HomeMy WebLinkAboutContract 33169 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. J.I
WHEREAS, Mooreland Development Company, Inc., hereinafter called
"Developer", desires to make certain improvements to South Oak Grove Section II Phase
II , an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth, is hereby incorporated into this Community Facilities Contract
as if copy herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and
obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
F. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its ofrcers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
2
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain(B-1)None; Street Lights and Signs (C)Attached.
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, BI,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $66,803.96.
3
SUMMARY OF
COST
South Oak Grove Section II Phase II
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $62,023.04 62,023.04
2. Storm Drainage $0.00 $
3. Street Lights $2,200.00 2,200.00
$
4. Street Name Signs $100.00 100.00
B. Engineering Design $
C. Construction Engineering
and Management by DOE $ $
4% 2,480.92 2,480.92
TOTALS 66,803.96 $ - 66,803.96
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent(4%)cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
��
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary,with the corporate seal of the City affixed, d said Developer
has executed this instrument in triplicate,at Fort Worth,Texas this the day of
92006.
ECEIYEi
Approval Recommended:
Transportation and Public Works
Department
C`'
Robert Goode,P. E.
Director
1
it y f Fo Wo h
NO M&C REQUIRED
Marc Ott
Assistant City Manager
ATTEST:
AA
Ma Hendrix
J City Secretary
Appr d as to F
si��Xy
Attorney
ATTEST: DEVELOPER —rhe CYl �lah��Car,�P�n '
By:
Corporate Secretary
,
5 .11 J1..
r��, . ✓1.1f� 115,\^:
PROPOSAL
TO:
SOUTH OAK GROVE ESTATES SEC. II
Phase II
MOORELAND FUND 1, LP
Mr. Michael Beaty
Pursuant to the foregoing "Notice to Bidders", the undersigned Bidder, having thoroughly examined the
Contract Documents, including Plans, Special Contract Documents, the General Specifications, the site of
the Project and understanding the amount of work to be done and the prevailing conditions, hereby
proposes to do all the work, furnish all labor, equipment and material, except as specified to be furnished
by the City, which is necessary to fully complete the work as provided in the Plans and Contract
Documents, and subject to the inspection and approval of the Director of the Department of Engineering
of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a
contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond and such other
bonds, if any, as may be required by the Contract Documents for the performing and completing of the
said work. Contractor proposes to do the work within the time stated and for the following sums, to wit:
PAVING IMPROVEMENTS
SOUTH OAK GROVE ESTATES SEC. II
Phase II
The following are bid items required for the referenced project(s). Furnish and install, including all
appurtenant work, complete and in place, the following items:
PAVING IMPROVEMENTS
ITEM APPROX DESCRIPTION OF ITEMS WITH UNIT PRICE TOTAL PRICE
NO. QUAN BID PRICES WRITTEN IN WORDS
1. 1,752 SY 6" LIME STABILIZED SUBGRADE
Per Square Yard:
Three Dollars
and Fifty Cents $ 3.50 $ 6,132.00
2. 1,701 SY 6" CONCRETE PAVING
Per Square Yard:
Twenty Nine Dollars
and Twenty Four Cents $ 29.24 $49,737.24
PAVING IMPROVEMENTS
ITEM APPROX DESCRIPTION OF ITEMS WITH UNIT PRICE TOTAL PRICE
NO. QUAN BID PRICES WRITTEN IN WORDS
3. 26.28 TON HYDRATED LIME FOR SUBGRADE
(30#/sy)
Per Ton:
One Hundred Ten Dollars
and Zero Cents $ 110.00 $ 2,890.80
4. 921 LF 7" CONCRETE CURB AND 18" GUTTER
Per Linear Foot:
Three Dollars
and Zero Cents $ 3.00 $ 2,763.00
5. 1 EA ADJUST SANITARY SEWER MANHOLE
Per Each:
Three Hundred Fifty Dollars
and Zero Cents $ 350.00 $ 350.00
6. 1 EA REMOVE DEAD END BARRICADE
Per Each:
One Hundred Fifty Dollars
and Zero Cents $ 150.00 $ 150.00
7. 1 LS MAINTAIN EROSION CONTROL
Per Lump Sum:
Dollars
and Cents $ $ Included
* PAVING IMPROVEMENTS $ 62,023.04
*Prices include City of Fort Worth required bonds. J �
s'
PROPOSAL (cont.)
The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth
City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices.
The undersigned agrees to complete all work covered by these contract documents within /S Working
Days from and after the date for commencing work as set forth in the written Work Order to be issued by
the Owner, and to pay not less than the "Prevailing Wage Rates for Street, Drainage and Utility
Construction" as established by the City of Fort Worth, Texas.
Within ten (10) days of receipt of notice of acceptance of this bid, the undersigned will execute the formal
contract and will deliver an approved Surety Bond for the faithful performance of this contract. The
attached deposit check in the sum of iv/A Dollars ($ ) is to become the
property of the Owner, or the attached Bidders Bond is to be forfeited in the event the contract and bond
are not executed within the time set forth, as liquidated damages for delay and addition work caused
thereby.
Receipt is acknowledged of the following addenda:
Addendum No. 1 (Initials) Addendum No. 2 (Initials)
Addendum No. 3 (Initials) Addendum No .4 (Initials)
Respectfully Submitted,
ile &Winn [ c.
By: w
r,-ss: P.O.Box 79380
Saginaw, TX 76179-0380
(SEAL) Telephone: 817-847-2086
Date: /yo�«»�•,• 9 -�
BID QUALIFICATION:
01 This proposal is submitted with the understanding that the owner's
credit and financial arrangements for making payment under the
Contract are satisfactory to Stabile& Winn, Inc.
02 Partial Payments on the Fifteenth of the next month, Final
Payment immediately upon acceptance from Owner.
03 Two Year Maintenance Bond is included.
04 All Testing, Soil Series, and Coring for Compliance to be furnished & paid for by others.
05 All Construction Staking to be furnished and paid for by others.
06 Inspection Fees, if any, to be paid for by others.
07 Backfill all work is included.
08 Utility Relocations, if any, to be furnished & paid for by others.
09 Temporary Barricades with Lites &Signage are included.
10 Imported Material (Topsoil, Select Fill, etc.)& Seeding Parkways are not included.
11 After the Utility Contractor has completed their work, the Street
Subgrade and Parkways must be restored to+/-0.10 Ft. by others
or it will be done on a Force-Account-Basis.
12 Excess Excavation disposed of on jobsite.
13 The Erosion Control Plan (SWPPP)and the implementation of
the plan are not included. However, the maintaining of the
existing implementation is included.
14 Sales Tax is not included.
15 W.C. Ramps are not included.
This Bid Qualification is a part of this Contract.
Contractor: STABILE & WINN, INC.
Signe c.)
4)John W. Stabile
President
CONTRACTOR COMPLIANCE WITH
WORKER'S COMPENSATION LAW
Pursuant to Article 8308-3.23 of Vernon's Annotated Civil Statutes, Contractor certifies that it provides
workers' compensation insurance coverage for all of its employees employed on City of Fort Worth DOE
Number 5041.
PAVING IMPROVEMENTS
SOUTH OAK GROVE ESTATES SEC. II
Phase II
Stabile &Winn. Inc.
LY
CTI..)
President
TITLE
DATE
STATE OF TEXAS §
COUNTY OF TARRANT §
BEFORE ME, the undersi ned authority, on this day personally appeared
t,�. �iCL , known to me to be the person whose name is
subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the
act and deed of_ PKaL.•4 r'Lw*-%w-4: ;=L- for the purposes and
consideration therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this 9 day of 20 -S.
Notary Public in and for the State of Texas
:1
l rl�
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK RESIDENTIAL 0 EA $ 2, 000 $0, 000. 00
CHANGE OF DIRECTION RESIDENTIAL 1 EA $ 2, 000 $2, 000. 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000. 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000.00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000. 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000. 00
Subtotal $2,000.00
City' s Cost $00,000.00
Developer's Subtotal $2,000.00
10% Contingency $200. 00
Project Total $2,200.00
Adjacent Developer' s Cost $00,000.00
Developer's Cost $2,200.00
2% Inspection Fee $00,000. 00
CFA CODE #2005166
DEVELOPER' S COST: $2,200. 00
SOUTH OAK GROVE SECTION - II, PHASE II
January 4, 2006
Fort Worth, Texas
January 4 , 2006
PAGE I OF Exhibit C
II . STREET LIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at the
approximate locations shown in Exhibit "C", immediately after final
acceptance of the street construction, in accordance with engineering plans
and specifications approved by the Transportation and Public Works
Department.
2. Streetlights on residential and /or collector streets can be installed
using overhead or underground conductors with the approval of the Director
of Transportation and Public Works.
3. The City will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to
pay the city the amount shown below prior to the City starting its design
efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors.
5. The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for the
installation of any electrical transformers required for the proper
operation of the street lights
6. The estimated cost of this street light installation is detailed on page 1
of exhibit C and is summarized below, the street lights will remain the
property of, and will be maintained by the City of Fort Worth.
DEVELOPER'S COST: $2,200.00
SOUTH OAK GROVE — SECTION II, PHASE II
January 4, 2006
FORT WORTH, TEXAS
CFA CODE 32005166
Page II of Exhibit C
III
"STREETLIGHTS"
CHANGE OF DIRECTIONS
MANY OAKS DR 1
SOUTH OAK GROVE ESTATES SECTION II, PHASE II
Page III of Exhibit C
IV
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following one (1) intersection at a cost to
the Developer of $100.00:
Silver Oak Lane & Many Oaks Dr
South Oak Grove, Phase II, Section 2
CFA code: 2005166 December 28, 2005
RECEIV t,
N
CA
W E
ENON AVE.
S EVERMAN PKWY.
SHELBY RD.
NTS
OAK GROVE—
w
w
RISINGER RD. SHELBY RD. Q
� ��
� o
� o
ti
o a
McPHERSON RD.
0
SITE
OAK GROVE RD. E
GARDEN
ACRES DR.
LOCATION MAP
SOUTH ® AIS GROVE
SECTION II PHASE II
MCPHERSON RD.
i
i
I
45B / ,. 46A �iSB
I
45A 146E 55A
44B ` %y
1 6Q�
47A�13
' 44A I r 60B
47B ------�-!
43E I I (-'I'-----� 61A I
--- I I 48A � -- 618
43A-R
42B-R I I L� - 48B I -_6-24
49A , --62B - --�
42A-R
r------I �: I------i 63A
41B-R 49B
-------I- ' I 63B
' 41A-R I I i 50A 64A I
' 64B
40B-R I I 50B ,
- ! -SILVER-0AK-L4N-E- -
N
PAVING
wE EXHIBIT "A"
S FOR
N.T.S. SOUTH OAK GROVE
LEGEND ESTATES
0
PAVEMENT SECTION II - PHASE II
(MANY OAKS COURT)
U
N
O
O
N
N
N
n
n
GORDON S. SWIFT
W
CONSULTING ENGINEER INC.
900 mw"SL sic.a.FORT W+M Utui 761c2-s392
(en)335-6/64
MCPHERSON RD.
li
45B 46A
55B
-4--J
45A
146B
44B
44A I F,-OB
47B
-1-j
43B I I F-F 61.4
48A
43A-R J
48B 61 4
-4-2—B-R--1
42A-R 49A
6,3-A
41B-R I I 49B
F-F-
J
41A-R I I i 50A
'A
40B-R I I 50B
_j
—SILVER-OAK-LANE-
77A
95A
1 83
77R
N
STREET LIGHT
W E EXHIBIT
LEGEND s FOR
EXISTING STREETLIGHT N.T.S. 0
SOUTH OAK GROVE
PROPOSED STREETLIGHT ESTATES
SECTION 11- PHASE 11
(MANY OAKS COURT)
MLI
O
O
ry
GORDON S. SWIFT
C2NSULTING ENGINEER INC.
.
S,_ f T wWTK TES.76102-6392
(81� - TEXAS.
)
335-6".