Loading...
HomeMy WebLinkAboutContract 33186 AMENDMENT NO. 4 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. (MSC Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Dunaway Associates, Inc, (Engineer) made and entered into City Secretary Contract No. 29019, (the Contract) which was authorized by the City Council by MSC C-19701 on the 12th day of August, 2003 and subsequently revised by three previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Water Main Extensions to Serve Walsh Ranch, Phase I . WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I, of the Contract is amended to include the addition- al engineering services specified in MSC C-21256, adopted by the City Council on the 19th day of January, 2006 and further amplified in a proposal letter dated October 12, 2005, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $206,826.00. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $1,364,517.45. _- 777 5� i 9 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of 2006, in Fort Worth, Tarrant County, Texas. ATTEST: -�2—Diadu Contra au horization 40k;-:iarq Hendrix Data U City Secretary APPROVAL RECONNENDED: AP ;71 , A. Douglas Rademaker, P.E. c A. Ot Director, Department of Assistant City Manager Engineering DUNAWAY ASSOCIATES, INC. Engineer By: Name: Brian S. Da y, P.E. , Associate 1501 Merrimac Circle, Suite 100 Fort Worth, TX 76107-6572 APPROVED AS TO FORM AND LEGALITY: Assi gtint ty ttorney -2- J' Dunaway Engineers Planners Surveyors **I`rAssociates, L.P. I Landscape Landscape Architects DAI No. 2002113 October 12,2005 Mr. Rakesh Chaubey, P.E. Project Manager City of Fort Worth Department of Engineering Fort Worth,Texas 76102 Reference: Amendment No. 4—Revision#2 (Original dated July 26, 2005) Water Main Extension to serve Walsh Ranch, Phase I City Project No. 00218 Water Project No. PW77-060770140580 Dear Mr. Chaubey: Dunaway Associates, L.P. is pleased to present this Amendment No. 4 for the following additional services that are beyond our original scope of services. • Additional coordination with City staff in various departments and property owner for agreement on two separate letter agreements for modifications to the scope and time frame of the Economic Development Agreement. • Additional coordination with City staff in various departments and property owner to facilitate acquisition of easement and dedication documents for the City. • Four addendums for Units 1 through 3 on the pipeline construction portion of the project. o Bolt material change. o Liquidated Damages increase. o Uniform embedment and backfill details. o Property owner contact information. o Delayed bid opening. o Uniform Storm Water Pollution Prevention bid items. o Change Gate Valves specification. o Additional contractor insurance requirements for Walsh Ranch properties. o Change combination air / vacuum release valve specification and allowable manufactures. 1501 Merrimac Urcie-Suite 100•Fort Worth,Texas 76107 Tei:817.335.1121•Metro:817.429.2135•Fax:817.335.7437 www.dunawayassociates.com • Amendment No.4 October 19, 2005 Page 2 o Additional gas operators contact. o Additional delayed bid opening. o Change Bar Wrapped Concrete Cylinder Pipe and Fittings specification. o Additional Gate Valves for separate NS-II project. ■ Bid item ■ Specification o Revise all cathodic protection ■ Plans ■ Specifications ■ Bid items ■ Test Station Schedule • Three addendums for the Unit 4 on the water storage portion of the project. o Remove Ground Storage Tank Reservoir from advertised package. ■ Revised Site Layout and Yard Piping plan. ■ Revised process, Mechanical, and Instrumentation Diagram plan. ■ Revised Ground Storage Reservoir Plan and Sections plan. ■ Additional Mechanical Details plan. ■ Revised Electrical Site Plan ■ Revised Valve Vault Electrical Plan and Ductbank Sections plan. ■ Revised electrical Schedules, Diagrams, &Schematics plan. ■ Revised Loop Diagrams plan. • Additional specification for Standpipe manufacturer acceptance. ■ Revised Bid Items. ■ Additional revised Bid Items. ■ Revised Specifications sections: 13205, 13210, 01010, 01300, 01730, 02270, 03100, 03300, 03$00, 09901,09902, 11216, 13210, 16000,03200, 13300 ti7q 'I i • Amendment No.4 October 19, 2005 Page 3 Revised MWBE goal. o Delayed bid opening. o Property owner contact information. o Liquidated Damages increase. o Additional Field Office specification. o Additional contractor insurance requirements for Walsh Ranch properties. o Additional delayed bid opening. • Additional separate construction advertisement for proposed 2.5 Ground Storage Tank. o Prepare separate plan sets. o Prepare separate contract documents. o Additional site work considerations. o Additional geotechnical engineering. o Additional coordination meetings for new advertisement package o Additional bid assistance. o Additional pre-construction meeting. o Additional public meeting. o Additional services during construction o Additional final inspection. • Construction assistance and additional property owner liaisons for City. • Additional Site Visits. • Amendment No.4 October 19, 2005 Page 4 A summary of the proposed budget for this revised amendment is as follows: Basic Fee EDA Letter agreements $ 4,000.00 Easement acquisistion $ 6,000.00 Addendums $ 12,000.00 Ground Storage Tank advertisement $ 153,240.00 Prepare contract documents for GSR $ 83,180.00 Bidding $ 17,720.00 Services during construction $ 36,340.00 Site Civil Engineering $ 6,000.00 Geotechnical Engineering $ 2,000.00 Direct Costs $ 8,000.00 Subconsultant Coordination $ 22,986.00 Construction assistance/Property Owner liaison $ 5,000.00 Site Visits 3.60(100 TOTAL PROPOSED AMENDMENT $ M826.00 A summary of the total project is as follows: Contract Description Fee Original Contract Design of 31,000 LF of Water $965,406.95 Improvements Amendment No. 1 Design of 3,450 LF of Water $42,605.00 Improvements Amendment No. 2 Additional land purchase for tank site $24,302.6 Amendment No. 3 Tank site location&design change $125,377.00 Amendment No.4 Tank separate advertisement $206,826.00 TOTAL PROJECT $1,364,517.45 Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, DUN AW CIATES, L.P. Brian S. Darby, P.E. Associate 20D2113 Amendment#4_RChaubey_0�10-18_BSD.doc ?S7 rage i or City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 1/19/2006 DATE: Thursday, January 19, 2006 LOG NAME: 30WALSH AMEND4 REFERENCE NO.: **C-21256 SUBJECT: Authorize Execution of Amendment No. 4 to the Engineering Agreement with Dunaway Associates, Inc., for Walsh Ranch Water Main Extension, Phase 1 RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 4 to City Secretary Contract No. 29019 with Dunaway Associates, Inc., in the amount of$206,826.00, to provide for additional engineering services, thereby increasing the contract amount to $1,364,517.45. Subsequent amendments, if necessary, will be processed administratively, up to a $25,000 total. DISCUSSION: On August 12, 2003, (M&C C-19701) the City Council authorized an Engineering Agreement with Dunaway Associates, Inc. in the amount of $965,406.95 for Walsh Water Main Extension, Phase 1. The agreement provided for the design of 31,000 feet of 30 and 24-inch water line and a ground storage tank. The agreement was subsequently revised by three previous amendments totaling $192,234.50 as follows: . Amendment No. 1 (M&C C-19940, January 20, 2004) in the amount of $42,605 provided for the design of an additional 3,500 feet of water line. . Amendment No. 2 (City Secretary Contract No. 29588) in the amount of $24,302.50 and administratively approved by the City Manager on February 27, 2004, provided for the necessary services to acquire an alternate parcel of land for the proposed ground storage tank. . Amendment No. 3 (M&C C-20561, March 8, 2005), in the amount of $125,377.00 provided for the design of an additional 1,500 feet of water line and ground storage tank site due to the change in location of the ground storage tank site. In order to expedite construction, the project was divided into four units for design and construction purposes. Units 1, 2 and 3, which consist of water main installation are under construction, and Unit 4, steel ground storage tank. Due to a recent collapse of a ground storage tank of similar design to the one proposed under Unit 4, in the City of Ennis, Texas, on April 16, 2005, the Water Department decided to delay construction of the ground storage tank until the report of the investigation of the collapse was released. Pending, the._inxestigation. the Water Department and the developer of Walsh Ranch agreed that the City could construct a stand alone http://www.cfwnet.org/council_packet/Reports/mc_print.asp1/19/2006 Page 2 of 2 water stand pipe (Unit 4) to provide water service to a reduced area and that the ground storage tank could be constructed at a future date. Consequently, another unit (Unit 5), was created for the construction of the ground storage tank. Construction of the water stand pipe, Unit 4 is underway. The report of the Ennis collapse indicated that an inadequate foundation and not the design of the storage tank caused it to fail. The Water Department is now comfortable with finalizing design and constructing of the ground storage tank. Amendment No. 4 will allow for the preparation of separate plans and contract documents for the ground storage tank and the necessary revisions to the site layouttyard piping plan, mechanical instrumentation diagram plan, ground storage reservoir/section plans, electrical schedules/schematics plans and loop diagram plan. The amendment will also allow Dunaway Associates, Inc. to provide construction management and inspection services during construction of the ground storage tank. Dunaway Associates, Inc. proposes to provide the necessary additional engineering services for a lump sum fee for$206,826.00. Staff considers this amount to be fair and reasonable. Dunaway Associates, Inc. is in compliance with the City's M/WBE Ordinance by committing to 4% M/WBE participation on this amendment No. 4. The City's goal on this amendment is 4%. The project will be located in COUNCIL DISTRICTS 3 and 7, Mapsco 57W and X; and 76 D, H, J, M, N, O, P, Q, and R. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds will be available in the current capital budget, as appropriated, of the Commercial Paper—Water Fund. TO Fund/Account/Centers FROM Fund/Account/Centers PW77 531200 060770140580 $206,826.00 Submitted for City Manager's Office b Marc Ott (8476) Originating Department Head: A. Douglas Rademaker(6157) Additional Information Contact: A. Douglas Rademaker(6157) http://www.cfwnet.org/council_packet/P,eports/mc_piint.asp 1/19/2006