFA Official Release Date: 01.03.2017 FT.WORTH,TX
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, D.R. Horton - Texas, Ltd, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements")related to
a project generally described as Trinity Oaks ("Project") within the City or the extraterritorial
jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Proj ect.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if,copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Trinity Oaks
CFA Official Release Date: 01.03.2017
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) FA, Sewer(A-1) ®, Paving (B) ®,, Storm Drain(B-1) ®, Street Lights & Signs
(C) M
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Trinity Oaks
CFA Official Release Date:01.03.2017
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Trinity Oaks
CFA Official Release Date:01.03.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City,its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with,the construction of the infrastructure contemplated
herein,whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Trinity Oaks
CFA Official Release Date: 01.03.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Trinity Oaks
CFA Official Release Date: 01.03.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Trinity Oaks
CFA Official Release Date:01.03.2017
Page 7 of 11
Cost Summary Sheet
Project Name: Trinity Oaks
CFA No.: 2017-044 City Project No.: 100466
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 501,699.60
2.Sewer Construction $ 615,195.00
Water and Sewer Construction Total $ 1,116,894.60
B. TPW Construction
1.Street $ 1,230,598.98
2.Storm Drain $ 307,602.00
3.Street Lights Installed by Developer $ 80,094.38
4. Signals $ -
TPW Construction Cost Total $ 1,618,295.36
Total Construction Cost(excluding the fees): $ 2,735,189.96
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 22,337.89
D. Water/Sewer Material Testing Fee(2%) $ 22,337.89
Sub-Total for Water Construction Fees $ 44,675.78
E. TPW Inspection Fee(4%) $ 61,528.04
F. TPW Material Testing(2%) $ 30,764.02
G. Street Light Inspsection Cost $ 3,203.78
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 95,495.83
Total Construction Fees: $ 140,171.61
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond= 100% $ 2,735,189.96 x
Completion Agreement=100%/Holds Plat $ 2,735,189.96
Cash Escrow Water/Sanitary Sewer=125% $ 1,396,118.25
Cash Escrow Paving/Storm Drain=125% $ 2,022,869.20
Letter of Credit=125%w/2yr expiration period 1 $ 3,418,987.45
City of Fort Worth,Texas
Standard Community Facilities Agreement-Trinity Oaks
CFA Official Release Date: 01.03.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
D.R.Horton-Texas,Ltd.,
�— a Texas Limited Partnership
By D.R.Horton,Inc.,
Jesus J. Chapa a Delaware Corporation
AssistantPZZ -.12
Manager Its authorized agent
Date:
Recommended by:
Name: Mark Allen
Wendy Chi- abulal, EMBA, P.E. Title: Assistant Secretary
Development Engineering Manager
Water DepartmentZV,A;- 0. Li Date:
ATTEST: (Only if required by Developer)
Douglas . Wiersig, P.E.
Director
Transportation &Public Works Department
Signature
Approved as to Form &Legality: Name:
Contract Compliance Manager:
Richard A. McCracken By signing, I acknowledge that I am the
Assistant City Attorueey person responsible for the monitoring and
M&C No. PJ administration of this contract, including
ensuring all performance and reporting
Date: 4 kdrl requirements.
Form 1295: IF R;r-
UY�
ATTEST:
U 13:re:
lf
Aar✓ .
City Secre y
City of Fort Worth,Texas
Standard Community Facilities Agreement-Trinity Oaks OFFICIAL RECORD
Official Release Date: 01.03.2017
Page 9 of 11 CITY SECRETARY
FT.WORTH,TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvements
Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit 13-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Trinity Oaks
CFA Official Release Date: 01.03.2017
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100466
None
City of Fort Worth,Texas
Standard Community Facilities Agreement-Trinity Oaks
CFA Official Release Date: 01.03.2017
Page 11 of 11
es�a ox iaxoad uo ox�arewoo�acrm�o-�na�vxi°aroaaaaxas sxrouw�ai '
ossa-x turn ox and wsiare»ro�cc,ww�wes a+ia3roaa aaisxs anaas of sixavyoasuLr�n faaau s awMrw'�auva•aquas tnfrfn
N r
n n
N
N
x X
n
n �
a
U
o ,qx
zz
90
X03 ; O
ii°aoa°a°a
aa'DSa 'ai'sias»aow �> sa`� ,0 0.
WN 9AE9
y r ����»»»»» »>'> "�+0000p oo `000 Qc d A
�2 s °°�°vasoaadads121H a�IM162"�s�»aWw � H _
tawLL
w
� 94
V)
O
Z W
1 J
as
W (7cn Qz
�— _ Qh "a —
F— Z Z ama
=V QW (n a_ p"
Q w e 15ovV4
v "o3m
OU j zww < VNv
O � ,
� z � > (6
co
f
F— O Q w >- o
U o- F—U)
O w s N
W D =0 f
� o
7 F z 0 W Ci^n
_ O— w
LLW L � Lo zo U 3 In q3
O - aA Q xoN
UJ
U) W �®
}' O W LL,�°
M
F_ F.1_
LLI
U U) e o
z Q °~
. W=
Q >o=o ,
= o=N�m
F— o
OD
u
0
x w go
Z
F w
pG � Y Q a
Oix o to
x a O w o H `° C, m
U �
d � 0 w-gg to m N
W to .3 O z z
°0 g z z v v " I
Of to
= F W W vI
O a 0 a a N
0 a a
CL "' 3 w
F
Q. W J
v 3 m LL
J
J
� c O
C9 N w CO C'
w Y Q
Q
w N
om y^ O
O Z
ED =
N rn� O
w `} O
C �� m • U
W rr
.to V)
'O c 2.0 O U Z Q
N w d o3m S U
t
In
4'
C9
O
U
azlxnn z NHOf
A
z
J O
N
F
tu t O
N
z
W r^^N
z x
Z 3a U) 4
O 0 xgv
E z JN
Q 0 Y p
0 U
z
Z M
O
i
F—
U
w
a o
J Q�
K x ^
F W0
LU LL r-o
w 000
o �z3 ,
O ti m
_^o
O
O
L
r,
U)
LL O <
E
� O z O N H
d5"fdfuuo to L w
w
c��� 0
x _
_ / ...... W O w
J w�3D� LOU Z f-
tD N = 0 W
U
l i
C9
J O
i
�a
r;
-M C996-x TO W.9 M - M
` 1 1 1, w 1 -__ 1 -
WWI F1�IV'I xa 1
l'L7 � l Vit/
,gyp VY� m uj_ _ H
_...- ....i t
ZW N O
(! W
xga
�zaN
no
zo
ljl� x
..
SO o
w ui
LLJ
W
o0CO
�Q � � i i p �z3� oo N M 0,rn
� Mdi I i I
o zIlkNvsso� o10
! E
i!t
i i f i
to
TA
O
}}( W z Q W W
Qf I H_jJ > z
O �7 6S f[xSS,.B_ - Lu-11-0 Q
Z oo ti Ute`
M I Ll1 ^ ^
x U 0 0 O
a W w w
X
_j a CL a W
j 0- rn
c
f v N N
/ o v! LL
Lr) U N W r W
/ Y n
ino O LL Q N Q
Q7 df°„ffu'`D p Z O r� Q
D En
/ CP
x 0 Ea
a � O W vCj
'^
w Q
yy'
i S
/
M C996-XTDM.9 M M
liv2LL
Ln
,
W ) �liv .i.
,-�z'r .• "i _-s"� ,.. �.-.� T-.-s, -. _ = a 7 I��4CI� _. f C x 0-3-
00-3N -
i
z
f u
Zl�s� i MID � � _ - J �G � � w
I . _� I, f _ (1) 0,J o f a
} } w
t
III
w w o
aF _CPO
U)
w N o
oo� ILL
�
Ell il- ( i �. a-fro .�-� U)
=rla
o 4N V-1 lw! N� s l o'a I v I N M
- °z
_ 1 - o
i1i { I
r ,
fIIv L EINVZ�IBZI
' I
W W
w O O
z s
_jJly-I.L J)IV'I c dv znB
n
s
f
-
0 � W W W
�
W W W
bs�sr ss s
as 'f _ z �—
I� z 0 U) U) CO
x w C a E- f-
(D O O ro va
w x x
I Gi
a- Lll W
, � J
/ % J
d
/ c 0
C =0 9N a p m /�
ma O N V
0°-O Z O t i-
H
DEnQ J }
,l c win nt�rn Z 0
% I N N = Z Q LLI ty
f �
t
�S-
�.,;-.1 M C986-X' � .9 m M
PMi
E O 0
�� I e N
uj
za
za
_ r
11C .L (H)I V ✓ I .. 1 I _. w X L o W IijtH
' ID
nCL to
O
- - - w Iz-Hry m a a
o
OD
> >
tD tD
o I z
gg
IIV2I �72
,« "T
Sf E
s'
t
{
k
>
0 F—
W i
E bscerxss.,a _ W C� F— Q
zLL a
3
E uj LL
J
dp�
CL a O
F- I- I- 0 2 r-n
J J J Z Z J N LU
Z W QM N
Q Wm
N LL
S Q Q Q U U U C m��N W O V Q
Z W W S W �yix . `v _m
Q 2 S
d N 3 w(n^gym U
a U d Q d W Z Z Z D D w
Q U U U Q Q Q N W d o 02 30o N = Z Q X p
N N t` M CV = J J J Z Z Z L >a�o�. a O W t�^,
LL J LL C�1 (n (q U Q Q Q CSA vJ
N
V, p J M J d' V N M U U ~ -
U
O
�2 Lco) M
I c a
{
£996-X TO M.9 M ! k,
_ � aI I! N
I w ffno
F J-u"N
LLJ
F a
x
! i
4 r � c o
r W €I l �Vldl k I a', m
I
I i�
IN
ql
II 'II�2I LI 3
awo
a X D o
u wu-
w oo�
o0z OD
Ln L
i U
I o
1!
tvwl
( w
kk
I � � 1 k � I i � � i f ( f • 1�! I�.�� !
I
I iI
I
! �,,P CIE I. ! l I • ( � 1 � { � �Z'
k
E
t
f
Rf
til �xz ax�zzns J
CD
UJi
k _ —
ffjj
ULE I-XMJ .-_ o
1 ,_1a� M € W
- C
F 65l£1-�Ss„8 J
/ u
CO
CL LO 06 Z
v
i o U) Ur
r w ,x
O Z < N 06 = w
U
m� t U
Cr�o }
O LU G N — w m w
>w-Vpz N p W w
UR tiu�.m LL LL w
w
U)
Cb �-
iN �/-
�, o
I
I
III
11
mv�?
` Q If
N
rW o
14
Z `nN
WIC$ I o l jF j I w y ni
z K vi
goo II�'2I.L �Q o 0 x`"
Al
0 0
2 Z
o 4� a 4hI fII
G f
U
f J
-7 I'-1I�� IIE !Y I U)1,. o wLLL
z
af LL
Ji N o o I
Iho id� U Q'D 1 F—
HLLI
o s"'` $ S r�s2� ��� w�Kj X W o N ao
z
Ada00
O
f -
00
3 z 3:.,
_ � t .. 0 u ao
o
110
1
I I I I II i
NIVZ,H)OZ I
if
f 1 �—
�. Al � }
if
� y I ' w
k i
Q$ Z UJ
y1mig
I g
i
r�
e ggg E
co V/
if
Z OO
IP
M t ":
po o a a
E I } w
rx I w
. f -
UO 42 43-Jackson Constmetion
DAP-IUDPROPOSAL
Pagel of4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
BidlistUnit of Bid
Item No. Description Specification Section No. Measure Quantity Unit Price Bid Value
UNIT I:WATER IMPROVEMENTS
1 3311.02418"Water Pipe 3311 10 33 11 12 LF 8876 $22.00 $195,272.00
2 3312.0001 Fire Hydrant 33 12 40 EA 9 $3,675.0 $33,075.00
3 3312.20031"Water Service 331210 EA 219 $905.00 $198195.00
4 3312.3003 8"Gate Valve 33 12 20 EA 30 $1,200.00 $36,000.00
5 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 3 $900.00 $2,700.00
6 3311.0001 Ductile Iron Fittings w/Restraint 3311 11 TON 2.13 $10,000.00 $21,300.00
7 3305.0109 Trench Safety 33 05 10 LF 8876 $0.10 $887.60
8 0241.1100 Remove Asph Pvmt 0241 15 SY 90 $5.00 $450.00
9 3201.0201 Asphalt Pvmt Repair Beyond Defined Width,Residential 3201 17 SY 90 $82.00 $7,380.00
10 3305.0003 8"Waterline Lowering 33 05 12 LF 23 $280.00 $6,440.00
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
-
33
34
36
37
38
39
40
TOTAL UNIT I:WATER IMPROVEMENTS $501,699.60
CUYOFFORT WORTI{
STANDARD CONSTRUCTION SPECIRCATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Proposal F.—Unit Price(Jack..)
004243-hck—Con don
DAP-BID PROPOSAL
Page 2 of4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value
Item No. Measure Quantity
UNIT 11:SANITARY SEWER IMPROVEMENTS
1 3331.4115 8"Sewer Pipe 33 31 20 LF 7971 $27.00 $218,617.00
2 3339.1001 4'Manhole 33 39 10,33 39 20 EA 32 $3,200.00 $102,400.00
3 9999.0001 Connect to Existing SS EA 2 $1 800.00 $3,600.00
4 3331.31014"Sewer Service 33 31 50 EA 219 $615.00 $134,685.00
5 3301.0002 Post-CCN Inspection 3301 31 LF 7971 $2.00 $15,942.00
6 3301.0101 Manhole Vacuum Testing 3301 30 EA 32 $200.00 $6,400.00
7 3305.0109 Trench Safety 33 05 10 LF 7971 $1.00 $7,971.00
8 9999.0002 Cement Stabilized Backfill LF 260 $65.00 $16,900.00
9 3339.0001 Epoxy Manhole Liner 33 39 60 VF 92 $210.00 $19,320.00
10 9999.0003 Sanitary Line By Bore LF 298 $130.00 $38,740.00
11 3339.1003 4'Extra Depth Manhole 33 39 10 VF 125 $250.00 $31,250.00
12 0330.0001 Concrete Encase Sewer Pipe 03 30 00 LF 298 $65.00 $19,370.00
13
14
15
16
17 -_
18
19
20
21
22
23
24
25 .
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
TOTAL UNIT It:SANITARY SEWER IMPROVEMENTS $615,195.00
CITY OP FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Proposal Form Unit Pk.(3ackson)
004243-Jackson Crrs ction
DAP-RID PROPOSAL
Page 3 of4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value
Item No. Measure Quantity
UNIT III:DRAINAGE IMPROVEMENTS
1 3341.020121"RCP,Class III 3341 10 LF 194 $61.00 $11,834.00
2 3341.0205 24"RCP,Class III 3341 10 LF 1007 $70.00 $70,490.00
3 3341.0208 27"RCP,Class III 3341 10 LF 12 $78.00 $936.00
4 3341.0302 30"RCP,Class III 3341 10 LF 193 $89.00 $17,177.00
5 3341.0402 42"RCP,Class 111 3341 10 LF 50 $157.00 $7,850.00
6 9999.000421"Sloping Headwall EA 1 $1100;$4,100.00
00 $1100.00
7 9999.000530"Slo in Headwall EA 3 $5100.00
8 9999.0006 42"Sloping Headwall EA 1 $2,200.00
9 3349.01044'Stacked Manhole 33 49 10 EA 3 $12,000.00
10 3349.5001 10'Curb Inlet 33 49 20 EA 8 $32,800.00
11 3349.500215'Curb Inlet 33 49 20 EA 4 $22 000.00
12 3349.5003 20'Curb Inlet 334920 EA 1 . $7,800.00
13 3305.0109 Trench Safety 33 05 10 LF 1456 $1.00 $1,456.00
14 3137.0104 Medium Stone Ri ra ,dry 31 37 00 SY 586 $49.00 $28,714.00
15 9999.0007 Outlet Structure EA 2 $19,700.00 $39,400.00
16 3213.03014"Con;Channel Lining 32 13 20 SF 5775 $7.00 $40,425.00
17 3137.0105 Medium Stone Riprap,grouted 31 3700 SY 80 $79.00 $6,320.00
18
19
20
21
22
23
24
25
26,
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
TOTAL UNIT III:DRAINAGE IMEROVEMENTS1 $307,602.00
CITY OF PORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Vcrsim September 1,2015 00 42 43 Proposal Fonn Unit Price(Jackson)
GO 42 43-Jack—Construction
DAP-Bm PROPOSAL
Page 4 of4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Description Specification Section No. Unit re Bid Unit Price Bid Value
Item No. Measure Quantity
Bid Stuntuary
UNIT I:WATER IMPROVEMENTS $501,699.60
UNIT II:SANITARY SEWER IMPROVEMENTS $615,195.00
UNIT III:DRAINAGE IMPROVEMENTS $307,602.00
Total Construction Bid $1,424,496.60
Contractor agrees to complete WORK for FINAL ACCEPTANCE within :180_ calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
.CrIY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Proposal Fom,Unit Price trackson)
00 42 43-JLB Contracting
DAP-BID PROPOSAL
Page 1 ora
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
_ BidlistUnit of .Bid -
Item No. Description - Specification Section No. Unit Price Bid Value
Measure I Quantity
UNIT IV:PAVING IMPROVEMENTS
13213.0101 6"Conc Pvmt1321313 Sy 28371 $31.31 $888.296.011
2_ 3213.0302 5"Cone Sidewalk 1321320 SF 1 103601 $4.731 $49,002.80
3
13211.05016"Lime Treatment 1321129 Sy 1 312081 $2.251 $70,218.00
4— 3211.0400 Hydrated Lime 1321129 TON 1 625 $160.001 $100,0o0.001
5 13216.0101 6"Concrete Curb and Gutter 1321613 LF 1 178171 $2.051 $36,524.851
6 13213.0501 Barrier Free Rams Type R-1 321320 EA 3 $1,100.001 $3300.00
7 13213.0504 Barrer Free Ramp,Type M-2 1321320 EA 22 $800.001 $17,600.001
8 -3213.0506 Barrier Free Ram ,Type P-1 1321320 EA 26 $685.001 $17,810.001
9 9999.XXXX Type III Barricade EA 2 $1,090.001 $2,180.001
10 3212.0302 2"Asphalt Pvmt Type D 1321216 Sy 1 226 $15.331 $3,464.581
11 13212.05014"Asphalt Base Type 8 1331216 Sy 1 226 $31.731 $7,170.98
12
13
14
15
16
17 --
- ----------------------------.....----...........--...-------- -..... ----- - --—...-- -------------- --- -- -------
19
-----2-O0-..._.__.....-----
..--- --_--- ------
21 - -
22
24
25
26 - -� - -- -- -
-- - ----------- ------------
28
29 -
32 — ---- --
33
35
_. 36
37
39
40 — --- - -
4S-
44
3-44 - - -
TOTAL UNIT IV:PAVING IMPROVEMENTS $1,195,567.22
t ,
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1.2015 00 42 43 Proposal Form Unit Price(JLB)
004143-JLB Contracting
DAP-BID PROPOSAL
Page 1 af3
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID ' Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist - _
Item No. - Description Specification Section No. Unit of Bid -
Measure Quantity Unit Price Bid Value
UNIT V:OFFSITE PAVING
3213.0102 7"Conc Pvmt 32 13 13 SY 728
2-= 3213.0302 5"Conc Sidewalk321320
$40.27 $29316.5
3211.05016"Lime Treatment321129
6
32 13 20 SF 100 $4.73 $473.00
32 11 29 SY
3 _�
4 -_ 3211.0400 H drated Lime 801 $2.25 $1802.25
-- 29
5 3216.01016"Concrete Curb and Gutter 32 11 TON 16.02 $160.00 $2563.20 16 13 LF
6 9999.XXXX Remove Barricade 375 $2.05 $768.75
7— 1 $108.00. $108.00
8 -- - _
12 - --- --_ —__--_ - --- -i - -_ - -- __
--
16 --
17 -
_-.----_
--- v _.._... `-�
24
25 — -
26
----
zw -
30 --_. --_ -- _
31 _
---.....__.._.. — ..... ---._...........
33 ---
34
35 -- -
----- -------------------
40 -- --------------
41 --
42 -- -—
43
UNIT V:OFFSITE PAVING $35,031.76
t
t
CrTY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015
00 42 43 Pmpuml Fom Unit Price(,LB)
00 4243-ILE Conhmting
DAP-BE)PROPOSAL
Poge 3 of 3
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project it Information Bidder's Proposal
Bidlist
Item No. Description Specification Section No. Unit of Bid -
Measure Quantity Unit Price Bid Value
Bid Summary
UNIT IV:PAVING IMPROVEMENTS �$1230,598.98
67.22
UNIT V:OFFSITE PAVING 31.76
Total Construction Bidff��
Contractor agrees to complete WORK for FINAL ACCEPTANCE within MQ.-.'--- calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions. "
END OF SECTION
c
1 �
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Foam Version September 1,2015
0042 43 Pmpomf Fono Unit Price(JLB)
004243
DAP•BID PROPOSAL
P.Se 1 of I
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item hrm
foration Bidders Proposal
Bidlist Item
No. . Description Specification Section No. Unit of Bid Measure Quantity Unit Price Bid Value
UNIT VI:ELECTRIC IMPROVMENTS
1 3441.3351 Furnish/Install Rdwa Ilium TY 11 Pole 34 41 20 EA 20 3496 $69 920.00
2 2605.3015 2"CONDT PVC SCH 80 26 05 33 LF 1123 $7.55 $8478,65
9999.XXXX#8 Aluminum Cable LF 1123 $1.51 $1 695.73
4
5 --— — --—
12
13 --
14 ---
_15
16
17 _
19 ----- -- -:-
23 _._---- ----— - -
24 — - - - - -
-
_ _2
30
------ - ---------------._...--------- .....---. - --- - ---- — -...........--- - ------------
-32
34
35 _--
----._......---------- - .._.. -- ------ ----------------
----._.-
38 ..-----..._...---...—..- -------- -_.---.._..__._..-___... .----...._
-39 ... .-.-..____..-..-
40
41
UNIT VI:ELECTRIC IMPROVMENTS $80,094.38
UNIT VI:ELECTRIC IMPROVEMENTS $80,094.38
Total Construction Bid $80,094.38
Contractor agrees to complete WORK for FINAL ACCEPTANCE within `I80_,.� calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
f
CRY OF FORT WORTH ,
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPERAWARDED PROJECTS
Form Vmim September 1,2015
00 42 43 Pmpossl Form Unit Price(Indcpmdm1)