Loading...
HomeMy WebLinkAboutContract 49064 b,l � •.; 10 111 lb M CITY SECRETARY Agreement /jI� CONTRACT NO. t�D page I of 4 - S N> Q Cjys��Rr C- 01 c 1 SECTION 00 52 43 2 AGREEMENT FOR EMERGENCY REPAIR SERVICES 3 4 THIS AGREEMENT is made by and between The City of Fort Worth, a Texas home rule municipality acting by 5 and through its duly authorized City Manager, ("City"), and Quadex Lining Systems LLC (Quadex), a limited 6 liability company authorized to do business in Texas, acting by and through its duly authorized representative 7 ("Contractor"). City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article 1. WORK 10 11 Contractor shall perform structural rehabilitation of approximately 930 feet of 78-inch diameter corrugated metal 12 pipe (CMP) storm drain, including surface, joint, and invert repair and preparation and spray application of 13 GeoKrete liner, in accordance with their proposal dated April 9,2017 and email dated April 12,2017. 14 Article 2.PROJECT 15 16 A 78-inch diameter CMP storm drain is located within the Boca Raton residential neighborhood at 500 Canyon 17 Creek Trail in east Fort Worth. On March 10, 2017 Stormwater Management(SWM)Field Engineering staff 18 walked the line and found the following issues: 19 0 Metal sheet is curling up,trapping sediment and impeding the flow. 20 • The bottom of line is eroded and washed out(over 30' of the bottom is gone at one spot). 21 • The line has many visible holes in the bottom. 22 • There are sediments deposited in the line. 23 24 It is beyond the capacity and technical resources of TPW Department staff to perform repairs of this type. 25 Article 3. CONTRACT TIME 26 3.1 Time is of the essence. 27 Contractor recognizes that time is of the essence, and the Contractor will be required to remain on the jobsite until 28 the 78-inch diameter CMP storm drain is repaired. The City expects the Contractor to have a sense of urgency to 29 complete the Work in a timely manner. The project duration is 14 working days per the contractor's email dated 30 April 12, 2017. 31 32 Article 4. CONTRACT PRICE 33 City agrees to pay Contractor for performance of the Work based on Contractor's invoice an amount up to Four 34 Hundred and Ten Thousand Dollars ($410,000.00) This figure may be amended up or down as final invoices are 35 received. 36 Article 5. CONTRACT DOCUMENTS 37 5.1 CONTENTS: 38 The Contract Documents which comprise the entire agreement between City and Contractor concerning 39 the Work consist of the following: =- OFFICIAL.RECORD CITY SECRETARY FT-WOR'TNt'TX _ 2 Agreement Page 2 of 4 40 1. This Agreement. 41 2. Exhibits to this Agreement: 42 a. Approved Invoice 43 b. Evidence of Current Insurance 44 c. Current Prevailing Wage Rate Table incorporated by reference. 45 3. General Conditions incorporated by reference 46 47 Article 6. INDEMNIFICATION 48 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its 49 officers,servants and employees,from and against any and all claims arising out of,or alleged to arise 50 out of, the work and services to be performed by the contractor, its officers, agents, employees, 51 subcontractors, licenses or invitees under this contract. This indemnification provision is specifically 52 intended to operate and be effective even if it is alleged or proven that all or some of the damages 53 being sought were caused, in whole or in part, by any act, omission or negligence of the city. This 54 indemnity provision is intended to include,without limitation, indemnity for costs, expenses and legal 55 fees incurred by the city in defending against such claims and causes of actions. 56 57 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its 58 officers,servants and employees,from and against any and all loss,damage or destruction of property 59 of the city, arising out of, or alleged to arise out of, the work and services to be performed by the 60 contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. 61 This indemnification provision is specifically intended to operate and be effective even if it is alleged 62 or proven that all or some of the damages being sought were caused, in whole or in part, by any act, 63 omission or negligence of the city. 64 65 Article 7.MISCELLANEOUS 66 7.1 Terms. 67 Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the 68 meanings indicated in the General Conditions. 69 7.2 Assignment of Contract. 70 This Agreement, including all of the Contract Documents may not be assigned by the Contractor without 71 the advanced express written consent of the City. 72 7.3 Successors and Assigns. 73 City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other 74 party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 75 7.4 Severability. 76 Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a 77 court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be 78 valid and binding upon CITY and CONTRACTOR. - 3 Agreement Page 3 of 4 79 7.5 Governing Law and Venue. 80 This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall 81 be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth 82 Division. 83 7.6 Other Provisions. 84 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is classified, 85 promulgated and set out by the City. 86 7.7 Authority to Sign. 87 Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of 88 the Contractor. 89 90 IN WITNESS WHEREOF, City and Contractor have signed this Agreement in multiple counterparts. At least 91 one counterpart of each has been delivered to City and Contractor. 92 93 This Agreement will be effective on the last date subscribed by a signatory(which is the Effective Date of the 94 Agreement). 95 City of Fort Worth Contractor: Qua ft#ng S stems, LLC By: Jay Chapa By: Assistant City Manager Q44 Si e) �- Title: Date COO Nick Banchetti (Printed Name) ®f FO/ � Attest: G 66 cre ` Address: 9155 Wallisville Rd. :7d Houston,TX 77029 (Seal) ,• J City/State/Zip: A proved as to Form and Legality: S � Date IT Douglas W. Black Senior Assistant City Attorney 97 Date 98 *�,r,tZV IGg � APPROVAL RECOMMENDED: 99 O`FJ ti[ 100 OFFICIAL RECORD CITY SECRETARY FT.WORTH:TX - 4 Agreement Page 4 of 4 101 102 Do 1 iersig, P.E. 103 VC4— Di for TPW Department 104 10' Throekmorton St. 105 Fort Worth, TX-76102 Contract Compliance Manager Re: Emergency Procurement, Canyon Creek Storm Drain Repair($410,000.00) Contractor: Quadex Lining Systems LLC Project Name: Canyon Creek Storm Drain Repair City Sec.No. Project No. 100961 By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performa e a reporting requirements. Nam of Employee r R6 19-OS Wa � 1 � Title FORTWORTH MEMORANDUM Date: March 24, 2017 From: Douglas Wiersig,TPW Director Via: Doug Black, Sr.Assistant City Attorney Jack Dale, Purchasing Manager To: Jesus Chapa,Assistant City Manager SUBJECT: EMERGENCY REPAIR—72" STORM DRAIN LINE CANYON CREEK TRAIL On March 10, 2017 during a recurring inspection of a previous repair, City Staff discovered severe deterioration in the 72"metal storm drain line running along Canyon Creek Trail in east Fort Worth north of Boca Raton Blvd. The previous repairs were made in 2007 after a section of the pipe failed during a heavy rain event causing a large sinkhole in the yard of a resident. City staff believe that there is a significant risk of a recurrence of such an event which would create a public health or safety risk and, therefore,repairs should be made as quickly as possible. It is estimated that approximately 400 linear feet of pipe need to be repaired. The estimated cost of the repair is $100,000-$150,000. Waiting to bid and award and contract to repair the deteriorated line is not in the best interest of the health and safety of the City of Fort Worth. Chapter 2,Article I, Section 2-9 of the City's Code of Ordinances and Section 252.022 of the Local Government Code exempts from normal bidding requirements expenditures that are necessary to preserve or protect the public health or safety of the municipality's residents. This memo is submitted to request authorization for emergency procurement of pipe repair services. A confirming M&C will be circulated to ratify the above activities after the work has been performed. APPROVED FOR EMERGENCY PROCUREME Recommended: ci, (,J Douglas j rsig,TPW Departme Approved as to Form and Legality: Douglas W.Blac Sr.Assistant City Attorney Approved: A," Jack bale urc acing Manager Approved: Jesus J. Chapa,Assist nt �ger TRANSPORTATION AND PUBLIC WORKS DEPARTMENT THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH,TEXAS 76102 817-392-7800 * FAX 817-392-8092 FORTWORTH MEMORANDUM Date: March 31,2017 From: Douglas Wiersig,TPW Director Via: Doug Black, Sr. Assistant City Attorney Jack Dale, Purchasing Manager To: Jesus Chapa,Assistant City Manager SUBJECT: SUPPLEMENT TO 3/24/17 MEMORANDUM RE EMERGENCY REPAIR—72" STORM DRAIN LINE CANYON CREEK TRAIL This supplement to the 3/24/17 memorandum which granted approval for emergency procurement of pipe repair services is provided to document that quantities and estimated unit prices for the Canyon Creek Trail storm drain project have been found to be significantly higher than originally estimated(see attached for original memo). The actual quantity of pipe needing to be repaired is approximately 900 lineal feet. It is expected that the repair project will cost$500,000- $550,000. The work will be funded from the Reactive line item in the Stormwater 5 year CIP. APPROVED FOR EMERGENCY PROCUREME r Recommended: �' — Dougla iersig,TPW Departm nt Approved as to Form and Legality: Douglas . Black, Sr. Assistant City Attorney Approved: Jack Dale, Purchasing Mana er Approved: Jesus J. Chapa,Assistant City Manager TRANSPORTATION AND PUBLIC WORKS DEPARTMENT THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102 817-392-7800 * Fax 817-392-8092 CERTIFICATE OF INTERESTED PARTIES FORM JL295 1 of 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-198378 Quadex Lining Systems, LLC Houston, TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 04/25/2017 being filed. City of Fort Worth Date Ackno d ed 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. Project 100961 geopolymer pipe rehabilitation services for the City of Ft Worth 78 inch Storm Pipe Emergency Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling I Intermediary Neil ,Wisener Houston,TX United States X Strawbridge, Craig Houston, TX United States X Banchetti, Nicholas Houston, TX United States X Vellano, Michael Houston,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. "�"'''• HAYDEN FOLEY MALONE NOTARY PUBLIC-STATE OF TEXAS 'Y ti:,� COMM.EXP.02-16-2020 �f OF"t NOTARY Ib 130541369 �� ` Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me, by the said Nick Banchetti this the 25th day of April 2017 ,to certify which,witness my hand and seal of office. Pi�,h-aAt," �&� Hayden Malone Notary S"ture df officer a ministering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883 Search Results I System for Award Management Page 1 of 1 Usemame Password Log In Forgot Username? Forgot Password? Create an Account Search Results Current Search Terms: quadex* lining* systems* Notice:This printed document represents only the first page of your SAM search results.More results may be available.To print your complete search resultsyou can download the PDF and print it. Glossary No records found for current search. Search Results Entity Exclusion Search Filters By Record Status By Record Type Search Records FAPIIS.gov Data Access Disclaimers GSA.gov/IAE Check Status Accessibility GSA.gov About Privacy Policy USA.gov Help IBM v1.P.64.20170330-1550 WWW2 haps://www.sam.gov/portal/SAM/?navigationalstate=JBPNS_rOOABXdcA... 4/28/2017