Customer:
Name: City of Fort Worth
C/O Chris Harder Invoice# VV-R# 2130485E
Address: 1000 Throckmorton Street
City:Fort Worth, Texas 76102-6311
Phone: 817-871-6820 Date:2/28/05
Qty Description Unit Price Total
Cost to installation of Electric facilities for Meadow Lakes $ 15,381.40
Lift Station
Total Due
Upon Receipt $15,381.40
b Remit payment to the above address.
b Please include the Invoice # on your check.
b If you have any questions about this invoice please
contact at 817/624-6063
{Invoice.doc}
MHorak 6/2001
Revisad 112002
Tariff for Retail Delivery Service
TXU Electric Delivery Company
6.3 Agreements and Forms
Applicable: Entire Certified Service Area Page 1 of 23
Effective Date:January 1,2002 Revision: Original
6.3.1 Facilities Extension Agreement
Project Number
WR Number 2130485
Region/District West/North Fort Worth
This Agreement is made between City of Fort Worth,hereinafter called"Customer"and_TXU Electric Delivery,a Texas corporation,
hereinafter called"Company"for the extension of Company Delivery System facilities,as hereinafter described,to the following location
Meadow Lakes Lift station.
The Company has received a request for the extension of: (check all that apply)
XSTANDARD DELIVERY SYSTEM FACILITIES TO NON-RESIDENTIAL DEVELOPMENT
Company shall extend standard Delivery System facilities necessary to serve Customer's estimated maximum demand
requirement of 15 kW("Contract kW"). The Delivery System facilities installed hereunder will be of the character
commonly described as 277/480 volt,Three phase,at 60 hertz,with reasonable variation to be allowed.
❑ STANDARD DELIVERY SYSTEM FACILITIES TO RESIDENTIAL DEVELOPMENT
Company shall extend standard Delivery System facilities necessary to serve:
All-electric residential lot(s)/apartment units,or
(Number of lots/units)
Electric and gas residential lot(s)/apartment units.
(Number of loWunits)
The Delivery System facilities installed hereunder will be of the character commonly described as
volt, phase,at 60 hertz,with reasonable variation to be allowed.
❑ NON-STANDARD DELIVERY SYSTEM FACILITIES
Company shall extend/install the following non-standard facilities:
ARTICLE I-PAYMENT BY CUSTOMER
At the time of acceptance of this Agreement by Customer,Customer will pay to Company,fifteen thousand three hundred eighty one
Dollars and forty cents.
($ 15,381.40)as payment for the Customer's portion of the cost of the extension of Company facilities, in accordance with Company's
Facilities Extension Policy,such payment to be and remain the property of the Company.
ARTICLE II-NON-UTILIZATION CLAUSE FOR STANDARD DELIVERY SYSTEM FACILITIES
This Article II applies only to the installation of standard Delivery System facilities.
a.The amount of Contribution in Aid of Construction("CIAC")to be paid by Customer under Article I above is calculated based on the
estimated data(i.e.,Contract kW or number and type of lots/units)supplied by Customer and specified above. Company will
conduct a review of the actual load or number and type of lots/units at the designated location to determine the accuracy of the
estimated data supplied by Customer. If,within two(2)years after Company completes the extension of Delivery System
facilities,the estimated load as measured by actual maximum kW billing demand at said location has not materialized or the
estimated number and type of dwelling units/lots at said location have not been substantially completed,Company will re-
calculate the CIAC based on actual maximum kW billing demand realized or the number and type of substantially completed
dwelling units/lots. For purposes of this Agreement,a dwelling unit/lot shall be deemed substantially completed upon the
installation of Company's meter. The installation of a Company meter in connection with Temporary Delivery Service does not
constitute substantial completion.
b.Customer will pay to Company a"non-utilization charge"in an amount equal to the difference between the re-calculated CIAC
amount and the amount paid by Customer under Article I,above. Company's invoice to Customer for such"non-utilization
charge"is due and payable within fifteen(15)days after the date of the invoice.
93
Tariff for Retail Delivery Service
TXU Electric Delivery Company
6.3 Agreements and Forms
Applicable: Entire Certified Service Area Page 2 of 23
Effective Date:January 1,2002 Revision: Original
ARTICLE III-TITLE AND OWNERSHIP
Company at all times shall have title to and complete ownership and control over the Delivery System facilities extended
under this Agreement.
ARTICLE IV-GENERAL CONDITIONS
Delivery service is not provided under this Agreement. However,Customer understands that,as a result of the
installation provided for in this Agreement,the Delivery of Electric Power and Energy by Company to the specified location
will be provided in accordance with Rate Schedule_6.1.1.3,which may from time to time be amended or succeeded.
This Agreement supersedes all previous agreements or representations,either written or oral,between Company and
Customer made with respect to the matters herein contained,and when duly executed constitutes the agreement between
the parties hereto and is not binding upon Company unless and until signed by one of its duly authorized representatives.
ARTICLE V-OTHER SPECIAL CONDITIONS
The City Of Fort Worth agrees that the payment indicated in ARTICLE I of this Agreement shall be made within 30 days of
the date the project is completed or the date the invoice is received,whichever is later.
ACCEPTED BY COMPANY: dq
aBY ST M
Tim Dolan
Signature Signature
Marc A. Ott
_NCM Assistant:Citi/ Manager
Title Title
_2/28/05
D
ate Signed Date Signed
i'Gi d ',ND LEGA s'
At Cit', Attorney
Attested By:
tarty Hend
City Secretary
NO M&C RE-1QUIRED
94
s