Loading...
HomeMy WebLinkAboutContract 37036-A2 AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. I __A a, (M&C Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and TranSystems Corporation d/b/a TranSystems Corporation Consultants, (Engineer) made and entered into City Secretary Contract No. 37036, (the Contract) which was authorized by the City Council by M&C C-22766 on the 15th day of April, 2008 and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Storm Water and Franchise Utility Relocations for the Trinity River Vision-Central City Project and Trinity Uptown Service Area, Phase 1A - Bridge and Channel Relocations. WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, of the Contract is amended to include the additional engineering services specified in M&C C-242791 adopted by the City Council on the 22nd day of June, 2010 and further amplified in a proposal letter dated April 22, 2010, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $118, 979. 00. 2 . Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $2, 965, 479. 00 . 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the / day of -"111, 2010, in Fort Worth, Tarrant County, Texas. p4 tiA y a o'l, °R r� �� AT E o° %J. 0 V� O r y Hendrix o o 0d� "'City Secretary �� 00 c 0 0° a 0000 0 APPRO RE D: APPROVED: nd#Z H wood, D'rector Fernando Costa Program Management Office Assistant City Manager TRANSYSTE4S CORPORATION d/b/a TRANSYSTEMS__CORPQRA,TION CONSULTANTS Engineer By: Contract Authori.zatiox Name:Raul Pena III, P.E. , Principal I 500 W. 7t' Street, Suite 600 Fort Worth, TX 76102 Date APPROVED AS TO FO LEGALITY: Assistant City Att rney R -2- �Systenls� TranSystems Bank of America Building 500 West 7"Street Suite 1100 Fort Worth,TX 76102 Tel 817 339 8950 Fax 817 336 2247 www.transystems.com AMENDMENT NO. 2 SUMMARY OF DESIGN FEE April 22,2010 Mr.Liam Conlon Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102-6311 RE: Amendment No.2 Trinity River Vision Zoning Legal Descriptions and Police Impound Lot Relocation Dear Mr.Conlon, This letter presents our proposal for additional services with respect to the above referenced project for your consideration. Per the request of the City,this proposal is specifically for the following tasks: • Research,field survey,and preparation of legal descriptions for the proposed zoning districts within the Trinity Uptown area of the Trinity River Vision project. • Survey,design and permitting for the proposed Police Impound Lot to be located on the landfill area south of the Brennan Avenue Service Center. Specific Information and fee breakouts for each project are presented below. Zonlnty lepal Descriptions TranSystems will provide the legal descriptions in accordance with the Comprehensive Land Pian that has been developed for the area. We will contract directly with the DBE firm of Spooner&Associates for assistance with field survey and exhibit preparation. Below is the itemized breakout of the specific services 1. Project Management Lump Sum $ 685 2. Deed and Property Research Lump Sum $ 1,715 3. Preliminary Mapping Lump Sum $ 1,030 4. Field Surveying Lump Sum $ 3,700 • Systems\. April 22, 2010 Page 2 of 3 5. Legal Description Preparation Lump Sum $ 3,300 6. 10%Admin.Fee on Sub-consultants Lump Sum $ 700 7. Project Expenses Lump Sum $ 50 Total Additional Costs: Police Impound Lot Relocation TranSystems will provide topographic surveying,civil engineering design,electrical and lighting design,and landscaperrrigation design for the proposed impound lot. We will contract directly with the following sub consultants for the services listed: 0 Chiang,Patel&Yerby(MWBE)for the provision of electrical engineering and lighting design; • LTS Design Group(MWBE)for the provision of landscape and irrigation design; • CMJ Engineering for the provision of geotechnical investigation. Below is the itemized breakout of the specific services 8. Site Investigation and Research Lump Sum $ 4,020 9. Exhibits and Schematic Plan Development Lump Sum $ 6,540 10. Property Rezoning Application and Representation Lump Sum $ 1,800 11. Topograhic Surveying Lump Sum $ 4,315 12. Geotechnical Investigation Lump Sum $ 7,825 13. Lighting and Electrical Design Lump Sum $21,500 14. Landscape and Irrigation Design Lump Sum $22,615 15. Site Pians and Specifications Lump Sum $21,390 16. SW3P Preparation Lump Sum $ 2,510 17. Permitting(TCEQ and Floodplain) Lump Sum $ 3,980 18. Review Meetings Lump Sum $ 3,440 19. Construction Services Lump Sum $ 1,220 20. 10%Admin.Fee on Sub-consultants Lump Sum $ 5,194 21. Project Expenses Lump Sum 1,450 Total Additional Costs: Summary of Contract Amendments Original Contract Fee: $ 946,500.00 Amendment No. 1: $1,900,000.00 Amendment No.2: $ 118,979.00 TOTAL.CONTRACT $2,965,479.00 G:1FW08"51ProjectMgmtIContractsW amendment 2R_Zoning-Potioe Impound.doc JWF�Y�Sgt Ills April 22,2010 Page 3 of 3 The above work effort will be accomplished for the total lump sum fee of$118,979,00, This amount includes 43%being provided to our MWBE sub consultant. Please contact me should you require any additional Information. Sincerely, TranSystems Corporation Consultants . -Craig P.Schellbach,P.E. Municipal Services Manager Attachments G:TW0810305V'roJe ftrdConhdsVtlr emendmenL 2R.Zoning-Pdlce Impo uid.doc M&C Review Page 1 of 3 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FORT I, COUNCIL ACTION: Approved on 6/22/2010 - Ord. No. 19193-06-2010 DATE: 6/22/2010 REFERENCE NO.: **C-24279 LOG NAME: 02TRVSWA2-TRANS CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize the City Manager to Execute Amendment No. 2 in the Amount of$118,979.00 to City Secretary Contract No. 37036 with TranSystems Corporation, d/b/a TranSystems Corporation Consultants, for Design of Improvements for Phase II of the Police Auto Pound and Fleet Operations as Part of the Relocation Projects for the Trinity River Vision and Adopt Appropriation Ordinance (COUNCIL DISTRICTS 2 and 9) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the City Manager to execute Amendment No. 2 in the amount of$118,979.00 to City Secretary Contract No. 37036 with TranSystems Corporation, d/b/a TranSystems Corporation Consultants, for design of improvements for Phase 11 of the police auto pound and fleet operations as part of the relocation projects for the Trinity River Vision; 2. Increase the Contract amount to $2,965,479.00; 3. Authorize the transfer of$118,979.00 from the General Fund to the Specially Funded Capital Projects Fund; and 4. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Specially Funded Capital Projects Fund by $118,979.00 from available funds. DISCUSSION: On April 15, 2008, (M&C C-22766) the City Council authorized an Engineering Agreement in the amount of$946,500.00 with TranSystems Corporation, d/b/a TranSystems Corporation Consultants, for storm water and franchise utility relocations for the Trinity River Vision-Central City Project and Trinity Uptown Service Area, Phase 1A - Bridge and Channel Relocations. The Agreement was subsequently revised by Amendment No. 1 (M&C C-23915, November 17, 2009) in the amount of $1,900,000.00 to provide for the addition of the necessary scope of services for Phase 1 B of the project. The proposed Amendment No. 2 brings the total Contract amount to $2,965,479.00. Amendment No. 2 to the Contract will provide for the following: Engineering and design services for the police auto pound and fleet services - Phase II expansion. The auto pound facility was relocated last year from Northside Drive to its current location behind the Brennan Avenue Service Center (2530 Brennan Avenue) in order to provide for current and future operational needs of the City and also provide valley storage for the project at the previous location of the auto pound; and Research, field survey and preparation of legal descriptions for the proposed zoning districts within the Trinity Uptown Area of the Trinity River Vision Project. Tran Systems Corporation, d/b/a Tran Systems Corporation Consultants, proposes to provide the additional services for a lump sum fee of$118,979.00. Funding for the additional services covered by this Amendment will be provided by the Police Auto Pound Operating Budget. City staff considers the amount of the consultant's proposal to be fair and reasonable for the scope of services to be performed. http://apps.cfwnet.org/council packet/mc_review.asp?ID=13458&councildate=6/22/2010 6/25/2010 M&C Review Page 2 of 3 In order to construct the Trinity River Vision - Central City Project, it is necessary to relocate conflicting water, sewer, storm water, electrical, gas utilities and some facilities. To expedite the relocation of the storm water improvements and franchise utilities prior to the construction of the Trinity River Vision (TRV) Projects, the proposed project was divided into the following phases for design and construction purposes: 1. Storm water and franchise utility relocations for the Trinity River Vision - Central City Project and the Trinity Uptown Service Area, Phase 1A— Bridge and Channel Relocations; 2. Storm water and franchise utility relocations for the Trinity River Vision - Central City Project and the Trinity Uptown Service Area, Phase 1 B— Bridge and Channel Relocations; 3. Storm water and franchise utility relocations for the Trinity River Vision - Central City Project and the Trinity Uptown Service Area, Phase 2— Mitigation Areas; and 4. Storm water and franchise utility relocations for the Trinity River Vision - Central City Project and the Trinity Uptown Service Area, Phase 3 - Bypass Tie-ins, University Drive, Isolation Gates and Samuels Avenue Dam. In addition to these utility relocation needs, staff also identified the need to relocate the auto pound and fleet services operation of the Police Department to the Brennan Service Center. This replaces the auto pound facility relocated for fill and flood storage with a centrally located shared facility on existing City property. TranSystems Corporation, d/b/a TranSystems Corporation Consultants, is in compliance with the City's M/WBE Ordinance by committing to an additional 37 percent M/WBE participation on this Amendment No. 2. The City's goal on this amendment is 20 percent. The overall project is located in COUNCIL DISTRICTS 2 and 9; however, the services to be provided in this particular amendment are located in COUNCIL DISTRICT 2, 8 and 9 and the facility will serve residents in ALL COUNCIL DISTRICTS. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Specially Funded Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers C291 472001 309280096933 $107.799.00 C291 531200 309280096933 $107.799.00 U $11.180.00 3D $11.180.00 C291 472001 309280096951 C291 531200 309280096951 2D $107,799.00 1)) GG01 538070 0357201 $107.799.00 C291 472001 309280096933 21) 1)) GG01 538070 0357201 $11,180.00 C291 531200 309280096933 $107,799.00 C291 472001 309280096951 $11,180.00 C291 531200 309280096951 $11.180.00 Submitted for City Manager's Office by: Fernando Costa (6122) http://apps.cfwnet.org/council_packet/mc review.asp?ID=13458&councildate=6/22/2010 6/25/2010 M&C: Review Page 3 of 3 Originating Department Head: Randle Harwood (6101)Jeff Halstead (4210) Additional Information Contact: Mark Rauscher (2446) Monique Lee (4221) ATTACHMENTS PDC Request TranSystems Site Map 03 22 10 pdf TransSystems.App Ord.doc http://apps.cfwnet.org/council_packet/mc_review.asp?ID=13458&councildate=6/22/2010 6/25/2010