Loading...
HomeMy WebLinkAboutContract 33173 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary � COUNTY OF TARRANT § Contract No.3 /�J 3 WHEREAS, Riverbend Investment II, hereinafter called "Developer", desires to make certain improvements to Lakes of River Trails South Phase V, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. t • 3 F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. 2 _ , _ L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain(B-1) Attached; Street Lights and Signs (C)Attached. M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $275,042.00. 3 � ' SUMMARY OF COST Lakes of River Trails South Phase V Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $152,624 $152,624 2. Storm Drainage $73,594 $73,594 3. Street Lights $11,000 $33,000 $44,000 4. Street Name Signs $0 $300 $300 B. Engineering Design $0 C. Construction Engineering and Management by DOE 2% $4,524 $4,524 TOTALS $241,742 $33,300 $275,042 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed said Toper has executed this instrument in triplicate, at Fort Worth, Texas this the day of , 204P RECEIVED Approval Recommended: Transportation and Public Works Department Robert Goode, P. E. Director ity rt Wo r crtract Aut oriz ion � Marc Ott Date Assistant City Manager ATTEST: / Marty endrix City Secretary UUU DEVELOPER: Appr e as to Form: Riverbend Investment II, Ltd. A Texas Limited Partnership Assist y At rney RBE Investment, Corporation Its General Partner ATTEST: B�Q Corporate Secretary Kenneth ewell, President 5 ) Ul", GSWW, Inc. OPINION OF PROBABLE COST Civil/Environmental Engineers&Planners 3950 Fossil Creek Blvd.,Suite 210,Fort Worth,Texas 76137 OWNER: Rlverbend Investment II, 817-306-1444;fax 817-306-1555 Ltd. PROJECT: DATE: February 17,2003 Lakes of River Trails, South Ph V BY: Gregory W.Dickens,P.E. PROJECT DESCRIPTION: GSWW#0288-015 Border Street Assessment Calculations: Precinct Line Rd.—225 feet of Frontage (1/2 of future 2-27'F/F divided roadway sections in a 100'ROW) ITEM I TOTAL UNIT NO. DESCRIPTION OF UNIT UNIT QUANTITY PRICE COST Phase V 225 feet of frontage 1 Unclassified Street Excavation 1/2 of 1.5 CY per LF C.Y. 169 $1.55 $261.64 2 6"Thick Lime Stabilized Sub rade S.Y. 725.0 1.50 1,087.50 3 Lime for Stabilization (30#/SY) Tons 1 10.9 97.00 1,057.30 4 7"Concrete Curb L.F. 450 2.00 900.00 5 6" Reinforced Concrete Pavement S.Y. 675.0 18.40 12.420.00 Subtotal: 15,726.44 Total Opinion of Probable Construction Cost $15;726.44 aqt This Engineer's opinion of probable construction cost is made on the basis of the Engineer's experience and bestjudgment as a design professional. The engineer has no control over the cost of labor material or services to be furnished by others or over market conditions. GSWW.Inc.cannot guarantee that actual costs will not vary from the opinions expressed herein. server2k\$project10288-0151Cost Estimates for Precinct Line Rd.2-17-03 Lakes of River Trails South, Phase V Item No. Description Qt /Unit Unit Price Amount .. . :PAVING 1. 6-Inch Concrete Paving 6,485 SY 18.95 $ 122,890.75 2. 6-Inch Stabilized Subgrade 6,681 SY 1.65 $ 11,023.65 3. Hydrated Lime 100 Ton 97.00 $ 9,721.34 4. 7-Inch Integral Curb 3,519 LF 2.00 $ 7,038.00 5. jAdjust Manholes 6 jEA 300.00 $ 1,800.00 6. jAdjust Water Valve Box 1 JEA 1 150.00 $ 150.00 TOTAL - PAVING. . . . . . . . . $ 152,623.74 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II STORM`DRAIAIAGE I=ACILITIES 7. 42-Inch RCP Pie 76 LF 101.00 $ 7,676.00 8. 36-Inch RCP Pie 279 LF 77.70 $ 21,678.30 9. 24-Inch RCP Pie 148 LF 45.60 $ 6,748.80 10. Connect to Existing 42-Inch stub 1 EA 250.00 $ 250.00 11. 15-Foot Curb Inlet 6 EA 3,815.00 $ 22,890.00 12. 1 Std. Headwall for 36-inch RCP 1 EA 1,650.00 $ 1,650.00 13. 1 Std. Headwall for 36-inch RCP w/energy dissipaters 1 EA 2,325.00 $ 2,325.00 14. 5-Foot Square Manhole 1 EA 5,300.00 $ 5,300.00 15. Rock Rip-Rap 64 SY 75.00 $ 4,800.00 16. Trench Safety 1 ILS 1 275.90 $ 275.90 TOTAL -STORM DRAINAGE FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 73,594.00 WATER,fAOLITtES �Y$ ; , 17. 8-Inch DR-14 PVC Pipe 936 LF 13.90 $ 13,010.40 18. Connect to Existing 8-Inch 2 EA 350.00 $ 700.00 19. 1-Inch Water Service 33 EA 355.00 $ 11,715.00 20. Cast Iron Fittings & Blocking 1 LS 375.00 $ 375.00 21. Testing 1 JEA 1 1,050.00 $ 1,050.00 22. Trench Safety 1 JEA 1 275.60 $ 275.60 TOTAL -WATER FACILITIES . . . . $ 27,126.00 . . . . . . . . . . . . . . . . . . . . . IT:` SANITARY SEWER FACILITIESx 4, � r P 23. 18-Inch PVC Pie 90 LF 25.10 $ 2,259.00 24. 8-Inch PVC Pipe 70 LF 12.80 $ 896.00 25. Connect to Existing 18-Inch 1 EA 450.00 $ 450.00 26. Connect to Existing 8-Inch 1 EA 450.00 $ 450.00 27. JStd. 4-foot Dia. Manhole 2 EA 2,130.00 $ 4,260.00 28. 4-Inch Sanitary Sewer Service w/Two Way Clean Out 8 EA 450.00 $ 3,600.00 29. Testing 1 EA 700.00 $ 700.00 30. Trench Safety 1 EA 275.00 $ 275.00 31. Bonds 1 EA 3,300.00 $ 3,300.00 32. 1 Lab 1 EA 2,750.00 $ 2,750.00 TOTAL - SANITARY SEWER FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 18,940.00 E. STREET LIGHTS: 1. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 8 EA $ 2, 000 $16, 000 . 00 MID-BLOCK RESIDENTIAL 10 EA $ 2, 000 $20, 000 .00 CHANGE OF DIRECTION RESIDENTIAL 4 EA $ 2 , 000 $8, 000 . 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 200 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2 , 200 $0, 000 . 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00 Subtotal $44, 000 . 00 City' s Cost $33, 000 . 00 Developer' s Subtotal $0, 000 . 00 10% Contingencies $0, 000 . 00 Project Total $44, 000 . 00 Adjacent Developer' s Cost $0, 000 .00 Developer's Cost $0,000.00 2% Inspection Fee $0, 00 . 00 Developer's Responsibility See PG III-1, "Line 7" LAKES OF RIVER TRAILS SOUTH PHASE V March 11, 2003 Fort Worth, Texas March 11, 2003 III- 1 2 . STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C" , immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department . 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works . 3 . Streetlights on arterial streets shall be installed with underground conduit and conductors. 4 . The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit at a depth not less than 30 inches and at least 18-inch behind the curb, "clear from all other utilities" . S . The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit between streetlights proposed for installation and the power source to become operational . 6 . A 3-inch schedule 80 PVC conduit is required when crossing streets at a depth not less than 30 inches, unless indicated otherwise on the plans concrete pull boxes shall be provided at the crossing points . 7 . Street light conduit and footings shall be installed by the developer's contractor as part of and at the time of street construction. The city will obtain electric service and complete the street light construction in accordance with approved plans. 8 . The developer or their contractor shall contact City' s street light division 48 hours prior to starting any installation of conduit and/or streetlights at (817) 871-8100 to insure proper inspection of work. 9 .The procedure for installing conduit and footings will be with the inspector on the job site or you can request a copy by calling 817- 871-6596 . LAKES OF RIVER TRAILS SOUTH, PHASE V March 11, 2003 III- 2 "STREETLIGHTS" INTERSECTIONS WINDING RIVER DR & RIVERS EDGE DR 1 WINDING RIVER DR & RUSHING SPRING DR 1 WINDING RIVER DR & STREET A 1 AUTUMN FALLS DR & LAKE FALLS DR 1 RIVERFALLS DR & RUSHING SPRING DR 1 RIVERFALLS DR & STREET A 1 AUTUMN FALLS DR & RUSHING SPRING DR 1 AUTUMN FALLS DR & RIVERFALLS DR 1 MID - BLOCK WINDING RIVER DR 5 RIVER FALLS DR 5 CHANGE OF DIRECTIONS LAKE FALLS DR 2 AUTUMN FALLS DR 1 RIVERFALLS DR 1 LAKES OF RIVER TRAILS SOUTH, PHASE V IV STREET NAME SIGNS 1. The City will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City. 2 . The City will pay for the street name sign installations required for this development to the extent of $100 .00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3 . This development creates the following three (3) intersections at a cost to the City of $300.00 : Riverfalls Drive and rivers Edge Drive Falls Drive and Autumn Falls Drive Lake Falls Drive and Rushing Spring Drive LAKES OF RIVER TRAILS SOUTH PHASE 5 Fort Worth, Texas Date: February 24, 2003 IV-1 Z E � � E o pre . cinct Line Rushing Sprin Drive m Df 94 > 94 > C4 � 0.4o F w O ID �a O I I . 1 p . d f ' a �, ■ I I . law Maw cn _—� - it p p f � � .— f w ■ F 1'' —_ p - p R ■ A p A � � ■ A - 'i ■ II of L F_ ■ f A R a R e ■ i lk it A � � L A 4 a a A• it ■ i R A . ' ■ A LOpnm sm ;t R 9 f` R i A A ■ A R N It R— ■ i �—� � o— ■ e � 0. 0. ■ � � i ■ e 0. En r k a I I - ■ ■ A R � ■ if C—� f A c 1 ■■■ ac ■ A - ■ 76 t70t EMM L ■I �� A a = ■ N <<o J" i n I■ I` � ° I ° I= ! ! IF e 9'� �'w— ! • A LOQ vmd aR i � � . s • A R t R 3 R R R qR LOQ sm 11.itOI 11�•+��+'pl�— C R a Jt R � �Y t q i _ • R R �• !'• � � R IMAILM —-{ L R I IIr - q cn • p C �—• A J p r t w ma mot C p TTTT ��j c I MT S `WV tO:S£:60 ZOOZ/tO/ZI `gA',PT %VJ3\Ar[J-qlnoS-SIO-88Z\:Z wax C i �-- C ■ SMAMM rrnr t • ^ q A _ F II ■ ! t I t • � N -- ! I ■ N F ■ L } F q q A I � x ■ a N• _ _ R LAIR AT1I !01■i■► R I �` ! R x N ■ ■ �+ ■ ell � ■ a . V y ■ ■ ■ q E� A I � A o ■ R _ x _ a TTTT ^ t I I I 1 R R Z `amn fin. ♦ R A c r t—� R a R R R R R R R � � i R A R• R a =— R t A aw RM IAIt(a/ t , R R y t a i R C R ct --� -- R f R R R t R � � A R R `LY= ■ I I - R R S 0 � It -- t At r a . � � R R 1 F t R I C J — TTTT � q ObOY A1710N103�d ■o - i= i s i A i a j= _ _ - __ 1K3K3E1dX CID L' l szz Z IT am &Mftr ����L - ■ y Ijl n . ■ c a a law rmd cm J' ■ I r r r It A R n It q � Ir ■ q � c = R •R � 7 A � r C A R I I � _ ,R a ■ R. it mw a �yI IF ■ a mw mr wovo► is - i >/ A I -{f q q�•1 R— I i � q R ■ W if W I �^ a Ir—— R ISI - R ■ q_� L_■ A c = as ma aour Hl T•I-`a!` City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 10/18/2005 DATE: Tuesday, October 18, 2005 REFERENCE NO.: C-21096 LOG NAME: 20LAKESRIVERTRS SUBJECT: Authorize Execution of a Community Facilities Agreement with Riverbend Investment 11, Limited by RBE Investment Corporation for the Installation of Community Facilities for Lakes of River Trails South Phase V RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a Community Facilities Agreement with Riverbend Investment 11, Limited for the installation of community facilities to serve Lakes of River Trails South Phase V. DISCUSSION: On April 22,2003, (M&C G-13956)the City Council approved funds in the amount of$3.28 million to be moved from the Special Assessments Fund to supplement the 1998 Capital Improvement Program new development funds. This project was included in the list of the 83 projects submitted to the City prior to July 29, 2003,when the City Council placed a moratorium on City participation in community facilities agreements for street, storm drain, street light and street name signs facilities.' ' Of the 83 projects, two more projects remain which will need City Council approval for funding. Riverbend Investment 11, Limited by RBE Investment Corporation, its General Partner, the developer, has executed a proposed contract for community facilities to construct public improvements to serve Lakes of River Trials South Phase V.' ' This subdivision is located in east Fort Worth west of Precinct Line and north of Trinity Boulevard(see attached vicinity map).' ' There will be City participation for street lights and street name signs. There will be 22 street lights and three street name signs installed.' ' The developer is responsible for the cost of the installation of underground conduit and pole bases.' ' Transportation and Public Works Department(TPW)is participating in the wiring, street light fixtures and the street name signs. PLAN COMMISSION APPROVAL On June 28, 2000, the Plan Commission approved the preliminary plat(PP00021).' ' The final plat(FP-002-155)has been filed of record on July 3, 2003.' ' This Community Facilities Agreement is in compliance with the City s Policy for the Installation of Community Facilities.' ' The estimated cost of the community facilities is as follows and subject to the actual bid price. ESTIMATED COST DEVELOPER COST TPW TOTAL Street Improvements $ 152624.00 $ 0.00 $ 152624.00 Design Engineering $ 0.00 $ 0.00 $ 0.00 Construction Inspection Fees $ 3052.00 (*) $ 3052.00 Storm Improvements $ 73594.00 $ 0.00 $ 73594.00 Design Engineering $ 0.00 $ 0.00 $ 0.00 Construction Inspection Fees $ 1472.00 (*) $ 1472.00 Street Lights $ 11000.00 $ 33000.00 $44000.00 Street Name Signs 0.00 $300.00 $300.00 TOTAL $ 241742.00 $ 33300.00 $275042.00 (*)The City's portion of construction inspection fees are calculated based on actual street and storm drain construction costs over the 2%cap paid by developer, as per the Community Facilities Agreement policy, in place at the time of this project. This project is located in COUNCIL DISTRICT 4. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that that funds are available in the current capital budget as appropriated of the Street Improvement Fund. FUND IDENTIFIERS (FIDs): TO Department Account Project Program Activity Budget Reference# Amount Fund ID ID year (Chartfield 2) FROM Department Account Project Program Activity Budget Reference# Amount Fund ID ID year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Marc Ott (8476) Originating Department Head: Robert Goode (7804) Additional Information Contact: Christa Sharpe (8009) ATTACHMENTS 1. 20Lakesrivertrs.j12g (Public)