HomeMy WebLinkAboutContract 32006 FORTWORTH Cl
SECRETARY Rj aa QSS.NT
i
��iyJ����II �.7pp�//���^f1�p��P9��
CONTRACT NO. �.,- �� .AO
1
SPECIFICATIONS
AND
CONTRACT DOCUMENTS ►�' ,; ,;;''�
FOR
n � �11F
PLAYGROUND IMPROVEMENTS AT:
COBB SOUTH PARK 'S";t`-, �-i1--`' -,0i Ii7 7iNG CO.
SEMINARY HILLS PARK
TADLOCK PARK i iC i G 'y` :. ~Y
SOUTH Z. BOAZ PARK T
PROJECT NAME PROJECT NUMBER D.O.E. NO.
COBB SOUTH PARK C280/541600/808480003130 #47.53
SEMINARY HILLS PARK C280/541600/809480002930 #4754
TADLOCK PARK C280/541600/808480003230 #475.5
SOUTH Z. BOAZ PARK C280/541600/803480003030 #4756
IN
THE CITY OF FORT WORTH
TEXAS
MIKE MONCRIEF CHARLES BOSWELL
MAYOR CITY MANAGER
RANDLE HARWOOD, ACTING DIRECTOR
PARKS AND COMMUNITY SERVICES
PARKS AND COMMUNITY SERVICES DEPARTMENT
PLANNING AND RESOURCE MANAGEMENT DIVISION
w
FUNDING OF PROJECT BY
CITY OF FORT WORTH
2004 CAPITAL IMPROVEMENT PROGRAM
i
FORTWORTH ZQSSNTHF`N1
C:f i�' �CR�T��1� ff#:
CONTRACT NO. rS lv
SPECIFICATIONS
AND
CONTRACT DOCUMENTS ;NI
FOR
PLAYGROUND IMPROVEMENTS AT:
COBB SOUTH PARK,
SEMINARY HILLS PARK
TADLOCK PARK ''ii
SOUTH Z. BOAZ PARK
w.. �T
PROJECT NAME PROJECT NUMBER D.O.E. NO.
COBB SOUTH PARK C280/541600/808480003130 #47.53
SEMINARY HILLS PARK C280/541600/809480002930 #4754
TADLOCK PARK C280/541600/808480003230 #4755
SOUTH Z. BOAZ PARK C280/.541600/803480003030 #4756
IN
THE CITY OF FORT WORTH
TEXAS
MIKE MONCRIEF CHARLES BOSWELL
MAYOR CITY MANAGER
RANDLE HARWOOD, ACTING DIRECTOR
PARKS AND COMMUNITY SERVICES
PARKS AND COMMUNITY SERVICES DEPARTMENT
PLANNING AND RESOURCE MANAGEMENT DIVISION
FUNDING OF PROJECT BY
CITY OF FORT WORTH
2004 CAPITAL IMPROVEMENT PROGRAM
FORT WO.Wf H
,l-
ADDENDUM #1 f
Playground Improvement`at Cobb Sou h, Seminary Hills, Tadlock and South Z. Boaz
Parks
M
January 11, 2005
TO ALL BIDDERS:
Please attach to your specifications: This addendum is hereby made a part of the
Contract Documents and is issued to modify explain or correct the original drawings
and/or project manual.
PROJECT MANUAL
REFER TO PROPOSAL
Replace Sheet 11 with attached Sheet 11. The purpose of this revision is to modify
Section D to indicate the use of 2002 AGC North Texas Construction Industry Wage
Survey instead of indicated City of Fort Worth Building and Construction Trades
Prevailing Wage Rates for 2000.
END OF ADDENDUM #1
Bid Opening Date: Thursday, January 20, 2005.
Acknowledge the receipt of this Addendum on your Proposal.
By:
Sc tt E. enn, Project Manager
Release Date: January 11, 2005
QPQKS&CO/�P
ty,yS 1N THP '7/J
PARKS AND COMMUNITY SERVICES DEPARTMENT
THE CITY OF FORT WORTH * 4200 SOUTH FREEWAY, SUITE 2200 * FORT WORTH, TEXAS 76115-1499
(817) 871-PARK * FAx (817) 871-5724
Q� Printed on recycled paper
A. This contract is issued by an organization that qualifies foi exemption pursuant to the provisions of Article 20.04 (F)
of the Texas Limited Sales, Excise and Use Tax Act.
B. The Contractor performing this contract may purchase, rent or lease all materials, supplies, equipment used or consumed in
the performance of the contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption
certificate complying with State Comptroller's ruling tax, said exemption certificate complying with State Comptroller's
ruling#95-0.07. Any such exemption certificate issued by the Contractor in lieu of the tax shall be subject to the
provisions of the State Comptroller's ruling#95.09 as amended to be effective October 2, 1968.
C. The undersigned assures that its employees and applicants for employment and those of any labor organization,
subcontractor or employment agency in either furnishing or referring employee applicants to the undersigned are not
discriminated against as prohibited by the terms of City Ordinance 7278, as amended by City ordinance 7400 (Folt Worth
City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices.
D. The undersigned agrees to complete all work covered by these contract documents within Sixty five(65)Working Days
after the date for commencing work as set forth in the Notice to Proceed to be issued by the Owner and to pay not less than
the 2002 AGC North Texas Construction Industry Survey.
E. Within ten (10)days of receipt of notice of acceptance of this bid, the undersigned will execute the formal contract and will
deliver applicable Surety Bonds for the faithful performance of this contract. The attached deposit check in the sum of$
Dollars($ ) is to become the property of the City of Fort Worth, Texas, or the attached Bidder's Bond is to be
forfeited in the event the contract and applicable bonds are not executed within the time set forth, as liquidated damages for
delay and additional work caused thereby.
F In the case of ambiguity or lack of clearness in stating prices in the Proposal,the City reserves the right to adopt the most
advantageous price for construction thereof to the City or to reject the proposal.
G. Receipt is hereby acknowledged of the following addenda:
No. I No. 2 No. 3 No. 4
Respectfully submitted,
(Company Name)
By(Authorized Signature)
Date:
Address:
Telephone: ( )
SEAL(if corporation)
PROPOSAL
- il -
oR14
Not Itor
WW
Home I Council Agenda I M&C Employee Directory I Morning Report Ads PRS IT Online I Departments I Site Map i
Print M&C
E
COUNCIL ACTION: Approved on 5/10/2005 - Ord. #16427-05-2005
DATE: 5/10/2005 REFERENCE NO.: C-20729 LOG NAME: 80J&J SPRINKLER
CODE: C TYPE: NON-CONSENT PUBLIC HEARING: NO
=SUBJECT: Authorize the Execution of a Contract with J&J Hardscape, Inc., for Playground Renovations at
Cobb South, Seminary Hills, Tadlock and South Z. Boaz Parks, Adopt Appropriation Ordinance
and Authorize the Acceptance of a Donation from the Fort Worth Independent School District for
Seminary Hills Park
RECOMMENDATION:
It is recommended that the City Council:
u 1. Authorize the City Manager to execute a contract with J&J Hardscape, Inc. in the amount of$350,362.80
for playground renovations at Cobb South, Seminary Hills, Tadlock and South Z. Boaz Parks;
2. Adopt an appropriation ordinance increasing estimated receipts and appropriations by $15,000.00 in the
Park and Recreation Improvements Projects Fund from available funds; and
3. Authorize the City Manager to accept a donation from the Fort Worth Independent School District in the
amount of$15,000.00 for additional improvements at Seminary Hills Park.
DISCUSSION:
On March 30, 2004, (M&C G-14319), the City Council adopted the proposed six year implementation
schedule for the 2004 Capital Improvement Program. At that time, $3,226,000 was allocated for replacement
of deteriorated playgrounds in Proposition 2 (Parks, Recreation and Community Services Improvements)
with $350,000 allocated for year one playground replacement at Cobb South, Seminary Hills, Tadlock and
South Z. Boaz Parks, or$87,500 budgeted for each site. The Fort Worth Independent School District
(FWISD) donated $15,000 towards playground renovation at Seminary Hills Park, currently under lease to
the FWISD per Lease Agreement authorized by City Council on July 10, 2001, (M&C L-13088). This
agreement allowed for joint use of the premise as a public school/neighborhood park with the option for joint
development opportunities for public use. FWISD's allocation of$15,000 toward additional improvements
affirms the intent of the agreement.
The Parks and Community Services Department (PACSD) held public meetings with neighborhood groups
on July 13 and 15, 2004, to receive input and selection of the preferred playground prototype. Upon
selection of the preferred prototype, PACSD staff proceeded with preparation of the construction
documents. This project was advertised for bid in the Commercial Recorder on December 30, 2004 and
January 6, 2005. On January 20, 2005, the following bids were received:
BIDDER BASE BID BID ALTS. TOTAL
Eagleton Construction, Inc. $304,158.00 $34,115.00 $338,273.00
J&J Hardscape, Inc. $322,287.60 $28,075.20 $350,362.80
Parks for Play, Inc. $333,020.20 $42,534.50 $375,554.70
Cole Construction, Inc. $349,333.90 $38,096.80 $387,430.70
Hardscape Construction Spec., Inc. $364,162.55 $29,070.95 $393,233.50
i
3
a,
Walk in the Park Construction $345,450.60 N/A N/A
Base Bid - (Units 1, 2,3 and 4)
11 Consist of site grading, demolition of existing facilities, installation of concrete walkway and play area and
playground area equipment at Cobb South, Seminary Hills, Tad lock and South Z. Boaz Parks.
Bid Alternate - Unit 6 (Seminary Hills Park)
Consist of the installation of 1150 square feet of 4' concrete walk, installation of 594 square foot shelter slab,
installation of 334 square foot of 5' concrete walk around shelter slab, purchase and installation of one 8'
ADA picnic table and two 6' picnic tables and the purchase and installation of shelter.
Bid Alternate - Unit 7 (Tadlock Park)
Consist of the purchase and installation of one 8'ADA picnic table, purchase and installation of two 6' picnic
tables and the purchase and installation of two cookers.
Due to a non-responsive bid turned in by the apparent low bidder, Eagleton Construction, Inc. -failure to
5 submit MWBE documentation, recommended award is based on the second low bidder, J&J Hardscape,
Inc.
s It is recommended that the Base Bid - Unit 1, 2, 3 and 4 in the amount of$322,287.60, and Bid Alternates
Units 6 - 1,3,4,5,6 in the amount of$25,575.20, Unit 7 - 2,3,4 in the amount of$2,500, totaling $350,362.80,
as submitted by J&J Hardscape, Inc., be approved for award of contract. The contract time is 65 working
I days.
In addition to the contract cost, associated contingency funding for construction inspection (3.5%), project
management (1.5%), and possible change orders (5%) is $21,200.00.
" M/WBE - J&J Hardscape, Inc. is in compliance with the City M/WBE Ordinance by committing to 47%
M/WBE participation. The City's goal on this project is 15%. There will be no annual budget impact
associated with the replacement of these playgrounds. Construction is anticipated to commence in June
2005, and be completed in September 2005.
Cobb South and Tadlock Parks are located in COUNCIL DISTRICT 8.
s Seminary Hills is located in COUNCIL DISTRICT 9.
South Z. Boaz Park is located in COUNCIL DISTRICT 3.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that upon adoption of the attached appropriation ordinance, funds will be
available in the current capital budget, as appropriated, of the Park Improvements Fund and the '78 Park and
Recreation Improvements Projects Fund.
t
TO Fund/Account/Centers FROM Fund/Account/Centers
GC23 488100 080230410320 15 000.00 C280 541600 808480003280 $77,508.20
GC23 541200 080230410320 $15,000.00 C280 541600 803480003080 $81,518.00
C280 541600 808480003180 $82,065.40
C280 541600 809480002980 $74,771.20
I GC23 541200 080230410320 $34,500.00
3
Submitted for City Manager's Office by: Libby Watson (6183)
Originating Department Head: Randle Harwood (Acting) (5704)
I Additional Information Contact: Mike Ficke (5746)
t,
ATTACHMENTS
80J&J SPRINKLER ORD.pdf
}
5
5
f
3
j
l
3
1
TABLE OF CONTENTS
1. NOTICE TO BIDDERS
t
2. SPECIAL INSTRUCTIONS TO BIDDERS
3. PROPOSAL
4. CITY OF FORT WORTH M/WBE ENTERPRISE SPECIFICATIONS
5. CITY OF FORT WORTH PREVAILING WAGE RATES
6. WEATHER TABLE
7. VENDOR COMPLIANCE TO STATE LAW
8. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION
9. PROJECT DESIGNATION SIGN
10. TECHNICAL SPECIFICATIONS
i
DIVISION 1 -GENERAL REQUIREMENTS
SECTION 01100-Summary of Work
SECTION 01135-Contract Time
SECTION 01140-Alternatives
SECTION 01150-Payment To Contractor
SECTION 01300-Submittals
SECTION 01400-Quality Control
SECTION 01410-Testing
SECTION 01500-Temporary Facilities and Controls
SECTION 01640-Product Options
SECTION 01700-Project Closeout
SECTION 01800-Contractor's Responsibility for Damage Claims
DIVISION 2-SITE WORK
Section 02200-Site Preparation
Section 02140-Site Underdrains
Section 02300-Earthwork
Section 02537- Engineered Wood Fiber Playground Surfacing
Section 02840-Turf Sodding
Section 02860-Playground Equipment
Section 02870-Site Furnishings
Section 02930 Seeding
' DIVISION 3-CONCRETE
Section 03300-Cast-in-Place Concrete
11. CERTIFICATE OF INSURANCE
12. BIDDER'S STATEMENT OF QUALIFICATIONS
13. PERFORMANCE BOND
14. PAYMENT BOND
15. MAINTENANCE BOND
16. CONTRACT
Y
3
NOTICE TO BIDDERS
; t
Sealed Proposals for the following:
PLAYGROUND IMPROVEMENTS AT: DOE NO.
COBB SOUTH PARK C280/541600/808480003130 #4753
SEMINARY HILLS PARK C280/541600/809480002930 #4754
TADLOCK PARK C280/541600/808480003230 #4755
SOUTH Z. BOAZ PARK C280/541600/803480003030 #4756
Addressed to Mr. Charles R. Boswell, City Manager of the City of Fort Worth, Texas, will
be received at the Purchasing Division Office until 1:30 p.m., Thurs., January 20, 2005
and then publicly opened and read aloud at 2:00 p.m. in Council Chambers 2n floor--
N.E. corner of City Hall. Plans, Specifications and Contract Documents for this project
may be obtained at the Park Planning section, Parks and Community Services
Department, 4200 South Freeway, Suite 2200, Fort Worth, Texas 76115-1499.
Documents will be provided to prospective bidders for a deposit of$50 per set; deposits
shall be made in the form of a check or money order. Each prospective bidder shall
receive a deposit refund on the first two plan sets if the documents are returned in good
condition within 10 days after bids are opened. Any additional plan sets shall require a
non-refundable deposit. These documents contain additional information for
! prospective bidders.
All Bidders will be required to comply with Provision 5159a of"Vernon's Annotated Civil
Statutes" of the State of Texas with respect to the payment of the prevailing wage rates,
and City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City
i
Code, Section 13-A-21 through 13-A-29) prohibiting discrimination in employment
practices.
1. Minority/Women's Business Enterprise Participation Goals
In accordance with the City of Fort Worth Ordinance No. 15530, the City of Fort Worth
has goals for the participation of minority business enterprises and women business
enterprises in City contracts. A copy of the Ordinance can be obtained from the M/WBE
Office or from the Office of the City Secretary. The bidder shall submit the MBE /WBE
UTILIZATION FORM, SUBCONTRACTOR/ SUPPLIER UTILIZATION FORM, PRIME
CONTRACTOR WAIVER FORM, GOOD FAITH EFFORT FORM and /or the JOINT
VENTURE FORM ("Documentation) as appropriate and must be received no later than
5:00 P.M., five (5) City business days after the bid opening date, exclusive of the bid
opening date. The bidder shall submit documentation at the reception area of the
managing department, Department of Engineering, 2nd floor, City Hall, and shall obtain a
receipt. Such receipt shall be evidence that the documentation was received by the
City. Failure to comply shall render the bid non-responsive.
The following list is provided to assist bidders in obtaining the services of M/WBE
vendors qualified to provide such services/materials for this project. A listing of qualified
M/WBE vendors may be obtained at the City of Fort Worth M/WBE office, 3rd floor City
Hall.
:
_x
Services/materials for this proiect are as follows:
demolition/site prep, grading/earthwork
install shelter sodding concrete
seeding steel rebar site furnishings
earthwork asphalt
The City's minimum MNVBE goal on this project is 15 % of the total dollar value of
this contract.
2. Prime Bidder Qualification Requirements
The City will evaluate all submitted bids based on criteria and qualifications to determine
award of contract as noted in Item 14. - Bidder's Statement Of Qualifications — Special
Instructions To Bidders and upon receipt of Bidder's Statement Of Qualifications form
included in this construction document. In general:
• The Prime Bidder, as general contractor or sub-contractor, must demonstrate
similar project scope experience on three (3) projects within the last three (3)
years. All subcontractors intended for use on this project shall also demonstrate
similar project scope experience necessary to successfully perform on their
respective portion of work on this project.
• The Prime Bidder must provide a list the surety company(s) which issued bonds
for projects listed above. Additionally, the Prime bidder shall list the surety
company intended for use on this project.
• The Prime Bidder must submit a current certified financial statement prepared by
an independent Certified Public Accountant.
• The Prime Bidder shall perform with its own organization and with the assistance
of work crews under its superintendence work of a value not less than fifty
percent (50%) of the project scope of work as per Section 8.1 of the standard
specifications for Street and Storm Drain Construction for the City of Fort worth.
Bidder Qualifications submitted to the Parks and Community Service Department
Project Manager must be received no later than 5:00 P.M., five (5) City business days
after the bid opening date, exclusive of the bid opening date.
3. Bid Addendum
Bidders are responsible for obtaining all addenda to the contract documents and
acknowledging receipt of the addenda by initialing the appropriate spaces on the
Proposal form. Bids that do not acknowledge receipt of all addenda may be rejected as
being non-responsive. Information regarding the status of addenda may be obtained by
contacting the Project Manager.
4. Pre — Bid Conference
A pre-bid conference will be held with prospective bidders at the Parks and Community
Services Offices Conference Room 2 on January 11, 2005 at 8:30AM.
3
5. AWARD OF CONTRACT
The City reserves the right to reject any or all bids and waive any or all formalities.
The City will award one contract with a combination of base bids and/or alternates
which is most advantageous to the City.
No bid may be withdrawn until the expiration of 55 calendar days from the day bids are
opened. The award of contract, if made, will be within 55 calendar days after the
opening of bids, but in no case will the award be made until all necessary investigations
are made as to the responsibility of the bidder to whom the contract will be awarded.
f
RANDLE HARWOOD, ACTING DIRECTOR CHARLES BOSWELL
PARKS AND COMMUNITY SERVICES DEPARTMENT CITY MANAGER
MARTY HENDRIX
CITY SECRETARY
By:
kle
Scot E. Penn, Senior/ Proj ct Manager
i
(81 871-5750
Thursday December 30, 2004
i Thursday January6, 2005
i
s
s
SPECIAL INSTRUCTIONS TO BIDDERS
t
1. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of
Fort Worth, in an amount of not less than 5 percent of the largest possible total of the bid
submitted must accompany the bid, and is subject to forfeit in the event the successful
bidder fails to execute the contract documents within ten days after the contract has been
E
awarded.
To be an acceptable surety on the bid bond, the surety must be authorized to do business
in the state of Texas. In addition, the surety must (1) hold a certificate of authority from
the Untied States secretary of the treasury to qualify as a surety on obligations permitted
or required under federal law; or (2) have obtained reinsurance for any liability in excess
of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of
Texas and is the holder of a certificate of authority from the Untied States secretary of the
treasury to qualify as a surety on obligations permitted or required under federal law.
Satisfactory proof of any such reinsurance shall be provided to the City upon request.
The City, in its sole discretion,will determine the adequacy of the proof required herein.
2. PROPOSAL: After proposals have been opened and read aloud,the proposals will be
tabulated on the basis of the quoted prices, the quantities shown in the proposal, and the
application of such formulas or other methods of bringing items to a common basis as
may be established in the Contract Documents.
The total obtained by taking the sum of the products of unit prices quoted and the
estimated quantities plus any lump sum items and such other quoted amounts as may
enter into the cost of the completed project will be considered as the amount of the bid.
j Until the award of the contract is made by the Owner, the right will be reserved to reject
any or all proposals and waive technicalities,to re-advertise for new proposals, or to
proceed with the work in any manner as maybe considered for the best interest of the
' Owner.
The quantities of work and materials to be furnished as may be listed in the proposal
forms or other parts of the Contract Documents will be considered as gpproximate only
and will be used for the purpose of comparing bids on a uniform basis. Payment will be
made to the Contractor for only the actual quantities of work performed or materials
furnished in strict accordance with the Contract Documents and Plans. The quantities of
work to be performed and materials to be furnished may be increased or decreased as
hereinafter provided,without in any way invalidating the unit prices bid or any other
requirements of the Contract Documents.
3. ADDENDA: Bidders are responsible for obtaining all addenda to the Contract
Documents prior to the bid receipt. Information regarding the status of addenda may be
obtained by contacting Parks and Community Services Department telephone number
indicated in the Notice to Bidders. Bids that do not acknowledge all applicable addenda
A{ will be rejected as non-responsive. (See Item G in the Proposal.)
4. AWARD OF CONTRACT: The Contract may not necessarily be awarded to the lowest
bidder of the Base Bid. The Parks and Community Services Department shall evaluate
and recommend to the City Council the best bid based on the combined benefits of total
SPECIAL INSTRUCTIONS TO BIDDERS
— 1 -
bid price and number of contract days allotted, as specified in the Proposal, and which is
considered to be in the best interest of the City.
Regardless of the Alternative chosen, the Contractor agrees to complete the Contract
within the allotted number of days. If the Contractor fails to complete the work within
the number of days specified in the Construction Documents, liquidated damages shall be
charged as outlined in General Provisions, Item 8.6 Failure to Complete Work on Time,
found in the Standard Specifications for Street and Stonn Drain Construction of the City
of Fort Worth,Texas.
5. PAYMENT PERFORMANCE AND MAINTENANCE BONDS: The successful bidder
entering into a contract for the work will be required to give the City surety in a sum
equal to the amount of the contract awarded. The successful bidder shall be required to
furnish bonding as applicable in a sum equal to the amount of the contract awarded. The
form of the bond shall be as herein provided and the surety shall be acceptable to the
City. All bonds furnished hereunder shall meet the requirements of Chapter 2253 of the
Texas Government Code, as amended.
A. If the total contract price is $25,000 or less,payment to the contractor shall be
made in one lump sum. Payment shall not be made for a period of 45 calendar
days from the date the work has been completed and accepted by the City.
B. If the contract amount is in excess of$25,000, a Payment Bond shall be
executed, in the amount of the contract, solely for the protection of all claimants
supplying labor and material in the prosecution of the work.
C. If the contract amount is in excess of$100,000, a Performance Bond shall be
executed, in the amount of the contract conditioned on the faithful performance of
the work in accordance with the plans, specifications, and contract documents.
Said bond shall solely be for the protection of the City of Fort Worth.
D. A Maintenance Bond shall be required for all Parks and Community Services
Department projects to insure the prompt, full and faithful performance of the
general guarantee as set forth in Division 1, Section 01700-Project Closeout, Item
1.02.
In order for a surety to be acceptable to the City, the surety must meet the requirements of
V. A. T. S Insurance Code, art. 7.19-1(c). Satisfactory proof of any such reinsurance
shall be provided to the City as outlined in the Notice To Bidders. The City, in its sole
discretion, will determine the adequacy of the proof required herein.
No sureties will be accepted by the City that are at the time in default or delinquent on
any bonds or which are interested in any litigation against the City. Should any surety on
the contract be determined unsatisfactory at any time by the City,notice will be given to
the contractor to that effect and the contractor shall immediately provide a new surety
satisfactory to the City
6. LIQUIDATED DAMAGES: The Contractor's attention is called to Part 1 - General
Provisions, Item 8, Paragraph 8.6, Standard Specifications for Street and Storm Drain
SPECIAL INSTRUCTIONS TO BIDDERS
-2-
Construction of the City of Fort Worth, Texas, concerning liquidated damages for late
completion of projects.
7 EMPLOYMENT: All bidders will be required to comply with City Ordinance No. 7278
as amended by City Ordinance No. 7400(Fort Worth City Code Section 13-A-21 through
13-A-29)prohibiting discrimination in employment practices.
8 WAGE RATES: All bidders will be required to comply with provision 5159a of
"Vernons Annotated Civil Statutes" of the State of Texas with respect to the payment of
prevailing wage rates as established by the City of Fort Worth, Texas, and set forth in
Contract Documents for this project. Disregard if Federal Wage Rates are applicable to
this project. If Federal Wage Rates are applicable to a project,the Contractor shall
comply with all items identified in the attached Contractor's Packet. For further
information regarding this packet, contact the Intergovernmental Affairs/Grants
Management Division,Finance Department at(817) 871-8365 or 871-8387
9. FINANCIAL STATEMENT: A current certified financial statement shall be provided to
the City as outlined in the Notice to Bidders for use by the CITY OF FORT WORTH in
determining the successful bidder. This statement is to be prepared by an independent
Public Accountant holding a valid permit issued by an appropriate State Licensing
Agency.
10. INSURANCE: Within ten days of receipt of notice of award of contract, the Contractor
must provide, along with executed contract documents and appropriate bonds,proof of
insurance for Workers Compensation(statutory); Comprehensive General Liability
($1,000,000 per occurrence, $2,000,000 aggregate); and Automobile Insurance
($1,000,000 each accident on a combined single basis or$250,000 property
damage/$500,000 bodily injury per person per occurrence. A commercial business
policy shall provide coverage on"any auto", defined as autos owned,hired, and non-
owned). Additional lines of coverage may be requested. If such a request is made after
bid opening, Contractor shall be entitled to additional compensation equal to 110% of the
additional premium cost. For worker's compensation insurance requirements, see Special
Instructions to Bidders - Item 16.
_ ADDITIONAL INSURANCE REQUIREMENTS:
A. The City, its officers, employees and servants shall be endorsed as an additional
insured on Contractor's insurance policies excepting employer's liability insurance
coverage under Contractor's workers' compensation insurance policy.
B. Certificates of insurance shall be delivered to the City of Fort Worth, contract
administrator in the respective department as specified in the bid documents, 1000
s Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on
the contracted project.
C. Any failure on part of the City to request required insurance documentation shall
not constitute a waiver of the insurance requirements specified herein.
D. Each insurance policy shall be endorsed to provide the City a minimum thirty
days notice of cancellation, non-renewal, and/or material change in policy terms
SPECIAL INSTRUCTIONS TO BIDDERS
-3-
or coverage. A ten days notice shall be acceptable in the event of non-payment of
premium.
E. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A: VII or equivalent measure of financial strength and
solvency.
F. Deductible limits, or self-funded retention limits, on each policy must not exceed
$10,000.00 per occurrence unless otherwise approved by the City.
G. Other than worker's compensation insurance, in lieu of traditional insurance, City
may consider alternative coverage or risk treatment measures through insurance
pools or risk retention groups. The City must approve in writing any alternative
coverage.
H. Workers' compensation insurance policy(s) covering employees employed on the
project shall be endorsed with a waiver of subrogation providing rights of
recovery in favor of the City.
I. City shall not be responsible for the direct payment of insurance premium costs
for contractor's insurance.
J. Contractor's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self-funded or commercial coverage
maintained by City shall not be called upon to contribute to loss recovery.
K. In the course of the project, Contractor shall report, in a timely manner, to City's
officially designated contract administrator any known loss occurrence which
could give rise to a liability claim or lawsuit or which could result in a property
loss.
L. Contractor's liability shall not be limited to the specified amounts of insurance
required herein.
M. Upon the request of City, Contractor shall provide complete copies of all
insurance policies required by these contract documents.
1 1. NON-RESIDENT BIDDERS: Pursuant to Texas Government Code, art. 2252.002, the
City of Fort Worth will not award this contract to a non-resident bidder unless the non-
resident's bid is lower than the lowest bid submitted by a responsible Texas resident
bidder by the same amount that a Texas resident bidder would be required to underbid a
non-resident bidder to obtain a comparable contract in the state in which the non-
resident's principal place of business is located.
"Non-resident bidder" means a bidder whose principal place of business is not in
this state,but excludes a contractor whose ultimate parent company of majority
owner has its principal place of business in this state.
SPECIAL INSTRUCTIONS TO BIDDERS
-4-
"Texas resident bidder" means a bidder whose principal place of business is in this
state, and includes a contractor whose ultimate parent company or majority owner
has its principal place of business in this state.
This provision does not apply if the project is funded in whole or in part with federal
funds.
The appropriate blanks of the Proposal must be filled out by all non-resident bidders in
order for its bid to meet specifications. The failure of a non-resident contractor to do so
will automatically disqualify that bidder.
` 12. MINORITY/WOMEN BUSINESS ENTERPRISE: In accordance with City of Fort
Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of
minority business enterprises and women business enterprises in City contracts. You may
obtain a copy of the Ordinance from the Office of the City Secretary.
The MEB/WBE Utilization Form, Subcontractor/ Supplier Utilization Form, Prime
Contractor/Waiver Form and the Good Faith Effort Form and or the Joint Venture Form,
as applicable,must be submitted no later than 5:00 p. in. five(5) City business days after
:
the bid opening date, exclusive of the bid opening date. The bidder shall submit the
documentation at the reception area of the Department of Engineering ("Managing
Department"), 2nd floor, City Hall, and shall obtain a receipt. Failure to comply shall
render your bid non-responsive.
Upon contract execution between the City of Fort Worth and the successful bidder,now
known as Contractor, a pre-construction meeting will be scheduled at which time the
Contractor is required to submit either Letters of Intent or executed agreements with the
M/WBE firm(s)to be utilized on this project. Such Letters of Intent or executed
agreements shall include the following information:
1. Name of Contract
2. Name of M/WBE firm utilized
3. Scope of Work to be performed by the M/WBE firm
4. Monetary amount of work to be performed by the M/WBE firm
5. Signatures of all parties
A notice to proceed will not be issued until the signed letter(s) or executed
agreement(s) have been received.
Throughout the duration of this project, the Contractor comply with the M/WBE
Ordinance by complying with the following procedures:
• A M/WBE Participation Report Form must be submitted monthly until the contract is
completed. The first report will be due 30 days after commencement of work. The
monthly report MUST have an original signature to ensure accountability for audit
purposes.
• Reports are to be submitted monthly to the M/WBE Office, regardless of whether or
not the M/WBE firm has been utilized. If there was no activity by an M/WBE in a
particular month, place a"0" or "no participation" in the spaces provided, and provide
SPECIAL INSTRUCTIONS TO BIDDERS
-S-
a brief explanation.
• The Contractor shall provide the M/WBE Office proof of payment to the M/WBE
subcontractors and suppliers only. The M/WBE Office will accept the following as
proof of payment:
1. Copies of submitted invoices with front and back copies of canceled check(s), OR
2. A notarized letter explaining, in detail:
a Subcontractor/supplier Scope of Work
b. Date when services were received from subcontractor/supplier
c. Amounts paid to the subcontractor/supplier
d. Original signatures from both parties must be included on this letter.
• If the Contractor foresees a problem with submitting participation reports and/or
proof of payment on a monthly basis, the M/WBE Office should be notified.
If the Contractor wishes to change or delete an M/WBE subcontractor or supplier, adhere
to the following:
1. Immediately submit a Request for Approval of Change Form to the M/WBE
Office explaining the request for the change or deletion.
2. If the change affects the committed M/WBE participation goal, state clearly how
and why in documentation.
a. All requests for changes must be reviewed and pre-approved by the M/WBE
Office.
b. If the Contractor makes change(s)prior to approval, the change will not be
considered when performing a post compliance review on this project.
• Upon the Contractor's successful completion of this project, and within ten days after
receipt of final payment from the City of Fort Worth, The Contractor will provide the
M/WBE Office with a Final Participation Report Form to reflect the total
participation from ALL subcontractors/suppliers utilized on the project.
• All forms are available at the M/WBE Office, 3rd floor- City Hall. For additional
information regarding compliance to the M/WBE Ordinance, call (817) 871-6104.
Upon request, Contractor agrees to provide to Owner Complete and accurate information
regarding actual work performed by a Minority/Women Business Enterprise(M/WBE)
on the contract and payment therefore. Contractor further agrees to permit an audit and/or
examination of any books, records or files in its possession that will substantiate the
actual work performed by an M/WBE. The misrepresentation of facts (other than a
negligent misrepresentation) and/or the commission of fraud by the Contractor will be
grounds for termination of the contract and/or initiating action under appropriate federal,
state or local laws or ordinances relating to false statements; further, any such
misrepresentation(other than a negligent misrepresentation) and/or commission of fraud
SPECIAL INSTRUCTIONS TO BIDDERS
-6-
y
a
will result on the Contractor being determined to be irresponsible and barred from
participating in City work for a period of time of not less than three years.
13. PROTECTION OF TREES PLANTS AND SOIL: All property along and adjacent to
the Contractor's operations including lawns, yards, shrubs, trees, etc., shall be preserved
' or restored, after completion of the work, to a condition equal or better than existed prior
to start of work.
By ordinance,the Contractor must obtain a permit from the City Forester before any
work (trimming,removal, or root pruning) can be done on trees or shrubs growing on
public property including street Rights-Of-Way and designated alleys. This permit can
be obtained by calling the Forestry Office at 871-5705. All tree work shall be in
compliance with pruning standards for Class II Pruning as described by the National
Arborist Association. A copy of these standards can be provided by calling the above
number. Any damage to public trees due to negligence by the Contractor shall be
assessed using the current formula for Shade Tree Evaluation as defined by the
International Society of Arboriculture. Payment for negligent damage to public trees
shall be made to the City of Fort Worth and may be withheld from funds due the
Contractor by the City.
3 To prevent the spread of the Oak Wilt fungus all wounds on Live Oak and Red Oak trees
shall be immediately sealed using a commercial pruning paint. This is the only instance
when pruning paint is recommended.
14. BIDDER'S STATEMENT OF QUALIFICATIONS
A. QUALIFICATION OF BIDDERS: Prime Bidder and all sub-contractors to be used
by the bidder in the performance of this project shall be required to demonstrate
experience necessary to successfully perform the proposed scope of work. The Prime
Bidders' specific(1) experience, (2) stability and(3)history of performance on
projects of a similar nature and scope will be considered. The BIDDERS
STATEMENT OF QUALIFICATIONS shall be provided to the City as outlined in
the Notice To Bidders and as noted in the specifications for the purpose of evaluating
the Prime bidder/subcontractors qualifications.
B. PRIME BIDDER/SUBCONTRACTOR QUALIFICATIONS
1. Demonstrate experience as either general or sub-contractor on a minimum of
three(3)projects similar in scope within the last three(3) years.
2. Provide listing of surety company(s)which issued bonds for previous projects
identified as demonstrated experience.
3. Provide name of surety company to be used for this project.
4. Provide a current certified financial statement as prepared by an independent
Certified Public Accountant.
5. Name and qualifications for the site superintendence of the work.
6. Identify at least 50%of work which is to performed by the Prime Bidder with its
own organization and work crews under its superintendence.
7. All sub-contractors intended for use on this project shall also demonstrate similar
project scope experience (three similar projects in scope within last three years)
' necessary to successfully perform their respective portion of work on this project.
SPECIAL INSTRUCTIONS TO BIDDERS
-7-
8. Submittal of Letters Of Intent for the use of specific subcontractors listed on the
Bidders Statement Of Qualification form. The Prime Bidder shall submit such
Letters of Intent to the City no later than five (.5) working days upon being
recognized as the overall qualified bidder by the City. Should the Prime Bidder
subsequently desire to substitute a subcontractor, the Prime Bidder shall notify the
Project Manager in writing along with Letter Of Intent and experience
qualifications for approval prior to commencement of construction.
The documentation required herein shall be received by the Project Manager of the
Parks and Community Services Department no later than five (5) City business days
after the bid opening date, exclusive of the bid opening date.
Recommendation of award of contract shall be contingent upon the Bidder and/or
sub-contractors meeting such qualification requirements.
Location and responsive ability of the firm will be considered.
If your firm anticipates entering into a joint venture with any other firm to conduct all
or part of the performance required under the proposed project, that firm should be
specified in your response. For each firm included in the joint venture,please provide
the information required above. Under the Contract executed for this work the City
will require your firm to be completely 100 percent responsible for fulfilling all
aspects of the contract bonds. Other firms and employees that may be involved in
their joint venture will be treated by the City under the contract as if they were
employees or subcontractors of your firm. Other than those firms noted in the
contract as a part of the joint venture, no other firms will be allowed to participate in
the joint venture without written consent from the City.
B. PLAYGROUND INSTALLATION AS PRIME PROJECT SCOPE
1. For projects in which the construction of playground area is the prime scope of
work,bidders must be able to demonstrate the following. Failure to adequately
demonstrate that the bidder meets these requirements may result in a
recommendation that the bid be rejected as non—responsive.
2. The prime bidder shall submit such documents as are necessary to establish that
the bidder has successfully and satisfactorily completed the construction and
installation of at least three (3)playground facilities within the immediate past
three(3) years for the state of Texas or other municipalities within the Dallas/
Fort Worth metroplex, such work to have included grading, sub surface drainage,
playground perimeter concrete edging, equipment and safety surface installation.
The documentation shall also demonstrate that the bidder completed the projects
within the contract time without the assessment of liquidated damages.
3. If the prime bidder has not performed work for the state of Texas or
municipalities within the Dallas/Fort worth metroplex,the bidder may still be
considered if it has completed three(3)park playgrounds within the last three(3)
years for private entities which included work as noted in B.1.
4. The prime bidder in addition shall provide information that discloses or
demonstrates the following:
SPECIAL INSTRUCTIONS TO BIDDERS
-8-
a. Name and qualifications for the site superintendence of the work.
b. Knowledge in appropriate task sequencing.
c. Intended staffing requirements to construct the work within the contract
time allowed.
15. OZONE ALERT DAYS: The Contractor shall be required to observe the following
guidelines relating to working on City construction sites on days designated as "OZONE
ALERT DAYS". Typically, the Ozone Alert season within the Metroplex area runs from
May through September,with 6:00 a.m. - 10:00 a.m. being critical ozone forming periods
each day.
1
i
The Texas Natural Resource Conservation Commission(TNRCC) in coordination with
the National Weather Service,will issue the Ozone Alert by 3:00 p.m. on the afternoon
prior to the alert day. On designated Ozone Alert Days, the Contractor shall bear the
responsibility of being aware that such days have been designated Ozone Alert Days and
as such shall not begin work until 10:00 a.m. whenever construction phasing requires
substantial use of motorized equipment. However, the Contractor may begin work earlier
if such work minimizes the use of motorized equipment prior to 10:00 a.m.
If the Contractor is unable to perform continuous work for a period of at least seven hours
between the hours of 7:00 a.m. - 6:00 p.m., on a designated Ozone Alert Day, that day
will be considered as a weather day and added onto the allowable weather days of a given
month.
_ 16. WORKERS COMPENSATION INSURANCE COVERAGE: Contractors compliance
with Workers Compensation shall be as follows:
A. Definitions:
Certificate of coverage("certificate") -A copy of a certificate of insurance, a
certificate of authority to self-insure issued by the commission, or a coverage
agreement(TWCC-81,TWCC-82, TWCC-83, or TWCC-84), showing statutory
workers' compensation insurance coverage for the person's or entity employees
providing services on a project, for the duration of the project.
Duration of the project- includes the time from the beginning of the work on the
project until the contractor's/person's work on the project has been completed and
accepted by the governmental entity.
Persons providing services on the project ("subcontractor" in 406.096) -includes all
persons or entities performing all or part of the services the contractor has undertaken
to perform on the project,regardless of whether that person has employees. This
includes, without limitation, independent contractors, subcontractors, leasing
companies,motor carriers, owner-operators, employees of any such entity, or
employees of any entity which furnishes persons to provide services on the project.
"Services" include,without limitation, providing, hauling, or delivering equipment or
materials, or providing labor,transportation, or other service related to a project.
"Services" does not include activities unrelated to the project, such as food/beverage
vendors, office supply deliveries, and delivery of portable toilets.
SPECIAL INSTRUCTIONS TO BIDDERS
-9-
B. The contractor shall provide coverage,based on proper reporting of classification
codes and payroll amounts and filing of any coverage agreements,which meets the
statutory requirements of Texas Labor Code, Section 401.011(44) for all employees
of the contractor providing services on the project, for the duration of the project.
C. The Contractor must provide a certificate of coverage to the governmental entity prior
to being awarded the contract.
D. If the coverage period shown on the contractor's current certificate of coverage ends
during the duration of the project, the contractor must, prior to the end of the
coverage period, file a new certificate of coverage with the governmental entity
showing that coverage has been extended.
E. The contractor shall obtain from each person providing services on a project, and
provide to the City:
(1) a certificate of coverage,prior to that person beginning work on the project, so
the City will have on file certificates of coverage showing coverage for all
persons providing services on the project; and
(2) no later than seven days after receipt by the contractor, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project.
E. The contractor shall retain all required certificates of coverage for the duration of the
project and for one year thereafter.
G. The contractor shall notify the governmental entity in writing by certified mail or
personal delivery, within ten days after the contractor knew or should have known, of
any change that materially affects the provision of coverage of any person providing
services on the project.
H. The contractor shall post on each project site a notice, in the text, form and manner
prescribed by the Texas Workers' Compensation Commission, informing all persons
providing services on the project that they are required to be covered, and stating how
a person may verify coverage and report lack of coverage.
I. The contractor shall contractually require each person with whom it contracts to
provide services on a project, to:
(1) provide coverage,based on proper reporting on classification codes and payroll
amounts and filing of any coverage agreements,which meets the statutory
requirements of Texas Labor Code, Section 401.011(44) for all of its employees
providing services on the project, for the duration of the project;
(2) provide to the contractor,prior to that person beginning work on the project, a
certificate of coverage showing that coverage is being provided for all employees
of the person providing services on the project, for the duration of the project;
SPECIAL INSTRUCTIONS TO BIDDERS
- 10-
(3) provide the contractor,prior to the end of the coverage period, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(4) obtain from each other person or entity with whom it contracts, and provide to
the contractor:
(a) a certificate of coverage,prior to the other person or entity beginning work
on the project; and
' (b) a new certificate of coverage showing extension of coverage,prior to the end
of the coverage period, if the coverage period shown on the current certificate
of coverage ends during the duration of the project;
(5) retain all required certificates of coverage on file for the duration of the project
and for one year thereafter.
(6) notify the governmental entity in writing by certified mail or personal delivery,
within ten days after the person knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on
the project; and
(7) contractually require each person with whom it contracts, to perform as required
by paragraphs (1) - (7), with the certificates of coverage to be provided to the
person for whom they are providing services.
J. By signing this contract or providing or causing to be provided a certificate of
coverage, the contractor is representing to the governmental entity that all employees
of the contractor who will provide services on the project will be covered by workers'
compensation coverage for the duration of the project,that the coverage will be based
on proper reporting of classification codes and payroll amounts, and that all coverage
agreements will be filed with the appropriate insurance carrier or, in the case of a self-
insured,with the commission's Division of Self-Insurance Regulation. The providing
of false or misleading information may subject the contractor to administrative
penalties, criminal penalties, civil penalties or other civil actions.
K. The contractor's failure to comply with any of these provisions is a breach of contract
4 by the contractor which entitles the City to declare the contract terminated if the
contractor does not remedy the breach within ten days after receipt of notice of breach
from the City.
"The contractor shall post a notice on each project site informing all persons
providing services on the project that they are required to be covered, and stating how
a person may verify current coverage and report failure to provide coverage. This
notice does not satisfy other posting requirements imposed by the Texas Workers'
- Compensation Act or other Texas Workers' Compensation commission rules. This
7-1 notice must be printed with a title in at least 30 point bold type and text in at least 19
point normal type, and shall be in both English and Spanish and any other language
common to the worker population. The text for the notices shall be the following
text, without any additional words or changes:
SPECIAL INSTRUCTIONS TO BIDDERS
- 11 -
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related
to this construction project must be covered by workers' compensation insurance.
This includes persons providing,hauling, or delivering equipment or materials, or
providing labor or transportation or other service related to the project,regardless of
the identity of their employer or status as an employee."
"Call the Texas Workers' Compensation Commission at(512)440-3789 to receive
information on the legal requirement for coverage, to verify whether your employer
has provided the required coverage, or to report an employer's failure to provide
coverage."
END OF SECTION
SPECIAL INSTRUCTIONS TO BIDDERS
- 12-
PROPOSAL
TO: MR. Charles Boswell
City Manager
Fort Worth,Texas
FFOR: CONSTRUCTION AND INSTALLATION OF PLAYGROUND IMPROVEMENTS AT:
COBB SOUTH PARK C280/541600/808480003130 DOE NO. 4753
SEMINARY HILLS PARK C280/541600/809480002930 DOE NO. 4754
TADLOCK PARK C280/541600/808480003230 DOE NO. 4755
SOUTH Z. BOAZ PARK C280/541600/803480003030 DOE NO. 4756
Pursuant to the foregoing "Notice to Bidders," the undersigned has thoroughly examined the plans, specifications, and the
site, understands the amount of work to be done, and hereby proposes to do all the work and furnish all labor, equipment,
"and materials necessary to fully complete all the work as provided in the plans and specifications, and subject to the
inspection and approval of the Parks and Community Service Department Director of the City of Fort Worth.
!The "approximate quantity" category is for information purposes only. The Contractor shall be paid on the basis of actual
'installed quantities on non lump sum items. Additionally,the Contractor shall be aware that the Proposal contains both
Lump Sum and Unit Price items.
I
If the lowest bid received exceeds the funds budgeted for the project,the City reserves the right to decrease the quantities
contained in any line item or to eliminate any specific line items before award of the contract in order to bring the work
,within budget. By submitting a bid, the bidder acknowledges the City's right to adjust or eliminate line items prior to the
laward of contract. Further,by submitting a bid,the bidder agrees to honor each line item bid price without recourse to the
City in the event line items are adjusted or eliminated.
;Upon acceptance of this proposal by the City Council,the bidder is bound to execute a contract and furnish, if applicable,
Performance, Payment, and Maintenance Bonds approved by the City of Fort Worth for performing and completing the
said work within the time stated and for the following sums,to-wit:
BASE BID
PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
UNIT ONE—COBB SOUTH PARK
1. 1 LS Excavation/Grading(see sheet 3 of 11) @
Dollars &
va Cents per LS $ Lump Sum $ Socp
2. 1 L,S Demolition/Removal of ExistingPlayground Edge,
Equipment, Safety Surfacing(min. 9"),portion of concrete
walk, HC Striping and HC ramp (see sheet 3 of 11) @
Dollars &
Cents per LS $ Lump Sum $ 3a
3. 382 SF Installation of Concrete Paving (see sheet 10 of 11)@
Dollars &
� haat Cents per SF $ L4 $ 1&014 Li
PROPOSAL
-1
PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAI,
:TEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
4. 2 EA Installation of HC Ramp (see sheet 10 of 11) @
%;,,eJe-u,, 1A Dollars &
Cents per EA $ 1 Zx90 $ X 4-100
5. 268 LF Installation of Concrete Mow Strip (see sheet 10
of11) @
irA Dollars &
Cents per LF $ -5z!>V
6. 1 EA Installation of Project Sign pe Sp�ecifications @
1�y v� � l&rs &
-LeV-U Cents per EA $ -7
7. 1 LS Installation of Safety Surfacing Material W/Wear
Mats @
�' q fop/ M i�m� � 'I' Dollars &
Cents per LS $ Lump Sum
f
8. 1 LS Installation of Sub Drain and Headwall (see sheet
10 of11) @ a
— ��� �� A[-Ity° Dollars &
A
, rte Cents per LS $ Lump Sum $ �
9. 1 EA Specified Play Structure Installed(see sheet 4 of
11) @
i✓� ►� Y,
Dollars &
tea% Cents per EA $
5-11 I mo $
10. 1 EA Specified Spring Animal Installed @
a Cents per EA $ $
11. 1 EA Specified Buck—A-Bout Installed @
-11,,,e-9ew H Dollars &
Cents per EA $ /Z./02��-- $ j-Z.
12. 1 EA Specified Two (2) Bay Swing Installed @
� '1..IDollars &
Cents per EA $ $ "
13. 1 LS Parking Lot HC Striping see sheet 11 of 11) @
Dollars &
Cents per LS $ f $ l=}
PROPOSAL
-2-
-'AY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL,
ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
14. 2 EA Installation of HC Parking Signage (see sheet 11
of 11) @ ,�
=4 F, Dollars &
60
Le,Wtc; Cents per EA $ $
15. 4 EA Installation of 6' Park Bench-in ground @
Dollars & 00
Cents per EA $ $
Unit One-TOTAL $
UNIT TWO-SEMINARY HILLS PARK
1. 1 LS Excavation/Grading @
Dollars &
1 � Cents per LS $ Lump Sum $
2. 1 I,S Demolition/Removal of Existing Playground
Equipment, re-establishment of grade (see
sheet 2 of 11)
F;ve- jibowAVV Dollars &
Cents per LS $ Lump Sum $
3. 2185 SF Installation of 6' Concrete Walk and Entry
Slab (see sheet 5 of 11) @
Dollars &
Cents per SF $ �-�= $ 67
4. 1 EA Installation of HC Accessible Ramp(see sheet
10 of 11) @
et e- C VK� yul Dollars &
Cents per EA $ ,-Z-00�X-7 $ 17,00e'0
5. 258 LF Installation of Concrete Mow Strip (see sheet
10 of 11) @
Dollars &
a
Cents per LF $ 0 $
6. 1 EA Installation of Project Sign per Specifications
Dollars &
00
Cents per EA $ $
7. 1 LS Installation of Safety Surfacing Material
W/Wear Mats JAL I �VL2
'1"ICAA'—VN Pour, Dollars &
Cents per LS $ Lump Sum $ N0 0
PROPOSAL
-3-
PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
SEMQUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
8. 1 LS Installation of Sub Drain and Catch Basin(see
sheet 10 of 11) @ $,rr
�"
n. Dollars &
- Cents per LS $ Lump Sum $
9. 1 EA Specified Play Structure Installed @
s
�.;�����-;'7►=� �„r�r��.,.-_�- �,n,� ilE.�.ua�..�hf*�' °�llars &
Cents per EA $ � o h9 $ 011l o?
10. 2 EA Specified Spring Animals Inaallped @
Cents per EA $ 3 $
11. 1 EA Specified Two (2) Bay Swing Installed @
Dollars & 09 CV
Cents per EA $ $ i, �
12. 2 EA Installation of 6' Park Bench—in ground @
414: 1 Dollars &
Cents per EA
Unit Two—TOTAL $
UNIT THREE—TADLOCK PARK
1. 1 LS Excavation/Grading @
Dollars &
'7�6'r"t? Cents per LS $ Lump Sum $ t'- 0
2. 1 LS Demolition/Removal of Existing Playground
Equipment,Tree and Safety Surfacing(min
9"), (see sheet 2 of 11)
FL v,-, AyKLAeta Dollars &
�y Cents per LS $ Lump Sum $ J�
3. 401 SF Installation of 6' Concrete Walk and Entry
Slab(see sheet S of 11) @
3 Y o v 4/ Dollars&
J s (A Cents per SF $ 44Zs $ % td
PROPOSAL,
-4-
7
�AY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
4. 1 EA Installation of HC Accessible Ramp (see sheet
l0ofll) @
Dollars&
, ✓ Cents per EA $ $
5. 207 LF Installation of Concrete Mow Strip(see sheet
l0 of 11) @
'Aiy4q'TWa Dollars &
Cents per LF $ $ �i
6. 1 EA Installation of Project Sign per Specifications
@ � �v �l
✓aa Dollars & 00_
Cents per EA $ > $ '-750-
7.
-750-7. 1 LS Installation of Safety Surfacing Material
{ W/Wear Mats @ &
F i-L fEwl- A v aAYBollars &
Cents per LS $ Lump Sum
8. 1 LS Installation of Sub Drain and Catch Basin(see
sheet 10 of 11) @
v--�A VO Dollars &
Cents per LS $ Lump Sum $ -7
9. 1 EA Specified Play Structure Insst�, end
ovvAvlVollars
Cents per EA $ .S ,/y p® $ 3. ,
10. 2 EA Specified Spring Animas In tagEd @
`
oars &
::z elyp Cents per EA
11. 1 EA Specified Two (2) Bay S ,ing Installed @
�1 � N=��►� Atr �" ollars &
Cents per EA $ 77-F3 $
12. 2 EA Installation of 6' Park)3ench-in ground @
a=»t®�� ���►�r 1 &llars &
09
Cents per EA $ t5, 30, $ /-,-2
Unit Three-TOTAL $ -7 s
PROPOSAL
-5-
' E
PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
STEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
UNIT FOUR—SOUTH Z.BOAZ PARK
1. 1 LS Excavation/Grading @
Dollars &
Cents per LS $ Lump Sum $
2. 1 LS Demolition/Removal of Existing Asphalt and
Post and Cable (see sheet 2 of 11)
f�-•`ve 11 vn lytA Dollars &
Cents per LS $ Lump Sum $ � �
3. 860 SF Installation of 6' Concrete Walk and Entry
Slab (see sheet 5 of 11) @
T ouy- Dollars&
Cents per SF $ $ -3" q0
4. 1 EA Installation of HC Accessible Ramp (see
sheet 10 of 11) @
Dollars &
Cents per EA $ /zlooep $ IZ,00 c
5. 2741,17 Installation of Concrete Mow Strip (see sheet
10 of 11) @
Dollars&
f Cents per LF $ $
-110
6. 1 EA Installation of Project Sign per
Specifications @,
Mlars &
-rte Cents per EA
7. 1 LS Installation of Safety Surfacing Material
W/Wear Mats @
`11 Dollars&
7Cents per LS $ Lump Sum $ ��
8. 11's Installation of Sub Drain and Catch Basin
(see sheet 10 of 11) @
'��tri'=v��vi �;v�'��,rr►���ollars &
Cents per LS $ Lump Sum $ �
9. 1 EA Specified Play Structure Installed @
►�� z� �,jz 1 , .Dollars &
�n taLzq d r _ Cents per EA $ 1> $ 3 i SCJ
PROPOSAL
_3 -6-
_'AY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
1
10. 1 EA Specified Whirl Installed
�(l-,r �;r,+�r� ;-,W � 1ars &
�yy Cents per EA
11. 1 EA / Specified Two (2) Bay Swing Installed @
Dollars &
Cents per EA
1
12. ILS Parking Lot Striping–HC Stall Only(see
sheet 11 of 11) @
Dollars &
Cents per LS
1 13. 1 EA Installation of HC Parking Signage (see sheet
11 of ll) @
, Dollars &
l
Cents per EA $ y $ 3
14. 2 EA Installation of 6' Park Bench–in ground @
F-;ve Pjr,y,,,,),vz—b afl Dollars &
r�yP� Cents per EA $
Unit Four–TOTAL
UNIT FIVE–PROPOSED BID ALTERNATES FOR COBB SOUTH PARK
1. 1 EA Purchase and Installation of 340SF slab and
one (1) 8' ADA picnic table @
ollars &
V
Cents per EA $ ZZ-00 $ 71
2. 1 EA Purchase and Installation of one (1) 6' picnic
table @y
!; �� +-►�/ Dollars &
Cents per EA $
3. 2 EA Purchase and Installation of two (2) cookers
,rte 1/4 6 '-(1,t"$ollars &
7, o Cents per EA $ �✓
Unit Five–TOTAL $ j j
PROPOSAL
-7-
''AY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL,
ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
g UNIT SIX—PROPOSED BID ALTERNATES FOR SEMINARY HILLS PARK
1. 1154SF Installation of 4' Concrete Walk along
Southcrest @
Foul Dollars &
e- Cents per SF $ $ L4 tv 00"
2. 2 EA Purchase and Installation of two (2)
Basketball Goal Assembly's @
x �1 Dollars &
F`V--� C
Cents per EA ��
_
3. 594 SF Installation of Shelter Slab @
5; )c Dollars & ��
e' 1 b i''-i Cents per SF
4. 334 SF Installation of 5' Concrete Walk around
Shelter Slab @
F oirvr' Dollars &
Cents per SF
5. 1 LS Purchase and Installation of one 8' ADA
picnic table n tWo 6' picnic tables @
v f je hyig`-�o ars &
Cents per LS $ Lump Sum_ $ 7,�)(90-
1
6. 1 EA Purchase and Ins llatio f Shelter @
Inpn ! : rars
Pyrg Cents per EA
7. 1 LS Purchase and Installation of three(3) 6' Park
Benches with Concrete Slab @
fJt' � sI��� Dollars &
Cents per LS $ Lump Sum
Unit Six—TOTAL
UNIT SEVEN—PROPOSED BID ALTERNATES FOR TADLOCK PARK
1. 1 LS Purchase and Installation of two 6' Park
n Benches with slab @
✓- �'' Dollars &
-�-✓ Cents per LS $ Lump Sum
3
PROPOSAL
-8-
PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
I
2. 1 EA Purchase and Installation of one (1) 8' ADA
Picnic Table @
Dollars &
Cents per EA $ -790wt $ 77"0 CX)
3. 2 EA Purchase and Installation of two (2) 6' Picnic
Tables .�a,
Dollars &
=T Cents per EA $
I
4. 2 EA Purchase and Installation of two (2) cookers
@ `l%
Dollars &
r-y-y Cents per EA $
Unit Seven-TOTAL $ 39CV �
UNIT EIGHT-PROPOSED BID ALTERNATES FOR SOUTH Z. BOAZ PARK
1. 110 LF Installation of Post and Cable (see sheet 11 of
a
j�%t.✓�G,z it>ll)�@�,'.����t nI 4i'Dollars &
�✓. Cents per 1.17 $ Lump Sum $ Z/ 10�o
2. 312 SF Installation of 6' Concrete Walk @
Dollars &
Cents per SF $ ) _ $ / Z�Lj
3. 252 SF Installation of 6' Concrete Walk @
/0:1-vvr Dollars &
7,e,7v,> Cents per SF $ �=`J $ /000-
4. 850 SF Installation of Shelter Slab @
Dollars &
U0
n t-dACents per SF $ � $ 7 saw
5. 1 LS Purchase and Installation of one 8' ADA
Picnic Table and tw 6' Picnic Tables @
is
e,10�Z ollars & 00
7t Cents per LS $ Lump Sum $
6. 2 EA Purchase and Installation of two (2) 6' Park
r
Benches
' �,,
�'..V-. Num'k-ea-t iW4ollars &
i
>0��
�y�z, Cents per EA $ $ /�%�Je%
PROPOSAL
-9-
I
�Ay
APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
TEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID
I7. 3 EA Purchase and Installation of three (3) Cookers
@ / J
AyvA,d-ce , K, Dollars & cc
I —t Cents per EA $ _Z150 $ (d�C�_
I 8. 1 EA Purchase and Installation of Shelter @
0he-0 Dollars &
Cents per EA $ /� r '�� $ /� ► G't`i�
9. 1 LS Parking Lot Striping—Remaining Parking
Area @
)1t",/ ,V4--'-Dollars &
I ('_vo Cents per LS L
Unit Eijjht—TOTAL 186 c
BID - RECAPITULATION
�!0
Unit One -Total Base Bid Cost for Cobb South Park $ Z, '
Unit Two -Total Base Bid Cost for Seminary Hills Park
Unit Three- Total Base Bid Cost for Tadlock Park
Unit Four- Total Base Bid Cost for South Z. Boaz Park
1 Total Base Bid
Unit Five -Total Alternate Bid Cost for Cobb South Park $ j 10
Unit Six—Total Alternate Bid Cost for Seminary Hills Park
IUnit Seven - Total Alternate Bid Cost for Tadlock Park $ 1 0
Unit Eight -Total Alternate Bid Cost for South Z. Boaz Park C90
r
1
PROPOSAL
- ]0-
A. This contract is issued by an organization that qualifies for exemption pursuant to the provisions of Article 20.04(F)
pf the Texas Limited Sales, Excise and Use Tax Act.
:
B. The Contractor performing this contract may purchase,rent or lease all materials,supplies,equipment used or consumed in
the performance of the contract by issuing to his supplier an exemption certificate in lieu of the tax,said exemption
certificate complying with State Comptroller's ruling tax,said exemption certificate complying with State Comptroller's
ruling#95-0.07. Any such exemption certificate issued by the Contractor in lieu of the tax shall be subject to the
i
provisions of the State Comptroller's ruling#95.09 as amended to be effective October 2, 1968.
C. The undersigned assures that its employees and applicants for employment and those of any labor organization,
subcontractor or employment agency in either filrishing or referring employee applicants to the undersigned are not
discriminated against as prohibited by the terms of City Ordinance 7278,as amended by City ordinance 7400(Fort Worth
City Code Sections 13-A-21 through 13-A-29),prohibiting discrimination in employment practices.
D. The undersigned agrees to complete all work covered by these contract documents within Sixty five(65)Worldng Days
after the date for commencing work as set forth in the Notice to Proceed to be issued by the Owner and to pay not less than
the City of Fort Worth Building and Construction Trades Prevailing Wage Rates For 2000.
aE. Within ten(10)days of receipt of notice of acceptance of this bid,the undersigned will execute the formal contract and will
deliver ap,p�licable Surety Bonds for the faithful performance of this contract. The attached deposit check in the semi of$
`' ~ `Dollars ($�l rs Aecome the property of the City of Fort Worth,Texas,or the attached Bidder's Bond is to be
forfeited in the event the contract and applicable bonds are not executed within the time set forth, as liquidated damages for
E delay and additional work caused thereby.
'F In the case of ambiguity or lack of clearness in stating prices in the Proposal,the City reserves the right to adopt the most
advantageous price for construction thereof to the City or to reject the proposal.
G. Receipt is he eby acknowledged of the following addenda:
No. 1 -� No.2 No. 3 No.4
]Respectfully submitted,
(Company Name)
By(Authorized Signature)
'Date:
Address:
Telephone: (011 _7-j
SEAL(if corporation)
PROPOSAL
t -ll
i
01/25/05 11:53 FAX 871 5724 CITY OF FT 1VORTH 10002
k
ORT WORTH City of Fort Worth
Minority and Women Business Enterprise Specifications
SPECIAL INSTRUCTIONS FOR BIDDERS
APPLICATION OF POLICY
If the total dollar value of the contract is $25,000 or more,the MIWBE goal is applicable.
If the total dollar value of the contract is less than $25,000, the M/ WE goal is not applicable.
POLICY STATEMENT
It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business
Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements
and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid.
M/WBE PROJECT GOALS
The City's MBEAVBE goal on this project is 15 %of the base bid value of the contract.
COMPLIANCE TO BID SPECIFICATIONS
On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by
either of the following:
1. Meet or exceed the above stated MIWBE goal, or '
2. Good Faith Effort documentation, or;
3. Waiver documentation,or;
4. Joint Venture.
SUBMITTAL OF REQUIRED DOCUMENTATION
The applicable documents must be received by the Managing Department,within the following times allocated, in order
for the entire bid to be considered responsive to the specifications.
1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid
met or exceeded: o ening date, exclusive of the bid opening date.
2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid
Utilization Form, if participation is less than U opening date, exclusive of the bid opening date.
stated goal:
3. Good Faith Effort and Subcontractor J received by 5:00 p.m., five (5) City business days after the bid
Utilization Form, if no MAYBE participation: ,opening date, exclusive of the bid opening date.
4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid
perform all subcontracting/supplier work: opening date, exclusive of the bid opening date.
5. Joint Venture Form, if utilize a joint venture /' received by 5:00 p.m., five (5) City business days after the bid
to met or exceed goal. opening date, exclusive of the bid opening date.
FAILURE TO COMPLY WITH THE CITY'S MIWBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED
NON-RESPONSIVE TO SPECIFICATIONS
Any questions, please contact the M/WBE Office at(817)871.6104.
Rev.5130103
w
01/25/05 11:53 FAX 871 5724 CITY_OF FT {NORTH 1a003
ATTACHMENT 1A
Page 1 of 4
FORT WORTH City of Fort Worth �Ijl
Subcontractors/Suppliers Utilization Form
I,I
PRIME COMPANY NAME: Check applicable block to describe prime
/� �I III
7 PRINK LC'{L L/��5 �N`'• M/W/DBE NON-M/w/DBE t �I
IPROJECT NAME: t 1
d`� �/�a11/U/� 1/Gfi�/LCJlr!/vtE.t'TS BID DATE
�o �.SrN�� (P/�r�c� S
7;41D L069,.:eur7f /6olty a p5 Ill
Prime's MIWBE Project Utilization: ROJE T MBER I�1
City's MIWBE Project Goal2�0/ /�Op ���000✓?/�
% e 7—XU Jl
e���s��dvo/��Fd'dd�3L3o ;j
/ �`.
Identify all subcontractors/suppliers you will use on tans pr j
Failure to complete this form, in its entirety with requested documentation, and received by the Managing !
Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, :
will result in the bid being considered non-responsive to bid specifications. +` I
The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this i
utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional I,
and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the
bid being considered non-responsive to bid specifications
r
IF
M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or
currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant,
Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties.
Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct
payment from the prime contractor to a subcontractor is considered 1" tier, a payment by a subcontractor to
its supplier is considered 2rd tier
i�
ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD.
Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have
been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification
Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business !i
Enterprise (DBE) is synonymous with Minority/Women Business Enterprise (M/WBE).
I`
.I
i
If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and
operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease
trucks from another M/WBE firm, including M/WBE owner-operators, and receive full M/WBE credit. The j!
M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for the it
fees and commissions earned by the M/WBE as outlined in the lease agreement.
i!
Ij
�j
Rev.5130103
5
01/25/05 11: 54 FAX 871 5724 CITY OF FT NORTH U004
- - - - - - - - - - - - - - - - - -OF.FT I I
ATTACHMENT 1A
I :
Page 2 of 4
I
T WORTH I
Primes are required to identify ALL subcontractors/suppliers,regardless of status; i.e., Minority,Women and non-M/WBEs.
Please list MNVBE firms first,use additional sheets if necessary.
I
Certification o
(check one)
IBCONTRACTOR/SUPPLIER T N T n Detail Detail
Company Name i C X M Subcontracting Work Supplies Purchased Dollar Amount
Address e M W T D W
Telephone/Fax r E E R O B
C T E
A
I7,
I's, 6 rry Vj
v - 3 VQbS 1
F-� • la/a 1a�'C� 7ro��`
g�� • Z36 -5�-13�'�
J g !1 -a23 b
v
1
Rev.5/30/03
01/25/05 11:54 FAX 871 5724 CITY OF FT WORTH 14006
I
ATTACHMENT 1A
Page 4 of 4 ,
SII
WORTH
� II
I:
,I.
��/ l
Iters
al Dollar Amount of M/WBE Subcontractors/Supp'
I,
ai Dollar Amount of Non-MIWBE Subcontractors/Suppliers
$ 11-17-3 ® l
f.
AL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ zoi lc" h
I,
Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval
the Minority and Women Business Enterprise Office Manager or
or deletion shall be aesignee throughtmaterial breach of
west for Approval of Change/Addition. Any unjustified change
tract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor
all submit a detailed explanation of how the requested change/addition or deletion will affect the committed
-/BE goal. If the detail explanation is not submitted, it will affect the final compliance determination.
affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request,
Tiplete and accurate information regarding actual work performed by all subcontractors, including
rl/d1//DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or
examination of any books, records and files held by their company. The bidder agrees to allow the
nsmission of interviews with owners, principals, officers, employees and applicable
�bcontractors/suppliers/contractors participating on the contract that will substantiate the actual work
by an authorized officer or employee of the City. Any
)erforrried by the MAN/DBE(s) on this contract,
.entional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment
I )m City work for a period of not less than three (3) years and for initiating action under Federal, State or i
Local laws concerning false statements. Any failure to comply with this ordinance and create a material i
1--each of contract may result in a determination of an irresponsible Offeror and barred from participating in
ty work for a period of time not less than one (1)year.
I
Authorized Si nai&ffd Printed Signature
Contact Name/Title(if different)
Title
J Piz
%lompany Name Telephone and/or Fax
E-mail Address
ddress
:qty/state/Zip Date 7
Rev.5/30/03
01/25/05 11:54 FAX 871 5724 CITY OF FT NORTH In 007
__
ATTACHMENT 1B
Page 1 of 1
)oRT WORTH
City of Fort Worth
Prime Contractor Waiver Form
Check applicable block to describe I
RIME COMP
A
NY NAME: rimy
MW/DBE NON-M/W/DBE
IROJECT NAME: o�P �z/ N° �v�r s BID DATE
IGus;gn �'z�w Zr 05
GaoBg S yv+�ru i3o�2 c���GoS c ��S �6 �o�'z/��vo3 'D
city's MfWBE Project Goal: PR0D5yNUMBER,,/go,
ed0�l3D
8a�o73o C-GSo S�l�vza �o3'F�oaa3a "�
do not complete ATTACHMENT 1 C(Good Faith Effort Form). All questions on
If both answers to this form are YES,
this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is
NO, then you must complete ATTACHMENT 1C. This form Is only applicable if both answers are yes
Failure,to complete this form In its entirety and,be received boys e d o'tentng dat mwlll resultbin the btdo
m. e' 5 'Cit business da s after,btd o enin , exctustve
being considered no.n.responsive.ao:b'td.specificatlans
Will you perform this entire contract without subcontractors? f
if yes, please provide a detailed explanation that proves based on the size and scope of this project, t
this is our normal business practice and provide an operational rofile of our business.
Will you perform this er fire cantir tMlit[nOwAt suppliers? YES i..
i
If yes, please provide a detailed explanation that proves based on the size and scope of this project, NO
this is your normal business practice and provide an inventory profile of your business.
Cit
the The bidder further agrees to provide, directly to h y upon request, complete and accurate information
regarding actual work performed by all subcontractors, including M/W BE(s)on this contract, the payment therefore i
and any proposed changes to the original MNVBE(s) arrangements submitted with this bid. The bidder also
agrees to allow an audit and/or examination of any books, records and files held by their company that will
officer or employee of
substantiate the actual work performed by the M/WBEs on this contract, by an authorized
the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or
debarment from City work for a period of not less than three (3)years and for initiating action under Federal, State
or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of
contract may result in a determination of an irresponsible offeror and barred from participating in City work fora
period of time not less than one 1 year.
Authlize ignatu�e Printed Signature
Title Contact Name(if different)
4���jZ•+iyu/L�'►/L �it/�fC Z� Number
ax Number
Phone Numb
Company `
�I7 / L(/� l7�LLJ��s � riQv�.S� i/tJC✓� fay.CC7 tit �c�r
Email Address C-V
Address
x-,'�� � 7Y 7l/(ly ; d S
Date
City/State/Zip Rev.5130103
01/25/05 11:55 FAX 871 5724 CITY OF FT WORTH Q.1008
ATTACHMENT 1 C
Page 1 of 3
FORT WORTH City of Fort Worth
Good Faith Effort Form
Check applicable block to describe
PRIME COMPANY NAME: / rime
I�T �� ,`GL�� M/W/DBE NON
-M/WIDBE
PROJECT NAME: z`s�`� 'J ��/�v� BID DATE
by
City's MMBE Project Coal: PROJECT NUMBER Der v-?(3
2gL Syube?, o ff
/ Z' 1Cv3 e o
-2-yr-5(54 3
If you have failed to secure MlWBE participation and you have subcontracting and/or supplier opportunities or if your
DBE participation is less than the City's project goal, you must complete this form.
If the bidder's method .of compliance with the MNMBE goal is based upon demonstration of a
"good faith effort", the' bidder will have the burden of correctly and accurately preparing and
submitting the documentation required by the City. Compliance with each item, 1 thru 6 below,
shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or
knowing misrepresentation the facts or intentional discrimination by the bidder.
Failure to complete this form, in its entirety with supporting documentation, and received by the
Managing Department on or before 5:00 p.m.five (5) City business days after bid opening, exclusive of bid
opening date,will result in the bid being considered non-responsive to bid specifications.
1.) Please list each and every subcontracting and/or supplier opportunityl for the completion of this
project, regardless of whether it is to be provided by a MlWBE or non-M/WBE. (DO NOT LIST NAMES
OF FIRMS) On Combined Projects, list each subcontracting and or supplier opportunity through the
2 niltier.
(Use additional sheets, if necessary)
List of Subcontracting Opportunities List of Supplier Opportunities
�v�u JGD Xq- 1 ztoc
Lew
v1i
14,
Cr?
I�
01/25/05 11:55 FAX 871 5724 CITY OF FT WORTH 2009
ATTACHMENT 1C
Page 2 of 3
2.) Obtain a current(not more than three (3) months old from the bid open date) list of M/WBE
subcontractors and/or suppliers from the City's M/WBE Office.
Yes Date of Listing
✓N o
3.) Did you solicit bids from MMBE firms,within the subcontracting and/or supplier areas previously
listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are
opened?
Yes (if yes,attach M/WBE mail listing to include name of firm and address and a dated copy of letter mailed.)
_�7_No
4.) Did you solicit bids from MIWBE firms,within the subcontracting and/or supplier areas previously
listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are
opened?
Yes (if yes,attach list to include name of M/WBE firm, ep rson contacted,phone number and date and time of contact.)
-�7'No
I
NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. if a facsimile
is used, attach the fax confirmation, which is to provide M/WBE name, date, time, fax number and
documentation faxed.
NOTE: If the list of M/WBEs for a particular subcontracting/supplier opportunity is ten (10) or less, the
bidder must contact the entire list to 6e. iii compliance with questions 3 and 4. If the list of MM
for a
particular subcontracting/supplier opprtunity is ten (10) or more, the bidder must contact at least two.
thirds (2/3) of the list within such area of opportunity, but not less than ten to be in compliance with
questions 3 and 4.
5.) Did you provide plans and specifications to potential MIWBEs or information regarding the location of
plans and specifications in order to assist the M/WBEs?
yvs
—_—No
No
6.) Submit documentation if M/WBE quotes were rejected. The documentation submitted should be in
the forms of an affidavit, include a detailed explanation of why the M/WBE was rejected and any
supporting documentation the bidder wishes to be considered by the City. In the event of a bona fide
dispute concerning quotes, the bidder will provide for confidential in-camera access to and inspection
of any relevant documentation by City personnel.
Please use additional sheets, if necessary, and attach.
Company Name Telephone Contact Person Scope of Work Reason for Rejection
Rev.05/30/03
01/25/05 11:55 FAX 871 5724 CITY OF FT WORTH U010
gf
ATTACHMENT 1C
Page 3 of 3
.t
ADDITIONAL INFORMATION:
Please provide additiona
I information you feel will further explain your good and honest efforts to obtain
MjWBE participation on this project. i
J
,t
i
on request, complete and
provide, directly to the City up
The bidder further agrees top performed on this contract, the payment
accurate information regarding actual work
ed changes to the original arrangements submitted withthiand
thereof and any propos g ionbooks, records
The bidder also agrees to allow an audit and/or exate the actual ualfwork performed on this
files held by their company that w
contract, by an authorized officer or employee of the City.
misre resentation of facts will be grounds for
Any intentional and/or knowing p period of not less than three
terminating the contract or debarment� from e���alw� trk �°or Local laws concerning false
(3) years and'for initiating
statements. An failure to comply with this ordinance and creates ertdrlbarbred from
Y
contract may result in a determination of an irresponsible offeror an
participating in City work for a period of time not less than one (1) year.
The undersigned certifies that the information provided and the MNVBE(s) listed
was/were contacted in good faith. It is understood that any M/WBE(s) listed in
was1 C will be contacted and the reasons for not using them will be verified by
Attachment t
the City's M/WBE Office.
Printed Sig ature
�Aut o zed Sign t-u e
All ��� Contact Name and Title (if different) ;
y TitleSq7 eS//(p
ivy ��'i / f
Phone Number Fax Number
Company Name
S7� Gv Email Address
1 Address
41e)-f
CityistatelZip
Rev.05130/03
2002 AGC North Texas Construction Industry Wage Survey
Average_Hourly Health & pension Vacation Total
I Classification Rate Welfare Package
IAC Mechanical $17.55 $1.67 $0.38 $0.21 $19.81
AC Mechanical Helper $10.74 $1.70 $0.28 $0.18 $12.90
(Acoustic Ceiling Installer $14.26 $0.38 $0.20 $0.15 $14.99
1
Acoustic Ceiling Installer Helper $10.53 $0.20 $0.14 $0.09 $10.96
I'Bricklayer/Stone Mason $19.29 $1.62 $0.33 $0.00 $21.24
'Bricklayer/Stone Mason Helper $13.07 $0.35 $0.00 $0.00 $13.42
(Carpenter $15.76 $1.17 $0.47 $0.36 $17.76
;Carpenter Helper $11.69 $0.46 $0.27 $0.22 $12.64
Concrete Finisher $14.29 $0.40 $0.22 $0.00 $14.91
yConcrete Finisher Helper $10.09 $0.20 $0.00 $0.00 $10.29
Concrete Form Builder $12.16 $0.36 $0.03 $0.02 $12.57
Concrete Form Builder Helper $8.81 $0.00 $0.07 $0.04 $8.92
Drywall Taper $13.25 $0.89 $0.68 $0.32 $15.14
Drywall Taper Helper $8.00 $0.00 $0.25 $0.25 $8.50
Electrician $19.79 $1.88 $0.32 $0.61 $22.60
Electrician Helper $12.95 $1.59 $0.13 $0.19 $14.86
Electronic Technician $20.06 $1.31 $0.79 $1.34 $23.50
3
Electronic Technician Helper $12.27 $1.07 $0.79 $1.59 _ $15.72
$Floor Layer(Carpet) $15.17 $0.60 $0.32 $0.17 $16.26
Floor Layer(Resilient) $15.94 $0.00 $0.00 $0.00 $15.94
Floor Layer Helper $11.00 $0.00 $0.00 $0.00 $11.00
Glazier $14.35 $0.92 $0.16 $0.40 $15.83
Glazier Helper $10.32 $0.85 $0.23 $0.21 $11.61
Pipe Insulator $1.5.05 $0.94 $0.76 $0.14 $16.89
Pipe Insulator Helper $10.12 $1.13 $0.12 $0.00 $11.37
Laborer Common $9.21 $0.54 $0.07 1 $0.09 $9.91
Laborer Skilled $11.59 1 $0.82 $0.04 $0.16 $12.61
10/7/2002
G-AGC 2002 Wage Survey.xls 2002 Building Trades 1
2002 AGC North Texas Construction Industry Wage Survey
Classification Average Hourly Health & pension Vacation Total
Rate Welfare Package
Lather $15.94 $0.23 $0.02 $0.17 $16.36
Lather Helper $11.12 $0.45 $0.04 $0.33 $11.94
Metal Building Assembler $14.29 $5.62 $0.99 $0.49 $21.39
Metal Building Assembler Helper $9.33 $2.60 $0.04 $0.14 $12.11
Painter $12.86 $0.89 $0.62 $0.16 $14.53
Painter Helper $8.,66 $0.50 $0.31 $0.06 $9.53
Pipefitter $18.22 $1.59 $0.39 $0.41 $20.61
Pipefitter Helper $12.90 $1.72 $0.09 $0.43 $15.14
Plasterer $16.16 $0.75 $0.02 $0.18 $17.11
Plasterer Helper $9.98 $0.29 $0.02 $0.21 $10.50
Plumber $19.25 $1.53 $0.49 $0.20 $21.47
Plumber Helper $11.74 $1.18 $0.18 $0.21 $13.31
Reinforcing Steel Setter $13.00 $0.00 $0.00 $0.00 $13.00
Reinforcing Steel Setter Helper $9.31 $0.00 $0.00 $0.00 $9.31
Remediation Worker $11.75 $0.00 $0.00 $0.00 $11.75
Roofer $15.33 $0.52 $0.00 $0.06 $15.91
Roofer Helper $10.24 $0.44 $0.00 $0.00 $10.68
Sheet Metal Worker $15.73 $1.62 $0.36 $0.29 $18.00
Sheet Metal Worker Helper $10.53 $1.38 $0.30 $0.24 $12.45
Sheetrock Hanger $13.37 $0.43 $0.12 $0.26 $14.18
Sheet rock Hanger Helper $9.48 $0.16 $0.01 $0.11 $9.76
Fire Sprinkler Fitter $17.86 $2.17 $0.91 $0.30 $21.24
Fire Sprinkler Fitter Helper $13.33 $2.18 $0.66 $0.41 $16.58
Steel Worker Structural $16.20 $1.18 $0.30 $0.15 $17.83
Steel Worker Structural Helper $11.71 $2.05 $0.51 $0.16 $14.43
Concrete Pump $17.00 $0.00 $0.00 $0.15 $17.1.5
Crane,Clamshell, Backhoe,
Derrick, D'Une Shovel 1 $16.07 1 $1.11 1 $0.30 1 $0.05 1 $17.53
10/7/2002
G-AGC 2002 Wage Survey.xls 2002 Building Trades 2
2002 AGC North Texas Construction Industry Wage Survey
Classification Average Hourly Health & pension Vacation Total
Rate Welfare Package
i
Forklift $12.62 $0.91 $0.36 _$0.05 $13.94
1foundation Drill Operator $17.55 $1.23 $0.41 $0.00 $19.19
Front End Loader $13.27 $0.58 $0.00 $0.04 $13.89
Truck Driver
$12.66 $0.79 $0.13 $0.11 $13.69
; i
Welder $15.88 $0.93 $0.02 $0.21 $17.04
Welder Helper $11.25 $0.45 $0.05 1 $0.17 1 $11.92
I
k
10/7/2002
G-AGC 2002 Wage Survey.xls 2002 Building Trades 3
WEATHER TABLE
AVERAGE DAYS INCHES SNOW/ICE
MONTH RAINFALL(1) RAINFALL(2) PELLETS(3)
3
JANUARY 7 1.80 1
FEBRUARY 7 2.36
MARCH 7 2.54
APRIL, 9 4.30 0
MAY 8 4.47 0
a
JUNE 6 3.05 0
' JULY 5 1.84 0
AUGUST 5 2.26 0
SEPTEMBER 7 3.15 0
OCTOBER 6 2.68 0
NOVEMBER 6 2.03 0
DECEMBER 7 1.82
ANNUALLY 80 32.30 1
(1) Average normal number of days rainfall,0.01" or more.
f
(2) Average normal precipitation.
(3) One inch(1")or more.
* Less than one-half inch(1/2").
Unseasonable weather is defined for contract purposes as rain/snow days which exceed the average number
of days or inches of rainfall in any given month.
This table is based on information recorded at the former Greater Southwest International Airport,Fort
Worth,Texas,covering a period of 18 years. Latitude 32°50'N, Longitude 97°03'W, elevation(ground)
537 ft.
F
I
VENDOR COMPLIANCE TO STATE LAW
Section 2252.002, Texas Government Code,provides that, in order to be awarded a contract as low
bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal place of
business are outside of the State of Texas)bid projects for construction, improvements, supplies or
services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a
Texas resident bidder would be required to underbid a non-resident bidder in order to obtain a comparable
contract in the State in which the non-resident's principal place of business is located. The appropriate
blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to
meet specifications. The failure of out-of-state or non-resident contractors to do so will automatically
disqualify that bidder. Resident bidders must check the box in Section B.
A. Non-resident vendors in (give state), our principal place of business, are required to
be percent lower than resident bidders by state law. A copy of the statute is
attached.
Non-resident vendors in (give state), our principal place of business, are not required
to underbid resident bidders.
f
B. Our principal place of business or corporate office is in the State of Texas.
Please Check or mark with an "Y'
BIDDER:
:
y✓� By:-S6:5lru,�rOS+: �('= �. -� v �� , Company��l►t� ����
(please print)
Signature:
(please print)
r�
Title:
(please print)
City/ State k 1,-< , Zip ®7 /H
THIS FORM MUST BE RETURNED WITH YOUR QUOTATION
VENDOR COMPLIANCE TO STATE LAW
CONTRACTOR COMPLIANCE WITH
WORKERS' COMPENSATION LAW
Pursuant to V.T.C.A. Labor Code §406.96 (2000), as amended, Contractor certifies that
it provides workers' compensation insurance coverage for all of its employees employed
on City of Fort Worth Department of Engineering No. and City of Fort
Worth Project No. C 7-8go --A (000 00 313v
Lfbovo-07Z70
1 (GvI g gpoco -WRACTOP,
3 By:
I
Title: �c
Date: - -
STATE OF TEXAS §
COUNTY OF TARRANT §
Befor M,e, t e undersigned authority, on this day personally appeared
nown to me to be the person whose name is subscribed to the
foregoing i str agent, d ac owledge to a that he gxecuted the same as the act
and deed o t/� for the purposes and
consideration therein expressed and in the capacity therein stated.
Given Under My Hand and Seal of Office this n day of 120015 .
MISHIKA HOWARD
Notary Public,State of Texas
,€ My Commission Expires Notary Public in and for the State of
March 06,2006 Texas
a
4
Con
O o � •�
cd 45.4 >1
Cdb
O
3
cri
5 rd
O
�j► P-4 N U O
Cd
OO N
•O� >cn O "-.q
� 'cd �--' q c� w O
rte, 4-+
a) C40 ro
•� � � x O
O O b O ,y Ct
� 03
cu
Cd
cd
� � o
M 0
N
O � ct3
>
•O
a N col u Nva
i
00
Cc3 •U M
., CdN_ a�
cd
cn -413i
cd
vi
O bq
O ct
9 CA
cd
c CdCd
• O
cd '-+
CA t-f
cd
cd
u �., cc3
a
N ��,� C�
r-+ Nsaq cu CU
�..{
crj
cn ° Cd
•�A � °
c p O
NcldCid rA
cn CU
CU
Cld
Gu U
Cd
Cld
Cd M
� U
cu
`■/ Cld
• cry p cld +j u ctCU Cl) CU
U Cid
� OHO � �
U ( ° R3 .�
cu
Cd U
f
PROJECT DESIGNATION SIGN
4'-0"
iS-288
4
41„ FORT W01 H
1
I
r 1
6 2"
PMS-167
3 Proj' ect Title
31/ 2ND LANE
4 -p 3„
IF NECESSARY
1 Contractor: 1„
2z" -Contractor's Name__- 2
2111
FUNDED BY A
.�- 1
1"r 2004 CAPITAL IMPROVEMENT PROGRAM �1
�24
112"= Scheduled Completion Date t- z
1 "T Year
5"
1„
FONTS:
1 FORT WORTH LOGO IN CHELTINGHAM BOLD
ALL OTHER LETTERING IN ARIAL BOLD
COLORS:
FORT WORTH-PMS 288
LONGHORN LOGO-PMS 167
LETTERING-PMS 288
BACKGROUND-WHITE PROJECT DESIGNATION SIGN
BORDER-BLUE (Community Development Block Grant projects only)
CITY OF FORT WORTH-CONSTRUCTION STANDARD
DRAWING N0. DATE: 9--20-02
4
TECHNICAL SPECIFICATIONS
DIVISION 1 - GENERAL.REQUIREMENTS
SECTION 01100-SUMMARY OF WORK
The Contractor shall supply all superintendence and shall perform all work and furnish all labor,
equipment, materials and incidentals necessary and complete all work as described in the plans
and specifications. All construction and other work shall be done by the Contractor in
accordance with the best engineering and construction practices for the skill or trade involved.
The work to be accomplished under these plans and specifications for: Playground
"r Renovations at Cobb South Park(Mapsco No. 77-Z), Seminary Hills Park(Mapsco No. 90-
Q), Tadlock Park(Mapsco No. 92-A), South Z. Boaz Park(Mapsco No. 87-G) includes:
Site/equipment demolition, site grading and installation of new playground
equipment and park amenities as per construction documents.
These plans and specifications were prepared by the Parks and Community Services Department.
The Department of Engineering will administer the contract and furnish inspection.
In addition to project performance stated above, the Contractor shall also be responsible for:
i
1. Setting all project layout dimensions and final finish grade elevations in accordance to plans.
All such survey work shall be performed by a Registered Surveyor in the State of Texas and
verification provided to the City that such survey work complies to plans and specifications.
2. Attend all project progress meetings as scheduled by the City and provide updated project
schedules within 3 calendar days upon request by the City.
The applicable items contained in the Standard Specifications for Street and Storm Drain
Construction for the City of Fort Worth, Texas, shall apply to this contract just as though each
were incorporated in these documents. Where the provisions or specifications contained in those
documents are contrary to this publication, this publication shall govern. In case of conflict
between plans and specifications, the plans shall govern. A copy of the Standard Specifications
for Street and Storm Drain Construction can be purchased at the office of the Transportation and
Public Works Department, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort
Worth, Texas.
The Contractor shall provide all permits and licenses and pay all charges and fees, and give all
notices necessary and incidental to the due and lawful prosecution of the work. The Contractor
shall contact the City of Fort Worth's Development-Plans Exam Section for a detennination of
applicable pen-nits or variances required for this project.
GENERAL REQUIREMENTS
i
SECTION 01135 - CONTRACT TIME
1.01 PROGRESS AND COMPLETION
Upon receipt of a notification letter and the executed construction contract, the
Contractor shall be responsible for scheduling a preconstruction conference,which shall
be held no later than ten working days from the date of the notification letter.
At the time of the preconstruction conference , a construction start date shall be
established and indicated in the Notice to Proceed(Work Order) issued by the
Engineering Department. The Contractor shall begin the work to be performed under the
contract on or before ten working days from the date the Work Order is issued. The
Contractor shall carry the work forward expeditiously with adequate forces and shall
complete it within the period of time stipulated in the contract.
1.02 LIQUIDATED DAMAGES
This project shall be completed within the specified days allowed. If project construction
exceeds the allotted contract time, liquidated damages will be assessed as stipulated in
the City of Fort Worth Standard Specification for Street and Storm Drain Construction. In
the event of a dispute regarding either final quantities or liquidated damages, the parties
shall attempt to resolve the differences within 30 calendar days.
SECTION 01140-ALTERNATIVES
The City reserves the right to abandon, without obligation to the contractor, any part of the
project (subject to conditions set forth in Section 01150 -Payment to Contractor) or the entire
project at any time before the Contractor begins any construction work authorized by the City.
SECTION 01150- PAYMENT TO CONTRACTOR, PROJECT ACCEPTANCE &
WARRANTY
1.01 SCOPE OF PAYMENT: The Contractor shall accept the compensation as provided in
the contract in full payment for furnishing and paying for all materials, supplies,
subcontracts, labor, tools and equipment necessary to complete the work of the
contract; for any loss or damage which may arise from the nature of the work from the
action of the elements, or from any unforeseen difficulty which may be encountered in
the prosecution of the work, until the final acceptance of the work by the City; for all
risks of every description connected with the prosecution of the work; for all expenses
and damages which might accrue to the Contractor by reason of delay in the initiation
and prosecution of the work from any cause whatsoever; for any infringement of patent,
trademark or copyright, and for completing the work according to the plans and/or
specifications. The payment of any current or partial estimate shall in no way affect the
obligations of the Contractor to repair or remove, at his own expense, the defective
parts of the construction or to replace any defective materials used in the construction,
GENERAL REQUIREMENTS
-2-
and to be responsible for all damages due to such defects if such defects or damages are
discovered on or before the final inspection and acceptance of the work.
1.02 Partial pay estimates shall be submitted by the Contractor or prepared by the City on
the 1st day and 15th day of each month that the work is in progress. Estimates will be
paid within 25 days following the end of the estimate period, less the appropriate
retainage as set out below. Partial pay estimates may include acceptable nonperishable
materials delivered to the work place which are to be incorporated into the work as a
permanent part thereof,but which at the time of the pay estimate have not been so
installed. If such materials are included within a pay estimate,payment shall be based
upon 85% of the net invoice value thereof. The Contractor will furnish the Engineer
such information as may be reasonably requested to aid in the verification or the
preparation of the pay estimate.
1.03 It is understood that the partial pay estimate amounts will be approximate only, and all
partial pay estimates and payment of same will be subject to correction in the estimate
rendered following the discovery of the mistake in any previous estimate. Payment of
any partial pay estimates shall not be an admission on the part of the Owner of the
amount of work done or of its quality or sufficiency or as an acceptance of the work
done;nor shall same release the Contractor of any of its responsibilities under the
Contract Documents.
1.04 The City reserves the right to withhold the payment of any partial estimate if the
Contractor fails to perform the work in strict accordance with the specifications or other
provisions of this Contract.
1.05 Retainage- For contracts of less than $400,000 at the time of execution, retainage
shall be 10 percent. For contracts of$400,000 or more at the time of execution,
retainage shall be 5 percent. The Contractor will receive full payment for work,
less retainage, from the City, on each partial payment period.
Payment of the retainage will be included with the final payment after acceptance
of the project being complete.
1.06 Contractor shall pay subcontractors in accord with the subcontract agreement within five
business days after receipt by Contractor of the payment by City. Contractor's failure to
make the required payment to subcontractors will authorize the City to withhold future
payments from the Contractor until compliance with this paragraph is accomplished.
r 1.07 Contractor hereby assigns to City any and all claims for overcharges associated with this
i
contract which arise under the antitrust laws of the United States, 15 U.S.C.A. Sec. 1 et
seq(1973).
1.08 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter
the quantities of the work to be performed or to extend or shorten the improvements at
any time when and as found to be necessary, and the Contractor shall perform the work
GENERAL REQUIREMENTS
-3-
as altered, increased or decreased at the unit prices. Such increased or decreased quantity
shall not be more than 25 percent of the contemplated quantity of such item or items.
When such changes increase or decrease the original quantity of any item or items of
work to be done or materials to be furnished by the 25 percent or more, then either party
to the contract shall upon written request to the other party be entitled to a revised
consideration upon that portion of the work above or below the 25 percent of the original
quantity stated in the proposal; such revised consideration to be determined by special
agreement or as hereinafter provided for "Extra Work." No allowance will be made for
any changes in anticipated profits nor shall such changes be considered as waiving or
invalidating any conditions or provisions of the Contract Documents.
1.09 PAYMENT FOR EXTRA WORK: Extra work performed by the Contractor, that is
authorized and approved by the City Engineer,will be paid for under "Change orders"
made in the manner hereinafter described, and the compensation thus provided shall be
accepted by the Contractor as payment in full for all labor, subcontracts,materials, tools,
equipment and incidentals, and for all supervision, insurance,bonds and all other expense
of whatever nature incurred in the prosecution of the extra work. Payment for extra work
will be made under one of the following types of"Change orders" to be selected by the
City:
A. Method"A". By unit prices agreed upon in the contract or in writing by the
Contractor and City Engineer and approved by the City Council before said extra
work is commenced subject to all other conditions of the contract.
B. Method "B". By a lump sum price agreed upon in writing by the Contractor and
City Engineer and approved by the City Council before said extra work is
commenced, subject to all other conditions of the contract.
C. Method"C". By actual field cost of the work,plus 15 percent as described herein
below, agreed upon in writing by the Contractor and City Engineer and approved
by the City Council after said extra work is completed, subject to all other
conditions of the contract.
In the event extra work is to be performed and paid for under Method "C", the actual
field costs of the work will include the cost of all workmen, foremen, timekeepers,
mechanics and laborers working on said project; all used on such extra work only,
plus all power, fuel, lubricants, water and similar operating expenses; and a ratable
proportion of premiums on performance and payment bonds,public liability,
workmen's compensation and all other insurance required by law or ordinance. The
City Engineer will direct the form in which the accounts of actual field cost will be
kept and will recommend in writing the method of doing the work and the type and
kind of equipment to be used,but such extra work will be performed by the
Contractor as an independent contractor and not as an agent or employee of the City.
The 15 percent of the actual field cost to be paid the Contractor shall cover and
compensate him for profit, overhead, general supervision and field office expense,
GENERAL REQUIREMENTS
-4-
and all other elements of cost and expense not embraced within the actual field cost
as herein specified.
The Contractor shall give the City Engineer access to all accounts,bills, invoices and
vouchers relating thereto.
1.10 DELAYS: If delay is caused by specific orders given by the City to stop work, or by the
performance of extra work, or by the failure of the City to provide material or necessary
instructions for carrying on the work, then such delay will entitle the Contractor to an
equivalent extension of time,his application for which shall, however,be subject to the
approval of the City Council; no such extension of time shall release the Contractor or the
surety on his performance bond from all his obligations hereunder which shall remain in
full force until the discharge of the contract.
3
1.11 CLAIMS AND DAMAGES: Any claims for extra work or for any other related matter
or cause must be made in writing to the City Engineer within seven calendar days from
and after the cause or claim arises. Unless such claim is so presented, it shall be held that
the Contractor has waived the claim, and he shall not be entitled to receive pay thereof.
5
1.12 TRANSPORTATION: No allowance or deduction will be made for any charge of freight
rates. No allowance for transportation of men,materials or equipment will be allowed.
1.13 ACCEPTANCE AND FINAL PAYMENT: The City,upon receipt of the Director's
"Certificate of Completion" and "Final Estimate" and upon receipt of satisfactory
' evidence from the Contractor that all subcontractors and persons furnishing labor or
materials have been paid in full and all claims of damages to property or persons because
of the carrying on of this work have been resolved, or the claims dismissed or the issues
joined, shall certify the estimate for final payment after previous payments have been
deducted and shall notify the Contractor and his surety of the acceptance of the project.
Bills Paid Affidavit and Consent Of Surety shall be required prior to final payment
becoming due and payable. In the event that the Bills Paid Affidavit and Consent Of
Surety have been delivered to the City and there is a dispute regarding(1) final quantities,
or(2) liquidated damages, the City shall make a progress payment in the amount that the
City deems due and payable.
On projects divided into two or more units, the Contractor may request a final payment
3 on one or more units which have been completed and accepted.
On delivery of the final payment, the Contractor shall sign a written acceptance of the
final estimate as payment in full for the work done. All prior partial estimates shall be
subject to correction in the final estimate and payment.
1.14 WARRANTY: The Contractor shall be responsible for defects in this project due to
faulty workmanship or materials, or both, for a period of two (2) years beginning as of
the date that the final punch list has been completed and the project accepted by the City
as of the date the final punch list has been completed, as evidenced by a written
GENERAL REQUIREMENTS
-5-
statement signed by the Contractor and the City. The contractor will be required to
replace, at own expense, any part, or all, of this project which becomes defective due to
these causes.
SECTION 01300- SUBMITTALS
Prior to construction, the Contractor shall furnish the Parks and Community Services Department
a schedule outlining the anticipated time each phase of construction will begin and be completed,
including sufficient time for turf establishment(if applicable) and project clean-up.
The Contractor shall submit to the Project Manager shop drawings,product data and samples
required in specification sections. Refer to Section 01640— 1.02.
SECTION 01400 - QUALITY CONTROL
The Contractor will receive all instructions and approvals from the Director of Engineering
and/or his assigned inspectors. The inspector will be introduced to the contractor prior to
beginning work. Any work done at the direction of any other authority will not be accepted or
paid for. Final approval for the finished project shall be given by the Director of Engineering,
City of Fort Worth.
The Contractor or a competent and reliable superintendent shall oversee the work at all times.
The superintendent shall represent the Contractor in his absence and all directions given to him
shall be binding as if given to the Contractor.
SECTION 01410-TESTING
All tests made by the testing laboratory selected by the City will be paid for by the City. In the
event manufacturing certificates are requested, they shall be paid for by the Contractor.
SECTION 01500-TEMPORARY FACILITIES AND CONTROLS
The Contractor shall take all precautions necessary to protect all existing trees, shrubbery,
sidewalks,buildings, vehicles, utilities, etc., in the area where the work is being done. The
Contractor shall rebuild, restore, and make good at his own expense all injury and damage to
same which may result from work being carried out under this contract.
The utility lines and conduits shown on the plans are for information only and are not guaranteed
by the Owner to be accurate as to location and depth; they are shown on the plans as the best
information available from the owners of the utilities involved and from evidences found on the
ground. The Contractor shall determine the exact location of all existing utilities and conduct his
work to prevent interruption of service or damages.
GENERAL REQUIREMENTS
-6-
SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES
A warning sign not less than five inches by seven inches,painted yellow with black letters that
are legible at twelve feet, shall be placed inside and outside vehicles such as cranes, derricks,
power shovel, drilling rigs,pile drivers,hoisting equipment or similar machinery. The warning
sign shall read as follows:
"WARNING-UNLAWFUL,TO OPERATE THIS EQUIPMENT
WITHIN SIX FEET OF HIGH VOLTAGE LINES."
Equipment that may be operated within six feet of high voltage lines shall have an insulating
cage-type guard about the boom or arm, except backhoes or dippers, and insulator links on the
lift hood connections.
When necessary to work within six feet of high voltage electric lines, the Contractor shall notify
power company(TU Electric or the appropriate power supplier) to erect temporary mechanical
barriers, de-energize the line, or raise or lower the line. The contractor shall maintain a log of all
such correspondence. The Contractor is responsible for all costs incurred.
SECTION 01640- PRODUCT OPTIONS
1.01 GENERAL
For review and approval of products to be used on this project, send submittals to:
Scott Penn,Project Manager (817) 871-5750
Parks and Community Services Department
4200 S. Freeway Suite 2200
Fort Worth, Texas 76115-1499
1.02 PRODUCTS LIST
A. Within five (5) Working Days after commencement of work, the Contractor shall
submit to the Project Manager two (2) copies of complete list of all specified
products and submittals for review and approval.
B. All specified manufacturer's products listed in the Equipment Schedule in the
construction plans have been previously reviewed and approved in conformance to
playground prototype designs approved for use in the City of Fort Worth.
C. All equipment specified(composite play structures, arch swings,buck-a-bouts,
spring animals,whirls)which comprise the various playground prototype options
has been designed to conform to both the Consumer Product Safety Commission
(CPSC) guidelines and Americans With Disabilities Act(ADA) requirements and
as such,no other product equipment shall be considered.
GENERAL REQUIREMENTS
-7-
C. For products specified under reference standards, include with listing of each
product:
1. Name and address of manufacturer
2. Trade name
3. Model or catalog designation
4. Manufacturer's data
a. Performance and test data
b. Reference standards
D. Specified material shall not be ordered by the Contractor until such time product
material submittals have been received, reviewed and approved by the project
consultant and/or City.
SECTION 01700- PROJECT CLOSEOUT
1.01 CLEAN -UP
The Contractor shall make final clean-up of the construction area, to the satisfaction of
the Parks and Community Services Department, as soon as construction in that area is
completed. Clean-up shall include removal of all construction materials, pieces of
concrete, equipment and/or other rubbish. No more than five(5) days shall elapse after
the completion of construction before the area is cleaned. Surplus materials shall be
disposed of by the Contractor, at this own expense, and as directed by the Parks and
Community Services Department. Cleaning of equipment by Contractor or
Subcontractor, such equipment as cement mixers,ready-mix trucks, tools, etc., shall talce
place in an area designated by the Parks and Community Services Department.
SECTION 01800- CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS
Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel
at the project site for contractor's sole negligence. In addition, Contractor covenants and agrees
to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and
employees, from and against any and all claims or suits for property loss, property damage,
personal injury, including death, arising out of, or alleged to arise out of,the work and services
to be performed hereunder by Contractor, its officers, agents, employees, subcontractors,
licensees or invitees, whether or not any such injury, damage or death is caused,in whole or
in part, by the negligence or alleged negligence of Owner, its officers, servants or
employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner
from and against any and all injuries to Owner's officers, servants and employees and any
damage, loss or destruction to property of the Owner arising from the performance of any of the
terms and conditions of this Contract, whether or not any such injury or damage is caused in
whole or in part by the negligence or alleged negligence of Owner, its officers, servants or
employees.
GENERAL REQUIREMENTS
-8-
In the event Owner receives a written claim for damages against the Contractor or its
subcontractors prior to final payment, final payment shall not be made until Contractor either(a)
submits to Owner satisfactory evidence that the claim has been settled and/or a release from the
claimant involved, or(b)provides Owner with a letter from Contractor's liability insurance
carrier that the claim has been referred to the insurance carrier.
The Director may, if he deems appropriate,refuse to accept bids on any other City of Fort Worth
t public work from a Contractor against whom a claim for damages is outstanding as a result of
work performed under a City Contract.
Z
END OF DIVISION
_ x
A
3
}
GENERAL REQUIREMENTS
-9-
i
SECTION 02140 - SITE UNDERDRAINS
PART I- GENERAL
1.01 SCOPE: Work in this section includes furnishing all labor, materials, equipment, and services
required to construct underdrains to the required lines, grades, and cross sections as specified
herein and on the plans.
1.02 RELATED WORK SPECIFIED ELSEWHERE:
A. Section 02300 - Earthwork.
B. Section 03300 - Cast-in-Place Concrete
E
PART 2 - PRODUCTS
2.01 UNDERDRAIN PIPE: Pipe and fittings shall be flexible, corrugated tubing manufactured of
high-density polyethylene resins and conforming to ASTM Product Specifications F-405 and
F-667. Drainage tubing shall be as manufactured by Advanced Drainage Systems (ADS), Inc.,
of Columbus, Ohio. The local manufacturing plant which will provide a list of suppliers is in
Ennis, Texas - telephone (972) 878-9600.
A. Perforated Pipe: Perforations shall be linear slots cut radially into the tubing wall
between corrugations. Perforated pipe will be furnished complete with the Cerex nylon
"Drain Guard" screen. The screen will completely surround the pipe and will have a
lapped,welded longitudinal joint.
B. Non-Perforated Pipe: Non-perforated pipe shall be used for collector lines which
convey the water from perforated pipe to the concrete inlet or outfall.
C. Fittings: All couplings,reducers, tees, ells,plugs, caps, and other fittings shall be non-
perforated and shall be of the same manufacturer as the drainage tubing. A fitting shall
be used at each pipe junction/termination, as appropriate.
2.02 FILTER MATERIAL: Filter material for use in backfilling trenches over and around
underdrains shall consist of 1/2" to 1" washed stone free of organic or other deleterious matter.
2.03 FILTER FABRIC: Filter fabric to line and lap over gravel filled subdrain trench shall be
Mirafi 14ON drainage fabric as manufactured by Celanese Corporation, (800) 223-9811, or
approved equal.
PART 3 -EXECUTION
3.01 VERTICAL AND HORIZONTAL CONTROLS:
A. The Contractor shall establish or shall employ a licensed surveyor to establish all lines
and grades necessary for each stage of the work described herein.
SITE UNDERDRAINS
02140
- 1 -
S. Provide blue tops for reference in dressing trench bottoms at intervals not to exceed 30
feet along the centerline of each trench.
3.02 UNDERDRAINS: Trenches for underdrains shall be dug after the subgrade is prepared. The
excavation of each trench shall begin at its outlet and proceed toward its upper end. The trench
must not be excavated below the proposed grade line. Trenches will be cleaned of all loose
material and their bottoms will be dressed and fine graded to blue tops set as previously
described. Trenches shall be lined with filter fabric and underdrain pipe shall be set on the
trench bottom. All fittings shall be securely coupled and all open ends will be capped. The
pipe shall be carefully covered with the gravel filter material and the filter fabric shall be
lapped over the trench.
Care shall be taken not to damage the pipe or its fabric filter screen. Underdrain pipe shall be
connected to solid pipe joints and to outfall at the concrete structure/collar as indicated in the
plans. Care shall be taken not to loosen or cave-in the trench walls. Any such damage will be
excavated and will be backfilled in mechanically tamped lifts not to exceed eight inches and
will be re-constructed.
3.03 SETTLEMENT: After the trench has been backfilled it shall be thoroughly soaked. This
process shall be repeated two times allowing the backfill material to dry twenty-four hours
before wetting again.
END OF SECTION
SITE UNDERDRAINS
02140
-2-
SECTION 02200- SITE PREPARATION
PART 1 - GENERAL
1.01 SCOPE: Work in this section includes furnishing all labor, materials, equipment and services
required for clearing and grubbing, demolition, and removal and disposal of items as specified
herein and on the plans.
1.02 RELATED WORD SPECIFIED ELSEWHERE:
A. Section 02300 -Earthwork
B. Existing Conditions, Removal and Demolition Items.
3
5
PART 2—PRODUCTS
:
2.01 No products are required to execute this work, except as the Contractor may deem necessary.
PART 3—EXECUTION
3.01 CLEARING AND GRUBBING:
A. Clearing and grubbing shall consist of removing all natural and artificial objectionable
materials from the project site or from limited areas of construction specified within the
r
site.
r B. In general, clearing and grabbing shall be performed in advance of grading and
earthwork operations and shall be performed over the entire area of earthwork
operations.
C. Unless otherwise specified on the plans, all trees and shrubs of three inch(3") caliper or
less (caliper is the diameter as measured twelve inches (12") above the ground) and all
scrub growth, such as cactus, yucca,vines, and shrub thickets, shall be cleared. All
dead trees, logs, stumps,rubbish of any nature, and other surface debris shall also be
cleared.
D. Buried material such as logs, stumps,roots of downed trees that are greater than one
and one half inches (1-1/2") in diameter, matted roots,rubbish, and foreign debris shall
be grubbed and removed to a minimum depth of twenty four inches (24") below
proposed finished grades.
E. Ground cover consisting of weeds, grass, and other herbaceous vegetation shall be
removed prior to stripping and stockpiling topsoil from areas of earthwork operations.
Such removal shall be accomplished by"blading" off the uppermost layers of sod or
root-matted soil for removal.
SITE PREPARATION
02200
- 1 -
3.02 PAVEMENT REMOVAL:
A. Bituminous and concrete pavements shall be removed to neatly sawed edges. Saw cuts
shall be full depth. If a saw cut in concrete pavement falls within three feet(3') of an en
existing score joint, construction joint, saw joint, cold joint, expansion joint, or edge,
the concrete shall be removed to that joint or edge. All saw cuts shall be parallel and/or
perpendicular to the line of existing pavement. If an edge of a cut is damaged
subsequent to saw cutting, the concrete shall again be sawed to a neat, straight line for
the purpose of removing the damaged area.
B. Concrete curb and gutter shall be removed as specified above. No section to be replaced
shall be smaller than thirty inches (30") in length or width.
3.03 UTILITIES REMOVAL: In general,those utilities on the site that are to be removed and that
belong to the Owner shall be removed by the Contractor. The Owner is responsible for
arranging the relocation or removal of other utilities owned by utility companies or other
parties.
3.04 MINOR DEMOLITION: There may be certain items on the site such as old building
foundations, fences, and other undetermined structures and improvements that must be
removed before construction can commence. Unless otherwise specified, such items become
the property of the Contractor for subsequent disposal.
3.05 USE OF EXPLOSIVES: The use of explosives will not be permitted in site preparation
operations.
3.06 BACKFILLING: All holes, cavities, and depressions in the ground caused by site preparation
operations will be backfilled and tamped to normal compaction and will be graded to prevent
ponding of water and to promote drainage. Should any excavated hole or cavity be required
to be left open over night, the Contractor shall be responsible to provide barriers and/or
coverings to enhance on site accident prevention measures.
3.07 DISPOSAL OF WASTE MATERIALS:
A. Unless otherwise stated, materials generated by clearing, grubbing, removal, and
demolition shall be known as "waste" or "spoils" and shall be removed from the site and
disposed of by the Contractor. Similar materials may be unearthed or generated by
earthwork operations or by subgrade preparation. Unless otherwise specified any
merchantable items become the property of the Contractor.
END OF SECTION
SITE PREPARATION
02200
-2-
SECTION 02300 -EARTHWORK
PART 1 -GENERAL
3 1.01 SCOPE: Work in this section includes furnishing all labor,materials, equipment, and services
required to construct, shape, and finish earthwork to the required lines, grades, and cross
sections as specified herein and on the plans.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Section 02200 - Site Preparation.
B. Grading Plan: Refer to plan sheets.
1.03 METHOD OF PAYMENT: Earthwork is a necessary and incidental part of the work. The
total cost will be included in the Bid Proposal. Payment will be made on a Lump Sum basis
only.
PART 2 - PRODUCTS
2.01 UNCLASSIFIED EXCAVATION: Unclassified excavation shall consist of all excavation,
unless separately designated,within the limits of the work. Unclassified excavation includes
all material encountered regardless of its nature or the manner in which it is to be excavated.
2.02 UNCLASSIFIED FILL
A. Unclassified fill shall consist of all fill within the limits of the work. All suitable native
materials removed in unclassified excavation, or similar imported materials, shall be
used insofar as practicable as unclassified fill. Properly deposited, conditioned, and
compacted fill is hereinafter referred to as "earth embankment."
B. Rock: Minor quantities of rock not greater than four inches in greatest dimension are
permissible in fill materials used to construct earth embankment. Minor quantities of
rock of greater dimensions may be placed in the deeper fills in accordance with the
State Department of Highways and Public Transportation requirements for construction
of rock embankments,provided such placement of rock is not immediately adjacent to
structures or piers. Also, rock may be placed in the portions of embankments outside
the limits of the completed graded width where the size of the rock prohibits their
incorporation in the normal embankment layers.
2.03 TOPSOIL
On-Site Topsoil: Topsoil shall consist of an average depth of six inches (6") of native surface
soil left in place after the ground cover of herbaceous vegetation and other objectionable matter
has been cleared by"blading," as specified in Section 02200, "Site Preparation." Topsoil may
be greater or less, than the upper six inches (6") in depth.
EARTHWORK
02300
- 1 -
2.04 IMPORTED FILL
A. Imported fill materials shall be used for the construction of earth embankment in the
event that(1) the volume of unclassified excavation is less than the volume of fill
required for earth embankment and/or(2)the condition of materials removed in
unclassified excavation makes them unsuitable for use in the construction of earth
embankment.
B. The Contractor shall haul and place imported fill obtained from off-site sources as
necessary to construct the embankment and various other details of the construction
plans. All costs related to such imported fill will be included in the contract price, and
no additional or separate payment for imported fill will be due the Contractor.
C. A sample of the proposed imported fill must be provided by the Contractor and be
approved by the Owner. In general, imported material must be equal to or better than
native material in quality and engineering characteristics. The Architect/Engineer may
also require the Contractor to provided a material analysis test of the proposed fill.
2.05 SELECT MATERIALS
A. Select materials shall be imported from offsite sources, unless they are available from
specifically designated areas on the site as marked on the plans.
2.06 UNSUITABLE MATERIALS
A. Topsoil, select material, imported fill, or unclassified fill will be declared as
"'unsuitable" by the Owner if, in his opinion, any of the following conditions or matter
and particles are present to a degree that is judged detrimental to the proposed use of the
material.
1. Moisture
2. Decayed or undecayed vegetation
3. Hardpan clay, heavy clay, or clay balls
4. Rubbish
5. Construction nibble
6. Sand or gravel
7. Rocks, cobbles, or boulders
8. Cementious matter
9. Foreign matter of any kind
B. Unsuitable materials will be disposed of as "waste" as specified in Section 02200.
C. Wet Material: If fill material is unsatisfactory for use as embankment solely because of
high moisture content, the Architect/Engineer may grant the Contractor permission to
process the material to reduce the moisture content to a usable optimum condition.
EARTHWORK
02300
-2-
PART 3 - EXECUTION
3.01 SITE PREPARATION: In general, "site preparation," as specified in Section 02200, shall be
performed in advance of grading and earthwork operations and shall be completed over the
entire area of earthwork operations.
3.02 TOPSOIL
7
A. The removal and storage of topsoil shall occur after site preparation is complete and
before excavation and embankment construction begin. Likewise, topsoil will be
replaced after excavation and embankment construction are complete.
B. Removal: Topsoil shall be stripped to an average depth of six inches (6") from areas
where excavation and embankment construction are planned. Topsoil may be obtained
from greater depths if it is uncontaminated by the substratum and it is of good quality,
in the opinion of the Architect/Engineer.
C. Storage: Topsoil shall be stored in stockpiles conveniently located to areas that will
later receive the topsoil. Stockpiles shall be out of the way of earthwork operations in
locations approved by the Owner or Architect/Engineer. Stored topsoil shall be kept
separate from other excavated materials and shall be protected from contamination by
? objectionable materials that would render it unsuitable.
D. Timing: Topsoil will not be replaced(deposited) until construction activities are
complete that would create undesirable conditions in the topsoil, such as
overcompaction or contamination. Trenching for items such as electrical conduit and
:
irrigation pressure lines must be complete before topsoil replacement may begin.
x
D. Replacement: Topsoil will be deposited in a single layer or lift. It will be placed,
processed, compacted, and graded to leave a finished layer of topsoil not less than five
inches in depth. Unless otherwise indicated,topsoil will be replaced over all areas of
earthwork (including slopes), except where pavement is planned.
F. Grading: Topsoil will be final graded to the elevations shown on the plans. Fine
grading will be accomplished with a weighted spike harrow, weighted drag, tractor box
blade, light maintainer, or other acceptable machinery. All particles of the finish grade
shall be reduced to less than one inch in diameter or they shall be removed. All rocks of
one inch or greater shall also be removed. Grading operations and equipment will be
such that topsoil does not become overcompacted. Bulldozer blades and front-end
loader buckets are not acceptable devices for topsoil grading operations. Final grading
within five feet of constructed or installed elements shall be hand raked.
G. Acceptability: Finished areas of topsoil are satisfactory if they are true to grade,true in
plane, even in gradient(slope), uniform in surface texture, and of normal compaction.
Areas of loose granular pockets or of overcompacted soils are not acceptable and will
3 be reworked. Finished areas will promote surface drainage and will be ready for
turfgrass planting.
EARTHWORK
02300
-3-
i
3.03 UNCLASSIFIED EXCAVATION
A. All excavated areas shall be maintained in a condition to assure proper drainage at all
times, and ditches and sumps shall be constructed and maintained to avoid damage to
the areas under construction.
B. Surplus Material:
1. Surplus excavation is that quantity of material that may be left over after the
grading plan is executed, and all earthwork operations, including excavation,
embankment construction, topsoil replacement, and final grading, are
completed. Any other surplus material shall be disposed of as "waste" as
specified in Section 02200. All such cost for removal shall be considered as
incorporated into Earthwork costs
C. Excavation in Rock: The use of explosives will not be permitted. Unless otherwise
indicated on the plans, excavation in solid rock shall extend six inches (6") below
required subgrade elevation for the entire width of the area under construction and shall
be backfilled with suitable materials as indicated on the plans.
3.04 EARTH EMBANKMENT
A. Earth embankment is defined as embankment composed of suitable materials removed
in unclassified excavation and/or imported fill. The construction of embankment
includes preparing the area on which fill is to be placed and the depositing,
conditioning, and compaction of fill material.
B. General: Except as otherwise required by the plans, all embankment shall be
constructed in layers approximately parallel to the finished grade of the graded area, and
each layer shall be so constructed as to provide a uniform slope as shown on the grading
plan. Embankments shall be constructed to correspond to the general shape of the
typical sections shown on the plans, and each section of the embankment shall
correspond to the detailed section or slopes established by the drawings. After
completion of the graded area, embankment shall be continuously maintained to its
finished section and grade until the project is accepted.
C. Preparation: Prior to placing any embankment, all preparatory operations will have
been completed on the excavation sources and areas over which the embankment is to
be placed. The subgrade shall be proof rolled to detect soft spots, which if exist, should
be reworked. Proof rolling shall be performed using a heavy pneumatc tired roller,
loaded dump truck, or similar piece of equipment weighing approximately twenty five
(25)tons except as otherwise specified for tree protection and areas inaccessible to
vehicular compactors. Stump holes or other small excavations in the limits of the
embankments shall be backfilled with suitable material and thoroughly tamped by
approved methods before commencing embankment construction. The surface of the
ground, including plowed, loosened ground, or surfaces roughened by small washes or
otherwise, shall be restored to approximately its original slope by blading or other
methods, and,where indicated on the plans or required by the Owner, the ground
surface, thus prepared, shall be compacted by sprinkling and rolling.
EARTHWORK
02300
-4-
D. Scarification: The surface of all areas and slopes over which fill is to be placed, other
than rock, shall be scarified to a depth of approximately six (6") inches to provide a
bond between the existing surface and the proposed embankment. Scarification shall be
accomplished by plowing, discing, or other approved means. Prior to fill placement, the
loosened material shall be adjusted to the proper moisture content and recompacted to
the density specified herein for fill.
3
E. Benching: Scarification is normally adequate for sloping surfaces. However, in certain
cases where fill is to be placed against hillsides or existing embankment with slopes
greater than 4:1,the Owner may direct the Contractor to key the fill material to the
existing slopes by benching. A minimum of two feet(2')normal to the slope shall be
removed and recompacted to insure that the new work is constructed on a firm
foundation free of loose or disturbed material.
F. Depositing: Fill material shall be placed in horizontal layers or lifts, evenly spread, not
to exceed eight(8") inches in loose depth before conditioning and compaction. Unless
otherwise permitted, each layer of fill material shall cover the length and width of the
area to be filled and shall be conditioned and compacted before the next higher layer of
fill is placed. Adequate drainage shall be maintained at all times.
G. Watering: At the time of compaction, the moisture content of fill material shall be such
that the specified compaction will be obtained, and the fill will be firm,hard, and
unyielding. Fill material which contains excessive moisture shall not be compacted
until it is dry enough to obtain the specified compaction.
H. Compacting: Each layer of earth fill shall be compacted by approved tamping or
sheepsfoot rollers,pneumatic tire rollers, or other mechanical means acceptable to the
Owner. Hand-directed compaction equipment shall be used in areas inaccessible to
vehicular compactors.
I. Grading: Embankments shall be constructed in proper sequence and at proper
densities for their respective functions. All embankment serves in one capacity
or another as subgrade(e.g., under topsoil, under concrete and asphalt pavement,
under structures, etc.). Accordingly, the upper layer of embankment shall be
graded to within plus or minus 0.10 foot of proper subgrade elevation prior to
depositing topsoil, and prior to the construction of pavements, slabs, etc.
q
3.05 DENSITY CONTROL,
A. Earth Embankment in General: Earth embankment shall be compacted in lifts at a
minimum of ninety percent(90%) of Standard Density ASTM D698 with plus four
percent(4%) or minus two percent(2%)percentage points of optimum moisture
content.
a B. Earth Embankment Under Structures and Pavement: The top six(6") inches of natural
x earth comprising the subgrade for structural slabs or for areas of pavement shall be
ninety five percent (95%)to ninety eight percent(98%) of Standard Density ASTM
EARTHWORK
02300
-5-
D698 with the moisture content at minus two percent(2%) to plus four percent(4%) of
optimum moisture content.
3.06 MOISTURE MAINTENANCE: The specified moisture content shall be maintained in all
embankments that are to function as subgrade for structures, areas of pavement, or for select
embankment. After completion of the embankment,the Contractor shall prevent excessive loss
of moisture in the embankment by sprinkling as required. Loss of moisture in excess of two
percent(2%)below optimum in the top twelve inches (12") of the fill will require that the top
twelve inches (12") of the embankment be scarified, wetted, and recompacted prior to
placement of the structure, select fill or pavement. If desired, the Contractor may place an
asphalt membrane of emulsified or cutback asphalt over the completed embankment and thus
eliminate the sprinkling requirement.
3.08 TOPSOIL REPLACEMENT: Topsoil shall be carefully placed to avoid any displacement or
damage to the subgrade. If any of the subgrade is rutted, damaged or displaced it shall be
restored prior to placing topsoil. Topsoil shall be replaced as specified herein per Item 3.02.
END OF SECTION
EARTHWORK
02300
-6-
SECTION 02537— WOOD FIBER PLAYGROUND SURFACING
PART I—GENERAL
1.01 SCOPE
Surfacing tasks for wood fiber surfacing with drainage system includes all labor,
materials and equipment necessary for, and pertinent to, the work to be done. Work will
be accomplished in a thorough and workmanlike manner. The specified product will be
applied strictly in accordance with the manufacturer's recommendations.
i
1.02 DESCRIPTION OF SYSTEM
A. Wood fiber playground surfacing material to be Zaeger Bros. provided by The
Playwell Group, Inc., 2750 Northaven Road, Suite 103,Dallas,Tx 75229,
1-800-726-1816, or approved equal.
PART 2—PRODUCTS
2.01 MATERIALS
A. WOOD FIBRE SURFACING
1. Surfacing shall be a mix of random-sized hardwood fibres selected from
durable hardwood tree stock. Softwood fibres, standard woad chips or
bark mulch will not be acceptable.
2. To allow for compaction, the following formulas must be used to
determine the correct number of cubic yards: 8" deep: Sq. ft. of
playground x 0.0375. Twelve inches deep: Sq. ft. of playground x 0.05.
3. Bidder will guarantee sieve analysis of wood fibre as follows: Greater
than 85 percent passing 3/8" sieve. Less than 50 percent passing#60
sieve.
4. Wood fibre shall have no recycled wood from pallets or waste wood and
no twigs,bark, leaf debris or other organic material incorporated within.
B. DRAINAGE FABRIC
I. Product used shall be FibarFelt, DuraLiner, or aproved equal polyester
nonwoven engineering geotextile fabric.
2. Bidder will provide enough material to allow for 12" overlap on all seams.
C. DRAINAGE MATRIX
3
1. 4"diameter ADS perforated pipe with sock installed within the subgrade
gravel trench as indicated on plans.
WOOD FIBER PLAYGROUND SURFACING
02537
D. WEAR MATS
I. Product used shall be per playground equipment manufacturer's
recommendation and meet ASTM F1292-91 playground surfacing
standard for a drop height not to exceed 3.5 feet. Must be installed under
all swings and slides to preserve warranty. Method of installation/
anchorage shall be per manufacturer's recommendations.
PART 3 - SPECIAL REQUIREMENTS
3.01 QUALITY CONTROL
A. The Bidder will provide the engineered wood fiber system to be constructed
exactly according to manufacturer's installation instructions.
B. The Bidder will provide the owner or its designated contractor with all necessary
licenses prior to start of construction in accordance with U. S. Patents.
C. Supplier must provide test results for impact attenuation in accordance with
ASTM F1292-93; Standard Specification for Impact Attenuation of Surface
Systems Under and Around Playground Equipment. Results must be provided for
new material and for 5-year-old material.
D. Testing must show "g" ratings of not more than 155g for the 8" thick system, or
120g for the 12" system at 12' fall heights, and HIC values of less than 1,000 for
both new and 8-year-old material.
E. Product must be wheelchair accessible and meet the requirements of the 1990
Americans with Disabilities Act(ADA) in accordance with ASTM PS83-97.
F. The Bidder will provide copies of flammability testing procedures and results
using(i) Section 1500.44 of the Federal Hazardous Substance Act, Title 16,
Chapter II, Subchapter C, for rigid and pliable solids, and(ii) 16 CFR Part 1630
Standard for the Surface Flammability of Carpets and Rugs (FF 1-70),Modified
Procedure. Testing should be performed by an independent testing laboratory.
G. The Bidder will provide copies of testing procedures and results of(i)new
shredded wood fibre, and (ii) shredded wood fibre not less than five years old
taken from an existing site,performed by an independent testing source using the
ASTM F1292-91 playground safety surfacing standard.
H. The Bidder will provide at least three references of handicapped-accessible
playgrounds that have been installed with said surface.
WOOD FIBER PLAYGROUND SURFACING
02537
-2-
3.02 WARRANTY
All materials and labor under this Section shall be installed by a contractor authorized by
the manufacturer. Safety surface shall be warranted for labor and materials for a period
of no less than two years. Written warranty must be submitted by the manufacturer and
the authorized installer.
PART 4—EXECUTION
A. PREPARATION
Installer shall thoroughly examine the site and specifications, carefully checking
the dimensions before starting work.
B. SUBGRADE
1. The subgrade shall be graded a minimum of 1 percent. It is not
recommended that the surfacing system be installed on a grade greater
than 10 percent. All roots, stones, and vegetation shall be removed.
2. The drainage matrix must be connected to the drainage system.
3. The first 6" of subgrade shall be compacted to at least 95 percent of the dry
density, as determined by the provisions of AASHTO or T 205, as
modified in 203.24.
C. APPLICATION:
1. Wood fiber surfacing system with gravel and subdrain. Install per plans
and specifications.
a. Aggregate Drainage Material
1. Install subdrain trench per plan.
2. Cover subgrade with washed stone, 1/2" to 3/4" diameter, at a
uniform depth of three inches.
3. Install drainage fabric over drainage aggregate, overlapping all
seams by at least 12". Cut to fit around equipment as necessary and
overlap seams as previously mentioned.
4. Install wood fiber safety surfacing at a uniformed compacted
depth of 9". Contractor shall be responsible for applying
additional material as required in order to maintain safety surface
finish elevation and anticipated settling for a period of sixty(60)
days following project acceptance.
END OF SECTION
WOOD FIBER PLAYGROUND SURFACING
02537
3-
SECTION 02840- TURF SODDING
PART 1 - GENERAL
1.01 DESCRIPTION
A. Work Included: This work includes all labor,materials and equipment for soil
preparation, fertilization,planting and other requirements regarding turfgrass sodding
shown on the plans.
B. Related Work Specified Elsewhere: Section 02300, Earthwork.
1.02 REFERENCE STANDARDS
A. For exotic plant materials: American Joint Committee of Horticultural Nomenclature,
Second Edition, 1942.
B. For native materials
a. Manual of the Vascular Plants of Texas by Correll and Johnston
b. Check List of Vascular Plants of Texas by Hatch
c. Flora of North Central Texas by Shinners and Moller
1.03 SUBMITTALS
Samples, certificates and specifications of sod, fertilizer, compost, soil amendments or other
materials may be requested by the Project Manager.
All delivery receipts and copies of invoices for materials used for this work shall be subject to
verification by the Project Manager.
1.04 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Sod: Harvesting and planting operations shall be coordinated with not more than forty
eight hours elapsing between the harvesting and planting.
B. Fertilizer
1. Unopened bags labeled with the analysis.
2. Conform to Texas Fertilizer Law.
1.05 QUALITY CONTROL,
The contractor who plants the sod is responsible for supervision of his crew,while planting the
sod and maintaining the sod until the project is accepted by the City.
SECTION 02840-TURF SODDING
PART 2—PRODUCTS
2.01 SOD
A. The sod shall be"Common Bermuda" and shall consist of stolons, leaf blades, rhizomes
and roots with a healthy,virile system of dense, thickly matted roots throughout the soil of
the sod for a thickness not less than one inch. Sod shall be alive, healthy and vigorous and
shall be free of insects, disease, stones and undesirable foreign materials and grasses. Sod
shall have been produced on growing beds of clay or clay-loam topsoil. The sod shall not
be harvested or planted when its moisture condition is so excessively wet or dry that its
survival will be affected. If sod is stacked, it shall be kept moist and shall be stacked
roots-to-roots and grass-to-grass.
B. The sod shall be cut in strips four feet wide, or as called for on plan, to be laid parallel
with the contours.
2.02 FERTILIZER
A. All fertilizer shall be delivered in bags or containers clearly labeled showing the analysis.
B. All fertilizer shall be in acceptable condition for distribution and shall be applied
uniformly over the planted area two weeks after sodding.
C. All fertilizer shall have an analysis of 3-1-2 or as designated on the plans. The fertilizer
rate shall be 45 pounds of nitrogen per acre.
2.03 WATER
The water shall be furnished by the Contractor and shall be clean and free of industrial wastes or
other substances harmful to the germination of the seed or to the growth of the vegetation. The
amount of water will vary according to the weather variables. Generally, the sod should be
soaked one time per day for three weeks or until established. Soaking is mandatory after
spreading the fertilizer.
2.04 COMPOST
All compost material is to be totally organic and decomposed for at lease nine months. All
compost is to be clean and free of fungus, disease, live plants, seed, excessive cotton lint and any
harmful chemicals. "New Life Soil Conditioner" or "Perma Green Compost", as specified below
or an approved equal, shall be used. Raw organics are not acceptable.
A. For soil with an alkaline pH condition: Use "New Life Acid Gro" (acid pH) soil
conditioner as produced by Soil Building Systems of Dallas, or an approved equal.
B. For soil with an acidic pH condition: Use "Perma Green Compost" by Texas Earth
Resources, Inc. of Dallas, or "New Life Natural Grower" (ph 8.0 to 9.0)by Soil Building
Systems,Inc., of Dallas.
C. Sample and Specification Submittal: Submit a producer's specification and a quart
sample of the compost proposed for the Project Manager's approval.
SECTION 02840-TURF SODDING
-2-
., .E
PART 3 -EXECUTION
3.01 GENERAL
All turfing operations are to be executed across the slope,parallel to finished grade contours.
3.02 SOIL PREPARATION
A. Scarify subgrade to a depth of three inches (3")before depositing the required topsoil.
B. Tillage shall be accomplished to loosen the topsoil, destroy existing vegetation and
prepare an acceptable sod bed. All areas shall be tilled with a heavy duty disc or a chisel-
type breaking plow, chisels set not more than ten inches apart. Initial tillage shall be done
in a crossing pattern for double coverage, then followed by a disc harrow. Depth of
tillage shall be five inches. A heavy duty rototiller may be used for areas to be planted
with sod.
C. Cleaning: Soil shall be further prepared by the removal of debris,building materials,
rubbish, weeds and stones larger than one inch in diameter.
D Fine Grading: After tillage and cleaning, all areas to be planted shall be topdressed with
one-half inch compost and then shall be leveled, fine graded, and drug with a weighted
spike harrow or float drag. The required result shall be the elimination of ruts,
depressions,humps and objectionable soil clods. This shall be the final soil preparation
step to be completed before planting.
3.03 PLANTING
Prior to laying the sod,the planting bed shall be raked smooth to true grade and moistened to a
depth of four inches, but not to the extent causing puddling. The sod shall be laid smoothly,
tightly butted edge to edge, and with staggered joints. The sod shall be pressed firmly into the
sod bed by mechanical roller so as to eliminate all air pockets,provide a true and even surface,
and insure knitting without displacement of the sod or deformation of the surfaces of sodded
areas. Following compaction, compost shall be used to fill all cracks between sods. Excess
compost shall be worked into the grass with suitable equipment and shall be well watered. The
quantity of compost shall be such that it will cause no smothering or burning of the grass.
3.04 FERTILIZING
Twenty-one days after planting, turfgrass areas shall receive an application of 3-1-2 fertilizer at
the rate of 45 pounds of nitrogen per acre. Water well after application to prevent burning as per
requirements indicated in Part 2—2.03 Water
F
END OF SECTION
3
SECTION 02840-TURF SODDING
-3-
-SECTION 02860- PLAYGROUND EQUIPMENT
PART 1 - GENERAL
1.01 DESCRIPTION
A. This section shall include all materials, labor, tools, equipment,transportation and
supervision required for the installation of new playground equipment.
1.02 RELATED WORK
A. Section 02140—Site Under drains
B. Section 02537 - Engineered Wood Fibar Playground Surfacing
C. Section 02870 - Site Furnishings
B. Section 03300 - Cast-In-Place Concrete
1.03 QUALITY ASSURANCE/PRODUCTS
A. Codes and Standards:
1 .All equipment and materials shall comply to the following standards:
a. U. S. Consumer Product Safety Commission(CPSC)
b. ASTM Designation F1487 (Standard Consumer Safety Performance
Specification for Playground Equipment for Public Use)
c. International Play Equipment Manufacturers Association(IPEMA)
2. All equipment shall be new and conform to equipment standards as noted in
Part 2 —2.02.
3. The Bidder shall be responsible for defects in equipment due to faulty material
or manufacturing, damage or loss.
B. Submittals:
1. Submittals must be received and approved by the Project Manager prior to
ordering equipment. Refer to General Requirements—Section 01640— 1.02.
2. Submittals Prior to Construction- Submit manufacturers' documentation of
product compliance with CPSC and ASTM F1487 Standards including:
a. All paints and other similar finishes must meet the current CPSC
regulation for lead in paint(0.06 percent maximum lead by dry
weight).
PLAYGROUND EQUIPMENT
02860
1
s
i
b. Regardless of the material or the treatment process, the
manufacturer shall ensure that the users of the playground
equipment cannot ingest, inhale, or absorb any potentially
hazardous amounts of substances through body surfaces as a result
of contact with the equipment.
C. Submittals must be received and approved by the Project Manager
prior to ordering equipment. Refer to General Requirements—
Section 01640— 1.02
3. Submittals Prior to Project Acceptance—Contractor shall submit all
manufacturers' literature to the Project Manager prior to acceptance of the
project.
1.04 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Protect from inclement weather: wet, damp, extreme heat or cold.
B. Store in a manner to prevent warpage,bowing or damage.
C. All construction material such as subsurface drain gravel and play surface material
may not be delivered to the site until installation of such material.
D. Operation and Maintenance Manuals—Prepare and deliver to the Owner within ten
(10) calendar days prior to completion of construction; two (2)hard cover and three
(3) ring binders containing the following information:
1. Index sheet stating Contractor's address,telephone and fax number, e-mail address
and listing of equipment with the name and addresses of the local equipment
manufacturer's representative.
2. Catalog and parts sheets on each product and equipment type installed under contract
3. Guarantee Statement.
4. Complete operating and maintenance instruction on all major equipment.
PLAYGROUND EQUIPMENT
02860
2
1.05 JOB CONDITIONS
A. The Contractor shall be responsible for the protection of unfinished work and
shall be responsible for the safety of the park users utilizing unfinished
equipment.
B. The Contractor shall be required to submit a Safety Plan indicating the use of
temporary construction fencing, signage and barriers necessary to prevent park
users from utilizing unfinished equipment for Owner approval at the Pre-
Construction meeting. At any time during construction non compliance to the
Safety Plan or any other safety hazard is found to exist on the construction site,
The Contractor shall be required to correct any and all non compliance issues and
/or safety hazards immediately within the same day of notification.
C. All cost incurred be the Contractor to insure compliance to this specification shall
be subsidiary to the cost of purchase and installation of equipment.
PART 2—PRODUCTS
2.01 Approved play component structures for each playground prototype option (see below)
and ancillary equipment shall consist of equipment supplied by pre-approved equipment
manufacturers/vendors and as noted on the Equipment Schedule of the plans.
1. Prototype Option No. 1
A- Gametime-Model No. TFVINP403C (Southwest Parks and Playgrounds,Inc.
1- 800-433-5347)
B - Playworld Systems—Model No. P24423F (The Playwell Group 1-800-726-1816
C -Burke—Model No. 57-8 (Child's Play, Inc. 1-972-484-0600)
2. Prototype Option No. 2
A- Gametime—Model No. TFWNP503C
B—Playworld Systems - Model No. P24424C
3. Prototype Option No. 3
A—Gametime—Model No. TFWNP603C
- B - Playworld Systems—Model No. P23318B
C - Burke—Model No. 56-8
PART 3 - EXECUTION
3.01 GENERAL: All items shall be supplied by Contractor and installed as per
manufacturer's recommendations.
PLAYGROUND EQUIPMENT
02860
3
3
3.02 FALL ZONES: Contractor shall verify all fall zone clearances onsite prior to installing
the equipment. Notify the Landscape Architect of any conflicts or discrepancies. The
Contractor will be required to remove and reinstall any mow strips/hardscape at own
expense and at no additional contract time if fall zone discrepancies are found and require
reined
2.03 CONCRETE FOOTINGS: The finished grade of all concrete footings shall be set a
minimum twelve inches below the finish grade of surfacing material.
2.04 FASTENERS: All nuts and bolts shall be upset and tack welded to prevent disassembly
on all equipment that is not installed with specialized fasteners.
2.05 INSTALLATION SEQUENCING: The Contractor will not be allowed to deliver on
site and install any playground equipment until gradework, mow strip, subsurface
drainage and all other hardscape items have been installed and approved by the
Project Manager. The Contractor will be required to remove any equipment from
the site at own expense and at no additional contract time if found to be in non-
compliance to this specification note.
END OF SECTION
PLAYGROUND EQUIPMENT
02860
4
SECTION 02870- SITE FURNISHINGS
PART I- GENERAL
1.01 DESCRIPTION
Furnish and supply all labor, equipment,materials and incidentals necessary to assemble,
install and otherwise construct park equipment as listed under products.
1.02 RELATED WORK
A. Section 03300 - Cast-in-Place Concrete.
B. Section 07920 - Caulking and Sealants
1.03 QUALITY ASSURANCE
A. All equipment shall be free of sharp edges and corners, or extremely rough
surfaces.
C. All materials shall be new and conform to all standards per specified product or
aproved equal (see Division I—Section 01640/Substitutions And Product
Options
D. The bidder shall be responsible for defects in equipment due to faulty materials or
manufacturing, damage or loss.
E. Metal shall be straight or at design radii or bends, without kinks, and shall be true
to shape.
- E. Codes and Standards: All "accessible"site furnishings shall comply with the
current Texas Accessibility Standards (TAS) of the Architectural Barriers Act,
Article 9102, Texas Civil Statutes (512) 453-3211.
1.04 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Protect from inclement weather: wet, damp, extreme heat or cold.
B. Store in a manner to prevent warpage and/or bowing.
1.05 JOB CONDITIONS
The contractor shall be responsible for protection of unfinished work and shall be
responsible for the safety of park users utilizing unfinished equipment.
-T/.
SITE FURNISHINGS
02870
-I -
PART 2 -PRODUCTS
2.01 Equipment as specified on plans or approved eaqual.
PART 3 -EXECUTION
3.01 INSTALLATION
A. Fasteners: All nuts and bolts shall be upset and tack welded to prevent
disassembly.
B. Manufacturer's Installation Instructions: The Contractor shall follow the
manufacturer's installation instructions and give the Landscape Architect the
instructions for filing,unless otherwise stated. Set benches and picnic tables
level.
END OF SECTION
SITE FURNISHINGS
02870
-2-
SECTION 02930- SEEDING
PART 1 - GENERAL
1.01 DESCRIPTION
A. Work Included: Seeding of grass seed or wildflower seed, as specified on the plans.
B. Related Work Specified Elsewhere: Section 02300, Earthwork.
1.02 REFERENCE STANDARDS
A. Standardized Plant Names
1. For exotic plant materials: American Joint Committee of Horticultural
Nomenclature, Second Edition, 1942.
2. For native materials
a. Manual of the Vascular Plants of Texas by Correll and Johnston
b. Check List of Vascular Plants of Texas by Hatch
c. Flora of North Central Texas by Shinners and Moller
B. Texas Highway Department: Standard Specifications for Construction, Item 164,
"Seeding for Erosion Control" and Item 180, "Wildflower Seeding".
1.03 SUBMITTALS
A. Seed
1. Vendors' certification that seeds meet Texas State seed law including:
a. Testing and labeling for pure live seed(PLS)
b. Name and type of seed
2. If using native grass or wildflower seed, seed must have been harvested within one
hundred(100) miles of the construction site.
3. All seed shall be tested in a laboratory with certified results presented to the City, in
writing,prior to planting.
4. All seed to be of the previous season's crop and the date on the container shall be
within twelve months of the seeding date.
S. Each species of seed shall be supplied in a separate, labeled container for acceptance
by the City.
B. Fertilizer
1. Unopened bags labeled with the analysis
2. Conform to Texas fertilizer law
1.04 JOB CONDITIONS
A. Planting Season: The season varies according to species (see Part 2 -Products). Do not
seed when soil is excessively wet or dry or when wind exceeds ten(10)miles per hour.
B. Schedule After All Other Construction and planting is complete.
SECTION 02930-SEEDING
- 1 -
C. Protect and Maintain Seeded Areas
1. From erosion
2. From traffic and all other use
3. Until seeding is complete and accepted
1.05 QUALITY CONTROL
The contractor who plants the seeds, whether the general contractor or a subcontractor, is
responsible for daily supervision of his crew, and for the planting and maintaining of seedlings
until acceptable, viable growth is achieved and the project accepted by the City.
PART 2—PRODUCTS
2.01 MATERIALS
A. Seed
All seed shall be planted at rates based on pure live seed(PLS =purity x germination)per
acre.
Substitution of individual seed types due to lack of availability shall be made only by the
City at the time of planting. The Contractor shall notify the City, prior to bidding, of
difficulties locating certain species. Only those areas indicated on the plans and areas
disturbed by construction shall be seeded. Prior to seeding, each area shall be marked in
the field and approved by the City. Any adjustment of area location by the City shall be
considered incidental and shall not entitle the Contractor to additional compensation.
Weed seed shall not exceed ten percent(10%) by weight of the total of pure live seed
(PLS) and other material in the mixture. Johnsongrass and nutgrass seed shall not be
allowed.
The seed shall be clean, dry and harvested within one year of planting.
1. Non-native grass seed shall consist of:
If planted between April 15 and September 10:
Lbs./Acre Common Name Scientific Name Purity Germination
25 Bermuda(unhulled) Cynodon dactylon 85% 90%
75 Bermuda(hulled) Cynodon dactylon 95% 90%
Substitute the following if planted between September 10 and April 15:
220 Rye Grass Lolium inultiflortan 82% 80%
40 Bermuda(unhulled) Cynodon dachdon 84% 85%
SECTION 02930-SEEDING
-2-
2 Native grass seed - The seed shall be planted between February 1 and October 1
and shall consist of:
Lbs. PLS/Acre Common Name Botanical Name
1.6 Green Sprangletop Leptochloa dubia
5.5 Sideoats Grama* Bouteloua curtipendula
3.7 Little Bluestein* Schizachyrium scoparium
17.0 Buffalograss Buchloe dactyloides
1.8 Indian Grass* Sorghastrum nutans
0.5 Sand Lovegrass* Eragrostis trichodes
6.0 Big Bluestein Andropogon gerardii
8.0 Eastern Grama Tripscacum dactyloides
1.2 Blue Grama Bouteloua gracilis
1.8 Switchgrass Panicum virgatum
10.0 Prairie Wildrye* Elymus canadensis
*These grasses are not to be planted within ten feet of a road or parking lot or
within three (3) feet of a walkway.
3 Wildflower seed -All wildflower seeds are to be hand broadcast, (see 3.02,A).
The seed shall be planted between March 5 and May 31 or between September 1
and December 1 and shall consist of:
Lbs. PLS/Acre Common Name Botanical Name
3.0 Bush Sunflower Sinsia calva
5.0 Butterfly Weed Asclepias tuberosa
2.0 Clasping Coneflower* Rudbeckia amplexicaulis
3.0 Golden-Wave Coreopsis basalis
13.4 Illinois Bundleflower Desmanthus illinoensis
13.6 Partridge Pea Cassia fasciculata
2.0 Prairie Verbena Verbena bipinnati�da
8.0 Texas Yellow Star Lindheimeri texana
8.0 Winecup Callirhoe involcrata
2.0 Black-eyed Susan Rudbeckia hirta
1 18.0 Cutleaf Daisy Engelmannia pinnatifida
2.0 Obedient Plant Physostegia intermedia
3.0 Pitcher Sage Salvia azurea
r 2.0 Plains Coreopsis Coreopsis tinctoria
8.0 Scarlet Sage Salvia coccinea
*These wildflowers are not to be planted within ten feet of a road or parking lot or
within three feet of a walkway.
4. Temporary erosion control seed
When specified on the plans,temporary control measures shall be performed.
These measures shall consist of the sowing of cool season plant seeds and the
work and materials as required in this section.
SECTION 02930-SEEDING
3
B. Mulch
1. Mulch should be designed for use with conventional mechanical or hydraulic
planting of seed, either alone or with fertilizer.
2. Mulch should be wood cellulose fiber produced from virgin wood or recycled
paper-by-products (waste products from paper mills or recycled newspaper).
3. Mulch should contain no growth or germination inhibiting factors.
4. Mulch should contain no more than ten percent(10%)moisture, air dry weight
basis.
5. Additives shall include a binder in powder form.
6. Material shall form a strong moisture retaining mat.
C. Fertilizer
1. All fertilizer shall be delivered in bags or containers clearly labeled showing the
analysis.
2. All fertilizer shall be in acceptable condition for distribution and shall be applied
uniformly over the planted area.
3. Analysis of 16-20-0, 16-8-8, or as designated on the plans. Fertilizer rate:
a. No fertilizer is required for wildflower seeding.
b. Where applying fertilizer on newly established seeding areas - 100 pounds
of Nitrogen per acre.
C. Where applying fertilizer on established seeding areas - 150 pounds of
Nitrogen per acre.
D. Water: Shall be furnished by the Contractor by means of temporary metering/irrigation,
water truck or by any other method necessary to achieve viable, acceptable stand of turf
as noted in 3.04.B.2. of this specification. The water source shall be clean and free of
industrial wastes or other substances harmful to the germination of the seed or to the
growth of the vegetation. The amount of water will vary according to the weather
variables. Generally, an amount of water that is equal to the average amount of rainfall
plus one half inch (1/2")per week should be applied for approximately three weeks or
until project is accepted by the City.
E. Erosion Control Measures
1. For seeding application in areas up to 3:1 slope, use cellulose, fiber or recycled
paper mulch, (see 2.01, B. Mulch and 3.03).
2. For seeding application in areas 3:1 slope or greater,use the following soil
retention blanket(Follow the manufacturer's directions):
"Curlex I" from American Excelsior, 900 Ave. H East,Post Office Box 5624,
Arlington, Texas 76001, 1-800-777-SOIL.
2.02 MIXING
Seed, mulch, fertilizer and water may be mixed provided that:
1. Mixture is uniformly suspended to form a homogenous slurry.
2. Mixture forms a blotter-like ground cover impregnated uniformly with grass seed.
3. Mixture is applied within thirty(30)minutes after placed in the equipment.
SECTION 02930-SEEDING
-4-
N
PART 3—EXECUTION
3.01 SEEDED PREPARATION
A. Clear Surface of All Materials, Such As:
1. Stumps, stones, and other objects larger than one inch.
2. Roots,brush,wire, stakes, etc.
3. Any objects that may interfere with seeding or maintenance.
B. Tilling
1. In all compacted areas till one inch(1") deep.
2. If area is sloped greater than 3:1,run a tractor parallel to slope to provide less
seed/water run-off.
3. In areas near trees: Do not till deeper than one half(1/2") inch inside "drip line"
of trees.
C. Watering: Soil should be watered to a minimum depth of four inches within forty eight
(48) hours of seeding.
3.02 SEEDING
A. If Sowing Seed By Hand
1. Broadcast seed in two directions at right angles to each other.
2. Harrow or rake lightly to cover seed.
3. Never cover seed with more soil than twice its diameter.
4. For wildflower plantings, scalp existing grasses to one (1") inch, remove grass
clippings, so seed can make contact with the soil.
B. Mechanically Seeding(Drilling):
If mechanically seeding(drilling)the seed or seed mixture,the quantity specified shall be
uniformly distributed over the areas shown on the plans or where directed. All varieties
of seed, as well as fertilizer,may be distributed at the same time provided that each
component is uniformly applied at the specified rate. Seed shall be drilled at a depth of
from one quarter inch to three eighth inch(1/4"-3/8")utilizing a pasture or rangeland type
drill. All drilling is to be on the contour. After planting, the area shall be rolled with a
roller integral to the seed drill, or a corrugated roller of the "Cultipacker" type. All rolling
} of slope areas shall be on the contour.
3.03 MULCHING
A. Apply uniformly after completion of seeding in areas up to 3:1 slope. Mulch may be
3
applied concurrently with fertilizer and seed, if desired.
B. Apply at the following rates unless otherwise shown on plans:
1. Sandy soils, flat surfaces -minimum 1,500 lbs./acre.
2. Sandy soils, sloping surfaces -minimum 1,800 lbs./acre.
3. Clay soils, flat surfaces -minimum 2,500 lbs./acre.
4. Clay soils, sloping surfaces -minimum 3,000 lbs./acre.
SECTION 02930-SEEDING
5. "Flat" and"sloping" surfaces will be shown on the pians if not visually obvious.
C. Apply within thirty(30) minutes after placement in equipment. Keep mulch moist,by
daily water application, if necessary:
1. For approximately twenty-one (2 1) days, or
2. Until seeds have germinated and have rooted in soil, (see 3.04.13.2.) and project
has been accepted by the City.
3.04 MAINTENANCE AND MANAGEMENT
A. Includes protection,replanting, maintaining grades and immediate repair of erosion
damage until the project receives final acceptance. Refer to Part 2—2.01 —D. for
watering requirements to be executed by the contractor.
B. Replanting
1. Replant areas where a stand of grass or wildflowers are not present in a reasonable
length of time, as determined by the City.
2. A"stand" shall be defined as:
a. Bermuda/Rye grasses: Full coverage per square foot established within
two to three(2-3)weeks of seeding date on a smooth bed free of foreign
material and rocks or clods larger than one inch diameter.
b. Native grass and wildflowers: eighty percent(80%) coverage of growing
plants within seeded area within twenty-one days of seeding date on a
smooth bed free of foreign material and rocks or clods larger than one inch
diameter.
END OF SECTION
SECTION 02930-SEEDING
-6-
SECTION 03300—CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.01 SCOPE OF WORK
A. Concrete Sidewalk
B. Concrete Handicap Ramps
C. Picnic Table Slabs
D. Playground Edging
E. Concrete Walls and Footings
F. Related work elsewhere: Section 07920—Caulking and Sealants
1.02 QUALITY ASSURANCE
Reference Specifications: The work under this division of the Specifications shall
conform generally to the requirements of Item 314 - "Concrete Pavement", Item 406 -
"Concrete for Structures", and Item 410—"Concrete Structures" of the City of Fort
Worth's Standard Specifications for Street and Storm Drain Construction,
PART 2 -MATERIALS
2.01 FORMS
Forms shall be of ample strength, adequately braced,joined neatly and tightly and set
exactly to established line and grade.
2.02 REINFORCING MATERIALS
Reinforcing Bars: Reinforcing bars shall be round deformed bars meeting the
requirements of the current standard Specifications for Intermediate Grade Billet Steel
Concrete Reinforcing Bars of the A.S.T.M. Designation A-615. Reinforcing bars at the
time the concrete is placed shall be free from rust, scale or other coatings that will destroy
or reduce the bond. General reinforcing bars shall be number three bars spaced 18 inches
on center in walks and 12 inches in slabs as shown on Plans.
2.03 CONCRETE MATERIALS
A. Cement: Portland cement shall meet the requirements of A.S.T.M. Specifications
Designation C-150 and shall be Type 1.
B. Aggregates: Concrete aggregates shall consist of gravel or crushed stone and
shall be free from any excess amount of salt, alkali, vegetative matter or other
objectionable materials. The aggregate shall be well graded from fine to course
and the maximum size shall be one inch . Fine aggregate shall consist of sand
5 C. Water: Water used in mixing concrete shall be clean and free from deleterious
amounts of acids, alkalies, vegetative matter or organic material. The concrete
shall be mixed in an approved batch mixer. The mixing time shall not be less
than one minute after all the batch materials are in the mixer. Cement content
-=
CAST-IN-PLACE CONCRETE
03300
x
- 1 -
i
shall be not less than five sacks per cubic yard of concrete and shall have a
minimum 28 day compressive strength of 3,000 psi.
D. Mixing: Transit mixed concrete shall meet all the requirements for concrete as
specified above. Sufficient transit mix equipment shall be assigned exclusively to
the project as required for continuous pours at regular intervals without stopping
or interrupting. Concrete shall not be placed on the job after a period of 1 1/2
hours after the cement has been placed in the mixer.
2.04 RELATED MATERIAL
A. Expansion Joint Filler: Expansion joint material shall be one inch clear heart
redwood with cap and paved cross section as shown on the plans
B. Dowels: Dowels for expansion joints shall be number four smooth round steel
bars with expansion tubes as shown on Plans. Dowels shall be placed eighteen
inches on center or as shown on Plans.
C. Curing Compound: The membranous curing compound shall comply with the
requirements of A.S.T.M.,Designation C-309,Type 2,white pigmented.
D. PVC Sleeves: The Contractor shall furnish and install four inch class 200 PVC
pipe sleeves under concrete walk as shown on plans and details.
E. Caulking and Sealants—See Section 07920
2.05 CONCRETE MIX DESIGN AND CONTROL
A. Mix Design: The concrete shall contain not less than five sacks of cement per
cubic yard. Total water shall not exceed seven gallons per sack of cement. The
mix shall be uniform and workable. The amount of course aggregate(dry-loose
volume) shall not be more than 85 percent per cubic yard of concrete.
The net amount of water will be the amount added at the mixer plus the free water
in the aggregate or minus the amount of water needed to compensate for
absorption by the aggregates. Free water or absorption determinations will be
based on the condition of the aggregates at the time used. The absorption test will
be based on a thirty minute absorption period. No water allowance will be made
for evaporation after batching.
B. Slump: When gauged by the standard slump test, the settlement of the concrete
shall not be less than 3 inches nor more than 5 inches, unless otherwise indicated.
C. Quality: The concrete shall be designed for a minimum compressive strength of
3,000 pounds per square inch at the age of twenty-eight days using a 5 sack mix.
CAST-IN-PLACE CONCRETE
03300
-2-
D. Control-Submittal: Within a period of not less than ten days prior to the start of
concrete operations, the Contractor shall submit to the Engineer a design of the
concrete mix proposed to be used together with samples of all materials to be
incorporated into the mix and a full description of the source of supply of each
material component. The design of the concrete mix shall conform with the
provisions and limitation requirements of these specifications. All material
samples submitted to the Engineer shall be sufficiently large to permit laboratory
batching for the construction of test beams to check the adequacy of the design.
When the design mix has been approved by the Engineer, there shall be no change
or deviation from the proportions thereof or sources of supply except as
hereinafter provided. No concrete may be placed on the job site until the mix
design has been approved by the Engineer in writing to the Contractor.
PART 3- EXECUTION
3.01 REINFORCING
Metal reinforcing shall be accurately placed in accordance with the Plans and shall be
adequately secured in position by concrete, metal, or plastic chairs and spacers. Bar
splices shall overlap at least twelve inches. The re-bars shall be bent cold.
3.02 JOINTS
A. Expansion Joints: Expansion joint materials shall be installed perpendicular to
the surface. The bottom edge of the material shall extend to or slightly below the
bottom edge of the slab and the top edge shall be held approximately 1/2 inch
below the surface of the slab. The edge of joints shall be tooled with an edging
tool having a 1/2 inch radius.
B. Contraction Joints: Contraction joints shall be 1/4 inch wide by 3/4 inch deep,
tooled joints placed on six foot centers, unless otherwise indicated. Contraction
- joints will not be required to be sealed. Sawed joints may be allowed only if
specifically approved by the Engineer. Joints will be sawed as soon as sawing
can be performed without stripping aggregate from the concrete, generally within
- twelve to twenty-four hours after placement, and they shall be completed before
uncontrolled cracking of the pavement takes place.
C. Construction Joints: Construction joints shall be installed in all concrete work at
the locations shown on the Plans. Construction joints formed at the close of each
day's work shall be located at any of the control joints designated on the Plans.
Joints may be constructed by use of wood or preformed metal bulkheads set true
to the section of the finished concrete and cleaned and oiled. Surplus concrete on
the subgrade shall be removed before resuming concreting operations.
3.03 PLACING CONCRETE
Placement of Concrete: The concrete shall be rapidly deposited on the subgrade
immediately after mixing is completed. Subgrade and forms shall be dampened prior to
placement of the concrete. The concrete shall be transported,placed and spread in such a
-= CAST-IN-PLACE CONCRETE
03300
-3-
manner as to prevent segregation of the aggregate or an excess amount of water and fine
materials to be brought to the surface. No concrete shall be placed when the air
temperature is less than forty degrees Fahrenheit nor when the temperature of the
concrete is eighty-five degrees Fahrenheit or higher,without approval of Construction
Inspector.
Placement shall be carried on at such a rate that the concrete is at all times plastic and
flows readily into the space between the bars. No concrete that has partially hardened or
that has been contaminated by foreign material shall be deposited in the work nor shall
retempered concrete be used. Each section of pavement between expansion and
construction joints shall be placed monolithically.
All concrete shall be thoroughly compacted by suitable means during the operation of
placing and shall be thoroughly worked around reinforcement and embedded fixtures and
into the corners of the forms. Special care shall be taken to prevent voids and
honeycombing. The concrete shall then be struck off and bull-floated to the grade shown
on the Plans before bleed water has an opportunity to collect on the surface.
3.04 FINISHING
All concrete shall be finished by experienced, qualified concrete finishers. All concrete
shall have a neat,rounded edge. Edging and jointing (radius described on Plans) shall be
accomplished with care so as not to leave deep impressions in the concrete surface
adjacent to edges and joints. After the concrete has been floated and has set sufficiently
to support the weight of cement finishers, a smooth steel trowel will be used to produce
hard surface. The entire surface will then be brushed with a stiff bristle broom to produce
a uniform textured finish. All edges and sides of concrete exposed to view shall be free
of warp and blemishes with a uniform texture and smoothness as described in Plans.
3.05 CURING
Curing Compound: Immediately after the finishing operations,the concrete shall be
completely covered with a curing compound. The concrete surface shall be kept moist
between finishing operations and the application of the curing compound. The curing
compound shall be applied under pressure by means of a spray nozzle at a rate not to
exceed 200 square feet per gallon. A minimum of 72 hours curing time will be required.
3.06 CONCRETE WALLS
A. Placing Concrete
1. Where tremies are used, or where the free drop is 5'-0" or more, and
through reinforcement, use a dumping box or board,moving the concrete
therefrom by shovels or hoes.
2. Deposit concrete so that the surface is kept level throughout, a minimum
being permitted to flow from one position to another, and place as rapidly
as practicable after mixing.
3. Do not use in this Work any concrete not placed within 30 minutes after
leaving the mixer.
CAST-IN-PLACE CONCRETE
03300
-4-
4. Thoroughly work concrete around reinforcement and embedded fixtures,
and into corners of forms, during placing operations.
5. Completely compact with tamping poles and by tapping forms until the
concrete is thoroughly compact and without voids. Determine the number
of tampers needed by the amount and method of placing concrete.
6. Exercise care to tamp concrete vigorously and thoroughly to obtain
maximum density.
7. Use manual tampers as well as mechanical vibrators.
a. Exercise care to direct the quick handling of vibrators from one
position to another.
b. Do not over-vibrate concrete.
C. Do not move concrete by use of vibrator.
B. Finishing
1. All formed surfaces exposed to view shall have a smooth form finish.
2. After concrete has been properly placed and cured, sandblast finish if
indicated on the plans and per specification Section 03350.
3.07 PROTECTION
After concrete is placed, finished and cured as required,permit no traffic thereon for
three days thereafter and further protect the surface from damage due to other causes.
END OF SECTION
CAST-IN-PLACE CONCRETE
03300
-5-
BIDDER'S STATEMENT OF QUALIFICATIONS
Firm Name: Date Organized:
❑ PARTNERSHIP ❑ CORPORATION
Address:
City: State: Zip:
Telephone Number: Fax Number:
Number of years in business under present name:
3
Former name(s) of organization:
CLASSIFICATION: ❑ General ❑Building ❑ Electrical ❑ Plumbing ❑ HVAC
❑ Utilities ❑Earthwork ❑ Paving ❑ Other
LIST A MINIMUM OF THREE SIMILAR COMPLETED PROJECTS WITHIN LAST THREE
YEARS
PROJECT NAME AND LOCATION
NAME/TELEPHONE NUMBER OF OWNER
NAME/TELEPHONE NUMBER OF SURETY
AMOUNT OF CONTRACT
COMPLETION DATE
SCOPE OF WORK DESCRIPTION
PROJECT NAME AND LOCATION
NAME/TELEPHONE NUMBER OF OWNER
NAME/TELEPHONE NUMBER OF SURETY
AMOUNT OF CONTRACT
COMPLETION DATE
3
- ' BIDDER'S STATEMENT OF QUALIFICATIONS
- 1 -
SCOPE OF WORK DESCRIPTION
PROJECT NAME AND LOCATION
NAME/TELEPHONE NUMBER OF OWNER
NAME/TELEPHONE NUMBER OF SURETY
{
AMOUNT OF CONTRACT
COMPLETION DATE
SCOPE OF WORK DESCRIPTION
PROJECT NAME AND LOCATION
NAME/TELEPHONE NUMBER OF OWNER
NAME/TELEPHONE NUMBER OF SURETY
AMOUNT OF CONTRACT
COMPLETION DATE
SCOPE OF WORK DESCRIPTION
PROJECT NAME AND LOCATION
NAME/TELEPHONE NUMBER OF OWNER
NAME/TELEPHONE NUMBER OF SURETY
AMOUNT OF CONTRACT
COMPLETION DATE
5
SCOPE OF WORK DESCRIPTION
- BIDDER'S STATEMENT OF QUALIFICATIONS
-2-
1
i
2. LIST CONSTRUCTION SUPERINTENDENT'S NAME AND CONSTRUCTION EXPERIENCE:
3. LIST ALL LABOR SUBCONTRACTORS (attach additional pages as needed)
SUBCONTRACTOR NAME
TRADE
PREVIOUS PROJECT EXPERIENCE/CONTACT NAME/TELEPHONE NUMBER
A.
B.
C.
SUBCONTRACTOR NAME
TRADE
PREVIOUS PROJECT EXPERIENCE/CONTACT NAME/TELEPHONE NUMBER
A.
B.
C.
BIDDER'S STATEMENT OF QUALIFICATIONS
-3 -
SUBCONTRACTOR NAME
TRADE
PREVIOUS PROJECT EXPERIENCE CONTACT NAME/TELEPHONE NUMBER
A.
B.
C.
SUBCONTRACTOR NAME
TRADE
PREVIOUS PROJECT EXPERIENCE CONTACT NAME/TELEPHONE NUMBER
A.
B.
C.
SUBCONTRACTOR NAME
TRADE
PREVIOUS PROJECT EXPERIENCE CONTACT NAME/TELEPHONE NUMBER
A.
B.
C.
Note
1. Section 8.1 of the Standard Specifications for Street and Storm Drain Construction for
the City of Fort Worth will be enforced.
2. The Prime Bidder selected for this project shall submit Letters Of Intent executed
between the Prime Bidder and any and all subcontractors to be utilized on this project
within five working days of being recognized as the overall qualified low Prime Bidder by
the City. Subsequent substitution of sub-contractors must be approved by the City.
3. Prime Bidder shall include financial statement in this submittal.
_J
BIDDER'S STATEMENT OF QUALIFICATIONS
-4-
JUN, 17. 2005_ 9.47AM INSURANCE OFFICE N0. 896 Pr 1 ,_.
.,., r:e:: ...y..'•".^T•q tsf3fi'r�,::cg ••vr, �� n•4<:'9'r,.s:;:,..•<.... ... ..s: :. :ww,L'S:y a ':R# •^ i 7,, .,. ..,ys
4 w. .�. �. s• Lc F'. <!i; DATE(MM/D
�. . :0., �. '<} S• \rt ',r ' '!'� r,V`, x. `�' S;.. V,:T�6.. ;r,,•i,�y ,%
+�<siy ^ ��',x >'ir ,la <. `t.. f•LF�•r.:r. ti :r r'�i k 106/1
7705
.Lf9:4GwQ•wiN3ad![.�:P:�SYvi5a:��%!i•..Sr. 111
PRaoucm THIS CERTIFICATE IS ISSUED AS A MATTER rOF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
"JAY 'S r LYDA INSURANCE AGENCY ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW,
2520 HARWOOD RD, , ST-9 500 COMPANIES AFFORDING COVERAGE
BEDFORD, TEXAS 76021 COMPANY
A FARMERS INSURANCE GROUP
INSURED I COMPANY
J&J HARDSCAPE CONSTRUCTION, INC B SERVICE LLOYDS INSURANCE
5749 WATAUGA RD, COMPANY
FT WORTH, TX 7614$ C
COMPANY
D
'rsr�:k ;'w`F..:... ^^•iH 4 2' a:i 'ti'•' •'s,w n;+' ,:<•:3'M.,,
'Y. ;YSSi.MINN.,
:s;..,.. s. vi
�). $� '4�>!
.9.,,.,T'I •ss?, •[: .s,i`+s`,f.k g'. ,.k+:a>t� nv, »�. •L;F- [
u. ;f. r.y,6. 'Y:. ,'fir. dr .St �v,c r,` +�2,. q..r:'` r "•r<h.,L..s.4a..',.
,, ,r,:;:L:,r>,: hr, 3:3i�.:.2?orf?�f•rni:5us':,.'��,.v„� r`;.N..•3,.fi',r. < ,e`,Gid.s.::•,,,5<"e:r+n5#i,:•:F"rS•r,r �a....:�19.vr�,,r.r::•rah! .ft'.�•F7�w+:.•3y�r.:?�:nr3'a ra.53:.e°•¢t4• r�<a%..i�'�'ra4},#�FrrCr�
THIS Is TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED,NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS,
co LTRTYPE OF INSURANCE I POLICY NUMBER DATE(MM/DONY) DATE(MM/DD/YY)N LIMITS
GENERAL UA131LITY GENERALAGUREQATE s2, 000, 000
XCOMMERCIAL GENERAL LIABILITY PRODUCTS-COMP/OP AGG s2, 000, 000
CLAIMS MADE L._+OCCUR 1 PEFWNAL&ADV INJURY 81 000 000
A X OWNER'8 a OON7RACTOR'S PROT( 6931 4 9 00 01 /18/0 5 1 01 /18/0 6 EACH OCCURRENCE sl ( 000, 000
1 FIRE DAMAGE Any we tire) 19 50, 000
MED EXP Any one rson) s 1 , 000
AUTOMOBILE LIABILITY
COMBINED SINGLE LIMIT s
X ArrYAuro 1 I 1 , 000, 000
X ALL OWNED AUTOS I BODILY INJURY E
SCHEDULED AUTOS (Per person)
A X HIRED AlJf06 6 9 31 48 43 04/15/05 04/15i06 BODILY INJURY
N014-OWNED AUTOS l (Per 6addenq S
PROPERTY DAMAGE s
I
AGE UABIUTY AUTO ONLY•EA ACCIDENT S
ANY AUTO OTHER THAN AUTO ONLY;
EACH ACCIDENT S
AOCREtaATE B
EXCESS LIABILITY { EACH OCCURRENCE s4, 000, 000
AX UMBRELLA FORM 16943 5 4 91 101 /18/05 . 01 /18/0 6 AGGREGATE s4, 000, 000
OTHER THAN UMBRELLA FORM 8
WORKERS COMPENSATION AND X TOR
I aru I -
EMPLOYERS'LIABILITY I EL EACH ACCIDENT -.500, 000
B THE PROPRIETOW n INCL 4047361 1 02/01 /05 02/01 /06 EL DISEASE•POL1cY LIMIT 85001 0 00
PAMNVE
OFFICFEM ARE:�n N1 EXCL EL DISEASE.EA EMPLOYEE s 5 0 O O O O
OTHER
A INSTALL FLOATER 16931 49 00 01 /18/05 01 /18/061 PER LOC $300, 000
PER OCC $300, 000
DESCRIPTION OF OPERATIONS/LOCATIONS/VENICLM/SPECIAL ITEMS
THE CITY, ITS OFFICERS, EMPLOYEES & SERVANTS ARE NAMED AS ADDITIONAL INSUREDS,
INCLUDES WAIVER OF SUBROGATION IN FAVOR OF ADDITIONAL INSUREDS ON WORK COMP.
PROJECT: COBB SOUTH SEMINARY HILLS TADLOCK & SOUTH Z BOAZ PARKS .
Ss,, f� `yii:• A'BSr `i�L'+.; % r'ti.£
[rs k v ':"iiY'`.{,f• :;i2�.. •i?., .''�',v�:�r •i' '':t�iti(ri�:::;` ..Y•` ,.£'4
•.'`>. s ., #
..y:.•, .7.s'. r. r.•era,.,. <r`✓:'ru v..R.'•w.. f o:,, �fl;l%s
...Y117 •y<:
.. , .. �,.,,.w,..�+'....:,...r..•....!3'•:,.,xr,v•`:;��°�[?,.......,..........,,l.YS<•.r. ,ti:;��►► r %r.
..� `�)�^;r�^, :� •��:c, :�r.; .{n nvw,r•ti r::<.6:.! �+,r sn+.ok
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES 6E CANCELLED BEFORE THE
CITY OF FT WORTH EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL
1000 THROCKMORTON ST. 3Q DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,
FT WORTH, TEXAS 76102 BUT FAILURE TO MAIL SUCH NOTICE 8HALL IMPOSE NO OBLIQATION OR LIABILITY
OF ANY KIND UPON THE COMPANY, ITS ACIRNTS OR REPRESENTAYIVEB,
AUTHORI PRES A
;<sn,. rs, .ray. •u:'., ,,a•,: .¢• ..<.
$"^!::rr '4n.: "i:rY.v,X•:0. ,:.,• '<<. ,-:<•qp;r/;r
••g
iaw•r.. ..�. i
:
CERTIFICATE OF INSURANCE
TO: CITY OF FORT WORTH Date:
NAME OF PROJECT: PLAYGROUND RENOVATIONS AT COBB SOUTH SEMINARY HILLS
TADLOCK AND SOUTH Z.BOAZ PARKS
PROJECT NUMBER: C280-808480003130/C280-809480002930/C280-808480003230/C280-803480003030
IS TO CERTIFY THAT: J&J HARDSCAPE,INC
is,at the date of this certificate,Insured by this Company with respect to the business operations hereinafter described,for
the type of insurance and accordance with provisions of the standard policies used by this Company,and further
hereinafter described. Exceptions to standard policy noted on reverse side hereof.
TYPE OF INSURANCE
Policy Effective Expires Limits of Liability
Worker's Compensation
Comprehensive General Bodily Injury:
Liability Insurance(Public Ea. Occurrence: $
Liability) Property Damage:
Ea. Occurrence: $
Blasting Ea.Occurrence: $
Collapse of Building or
structures adjacent to Ea. Occurrence: $
excavations
Damage to Underground
Utilities Ea.Occurrence: $
Builder's Risk
Comprehensive Bodily Injury:
Automobile Liability Ea.Person: $
Ea. Occurrence: $
Property Damage:
Ea. Occurrence: $
Bodily Injury:
Contractual Liability Ea. Occurrence: $
Property Damage:
Ea. Occurrence: $
Other
Locations covered:
Description of operations covered:
The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or
canceled by the insurer in less than five(5)days after the insured has received written notice of such change/or
cancellation.
Where applicable local laws or regulations require more than five(5)days actual notice of change or cancellation to be
assured,the above policies contain such special requirements,either in the body thereof or by appropriate endorsement
thereto attached.
The City,its officers,employees and servants shall be endorsed as an additional insured on Contractor's insurance policies
excepting employer's liability insurance coverage under Contractor's workers' compensation insurance policy.
Agency Insurance Co.:
Fort Worth Agent By
Address Title
BOND NO. 4347998
PERFORMANCE BOND
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we,(1)J&J HARDSCAPE, INC,as Principal herein, and(2) g1jgETEC INSURANCE COMPANY,
corporation organized under the laws of the State of(3) Texas , and who is authorized to issue
surety bonds in the State of Texas, Surety herein, are held and firmly bound unto the City of Fort Worth, a municipal
corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the sum of THREE HUNDRED
FIFTY THOUSAND THREE HUNDRED SIXTY-TWO AND 80/100............................ Dollars ($350,362.80)
for the payment of which sum we bind ourselves,our heirs,executors, administrators, successors and assigns,jointly
and severally, firmly by these presents.
WHEREAS, Principal has entered into a certain written contract with the Obligee dated the 10th day of
May,2005,a copy of which is attached hereto and made a part hereof for all purposes, for the construction of
PLAYGROUND RENOVATIONS AT COBB SOUTH SEMINARY HILLS TADLOCK AND
SOUTH Z.BOAZ PARKS
NOW, THEREFORE, the condition of this obligation is such, if the said Principal shall faithfully perform
the work in accordance with the plans, specifications, and contract documents and shall fully indemnify and hold
harmless the Obliaee from all costs and damages which Obligee may suffer by reason of Principal's default, and
reimburse and repay Obligee for all outlay and expense that Obligee may incur in making good such default, then
this obligation shall be void;otherwise,to remain in full force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government
Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of such
statute,to the same extent as if-it were copied at length herein.
IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have
executed this instrument.
SIGNED and SEALED this 10th day of May,2005.
J&J HARDSCAPE, INC
PRINCIPAL
ATTEST: By: — tdL
Name: �r���,%� G� ►�� �
(Principal) Secretary
Title:
(S E A Q Address: 5749 WATAUGA ROAD
/ FORT WORTH, , TX 76148
Witness as to Principal
SUR ETEC INSURANCE COMPANY
SURETY
ATTEST: By:
Name: Pauline L. Lesch
Secretary Attorney in Fact
(S E A Q Address:
952 Echo Lane, #450
-Houston, TX 77024
�ditness a to Surety Telephone Number: 71-1-
331-6053
NOTE: (1) Correct name of Principal (Contractor).
(2) Correct name of Surety.
(3) State of incorporation of Surety
Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be
attached to Bond by the Attorney-in-Fact.
The date of bond shall not be prior to date of Contract.
BOND NO. 4347998
PAYMENT BOND
- THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT
That we, (1)J&J HARDSCAPE,INC, as Principal herein, and (2) MUREWE INSURANCE CQMPANYa
corporation organized and existing under the laws of the State of(3) Texas as surety, are held and
firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas,
Obligee herein, in the amount of THREE HUNDRED FIFTY THOUSAND THREE HUNDRED SIXTY-TWO
AND 80/100............................ Dollars($350,362.80)for the payment whereof, the said Principal and Surety bind
themselves and their heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these
presents:
WHEREAS, the Principal has entered into a.certain written contract with the Obligee dated the 10th day of
May,2005, which contract is hereby referred to and made a part hereof as if fully and to the same extent as if copied
at length,for the following project:
PLAYGROUND RENOVATIONS AT COBB SOUTH, SEMINARY HILLS TADLOCK AND
SOUTH Z.BOAZ PARKS
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal
shall faithfully make payment to each and every claimant(as defined in Chapter 2253,Texas Government Code, as
amended)supplying labor or materials in the prosecution of the work under the contract, then this obligation shall be
void;otherwise, to remain in full force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government
Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said
statute,to the same extent as if it were copied at length herein.
IN WITI ESS WHEREOF, the duly authorized representatives of the Principal and the Surety have
executed this instrument.
SIGHTED and SEALED this 10thday of Nfay,2005.
J&J HARDSCAPE, INC
PRINCIPAL
ATTEST: By: z2' A)
Name: cry,-
(2
(Principal) Secretary ��tt
Title: o y-
(S E A L) Address: 5749 WATAUGA ROAD
FORT WORTH, , TX 76148
Witness as to Principal
SURETEC INSURANCE COMPANY
SURETY
ATTEST: By: �Qr;uU
Name: Pauline L. Lesch
Secretary Attorney in Fact
(S E A L) Address:
952 Echo Lane, #450
Houston, TX 77024
Witness as to Surety Telephone Number: 713-
331-6053
NOTE: (1) Correct name of Principal (Contractor).
(4) Correct name of Surety.
(5) State of incorporation of Surety
Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be
attached to Bond by the Attorney-in-Fact.
The date of bond shall not be prior to date of Contract.
BOND NO. 4347998
MAINTENANCE BOND
THE STATE OF TEXAS §
COUNTY OF TARRANT §
KNOW ALL BY THESE PRESENTS:
That J&J HARDSCAPE, INC("Contractor"), as principal, and SUREI'EC INSURANCE COMPANY
a corporation organized under the laws of the State of Texas , ("Surety"), do hereby
acknowledge themselves to be held and bound to pay unto the City of Fort Worth, a Municipal
Corporation chartered by virtue of Constitution and laws of the State of Texas, ("City") in Tarrant
County, Texas, the sum of THREE HUNDRED FIFTY THOUSAND THREE HUNDRED SIXTY-TWO
AND 80/100............................ Dollars
($350,362.80) lawful money of the United States, for payment of which sum well and truly be made
unto said City and its successors, said Contractor and Surety do hereby bind themselves, their heirs,
executors, administrators, assigns and successors,jointly and severally.
This obligation is conditioned, however, that:
WHEREAS, said Contractor has this day entered into a written Contract with the City of Fort
Worth, dated the 10th of May, 2005, a copy of which is hereto attached and made a part hereof, for the
performance of the following described public improvements:
PLAYGROUND RENOVATIONS AT COBB SOUTH SEMINARY HILLS TADLOCK AND SOUTH Z.
BOAZ PARKS
the same being referred to herein and in said contract as the Work and being designated as project
number(s) C280-808480003130/C280-809480002930/C280-808480003230/C280-803480003030 and
said contract, including all of the specifications, conditions, addenda, change orders and written
instruments referred to therein as Contract Documents being incorporated herein and being made a
part hereof; and,
WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct
the work that it will remain in good repair and condition for and during a period of after the date of the
final acceptance of the work by the City; and
WHEREAS, said Contractor binds itself to maintain said work in good repair and
condition for said term of Two (2) years; and
WHEREAS, said Contractor binds itself to repair or reconstruct the Work in whole or in
part at any time within said period, if in the opinion of the Director of the City of Fort Worth
Department of Engineering, it be necessary; and,
WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to
repair or recons?ruct said Work as herein provided.
NOW THEREFORE, if said Contractor shall keep and perform its said agreement to
maintain, repair or reconstruct said Work in accordance with all the terms and conditions of said
Contract, these presents shall be null and void, and have no force or effect. Otherwise, this
Bond shall be and remain in full force and effect, and the City shall have and recover from
Contractor and Surety damages in the premises as prescribed by said Contract.
This obligation shall be a continuing one and successive recoveries may be had hereon
for successive breaches until the full amount hereof is exhausted.
IN WITNESS WHEREOF, this instrument is executed in 6 counterparts,each of which shall be deemed an
original, this 10th day of May,A.D.2005.
ATTEST: J&J HARDSCAPE, INC
(S E A L) Contractor
By:
Secretary Name:
Title:
ATTEST: SURETEC INSURANCE COMPANY
(S E .A L) Surety
By: �&'tL PXgadLll
Secretary Name: Pauline L. Lesch
Title: Attorney-in-Fact
952 Echo Lane, #450
Houston, TX 77024
Address
SureTec Insurance Company
THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION
Statutory Complaint Notice
To obtain information or make a complaint:
You may call the Surety's toll free telephone number for information or to make a complaint at: 1-866-732-0099
You may also write to the Surety at:
SureTec Insurance Company
5000 Plaza on the Lake, Suite 290
Austin, TX 78746
You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or
complaints at 1-800-252-3439.
You may write the Texas Department of Insurance at
PO Box 149104
Austin, TX 78714-9104
Fax#: 512-475-1771
PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim, you
should contact the Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance.
------------------------------------------------------------------------------------------------------------------------------
Important Notice Regarding
Terrorism Risk Insurance Act of 2002
In accordance with the Terrorism Risk Insurance Act of 2002 (the"Act"), this disclosure notice is provided for surety
bonds on which one or more of the following companies is the issuing surety: SureTec Insurance Company, U. S.
Specialty Insurance Company, and any other company that is added to SureTec Insurance Company for which
surety business is underwritten by SureTec Insurance Company("Issuing Sureties").
The premium attributable to any bond coverage for"acts of terrorism" as defined in Section 102(1) of the Act is
Zero Dollars ($0.00).
The United States will reimburse the Issuing Sureties for ninety percent (90%)of any covered losses from terrorist
acts certified under the Act exceeding the applicable surety deductible.
The actual coverage provided by your bond for acts of terrorism, as is true for all coverages, is limited by the terms,
conditions, exclusions, penalties, limits, other provisions of your bond and the underlying contract, any
endorsements to the bond and generally applicable rules of law. This Important Notice Regarding Terrorism
Insurance Risk Act of 2002 is for informational purposes only and does not create coverage nor become a part or
condition of the attached document.
------------------------------------------------------------------------------------------------------------------------------
Exclusion of Liability for
Mold, Mycotoxins, and Fungi
The Bond to which this Rider is attached does not provide coverage for, and the surety thereon shall not be liable
for, molds, living or dead fungi, bacteria, allergins, histamines, spores, hyphae, or mycotoxins, or their related
products or parts, nor the remediation thereof, nor the consequences of their occurrence, existence, or appearance.
� I
SureTec
GENERAL POWER OF ATTORNEY
Know 411 Alen bp These Pre.antc, That SURETEC INSURANCE COMPANY (the "Company"), a corporation dul}organized and
existing under the laws of the State of Texas,and having its principal office in Houston, Harris County, Texas.doeb}ihese presents
make, constitute and appoint
Clem F. Lesch, Pauline L. Lesch,Cary Afatula, Steven NV. Le"is
of Le"-isville. Texas its true and lawful Attorncy(s)-in-fact, with full power and authority hereby conferred in its name. place and
stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other insirumentsorcontracts of
suretyship to include mai%'ers to the conditions or contracts and consents or surety, providing the bond penalty does not exceed
Five Million Dollars and no!100 (55,000,000.00) and to bind the Company thereby as fully and to the same cxtcnlasifsuch bonds
were signed by the President,sealed with the corporate seal of the Company and duly attested by its Secretary, hrrrbyratifying and
confirming all that the said Artomey(s)-in-Fact may do in the premises. Said appointment is made under and byamhority of the
following resolutions of the Board of Directors of the SureTec In. Company:
Be it Resol -ed, that the President, any Vice-President, any Assistant Vice-President, any Secretary or any Assistant
Secretary shall be and is hereby vestedw
with full power and authority to appoint any one or more suitable persons as
Artorney(s)-in-Fact to represent and act for and on behalf of the Company subject to the following pro6sions:
Attat-nev-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute.
acknowledge and deliver, any and all bonds, recognizances, contracts, agreements or indemnify and odirrconhereual r.
obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder,
and any such instruments so executed by any such Attorney-in-Fact shall be binding upon the Company as ifsigned by the
President and sealed and effected by the Corporate Secretary.
Be it Re.cah•ed, thai the signature of any authorized officer and seal of the Company heretofore or Isrreaheraffixed to any
power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile
signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to u-hich it
is attached. (Adopted at a meeting held on 20'''of April, 1999.)
In Witness 11 hereaj SURETEC INSURANCE COMPANY has caused these presents to be signed by its President, and its
corporate seal to be hereto affixed this I 1 th day of June,A.D. 2002.
SURETEC INSURANCE COMPANY
Corporate Seal `�suwHcfc
W/ X�1 ; By
p" T
� W y
State of Texas
�'"�-- t Joh nox,Jr.,
President
County of Harris ss:
On this 1 1 th day of lune A.D. 2002 before me personally came John Knox, Jr., to me known, .+-ho, being by me duly sworn. did
"- depose and say, that he resides in Houston. Texas, that he is President of SURETEC INSURANCE COMPANY,Ihe company
described in and which executed the above instrument: that he knows the seal of said Company. that the seal afTixedtogid instrument
is such corporate seal; that it u•as so affixed by order of the Board of Directors of said Company: and that he signedhisname thereto
-by like order. ..,--
- �
DONNA U.UAGU t d�+�►�-
-�$s: `OPT.. '—L-6a Donna U. Ibanez, Notary it
Notary Seal Nly commission expires lune I I,2006
1, Michael P. Whkenant, Vice President and Assistant Secretary of SURETECINSURANCE COMPANY. do hcrbrtrnify that the
above and foregoing is a true and corTect copy of a Power of Attorney, executed by said Company, which is still inUl force and
effect; and furthermore, the resolutions of the Board of Directors,set out in the PoN%,er of Attorney are in full force andtrect.
In Witness Whereof, I have hereunto set my hand and affixed the seal of said Company at Houston. Texas lhis10th day of
May 20 05 A.D. Socv+Nc !/
V; A�a t
o?/X �Fco
f L
-orporate Seal Q�w i ltilichael P.�1'hisenant,
f�``1 Vice President,Assistant Secret?nv
6.
Contractor covenants and agrees to indemnify City's engineer and architect,and their personnel at the
project site for Contractor's sole negligence. In addition,Contractor covenants and agrees to indemnify, hold
harmless and defend,at its own expense,the Owner, its officers,servants and employees,from and against any and
all claims or suits for property loss,property damage,personal injury, including death,arising out of,or alleged to
arise out of,the work and services to be performed hereunder by Contractor,its officers,agents,employees,
subcontractors, licensees or invitees,whether or not any such injury,damage or death is caused,in whole or in
part,by the negligence or alleged negligence of Owner,its officers servants or employees Contractor likewise
covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's
officers,servants and employees and any damage,loss or destruction to property of the Owner arising from the
performance of any of the terms and conditions of this contract,_whether or not any such iniury or damage is
caused in whole or in part by the negligence or alleged negligence of Owner,its officers servants or
employees.
In the event Owner receives a written claim for damages against the Contractor or its subcontractors
prior to final payment,final payment shall not be made until Contractor either(a)submits to Owner satisfactory
evidence that the claim has been settled and/or a release from the claimant involved, or(b)provides Owner with a
letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier.
The Director may,if he deems it appropriate,refuse to accept bids on other City of Fort Worth public
work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City
Contract.
7.
The Contractor agrees, on the execution of this Contract,and before beginning work,to make,execute
and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful performance of the terms and
stipulations of the contract,including the exhibit attached hereto and made a part hereof and such bonds shall be 100
percent of the total contract price, and the said surety shall be a surety company duly and legally authorized to do
business in the State of Texas, and acceptable to the City Council of the City of Fort Worth.
8.
Said City agrees and binds itself to pay,and the said Contractor agrees to receive,for all of the aforesaid
work,and for all additions thereto or deductions therefrom,the price shown on the proposal submitted by the
successful bidder hereto attached and made a part hereof.
9.
It is further agreed that the performance of this Contract,either in whole or in part,shall not be sublet or
assigned to anyone else by said Contractor without the written consent of the Department of Engineering Director of
said City of Fort Worth.
10.
The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified,
promulgated and set out by the City of Fort Worth,Texas,a copy of which is attached hereto and made a part hereof
the same as if it were copied verbatim herein.
11.
It is mutually agreed and understood that this agreement is made and entered into by the parties hereto
with reference to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas
with reference to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with
all the provisions of the same.
IN WITNESS WHEREOF,the City of Fort Worth has caused this instrument to be signed in triplicate in
its name and on its behalf by the City Manager and attested by its Secretary,with the corporate seal of the City of
Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in three.
counterparts with its corporate seal attached.
Done in Fort Worth,Texas,this the 10th day of Ma-v,A.D. 2005
RECOMMENDED BY: P
VED BY:
DEPARTMENT OF ENGINEERING ARKb'AND C UNI f SE VICES
DIRECTOR DIRECTOR
CITY RT WORTH( ATTEST:
B
ITY MANAGER CITY SECRETARY
J&J HARDSCAPE,INC
CONTRACTOR
By: -
SEAL
�i TITLE
5749 WATAUGA ROAD
FORT WORTH, TX 76148
ADDRESS APPROVED TO FORM EG LITY
J
Ag T ITY ATTORNEY
r November 1960
i
N Revised November 1982
Revised May 1986
Revised October 1989
Contract J!Au'. ' v tion
U Date