Loading...
HomeMy WebLinkAboutContract 49069 CITY SECRETARY CONTRACT NO. 1 660 C1 Developer and Project Information Cover Sheet: Developer Company Name: GBR Realty, LTD, by its two General Partners: Steve Hawkins Custom Homes LTD a Texas limited partnership By: Its General Partner SJSHCH, LLC, a Texas limited liability company Address, State,Zip Code: 7201 Hawkins View Drive,Fort Worth, TX, 76132 Phone & Email: 817-737-4446 Authorized Signatory, Title: Steve Hawkins Project Name and Brief Ridgeview Estates Ph.3 Description: Project Location: Granbury Road& Water Meadows Drive Plat Case Number: FP-16-002 Plat Name: Ridgeview Estates Addition Mapsco: 102 sec H Council District: 8 City Project Number: 100362 CFA Number: 2016-066 DOE Number: None To be completed b taff Received by: Date: 7 j lsr ., -•r 4�,/r City of Fort Worth,Texas Standard Community Facilities Agreement EFT.WORTN:1T)]( CFA Official Release Date: 10.07.2015 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, GBR Realty, LTD, by its two General Partners: Steve Hawkins Custom Homes LTD a Texas limited partnership By: Its General Partner SJSHCH, LLC, a Texas limited liability company , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Ridgeview Estates Ph.3 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) 0, Street Lights & Signs (C) FR. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Ridgeview Estates Phase 3 CFA No.: 2016-066 CP No.: 100362 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 336,731.00 2. Sewer Construction $ 344,297.00 Water and Sewer Construction Total $ 681,028.00 B. TPW Construction 1.Street $ 640,851.20 2.Storm Drain $ 72,143.00 3.Street Lights Installed by Developer $ 123,900.00 4. Signals $ - TPW Construction Cost Total $ 836,894.20 Total Construction Cost(excluding the fees): $ 1,517,922.20 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 13,620.56 D. Water/Sewer Material Testing Fee(2%) $ 13,620.56 Sub-Total for Water Construction Fees $ 27,241.12 E. TPW Inspection Fee(4%) $ 28,519.77 F. TPW Material Testing(2%) $ 14,259.88 G. Street Light Inspsection Cost $ 4,956.00 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 47,735.65 Total Construction Fees: $ 74,976.77 Choice Financial Guarantee Options, choose one Amount Mark one) Bond=100% $ 1,517,922.20 Completion Agreement= 100%/Holds Plat $ 1,517,922.20 x Cash Escrow Water/Sanitary Sewer=125% $ 851,285.00 Cash Escrow Paving/Storm Drain= 125% $ 1,046,117.75 Letter of Credit= 125%w/2yr expiration period $ 1,897,402.75 City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of i l ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER GBR Realty, LTD, by its two General Partners: Steve Hawkins Custom Homes LTD a Texas limited partnership Jesus J. Chapa Assistant City Manager By: Its General Partner Date: �? SJSHCH, LLC, a Texas limited liability company Recommended by: ' (/ 2 - L�-LA N eve wkins Wendy Chi- abulal, EMBA, P.E. Ti Presi nt Development Engineering Manager Date: 2 17,017 Water Department ATTEST: (Only if required by Developer) Dougrotion sig, P.E. DirecSignatu Trans &Public Works Department Name: Approved as to Form &Legality: SOF FORT Richard A. McCracken Assistant City Attorney U ATTEST: M&C No. , Date: S11511-7 S F04,%". lZq$ : rV14 - Wary'J. Kay r City Secretary City of Fort Worth,Texas Standard Community Facilities Agreement OFFICIAL RECORD CFA Official Release Date: 10.07.2015 Page 9 of 11 CITY$E(;�A� FT. WORTH, TX Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. ate: Janie S. Morales 4�,/ Development Man er k ► Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Q Attachment 1 - Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvments Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate Exhibit 13-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100362 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 I z JE] � J a u _ Li W 11ISC OURA SI°� z PCO b BPS �° z �� VPIN CL ��f -\?k LU N❑ Q M Ln <1 �NZ FBF° �, W a LU Q Z LU Uo cc U > C5 LLJ W O w Q LLJ LA J N l~ �Vb u � o GRANBURY D F- O M U oLno J I I I hJ1�d�1 J x CVOs' 3 Jy o u a C, o�LL 0 �N C N D n C CD Q� 111 6anP'dVW AlINIJIA\V3O\s6u,rn-(1\100\u6lsaa\4681\008100\OOSuouonpoJd\:C:H1Vd3lid Wd 8014:1V LIOZ'£OIudV'Ar)Puoyq:NO Inod•esnojN J,8 03l101d C, 0 2 \ y J J \ r— O - j3 � � J ON a� o \ O _II J O W x ' w o ' J N � 7 W U Go N 'HO 390tH AONIfA O \ •3 / W / / ma smoavaw auvm N f / z LU W ro f Q Ln o O > m DC J M > _ > LU W X (D Q LU _ o -CIO LU 5 >< I— ac W o a w Z z � w w � Q Q 3 3 O 3 w • (7 x �. J � o vi 00 Ci3 t^ zi o CLL 31 V7ZRrr:)—Uo X w J – 7laS • w •�N C • � >< — _N Neo T , N • N �"- atlOH AH00Ntltl9 m 6wP'SlN3W3AO8dWl?131VM V 1181HX3\VAJ\s6u!MoJd\100\u6!sap\y681\008100\003uo4onpad\:J:H1Vd3lld Wd 9E:V:1V L!ol"E01!jdV•,(opuoW:NO Inod•asnorl,78 GRIold 0 0 - i • 3 � � N O , - N M co p II N o co x w o � s Q 039GIUAONIM I N N I O LO M z W i ao i W W O p r-I DC m a _ H w O Q a Q Q a _ a V) • m DC U.J W > co = w x 3 _o W W o DC Q 3 1 a Go BO N y 2 v � h Z Z Ll Q N N Q � 0 W w O • Ur x x � W N J ou' 3C') GoM N J i0&0: N N v aLL N oj N M NBO Co '. a)co / a)co — z — Q N EX-SS� °) avounn8Ntltl9LO LO 6,wp'b3M3S),NVANVS I-V 1191HX3\VdO\s6ulmoja\I00\u6lsap\468 f\008100\OOSuogonpad\:O:H1Vd3lld Nd 6E:6:1V L IOZ'EO IudV'AopuoW:NO Inod'asnojN:A8 o3l101d 0 0 W H LU m hd ZJ 'Q O W W H U I I N I N cI I lI I I Q — I U uj I 'I N�.v...oPoevT,a�o'�—' m W m i I II CL LU U c.i G II 1 / oa W _ m O F.- QI I II � i it m w U W I I Q I r O d m M� ��// O ; = i li ai II W I I LU CL CL LLJI Q G 0 II I II I I I LU — o I , I _ LU t i C CD I Z I I I I I Z I I li it UL J I I I I I I I I fI II II I � I II I I II I I I I , I I I l i I I I II I I I 1 I I I I uj . I I li I II W � I I it uj I O j I W o ii-+ a ''a CO i a �i I it ~ U - mCal CL I l _ - J1) I o o LL CL :�- d H N W I D� I 6 I j a ro - --- --J 'ill:' ----- jo -� Poz4 � 6MP'S1N3W3n0861WI ONIAW 91191HX3\VdO\s6wnnoJp\loo\u6lsap\qbg l\oog loo\ooguogonpad\:O:H1Vd31113 Wd ZV:ti:1V L loZ'Eo lljdV'Aopuoy,4:NO Inod'asnoj)j:A9 431101d 0 CD— CD O O m fV a oCD II -- -- ---------- ?_ I i o I \\ w \\ LLJ w N LLJ I Ij I II i W LLJ �� --- w I II I I I � 100 � dse I I mV uII IC4d O C4CL Al o I d - d CLI i w� II I 3 II co — I I I 0 I O I I I ���_ o aLL ij �NXc ad 9L I lCID 0 N 6MP'NIV8ClVgNO1S1-91191HX3\VJ3\s6ulrnola\100\u61Sap\4691\009100\oo3uogonpoJd\:J H1Vd31IAWd4Z:4:1VLtOZ'EOIudV'AopuoW:NOInod asnoj)i:A9O311O1d 0 C) ` H W — 2W aN O je0� ~ cV — — -------- i oo II 23 I o I I H J 901H AONIM f I I N o ui I O LU \ J _J ^ Ln W \� w w �CL i CL J m LU cn I I I I I C _ ! Lu W W I F.- LU _ N I I W I > i LU W H 1 I— H 1 art w CL _ I H W I F.- x = 0 ,,nn 1 w rim d J i + I H I O = (D I J I 1 = I I I I � _I E I CL J1 1 , w I E-5, I W LU I I 1 ~ I I p I I I W (� I I I I % Imo I I I I Q.Zo i o I IL. I � x I I I I 1 t: I I 20 I I 3M X c) I -w� N u� Qco adon Aanerrdao ��� o o-IP In 6MP'1HOIl 133?11S O 1191HX3\VdJ\s6u-c)J(I\100\u6!sap\bb91\008100\009UOuOnp-dV O:H1Vd3lld Wd BZ:t,:1V L 1 OZ'EO I!jdV'ADPuOV4:NO Inod'asn-)I:A9 031101d Z o UI C) N ^ O � y O � N — �— -- -- -------- O II LU _ _ I Q I U I I I 1 I o I I - Ur I L LL LL Lu Q1 C W I II I II I I d 0 W I hI II I II II I it i -- m W LU Iw I II I II I I I 5 p I I I x I _ z I I I II ; II I , I I. im I I. , .I I I w LU I I I II I II I Lnn li I' i li ,I I I II I I I I I I Z II II I _ I II I I I II I LH a _ I I LU m I II I , II I H 0L'i Q I 3C? I II I� H I I I t� I -- — -- g°LL I I v I I I I I CD o[) 6MP'NOI$OIAJV81(INV 3N1VN133NIS 1-0119IHX3\Vd0\sbulMoJa\I00WOIsaa\4681\008100\OOSuolyonpad\:O:H1Vd3lld Wd 1£:h:1VLlOZ'EOIpdV'AopuoW:NO lnod'esnoj)l:A903RO1d N„ur�umg cx ec DAP-1311)PROPOSAL P,Ve M 2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No, Description Specification Section No. Unit of Bid Unit Price Bid Value Measure Quantity WATER IMPROVEMENTS 1 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 6.8 1 $4,000.00 $27,200.00 2 3312.4114 16"x 12"Tapping Sleeve&Valve 33 12 25 EA 1 1 $4,500.00 $4,500.00 3 3311.0141 6"Water Pie 33 11 10,33 11 12 LF 50 $32.00 $1,600.00 4 3312.3002 6"Gate Valve 33 12 20 EA 5 $900.00 $4,500.00 5 3311.0241 8"Water Pipe 3311 10,33 11 12 LF 2,239 $33.00 $73,887.00 6 3312.3002 8"Gate Valve 33 12 20 EA 5 $1,200.00 $6,000.00 7 3311.0441 12"Water Pipe 33 11 10.33 11 12 LF 1 1,971 $44.001 $86,724.00 8 1 3312.3005 12"Gate Valve 1331220 EA 1 5 $1,850.00 $9,250.00 9 1 3312.0001 Fire Hydrant 1331240 EA 1 5 $3,200.00 $16,000.00 10 3312.2003 1"Water Service 331210 EA 1 105 $900.001 $94,500.00 11 3305.0005 12"Waterline Lowering 3305 12 EA 2 $2,500.001 $5,000.00 12 3305.0109 Trench Safety 33 05 10 LF 4,260 $0.501 $2,130.00 13 2605.3011 2"CONDT PVC SCH 40(T) 26 05 33 LF 120 $12.001 $1,440.00 14 3312.0106 Connection to Existing 16"Water Main 33 12 25 EA 1 $1,000.001 $1,000.00 15 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 3 1 $1.000.001 $3,000.00 TOTAL WATER IMPROVEMENTS: $336,731.00 SEWERIMPROVEMENTS 16 3339.0000 4"Sewer Service 33 39 10 EA 103 $650.00 $66,950.00 17 3339.1001 4'Manhole 33 39 10,33 39 20 1 EA 26 1 $3,500.001 $91,000.00 18 3339.1003 4'Extra Depth Manhole 33 3910,33 VF 50 1 $175.001 $8,750.00 19 3331.4115 8"Sewer Pipe 33 31 12,33 31 20 1 LF 3,602 1 $38.001 $136,876.00 20 3331.4116 8"Sewer Pipe,CSS Backfill 33 11 10,33 31 12.33 3120 LF 100 $48.00 $4,800.00 21 3339.0001 Epoxy Manhole Liner 333960 VF 89 $195.00 $17,355.00 22 3305.0109 Trench Safety 330510 LF 3,702 $1.00 $3,702.00 23 3301.0002 Post-CCN Inspection 3301 31 LF 3,702 $2.00 $7,404.00 24 3301.0101 1 Manhole Vacum Testing 1330130 EA 26 $100.00 $2,600.00 25 3305.0116 lConcrete Encasement for Utility Pipes 1330510 CY 1 32.4 $150.00 $4,860.00 TOTAL SEWER IMPROVEMENTS: $344,297.00 PAVEMENTIMPROVEMENTS 26 1 3213.0102 6"Conc Pvmt 132 1313 SY 13,816 $35.50 $490,468.00 27 3211.0400 Hydrated Lime(30 lbs/sy) 1321129 TN 221 $175.00 $38,675.00 28 3211.0502 6"Lime Treatment 132 1129 SY 1 14,734 1 $1001 $44,202.00 29 3213.0353 4"Conic Sidewalk 1321320 SF 1 1,182 1 $3.101 $3,664.20 30 3213.0501 Barrier Free Ramp,Type R-1 133 1320 EA 1 10 1 $1,200.001 $12,000.00 31 2605.3025 3"CONDT PVC SCH 80(T) 1260533 LF 1 588 1 $15.001 $8,820.00 32 2605.3011 2"CONDT PVC SCH 80(T) 1260533 LF 147 $12.00 $1,764.00 33 241.0100 Remove Sidewalk 10241 13 SF 330 $1.00 $330.00 34 241.1100Remove Asphalt Pvmt 0241 15 SY 5,482 $1.50 $8,223.00 35 241.0401 Remove Concrete Pvmt 0241 13 SF 1,031 $2.00 $2,062.00 36 241.0900 1 Remove Misc.Conc,Structure 1024113 LS 1 $1,500.00 $1,500.00 TOTAL PAVEMENT IMPROVEMENTS: $611,708.20 PAVEMENT IMPROVEMENTS OLD GRANBURY ROAD 37 3213.0103 8"Conc Pvmt 321313 SY 280 $45.00 $12,600.00 38 3211.0400 Hydrated Lime(30lbs/s) 32 1129 TN 5.2 $175.00 $910.00 39 3211.0502 6"Lime Treatment 32 1129 SY 345 $3.00 $1,035.00 40 241.1300 Remove Concrete Curb and Gutter 0241 15 LF 416 $20.00 $8,320.00 TOTAL PAVEMENT IMPROVEMENTS OLD GRANBURY ROAD:1 $22,865.00 DRAINAGE IMPROVEMENTS 41 3349.5001 110'CurbInlet 1334920 1 EA 6 $2,500.00 $15,000.00 42 3341.0202 21"RCP,Class III 3341 10 LF 1 55 $50.00 $2,750.00 43 3341.0202 24"RCP,Class III 3341 10 LF 399 $65.00 $25,935.00 44 3341.0302 30"RCP,Class III 3441 10 LF 284 $80.00 $22,720.00 45 3349.0001 4'Storm Junction Box 0241 14 EA 1 $4,000.00 $4,000.00 46 3305.0109 Trench Safety 330510 LF 738 $1.00 $738.00 47 241.3106 30"Storm Abandonment Plug 024114 EA 1 $1,000.00 $1,000.00 TOTAL DRAINAGE IMPROVEMENTS: $72,143.00 CH Y OF FOR IWoRlif Spvnu Rnn.h I'smaw Phew IA iIANDARD CONSIRITC110N SITCIFICArrON 1Y)C1NIF IS-DI-WL(1P)It AWARDED PI2OILC IS Cn�'PmjiY N,, t(h)572 Fnnn Version Septonl Y 1.2015 110014'xi(W3 Nn 6.d.ny Or I:C DAP-BID PROrOSAI. Page_' ,f2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item No. Description Specification Section No. Unit of Bid (snit Price Bid Value Measure Quantity SIGNAGE AND PAVEMENT MARKINGS r#REFI EF! 3217.2102 REFL Raised Marker TY I-C 32 17 23 EA 32 $4.00 $128.00 EF! 3217.1002 Lane Legend Arrow 32 17 23 EA 1 $650.00 $650.00 EF! 3471.0001 Traffic Control 347113 MO 3 $1,000.00 $3,000.00 3441.4004 1 Furnish/Install Alum Sign Ground Mount City Std. 1344130 EA 5 $500.001 $2,500.00 TOTAL SIGNAGE AND PAVEMENT MARKINGS: 1 $6,278.00 STREET LIGHTING IMPROVEMENTS #REF! 3441.3002 Rdwy Ilium Assmbly TY 8,11,D-25,and D-30 1344120 EA 21 1 $2,800.00 $58,800.00 #REF! 3441.3050 Furnish/Install LED Lighting Fixture 70 watt ATBO Cobra Head) 3441 20 EA 1 21 1 $600.00 $12,600.00 #REF! 3441.3110 Install Lighting Fixture 35 41 20 EA 21 $300.00 $6,300.00 #REF! 3441.3301 Rdwy Ilium Foundation TYl,2,and 4 344120 EA 21 $1000.00 $21,000.00 #REF! 3441.1317 #6 XHHW Black Conductor 3441 20 LF 3,600 $3.00 $10,800.00 #REF! 2605.3011 2'CONDT PVC SCH 80 26 05 33 LF 1,200 $12.00 $14,400.00 TOTAL STREET LIGHTING IMPROVEMENTS: $123,900.00 Bid Summary $1,517,922.20 TOTAL $1,517,922.20 Total Construction Bid $1,517,922.20 Contractor agrees to complete WORK for FINAL ACCEPTANCE within Ise calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. Title: BROCK HUGGINS,V.P. Company. CONATSER CONSTRUCTION TX,L.P. Address P.O.BOX 15448,FORT WOKTH,TX 76119 END OF SECTION CFFY OF FDRT WORTH Sp,ng Ranch F-W,Ph—I A STANDARD CONS1Rt1CTION SPECIFICATION DOCtIMI'MS-DFVTII01FI2 AWARDED PROJECTS I0572 F—V--Sap—bm I,201 i 11()11441()03