Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 49065
CITY Y SECR UMI-v` L CON i RAC I'NO. Developer and Project Information Cover Sheet: Developer Company Name: CRP West 7th University, LP Address, State, Zip Code: 600 E. Las Colinas Blvd,Irving TX, 75039 Phone&Email: 817-917-7042, lsparks@greystar.com i Authorized Signatory,Title: Laird Sparks ,Vice President _i Project Name: Elan West 7th 3 Brief Description: = Water, Sewer,Paving, Storm Drain, Street Lights Project Location: 1 Southeast corner of Crockett Rd. and University Dr. intersection Plat Case Number: FS-15-200 Plat Name: Van Zandts Addition Mapsco: 76A Council District: 9 CFA Number: 2017-057 City Project Number: 100925 To be completed by f.• Received by: Date: a 7 OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX 56 789r !00 City of Fort Worth,Texas G Standard Community Facilities Agreement- Elan West 7th G ��F6 CFA Official Release Date: 02.20.2017 t�o� Gig Page 1 of 11 78 LSSb STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, CRP West 7th University , LP, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Elan West 7th ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Proj ect. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement- Elan West 7th CFA Official Release Date: 02.20.2017 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®', Sewer (A-1) ® Paving (B) ®, Storm Drain (B-1) ®, Street Lights & Signs (C) Z. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 11,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement- Elan West 7th CFA Official Release Date: 02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement- Elan West 7th CFA Official Release Date: 02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damag-es are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damazes are caused, in whole or in part, by the allezed nezlizence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement- Elan West 7th CFA Official Release Date: 02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement- Elan West 7th CFA Official Release Date: 02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement- Elan West 7th CFA Official Release Date: 02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Elan West 7th CFA No.: 2017-057 City Project No.: 100925 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 106,870.80 2.Sewer Construction $ 106,536.60 Water and Sewer Construction Total $ 213,407.40 B. TPW Construction 1.Street $ 183,869.25 2.Storm Drain $ 338,480.00 3.Street Lights Installed by Developer $ 158,682.58 4. Signals $ - TPW Construction Cost Total $ 681,031.83 Total Construction Cost(excluding the fees): $ 894,439.23 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 4,268.15 D. Water/Sewer Material Testing Fee(2%) $ 4,268.15 Sub-Total for Water Construction Fees $ 8,536.30 E. TPW Inspection Fee(4%) $ 20,893.97 F. TPW Material Testing(2%) $ 10,446.99 G. Street Light Inspsection Cost $ 6,347.30 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 37,688.26 Total Construction Fees: $ 46,224.56 Choice Financia/Guarantee Options,choose one Amount Mark one Bond=100% $ 894,439.23 x Completion Agreement=100%/Holds Plat $ 894,439.23 Cash Escrow Water/Sanitary Sewer=125% $ 266,759.25 Cash Escrow Paving/Storm Drain=125% $ 851,289.79 Letter of Credit=125%w/2yr expiration period $ 1,118,049.04 City of Fort Worth,Texas Standard Community Facilities Agreement- Elan West 7th CFA Official Release Date: 02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER CRP West 7th University,LP Jesus J. Chapa Assistant City Manager Date: 5---/ o> - f -) Name: Laird Sparks Recommended by: Title: Vice President 0 A Date: �,• ? • Wendy Chi- abulal, EMBA, P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department Signature Doug l 'ersig, P.E. Name: Direct i Transpo ation &Public Works Department Contract Compliance Manager: Approved as to Form &Legality: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting Richard A. McCracken requirements. Assistant City Att rrrteey M&C No. 11 Date: Form 1295: W • Name: Janie Morales Title: Development Ma ger ATTEST: Mdry J. Kayer City Secreta x s OFFICIAL RECORD City of Fort Worth,Texas � � CITY SECRETARY Standard Community Facilities Agreement- Elan West 7th - FTS WORTH,TX CFA Official Release Date: 02.20.2017 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ......._.. Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map ®i Exhibit A: Water Improvements Water Cost Estimate ®' Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements ® Paving Cost Estimate ®' Exhibit B-1: Storm Drain Improvements ®' Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement- Elan West 7th CFA Official Release Date: 02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100925 None City of Fort Worth,Texas Standard Community Facilities Agreement- Elan West 7th CFA Official Release Date: 02.20.2017 Page 11 of 11 D W 5TH ST W 5TH ST v o O z 9` W 6TH ST o(nj W 6TH ST H w W 7TH ST v W 7TH ST P�O"14\`c��Jo _ CPQ v CROCKETT ST o cf) LLI (If U MORTON ST w z a N DARNELL ST PROJECT BLEDSOE ST z W E ( LOCATION a5 W LANCASTER AVE W LANCASTER AVE VICINITY MAP - ELAN WEST 7TH N.T.S. MAPSCO NO. 76A COUNCIL DISTRICT 9 O N = W C o � Qm z = 3ry�o a g LLJ Q 0 N M C-)C-0 ❑ D v n.i.zi xa - (nom o EPIT = 'll x a SS o-- S � � e =O .� 3H0I Jill �I 9HO Q L ]]T� O L O o O \\ F - \. W W 0 \ O -) j H ° > w w � � CO c� w W4 i _ ww w (if -I i Q CL O 10 W � a CSI W3 W o 0 0 ~ � I � � 3I J- 0 oax Q W a U W I W , o W o U � ¢ 4 w U ) - w � U w \\\ ¢ W \\~ _U w N i4: U �ULLJ w o LU ¢ Z w — TT IT�T i a U) w N w a O r � C 7 \�� d N Im O W p �u5i�i�i Q � 0 W � Iy h o Z Z ❑ J w2 � W �\ w F- W w < W ¢ W w W W ssc~i) o ~ 0 0 (Avnnyo-tttrrrta�m�eviavnv) Of AA M M �nIN4 A I MOAINn W d W(L CL 83N/A DAd.ZLM M ° HRIVM OAd.ZL'X3 [i><+nl'zwauvn R. si.zw bs-ru.-. .zw 4 .ttw-((.=C3f.YfM1.m3e...m..uT O = W W LL- - — — — — — — w8 s� of VA M (AvmU �� CC - - amx a ss'ra.zt'X3 i- ®r vidul s 0 f R' ® = a^ �� Y 3H0 �� - 3H0 CD Q O L LU ° o _ W � �II � � �� licol LU z o Q—- U � w -9 � O > � Ha W `)LLJ U CD LLJ cn co Q � Wri W W i w LLI ° ow ILLI o2 0 ~ � w I \ O LLJ w o = I \ O ¢ o >~ L w— U) U c - w � � I y �� o O O I 0 ORa w iw _U w I Z LLJ� J U w I = = � ] w w I LLLI 0w I N CC) 00 w a a Z w w J Z J X J O w o w = z w Q o 0 0 o cwn o w w 0O z O Z ss ss a C- U) a P a 2 (AVM--IIN-..,Ms�,eviavn v) 0 X X M N DAN4_ �__.___D11�S?�3l INn a. a w 0 w M M lo:�•-� ►�•��;•7 SFr. .��ll��tl•�► �• ��-1 \ 0 ���i�,�� � _ '�"-imp �■ �+;l� aa� ■ 1■ • ■ w I ■ Ir � nnnnu// I i� l■ ImNI ft ■ • , 11111, ■!111111 . . ■ . 1 1•� ■ f i f f • , E R'�'\ � I— — /.�. � \i� a 1 1 a a � \ ■ � I RIF lot ►��� �= .. ' MEN fir,A`�a .ate,_ __ u-� .. • •++�•�o�o��������i+iiia►+1►!i►!i+i+i�i�i!i?i!i!o!oToTo`.�� 0 N W LLI o W 0 � g — — — — — — — — — W Q 0 U so� O (-0 M R LL m x sU Tsir a- . _ SS �- � S � ■ 3HO ter, 9HO Y W Q \ Z ui PU I w z° a —Z o O mow= ° W aU o IID O � Z Oma; UJ U) o N . !�-1 (w V �O N w U Z a I� a z �, l o; o C� ��l �o ° = 1 v) ICO w a o � a I wZ m W [7� N w U" ��- N iD J 'cTi D ° D '9 " � t o o W O CL co a 66 & F- P-4 N � Qat 0 CD `iili U � c � FP4E--� W w ^ � o 0 � � 3 I Z = a s� 00a 0 � w aUww W ? = I � o < o I ITTJT� I TI cl U CI W W w Ell, zJ of w w i w w J UIWO z _ --i_ -- -__1 �_ __1 \ cl w R 0 Om V 0 m m cn w O Z O SS � SS 0 0 z� Q 9Yditt8hbF9l (AVM-MY-± IWA V) w Q' _ x Of M.-. M BnRNa A ISM71AINn a O.. J W a- M M n.wi�w-a;.n 0 N I- = W o Ld L z 0 i w /^1 as< =o Q 0 .�. $ \A M C-)CD W � Cf) o m x 0 _IN — r 3H0 3HO Q CD o o I— o � LU = Iw y CD I o [� O co cno _—� I W z U cn tY xW0 i� IL I TE I www w > w CO 3 ° tea' c) � � � Q w aUwW WI o - OS U Mme UM 1� CD 1- 0J 11 w © w o W = J N a 0 w I- i�i ILI � � Z F- o 0 0 o e o 0 w O ��0--SS SS a O O (,kVMS0±M5IMM±MIMIR9S RNA V) w w nn 3AI 10 1.1IS,RnINn M M 00 42 43 DAP-BID PROPOSAL Page 1 of7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Section Unit of Bid No. Description No. Measure Quantity Unit Price Bid Value UNIT I:WATER IMPROVEMENTS 1 3312.2802 4"Water Meter and Vault 33 12 11 EA 1 $22,100.00 $22,100.00 2 3312.2203 2"Water Service 33 12 10 EA 2 $5,050.00 $10,100.00 3 3312.2003 1"Water Service 33 12 10 EA 2 $3,350.00 $6,700.00 4 3312.3005 12"Gate Valve 33 12 20 EA 1 $2,750.00 $2,750.00 5 3311.0141 6"Water Pipe 3311 12 LF 35 $65.00 $2,275.00 6 3312.3003 8"Gate Valve 33 12 20 EA 1 $2,100.00 $2,100.00 7 3312.3002 6"Gate Valve 33 12 20 EA 1 $1,500.00 $1,500.00 8 3312.0001 Fire Hydrant 33 12 40 EA 1 $3,500.00 $3,500.00 9 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 0.39 $12,300.00 $4,797.00 10 3305.0109 Trench Safety 33 05 10 LF 172 $16.65 $2,863.80 11 0241.1000 Remove Conc Pvmt 0241 15 SY 265 $45.001 $11,925.00 12 9999.0000 Cut and Plug Ex.Water Services 00 00 00 EA 9 $2,340.001 $21,060.00 13 9999.0000 6"Fire Service Taps 00 00 00 EA 2 $7,600.001 $15,200.00 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT I:WATER IMPROVEMENTS $106.870.80 CITY OF FORT NORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fmm Version September 1,2015 ECR-00 42 43 Bid Proposal_DAP-DRAFT.As 00 42 43 DAP-BID PROPOSAL Pale 2 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Specification Section Unit of Bid No. Description No. Measure Quantity Unit Price Bid Value UNIT II:SANITARY SEWER IMPROVEMENTS 1 3331.4116 8"Sewer Pipe,CSS Backfill 3331 20 LF 52 $155.00 $8,060.00 2 3331.4115 8"Sewer Pipe 3331 20 LF 229 $155.00 $35,495.00 3 3305.0116 Concrete Encasement for Utility Pipes 33 05 10 CY 0.53 $150.00 $79.50 4 0241.1000 Remove Cone Pvmt 0241 15 SY 349 $45.00 $15,705.00 5 3339.1001 4'Manhole 33 39 10 EA 3 $3,350.00 $10,050.00 6 3339.1003 4'Extra Depth Manhole 33 39 10 VF 0.49 $26,940.00 $13,200.60 7 0241.2013 Remove 8"Sewer Line 0241 14 LF 488 $14.00 $6,832.00 8 0241.2201 Remove 4'Sewer Manhole 0241 14 EA 2 $1,100.00 $2,200.00 9 3301.0001 Pre-CCTV Inspection 3301 31 LF 692 $4.15 $2,871.80 10 3301.0002 Post-CCN Inspection 3301 31 LF 907 $4.15 $3,764.05 11 3305.0109 Trench Safety 33 05 10 LF 281 $16.65 $4,678.65 12 3301.0101 Manhole Vacuum Testing 3301 30 EA 5 $500.00 $2,500.00 13 9999.0000 Connect to Existing Manhole 00 00 00 EA 1 $1,100.00 $1,100.00 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 LJ- TOTAL UNIT It:SEWER IMPROVEMENTS $106 53 , 6.60 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 ECR-00 42 43 Bid Proposat_DAP-DRAFT.xis 00 42 43 DAP-BID PROPOSAL Page 3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Description Specification Section Unit of Bid Unit Price Bid Value No. No. Measure Quantity UNIT III:DRAINAGE IMPROVEMENTS 1 3341.1403 7x5 Box Culvert 3341 10 LF 462 $550.00 $254,100.00 2 3341.0201 21"RCP Class III 3341 10 LF 300 $70.00 $21,000.00 3 3349.5001 10'Curb Inlet 33 49 20 EA 3 $3,750.00 $11,250.00 4 3349.0104 4'Stacked Manhole 33 49 10 EA 4 $5,850.00 $23,400.00 5 3349.0003 6'Storm Junction Box 33 49 10 EA 1 $14,950.00 $14,950.00 6 3349.8001 10'Type 2 Inlet 33 49 20 EA 1 $4,680.00 $4,680.00 7 9999.0000 Connect to Existing RCP 00 00 00 EA 4 $2,275.00 $9,100.00 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT III:DRAINAGE IMPROVEMENTS $338,480.00 CITY OF FORT NORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 ECR-00 42 43 Bid Proposat_DAP-DRAFr.,ds 00 42 43 DAP-BID PROPOSAL Page 4 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Section Unit of Bid No Description No. Measure Quantity Unit Price Bid Value UNIT IV:PAVING IMPROVEMENTS 1 3213.0103 8"Conc Pvmt 32 13 13 SY 569 $60.00 $34,140.00 2 3213.0105 10"Conc Pvmt 32 13 13 SY 212 $72.00 $15,264.00 3 3213.0401 6"Conc Driveway 32 13 20 SY 224 $60.00 $13,440.00 4 0241.1000 Remove Cone Pvmt 0241 15 SY 773 $45.00 $34,785.00 5 3213.0301 4"Conc Sidewalk 32 13 20 SF 11,313 $6.50 $73,534.50 6 13211.0501 6"Lime Treatment 3211 29 SY 1 005 $6.15 $6,180.75 7 13211,0400 Hydrated Lime 32 11 29 TONS 19 $175.00 $3,325.00 8 3441.4002 Furnish/Install Alum Sign Ground Mount 3441 30 EA 4 $350.00 $1,400.00 TxDOT Std. 9 3441.4108 Remove Sign Panel and Post 3441 30 EA 13 $100.00 $1,300.00 10 9999.0000 4"White Parking Stripes 00 00 00 LF 500 $1.00 $500.00 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT IV:PAVING IMPROVEMENTS $183.869.25 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September I,2015 ECR-00 42 43 Bid Proposal_DAP-DRAFT.xis 00 42 43 DAP-BID PROPOSAL Page 5 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Biddees Proposal Bidlist Item Specification Section Unit of Bid No. Description No. Measure Quantity Unit Price Bid Value UNIT V:STREET LIGHTING IMPROVEMENTS 1 0170.0100 Mobilization 01 7000 LS 1 $7,415.00 $7,415.00 3441.3201 LED Lighting Fixture 2 (Decorative Street Light, Bounce BNSI,70 watt, 34 41 20 EA 4 $5,339.00 $21,356.00 240V 14'Pole Height, Privided by Kim Lighting) 3441.3201 LED Lighting Fixture 3 (Decorative Pedestrian Light,Bounce BNSI,70 3441 20 EA 18 $5,339.00 $96,102.00 watt,240V,12'Pole Height,Privided by Kim Li htin 4 2605.3018 2"CONDT PVC SCH 80,Open Cut 26 05 33 LF 1,479 $16.80 $24,847.20 5 9999.0000 Circuit Wiring-3#6 AL 00 00 00 LF 1,479 $3.22 $4,762.38 6 3441.1502 Ground Box Type B w/A ron 3441 10 EA 6 $700.00 $4,200.00 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $158.682.58 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Foran Version September 1,2015 ECR-00 42 43 Bid Proposal_DAP-DRAFf.As 00 42 43 DAP-BID PROPOSAL Page 6 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Section Unit of Bid No. Description No. Measure Quantity Unit Price Bid Value UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS 2 -4--- — --- - ---- - ---- --- - 5-- ----------- ----- — -- - -- - 6 ---- --- --------- --.- -- ------ -- 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 -- - - -- ---- ----- ---- ----- 26 27 28 29 30 31 32 33 34 35 36 37 - ------- -_.----- -- - --- - - ------ ---- 38- - - -- 39 40 41 42 43 44 45 TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS CITY OF FORT NORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 ECR-00 42 43 Bid Proposal—DAP-DRAFT-zls 00 42 43 DAP-BID PROPOSAL Page 7 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Section Unit of Bid No. Description No. Measure Quantity Unit Price Bid Value Bid Summary UNIT I:WATER IMPROVEMENTS $106,870.80 UNIT II:SANITARY SEWER IMPROVEMENTS $106,536.60 UNIT III:DRAINAGE IMPROVEMENTS $338,480.00 UNIT IV:PAVING IMPROVEMENTS $183,869.25 UNIT V:STREET LIGHTING IMPROVEMENTS $158,682.58 UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS Total Construction Bid $894,439.23 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 973 calendar CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT NORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September I,2015 ECR-00 42 43 Bid Proposal_DAP-DRAFT.xis