Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 32122
CITY SECRETARI( CONTRACT NO. < SPECIFICATIONS AND CONTRACT DOCUMENTS FOR WATER REPLACEMENT CONTRACT 2002 STM — F CITY SECRETARY ly/ DOE No. 3706 PW53-060530176470 U.O.E. FILE (-ONTRACTOR'S BONDING CO In C"ONSTRUCTION'S COPY CLIENT DEPARTMENT THE CITY OF FORT WORTH,TEXAS i � i MIKE MONCRIEF CHARLES R. BOSWELL MAYOR CITYMANAGER ROBERT D. GOODE, P.E. A. DOUGLAS RADEMAKER, P.E. S. FRANK CRUMB, P.E. DIRECTOR DIRECTOR ACTING DIRECTOR TRANSPORTATION & DEPARTMENT OF ENGINEERING WATER DEPARTMENT PUBLIC WORKS PREPARED BY: Teague Nall and Perkins, Inc. Consulting Engineers 1100 Macon Street Fort Worth,Texas 76102 �'+ � rFX' e► ALAN L. HOLLY 2005 vo .0 94792 � ORIGINAL WWWXn G. _ ;, '144ome I Council Agenda I M&C I Employee Directory I Morning Report I Ads I PRS ( IT Ontirm I Departments I Site Map Print M&C COUNCIL ACTION: Approved on 6/28/2005 - Ordinance No. 16488-06-2005 DATE: 6/28/2005 REFERENCE NO.: **C-20811 LOG NAME: 302002STMFSHUC CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Adopt Appropriation Ordinance and Authorize Award of Contract to S.H.U.C, Inc., for Water Replacement Contract 2002 STM-F RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$118,003.12 from the Water& Sewer Operating Fund to the Water Capital Projects Fund; 2. Adopt the appropriation ordinance increasing estimated receipts and appropriation in the Water Capital Project Fund in the amount of$118,003.12 from available funds; and 3. Authorize award of contract to S.H.U.C., Inc. in the amount of$667,803.12 for Water Replacement Contract 2002 STM-F. DISCUSSION: On August 8, 2002, (M&C C-19183) the City Council authorized the City Manager to execute an engineering agreement with Teague Nall and Perkins, Inc. to prepare plans and specifications for Water Main Replacement Contract 2002 STM-F. On February 22, 2005, (M&C C-20538) the City Council authorized the execution of a contract with AOC Contracting, L.P., for Water Replacement Contract 2002 STM-F. On April 12, 2005, (M&C C-206491/ the City Council authorized rescinding the award of contract to AOC Contracting, L.P., for Water Replacement Contract 2002 STM-F and readvertising the project for bid at the earliest possible convenience. The project consists of the replacement of the water mains located on the following streets: Street From To Lake Harbor Court Crosswind Drive South cul-de-sac Lake Highlands Drive Canyon Crest Drive Lake Country Drive Lake Highlands Drive Lake Country Drive Crosswind Drive Trailridge Drive Lake Country Drive Crosswind Drive Heatherwood Court Lake Country Drive East cul-de-sac Lake Country Court Lake Country Drive East cul-de-sac Summit Cove Skylake Drive South cul-de-sac Aspen Wood Court Glen Hollow Drive South cul-de-sac Stonewood Court Lake Highlands Drive South cul-de-sac Greenhaven Drive Lake Highlands Drive Overland Drive Incline Terrace Trailridge Drive Crosswind Drive All streets will be pulverized and overlayed with asphalt after the proposed water improvements are completed. This project was re-advertised for bid on April 14 and April 21, 2005 in the Commercial Recorder On May 12, 2005, the following bids were received: Bidder Amount time of Completion RKM Utility Services Inc.* $648,195.00 150 Calendar Days S.H.U.C., Inc. $667,803.12 O.T. Utility Construction, Inc. $712,786.35 Cleburne Utility Construction, Inc. $713,848.00 M.E. Burns Construction, Inc. $717,890.00 Conatser Construction TX, LP $763,465.00 Jackson Construction, Ltd. $983,571.00 * In addition to this project, RKM Utility Services, Inc. was also the low bidder on another City project Sanitary Sewer Extension and Water Main Replacement to serve Town of Tarrant Addition. In order to satisfy citizen expectations, it is necessary to construct both projects concurrently. As customary for utility contractors such as RKM who have no previous work experience with the City of Fort Worth projects, City staff conducted an assessment of RKM's ability to successfully construct both projects. Based upon this assessment, City staff is of the opinion that it would be in the City's best interest not to award multiple contracts to RKM at this time. Instead, City staff recommends awarding only the Tarrant project to RKM and awarding this project, Water Replacement Contract 2002 STM-F, to the second low bidder, S.H.U.C., Inc. City staff met with RKM to discuss the matter and the company accepted the staff's position with the understanding that it could be recommended for award of multiple City utility contracts in the future depending on its performance on this project. S.H.U.C., Inc., is in compliance with the City's M/WBE Ordinance by committing to 17% M/WBE participation. The City's goal on this project is 17%. In addition to the contract cost, $47,000 is required for inspection and survey and $20,000 is required for project contingencies. This project is located in COUNCIL DISTRICT 7, Mapsco 31 J, M, N, P. j} E SPECIFICATIONS AND CONTRACT DOCUMENTS FOR WATER REPLACEMENT CONTRACT 2002 STM — F DOE No. 3706 PW53-060530176470 i In THE CITY OF FORT WORTH,TEXAS MIKE MONCRIEF CHARLES R. BOSWELL MAYOR CITY MANAGER ROBERT D. GOODE, P.E. A. DOUGLAS RADEMAKER, P.E. S. FRANK CRUMB, P.E. DIRECTOR DIRECTOR ACTING DIRECTOR TRANSPORTATION & DEPARTMENT OF ENGINEERING WATER DEPARTMENT i PUBLIC WORKS PREPARED BY: Teague Nall and Perkins, Inc. Consulting Engineers 1100 Macon Street Fort Worth,Texas 76102g7�9CW'L� �cE, . ALAN L.HOLLY 2005 A9 947W 77,k NAL. i TABLE OF CONTENTS PART A. GENERAL INFORMATION Notice to Bidders Comprehensive Notice to Bidders Special Instructions to Bidders PART B. PROPOSAL • Minority and Women Business Enterprise (M/WBE) Specifications • Proposal PART C. GENERAL CONDITIONS PART C1. SUPPLEMENTARY GENERAL CONDITIONS PART D. SPECIAL CONDITIONS PART DA. ADDITIONAL SPECIAL CONDITIONS PART E. SPECIFICATIONS PART F. INSURANCE AND BONDS Certificate of Insurance Performance Bond Payment Bond Maintenance Bond Vendor Compliance to State Law Contractor Compliance with Worker's Compensation Laws PART G. CONTRACT PART H. STANDARD FIGURES AND DETAILS APPENDIX A ROADWAY CORE RESULTS Part A. General Information Notice to Bidders Comprehensive Notice to Bidders Special Instructions to Bidders i F Notice to Bidders Sealed Proposals for the following: Water Replacement Contract 2002, STM-F PW53-060530176470 D.O.E. No. 3706 Addressed to Mr. Charles R. Boswell, City Manager of the City of Fort Worth, Texas will be received at the Purchasing Office until 1:30 P.M., Thursday, May 12, 2005, and then publicly opened and read aloud at 2:00 P.M. in the Council Chambers. Contract Documents, including Plans and Specifications, may be obtained in the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton, Fort Worth, Texas 76102, for a non-refundable fee of thirty dollars ($30.00) per set. The major work on the above project shall generally consist of the following: Water Improvements 245 LF 12"Water by Open Cut 8,540 LF 8"Water by Open Cut 22 EA 8" Gate Valves w/Box 18 EA Standard Fire Hydrants 4,412 LF 1" Type "K' Copper Water Service Line 142 EA Class "A" Meter Boxes 11,596 LF Temporary Asphalt Pavement Repair 600 LF Permanent Asphalt Pavement Repair For additional information concerning this project, please contact Ty Hilton, P.E., at the offices of Teague Nall and Perkins, Inc., (817)•336-5773 or Tony Sholola, P.E., Project Manager, at the City of Fort Worth, (817) 392-6054. Department of Engineering A. Douglas Rademaker, Director Advertising Dates: April 14, 2005 April 21, 2005 I r i Comprehensive Notice to Bidders Sealed Proposals for the following: Water Replacement Contract 2002, STM-F PW53-060530176470 D.O.E. No. 3706 Addressed to Mr. Charles R. Boswell, City Manager of the City of Fort Worth, Texas will be received at the Purchasing Office until 1:30 P.M., Thursday, May 12, 2005 and then publicly opened and read aloud at 2:00 P.M. x Contract Documents, including Plans and Specifications, may be obtained in the office of the Department of Engineering, Municipal office Building, 1000 Throckmorton, Fort Worth, Texas 76102, for a non-refundable fee of thirty dollars ($30.00) per set. These documents contain additional information for prospective bidders. All bidders will be required to comply with provision 5159a of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. Bid security is required in accordance with Paragraph 2 of the Special Instructions to Bidders. The major work on the above project shall generally consist of the following: Water Improvements 245 LF 12"Water by Open Cut 8,540 LF 8"Water by Open Cut 22 EA 8" Gate Valves w/Box 18 EA Standard Fire Hydrants 4,412 LF 1" Type "K" Copper Water Service Line 142 EA Class "A" Meter Boxes 11,596 LF Temporary Asphalt Pavement Repair 600 LF Permanent Asphalt Pavement Repair Included in the above will be all other items of construction as outlined in the Plans and Specifications. Construction time is 150 Calendar Days. The City reserves the right to reject any and/or all bids and waive any and/or all formalities. Bidders shall not separate, detach, or remove any portion, segment, or sheets from the contract document at any time. Bidders must complete the proposal sections and submit the complete specifications book or face rejection of the bid as non-responsive. AWARD OF CONTRACT: No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened. The award of contract, if made, will be within ninety (90) days after the opening of bids, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the proposal form. Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at (817) 871-7910. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Bidders must complete the proposal section(s) and submit the complete specifications book or face rejection of the bid as non-responsive. It is recommended that the bidder make a copy of the forms included in the Minority and Women Business Enterprise section for submittal within the time-line stated below or the bidder may request-a copy of said forms from the City Project Manager named in this solicitation. In accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM SUBCONTRACTOR/SUPPLIER UTILIZATION FORM , PRIME CONTRACTOR WAIVER FORM, GOOD FAITH EFFORT FORM with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. The Managing Department for this project is the Department of Engineering. For additional information, contact Ty Hilton, P.E., at the offices of Teague Nall and Perkins, Inc., (817) 336-5773 or Tony Sholola, P.E., Project Manager, at the City of Fort Worth, (817) 392-6054. CHARLES R. BOSWELL MARTY HENDRIX CITY MANAGER CITY SECRETARY Department of Engineering A. Douglas Rademaker, Director Advertising Dates: April 14, 2005 10A 's i u 4 {tee- Rick Trice, P.E. April 21, 2005 Department of Engineering, Assistant Director i f i SPECIAL INSTRUCTIONS TO BIDDERS 1) PREQUALIFICATION REQUIREMENTS: All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable experience record, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7)calendar days prior to the date of the opening of bids. a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status to the submitting company. This statement must be current and not more than one (1)year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. c) The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. e) The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalified bidder shall be returned unopened, and if inadvertently opened, shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications (financial or experience)are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary prequalification. 2. BID SECURITY: A cashier's check, or an acceptable bidder's bond, payable to the City of Fort Worth, in an amount of not less than five(5%)percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10)days after the contract has been awarded To be an acceptable surety on the bid bond, the surety must be authorized to do business in the state of Texas. In addition, the surety must(1)hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or(2)have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 3. BONDS: A performance bond, a payment bond, and a maintenance bond each for one hundred (100%) percent of the contract price will be required, Reference C 3-3.7. 1 06/04/03 : i 4. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: (a) The contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258, Texas Government Code. Such prevailing wage rates are included in these contract documents. (b) The contractor shall, for a period of three (3)years following the date of acceptance of the work, maintain records that show(i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii)the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of D-3 Right to Audit pertain to this inspection. (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a)and (b)above. (d) With each partial payment estimate or payroll period,whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258,Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601 g,Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business in located. "Nonresident bidder"means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has its principal R place of business in this state. This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the bid amount is $25,000.00 or less, the contract amount shall be paid within forty-five (45)calendar days after completion and acceptance by the City. 9. AGE: In accordance with the policy("Policy")of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents employees, program participants or subcontractors,while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate 06/04/03 I i against persons because of their age except on the bases of a bona fide occupational qualification, retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal, state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors'alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE)and/or women business enterprise (WBE) on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation)and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three (3)years. 12. FINAL PAYMENT, ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment (less retainage)from the city for each pay period. b. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. 0Ffl ]A REM p�7� 06/04/03 CI o u �E kEAl FT. WINK YEN, C. The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed, as evidenced by a written statement signed by the contractor and the City. d. The warranty period shall begin as of the date that the final punch list has been completed. e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding (i)final quantities, or(ii)liquidated damages, city shall make a progress payment in the amount that city deems due and payable. g. In the event of a dispute regarding either final quantities or liquidated damages, the parties shall attempt to resolve the differences within 30 calendar days. 06/04/03 Part B. Proposal Minority and Women Business Enterprise Specification Proposal FORT WORTH City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is$25,000 or more,the M/WBE goal is applicable. If the total dollar value of the contract is less than$25,000, the M/W BE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. M/WBE PROJECT GOALS The City's MBE/WBE goal on this project is 17 %of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal, or 2. Good Faith Effort documentation, or; 3. Waiver documentation, or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. stated goal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no MN1/BE participation: opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontracting/supplier work: opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions, please contact the M/WBE Office at(817) 871-6104. Rev.5/30/03 l ATTACHMENT 1A Page 1 of 4 FORT WORTH City of Fort Worth Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime :!!�' I ' ' C' s L M/ W/DBENON-MNWDBE PROJECT NAME: Water Replacement Contract 2002 STM-F BID DATE Mav 12,2005 City's M/WBE Project Goal: Prime's M/WBE Project Utilization: PROJECT NUMBER PW53-060530176470 17% 17 % DOE No.3706 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing` Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications - MfVVBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1 s`tier, a payment by a subcontractor to its supplier is considered 2"d tier- ALL M[WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise (DBE) is synonymous with Minority/Women Business Enterprise (M/WBE). If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/VVBE may lease trucks from another M/WBE firm, including M/WBE owner-operators, and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for the Fees and commissions earned by the M/WBE as outlined in the lease agreement. Rev.5/30/03 i ATTACHMENT 1A FORT WORTH Page 2 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority,Women and non-M/WBEs. Please list M/WBE firms first, use additional sheets if necessary. Certification N (check one) o SUBCONTRACTOR/SUPPLIER T n Company Name i N T Detail Detail Address e M W C X M Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r B B T D W E E R O B C T E A i asuirc� I r uc �n�j `�c��nc� to :( �c� C�0C t i Agu- --ROCK 5315 5. NarnpShire i Fo rk LJ o r-A-4 �TX 7(a I I ( �_ 7r j- Iq TR ifa�� 20 , 0- q s--I- ys-Z- 713-') 8 LFctX) IY\. F- (urns CDASit,,TllL 0,1re a'.�-rhS 8 7 -(Ly'1 czc;-'7 Cc x) r 71 q,7 ��.. (�a�� ! Su�pijey �-;�},�rtes c:k aAj 4,'jiS;TJc741J/ I G o, S. jl X 17 - SSS- os�o lv � b{817-s8 -Di 7 •<fax 6 LJLL 2ri> 66-rYicuoles i c,wi'cad E, I s-t '�2�L ( ✓xiY YICGIG��" S g) SUD ,L Ff?rt I �r{�i X 7/o J1 ,-a 9/7-535 -351 00YL*ro l Y/7- P3) -7i7J C- )c ) I ��ewk- Lw L'� �or�G.b I Poiu b1 fir(; A1�}�,,,i X�(�U°� i So- 9�r gl7- gal�vus� ��� /9D l co Id SPS^'nq 5 Kd , /� 5,� kcLt - ��lt'.��r�, END Ivy W FT. TEXI i ATTACHMENT 1A FORT WORTH Page 3 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority,Women and non-M/WBEs. Please list M/WBE firms first, use additional sheets if necessary. Certification P (check one) SUBCONTRACTOR/SUPPLIER T r Company Name i N T Detail Detail Address e M W c X D Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r B B T D I E E R O E C T E A Rev.5/30/03 I ATTACHMENT 1A FORT WORTH Page 4 of 4 Total Dollar Amount of M/WBE Subcontractors/Suppliers $ o �� 3 , -S- Total Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ S-D i 3% The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. ��`- -�he✓rnca ,� H� �e-yr� A th ized Signatur Printed Signature Title Contact Name/Title(if different) A 1C 5C1(o- Company Name �— Telephone and/or Fax !0 L' ::5_h(4P =�E �)lr 'r rvrna s9 ' Address { p 7 E-mail Address City/tate i / Date 'L- 12. U Rev. 5/30/03 PROPOSAL I (This proposal must not be removed from this book of Contract Documents) TO: Mr. Charles R. Boswell City Manager Fort Worth, Texas l PROPOSAL FOR: The furnishing of all materials, except materials specified to be furnished by the City, equipment and labor for: Water Replacement Contract 2002, STM - F D.O.E. No. 3706 PW53-060530176470 Pursuant to the foregoing "Notice to Bidders", the undersigned bidder, having thoroughly examined the Contract Documents, including Plans, Special Contract Documents, the General Contract Documents and General Specifications for Water Department Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material, except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents, and subject to the inspection and approval of the Director of the Engineering Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: t (Furnish and install, including all appurtenant work, complete in place, the following items) ("D-No." refers to the related items in Part D— Special Conditions) I Water Replacement Contract 2002, STM-F a D.O.E. No. 3706, PW53-060530176470 Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items. D-No. refers to related items in the Part D Special Conditions.) 1. 245 LF 12-inch, PVC (DR-14)Water Pipe, Incl. Excavation, Embedment and Backfill, Complete in Place for Dollars & ` �S 3_ f q 1J Cents $—alp $ Y, 9s per Linear Feet P BF-1 Water Replacement Contract 2002, STM-F D.O.E. No. 3706, PW53-060530176470 Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items. D-No. refers to related items in the Part D Special Conditions.) 2. 30 LF 10-inch, PVC (DR-14)Water Pipe, Incl. Excavation, Embedment and Backfill, Complete in Place for 1� (.y Dollars & Cents $ C� � 3 $ q Oe-1 per Linear Feet 3. 8,540 LF 8-inch, PVC (DR-14)Water Pipe, Incl. Excavation, Embedment and Backfill, Complete in Place for Dollars & IVa Cents $ ��� LW $ CJS per Linear Feet 4. 717 LF 6-inch, PVC (DR-14)Water Pipe, Incl. Excavation, Embedment and Backfill, Complete in Place for �Lv{�✓f , --�Wc Dollars & nJ u Cents $ -22, $ J 7 per Linear Feet 5. 18 EA Stdandard Fire Hydrant Assembly(3'—6' Bury) Complete in Place for C fy -sX L h!t , &i, td red ����� Dollars & Cents $ $ per Each 6. 18 VF Fire Hydrant Barrell Extension Complete in Place for u N Dollars & U /V Cents $ 1.2 • $ per Vertical Foot BF-2 ��, INUIR1111H, TEX. Water Replacement Contract 2002, STM-F D.O.E. No. 3706, PW53-060530176470 Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items. D-No. refers to related items in the Part D Special Conditions.) i 7. 3 EA 12-inch Gate Valve with Cast Iron Box and Lid (D-52), Complete in Place for 5 /h r �- t'�1c'Y� i t Fo�� /-- ,P v, Au Kd ded Dollars & "I g J ( V/ "4—— Wi n y� Cents $1, 7-1 $ 3)3. i per Each 8. 22 EA 8-inch Gate Valve with Cast Iron Box and Lid (D-52), Complete in Place for ►`Ykeie"'Dri ollars & TP ✓� Cents $ $ S per Each 9. 22 EA 6-inch Gate Valve with Cast Iron Box and Lid (D-52), Complete in Place for l,� �ltiZ Hen eld �`�'�' "1 Dollars & n —Se ►��,n Cents $ / T per Each 10. 8.2 TN Ductile Iron or Grey Iron Fittings, (D52.12), for �N �y Itu0 /IQ n d red ollars & 0® y C7 Cents $ P $ 0, per Ton 11. 80 LF Concrete Encasement for 8"Water Line (DA-50), Complete in Place for i ( — �t�'✓t Dollars & va4)0 Cents $ 3 7. $ per Linear Foot i r i BF-3 Water Replacement Contract 2002, STM-F D.O.E. No. 3706, PW53-060530176470 i Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items. D-No. refers to related items in the Part D Special Conditions.) 12. 4,412 LF 1-inch Type"K"Copper Water Service Line (Public) (D-52.7), Complete in Place for i 7 i de -e- vt Dollars & , / "Ve Cents $_ � _ $�0o106s` i per Linear Foot 13. 142 EA 1-inch Tap, Saddle, Stop and Fittings for 1-inch Water Service Tap to Main (D-52.7), Complete in Place for Dollars & _. V e Cents $l ' $ � L •u� per Each j 14. 142 EA Install Class"A" Meter Box (D-52.7), Complete in Place for j'V11 _E,`< l�f Dollars & p o® 00 Cents $ b $ i per Each 15. 10 LF Install 1"Water Service By Other Than Open Cut, Complete in Place for �Wt 14 4�41 Dollars & e.0 Cents $ $ per Linear Foot 16. 11,596 LF Temporary Asphalt Pavement Repair(D-62), 2" Hot Mix on 6"Compacted Flex Base, Complete in Place for P Dollars & ba N� Cents $ ,p'' $�� �. i per Linear Foot BF-4 Water Replacement Contract 2002, STM-F D.O.E. No. 3706, PW53-060530176470 Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items. D-No. refers to related items in the Part D Special Conditions.) 17. 500 SY Additional Temporary Asphalt Pavement Repair Beyond Trench Width, Complete in Place for -6ey e v� Dollars & Cents $ '71 $� c3 per Square Yard i 3 18. 602 LF Permanent Asphalt Pavement Repair(D-25), Per T/DPW Fig. 2000-1, Complete in Place for Y e Q Dollars & j-Vb Cents $ 33= $ per Linear Foot 19. 100 SY Permanent Asphalt Pavement Repair(D-25), Beyond T/PW Fig. 2000-1 Limits, Complete in Place for j tl r:64 —D Dollars & /1! Cents $ per Square Yard 20. 56 LF Permanent Concrete Pavement Repair(D-25), Per T/PW Fig. 2000-2, Complete in Place for i Y-k, _ Fjti -rte Dollars & U uQ lV O Cents $ $ 4, per Linear Foot E i 21. 100 SY Permanent Concrete Pavement Repair(D-25), Beyond T/PW Fig.2000-1 Limits, Complete in Place for �► '�a fl`i�l (' Dollars & Cents $ 00 per Square Yard i BF-5 t i Water Replacement Contract 2002, STM-F D.O.E. No. 3706, PW53-060530176470 Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items. D-No. refers to related items in the Part D Special Conditions.) 22. 80 SY 7"Concrete Valley Gutter Repair(DA-31), Complete in Place for X T4 — —Se O-P rt Dollars & (U C Cents $ $ per Square Yard 23. 200 SY Concrete Driveway Repair(D-20), Complete in Place for �0 (4\4 — i V C Dollars & �0 /LI D Cents $ 11 $ R_®o ' per Square Yard 24. 100 SY Replace Concrete Flume with Class 'B' (2500 PSI)Concrete (D-21), Complete in Place for :5i — -'Se V e pt Dollars & V o Cents $ l 7, $ per Square Yard 25. 1,660 LF Grass Solid Sodding (D-45) Complete in Place for I" 'y Dollars & ®t? e Cents $ S�j $Y,, 3DO per Linear Foot f 26. 950 LF Replace Concrete Curb& Gutter(DA-24), Complete in Place for J'1 Dollars & Nu Cents $_ $_���`�"�®C7 per Linear Foot t BF-6 } Water Replacement Contract 2002, STM-F D.O.E. No. 3706, PW53-060530176470 Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items. D-No. refers to related items in the Part D Special Conditions.) 27. 11 EA Remove and Salvage Existing Fire Hydrants (D-29), Complete for tJ �1 OYt j-t n►— ( �l' `F Dollars & lV t; Cents $ 5�, $ �L� C►_U per Each 28. 7 EA Remove and Salvage Existing Valves (D-29), Complete for D Cl ri'lAi Dollars & �Yo Cents $ �� $ SO ,L) per Each 29. 10 EA Cut and Plug Existing Water Line (D-29) Complete in Place for h 0 ,-� Dollars & / �t U 0i N /y U Cents $ $ � . per Each 30. 1 LS Furnish and Lay 2-inch Pipe and Fittings for Temporary Water Service Connection for Entire Project (D-52.8), Complete in Pace for p j lvevt-fy - n�zv TLIt L�S4 ricY Dollars & 00 Ad 'G Cents $ )-qjq C , per Lump Sum 31. 5,000 LF Trench Safety System for Trench Depth 5' and Greater, (D-26), for VQ( Dollars & Qj V-e Cents $ $ 2- per per Linear Foot BF-7 ��1 i1°SL�l�ilvJ �/ ��, 1010' TEX. i Water Replacement Contract 2002, STM-F D.O.E. No. 3706, PW53-060530176470 Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items. D-No. refers to related items in the Part D Special Conditions.) 32. 1 LS Storm Water Pollution Prevention Plan, Implementation and Maintenance, (D-68), for Eye- /7 +, tedDollars & og AA Cents $ $ � r per Lump Sum TOTAL t E r 4 1 i BF-8 Water Replacement Contract 2002, STM-F I r LIST OF CAST IRON FITTINGS AS REQUIRED BY E2-7.11A TO BE SUBMITTED WITH BID Weight Each Total Weight No. of Fittings Size of Fittings Type of Fitting Fitting (Ibs) (Ibs) 1 12"x 12" Cross 65S V &S S g � 1 8"x 8" Cross 5 S 1 12"x 12" Tee 1 16"x 8" Tee4e 0 1 12"x 6" Tee 2 10"x 8" Tee S 7 8"x8" Tee 5H 2 12 8"x 6" Tee �- 2 12" 45° Bend 6 8" 45° Bend 5 6" 450 Bend S,H- . -3 S- 7 8" 22%2° Bend 4 8" 11'/° Bend (� 1 12"x6" Reducer 5-14' 2 12"x8" Reducer 14 6 8"x6" Reducer 1 12" Cleaning Wye if ' Sd , 7 8" Cleaning Wye 3 6" Cleaning Wye 1 8" Plug -S-0 2 8" Plug w/Tap /0 (� 1 16" MJ Cut-In Sleeve 1 12" MJ Cut-In Sleeve 2 10" MJ Cut-In Sleeve ( 6 8" MJ Cut-In Sleeve J 3 S- J /0 1 6" MJ Cut-In Sleeve 91 q�7 1 6" MJ Solid Sleeve 1 12" Poly Pig 8 8" Poly Pig .6 3 6" Poly Pig Contractor shall fill in blanks for"Weight per Fitting"and"Total Weight'as a part of his bid(weight will be based on M.J. Fittings) } BF-9 k 4 Water Replacement Contract 2002, STM-F Within ten (10) days after notification by the City, the undersigned will execute the formal i contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of this Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event ythe contract and bond or bonds are not executed and delivered within the time above set forth as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and F conditions of those General Documents, and the specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by the City Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 150 Calendar Days after beginning construction as set forth in the written work order to be furnished by the Owner: Complete A or B below, as applicable: A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. (DThe principal place of business of our company or our parent company or majority owner is in the State of Texas. t e BF-10 l ` Water Replacement Contract 2002, STM-F f Receipt is acknowledged of the following addenda: Addendum No. 1 Addendum No. 2 [ Addendum No. 3 Respectfully submitted, - Q . e . nL I ,"- e�r By - Shri max PL 56 n Title 3 10 �-cL"n )P LJ,e a ;A,e�--ro nd Tzk-7(. y R7 Address (SEAL) If Bidder is Corporation Date: - END OF PROPOSAL- BF-1 I ROPOSAL-BF-11 i i i i i i i i Part C. General Conditions ( PART C - GENERAL CONDITIONS I TABLE OF CONTENTS t NOVEMBER, 1, 1987 TABLE OF CONTENTS IC1-1 DEFINITIONS C1-1.1 Definition of Terms C1-1 (1) ( C1-1. 2 Contract Documents Cl-1 (1.) I C1-1. 3 Notice to Bidders C1-1 (2 ) C1-1.4 Proposal C1-1 (2 ) C1-1.5 Bidder C1-1 (2) C1-1.6 General Conditions Cl-1 (2) C1-1.7 Special Conditions C1-1 (2) C1-1.8 Specifications C1-1 (2) C1-1.9 Bond Cl-1 (2) C1-1.10 Contract C1-1 (3 ) C1-1.11 Plans C1-1 (3 ) 1 C1-1.12 City C1-1 (3 ) C1-1.13 City Council Cl-1 (3 ) C1-1.14 Mayor C1-1 (3 ) C1-1.15 City Manager Cl-1 (3) C1-1.16 City Attorney C1-1 (3) C1-1.17 Director of Public Works C1-l .(4 ) Cl-1.18 Director, City Water Department C1-1 (4 ) C1-1.19 Engineer _ C1-1 (4 ) I C1-1.20 Contractor C1-1 (4) C1-1.21 Sureties - Cl-1 (4) ( C1-1.22 The Work or Project Cl-1 (4) I C1-1.23 Working Day C1-1 (4) C1-1.24 Calendar Day C1-1 (4 ) I C1-1.25 Legal Holiday C1--1 (4) C1-1.26 Abbreviations C1-1 (5) C1-1.27 Change Order C1-1 (6 ) C1-1.28 Paved Streets and Alleys Cl-1 (6 ) I C1-1*.29 Unpaved Streets and Alleys C1-1 (6) C1-1. 30 City Streets C1-1 (6 ) C1-1.31 Roadway C1-1 (6) IC1-1.32 Gravel Street C1-1 (6 ) C2-2 INTERPRETATION AND PREPARATION ( OF PROPOSAL I C2-2.1 Proposal Form C2-2 (1) C2-2.2 Interpretation of Quantities C2-2 (1) I C2-2.3 Examination of Contract Documents and Site -C2-2 (2) C2-2.4 Submitting of Proposal C2-2 (3 ) C2-2.5 Rejection of Proposals C2-2 (3) C2-2.6 Bid Security C2-2 (3 ) - f (1) C2-2. 7 Delivery of Proposal C2-2 (4 ) C2-2.8 Withdrawing Proposals C2-2 ( 4) C2-2. 9 Telegraphic Modification of Proposals C2-2 (4 ) C2-2.10 Public Opening of Proposal C2-2 (4 ) C2-2. 11 Irregular Proposals C2-2 (4) C2-2. 12 Disqualification of Bidders C2-2 (5) C3-3 AWARD AND EXECUTION OF DOCUMENTS C3-3. 1 Consideration of Proposals C3-3 (1) C3-3. 2 Minority Business Enterpise Women-Owned Business Enterprise compliance.- C3-3 (1) C3-3. 3 Equal Employment Provisions C3-3 (1) C3-3. 4 Withdrawal of Proposals C3-3 (2) C3-3.5 Award of Contract C3-3 (2) C3-3. 6 Return of Proposal Securities C3-3 (2) C3-3. 7 Bonds C3-3 (2) C3-3.8 Execution of Contract C3-3 (4) C3-3.9 Failure to Execute Contract C3-3 (4) C3-3. 10 Beginning Work C3-3 (4) C3-3.11 Insurance C3-3 (4) C3-3.12 Contractor 's Obligations C3-3 (7) C3-3.13 Weekly Payroll C3-3 (7) C3-3.14 Contractor 's Contract Administration C3-3 (7) C3-3.15 Venue C3-3 (8) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4 (1) C4-4.2 Special Provisions C4-4 (1) C4-4.3 Increased or Decreased Quantities C4-4 (1) C4-4.4 Alteration of Contract Documents C4-4 (2) C4-4.5 Extra Work C4-4 (2) C4-4:6 Schedule of Operations C4-4 (3) C4-4.7 Progress Schedules for Water and Sewer Plant Facilities C4-4 (4) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1) C5-5.2 Conformity with Plans C5-5 (1) C5-5.3 Coordination of Contract Documents C5-5 (2) C5-5.4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work C5-5 (3) C5-5.6 Field Office C5-5 (3) C5-5.7 Construction Stakes C5-5 (3) C5-5.8 Authority and Duties of Inspectors C5-5 (4) C5.-5.9 Inspection C5-5 (5) C5-5.10 Removal of -Defective and Unauthorized Wgxk C5-5 (5) C5-5.11 Substitute Materials or Equipment C5-5 (5) C5-5.12 Samples and Tests of Materials C5-5 (6).- 05-5.13 Storage of Materials C5-5 (6) C5-5.14 Existing Structures and Utilities C5-5 (7) C5-5.15 Interruption .of -Service C5-5 (7) C5-5.16 Mutual Responsibility of Contractors C5-5 (8) C5-5.17 Cleanup C5-5 .(8) C5-5.18 Final Inspection C5-5 (9) (2) i C6-6 LEGAL RELATIONS. AND PUBLIC RESPONSIBILITY --' C6-6. 1 Laws to be Observed C6-6 (1) C6-6.2 -Permits and Licenses C6-6 (1 ) C6-6. 3 Patented Devices, Materials and Processes C6-6 (1) C6-6. 4 Sanitary Provisions C6-6 (2 ) C6-6. 5 Public Safety and Convenience C6-6 (2 ) C6-6. 6 Privileges of Contractor in Streets, Alleys, and Right-of-Way C6-6 (3) C6-6. 7 Railway Crossings C6-6 (4 ) I C6-6. 8 Barricades, Warnings and Watchmen C6-6 (4 ) C6-6. 9 Use 'of Explosives, Drop Weight, etc. C6-6 (5) C6-6.10 Work Within Easements- C6-6 (6 ) C6-6.11 Independent Contractor C6-6 (8 ) f C6-6. 12 Contractor 's Responsibility for Damage Claims C6-6 (8 ) C6-6.13 Contractor ' s Claim for- Damages C6-6 (10) I C6-6.14 Adjustment of Relocation of Public Utilities, etc. C6-6 (10) C6-6.15 Temporary Sewer Drain Connections C6-6 (10) 1 C6-6.16 Arrangement and Charges of Water Furnished by *City C6-6 (11) C6-6.17 Use of a Section of Portion of the Work C6-6 (11 ) C6-6.18 Contractor 's Responsibility for Work C6-6 (11 ) C6-6.19 No Waiver of Legal Rights C6-6 MY C6-6. 20 Personal Liability of Public Officials C6-6 (12) C6-6. 21 State Sales Tax C6-6 (12) ( C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1 ) C7-7. 2 Assignment of Contract C7-7 (1) C7-7. 3 Prosecution of the Work C7-7 (1) C7-7. 4 Limitations of Operations C7-7 (2 )' C7-7.5 Character of Workman and Equipment C7-7 (2) I C7-7. 6 Work Schedule C7-7 (3 ) C7-7. 7 Time of Commencement and Completion C7-7 (4 ) C7-7. 8 Extension of time of Completion C7-7 (4) r C7-7. 9 Delays C7-7 (4 ) I C7-7. 10 Time of Completion C7-7 (5 ) C7-7.11 Suspension by Court Order C7-7 (6) C7-7.12 Temporary Suspension C7-7 (6) IC7-7.13 Termination of Contract due to National Emergency C7-7 (7) C7-7.14 Suspension of Abandonment of the I Work and Annulment of Contract C7-7 (7) C7-7.15 Fulfillment of Contract C7-7 (9) C7-7.16 Termination for Convenience of the Onwer C7-7 (10) IC7-7.17 Safety Methods and Practices - C7-7 (13 ) C8-8 MEASUREMENT -AND PAYMENT C8-8.1 Measurement of Quantities _C8-8 (1) C8-8. 2 Unit Prices C8-8 (1 ) I , OFFICJA1 RECORD CITY MCRETARY c 3 ) FT. FORTH, TEX. C8-8. 3 Lump Sum C8-8 (1) C8-8. 4 Scope of Payment C8-8 (1) C8-8.5 Partial Estimates and Retainage C8-8 (2 ) C8-8.6 Withholding Payment C8-8 (3 ) C8-8.7 Final Acceptance C8-8 (3 ) C8-8.8 Final Payment C8-8 (3 ) C8-8.9 Adquacy 'of Design C8-8 (4 ) C8-8.10 General Guaranty C8-8 (4 ) C8-8.11 Subsidiary Work C8-8 (5 ) C8-8.12 Miscellaneous Placement of Material C8-8 (5) C8-8.13 Record Documents C8-8 (5) j{f (4) P I PART C - GENERAL CONDITIONS C1-1 DEFINITIONS SECTION C1-1 DEFINITIONS C1-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract I Documents, the following terms or pronouns in place of them are used , the intent and meaning shall be understood and interpreted as follows: ICl-1 . 2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents , such as specifications , bonds , addenda , plans , etc . , which govern the terms and performance of the contract . These are contained in the General Contract Documents and the Special Contract Documents. Ia. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and include the following items: IPART A - NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL. (Sample) White PART C - GENERAL CONDITIONS (CITY) Canary Yellow I (Developer) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATION'S E1-White I E2-Golden Rod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS . (Sample) White PART G - CONTRACT. (Sample) White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract I Documents are prepared for each specific project as a supplement to- the General Contract Documents and include the following items: IPART A - NOTICE TO BIDDERS (Advertisement) Same as above I PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS I PART E - SPECIFICATIONS _ PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT IPART H - PLANS (Usually bound separately) C1-1 (1) C1-1 . 3 NOTICE TO BIDDERS : All of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1. 4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to - have-donee, toge:ther-with- the- bid- security-, constitutes the Proposal , which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-1 . 5 BIDDER: Any person , persons , firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents , constitutes a bidder. C1-1. 6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes ," and requirements of the City of Fort Worth' s charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions , the latter shall take precedence and shall govern. C1-1 . 7 SPECIAL CONDITIONS : Special conditions are the specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions. When considered with the General Conditions. and other elements of the Contract Documents they provide the information which the Contractor and Owner should have .in order to gain a thorough knowledge of the project. C1-1. 8 SPECIFICATIONS: The Specifications is that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed- and- useful project. Whenever reference is -made to standard specifications, regulations, requirements , statutes , etc. , such referred to documents shall become a part of the . Contract Documents just as though they were embodied therein. C1-1 . 9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and Cl-1 (2) f l = faithful performance of the contract and include the I following: a. Performance- Bond (see paragraph C3-3.7) b. Payment Bond (see paragraph C3-3 .7) C. Maintenance Bond (see paragraph C3-3.7) d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2-2.6) C1-1. 10 CONTRACT: The Contract is the formal signed agreement 1 between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. C1-1. 11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner's representative showing in detail the location , dimension and position of the various elements I of the project , including such profiles , typical cross-sections, layout diagrams, working drawings, preliminary drawings and ,such supplemental drawings as the Owner may issue I to clarify other drawings or for the purpose of showing changes in -the work hereinafter authorized by the Owner. The plans are usually -bound separately from other parts of the Contract Documents , but ' they are a part of the Contract I Aj Documents. just as though-they were bound therein. r C1-1 . 12 CITY: The City .of Fort Worth, Texas , a municipal I corporation, authorized and chartered under the Texas State Statutes, acting by and through its governing body or its. City Manger, each of which is required by charter to perform specific duties . Responsibility for final enforcement of I Contracts involving the City of Fort Worth is by Charter l vested in the City Manager. The terms City and Owner are synonymous. iC1-1 . 13 CITY COUNCIL: The duly elected and qualified governing body of the City of Fort Worth, Texas. IC1-1 . 14 MAYOR: The officially elected -Mayor, or in his absence, the Mayor Pro tem- of the City of Fort Worth, Texas. I C1-1. 15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas , or his duly authorized representative. C1-1. 16 CITY ATTORNEY: The officially appointed* City Attorney of the City of Fort Worth, Texas , or his .duly .authorized_ Irepresentative. I •,. - C1- 1 (3) I C1-1. 17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth, referred to in ' the Charter as the City Engineer, or his duly authorized .representative. C1-1.18 DIRECTOR , CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth , Texas , or his duly authorized representative , assistant, or agents. C1-1.19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department , or their duly authorized assistants , agents , engineers, inspectors , or superintendents , acting- within the scope of the particular duties entrusted to them. C1-1 . 20 CONTRACTOR : The person , persons , partnership , company, firm, association, or corporation, entering into a contract with the Owner for the execution of the work, acting directly or through a duly authorized representative. A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor, supplying labor and materials or only labor, for -work at the site of the project. C1-1. 21 SURETIES: The Corporate bodies which are bound by such bonds are required with and for the Contractor . The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the* Contract Documents and approved changes therein. C1-1. 22 THE WORK OR PROJECT:' The completed work contemplated in and covered by the Contract Documents, including but not limited to the furnishing of all labor, materials, -tools , equipment, and incidentals necessary to produce a completed and serviceable project. C1-1. 23 WORKING DAY: A working day is defined as a calendar day, not including Saturdays, Sundays , and legal holidays, in which the weather or other conditions not under the -control of the Contractor permit the performance of the principal unit of work for a period of not less than seven ( 7 ) hours between 7: 00 a.m. and 6: 00 p.m. , with exceptions as permitted in paragraph C7-7.6. C1-1. 24 CALENDAR DAYS : A calendar day is any day of the week or month, no days being excepted. C1-1. 25 LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows: Cl-1 (4) 4 f1. New Year's Day January l 2. M. L. King, Jr. Birthday Third Monday in January 3. Memorial Day Last Monday in May 4. Independence Day July 4 5. Labor Day First Monday in September 6. Thanksgiving Day Fourth Thursday in November 1 7. Thanksgiving Friday Fourth Friday in November 8. Christmas Day December 25 9. Such other days in lieu of holidays as the City Council may determine When one of the above named holidays or a special holiday is -declared by the City Council, falls on Saturday, the holiday I shall be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following Monday, by those I employees working on working day operations . Employees working calendar day operations will consider the calendar holiday as the holiday. ( C1-1 . 26 ABBREVIATIONS: Wherever the abbreviations defined I herein .appear in Contract Documents, the intent and meaning shall be as follows: 1 AASHTO - American Association of MGD - Million Gallons Per State Highway Transportation Day - Officials ASCE American Society of Civil CFS - Cubic Foot per Engineers Second LAW - In Accordance With I ASTM - American Society of Min. - Minimum Testing Materials Mono.- Monolithic AWWA - American Water Works % - Percentum I Association R - Radius - ASA American Standards Association I.D. - Inside Diameter HI - Hydraulic Institute O. D. - Outside Diameter I Asph. _ Asphalt Elev.- Elevation Ave. Avenue F - Fahrenheit Blvd. - Boulevard C - Centigrade I CI - Cast Iron In. - Inch CL - Center Line Ft. - Foot GI Galvanized Iron St. - Street Lin. _ Linear or Lineal CY Cubic Yard lb. Pound Yd. - Yard MH - Manhole SY - Square Yard Max. - Maximum L.F. - Linear Foot D.I. - Ductile Iron I - C1-1 (5) C1-1 . 27 CHANGE ORDER : A " Change Order " is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter -of a Change Order unless the increase or decrease is more than 25% of the amount of the particular item or items in the original proposal. All "Change Orders" shall be prepared by the City from information as necessary furnished by the Contractor. C1-1. 28 PAVED STREETS AND ALLEYS : A paved street or alley shall be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment , not including an oiled surface , with or without separate base- material. 3. Brick, with or without separate base material. 4. Concrete, with or without separate base material. 5. Any combination of the above. C1-1. 29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or other ' surface is any area except those defined above for "Paved Streets and Alleys. " C1-1. 30 CITY STREETS: A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1. 31 ROADWAY: The roadway is defined as the area between parallel lines two . ( 2 ' ) feet back of the curb lines or four . ( 4 ' ) feet back of the average edge of pavement where no curb exists. C1-1. 32 GRAVEL STREET: A gravel street is any unpaved street to which has been added one or more applications of gravel or similar material other than the natural material found on the street surface before any improvement was made. C1-1 (6 ) f SECTION C - GENERAL CONDITIONS I C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2. 1 - -PROPOSAL FORM: The Owner will furnish bidders with Iproposal - form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state i the Bidder ' s general understanding of the project to be I completed, provide a space for furnishing the amount of -bid security, and state the basis for entering into a formal + contract . The Owner will furnish forms for the Bidder ' s I "Experience Record, " "Equipment Schedule, " and "Financial. Statement, " all of which must be properly executed and filed .with the Director of the City Water Department one week prior I to the hour for opening of bids. I The financial statement required shall have been prepared by I an independent certified public accountant or an independent public accountant holding a valid permit issued by in appropriate state licensing agency, and shall have been so ., prepared as to reflect the current financial status. This J statement must be current and not more than one (1 ) year old. In the case that a bidding date falls within the time a new statement is. being prepared, the previous statement shall be I updated by proper -verification. Liquid assets in the amount of ten (10% ) percent of the- estimated project cost will be required. IFor an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as .that of the project for which bids are to be received, and such experience must have been on projects completed not more than five (5) years prior to I the date on which are to be received . The Director of the Water department shall be sole judge as to the acceptability of experience for qualification to - bid on any Fort Worth Water IDepartment project. The prospective bidder shall schedule the equipment he has available . for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. I C2-2 . 2- INTERPRETATION OF QUANTITIES: The quantities ' of work and materials to be furnished as may be listed in the proposal IC2-2(l) forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans . The quantities of work to be performed and materials to be furnished may be increased or . decreased as hereinafter provided , without in any way invalidating-- the. unit.. prices. bid. or.. any other. requirements of theContract Documents. C2-2. 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with the Owner shall constitute all -of the information which the Owner will furnish. All additional information and data which the owner will. supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. Bidders are required, prior to the filing of proposal, to read and become -familiar with the Contract Documents, to visit the site of the project and examine carefully all local conditions , to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project . They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time required for its completion, and obtain all information required to make an intelligent proposal. No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their own estimates , investigation, research, tests, explorations, and other data which are necessary for full and complete information, upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations , examinations and tests herein required. . Claims for additional compensation due to variation-s between 'conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct. Neither the C2-2(2) I Own.er nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2 . 4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. ' All blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state- the prices , written in ink in both words and numerals , for which he proposes 'to do the work contemplated or_ furnishe the materials required. All such prices shall be written legibly. In case I of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. 1 If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. .If a proposal is submitted by a firm, association , or ( partnership, the name and address of each member must be given , and the proposal must be signed by a member of the firm , association , or partnership, or by a person duly authorized . If a proposal is submitted by a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign 1 proposal must be .properly certified and must be in writing -and submitted with the proposal. IC2-2. 5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures, additions not called for , conditional or uncalled for alternate bids, incomplete bids, erasures , or irregularities of any kind, or 1 contain unbalance value of any items. Proposal tendered or delivered after the official time designated for receipt of Iproposal shall be returned to the Bidder unopened. C2-2. 6 BID• SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the character and in the amount indicated in the "Notice to Bidders" and the- "Proposal ." The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of I the - three lowest bidders will be retained until- the contract is awarded or other disposition is made thereof . The bid security of all other bidders may returned promptly after Ithe canvass of bids. I . C2-2(3) 1 C2-2 ..7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the City Manager or his representative in the official place of business as set forth in the "Notice to Bidders . " It is the Bidder ' s sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidder must have the proposal actually delivered. Each proposal- shall. be in a sealed envelope plainly marked with the word""PROPOSAL,"" and-- the name or description of* the project as designated- in the "Notice to Bidders. " The envelope shall be addressed to the City Manager, City Hall, Fort Worth, Texas. C2-2 . 8 WITHDRAWING PROPOSALS: Proposals actually filed with the City Manager cannot be withdrawn prior to the time set f or opening proposals . A request for non-consideration of a proposal must be made . in writing , addressed to the City Manager , and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, -the proposals for which non-consideration requests have been properly filed may, at the option of the Owner , be returned unopened. C2-2. 9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such. confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given. to the proposal. C2-2.10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and for which no ."Non-consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized .representative at the time and place indicated in the "Notice to Bidders. " All proposals which have been opened and read will remain on file with the Owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. C2-2 .11 IRREGULAR PROPOSALS: Proposals shall be considered as being "Irregular" if they show any omissions , alterations of form, -additions, or conditions not called for', unauthorized alternate bids, or irregularities of any kind. However, the C2-2(4) i Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best' interest of the City. Tendering a proposal after the closing hour is an irregularity which cannot- be waived. C2 -2 . 12 DISQUALIFICATION OF BIDDERS : Bidders may be disqualified and .their proposals not considered for any of, Ibut not limited to, the following reason: a. Reasons for believing that collusion exists among bidders. b. Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. C. The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d. The bidder being in arrears on any existing contract or having defaulted on a previous contract. e. The bidder having performed a prior contract in an unsatisfactory manner. f . Lack of competency as revealed- by the financial statement, experience record, equipment schedule, and such inquiries as the Owner may see fit to make. g. Uncompleted work which , in the judgment of the Owner, will prevent or hinder the prompt completion 1 of additional work if awarded. h. The bidder not filing with the Owner, one week in advance of the hour of the opening of proposals the following: I1. Financial Statement showing the financial condition of the bidder as specified in Parte "A" - Special Instructions. 2. A current experience record showing especially the projects of a nature similar to the one under consideration , which have been successfully completed by the Bidder. 3. An equipment- schedule showing the equipment the bidder has available for use on the Iproject. The Bid Proposal of a bidder who, in the judgment of the Engineer, is disqualified under the requirements stated herein, shall be set aside and not opened. l - I C2-2(5 ) I f I PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS I SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3 . 1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of' the quoted prices , the quantities shown in the proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of unit prices quoted- and the estimated quantities plus any lump sum I items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. I Until the award of the contract is made by the Owner, the l right will be reserved . to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to r _ proceed with the work in Any manner as maybe considered for the best interest of the Owner. C3-3 . 2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, I upon request , complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and . or a a Woman-owned Business Enterprise (WBE) on the contract and the payment- therefor. Contractor further agrees, upon request by Owner , to allow and audit and/or an examination of any books, records, or files in the possession Iof Contractor that will substantiate the actual work performed by the MBE or WBE. - Any material misrepresentation of any nature will be grounds for termination of the contract and for I initiating ' any -action under appropriate federal , state or local laws and ordinances relating to false statements; further , any such misrepresentation may be grounds for I disqualification of Contractor at Owner ' s discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6) months. IC3-3 . 3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with Current City Ordinance prohibiting discrimination in employment practices. I C3-3 (1) The Contractor shall post the required notice to that effect on the project site', and, at his request , will be provided assistance by the City of Fort Worth ' s Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3 . 4 WITHDRAWAL OF PROPOSALS : After a proposal has been read by the Owner it cannot be withdrawn by the Bidder within f orty-f ive (.45-) days• -after- the - dates 'on which the proposals were opened. C3-3 . 5 AWARD OF CONTRACT: The Owner reserves the right to withholdfinal action on the proposals for a reasonable time, not to exceed forty-five ( 45 ) days after the date of opening proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. The award of the contract, if an award is made, will be to the lowest and best responsible bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3 . 6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals have been determined for comparison of bids, the Owner may, at its discretion, return the proposal . security which accompanied the proposals which, in its judgment, would not be considered for the award. All other proposal securities, usually those of the three lowest bidders , will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by. the City Secretary. C3-3 .7 BONDS: With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file• with the Owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND : A good and sufficient performance bond in an amount not less than 100 percent of- the amount of the contract, as evidenced by the proposal tabulation or otherwise , guaranteeing the -full and faithful execution of the work and performance of the contract, and for the protection of . the Owner and all other persons against damage by reason of negligence ' of the Contractor, or improper execution of the work or the use of inferior materials . This performance C3-3 (2) I bond shall guarantee the payment for all labor , I materials, equipment, supplies , and services used in the construction of the work, and shall remain in full force and effect until provisions as above I stipulated are accomplished and final payment is I made on the project by the City. f b. MAINTENANCE BOND : A good and sufficient I maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as I evidenced by the proposal tabulation or otherwise, guaranteeing the prompt , full and faithful performance of the general guaranty which is set f forth in paragraph C8-8.10. I c: PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the f amount of the contract , as evidenced by the l proposal tabulation or otherwise, guaranteeing the prompt, full and faithful payment of all claimants as defined in Article 5160, Revised Civil Statutes f of -Texas , 1925 , as amended by House Bill 344 Acts 56th Legislature, Regular Session, 1959 , effective April 27 , 1959 , and/or the latest version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these 'specifications. Payment I Bond shall remain in force until all payments as above stipulated are made. d. OTHER BONDS : Such other bonds as may be required 1 by these Contract Documents shall be furnished by I the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested- in any litigation against the owner. All bonds shall be made on the forms furnished by the Owner and shall be I executed by an approved surety company doing business in the City of Fort Worth, Texas, and which is acceptable to the owner . In- order to be acceptable, the name of the surety shall be included on the current U. S . Treasury- list of acceptable sureties, and the amount of bond written- by any one acceptable company shall not exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the Contractor and Surety_ Company. Should any surety on the contract be determined unsatisfactory l at any time by the Owner, notice will be given the Contractor l to that effect and the Contractor shall immediately provide a l C3-3 (3) f new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties , as required, have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. C3-3 . 8 EXECUTION OF CONTRACT: Within ten (10) days after the Owner has by appropriate resolution, or otherwise, awarded the contract., the Contractor shall execute and file with the Owner the Contract and such bonds as may be required in the Contract Documents. No contract shall be binding upon the owner until it has been attested by the- City Secretary , approved 'as to form and legality by the City Attorney, and executed for the Owner by either the Mayor or City Manager. C3-3 . 9 FAILURE TO EXECUTE CONTRACT: The failure of the Awardee to execute the required bond or bonds or to sign the required contract within ten ( 10 ) days after the contract is awarded shall be considered by the Owner as an abandonment of his proposal, and the Owner may annul the Award. By reason of the uncertainty of the market prices of material and labor , and it being impracticable and difficult to accurately determine the amount of damages occuring to the Owner by reason of said awardee' s failure to execute said bonds and 5 contract within ten ( 10 ) days , the proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on the part of the Awardee and shall thereupon immediately be forfeited to the Owner. The filing of a proposal will be considered as an acceptance of this provision by the Bidder. C3-3. 10 BEGINNING WORK: The Contractor shall not commence .work until authorized in - writing to do so by the Owner . Should the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually termed the "Work Order" or "Proceed Order", it is agreed that the Surety Company will, within ten ( 10 ) days after the commencement date set forth in such written authorization, commence the physical execution of the contract. C3-3 . 11 INSURANCE: The Contractor shall not commence work under this contract until he has obtained all the insurance required under the Contract Documents, and such insurance has been approved by the Owner. The prime Contractor shall be responsible for delivering to the Owner the sub-contractors ' C3-3 (4) f certificate of insurance for approval. The prime contractor I shall indicate on the certificate of insurance included in the documents for execution whether or not his insurance covers sub-contractors . It is the intention of the Owner that the insurance coverage required herein shall include the coverage I of all sub-contractors. a. COMPENSATION -INSURANCE: The Contractor shall maintain , during the life of this contract , Workers ' Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub-contractors. In case any class of employees engaged in hazardous work on t•he project under this contract is not protected under the Workers ' Compensation Statute_, the Contractor shall provide adequate employer ' s general liability insurance for the protection of such of his employees not so protected. Ib. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure .and shall maintain during the life of this contract Contractor ' s Comprehensive General Liability Insurance (Public Liability and Property Damage Insurance) in an amount not less than $ 500 , 000 covering each occurrence on account of bodily injury, including death, and in an amount,- not less than $500 , 000 covering each occurrence on account of property 1 damage with $2,000,000 umbrella policy coverage. l C. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as separate policies or by additional endorsement- to one of the above-mentioned policies, and In the amount as set forth for public liability and property damage, the following insurance: 1. Contingent Liability ( covers General I Contractor ' s Liability for acts of sub-contractors) . 2. Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation ( if excavationes are to be fperformed adjacent to same) . 4. Damage to underground utilities for $500,000. I C3-3 (5) I 5. Builder 's risk (where above-ground structures are involved) . 6. Contractual Liability ( covers all indemnification requirements of Contract) . d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall procure and maintain, dur-irig• the-- life of this Contract, Comprehensive Automobile Liability insurance in an amount not less than $ 250 , 000 for injuries. including accidental death to any one person and subject to the same limit for each person an amount not less than $500 , 000 on account of one accident , and automobile property damage insurance in an amount not less than .$100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD : The insurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub-contractors , respectively, against damage claims which may arise from operations under this contract, whether such operations be- by the insured or by anyone directly or indirectly employed by him, and also against any of the following special hazards which may be encountered in the performance of the Contract. f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with, satisfactory proof of coverage by insurance required in these Contract Documents in amounts and by carriers satisfactory to the Owner . (Sample attached. ) All insurance requirements made upon the Contractor shall apply to the sub- contractor , should the Prime Contractor ' s insurance not cover the sub-contractor 's work operations. g. LOCAL AGENT FOR INSURANCE AND BONDING : The insurance and bonding companies with whom th.e Contractor ' s insurance and performance, payment, maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the city limits of the C3-3 (6) f i City of Fort Worth, Tarrant County, Texas . Each such agent shall be a duly qualified, one upon whom service of process may be had , and must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and I settle with the City of Fort Worth, or any other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been damaged , may have against the Contractor , insurance, and/or bonding company. If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in' a local agent or claims officer residing in the Metroplex, the Fort Worth-Dallas .area. The name of the agent or agents shall be set forth on all of such bonds and certificates of insurance. C3-3 . 12 CONTRACTOR' S OBLIGATIONS : Under the Contract, the Contractor shall pay for all materials , labor and services when due. lC3-3:. 13 WEEKLY PAYROLL: A certified copy of each payroll covering payment of wages to all person engaged in work on the project at the site of .the project shall be furnished to the Owner's representative within seven ( 7 ) days after the close of each payroll period. A copy or- copies of the applicable minimum wage rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the course of the Contract . Copies of the wage rates will be furnished the Contractor, by the Owner; however, posting and protection of the wage rates shall be the responsibility of the' Contractor. I C3-3 .14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, whether a person , persons , partnership, company , fir.m , association , corporation or other who is approved to do business with and enters into a contract with the City for l construction of water and/or sanitary sewer facilities, will l have or shall establish a fully operational business office within the Fort Worth-Dallas metropolitan area. The Contractor shall charge, delegate, or assign this office (or he may delegate his Project Superintendent ) with full authority to transact all business actions required in - the ' performance of the Contract. This, local authority shall be made responsible to act for the Contractor in all matters pertaining to the work governed by the Contract whether it be., administrative or otherwise and as such shall be empowered, thus delegated and directed, to settle all material, labor or other expenditures, all claims against. the work or any other CA Q�a C3-3 (7) ®� ICW� �ISM®�� ��vfla ly ��. WINTH, TEX, matter associated such as maintaining adequate and appropriate insurance or security coverage for the project . Such local authority for administration of the work under the Contract shall be maintained until all business transactions executed as part of the Contract are complete. Should the Contractor ' s principal base of operations be other than in the Fort Worth-Dallas metropolitan area, notification of the Contractor ' s assignment of local authority shall be. made in writing to the Engineer in advance of any work' on the project,' all appropriately signed and sealed, as applicable, by the Contractor ' s responsible officers with the understanding that this written assignment of authority to a local representative shall become part of the project Contract as though bound directly into .the project documents . The intent of these requirements is that . all matters associated with the Contractor 's administration, whether it be oriented in furthering the work, or other, be governed direct by local authority. This same requirement is imposed on insurance and surety coverage. Should the Contractor's local representative fail to perform to the satisfaction of Engineer, the Engineer, at his sole discretion , may demand that such local representative be replaced and the Engineer may, at his sole discretion , stop all work until a new local authority- satisfactory uthoritysatisfactory to the Engineer is\ assigned. No credit of working time will be for periods in which work stoppages are in effect for this reason. C3-3 . 15 VENUE Venue ' of any action hereinunder shall be exclusively in Tarrant County, Texas. i C3-3 (8) L _. . f i . PART C - GENERAL CONDITIONS . C4-4 SCOPE OF WORK I SECTION C4-4 SCOPE OF WORK C4-4 . 1 INTENT OF CONTRACT DOCUMENTS : It is the definite intention of these Contract .Documents to provide for a complete, useful project which the Contractor undertakes to construct or furnish , all in full compliance with the requirements and intent of the Contract Documents . It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do all extra or special work as may be considered by the Owner as necessary to l complete the project in a satisfactory and acceptable manner. The Contractor shall, unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment , special services , and incidentals necessary to the prosecution and completion of the project. C4-4 . 2 SPECIAL PROVISIONS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract � _.. Documents be anticipated, or should there be any additional proposed work which is not covered by these Contract Documents, then "Special Provisions" covering all such work will be prepared by the Owner previous to the time of receiving bids or proposals for such work and furnished to the Bidder in the form of Addenda. All such "Special Provisions" shall be considered to be a part of the Contract Documents 1 just as though they- were originally written therein. C4-4. 3 INCREASED OR DECREASED QUANTITIES: The Owner reserves h the right to alter the quantities of the work to be performed or to extend or. shorten the improvements at any time when and. as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices. I Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity ( of any item or items of work to be done or materials to be l furnished by the 25 percent or more, then either party to the contract shall upon written request to the other party be I entitled to a revised- consideration upon that portion of the 1 work above or below the 25 percent of the original quantity stated in the proposal; such revised consideration to be determined by special agreement or as hereinafter provided for "Extra Work. " No allowance will be made for any changes in anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes -in depth categories, shall be interpreted herein as applying to the overall quantities or sanitary sewer pipe in each pipe size, but not to the various depth- categories. C.4-4. 4 ALTERATION- OF CONTRACT...DOCUMEN.TS.: By Change. Order, the Owner reserves the right to make such. changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes do not materially alter the original Contract Documents or change the general nature of the project as a . whole. Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. C4-4 . 5 EXTRA WORK: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract -Documents or approved additions thereto; provided, however, that before any extra work is. begun a "Change Order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods: a. Unit bid price previously approved. b. An agreed lump sum. C. The actual reasonable cost of (1) labor, (2) rental of equipment used on the extra work for the time so used at Associated General Contractors of America current equipment . rental rates ; ( 3 ) materials entering permanently into the project, and (4 ) actual cost of insurance , bonds , and social security as determined by the Owner, plus a fixed fee to be agreed upon but not to exceed 10% of the actual cost of such extra work. The fixed fee is not to include any additional profit to the Contractor for rental of equipment owned by him and used for the extra work. The fee shall- be full and complete compensation to cover the cost of superintendence, overhead, other profit, general and all other expense not included in (1) , ( 2 ) , ( 3 ) , and ( 4 ) above. The Contractor shall keep accurate cost records on the form and in the method C4-4 ( 2 ) suggested by the Owner and' shallgive the Owner access to all accounts , bills , vouchers , and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved and signed by each of the Contracting parties. No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner . In case any orders or instructions, either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation, he shall make written request to the Engineer for written orders authorizing such Extra Work , prior to beginning such work. � \ Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof , and the 1 Engineer insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep an accurate account of the actual reasonable cost thereof as provided under method ( Item C ) . Claims for extra work will not be paid unless the Contractor shall file his claim with the Owner within- five ( 5 ) days before the time for making the first estimate after such work is done and unless the claim is supported by satisfactory j vouchers and certified payrolls covering all labor and materials expended upon the said Extra Work. j The .Contractor shall furnish the Owner such installation J records of all deviations from the original Contract Documents as may be necessary to enable the Owner to- prepare for permanent record a corrected set of plans showing the actual installation. The compensation - agreed upon for ' extra work' whether or not y� iniitiated by a 'change order ' shall be a full, complete and I final payment for all costs Contractor incurs as a result or relating to the change or extra work, whether said costs are known, unknown, foreseen or unforeseen at that time, including I without limitation, any costs for delay, extended overhead, ripple or impact cost , or any other effect on changed or Iunchanged work as a result or the change or extra work. C4-4 . 6 - SCHEDULE OF OPERATIONS:- Before commencing any work under this contract, the Contractor shall submit to the Owner and receive the Owner ' s- approval thereof, a-"Schedule -of +, Operations ; " showing by a straight line method the date of- commencing and finishing each of the major elements of the contract . There shall be also shown the estimated monthly cost of work for which estimates are to be expected. There C4-4 (3 ) shall be presented also a composite graph showing the anticipated progress of construction with the time being plotted horizontally and the percentage of completion plotted vertically. The progress charts shall be prepared on 8-1/2" x 11" sheets and at least five black or blue line prints shall be furnished to the Owner. C4-4 . 7 PROGRESS SCHEDULES FOR WATER .AND. SEWER PLANT FACILITIES: Within ten (10T da-ys .prior- to - submission of first monthly progress payment , the Contractor shall prepare and submit to the Owner for approval six copies of the schedule in which the Contractor proposes to carry on the work, the. date of which he will start the several major activities ( including procurement of materials, plans, and equipment) and the .contemplated dates for completing the same. The schedule shall be in the form of a time schedule Critical Path .Method (CPM) network diagram. As the work progresses, the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or. at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer. , Three copies of the updated schedule shall be delivered at such intervals as directed by the Owner. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications. Prior to the final drafting of the detailed construction schedule, the Contractor shall review the draft schedule with the Engineer to ensure the Contractor's understanding of the contract requirements. The -following guidelines shall be adhered to in preparing the construction schedule: a. Milestone dates and final project completion dates shall be developed to conform to time constraints , sequencing requirements and completion time. b. The c.onstruction process shall be divided into activities with time durations of approximately fourteen (1.4 ) days and construction values not to exceed $50 , 000 . Fabrication , delivery au.c3.., submittal activities - are exceptions to this guideline. C4-4 (4) f C. Durations shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the duration of each activity. d. One critical path shall be shown on- the construction schedule. e. -'Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. f. Thirty days shall be used for submittal review unless otherwise specified. The construction schedule shall as a minimum be divided into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen (14) days duration. I For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that fdllow the guidelines of this Section. For each of the trades or subcontracts, the construction schedule shall indicate the following procurements , construction and preacceptance activities and events in their logical sequence for equipment and materials. ;( 1. Preparation and transmittal of submittals. 2. Submittal review periods. I3 . Shop fabrication and delivery. I 4. Erection or installation. l 5. Transmittal of manufacturer ' s operation and maintenance instructions. 6. Installed equipment and materials testing. 7. Owner' s operator instruction (if applicable) . 8. Final inspection. C4-4 (5 ) I I R 9 . Operational testing. 10. Final inspection . If , in the opinion of the Owner , work accomplished falls behind that scheduled , the Contractor shall take such action as -necessary to improve his progress. In addition, the Owner• may require the Contractor to- submit a revised schedule -demonstrating-- hi"s program and proposed plan to make up lag in scheduled progress and to insure completion of the work within the contract time. If the Owner finds the proposed plan not acceptable , he may require the Contractor to increase the work force, the construction plant and equipment , the number of work shifts or the overtime operations without additional cost to the Owner. Failure of the Contractor to comply with these requirements shall be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time specified. C4-4 ( 6) 1 I - PART C - GENERAL CONDITIONS C5-5 CONTROL OF WORK AND MATERIALS SECTION C5-5 CONTROL OF WORK AND MATERIALS C5-5. 1 AOTHORITY .OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents. He shall decide all questions which arise as to the quality and acceptability of materials furnished , work performed, rate of progress of the work, overall sequence of the construction,* interpretation of the Contract Documents , acceptable fulfillment of the contract, compensation, mutual rights between Contractor and Owner .under these Contract Documents, supervision of the work, resumption of operations, and all other questi-ons or disputes which may arise . Engineer will not be responsible for Contractor ' s means , methods , techniques , sequences or procedures of construction, or the safety precaution and programs incident { thereto, and he will not be responsible for Contractor' s failure to perform the -work in accordance with the contract documents. He shall determine the amount and quality of the work completed and materials furnished, and his decisions and estimates shall be final. His estimates in such event shall li be- a condition to the right of the Contractor to receive money due him under the Contract . The Owner shall have executive authority to enforce and make effective such necessary decisions and orders as the Contractor fails to carry out promptly. In the event of any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters, the Engineer must, %ithin .a 'reasonable time, upon written request of the Contractor, render and deliver to both the Owner and Contractor, a written -decision on the matter in controversy. C5-5. 2 CONFORMITY WITH PLANS: The finished project in all cases shall conform with lines , grades , cross-sections , finish , and dimensions shown on the plans or any other requirements otherwise described in the Contraot Documents . Any deviation from the approved Contract Documents required by the Engineer during construction will in all case•&,• b-e- determined by the Engineer and authorized by the Owner by i Change Order. 1 C5-5 (1) 1 These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay . Such stakes or markings as may be established for the Contractor ' s use or guidance shall be preserved by the Contractor until he is authorized by the Engineer to remove them. Whenever, in the opinion of the Engineer, any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees , the full cost of replacing such stakes or marks plus 25% will be charged against- the, Contractor; -arid��the: full amount will be deducted from payment due the Contractor. C5-5 . 8 AUTHORITY AND DUTIES OF CITY INSPECTORS : City Inspectors will be authorized to inspect all work done and to be -done and all materials furnished. Such inspection may extend to all or any part of the work, and the preparation or manufacturing of the materials to be used or equipment to be installed. A City Inspector may be stationed on the work to report to the Engineer as to the progress of the. work and the manner in which it is being performed, to report any .evidence that the materials being furnished or' the work being performed by the Contractor fails to fulfill the requirements of the Contract Documents , and to call the attention of the Contractor to any such failure or other infringements. Such inspection or lack of inspection will not relieve the Contractor from any obligation to perform the work in accordance with the requirements of the Contract Documents . In case of any dispute arising between the Contractor and the City Inspector as to the materials or equipment furnished or the manner of performing the work, the City Inspector will .have authority to reject materials or equipment to suspend work until the question at issue can be referred. to and be decided by the Engineer . The City Inspector will not , however, be authorized to revoke, alter, enlarge, or release any requirement of these Contract Documents, nor to approve or accept any portion or section of the work, nor to issue any instructions contrary to the requirements of the Contract Documents. He will in no case act - as superintendent or foreman or perform- any other duties for the Contractor, or interfere with the management or operation of the work. He will not accept from the Contractor any compensation in any form for performing any duties. The Contractor shall regard and obey the directions and instructions of the City Inspector or Engineer when the same are consistent with the obligations of the Contract Documents , provided, however-, should the Contractor object to any orders or instructions of the City Inspector, the Contractor may within six days make written appeal to the Engineer for his decision on the matter in controversy. C5-5 (4 ) r C5-5 . 9 INSPECTION: The Contractor shall furnish the Engineer l with every reasonable facility for ascertaining whether or not the work as performed is in accordance with the requirements of the Contract Documents . I£ the Engineer so requests , the Contractor shall, at any time before acceptance of the work, remove or uncover such portion of the finished work as may be directed. After examination, the Contractor shall restore said -portions of the work to the standard required by the I Contract -Documents. 1 Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but should be work so exposed or -e.xamined prove to be unacceptable, the uncovering or removing and the replacing of all adjacent defective. or damaged parts shall be at the Contractor ' s expense. No work shall be done or materials. used I without suitable supervision or inspection. 1 C5-5 . 10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work, materials , or equipment which has been rejected shall be remedied . or removed -and replaced in an acceptable manner by the Contractor at his own expense. Work done beyond the lines and grades given or as shown on the plans, except as herein j specifically provided, or -any Extra Work done without written authority, will be considered as unauthorized and done at the expense of the Contractor and witl . not be paid for by the I Owner . Work so done may be ordered removed at the Contractor ' s expense. Upon the failure on the part of the Contractor to comply with any order of the Engineer made under the provisions of this paragraph , the Engineer will have the author-ity to cause defective work to be- remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted from any money due or to become due to the Contractor . Failure to -require the removal of any defective or unauthorized work shall not constitute acceptance of such works. 11 C5 - 5 . 11SUBSTITUTE MATERIALS OR EQUIPMENT : If the Specifications , - law, ordinance,. codes or regulations permit 1 Contractor to furnish or use a substitute that is equal to any material or equipment specified, -and if Contractor wishes to furnish or use a proposed substitute, he shall, prior to the i preconstruction conference, make written application t.o ENGINEER for approval of such substitute certify3.ng in writing that the proposed substitute will perform adequately the functions called for by the general design, be similar and of equal substance to that specified and be suited to the same use and capable of performing the same function as that specified; and identifying all variations of the proposed i C5-5 (5) FT. WORTH, TEX. substitute from that specified and indicating available maintenance service . No substitute shall be ordered or installed without the written approval of Engineer who will be the judge of the equality and may require Contractor to furnish such other data about the proposed substitute as he considers pertinent . No substitute shall be ordered or installed without such performance guarantee and bonds as Owner may require which shall be furnished at Contractor ' s expen-s-e., Contractor-- shall - indemnify and hold -harmless Owner and Engineer and anyone directly or indirectly employed by either of them from and against the claims , damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. C5-5 . 12 SAMPLES AND TESTS OR MATERIALS: Where, in the opinion of the Engineer, or as called for in the Contract Documents , tests of materials or equipment are necessary, such tests will be made at the expense of and paid for direct to the testing agency by the Owner unless otherwise specifically provided. The failure of the Owner to make any tests of materials shall be in no way relieve the Contractor of his responsibility of furnishing materials and equipment fully conforming to the requirements of the Contract Documents. Tests and sampling . of' materials , unless otherwise specified , will be made in accordance with the latest methods prescribed by the American Society for Testing Materials or specific requirements of the Owner. The Contractor shall provide such facilities as. the Engineer may require for collecting and forwarding samples and shall not , without spec.ific written permission of the Engineer, use the materials represented by the samples until tests have been made and the materials approved for use. The Contractor will furnish adequate samples without charge to the Owner. In case of concrete , the aggregates, design minimum, and the mixing and transporting equipment shall be approved by the Engineer before any concrete is placed, and -the Contactor shall be responsible for replacing .any concrete which does not meet the requirements of the Contract Documents. Tests shall be made at least 9 days prior to the placing of concrete , using samples from the same aggregate, cement, and mortar which are to be used later in the concrete. Should the source of supply change, new tests shall be made prior to the use of the new materials. C5-5 . 13 STORAGE OF MATERIALS: All materials which are ta._he, used in the construction operation shall be stored so as to insure the preservation of the quality and fitness of the work. When directed by the Engineer, they shall be placed on wooden platforms 'or other hard, clean durable surfaces and not on the C5-5 (6 ) ground, and shall be placed under cover when directed. Stored materials shall be placed and located so as to facilitate prompt inspection. C5-5 . 14 EXISTING STRUCTURES AND UTILITIES: The location and dimensions shown on the Plans relative to existing utilities are based on the best information available. Omission from, or f the inclusion of utility locations on the Plans is not to be 1 considered as the nonexistence of, or a definite location of, existing _underground utilities-. The location of many gas mains, water mains, conduits , sewer lines and service lines 1 for all utilities, etc. , is unknown to the Owner , and the Owner assumes no responsibility for failure to show any or all such structures and utilities on the plans or to show them in their exact location. It is mutually agreed that such failure will not be considered sufficient basis for claims for -additional compensation for Extra Work or for increasing the pay quantities in any manner whatsoever, unless an obstruction { encountered is such as to necessitate changes in -the lines and grades of considerable magnitude or requires the building of special works, provision for which is not made in the Contract f Documents , in which case the provision in these Contract 1 Documents for Extra Work shall apply. It shall be the Contractors responsibility to verify locations ` of adjacent and/or conflicting utilities sufficiently in advance of construction in order -that he may negotiate such local adjustments as necessary in the-construction process to provide adequate clearances. The Contractor shall- take all necessary precautions in order to protect all existing utilities , structures and ' service lines . Verification of existing utilities, structures and service lines shall include notification of -all utility companies at least. f orty eight (48) hours in advance of construction including exploratory excavation if necessary . All verification of existing j utilities and their adjustment shall be considered as subsidiary work. IC5-5.15 INTERRUPTION OF -SERVICE: a. Normal Prosecution: In the normal prosectuion . of i( work where the interruption of service is necessary, the Contractor, at least 24 hours in advance, shall I be required to: I _ 1. Notify the Water Department ' s Distribution Division as to location, time, and schedule -o-f !( service interruption. I I, C5-5 (7 ) I 2. Notify each customer personally through responsible personnel as to time and schedule of the interruption of their service, or 3. In the event that personal notification of a customer cannot be made, 'a prepared tag form shall be attached to the customer ' s entrance door knob . The tag shall be durable in composition-,. and. in. -large. bold -.type shall. say: "NOTICE" Due to Utility Improvement in your neighborhood, your (water) (sewer) service will be inter- rupted on between the hours of and This inconvenience will be as short as- possible. Thank you, Contractor = Address Phone b. Emergency: In the event that an unforeseen service interruption occurs , notice shall be as above,but immediate. C5-5. 16 MUTUAL RESPONSIBILITY OF CONTRACTORS: If, through acts or- neglect on the part of the Contractor ,. any other Contractor or any sub-contractor shall suffer loss or damage on the work, the Contractor agrees to settle with such other Contractor or sub-contractor by agreement or arbitration.- If _ such other Contractor or sub-contractor shall assert any claim against the Owner on account of any damage alleged to have been sustained, the Owner will notify the Contractor , who shall indemnify and save harmless the Owner against any such claim. C5-5. 17 CLEAN-UP: Clean-up of surplus and/or waste materials accumulated on the job site during the prosecution of the work under these Contract Documents" shall be accomplished in keeping with a daily routine established to the the satisfaction of the Engineer . Twenty-fours fours after written notice is given to .the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the Engineer', if the Contractor fails to correct the C5-5 (8) unsatisfactory procedure, the City may take such direct action 1 as the Engineer deems appropriate to correct the clean-up deficiencies cited . to the Contractor in the written notice, and the costs of such direct action, plus 25% of such costs , I shall be deducted from monies due or to become due to the Contractor. Upon the completion of the project as a whole as covered by 1 these Contract Documents , and before final acceptan-ce and final payment will be made, the Contractor shall clean and remove from the site of the project all surplus and discarded materials, temporary structures, and debris of every kind. He shall leave the site of all work in a neat and orderly condition equal to that which originally existed. Surplus and waste materials removed from the site of the work shall be disposed of at locations satisfactory to the Engineer. The Contractor shall thoroughly clean all equipment and materials l installed by him and shall deliver over such materials and 1 equipment in a bright, clean , polished and new appearing condition . No extra compensation will be made to the Contractor for 'any clean-up required on the project. C5-5. 18 FINAL INSPECTION: Whenever the work provided for in and contemplated under the Contract Documents has been satisfactorily completed and final cleanup performed, the Engineer will notify the proper offiials of the Owner and c request that the Final inspection- be made. Such inspection will be made within 1.0 days after such notification . After such final inspection, if the work and materials and equipment are found satisfactory, the Contractor will be notified in writing of the acceptance of the same after the proper resolution has been passed by the City Council . No time charge will be made against the Contractor between said date of notification of the Engineer and' the date of f inal inspection of the work. �I C5-5 (9) i 1 1 PART C - GENERAL CONDITIONS L_ C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY SECTION C6-6- LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 LAWS TO BE OBSERVED: The Contractor shall at all times 1 observe and comply with all Federal and State Laws and City ordinances and regulations which in any way affect the conduct of the work or his operations , and shall observe and comply with all .orders, laws, ordinances and regulations which exist or which may be enacted later by bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or .ignorance thereof will be considered-. The Contractor and his Sureties shall indemnify and save harmless the City and all of its officers , agents, and employees against any and all claims or liability arising from or based on the violation of any such law, ordinance, regulation, or order, whether it be by himself or his employees. C6-6 . 2 PERMITS AND LICENSES: The Contractor shall procure all permits and licenses, pay all charges, costs and fees, and give all notices necessary and incident to. the due and lawful I prosecution of the work. C6-6 . 3 PATENTED DEVICES, MATERIALS AND PROCESSES: If the Contractor is required or desires to use any design, device, material, or process covered by letter, patent, or copyright, he shall provide for such use by suitable legal agreement with the patentee or owner of such patent, letter, or copyrighted design. It is mutually agreed and understood that without exception the contract prices shall include all royalties or cost arising from patents, trade-marks, and copy rights in- any way involved in the work. The Contractor and' his sureties shall indemnify and save harmless the Owner from any and all claims for infringement by reason of the use of any - such patented design , device , material or process , or any I trade-mark or copy right in connection with the work agreed to be performed under these Contract Documents , and shall indemnify the Owner for any cost, expense, or damage which. it may be obliged to pay by reason of such infringement at any I time during the prosecution of the work or after completion of the work_, provided, however, that the Owner will assume the responsibility to defend any and all suits brought -for the infringement of any patent claimed to be infringed- upon by' the design , type of construction or material or equipment specified in the. Contract Documents furnished the Contractor- by the Owner , and to hold the Contractor harmless on account of such suits. l C6-6 (1 ) C6-6 . 9 SANITARY PROVISIONS: The Contractor shall establish and enforce among his employees such regulations in regard to cleanliness. and disposal of garbage and waste as will tend to prevent the inception and spread of infectious or contagious diseases and to effectively prevent the creation of a nuisance- about uisanceabout the work on any property either public or private, and such regulations as are required by Law shall be put into immediate force and effect by the Contractor . The necessary sanitary conveniences for- use of laborers on the work , properly secluded from public observation , shall be constructed and maintained by the Contractor and their use shall be strictly enforced by the Contractor . All such facilities shall be kept in a clean and sanitary condition, free from objectionable odors so as not to cause a nuisance. All sanitary laws and regulations of the State of Texas and the City shall be strictly -complied with. C6-6. 5 PUBLIC SAFETY AND CONVENIENCE: Materials or equipment stored about the work shall be so placed and used, and the work shall at all times be so conducted , as to cause no greater obstruction or inconvenience to the public than .is considered to be absolutely necessary by the Engineer. The Contractor is required to maintain at all times all phases of his work in such a manner as not to impair the safety or convenience of the public, including ti but not limited to, safe and convenient ingress and egress to property contiguous to the work area. The -Contractor shall make adequate provisions to render reasonable ingress and egress for normal vehicular ' traffic, except during actual trenching or pipe installation' operations , at all driveway crossings . Such provisions may include bridging, placement of crushed stone or gravel or such other means of providing proper ingress and egress for the property served by the driveway as the Engineer may approve as appropriate.. Such other means may include the diversion of driveway traffic, with specific approval by the Engineer. ' If diversion of traffic is approved by the Engineer at -any location, the Contractor shall make arrangements satisfactory to the Engineer at any location, the Contractor shall make arrangements satisfactory to the Engineer for the diversion of traffic_, and shall, at his own expense, provide all materials and perform all, work necessary for the construction and maintenance of roadways and bridges for such diversion of traffic. Sidewalks must not be obstructed except by special permission of the Engineer. - The materials excavated and the construction materials- sual as, pipe used in the construction of the work shall be placed so .as not to endanger the work or prevent free access to all fire hydrants, fire alarm boxes, police call boxes , water valves , C6-6 (2) 1 gas valves , or manholes in the vicinity. The Owner reserves the right to remedy any neglect on the part of the Contractor as regards to public convenience and safety which may come to its attention , after twenty-four hours notice in writing to the Contractor , save in cases of emergency when it shall have the right to remedy any neglect without notice, and in either case, the cost of such work done or materials furnished by the Owner or by the City shall be deducted from monies due or to become due to the Contractor. The Contractor , after approval of the Engineer, shall notify 1 the Fire Department Headquarters, Traffic Engineer , and Police Department, when any street or alley is requested to be closed or obstructed or any fire hydrant is to be made inaccessible , and, when so directed by the Engineer, shall keep any street, streets, or highways in condition for unobstructed use by fire apparatus . The Contractor shall promptly notify the Fire Department Headquarters when all such obstructed streets , alleys, or hydrants are again placed back in service. Where the Contractor is required to construct temporary bridges or make other arrangements for crossing over ditches or streams, his responsibility for accidents in connection with such crossings shall include the roadway approaches as 'i well as the structures of such crossings. The Contractor shall at all times- conduct his operation- and the use of construction machinery so as not to damage or destroy trees and shrubs located in close proximity to or on the site of the work. Wherever any such damage may be done, the - Contractor shall immediately satisfy all claims of property owners, and no payment will be made by the Owner in f settlement of such claims. The Contractor shall file with the Engineer a written statement showing all such claims adjusted. C6-6 . 6 PRIVILEGES OF CONTRACTOR IN STREETS, ALLEYS, AND RIGHT-OF-WAY: For the performance of the contract, the Contractor will be permitted to use and occupy such portions �I of- the public streets and alleys., or other public places. or other rights-of-way_ as provided for in the ordinances of the City , as shown in the Contract Documents , or as may be 1� specifically authorized in writing by the Engineer . A reasonable amount of tools, materials , and equipment for construction purposes may be stored in such space, but- no more than is necessary to avoid delay in the c-onstruction foperations. Excavated and waste materials shall be piled or stacked in such a way as not to interfere with the use of spaces that may ,be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. If the street is occupied by railway tracks, the work shall be 1 1 C6-6 (3) I� I I carried on in such manner as not to interfere with the operation of trains, loading or unloading of cars, etc. Other contractors of the Owner may, for all purposes required by the contract , enter upon the work and premises used by the Contractor and shall be provided all reasonable facilities and assistance for the completion of adjoining work . Any additional grounds desired by the Contractor for his .use shall be provided by him at his own cost and expense. C6-6. 7 RAILWAY -CROSSINGS: When the work encroaches upon any right-of-way :of any railway , the City will secure the necessary easement for the work. Where the. railway tracks are to be crossed , the Contractor shall observe- all the regulations and instructions of the railway company as to the methods of performing the work and take all precautions for safety of property and the public. Negotiations with the railway companies for permits shall be done by and through the City. The Contractor shall give the City notice not less than five days prior to the time of his intentions to begin work on that portion of the project which is related to the railway properties . The Contractor will not be given extra or additional compensation for such railway crossings unless specifically set forth in the Contract Documents. C6-6 . 8 BARRICADES WARNINGS AND WATCHMEN: Where the work is carried on in or adjacent to any street, alley, or public place, the Contractor shall at his own expense furnish, erect, and maintain such barricades , fences , lights and danger signals,. shall provide such. watchmen, and shall take all such other precautionary measures for the protection of persons or property and of the work as are necessary. Barricades and fences shall be painted in a color that. will be visible at night. From sunset to sunrise the Contractor shall furnish. and maintain at least one- easily visible burning light at each barricade.. A sufficient number of -barricades shall be erected -and maintained to keep pedestrians away from, and vehicles from being driven on or into, any work under construction or being maintained. The Contractor shall furnish watchmen and keep them at their respective assignments in sufficient numbers to protect the work and prevent accident or damage. All 'installations and procedures shall be consistent with the provisions set forth in the "1980 Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways" , codified as Article 6701d Veron's Civil Statutes, pertinent. sections being Section Nos. 27 , 29 , 30 and 31. C6-6 (4) a I The Contractor will not remove any regulatory sign , instructional sign, street name sign, or other sign which has been erected by the City. If it is determined that a sign must be removed to permit required construction , the Contractor shall contact the Transportation and Public Works department , Signs and Markings Division ( phone number 8780-8075 ) , to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above referenced manual and such temporary sign must be installed I prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required' specifications , the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be re-installed, the Contractor shall again contact the Signs and Markings Division to re-install the 1 permanent sign and shall leave his temporary sign in place 1 until such re-installation is completed. The Contractor will be held responsible for all damage to the { work or the public due to failure of barricades , signs , fences , lights , or watchmen- to protect them . Whenever evidence is found of such damage to the work the Engineer may order the damaged portion immediately removed and replaced by t the Contractor at the Contractor ' s own expense . The Contractor ' s responsibility for theme maintenance of barricades, signs, fences and lights, and for providing watchmen -shall not { cease until the project shall have been completed and accepted ! by the Owner. No compensation , except as specifically provided in these Contract Documents, will be paid to the Contractor for the 9 work and materials involved in ' the constructing , providing, and maintaining of barricades , signs , fences, and lights or for salaries of watchmen , for the subsequent removal and disposal of such - barricades , signs , or for any other- incidentals necessary for the proper protection, safety, *and convenience of the public during the contract period, as this work is considered to be subsidiary to the several items for j which unit .or lump sum prices are requested in the Proposal. l � C6-6 . 9 USE OF EXPLOSIVES , DROP WEIGAT, ETC. : Should the Contractor elect to use explosives, drop. weight, etc. , in the # prosecution of the work, the- utmost care shall bt exercised at all times so as not to endanger life or property . The Contractor shall notify the proper representative of any public service corporation , any company, individual , or ! utility, and the Owner, not less than twenty-four hours in C6-6 (5) advance of the use of any activity which might damage or endanger their or his property along or adjacent to the work. Where the use of explosives is to be permitted on the project, as specified in the Special Contract Documents, or the use of explosives is requested, the Contractor shall submit notice to the Engineer in writing twenty-four hours prior to commencing and shall furnish evidence that he has insurance coverage to protect against any damages and/or injuries arising out of such use of' explosives. All claims arising out of the use of explosives shall be investigated and a written report- made by -the Contractor ' s insurers to the - Engineer -within ten (10) days after receipt of written notice of the claim to the Contractor from either the City or the claimant . The City shall proceed to give notice to the Contractor of any such claim. The use of explosives may be suspended by the Engineer if any complaint is received and such use shall not be resumed until the cause of the complaint has been addressed. Whenever explosives are stored or kept, they shall be stored in a safe and secure manner and all storage places shall be plainly marked "DANGEROUS. EXPLOSIVES" and shall be under the care of a competent watchman at all times. All vehicles in which_ explosives are being transported' shall be plainly marked as mentioned above and shall, insofar as possible, not use heavy traffic routes. C6-6 . 10 WORK WITHIN EASEMENTS: Where the work passes over, through, or into private property, the Owner will provide such right-of-way or easement privileges as the City may deem necessary for the prosecution of -the work. Any additional rights-of-way or work area considered necessary by the Contractor shall be provided by him at hi*s own expense. Such additional rights-of-way or work area shall be acquired for the benefit of the City. The City shall be notified in writing as to the rights so acquired before work begins -in the affected area. The Contractor shall not enter upon private property for any purpose without having previously obtained permission from the owner of such property. The Contractor will not be allowed to store equipment or material on private property unless and until the specified 'approval of the property- owner: h-a-s- been secured in writing by the Contractor and a copy furnished to the Engineer . Unless specifically provided otherwise , the Contractor shall clear all rights-of-way or easements of obstructions which must:-- be- removed to make possible proper prosecution of the work as a part of the project construction operations. The Contractor shall be responsible for the preservation of and shall use C6-6 (6) 1 every precaution to prevent damage to all trees , shrubbery, plants, lawns, fences, culverts, curbing , and all other types of structures or improvements , to all water, sewer, and gas I lines, to all conduits, overhead pole lines, or appurtenances thereof , including the construction of temporary fences, and - to nd _to all other public or private property along adjacent to the work. . The Contractor shall notify the proper representatives of I owners or. occupants of public or private lands or interest in lands which might- be affected by the work. Such notice shall be made at least 48 hours in advance of the beginning of the work_ Notices shall be applicable to both public and private utility companies or any corporation, company, individual; or other, either as owners or occupants , whose land or interest in land might affected by the work. The Contractor shall be responsible for all damage or injury to property of- any character- resulting from any act , omission , neglect, or misconduct in the manner or method or execution of the work, or at any time due to defective work, material, or equipment. -When and where any direct or indirect or injury is done to. _ public or private property on account of any act, omission, neglect, or misconduct in the execution - of the work, or in t consequence of the non-execution thereof on the part of the Contractor, he shall restore or have restored at his own cost J and expense such property to a condition at least equal to l that existing before such damage or injury was done, by repairing, rebuilding, or otherwise replacing and restoring as I may be directed by the Owner , or he shall make good such damages or injury in a manner acceptable to the owner of the property and the Engineer. All fences encountered and removed during construction of this project shall be restored to the original or - a better than original condition upon completion of this project. When wire fencing, either wire mesh or barbed wire is to be crossed, the Contractor shall set cross braced posts on either side of permanent easement before the fence is cut. I Should additional fence.' cuts be necessary, the Contractor shall provide cross braced posts at point of the proposed cut in addition to the cross braced posts provided at the Ipermanent easements limits, before the fence is cut-;- Temporary ut:Temporary fencing shall be erected in place of the fencing removed whenever the work is not in progress and when the I site is- vacated overnight, and/or at all times to prevent livestock from entering the construction area. The cost for fence removal, temporary closures and replacement shall be subsidiary to the various items bid- .in the project C6-6 (7 ) proposal_ Therefore, no separate payment shall be allowed for any service associated with this work_. In case of failure on the part of the Contractor to restore such property to make good such damage or injury, the - Owner may, upon 48 hour written notice under ordinary circumstances, and without notice when a nuisance or hazardous condition results, proceed to repair, rebuild, or otherwise restore such property -as may be determined by the Owner tQ be necessary, and the cost thereby will be deducted from any monies due or to become due to the Contractor under this Contract_ C6-6 .11 INDEPENDENT CONTRACTOR: It is understood and agreed by the parties hereto that Contractor shall perform all work and services hereunder as an independent contractor, and not as an officer, agent, servant or employee of the Owner _ Contractor shall have exclusive control of-' and the exclusive right to control the details of all the work and services performed hereunder, and all persons performing same, and shall be solely responsible for the acts and omissions of its officers , agents , servants-, employees , contractors , subcontractors, licensees and invitees_ The doctrine of respondeat superior shall not apply as between Owner and Contractor, its officers, agents, employees, contractors and subcontractors , and nothing herein shall be construed as creating a partnership or joint enterprise between Owner and Contractor- C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS- Contractor covenants and agrees to and does hereby indemnify, hold harmless and defend, at its own expense, Owner, its officers, agents, servants and employees, from and against any and all claims or suits for property loss or damage and/or personal injury, including death, to any and all persons, of whatsoever kind or character, whether real or asserted, arising out of or in connection with, directly or indirectly, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not caused, in whole or in part, by the alleged negligence of the officers, agents, servants, em llQyees, contractors, subcontractors, licensees and invitees of the- Ci - and said Contractor does hereby covenant and agree to assume all liability and responsibility of City,its officers,agents, servants and employees for any and all claims or suits for property loss or damage and/or personal injury, including death, to any and all persons, of whatsoever kind or character, whether mal or asserted, arising out of or in connection with,directly or indirectly,the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not caused, in whole or in part, by the alleged negligence of the off cers, agents, servants, employees, C6-6 (8 ) I contractors subcontractors licen-sees and invitees of the Ci _ I Contractor likewise covenants and agrees to, and does hereby, indemnify and hold harmless City from and against any and all injuries,damage, loss or destruction to property I of City during the performance of any of the terms and conditions of this Contract, I whether arisin�out of or in connection withor resultingfr_ Iin whole or in part, any and all alleged acts or omissions officers, agents, servants, employees, contractors, subcontractors l censees intvitees of Owner. In the event a written claim for damages against the contractor or its subcontractors remains unsettled at the time all work on the project has been completed to the satisfaction of the Director of the Water Department, as evidenced by a final inspection, final payment to the Contractor shall not be recommended to the Director of the Water Department for a period of 30 days after the date of such final inspection, unless the Contractor shall submit written evidence satisfactory to the Director that the claim has been settled and a release has been obtained from the claimant involved_ If the claims concerned remains unsettled as of the expiration of the above 30-day xP 0 ay period, the Contractor may be deemed to be entitled to a semi-final payment for work completed, such semi-final payment to be in the amount equal to the total dollar amount then due Iess the dollar value of any written claims pending against the Contractor arising out of performance of such work, and such semi-final payment may then be recommended by the Director_ The Director shall not recommend final payment to a Contractor against whom such a 4 claim for damages is outstanding for a period of six months following the date of the acceptance of the work performed unless the Contractor submits evidence in writing satisfactory tot he Director that: ( 1_ The claim has been- settled and a release has been obtained from the claimant involved,or I2_ -Good faith efforts have been made to settle such outstanding claims, and such good faith efforts have failed_ I If condition (1) above is met at an time within the six month period, the Director shall Y P � I recommend that the final payment to the Contractor be made_ If condition(2) above is met Iat any time within the six month period,the Director may recommend that final payment to the Contractor be made_ At the expiration of the six month period, the Director may. C6--6 (9) recommend that final payment be made-if all other work has been performed and all other obligations of the Contractor have been met to the satisfaction of the Director. The Director may, if he deems it appropriate, refuse to accept bids on other Water Department Contract work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract_ (Revision Date:April 15, 1999) C6-6_13 CONTRACTOR'S CLAIM FOR DAMAGES: Should the Contractor claim compensation for any alleged damage by reason of the acts or omissions of the Owner, he shall within three days after the actual sustaining of such alleged damage, make a written statement to the -Engineer, setting out in detail the nature of the alleged damage, and on or before the 25th day of the month succeeding that in which- any such damage is claimed to have been sustained, the Contractor shall file with the Engineer an itemized statement of the details and amount of such alleged damage and, upon request, shall give the Engineer access to all books of account, receipts, vouchers, bills of lading, and other books or papers containing any evidence as to the amount of such alleged damage. Unless such statements shall be filed as hereinabove required, the Contractor's claim for compensation shall be waived, and he shall not be entitled to payment on account of such damages- C6--6.14 amages_C6--6.14 ADJUSTMENT OR RELOCATION OF PUBLIC UTILITIES, ETC. = In case it is necessary to change, move, or alter in any manner the property of a public utility or others, the said property shall not be moved or interfered with until orders thereupon have been 'issuedby the Engineer_ The right is reserved to the owners of public utilities to enter the geographical limits of the Contract for the purpose of making such changes or repairs to their property that may be necessary by the performance of this contract- C6-6--15 ontract_C6-6 _15 TEMPORARY SEWER AND DRAIN CONNECTIONS: When existingr se Er lines have to be taken up or removed, the Contractor, shall, at his own expense and cost, provide and maintain temporary outlets and connections for all private or public drains and sewers_ The Contractor shall also take care of all sewage and drainage which will be received from these drains and sewers , and for this purpose he shall provide and maintain, at his own cost and . expense , adequate pumping facilities and temporary outlets or diversions_ The Contractor, at his own cost and expense, shall construct such troughs, pipes, or other Structures necessary, and be Prepared at all times to dispose of drainage and sewage C6-6 (10) I received from these temporary connections until such times as the permanent connections are built and are in service. The existing sewers and connections shall be kept . in service and maintained under the Contract , except when specified or 1 ordered to be abandoned by the Engineer. All water, sewage, and other waste shall be disposed of in a satisfactory manner so that no nuisance is created and so that the work under Iconstruction will be adequately protected., C6-6 . 16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE CITY: When the Contractor desires to use City water in connection with any construction work, he shall make complete I and satisfactory arrangements with the Fort Worth City Water Department for so doing. City water furnished to the Contractor shall be delivered to the Contractor from a connection on an existing City main . All piping required beyond the point of delivery shall be installed by the Contractor at * his own expense. The Contractor ' s responsibility in the use of all existing fire hydrant and/or valves is detailed in Section E2-1. 2 USE OF FIRE HYDRANTS AND VALVES in these General Contract Documents. IWhen meters are -used to measure the water , the charges, if =7 any, for water will be at the regular established rates. When meters are not used , the charges , if any , will be as prescribed by the City Ordinance , or where no ordinance applies , payment shall be made. on estimates and rates established by the Director of the Fort Worth Water Department. C6-6 .17 USE OF A SECTION OR PORTION OF THE WORK: Whenever, in + the opinion of the Engineer, any section or portion of the Iwork or any structure is in suitable condition, it may be -put into use upon the written order of the Engineer , and such usage shall not be held to be in any way an acceptance of said I work or structure or any part thereof or as a waiver of any of the provisions of these Contract Documents. All necessary repairs and removals of any section of the work so put into I use, due to defective materials or workmanship, equipment, or to deficient operations on the part of the Contractor, shall { be performed by the Contractor at his own expense. fl C6-6 . 18 CONTRACTOR ' S RESPONSIBILITY FOR THE WORK: Until written acceptance by the Owner as provided for in these Contract Documents , the work shall be under the charge and care of the Contractor, and he shall take every necessary precaution to prevent injury or* damage to the work or any part C6-6 (11) thereof by action of the elements or from any cause whatsoever, whether arising from the execution or nonexecution of the work. The Contractor shall rebuild, repair, restore, and make good at his own expense all injuries or damage to any portion of the work occasioned by any of the hereinabove causes. C6-6. 19 NO WAIVER OF LEGAL RIGHTS: Inspection by the Engineer or any order by the Owner by payment of money or any payment for or acceptance- of any work, or any 'extension of time, or any possession taken by the City shall- not operate as a waiver of any provision of the Contract Documents. Any waiver of any breach or Contract shall not be held to be a waiver of any other or subsequent breach. The Owner reserves the right to correct any error that may be discovered in any estimate that may have been paid and to adjust the same to meet the requirements of the Contract Documents. C6-6. 20 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In carrying out the provisions of these Contract Documents or in exercising any power of authority granted thereunder, there shall be no liability upon the authorized representatives of the Owner, either personally or otherwise as they are agents and representatives of the City. C6-6 . 21 STATE SALES, TAX: On a contract awarded by the City of Fort Worth, an. organization which qualifies f.or exemption pursuant the provisions of Article 20 . 04 (H) of the Texas Limited Sales, excise, and Use Tax Act , the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in 'the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller ' s Ruling . 007 . Any such exemption certificate issued by the Contractor in lieu of the tax shall be subject to and shall comply with the provisions of State Comptroller's Ruling . 011 , and any other applicable State Comptroller rulings pertaining to the Texas Limited Sales, Excise, and Use Tax Act. On a contract awarded by a developer- for the construction of a publicly-owned improvement in a street right-of-way or other easement which has been dedicated to the public and the City of Fort Worth, an organization which qualifies for exemption pursuant to the provisions of Article 20.04 (H) of the. ThXas limited Sales, Excise, and Use Tax Act, the Contractor can probably be exempted in the same manner stated above. C6-6 (12) l Limited Sale, Excise and Use Tax permits and information can 1 be obtained from: 1 Comptroller of Public Accounts 1 Sale Tax Division Capitol Station Austin, TX I 1 it i I t I ;l it C6-6 (13) I I I . PART C - GENERAL CONDITIONS J C7-7 PROSECUTION AND PROGRESS SECTION C7-7 PROSECUTION AND PROGRESS: C7-7. 1 SUBLETTING: The Contractor shall perform with his own organization, and with -the assistance of workman under his immediate. super intendance, work of a value of not less than fifty (50%) percent of the value embraced in the contract. If i the Contractor sublets any part of the work to be done under I these Contract Documents, he- will not under any circumstances be relieved of the responsibility and obligation assumed under r these Contract Documents . All transactions of the Engineer I will be with the Contractor . Subcontractors will be considered only in the capacity of employees or workmen of the Contractor and shall be- subject to the same requirements as to I character and competency. The Owner will not recognize any I subcontractor on the work. The Contractor shall at all times; when the work is in ' operation, be represented either in person J or by a superintendent or other designated representatives. l C7-7 . 2 ASSIGNMENT OF CONTRACT : The Contractor shall not _-- assign, transfer, sublet, convey, or otherwise dispose of the contract or his rights , title, or interest in or to the same _. or any part thereof without the previous consent of the Owner expressed by resolution of the City Council and concurred in by the Sureties. If the Contractor does, without such previous consent, assign, transfer, sublet, convey, or otherwise dispose of the contract or his right, title, or interest therein or any part thereof, to any person or persons , partnership , company , firm, or. corporation, or does by bankruptcy, voluntary or involuntary, or by assignment under the insolvency laws of any state , attempt to dispose of the contract may, at the option of the Owner be revoked and annulled, unless the Sureties shall I successfully complete said contract, and in the event of any such revocation or annulment, any monies- due or to become due under or by virtue of said contract shall be retained by the Owner as liquidated damages for the reason that it would be impracticable and extremely difficult to fix the actual `damages. C7-7 . 3 PROSECUTION" OF THE WORK: Prior to beginning any construction operation, the Contractor shall submit to the Engineer in five or more copies, if requested by the Engineer, a progress schedule preferably in chart or diagram form, or a- brief outlining in detail and step by step the- manner of II� C7-7 (1) prosecuting the work and ordering materials and equipment which he expects to follow in order to complete the project in the scheduled time . There shall also •be submitted a table of estimated amounts to be earned by the Contractor during each monthly estimate period. The Contractor shall commence the work to be performed under this contract within the time limit stated in these Contract Documents and shall conduct the work in -a continuous manner and with sufficient equipment, materials , and labor "as is necessary to insure its completion within the time limit. The sequence requested of all construction operations shall be at all times as specified in the Special Contract Documents . Any deviation from scuh sequencing shall be submitted to the Engineer for his approval. Contractor shall not proceed with any deviation until he has received written approval from the Engineer . Such specification or approval by the Engineer shall not relieve the Contractor from the full responsibility of the complete performance of the Contract. The contract time may changed only as set forth in Section C7-7.8 "Extension of Time of Completion" of this Agreement, and a progress schedule shall not constitute a change in the contract time. C7-7 . 4 LIMITATIONS OF OPERATIONS: The working operations shall at all times be conducted by the Contractor so as to create . a minimum amount of inconvenience to the public. At any when, in the judgment of the Engineer, the Contractor has obstructed or closed or is carrying on operations in a portion of a street or public way greater than - is necessary for the proper execution of the work, the Engineer may require the Contractor to finish the section on which operations are in progress before the work is commenced on any additional section or street. C7-7. 5 CHARACTER OF WORKMEN AND EQUIPMENT: Local labor shall be used by the Contractor is available. The Contractor may bring in from outside the City of Fort Worth his key men and his superintendent. All other workmen, including equipment operators , may be imported only after the local supply is exhausted . The Contractor shall employ only such superintende:nts , foremen , and workmen who are careful , competent, and fully qualified to perform the duties or tasks assigned to them, and the Engineer may demand and secure the summary dismissal of any person or persons employed by tive, Contractor in or about or on the work who, in the opinion of the Owner , shall misconduct himself or be found to be incompetent , disrespectful , intemperate, dishonest, or C7-7 (2 ) otherwise objectionable or neglectful in the proper performance of his or their duties, or who neglects or refuses to comply with or - carry out the directions of the Owner, and such person or persons shall not be employed again thereon Iwithout written consent of the Engineer. All workmen shall have sufficient skill , ability, and I experience to properly perform the work assigned to them and operate any equipment necessary to properly carry out the performance- of the assigned duties. The Contractor shall furnish and maintain on the work all such equipment as is considered to be necessary for prosecution of the work in an acceptable manner and at a satisfactory rate of progress . - All equipment , tools , and machinery used for handling materials and executing any part of the work shall be , subject to the approval of the Engineer and shall be maintained in a satisfactory, - safe and efficient working condition. Equipment on any portion of the work shall be such that no injury to the work, workmen or adjacent property will Iresult from its use. l C7-7 . 6 WORK SCHEDULE: Elapsed working days shall be computed starting with the first day of work completed as defined in I C1-1 . 23 "WORKING DAY" or the date stipulated in the "WORK i ORDER" for beginning work, whichever comes first. Nothing in these Contract Documents shall be construed as prohibiting the Contractor from working on Saturday, Sunday or Legal Holidays., providing that the following requirements are met: 4 a. A . re quest to work on a specific Saturday, Sunday or Legal Holiday must be made to the Engineer no later than the proceeding Thursday. b. Any work -to be done on the project on such a specific Saturday? Sunday or Legal Holiday must be, Iin the opinion of the Engineer, essential to the x timely completion of the project. The Engineer 's decision shall be final in response to such a request for approval to work on a specific Saturday, Sunday or Legal Holiday, and no extra compensation shall be allowed to the Contractor for any work performed on such a specific Saturday, Sunday or Legal Holiday. Calendar Days shall be defined in C1-1.24 and the Contractor �) _ may work as he so desires. I - i C7-7 (3) i C7-7 . 7 TIME OF COMMENCEMENT AND COMPLETION: The Contractor shall commence the working operations within the time specified in the Contract Documents and set forth in the Work Order. Failure to do so shall be considered by the Owner as abandonment of the Contract by the Contractor and the Owner may proceed as he sees fit. The Contractor shall maintain a rate of progress such as will insure= th-at. the whoi-e:-work- will be. performed - and- the premises cleaned up in accordance with the Contract Documents and within the time established in such documents and such extension of time as may be properly authorized by the Owner. C7-7. 8 EXTENSION OF TIME COMPLETION: The Contractor's request for an extension of time of completion shall be considered only when the request for such extension is 'submitted in writing to the Engineer within seven days from and after the time alleged cause of delay shall have occurred. Should an- extension- of the time of completion be requested such request will be forwarded to the City Council for approval . In adjusting the - contract time for completion of work , consideration will be given to unforseeable causes beyond the control of and without the fault or negligence of the Contractor, including but limited to acts of the public enemy, <: acts of the Owner , fire, flood; tornadoes , epidemics , quarantine restrictions, strikes, freight embargoes, or ' delays of sub-contractors due to such -causes. When the date of completion is based on a calendar day bid, a request for extension of time because of inclement weather will not be considered. A request for extension of time due to inability to obtain supplies and mate-rials will be considered only when a review of the Contractor ' s purchase order dates and other pertinent data as requested by the Engineer indicates that the Contractor has- made a bonafide attempt to secure delivery on schedule. This shall include efforts to obtain the supplies and materials from alternate sources in case the first source cannot make delivery. if satisfactory execution and completion of the contract should require work and materials in greater amounts or quantities th-a-n those set forth in the approved Contract Documents, then the contract time may be increas-ed by Change Order. C7-7. 9 DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if C7-7 (4) I 5 any, which is to be furnished by the City. When such extra I compensation is claimed a written statement thereof shall be presented by the- Contractor to the Engineer and if by him found correct shall be appr.oved and referred by him to the I Council for final approval or disapproval ; and the action thereon by the Council shall be final and binding. If delay is caused by specific orders given by the Engineers to stop I work, or by -the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying. on the work , then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall , however, be subject to the approval of the City Council; and no such extension of time shall release the Contractor or the surety on his performance bond from all his I obligations hereunder which shall remain in full force until the discharge of the contract. C7-7 . 10 TIME OF COMPLETION: The time of- completion is an essential element of the contract. . - Each bidder shall indicate in the appropriate place on the last page of the Proposal the number of working days or calendar days that he will require 1 to fully complete this contract or the time of completion will I be specified by the City in the Proposal section of the contract documents. ( ^'; The number of days indicated shall be a realistic estimate of the time required to. complete the work covered by the specific contract being bid upon. The- amount of time so stated by the successful bidder or the City will become the time of completion specified in the Contract Documents. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents , or the increased time granted by the Owner , or as automatically increased by additional work or materials ordered after the f contract is signed, the sum per day given in the following schedule, unless. otherwise specified in other parts of the Contract Documents , will be deducted from monies due the I Contractor, not as a penalty, but as liquidated damages suffered by the- owner. AMOUNT OF CONTRACT Less than $ 5,000 inclusive $ 35. 00 �I $ 5,001 - to $ 15,000 inclusive $ 45.00 $ 15,001 to $ 25;000 inclusive $ 63.00 $ 25,001 to $ 50,000 inclusive $ 105.00-. �) $ 50,001 to $ 100,000 inclusive $ 154.00 l $ 100,001 to $ 500,000 inclusive $ 210.00 f C7-7 (5 ) � �VJd,! �� � CITY B"RETARY VT, 10vib, TEX. $ 500, 001 to $1,000,000 'inclusive $ 315.00 $1,000, 001 to $2,000,000 inclusive $ 420. 00 $2,000, 001 and over $ 630.00 The parties hereto understand and, agree that any harm to the City caused by the Contractor ' s delay in completing the work hereunder in the time specified by the Contract- Documents would be incapable or very difficult of accurate estimation , and that- the "Amount of Liquidated Damages Per Day" , as set out above, is a reasonable . forecast of just compensation due the City for harm caused by any delay. C7-7 . 11 SUSPENSION BY COURT ORDER: - The Contractor shall suspend operations on such part or parts of the work ordered by any court , and will not be entitled to additional compensation by virtue of such court order. Neither will he be liable to the City in the event the work is suspended by a Court Order . Neither will the Owner be liable to the Contractor by virtue of any Court Order or action for which the Owner is not solely responsible. C7-7 . 12 TEMPORARY SUSPENSION: The Owner shall have the right to suspend the work operation wholly or in part for such period or periods of time as he may deem necessary due to unsuitable weather conditions or any other unfavorable conditions which in the opinion of the Owner 'or Engineer cause further prosecution of the work to be unsatisfactory or detrimental to the interest of the project. During temporary suspension of work covered by this contract, for any reason, the Owner will make no extra payment for stand-by time of construction equipment and/or construction crews. If it should become necessary to suspend work for an- indefinite period, the Contractor shall store all materials in such manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. - Should the Contractor not be able to complete a portion of the project due to causes beyond the control of and without the fault or negligence of the Contractor as set forth in Paragraph C7-7... 8 EXTENSION OF THE TIME OF COMPLETION, and should it be determined by mutual consent of t-he Contractor and the Engineer that a solution to allow construction to proceed is not available within a reasonable period of time; then the Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the Engineer C7-7 (6) that construction may be resumed. Such reimbursement shall be ( based on actual cost to the Contractor of moving the equipment l and no profit will be allowed. I No reimbursement shall be allowed if the equipment is moved to another construction project for the City of Fort Worth. The Contractor shall not suspend work without written notice from the Engineer and shall proceed with the work operations promptly when notified by the Engineer to so- resume operations. IC7-7. 13 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY:- Whenever, because of National Emergency, so declared by the President of the United States or other lawful authority, it becomes impossible for the Contractor to obtain all of the necessary labor, materials, and equipment for the prosecution of the work with reasonable continuity for a period of two months, the Contractor shall within seven days notify the City in writing, giving a detailed statement- of the efforts which have been made and listing all necessary -items of labor , materials , and equipment not obtainable . If , after investigations, the Owner finds that such conditions existing and that the inability of the Contractor to proceed is not attributable in whole or in part to the fault or neglect of the Contract, then if the Owner cannot after reasonable effort assist the Contractor in procuring and making available the necessary labor, materials and equipment within thirty days , the Contractor may request the Owner- to terminate the contract I and the Owner may comply with the request, and the termination -shall be conditioned and based upon a final settlement mutually acceptable to both the Owner and the Contractor and final payment shall be made in accordance with the terms of .the agreed settlement, which shall include, but not* be limited to , the payment for all work executed but no anticipated profits on work which has not been performed. C7-7.14 SUSPENSION OR ABANDONMENT OF THE WORK AND ANNULMENT OF CONTRACT: The work operations on all or any portion or section of the work under Contract shallbe suspended immediately on written order of the Engineer or the Contract may be' declared cancelled by the City Council for any good and I sufficient cause. The following, by way of example, but not of limitation, may be considered grounds for suspension or cancellation: a. Failure -of the Contractor to commence work operations within the time specified in the Work Order issued by the Owner. J J!I - 9 C7-7 (7) b. Substantial evidence that progress of the work operations by Contractor is insufficient to complete the work within the specified time. C. Failure of the Contractor to provide and maintain sufficient labor and equipment to properly execute the working operations. d... Substant.i.a.l. e.vi.dence. th.a.t. the C.o,ntractor has abandoned the work. e. Substantial evidence that the Contractor has become insolvent or bankrupt , or otherwise financially unable to carry on the work satisfactorily. f. Failure on the part of the Contractor to observe any requirements of the Contract Documents or to comply with any orders given by the Engineer or Owner provided for in these Contract Documents. g. Failure of the Contractor promptly to make good any defect in materials or workmanship, or any defects of any nature the correction of which has been directed in writing by the Engineer or the Owner. h. Substantial- evidence of ,collusion for the purpose of illegally procuring a contract or perpetrating fraud on the City in the construction of work under contract. i. A substantial indication that -the Contractor has made an unauthorized assignment of the contract or any funds due therefrom for the benefit of any creditor or for any other purpose. j. If the Contractor shall for any cause whatsoever not carry on the working operation in an acceptable manner. k. If the Contractor commences legal action against the Owner. A copy of the suspension order or action of the City Council shall be served on the Contractor ' s Sureties. When work is suspended for any cause or causes , or when the contract is cancelled, the Contractor shall discontinue the work or such part thereof as. the Owner shall designate., whereupon the Sureties may, at their option, assume the contract or that portion thereof which the -Owner has ordered the Contractor to discontinue, and may perform the same or may, with the written C7-7 (8) 1 consent of the Owner , sublet the work or that portion of the work as taken over, provided however, that the Sureties shall I exercise their option, if at all , within two weeks after the written notice to discontinue the work has been served. upon the Contractor and upon the Sureties or their authorized I agents . The Sureties , in such event shall assume the. I Contractor ' s place in- all respects, and shall be paid -by the Owner for all work performed by them in accordance with the I terms of. the Contract Documents. All monies remaining due the Contractor at the time of this default shall thereupon become due and payable to the Sureties as the work progresses, f subject .to all of the terms of the Contract Documents. In case the Sureties do not, within the hereinabove specified time, exercise their right and option to assume the contract I responsibilities, or that portion -thereof which the Owner has ordered by the Contractor to discontinue, then the Owner shall have the power to complete, by contract or otherwise, as it may determine, the ' work herein described or such part thereof as it may deem necessary, and the Contractor hereto agrees that the Owner shall have the right to take possession of and I use any materials, plants, tools , equipment, supplies , and property of any kind provided by the Contractor for the purpose of carrying on the work and to procure other tools, equipment, materials, labor and property for the completion of the work, and to charge to the account of the Contractor of said contract expense for labor, materials , tools , equipment, and all expenses incidental thereto. The expense so charged f shall be deducted by the Owner from such monies as may be due l or may become due at any time thereafter to the Contractor under and by virtue of the Contract or any 'part thereof. The Owner shall not be required to obtain the lowest bid for the work completing the contract, but the expense to be deducted shall be the actual cost of the owner of such work. In case such expenses shall exceed the amount which would have been payable under the Contract if the same had been completed by the Contractor , then the Contractor and his. Sureties shall f pay the amount of such excess to the City on notice from the IOwner of the excess due. When any particular part of the work is being carried on by the Owner by contract or otherwise under the provisions of this section, the. Contractor shall continue the remainder of the work in conformity with the terms of the Contract Documents and in such a manner as to not hinder or interfere with performance of the work by the Owner. IC7-7 . 15 FULFILLMENT OF CONTRACT : The Contract will be considered as having been fulfilled, save as provided in any- bond or bonds or by law, when all the work and all sections or Iparts of the project covered by the Contract Documents have it C7-7 (9) been finished and completed, the final inspection -made by the Engineer, and the final acceptance and final payment made by the Owner. C7=7.-16 TERMINATION FOR CONVENIENCE OF THE OWNER: A. NOTICE OF TERMINATION: The performance of. the work under.. this contract. may be. terminated. by the Owner in whole , or from time to . time in part , "in accordance with this section, whenever the Owner shall determine that such termination is in the best interest of the Owner . Any such termination shall be effected by mailing a notice of termination to the Contractor specifying the extent to which performance 'of work under the contract is terminated', and- the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Mail by the Owner. Further , it shall be deemed conclusively presumed and established -that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the Owner regarding such discretionary action. B. CONTRACTOR ACTION: After receipt of a notice of termination, and except' as otherwise directed by the Engineer, the Contractor shall: 1. Stop work under the contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the work under the contract as is not terminated; - 3. terminate all orders and subcontracts to the extent that they relate to the performance of work terminated by the- notice- of termination; 4. transfer .title to the Owner and deliver in the manner, at the times, and to the extent, if any, directed by the Engineer: C7-7 (10) 1 - - a. the fabricated or unfabricated parts , ' work in process , completed work , supplies and other material produced as a part of, or acquired in connection I with - the performance of , the work terminated by the notice of termination; and I b. the completed, or partially completed plans, drawings , information and other property which , if the contract had I been completed , would have been required to be furnished to the Owner. 5. complete performance of such part of the work as shall not have been terminated by the notice of termination; and I 6. take such action as may be necessary, or as the Engineer may direct, for the protection and preservation of the property related to I its contract which is -in the possession of the Contractor and in which the Owner has or may acquire the rest. At a time not later than 30 days after the termination date specified in the notice of termination , the Contractor may submit to the 1 Engineer a list , certified as to quantity and guality , of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or I authorized by the Engineer. Not later than 15 days thereafter, the Owner shall accept title to such items provided, that the list submitted shall be subject to verification by the Engineer upon removal of the items or, if the items are stored, within 45 days. from the date of submission of. the I list, and any necessary adjustments to correct the list as submitted, shall be made prior to final i settlement. I C. TERMINATION CLAIM:- Within 60 days after notice of termination , the Contractor shall submit his termination claim to the Engineer in the form and with the certification prescribed by the Engineer . ,I Unless one or more extensions in writing are granted by the Owner upon request of: the. Contractor , made in writing within such 60-day jlperiod or authorized extension thereof, any and all such claims shall be conclusively deemed waived. 1 of 3 i C7-7 (11) 1 D. AMOUNTS : Subject to the provisions of Item C7-7..16 (C) , the Contractor and Owner may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total or partial termination of work pursuant hereto; provided, that such agreed amount or amounts shall never exceed the total contract price as reduced by the amount of payments otherwise made and as further! reduced by- the- contract- price of work not terminated . The contract shall be amended accordingly, and the Contractor shall be paid the agreed amount. No amount shall be due for lost or anticipated profits . Nothing in C7-7 . 16 (E ) hereafter, prescribing the amount to be paid to the Contractor in the event of failure of the Contractor by reason of the termination of work pursuant to this section, shall be deemed to limit, restrict or otherwise determine or affect the .amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraph. E. FAILURE TO AGREE: In the event of the failure of the Contractor and the Owner to . agree as provided in C7-7. 16 (D) upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this section the Owner shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. No amount shall be due for lost or anticipated profits. F. DEDUCTIONS : In arriving at the amount due the contractor under this section , there shall be deducted ( a ) all unliquidated advance or other payments on account theretofore made to the Contractor, applicable to the terminated portion of this contract; (b) any claim which the Owner may have against the Contractor in connection with this contract; and (c ) -the agreed price for , or the proceeds of sale of, any materials , supplies or other things kept by the Contractor or sold,' pursuant to the provisions of this clause, and not otherwise recovered by or credited to the Owner. G. ADJUSTMENT : If the termination here•u-nd&r• be partial, prior to the settlement of the terminated portion of this. contract, ,the Contractor may file with the Engineer a request in writing for an C7-7 (12) equitable adjustment of the price or prices f specified in the contract relating to .the continued portion of the contract (the portion not terminated by the notice of termination ) , such equitable adjustment as may be agreed upon shall be made in such price or prices; nothing contained herein , however, shall limit the right of the Owner and the Contractor to agree upon the amount or amounts to be paid to the Contractor for the completion of the continued portion of the contract when said - contract does not contain an -established contract price for such continued portion. H. NO LIMITATION OF RIGHTS: Nothing contained in this section shall limit or alter the rights which the Owner may *have for termination of this contract under C7-7 . 14 hereof entitled "Suspension of I Abandonment of the work and Amendment of Contract" l or any -other right which Owner may have for default or breach of contract by Contractor. IC7-7 . 17 SAFETY METHODS AND PRACTICES: The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the work at -� all times and shall assume all responsibilities for their 1 enforcement. l The -Contractor shall complywith federal , state, and local laws, ordinances, and regulations so as to protect -person and property from injury, including death, or damage in connection with the work. f - I - # C7-7 (13) i i PART C - GENERAL CONDITIONS C8-8 MEASUREMENT AND PAYMENT ISECTION C8-8 MEASUREMENT AND PAYMENT C8 -8 . 1 MEASUREMENT OF QUANTITIES : The determination of quantities of work performed by the Contractor and - authorized by the Contract Documents acceptably completed under the terms of the Contract Documents shall be made by the Engineer , based on measurements made by the Engineer. These measurements will be made according to the United States Standard Measurements used in common practice, and will be the actual length, area, solid contents, numbers , and weights of the materials and Iitems installed. C8-8. 2 UNIT PRICES: When in the Proposal a "Unit Price" is set forth, the said "Unit Price" shall include the furnishing by the Contractor of all labor, tools, materials, machinery, equipment , appliances and appurtenances necessary for. the construction of and the completion in a manner acceptable to the Engineer of all work to be done under these Contract Documents. C The "Unit Price" shall include all permanent and temporary protection of overhead, surface, and underground structures , cleanup, finished, overhead expense, bond, insurance, patent I fees, royalties, risk due to the elements and other causes , delays , profits , injuries, damages claims, taxes , and all other items not specifically mentioned that may be required to f ully construct each item of the work complete in place and in a satisfactory condition for operation. C8-8 . 3 LUMP SUM: When in the Proposal a "Lump Sum" is set forth, the said "Lump Sum" shall represent the total cost for I the Contractor to furnish all labor , tools , materials , machinery, equipment, appurtenances, and all subsidary work necessary for the construction and completion of all the work to provide a complete and functional item as detailed in the Special Contract Documents and/or Plans. C8-8 . 4 SCOPE OF PAYMENT: The Contractor shall receive and accept the compensation, as herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced- under these Contract Documents, for all loss and damage arising out of . the nature of the work or from the action of the elements , fox any unforeseen defects or -obstructions which may arise or be encountered during the prosecution of the work at any time 1 fC8-8 (1 before its final acceptance by the Owner, (except as provided in paragraph C5-5 . 14 ) for all risks of whatever description connected with the prosecution of the work, for all expense incurred by or in consequence of suspension or discontinuance of such prosecution of the working operations as herein specified , or any and all infringements of patents , trademarks, copyrights , or other legal reservations, and for completeing the work in an acceptable manner according to the terms of -the Contract Documents. The payment of any current or partial estimate prior to final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct, renew, or. replace at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about. the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects , which defects, imperfection, or damage shall have been discovered on or-before the final inspection and acceptance of work or during the one year guaranty period after final acceptance. The Owner shall be the sole judge of such defects , imperfections, or damage, and the Contractor shall be liable to the Owner for failure to corregt the same. as provided herein. C8-8. 5 PARTIAL ESTIMATES AND RETAINAGE: Between the 1st and 5th day of each month the Contractor shall submit to the Engineer a statement showing an estimate of the value of the work done during the previous month, or estimate period under the Contract Documents. Not later than the 10th day of the month the Engineer shall verify such estimate, and if it is found to be' acceptable and the value of work performed since the last partial payment was made exceeds one hundred dollars ( $100 . 00) in amount, 90% of such estimated sum will be paid to the Contractor if the total contract amount is less than . $400, 000 , or 95% of such estimated sum will be paid to the Contractor if the total contract amount is $400,000 or greater within twenty-five (25) days after the regular estimate period. The City will have the option of preparing estimates on forms furnished by the City. The partial estimate may include acceptable: nonperishable materials delivered to the work which are to be incorporated into the work' as a. pe-rmanent part thereof, but which at the the time of the -estimate have not been installed. ( such payment will be allowed on a basks° c& 85% of the net invoice value thereof . ) The Contractor shall furnish the Engineer such information as he may request to aid C8-8 (2) him as a guide in the verification or the preparation of partial estimates. it is understood that the partial estimate from month to month will be approximate only, and all partial monthly estimates and payment will be -subject to correction in the estimate rendered following the discovery of an error in any previous estimate,and such estimate shall not, in any respect, be taken I as an admission of the Owner of the amount of work done or of its quality of sufficiency, or as an acceptance of the work done or 'the release of the Contractor of any of his responsibilities under the Contract Documents. I The City reserves the right. to withhold the payment of any I monthly estimate if the contractor fails to perform the work l strictly in accordance with- the specifications or provisions of this contract. C8-8 . 6 WITHHOLDING PAYMENT: Payment on any estimate or estimates may be held in abeyance if the performance of the construction operations is not in accordance with the requirements of the Contract Documents. C8-8 . 7 FINAL ACCEPTANCE: Whenever the improvements provided for by the Contract Documents shall have been completed and j 4 all requirements of the Contract Documents shall have been _ fulfilled on the part of the Contractor, the Contractor shall notify the Engineer in writing that the improvements are ready I for the final inspection. The Engineer shall notify the appropriate officials of the Owner, will- within a reasonable ? time make such final -inspection , and if the work is satisfactory , in an acceptable condition , and has been completed in - accordance with the terms of the Contract E Documents and all approved modifications thereof, the Engineer } will initiate the processing of the final estimate and recommend final acceptance of the project and final payment therefor as outlined in C8-8.8 below. C8-8 . 8 FINAL PAYMENT: Whenever all the improvements provided for by the Contract Documents and all approved modifications thereof shall have been completed and all requirements *of the Contract Documents have been fulfilled on the part of the Contractor,- a final estimate showing the value of the work will be prepared by the Engineer as soon as the necessary measurements, computations, and checks can be made. All prior estimates upon which payment has been made are subject to necessary corrections or revisions in the f-in-al- payment. l - C8-8 (3 ) e a 1 The amount of the final estimate, less previous payments and. anysu.m that have been deducted or retained under the provisions of the Contract Documents , will be paid to the Contractor within 60 days after final acceptance by- the Owner on a proper resolution of the City Council, provided the Contractor has furnished to the Owner satisfactory evidence of payment as follows: Prior to submission of the final estimate for payment, the Contractor shall execute an affidavit, as furnished by the City, certifying that all persons, firms , associations, corporations, or other organizations furnishing labor and/or materials have been paid in full, that the wage scale established by the City Council in the City of Fort Worth has been paid, and that there are no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the last or final payment as aforesaid shall operate as and shall release the Owner from all claims or liabilities under the Contract- for anything done or furnished or relating to the work under Contract Documents or any act or neglect of said City relating to 'or connected with the Contract. The making of the final payment by the Owner shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. C8-8. 9 ADEQUACY OF DESIGN: It is understood that the Owner believes it has employed competent Engineers and designers to , prepare the Contract Documents and all modifications of the approved Contract Documents . It is , therefore, agreed that the Owner shall be responsible for the adequacy of its own design features, sufficiency of the Contract Documents , the safety of the structure , and the practicability of the operations of the completed project, provided the Contractor has complied with the requirements of the said Contract Documents, all approved modifications thereof, and additions and alterations thereto approved in writing by the Owner. The burden of 'proof of such - compliance shall be upon the Contractor to show that he has complied with the said requirements of the Contract -Documents, approved modifications' thereof, and all approved additions and alterations thereto. . C8-8.10 GENERAL GUARANTY: Neither the final certificate of payment n-or any provision in the Contract. Documents nor partial or entire occupancy or ' use of the pre-bises by the Owner shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve- the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and C8-8 (4 ) 9 pay for any damage to other work resulting therefrom which I shall appear within a period of one year from the date of .final acceptance of the work unless a longer period is specified andshall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general guaranty as above outline . The Owner will give notice of Iobserved defects with reasonable promptness. C8-8 . 11 SUBSIDIARY WORK : Any and all work specifically governed by documentary requirements for the project, such as conditions imposed by the Plans , the General Contract Documents or these Special Contract Documents , in .which no specific item for bid has been provided for in the Proposal, I shall be considered as a subsidiary item of work, the cost of which shall be included in the price bid in the Proposal, for each bid item. Surface restoration, rock excavation and cleanup are general items of work which fall *in the category l of subsidiary work. C8-8 . 12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be I allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions . Payment for miscellaneous i placement of material will be made for only that amount of material used , measured to the nearest one-tenth unit . Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. [ C8-8 . 13 RECORD DOCUMENTS : Contractor shall keep on record a copy of all specifications , plans, addenda, modifications , shop drawings and samples at the site, in good order and annotated to show all changes made during the construction process . -These shall be delivered to Engineer upon completion of the work. .I C8-8 (5) i i i i i i i i i Part C1. Supplementary General Conditions I SECTION Cl: SUPPLEMENTARY CONDITIONS TO PART C - GENERAL CONDITIONS f A. General These Supplementary Conditions amend or supplement the General Conditions I of the Contract and other provisions of the Contract Documents as indicated below. Provisions which are not so amended or supplemented remain in full force and affect. I B. C8-8.5 PARTIAL ESTIMATES - AND RETAINAGE. Page C8-8 (2), should be I deleted in its entirety and replaced with the following: Partial pay estimates shall be submitted by the Contractor or prepared by the City on the 5th day and 20th day of each month that the work is in progress. The estimate shall be proceeded by the City on the 10th day and 25th day respectively. Estimates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of the pay estimate have not been so installed. If such I materials are included within a pay estimate, payment shall be based upon 85% of the net voice value thereof. The Contractor will furnish the Engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. l For contracts of less than $400,000 at the time of execution, retainage shall be I ten per cent (10%). For contracts of $400,000 or more at the time of execution, retainage shall be five percent (5%). Contractor shall pay subcontractors in accord with the subcontract agreement l within five (5) business days after receipt by Contractor of the payment by City. I Contractor's failure to make the required payments to subcontractors will authorize the City to withhold future payments from the Contractor until Icompliance with this paragraph is accomplished. It is understood that the partial pay estimates will be approximate only, and all I partial pay estimates and payment of same will be subject to correction in the estimate rendered following the discovery of the mistake in any previous estimate. Partial payment by Owner for the amount of work done or of its quality or sufficiency or acceptance of the work done; shall not release the Contractor of any of its responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any partial estimate if the l Contractor fails to perform the work in strict accordance with the specifications or l other provisions of this contract. C. Part C - General Conditions: Paragraph C3-3.11 of the General Conditions is l deleted and replaced with D-3 of Part D - Special Conditions. Revised Pg. 1 10/24/02 f fD. C3-3.11 INSURANCE: Page C3-3 (6): Delete subparagraph "g. LOCAL AGENT FOR INSURANCE AND BONDING" I E. C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DAMAGE CLAIMS: Page C6- 1 6 (8), is deleted in its entirety and replaced with the following: f Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, [ subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in part, by the negligence or alleged ne_gli_gence of Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and I any damage, loss or destruction to property of the Owner arising from the l performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence f or alleged ne_gli_gence of Owner, its officers, servants or employees. I In the event Owner receives a written claim for damages against the Contractor I or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages I is outstanding as a result of work performed under a City Contract. l F. INCREASED OR DECREASED QUANTITIES: Part C - General Conditions, Section C4-4 SCOPE OF WORK, Page C 4-4 (1), revise paragraph C4-4.3 fINCREASED OR DECREASED QUANTITIES to read as follows: The Owner reserves the right to alter the quantities of the work to be performed l or to extend or shorten the improvements at any time when and as found to be l necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices as established in the contract documents. No allowance will be made for any changes in lost or anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories shall be IRevised Pg. 2 10/24/02 I i Iinterpreted herein as applying to the overall quantities of sanitary sewer pipe in each pipe size but not to the various depth categories. I G. C3-3.11 INSURANCE: Page C3-3 (7): Add subparagraph "h. ADDITIONAL ' INSURANCE REQUIREMENTS" r a. The City, its officers, employees and servants shall be endorsed as an l additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers' compensation insurance I policy. b. Certificates of insurance shall be delivered to the City of Fort Worth, contract administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on the contracted project. 1 c. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. Id. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation, non-renewal, and/or material change in policy terms or coverage. A ten days notice shall be acceptable in the event of non-payment of premium. e. Insurers must be authorized to do business in the State of Texas and have a current A.M. Best rating of A: VII or equivalent measure of financial strength and solvency. f. Deductible limits, or self-funded retention limits, on each policy must not exceed $10,000.00 per occurrence unless otherwise approved by the City. Ig. Other than worker's compensation insurance in lieu of traditional insurance City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups. The City must approve in writing any alternative coverage. ( h. Workers' compensation insurance policy(s) covering employees employed on the project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the City. I i. City shall not be responsible for the direct payment of insurance premium costs Ifor contractor's insurance. Revised Pg. 3 !, 10/24/02 OFFICIAL WORD CITY SECRETARY FT. WORTH, fix. i Ij. Contractor's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self-funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. k. In the course of the project, Contractor shall report, in a timely manner, to j City's officially designated contract administrator any known loss occurrence which could give rise to a liability claim or lawsuit or which could result in a property loss. ( I. Contractor's liability shall not be limited to the specified amounts of insurance required herein. 1 m. Upon the request of City, Contractor shall provide complete copies of all insurance policies required by these contract documents. H. C8-8.4 SCOPE OF PAYMENT: Delete C8-8.4, Scope of Payment at page C8- 8(1) is deleted in its entirety and replaced with the following: lThe Contractor shall receive and accept the compensation as herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for 1 performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any unforeseen defects or obstructions which may I arise or be encountered during the prosecution which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in paragraph C5-5.14) for all risks I of whatever description connected with the prosecution of the work, for all expenses incurred by or in consequence of the suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for completing the work in an acceptable manner according to the terms of the { Contract Documents. y The payment of any current or partial estimate prior to the final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the 0 acceptance of the work, materials, or equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct, renew, or replace at his own and proper expense any defects or imperfections in the construction or in I' the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, imperfections, or damage shall have been discovered on or before the final inspection and acceptance of the work or during the two. (2) year guaranty period after the final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. Revised Pg. 4 10/24/02 I. C8-8.10 GENERAL GUARANTY: Delete C8-8.10 General Guaranty at page is p g C8-8 4( ) deleted in its entirety and replaced with the following: Neither the final certificate of payment nor any provision in the Contract Documents, nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and pay for any damage to other work or property resulting therefrom which shall I appear within a period of two (2) years from the date of final acceptance of the work unless a longer period is specified and shall furnish a good and sufficient maintenance l bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general guaranty as above outlined. The Owner will give notice of observed defects with reasonable promptness. Any reference to any shorter period of time of warranty contained elsewhere within the specifications shall be resolved in favor of this specifications, it being I the City's intent that the Contractor guarantee its work for a period of two (2) l years following the date of acceptance of the project. In the Special Instructions to Bidders, TPW contracts place the following in lieu of the existing paragraph 2. J. Part C - General Conditions, Section C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL, Page C2-2 (4) exchange paragraphs C2-2.7, C2-2.8 and C2-2.9 with the following: lC2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders." It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division, P.O. Box 17027, Fort Worth, Texas 76102. C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. A request for non-consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non- consideration are opened and publicly read aloud, the proposals for which non- consideration requests have been properly filed may, at the option of the Owner, be returned unopened. 1 Revised Pg. 5 10/24/02 I �r C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal K. C3-3.7 BONDS (CITY LET PROJECTS): Reference Part C, General Conditions, dated November 1, 1987; (City let projects) make the following revisions: 1. Page C3-3(3); the paragraph after paragraph C3-3.7d Other Bonds should be revised to read: In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority from the United States secretary of the treasury to qualify as a surety on I obligations permitted or required under federal law; or(2) have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or lrequired under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 2. Pg. C3-3(5) Paragraph C3-3.11 INSURANCE delete subparagraph "a. II COMPENSATION INSURANCE". (1 3. Pg. C3-3(6), Paragraph C3-3.11 INSURANCE'delete subparagraph " g• LOCAL AGENT FOR INSURANCE AND BONDING". L. RIGHT TO AUDIT: Part C - General Conditions, Section C8-8 MEASUREMENT AND PAYMENT, Page C8-8 (5), add the following: 1 C8-8.14 RIGHT TO AUDIT: (a) Contractor agrees that the City shall, until the expiration of three (3) years Iafter final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of 1 the Contractor involving transactions relating to this contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space I in order to conduct audits in compliance with the provisions of this section. The City shall give contractor reasonable advance notice of intended audits. I Revised Pg. 6 10/24/02 I (b) Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subcontractor, involving transactions to the subcontract, and further, that City shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article. City shall give subcontractor i/ reasonable advance notice of intended audits. (c) Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse the Contractor for the cost of copies as follows: 1. 50 copies and under- 10 cents per page 2, More than 50 copies - 85 cents for the first page plus 1 fifteen cents for each page thereafter M. SITE PREPARATION: The Contractor shall clear rights-of-way or easements of obstruction which must be removed to make possible proper prosecution of the work as a part of this project construction operations. The contractor's attention is directed to paragraph C6-6.10 work within easements, page C6-6(4), part C - General Conditions of the Water Department General Contract Document and General i Specifications. I Clearing and restoration shall be considered as incidental to construction and all II costs incurred will be considered to be included in the Linear Foot price of the (I pipe N. Reference Part C - General Conditions, Section C6-6.8 BARRICADES, WARNINGS AND WATCHMEN: 1. Wherever the word Watchmen appears in this paragraph, it shall be changed to the word flagmen. l 2. In the first paragraph, lines five (5) and six (6), change the phrase take all ( such other precautionary measures to take all reasonable necessary measures. 1 O. MINORITY/WOMEN BUSINESS ENTERPRISE COMPLIANCE: Reference Part C (General Conditions), Section C3-3.2 Entitled "MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE" shall be deleted in its entirety and replaced with the following: Revised Pg. 7 10/24/02 4 Upon request, Contractor agrees to provide to Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Woman Business Enterprise (WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation (other than negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than thee (3) years. P. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: I (a) The contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment of not less than the rates determined 1 by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258, Texas Government Code. Such prevailing wage rates are included in these contract documents. "I (b) The contractor shall, for a period of three(3) years following the date of acceptance of the work, maintain records that show (i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii)the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of Section C-1, L. Right to Audit (Rev. 9/30/02) pertain 1 to this inspection. (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) and (b) above. I (d) With each partial payment estimate or payroll period, whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. IThe contractor shall post the prevailingwage rates in a conspicuous lace at the g p P site of the project at all times. l Revised Pg. 8 10/24/02 i i i i i 1 i Part D. Special Conditions i i PART D - SPECIAL CONDITIONS D-1 GENERAL...................................................................................................................3 D-2 COORDINATION MEETING........................................................................................4 D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW ..............5 D- 4 COORDINATION WITH FORT WORTH WATER DEPARTMENT..............................7 D- 5 CROSSING OF EXISTING UTILITIES ........................................................................7 D- 6 EXISTING UTILITIES AND IMPROVEMENTS............................................................7 D- 7 CONSTRUCTION TRAFFIC OVER PIPELINES..........................................................8 D- 8 TRAFFIC CONTROL...................................................................................... .........8 D- 9 DETOURS...................................................................................................................9 D- 10 EXAMINATION OF SITE..............................................................................................9 I ✓� D- 11 ZONING COMPLIANCE...............................................................................................9 D- 12 WATER FOR CONSTRUCTION................................................................................ 10 D- 13 WASTE MATERIAL ................................................................................................... 10 D- 14 PROJECT CLEANUP AND FINAL ACCEPTANCE.................................................... 10 D- 15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK............................... 10 D- 16 SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES.......................... 10 D- 17 BID QUANTITIES....................................................................................................... 11 D- 18 CUTTING OF CONCRETE........................................................................................ 11 D- 19 PROJECT DESIGNATION SIGN............................................................................... 11 D- 20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT.................................... 12 J D- 21 MISCELLANEOUS PLACEMENT OF MATERIAL...................................................... 12 D- 22 CRUSHED LIMESTONE BACKFILL.......................................................................... 12 D- 23 2:27 CONCRETE....................................................................................................... 12 D- 24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION ....................................... 12 D-25 PAVEMENT REPAIR (E2-19) .................................................................................... 14 D- 26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS).............. 15 D- 27 SANITARY SEWER MANHOLES.............................................................................. 15 D- 28 SANITARY SEWER SERVICES................................................................................ 18 D- 29 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES..............20 D- 30 DETECTABLE WARNING TAPES.............................................................................22 D- 31 PIPE CLEANING... 22 D- 32 DISPOSAL OF SPOIL/FILL MATERIAL.....................................................................22 D- 33 MECHANICS AND MATERIALMEN'S LIEN...............................................................23 D- 34 SUBSTITUTIONS ......................................................................................................23 D- 35 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER...........23 D- 36 VACUUM TESTING OF SANITARY SEWER MANHOLES........................................26 D- 37 BYPASS PUMPING ...................................................................................................27 D- 38 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER........27 D- 39 SAMPLES AND QUALITY CONTROL TESTING.......................................................29 D- 40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL........30 D-41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES ......................31 D-42 PROTECTION OF TREES, PLANTS AND SOIL........................................................31 D-43 SITE RESTORATION ........................................................ .................................31 D- 44 CITY OF FORT WORTH STANDARD PRODUCT LIST............................................31 D- 45 TOPSOIL, SODDING, SEEDING & HYDROMULCHING...........................................32 D-46 CONFINED SPACE ENTRY PROGRAM...................................................................37 D-47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION..........................37 D- 48 EXCAVATION NEAR TREES ....................................................................................37 D- 49 CONCRETE ENCASEMENT OF SEWER PIPE ........................................................38 D- 50 CLAY DAM.................................................................................................................38 D- 51 EXPLORATORY EXCAVATION (D-HOLE)................................................................38 D- 52 INSTALLATION OF WATER FACILITIES..................................................................39 09101104 SC-1 0P.16 11 RECORD CITY 5161:1RETARy FT. WORTH, Tlx, PART D - SPECIAL CONDITIONS 52.1 Polyvinyl Chloride (PVC) Water Pipe..........................................................................39 52.2 Blocking .....................................................................................................................39 52.3 Type of Casing Pipe...................................................................................................39 52.4 Tie-Ins........................................................................................................................40 52.5 Connection of Existing Mains.....................................................................................40 52.6 Valve Cut-Ins .............................................................................................................40 52.7 Water Services...........................................................................................................40 52.8 2-Inch Temporary Service Line ..................................................................................42 52.9 Purging and Sterilization of Water Lines ....................................................................43 52.10 Work Near Pressure Plane Boundaries......................................................................44 52.11 Water Sample Station................................................................................................44 52.12 Ductile Iron and Gray Iron Fittings..............................................................................44 D- 53 SPRINKLING FOR DUST CONTROL........................................................................45 D- 54 DEWATERING................................................................................•..........................45 D- 55 TRENCH EXCAVATION ON DEEP TRENCHES.......................................................45 D- 56 TREE PRUNING........................................................................................................45 D- 57 TREE REMOVAL.......................................................................................................46 D- 58 TEST HOLES.............................................................................................................46 D- 59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION......................................................................................................47 D-60 TRAFFIC BUTTONS..................................................................................................47 D- 61 SANITARY SEWER SERVICE CLEANOUTS............................................................48 D- 62 TEMPORARY PAVEMENT REPAIR..........................................................................48 D-63 CONSTRUCTION STAKES .......................................................................................48 D-64 EASEMENTS AND PERMITS....................................................................................48 D-65 PRE-CONSTRUCTION NEIGHBORHOOD MEETING ..............................................49 D- 66 WAGE RATES...........................................................................................................49 D-67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE....................................49 D-68 STORM WATER POLLUTION PREVENTION ..........................................................50 D-69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS..................................................................................52 D-70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD ..........................................52 D-71 EARLY WARNING SYSTEM FOR CONSTRUCTION...............................................52 D-72 AIR POLLUTION WATCH DAYS...............................................................................53 D-73 FEE FOR STREET USE PERMITS AND RE-INSPECTIONS....................................54 09101104 SC-2 PART D a SPECIAL CONDITIONS This Part D — Special Conditions is complimentary to Part C — General Conditions and Part C1 — Supplementary Conditions to Part C of the Contract. Anything contained in this Part D that is additive to any provision in Part C— General Conditions and part C1 — Supplementary Conditions to Part C of the Contract are to be read together. Any conflict between Part C — General I Conditions and Part C1 — Supplementary Conditions of the Contract and this Part D, Part D shall control. I FOR: WATER REPLACEMENT CONTRACT 2002, STM-F LAKE COUNTRY ESTATES FORT WORTH, TEXAS DOE PROJECT NO. 3706 ( WATER DEPARTMENT PROJECTS NO. PW 53-060530176470 D-1 GENERAL The order or precedence in case of conflicts or discrepancies between various parts of the Contract Documents subject to the ruling of the Engineer shall generally, but not necessarily, follow the guidelines listed below: 1. Plans 2. Contract Documents 3. Special Conditions The following Special Conditions shall be applicable to this project under the provisions stated above. The Contractor shall be responsible for defects in this project due to faulty materials and I workmanship, or both, for a period of two (2) years from date of final acceptance of this project by the City of Fort Worth and will be required to replace at his expense any part or all of this project ` which becomes defective due to these causes. 1 Subject to modifications as herein contained, the Fort Worth Water Department's General Contract Documents and General Specifications, with latest revisions, are made a part of the General Contract Documents for this project. The Plans, these Special Contract Documents and the rules, regulations, requirements, instructions, drawings or details referred to by manufacturers name, or identification include therein as specifying, referring or implying product control, performance, quality, or other shall be binding upon the contractor. The specifications and drawings shall be considered cooperative; therefore, work or material called for by one and not shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though required by all. Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre- qualified with the Water Department to perform such work in accordance with procedures described in the current Fort Worth Water Department General Specifications, which general specifications shall govern performance of all such work. This contract and project, where applicable, may also be governed by the two following published 1 specifications, except as modified by these Special Provisions: 1. . STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH 2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH CENTRAL TEXAS 09/01/04 SC-3 FART D , SPECIAL CONDITIONS Any conflict between these contract documents and the above 2 publications shall be resolved in favor of these contract documents. A copy of either of these specifications may be purchased at the office of the Transportation and Public Works Director, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, Texas 76102. The specifications applicable to each pay item are indicated by the call-out for the pay item by the designer. If not shown, then applicable published specifications in either of these documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Failure to bid or fully execute contract without retaining contract documents intact may be grounds for designating bids as "non-responsive" and rejecting bids or voiding contract as appropriate as determined by the City Engineer. INTERPRETATION AND PREPARATION OF PROPOSAL: A. DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL", and the name or description of the project as designated in the "Notice to Bidders". The envelope shall be addressed to the Purchasing Manager, City_of Fort Worth Purchasing Division, PO Box 17027, Fort Worth, Texas 76102. B. WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. A request for non-consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non- consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C. TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. D-2 COORDINATION MEETING For coordination purposes, weekly meetings at the job site may be required to maintain the project on the desired schedule. The contractor shall be present at all meetings. 09101104 SC-4 PART Q - SPECIAL CONDITIONS D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW IA. Definitions: 1. Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. 2. Duration of the project- includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. 3. Persons providing services on the project ("subcontractor" in §406.096)- includes all y persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the j contractor and regardless of whether that person has employees. This includes, without I limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and 1 payroll amounts and filing of any coverage agreements, which meets the statutory t requirements of Texas Labor Code, Section 401.011(44) or all employees of the Contractor providing services on the project, for the duration of the project. 1 C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide the governmental entity: 1. A certificate of coverage, prior to that person beginning work on the project, so the Igovernmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and 2. No later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 1 F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. I 09/01/04 SC-5 rNII(� RECORD PMA ART D s SPECIAL CONDITIONS G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known„ of any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: 1. Provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; 2. Provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a.) A certificate of coverage, prior to the other person beginning work on the project; and b.) A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 5. Retain all required certificates of coverage on file for the duration of the project and for one year thereafter. 6. Notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and 7. Contractually require each person with whom it contracts, to perform as required by paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom they are providing services. 8. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of Self-Insurance Regulation. Providing false or 09/01/04 „ SC-6 P ' ♦i i PART D - SPECIAL CONDITIONS misleading information may subject the contractor to administrative, criminal, civil 1 penalties or other civil actions. 9. The contractor's failure to comply with any of these provisions is a breach of contract by j the contractor which entitles the governmental entity to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach ( from the governmental entity. 1 J. The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: 1 "REQUIRED WORKER'S COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this I construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their ( employer or status as an employee." I Call the Texas Worker's Compensation Commission at (512)440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage". D-4 COORDINATION WITH FORT WORTH WATER DEPARTMENT During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. D- 5 CROSSING OF EXISTING UTILITIES Where a proposed water line crosses over a sanitary sewer or sanitary sewer service line and/or proposed sewer line crosses over a water line and the clear vertical distance is less than 9 feet barrel to barrel, the sanitary sewer or sanitary sewer service line shall be made watertight or be J constructed of ductile iron pipe. The Engineer shall determine the required length of j replacement. The material for sanitary sewer mains and sanitary sewer laterals shall be Class 51 Ductile Iron Pipe with polyethylene wrapping. The material for sanitary sewer service lines shall be extra strength cast iron soil pipe with polyethylene wrapping. Adapter fittings shall be a urethane or neoprene coupling ASTM C-425 with series 300 stainless steel compression straps. Backfill, fittings, tie-ins and all other associated appurtenances required are deemed subsidiary work, the cost of which shall be included in the price bid in the Proposal for each bid item. D- 6 EXISTING UTILITIES AND IMPROVEMENTS The plans show the locations of all known surface and subsurface structures. However, the Owner assumes no responsibility for failure to show any or all of these structures on the Plans, or to show them in their exact location. It is mutually agreed that such failure shall not be 09/01/04 SC-7 PART D - SPECIAL CONDITIONS considered sufficient basis for claims for additional compensation for extra work or for increasing the pay quantities in any manner whatsoever. The Contractor shall be responsible for verifying the locations of and protecting all existing utilities, service lines, or other property exposed by his construction operations. Contractor shall make all necessary provisions for the support, protection or relocation, and/or temporary relocation of all utility poles, gas lines, telephone cables, utility services, water mains, sanitary sewer lines, electrical cables, drainage pipes, and all other utilities and structures both above and below ground during construction. The Contractor is liable for all damages done to such existing facilities as a result of his operations and any and all cost incurred for the protection and/or temporary relocation of such facilities are deemed subsidiary work and the cost of same and shall be included in the cost bid per linear foot of pipe installed. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. Where existing utilities or service lines are cut, broken or damaged the Contractor shall replace or repair the utilities or service lines with the same type of original material and construction, or better, unless otherwise shown or noted on the plans, at his own cost and expense. The Contractor shall immediately notify the Owner of the damaged utility or service line. He shall cooperate with the Owners of all utilities to locate existing underground facilities and notify the Engineer of any conflicts in grades and alignment. In case it is necessary to change or move the property of any owner of a public utility, such property shall not be moved or interfered with until ordered to do so by the Engineer. The right is reserved to the owner of public utilities to enter upon the limits of the project for the purpose of making such changes or repairs of their property that may be made necessary by performance of this contract. The utility lines and conduits shown on the plans are for information only and are not guaranteed by the City of the Engineer to be accurate as to extent, location, and depth; they are shown on the plans as the best information available at the time of design, from the owners of the utilities involved and from evidences found on the ground. D-7 CONSTRUCTION TRAFFIC OVER PIPELINES It is apparent that certain construction vehicles could exceed the load bearing capacity of the pipe under shallow bury conditions. It will be the responsibility of the Contractor to protect both the new line and the existing lines from these possibly excessive loads. The Contractor shall not, at any time, cross the existing or new pipe with a truck delivering new pipe to the site. Any damage to the existing or new pipe will be repaired or replaced by the Contractor, at the Contractor's_ expense, to the satisfaction of the City. In locations where it is not permissible to cross the existing or proposed pipes without additional protection the Contractor may elect to provide additional protection of the pipes so that more frequent crossings of the pipes are allowed. It still is, however, the responsibility of the Contractor to repair any damage to the existing or proposed lines, if the damage results from any phase of his construction operation. D-8 TRAFFIC CONTROL The contractor will be required to obtain a "Street Use Permit" prior to starting work. As part of the "Street Use Permit" a traffic control plan is required. The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set 09/01/04 SC-8 PART D R SPECIAL CONDITIONS forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and I Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways," codified as Article 6701d Vernon's Civil Statutes, pertinent sections being Section f Nos. 27, 29, 30 and.31. A traffic control plan shall be submitted for review to Mr. Charles R. Burkett, City Traffic Engineer at (817) 871-8770, at the pre-construction conference. Although work will not begin until the 1 traffic control plan has been reviewed, the Contractor's time will begin in accordance with the time frame established in the Notice to the Contractor. The Contractor will not remove any regulatory sign, instructional sign, street name sign or other sign, which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works 1 Department, Signs and Markings Division, (Phone Number 871-7738) to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above-referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed 1 correctly or if it does not meet the required specifications, the permanent sign shall be left in 1 place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place I until such reinstallation is completed. i Work shall not be performed on certain locations/streets during "peak traffic periods" as determination by the City Traffic Engineer and in accordance with the applicable provision of the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas." The cost of the traffic control is subsidiary work and the cost of same shall be included in the price bid for pipe complete in place as bid in the Proposal, and no other compensation will be Iallowed. D-9 DETOURS I The contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the 1 project area. J D- 10 EXAMINATION OF SITE It shall be the responsibility of the prospective bidder to visit the project site and make such examinations and explorations as may be necessary to determine all conditions, which may affect construction of this project. Particular attention should be given to methods of providing ingress 1 and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during the preparation of the Proposal and all unusual conditions, which j may give, rise to later contingencies should be brought to the attention of the Owner prior to the ( submission of the Proposal. ( D- 11 ZONING COMPLIANCE During the construction of this project, the Contractor shall comply with present zoning S requirements of the City of Fort Worth in the use of vacant property for storage purposes. I 09101104 SC-9 DART D - SPECIAL CONDITIONS D- 12 WATER FOR CONSTRUCTION The Contractor at his own expense will furnish water for construction. D- 13 WASTE MATERIAL All waste material shall become the property of the Contractor and shall be disposed of by the Contractor at locations approved by the Engineer. All material shall be disposed of in such a manner as to present a neat appearance and to not obstruct proper drainage or to cause injury to street improvements or to abutting property. D- 14 PROJECT CLEANUP AND FINAL ACCEPTANCE The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items. Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary, clean-up shall be done on a daily basis. Clean up work shall include,but not be limited to: • Sweeping the street clean of dirt or debris • Storing excess material in appropriate and organized manner • Keeping trash of any kind off of residents' property A If the Engineer does not feel that the jobsite has been kept in an orderly condition, on the next estimate payment(and all subsequent payments until completed) of the appropriate bid item(s)will be reduced by 25%. Final cleanup work shall be done for this project as soon as all construction has been completed. No more than seven days shall elapse after completion of construction before the roadway, right- of-way, or easement is cleaned up to the satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work before acceptance by the City of Fort Worth or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. The City of Fort Worth Department of Engineering shall give final acceptance of the completed project work. D- 15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK Prior to executing the Contract, it shall be the responsibility of the Contractor to furnish a schedule outlining the anticipated time for each phase of construction with starting and completion dates, including sufficient time being allowed for cleanup. The Contractor shall not commence with water and/or sanitary sewer installation until such time that the survey cut-sheets have been received from the City inspector. D- 16 SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES The following procedures will be followed regarding the subject item on this contract: 1. A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. 09/01/04 SC-10 DART D - SPECIAL CONDITIONS The warning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." I 2. Equipment that may be operated within ten feet of high voltage lines shall have insulating cage-type of guard about the boom or arm, except back hoes or dippers, and insulator links on the lift hook connections. 3. When necessary to work within six feet of high voltage electric lines, notification shall be given the power company (ONCORE) who will erect temporary mechanical barriers, de- energize the lines, or raise or lower the lines. The work done by the power company shall ` not be at the expense of the City of Fort Worth. _The notifying department shall maintain an accurate log of all such calls to ONCORE, and shall record action taken in each case. 1 4. The Contractor is required to make arrangements with the ONCORE company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. 5. No person shall work within six feet of a high voltage line without protection having been 1 taken as outlined in Paragraph (3). 1 D- 17 BID QUANTITIES 1 Bid quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities. There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C4-4.3 conflicts with this provision, this provision controls. No claim 1 will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. D- 18 CUTTING OF CONCRETE When existing concrete is cut, such cuts shall be made with a concrete saw. All sawing shall be subsidiary to the unit cost of the respective item. D- 19 PROJECT DESIGNATION SIGN Project signs are required at all locations. It shall be in accordance with the attached Figure 30 (dated 9-18-96). The signs may be mounted on skids or posts. The Engineer shall approve the exact locations and methods of mounting. In addition to the 4' x 8' project signs, project signs shall be attached to barricades used where manhole rehabilitation or replacement is being conducted. Signs suspended from barricading shall be placed in such a way that signs do not interfere with reflective paint or coloring on the barricades. Barricade signs shall be in accordance with Figure 30, except that they shall be V-0" by 2'-0" in size. The information box ( shall have the following information: J For Questions on this Project Call: (817) 871-8306 M-F 7:30 am to 4:30 p.m. or (817)871-8300 Nights and Weekends Any and all cost for the required materials, labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cost of the project and no additional 4 compensation will be allowed. 09101104 SC-11 t_4ART D - SPECIAL CONDITIONS D-20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT At locations in the project where mains are required to be placed under existing sidewalks and/or driveways, such sidewalks and/or driveways shall be completely replaced for the full existing width, between existing construction or expansion joints with 3000 psi concrete with reinforcing steel on a sand cushion in accordance with City of Fort Worth Transportation/Public Works Department Standard Specifications for Construction, Item 504. At locations where mains are required to be placed under existing curb and gutter, such curb and gutter shall be replaced to match type and geometry of the removed curb and gutter shall be installed in accordance with City of Fort Worth Public Works Department Standard Specification for Construction, Item 502. Payment for cutting, backfill, concrete, forming materials and all other associated appurtenances required, shall be included in the square yard price of the bid item for concrete sidewalk or driveway repair. D-21 MISCELLANEOUS PLACEMENT OF MATERIAL Material has been allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one-tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. D-22 CRUSHED LIMESTONE BACKFILL Where specified on the plans or directed by the Engineer, Crushed Limestone shall be used for trench backfill on this project. The material shall conform to Public Works Standard Specifications for Street and Storm Drain Construction Division 2 Item 208.2 - Materials and Division 2 Item 208.3 - Materials Sources. Trench backfill and compaction shall meet the requirements of E2-2 Excavation and Backfill, Construction Specifications, General Contract Documents. Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal multiplied by the quantity of material used measured in accordance with E2-2.16 Measurement of Backfill Materials, Construction Specifications, and General Contract Documents. D-23 2:27 CONCRETE Transportation and Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as base repair. Since this call- out includes the word "concrete", the consistent interpretation of the Transportation and Public Works Department is that this ratio specifies two (2) sacks of cement per cubic yard of concrete. D-24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION Trench excavation and backfill under parking lots, driveways, gravel surfaced roads, within easements, and within existing or future R.O.W. shall be in accordance with Sections E1-2 Backfill and E2-2 Excavation and Backfill of the General Contract Documents and Specifications except as specified herein. 09/01/04 SC-12 FART D - SPECIAL CONDITIONS 1. TRENCH EXCAVATION: In accordance with Section E2-2 Excavation and Backfill, if the stated maximum trench widths are exceeded, either through accident or otherwise, and if the Engineer determines that the design loadings of the pipe will be exceeded, the Contractor will be required to support the pipe with an improved trench bottom. The expense of such remedial I measures shall be entirely the Contractor's own. All trenching operations shall be confined to the width of permanent rights-of-way, permanent easements, and any temporary construction easements. All excavation shall be in strict compliance with the Trench Safety Systems Special Condition of this document. 2. TRENCH BACKFILL: Trenches which lie outside of existing or future pavement shall be backfilled above the top of the embedment material with Type "C" backfill material. Excavated material used for Type "C" backfill must be mechanically compacted unless the Contractor can . furnish the Engineer with satisfactory evidence that the P.1. of the excavated material is less than 8. Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soils in all involved areas, with a map showing the location and depth of the various test holes. If excavated material is obviously granular in nature, containing little or no plastic material, the Engineer may waive the test report requirement. See E1-2.3, Type "C" or "D" Backfill, and E2-2.11 Trench Backfill for additional requirements. When Type "C" back-fill material is not suitable, at the direction of the Engineer, Type "B" backfill material shall be used. In general, all backfill material for trenches in existing paved streets shall be in accordance with Figure A'. Sand material specified in Figure A shall be obtained from an approved source and shall consist of durable particles free of thin or elongated pieces, lumps of clay, soil, loam or vegetable matter and shall meet the following gradation: • Less than 10% passing the#200 sieve I 0 P.I. = 10 or less i Additionally, the crushed limestone embedment gradation specified in Section E1-3 Crushed Limestone for Embedment of the General Contract Documents and Specifications shall be I replaced with the following: I Sieve Size % Retained ill 0-10 1/2" 40-75 3/8" 55-90 #4 90-100 #8 95-100 1 All other provisions of this section shall remain the same. 3. TRENCH COMPACTION: All trench backfill shall be placed in lifts per E2-2.9 Backfill. Trenches which lie outside existing or future pavements shall be compacted to a minimum of 90% Standard Proctor Density (A.S.T.M. D698) by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. Trenches which lie under existing or future pavement shall be backfilled per Figure A with 95% Standard Proctor Density by mechanical devices specifically designed for compaction or a i combination of methods subject to approval by the Engineer. Backfill material to be compacted as described above must be within +-4% of its optimum moisture content. The top two (2) feet of sewer line trenches and the top eighteen (18) inches of water line may be rolled in with heavy 1 09/01/04 SC-13 l IRT D - SPECIAL CONDITIONS equipment tires, provided it is placed in lifts appropriate to the material being used and,the operation can be performed without damage to the installed pipe. The City, at its own expense, will perform trench compaction tests per A.S.T.M. standards on all trench backfill. Any retesting required as a result of failure to compact the backfill material to meet the standards will be at the expense of the Contractor and will be billed at the commercial rates as determined by the City. These soil density tests shall be performed at two (2) foot vertical intervals beginning at a level two (2) feet above the top of the installed pipe and continuing to the top of the completed backfill at intervals along the trench not to exceed 300 linear feet. The Contractor will be responsible for providing access and trench safety system to the level of trench backfill to be tested. No extra compensation will be allowed for exposing the backfill layer to be tested or providing trench safety system for tests conducted by the City. 4. MEASUREMENT AND PAYMENT: All material, including any and all Type "B backfill, and labor costs of excavation and backfill will be included in the contract documents as a pre-'bid pay item in cubic yards. D-25 PAVEMENT REPAIR (E2-19) The unit price bid under the appropriate bid item of the proposal shall cover all cost for providing pavement repair equal to or superior in composition, thickness, etc., to existing pavement as detailed in the Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts, Figures 2000-1 through 2000-3. The results of the street cores that were conducted on the project streets, to determine HMAC depths on existing streets, are provided in these specifications and contract documents. All required paving cuts shall be made with a concrete saw in a true and straight line on both sides of the trench, a minimum of twelve (12) inches outside the trench walls. The trench shall be backfilled and the top nine (9) inches shall be filled with required materials as shown on paving details, compacted and level with the finished street surface. This finished grade shall be maintained in a serviceable condition until the paving has been replaced. All residential driveways shall be accessible at night and over weekends. It has been determined by the Transportation and Public Works Department that the strip of existing HMAC pavement between the existing gutter and the edge of the trench pavement repair will not hold up if such strip of existing pavement is two (2)feet or less in width. Therefore, at the locations in the project where the trench wall is three (3) feet or less from the lip of the existing gutter, the Contractor shall be required to remove the existing paving to such gutter. The pavement repair shall then be made from a minimum distance of twelve (12) inches outside the trench wall nearest the center of the street to the gutter line. The pavement shall be replaced within a maximum of five (5) working days, providing job placement conditions will permit repaving. If paving conditions are not suitable for repaving, in the opinion of the Owner, the repaving shall be done at the earliest possible date. A permit must be obtained from the Department of Engineering Construction Services Section by the Contractor in conformance with Ordinance No. 3449 and/or Ordinance No. 792 to make utility cuts in the street. The Department of Engineering will inspect the paving repair after construction. This permit requirement may be waived if work is being done under a Performance Bond and inspected by the Department of Engineering. 09/01/04 SC-14 PART D , SPECIAL CONDITIONS D-26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS) A. GENERAL: This specification covers the trench safety requirements for all trench excavations exceeding depth of five (5) feet in order to protect workers from cave-ins. The f requirements of this item govern all trenches for mains, manholes, vaults, service lines, and I all other appurtenances. The design for the trench safety shall be signed and sealed by a Registered Professional Engineer licensed in Texas. The trench safety plan shall be specific for each water and/or sanitary sewer line included in the project. B. STANDARDS: The latest version of the U.S. Department of Labor, Occupational Safety and Health Administration Standards, 29 CFR Part 1926, Sub-Part P - Excavations, are hereby made a part of this specification and shall be the minimum governing requirements for trench safety. C. DEFINITIONS: 1. TRENCHES - A trench is referred to as a narrow excavation made below the surface of f the ground in which the depth is greater than the width, where the width measured at the I bottom is not greater than fifteen (15)feet. 2. BENCHING SYSTEM - Benching means excavating the sides of a trench to form one or a series of horizontal level or steps, usually with vertical or near-vertical surfaces between levels. 3. SLOPING SYSTEM - Sloping means excavating to form sides of a trench that are inclined away from the excavation. 1 4. SHIELD SYSTEM - Shields used in trenches are generally referred to as "trench boxes" or 1 "trench shields". Shield means a structure that is able to withstand the forces imposed on it by a cave-in and protect workers within the structure. Shields can be permanent structures or can be designed to be portable and move along as the work progresses. Shields can be either pre-manufactured or job-built in accordance with OSHA standards. I 5. SHORING SYSTEM - Shoring means a structure such as a metal hydraulic, mechanical l or timber system that supports the sides of a trench and which is designed to prevent cave-ins. Shoring systems are generally comprised of cross-braces, vertical rails, (uprights), horizontal rails (wales) and/or sheeting. D. MEASUREMENT - Trench depth is the vertical measurement from the top of the existing ' ground to the bottom of embedment or bottom of excavation. The quantity of trench safety systems shall be based on the linear foot amount of trench depth greater than five (5)feet. E. PAYMENT - Payment shall be full compensation for safety system design, labor, tools, materials, equipment and incidentals necessary for the installation and removal of trench safety systems. D-27 SANITARY SEWER MANHOLES A. GENERAL: The installation, replacement, and/or rehabilitation of sanitary sewer manholes will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. All manholes shall be in accordance with sections E1-14 Materials for Sanitary Sewer Manholes, Valve Vaults, Etc., and E2-14 Vault and Manhole Construction of the General Contract 09101104 SC 15 DART Q - SPECIAL CONDITIONS Documents and Specifications, unless amended or superseded by requirements of this Special Condition. For new sewer line installations, the Contractor shall temporarily plug all lines at every open manhole under construction in order to keep debris out of the dry sewer lines. The plugs shall not be removed until the applicable manhole complete with cone section has been constructed and the lid installed to keep out debris as a result of additional construction. 1. CONCRETE COLLARS: Concrete collars will be required on all manholes specified as per Figure 121. 2. WATERTIGHT MANHOLE INSERTS: Watertight gasket manhole inserts shall be installed in all sanitary sewer manholes. Inserts shall be constructed in accordance with Fort Worth Water Department Standard E100-4 and shall be fitted and installed according to the manufacturer's recommendations. Stainless Steel manhole inserts shall be required for all pipe diameters 18" and greater. 3. LIFT HOLES: All lift holes shall be plugged with a pre-cast concrete plug. The lift hole shall be sealed on the outside of the manhole with Ram-Nek or an approved equal sealant. The lift hole shall be sealed on the inside of the manhole with quick setting cement grout. 4. FINAL RIM ELEVATIONS: Manhole rims in parkways, lawns and other improved lands shall be at an elevation not more than one (1) nor less than one-half (1/2) inch above the surrounding ground. Backfill shall provide a uniform slope from the top of manhole casting for not less than three (3)feet each direction to existing finish grade of the ground. The grade of all surfaces shall be checked for proper slope and grade by string lining the entire area regarded near the manhole. Manholes in open fields, unimproved land, or drainage courses shall be at an elevation shown on the drawings or minimum of 6 inches above grade. 5. MANHOLE COVERS: All lids shall have pick slots in lieu of pick holes. Manhole frames and covers shall be McKinley, Type N, with indented top design, or equal, with pick slots. Covers shall set flush with the rim of the frame and shall have no larger than 1/8-inch gap between the frame and cover. Bearing surfaces shall be machine finished. Locking manhole lids and frames will be restricted to locations within the 100-year floodplain and areas specifically designated on the plans. Certain teed Ductile Iron Manhole Lids and Frames are acceptable for use where locking lids are specified. 6. SHALLOW CONE MANHOLES: Shallow manhole construction will be used when manhole depth is four (4) feet or less. All shallow cone manholes shall be built in accordance with Figure 105. All shallow cone manholes shall have a cast iron lid and frame with pick slots. NOTE: MANHOLES PER FIGURE 106 WILL NOT BE ALLOWED. 7. MANHOLE STEPS: No manhole steps are to be installed on any sanitary sewer manhole. 8. EXTERIOR SURFACE COATING: Exterior surfaces of all manholes shall be coated with two mop coats of coal tar epoxy, Koppers "Bitumastic Super Service Black" Tnemec "46- 450 Heavy Tnemecol," or equal to, a minimum or 14 mils dry film thickness. 9. MANHOLE JOINT SEALING: All interior and/or exterior joints on concrete manhole sections constructed for the City of Fort Worth Water Department, excluding only the 09101104 SCA 6 PART D - SPECIAL CONDITIONS joints using a trapped type performed O-ring rubber gasket shall require Bitumastic joint sealants as per Figure M. This sealant shall be pre-formed and trowelable Bitumastic as manufactured by Kent- Seal, Ram-Nek, E-Z Stick, or equal. The joint sealer shall be supplied in either extruded pipe form or suitable cross-sectional area or flat-tape and shall be sized as recommended by the manufacturer and approved by the Engineer. The joint sealer shall be protected by ( a suitable removable wrapper and shall not in any way depend on oxidation, evaporation, I. or any other chemical action for either its adhesive properties or cohesive strength. The Joint sealer shall remain totally flexible without shrinking, hardening, or oxidizing regardless of the length of time it is exposed to the elements. The manufacturer shall furnish an affidavit attesting to the successful use of the product as a pre-formed flexible joint sealant on concrete pipe and manhole sections for a period of at least five years. B. EXECUTION: 1. INSTALLATION OF JOINT SEALANT: Each grade adjustment ring and manhole frame shall be sealed with the above-specified materials. All surfaces to be in contact with the joint sealant shall be thoroughly cleaned of dirt, sand, mud,.or other foreign matter. The manufacturer shall apply a primer to all surfaces prior to installing the joint sealant in 1 accordance with the recommendations. The protective wrapper shall remain on the joint sealant until immediately prior to the placement of the pipe in the trench. After removal of the protective wrapper, the joint sealant shall be kept clean. Install frames and cover over manhole opening with the bottom of the rings resting on Bitumastic joint sealer. Frames and grade rings shall rest on two (2) rows (inside and outside) of Bitumastic joint sealer. 2. SEALING AND/OR ADJUSTING EXISTING MANHOLES: Excavate (rectangular full depth saw cut if in pavement) adjacent to the manhole to expose the entire manhole frame and a minimum of 6 inches of the manhole wall keeping the sides of the trench nearly vertical. Remove manhole frame from the manhole structure and observe the condition of the frame and grade rings. Any frame or grade ring that is not suitable for use as determined by the Engineer shall be replaced. Grade rings that are constructed of brick, block materials other than pre-cast concrete rings, or where necessary and approved by the Engineer, shall be replaced with a pre-cast flattop section. Pre-cast concrete rings, or a pre-cast concrete flattop section will be the only adjustments allowed. In brick or block manholes, replace the upper portion of the manhole to a point 24 inches .. below the frame. If the walls or cone section below this level are structurally unsound, l notify the Engineer prior to replacement of the grade rings and manhole frame. Existing brickwork, if damaged by the Contractor, shall be replaced at the Contractor's expense. I Wire brush manhole frame and exposed manhole surfaces to remove dirt and loose debris. Coat exposed manhole surfaces with an approved bonding agent followed by an application of quick setting hydraulic cement to provide a smooth working surface. l If the inside diameter of the manhole is too large to safely support new adjustment rings or frames, a flat top section shall be installed. Joint surfaces between the frames, adjustment rings, and cone section shall be free of dirt, stones, debris and voids to ensure a watertight seal. Place flexible gasket joint l 09/01/04 SC-17 PART D - SPECIAL CONDITIONS material along the inside and outside edge of each joint, or use trowelable material in lieu of pre-formed gasket material. Position the butt joint of each length of joint material on opposite sides of the manhole. No steel shims, wood, stones, or any material not specifically accepted by the Engineer may be used to obtain final surface elevation of the manhole frame. In paved areas or future paved areas, castings shall be installed by using a straight edge not less than ten (10) feet long so that the top of the casting will conform to the slope and finish elevation of the paved surface. The top of the casting shall be 1/8 inch below the finished elevation. Allowances for the compression of the joint material shall be made to assure a proper final grade elevation. 3. EXPOSED EXTERIOR SURFACES: All exposed exterior surfaces shall be coated with two mop coats of coal tar epoxy. Kopper "Bitumastic Super Service Black"; Tnemec "46- 450 Heavy Tnemecol", or equal, to a minimum of 14 mils dry film thickness. 4. The exterior surface of all pre-cast section joints shall be thoroughly cleaned with a wire brush and then waterproofed with a 1/2-inch thick coat of trowelable bitumastic joint sealant from 6-inches below to 6-inches above the joint. The coated joint shall then be wrapped with 6 mil plastic to protect the sealant from damage during backfilling. C. MEASUREMENT AND PAYMENT: The price bid for new manhole installations shall include { all labor, equipment, and materials necessary for construction of the manhole including, but not limited to, joint sealing, lift hole sealing and exterior surface coating. Payment shall not include pavement replacement, which if required, shall be paid separately. The price bid for reconstruction of existing manholes shall include all labor equipment and materials necessary for construction of new manhole, including, but not limited to, excavation, backfill, disposal of materials, joint sealing, lift hole sealing and exterior surface coating. Payment shall not include pavement replacement, which if required, shall be paid separately. The price bid for adjusting and/or sealing of existing manholes shall include all labor, equipment and materials necessary for adjusting and/or sealing the manhole, including but not limited to,joint sealing, lift hole sealing, and exterior surface coating. Payment for concrete collars will be made per each. Payment for manhole inserts will be made per each. D-28 SANITARY SEWER SERVICES Any reconnection, relocation, re-routes, replacement, or new sanitary sewer service shall be required as shown on the plans, and/or as described in these Special Contact Documents in addition to those located in the field and identified by the Engineer as active sewer taps. The service connections shall be constructed by the Contractor utilizing standard factory manufactured tees. City approved factory manufactured saddle taps may be used, but only as directed by the Engineer. The decision to use saddle taps as opposed to tees shall be made on a case-by-case basis. The Contractor shall be responsible for coordinating the scheduling of tapping crews with building owners and the Engineer in order that the work be performed in an expeditious manner. A minimum of 24 hours advance notice shall be given when taps will be required. Severed service connections shall be maintained as specified in section C6-6.15. 09/01/04 SC-18 I ` PART D - SPECIAL CONDITIONS D. SEWER SERVICE RECONNECTION: When sewer service reconnection is called for the Contractor shall vertically adjust the existing sewer service line as required for reconnection and furnish a new tap. The fittings used for vertical adjustment shall consist of a maximum bend of 45 degrees. The tap shall be located so as to line up with the service line and avoid any horizontal adjustment. For open cut applications, all sanitary sewer service lines shall be replaced to the property or easement line, or as directed by the Engineer. Sanitary sewer services on sewers being rehabilitated using pipe enlargement methods shall be replaced to 1 the property or easement line or as directed by the Engineer. Procedures listed below for Sewer Service Replacement shall be adhered to for the installation of any sewer service line including the incidental four (4) feet of service line which is included in the price bid for Sanitary Sewer Taps. Payment for work such as backfill, saddles, tees, fittings incidental four (4) feet of service line and all other associated appurtenances required shall be included in the price bid for Sanitary Sewer Taps. 1 E. SEWER SERVICE REPLACEMENT: All building sewer services encountered during construction shall be adjusted and/or replaced by the Contractor as directed by the Engineer as required for the connection of the sewer service line. If the sewer service line is in such 1 condition or adjustment necessitates the replacement of the sewer service line, all work shall be performed by a licensed plumber. The Engineer shall determine the length of the replacement. All sewer services shall be installed at a minimum of two (2) percent slope or as l approved by the Engineer. For situations involving sewer service re-routing, whether on l public or private property, the City shall provide line and grade for the sewer service lines as shown on the project plans. Prior to installing the applicable sewer main or lateral and the j necessary service lines, the Contractor shall verify (by de-holing at the building clean-out) the I elevations (shown on the plans) at the building clean-out and compare the data with the elevation at the proposed connection point on the sewer main, in order to ensure that the two (2) percent minimum slope (or as specified by the Engineer) requirement is satisfied. Elevations shall also be verified at all bend locations on the service re-route. All applicable sewer mains, laterals and affected service lines that are installed without pre-construction de- holing at the affected residences (to verify design elevations) shall be removed and replaced as necessary at the Contractor's expense in the event grade conflicts are brought to light after de-holing is conducted. All elevation information obtained by the Contractor shall be submitted to the Inspector. The Engineer shall be immediately notified in the event that the two (2) percent minimum slope is not satisfied. If the Contractor determines that a different alignment for the re-route is more beneficial than shown on the plans, the Contractor shall obtain and submit all relevant elevation information for the new alignment to the Inspector and shall be responsible for ensuring that the two (2) percent minimum grade (or as approved by the Engineer) is satisfied. Prior to backfilling, the Contractor shall double check the grade of the installed service line and submit signed documentation verifying that the line has been installed as designed to the Engineer. The Contractor, at its sole expense, shall be required to uncover any sewer service for which no grade verification has been submitted. All re- routes that are not installed as designed or fail to meet the City code shall be reinstalled at the Contractor's expense. The Contractor shall ensure that the service line is backfilled and compacted in accordance with the City Plumbing Code. Connection to the existing sewer service line shall be made with appropriate adapter fittings. The fitting shall be a urethane or neoprene coupling A.S.T.M. C-425 with series 300 stainless steel compression straps. The Contractor shall remove the existing clean-out and plug the abandoned sewer service line. The contractor shall utilize schedule 40 PVC for all sanitary sewer service re-routes or relocations located on private property. Furthermore, the contractor shall utilize the services of a licensed plumber for all service line work on private property. Permit(s) must be obtained from the City of Fort Worth Development Department for all service line work on private 09/01/04 SC-1 9 { I ART D - SPECIAL CONDITIONS property and all work related to the service line must be approved by a City of Fort Worth Plumbing Inspector. A copy of the plumbing permit shall be provided to the Engineer prior to beginning work on the sanitary sewer service re-route and proof of final acceptance by the Plumbing Inspector shall be provided to the Engineer upon completion of the sanitary sewer re-route. Payment for work and materials such as backfill, removal of existing clean-outs, plugging the abandoned sewer service line, double checking the grade of the installed service line, pipe fittings, surface restoration on private property (to match existing), and all other associated work for service replacements in excess of four (4) linear feet shall be included in the linear foot price bid for sanitary sewer service line replacement on private property or public right of way. Payment for all work and material involving the "tap" shall be included in the price bid for sanitary sewer service taps. D-29 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES Any removal, salvaging and/or abandonment of existing facilities will necessarily be required as shown on the plans, and/or described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. This work shall be-done in accordance with Section E2-1.5 Salvaging of Material and E2-2.7 Removing Pipe, of the General Contract Documents and Specifications, unless amended or superseded by requirements of this Special Condition. A. SALVAGE OF EXISTING WATER METER AND METER BOX: Existing water meter and meter box shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. B. SALVAGE OF EXISTING WATER METER AND CONCRETE VAULT LID: Existing water meter and concrete vault lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The concrete vault shall be demolished in place to a point not less than 18 inches below final grade. The concrete vault shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. C. SALVAGE OF EXISTING FIRE HYDRANTS: Existing fire hydrants shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. D. SALVAGE OF EXISTING GATE VALVE: Existing gate valve and valve box and lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void area caused by the valve removal shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be' suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. If the valve is in a concrete vault, the vault shall be demolished in place to a point no less than 18" below final grade. 09/09/04 SC-20 PART D R SPECIAL CONDITIONS E. ABANDONMENT OF EXISTING GATE VALVE: Existing gate valve and box lid shall be I abandoned by first closing the valve to the fully closed position and demolishing the valve box in place to a point not less than 18 inches below final grade. Concrete shall then be used as backfill material to match existing grade. F. ABANDONMENT OF EXISTING VAULTS: Vaults to be demolished in place shall have top slab and lid removed and vault walls demolished to a point not less than 18" below final ( grade. The void area caused shall then be backfilled and compacted in accordance with I backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with the existing surrounding grade. G. ABANDONMENT OF MANHOLES: Manholes to be abandoned in place shall have all pipes I entering or exiting the structure plugged with lean concrete. Manhole top or cone section shall be removed to the top of the full barrel diameter section, or to point not less than 18 inches below final grade. The structure shall then be backfilled and compacted in accordance 1 with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be either clean washed sand of clean, suitable excavated material approved by the Engineer. Surface restoration shall be compatible with surrounding service surface. Payment for work involved in backfilling, plugging of pipe(s) and all other appurtenances required, shall be included in the appropriate bid item -Abandon Existing Sewer Manhole. 4 H. REMOVAL OF MANHOLES: Manholes to be removed shall have all pipes entering or exiting the structure disconnected. The complete manhole, including top or cone section, all full barrel diameter section, and base section shall be removed. The excavation shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be with Type C Backfill or Type B Backfill, as approved by the Engineer. Surface restoration shall be compatible with surrounding surface. I. CUTTING AND PLUGGING EXISTING MAINS: At various locations on this project, it may be frequired to cut, plug, and block existing water mains/services or sanitary sewer mains/services in order to abandon these lines. Cutting and plugging existing mains and/or services shall be considered as incidental and all costs incurred will be considered to be included in the linear foot bid price of the pipe, unless separate trenching is required. J. REMOVAL OF EXISTING PIPE: Where removal of the existing pipe is required, it shall be the Contractor's responsibility to properly dispose of all removed pipe. All removed valves, l fire hydrants and meter boxes shall be delivered to Water Department Field Operation, Storage Yard. C. PAYMENT: Payment for all work and material involved in salvaging, abandoning and/or removing existing facilities shall be included in the linear foot bid price of the pipe, except as follows: separate payment will be made for removal of all fire hydrants, gate valves, 16 inch 1 and larger, and sanitary sewer manholes, regardless of location. Payment will be made for salvaging, abandoning and/or removing all other existing facilities when said facility is not being replaced in the same trench (i.e., when removal requires a separate trench). fL. ABANDONMENT OF EXISTING SEWER LINES: Where plans call for abandonment of existing sewer mains after the construction of a new sewer main, the Contractor shall be responsible for TV inspection of 100% of the existing sewer main to be abandoned to make a 09/01/04 SC-21 1 PART D - SPECIAL CONDITIONS final determination that all existing service connections have been relocated to the new main. Once this determination has been made, the existing main will be abandoned as indicated above in Item I. D- 30 DETECTABLE WARNING TAPES Detectable underground utility warning tapes which can be located from the surface 'by a pipe detector shall be installed directly above non-metallic water and sanitary sewer pipe. The detectable tape shall be "Detect Tape" manufactured by Allen Systems, Inc. or approved equal, and shall consist of a minimum thickness 0.35 mils solid aluminum foil encased in a protective inert plastic jacket that is impervious to all known alkalis, acids, chemical reagents and solvents found in the soil. The minimum overall thickness of the tape shall be 5.5 mils, and the width shall not be less than two inches with a minimum unit weight of 2'h pounds/1 inch/100'. The tape shall be color coded and imprinted with the message as follows: Type of Utility Color Code Legends Water Safety Blue Caution! Buried Water Line Below Sewer Safety Green Caution! Buried Sewer Line Below Installation of detectable tapes shall be per manufacturer's recommendations and shall be as close to the grade as is practical for optimum protection and detectability. Allow a minimum of 18 inches between the tape and the pipe. Payment for work such as backfill, bedding, blocking, detectable tapes, and all other associated appurtenances required shall be included in the unit price bid for the appropriate bid item(s). D-31 PIPE CLEANING Joints shall be wiped and then inspected for proper installation by the inspectors. Each joint shall be swept daily and kept clean during installation. A temporary night plug shall be installed on all exposed pipe ends during any period of work stoppage. D-32 DISPOSAL OF SPOIL/FILL MATERIAL Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of Engineering Department, acting as the City of Fort Worth's Flood Plain Administrator ("Administrator"), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinances of the City of Fort Worth (Ordinance No. 10056). All disposal sites must be approved by the Administrator to ensure that filling is not occurring within a floodplain without a permit. A floodplain permit can be issued upon approval of necessary Engineering studies. No fill permit is required if disposal sites are not in a floodplain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary Engineering studies, shall be at the Contractor's expense. In the event that the Contractor disposes of spoil/fill material at a site without a fill permit or a letter from the administrator approving the disposal site, upon notification by the Director of Engineering Department, Contractor shall remove the spoil/fill material at its expense and dispose of such materials in accordance with the Ordinances of the City and this section. 09/01/04 SC-22 PART D - SPECIAL CONDITIONS D-33 MECHANICS AND MATERIALMEN'S LIEN The Contractor shall be required to execute a release of mechanics and material men's liens upon receipt of payment. 1 D- 34 SUBSTITUTIONS The specifications for materials set out the minimum standard of quality, which the City believes 1 necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material, which has been specified. Where the term "or equal", or"or approved equal" is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished, it will be approvable, as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. 'If a product of any other name is proposed for use, the Engineer's approval thereof must be obtained before the Contractor procures the proposed substitute. Where the term "or equal", or "or approved equal" is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However, the Contractor shall have the full responsibility of proving that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of this sub-section as related to "substitutions" shall be applicable to all sections of these specifications. 1 D- 35 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: Prior to the reconstruction, ALL sections of existing sanitary sewer lines to be abandoned, removed (except where being replaced in the same location), or rehabilitated (pipe enlargement, cured-in-place pipe, fold and form pipe, slip-line, etc.), shall be cleaned, and a television inspection performed to identify any active sewer service taps, other sewer laterals and their.location. Work shall consist of furnishing all labor, material, and equipment necessary for the cleaning and inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. 1. HIGH VELOCITY JET (HYDROCLEANING) EQUIPMENT: The high-velocity sewer line cleaning equipment shall be constructed for easy and safe operation. The equipment shall also have a selection of two or more high-velocity nozzles. The nozzles shall be capable of producing a scouring action from 15 to 45 degrees in all size lines designated to be cleaned. Equipment shall also include a high-velocity gun for washing and scouring manhole walls and floor. The gun shall be capable of producing flows from a fine spray to a solid stream. The equipment shall carry its own water tank, auxiliary engines, pumps, and hydraulically driven hose reel. Hydraulically Propelled Equipment shall be of a movable dam type and be constructed in such a way that a portion of the dam may be collapsed at any time during the cleaning operation to protect against flooding of the sewer. The movable dam shall be equal in diameter around the outer periphery to ensure removal of grease. If sewer cleaning balls or other equipment, which cannot be collapsed, is used, special precautions to prevent flooding of the sewers and public or private property shall be taken. The flow of sewage 1 present in the sewer lines shall be utilized to provide necessary fluid for hydraulic cleaning devices whenever possible. f2. CLEANING PROCEDURES: The designated sewer manholes shall be cleaned using high-velocity jet equipment. The equipment shall be capable of removing dirt, grease, rocks, sand, and other materials and obstructions from the sewer lines and manholes. If 09101104 SC-23 PART D - SPECIAL CONDITIONS cleaning of an entire section cannot be successfully performed from one manhole, the equipment shall be set up on the other manhole and cleaning again attempted. If, again, successful cleaning cannot be performed or equipment fails to traverse the entire manhole section, it will be assumed that a major blockage exists, and the cleaning effort shall be abandoned. When additional quantities of water from fire hydrants are necessary to avoid delay in normal working procedures, the water shall be conserved and not used unnecessarily. No fire hydrant shall be obstructed in case of a fire in the area served by the hydrant. Before using any water from the City Water Distribution System, the Contractor shall apply for and receive permission from the Water Department. The Contractor shall be responsible for the water meter and related charges for the setup, including the water usage bill. All expenses shall be considered incidental to cleaning. 3. DEBRIS REMOVAL AND DISPOSAL: All sludge, dirt, sand, rock, grease, and other solid or semisolid material resulting from the cleaning operation shall be removed at the downstream manhole of the section being cleaned. Passing material from manhole section to manhole section, which could cause line stoppages, accumulations of sand in wet wells, or damage pumping equipment, shall not be permitted. 4. All solids or semisolid resulting from the cleaning operations shall be removed from the site and disposed of at a site designated by the Engineer. All materials shall be removed from the site no less often than at the end of each workday and disposed of at no additional cost to the City. 5. UNDER NO CIRCUMSTANCE SHALL SEWAGE OR SOLIDS REMOVED THEREFROM BE DUMPED ONTO STREETS OR INTO DITCHES, CATCH BASINS, STORM DRAINS OR SANITARY SEWER MANHOLES. 6. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. B. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of any sewer service taps. to no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is emphasized. All television inspection videotapes shall have a footage counter. Measurement for location of sewer 09/01/04 SC-24 PART D - SPECIAL CONDITIONS service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. IThe City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at ( the option of the Contractor. The cost of retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service taps observed during inspection. In addition, other points of jsignificance such as locations of unusual conditions, roots, storm sewer connections, broken pipe, presence of scale and corrosion, and other discernible features will be recorded, and a copy of such records will be supplied to the City. 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. I 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes I shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. The Engineer will return tapes to the Contractor upon completion of review. Tapes shall not be erased without the permission of the Engineer. If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service l connections, the Contractor shall be required to re-televise and provide a good tape of the l line at no additional cost to the City. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera. THE TAPES SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO CONSTRUCTION FOR REVIEW AND DETERMINATION OF SAGS. Upon completion of review of the tapes by the Engineer, the Contractor will be notified as to which sections of the sanitary sewer are to be corrected. The Engineer will return tapes to the Contractor upon completion of review. All costs associated with this work shall be incidental to unit prices bid for items under Television Inspection of the Proposal. C. PAYMENT OF CLEANING AND PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for Pre-Construction Cleaning and Television Inspection of sanitary sewers shall be per linear foot of sewer actually televised. The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily 09101104 SC-25 PART D , SPECIAL CONDITIONS evaluated as to existing sewer conditions and for providing appropriate means for review of the tapes by the Engineer including collection and removal, transportation and disposal of sand and debris from the sewers to a legal dump site. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The primary purpose of cleaning is for television inspection and rehabilitation; when a portion of a line is not or cannot be televised or rehabilitated, the cleaning of that portion of line shall be incidental and no payment shall be made. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor, and the costs must be included in the bid price for TV Inspections. The cost of retrieving the TV Camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to TV Inspection. The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. D-36 VACUUM TESTING OF SANITARY SEWER MANHOLES D. GENERAL: This item shall govern the vacuum testing of all newly constructed sanitary sewer manholes. B. EXECUTION: 1. TEST PROCEDURE: Manholes shall be vacuum tested prior to any interior grouting with all connections in place. Lift holes shall be plugged, and all drop-connections and gas sealing connections shall be installed prior to testing. The sewer lines entering the manhole shall be plugged and braced to prevent the plugs from being drawn into the manhole. The plugs shall be installed in the lines beyond the drop-connections, gas sealing connections, etc. The test head shall be placed inside the frame at the top of the manhole and inflated in accordance with the manufacturer's recommendations. A vacuum of ten inches of mercury (10"Hg) shall be drawn and the vacuum pump will be turned off. With the valve closed, the level of vacuum shall be read after the required test time. The required test time shall be determined from the Table below in accordance with ASTM C1244-93: Table MINIMUM TIME REQUIRED FOR VACUUM DROP OF 1" Hg (10"Hg -9"Hg) (SEC) Depth of MH. 48-Inch Dia. 60-Inch Dia. (FT.) Manhole Manhole 0 to 16' 40 sec. 52 sec. 18' 45 sec. 59 sec. 20' 50 sec. 65 sec. 22' 55 sec. 72 sec. 09/01/04 SC-26 PART Q A SPECIAL CONDITIONS 24' 59 sec. 78 sec. 26' 64 sec. 85 sec. 28' 69 sec. 91 sec. I30' 74 sec. 98 sec. For Each 5 sec. 6 sec. Additional 2' 2. ACCEPTANCE: The manhole shall be considered acceptable, if the drop in the level of vacuum is less than one-inch of mercury (1" Hg) after the required test time. Any manhole, which fails to pass the initial test, must be repaired by either pressure grouting through the manhole wall or digging to expose the exterior wall of the manhole in order to locate the leak and seal it with an epoxy sealant. The manhole shall be retested as described above until it has successfully passed the test. f Following completion of a successful test, the manhole shall be restored to its normal condition, all temporary plugs shall be removed, all braces, equipment, and debris shall be removed and disposed of in a manner satisfactory to the Engineer. C. PAYMENT: Payment for vacuum testing of sanitary sewer manholes shall be paid at the contract price per each vacuum test. This price shall include all material, labor, equipment, f and all incidentals, including all bypass pumping, required to complete the test as specified herein. D- 37 BYPASS PUMPING 1 The Contractor shall bypass the sewage around the section or sections of sewer to be rehabilitated and/or replaced. The bypass shall be made by plugging existing upstream manhole and pumping the sewage into a downstream manhole or adjacent system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. Provisions shall be made at driveways and street crossings to permit safe vehicular travel without interrupting flow in the bypass system. Under no circumstances will the Contractor be permitted to discharge sewage into the trenches. Payment shall be incidental to rehabilitation or replacement of the sewer line. D- 38 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: After construction, ALL sections of sanitary sewer lines shall have a television inspection performed by an independent sub-Contractor hired by the prime Contractor. Work shall consist of furnishing all labor, material, and equipment necessary for inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. B. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection I shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the f satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. l 09/01/04 SC-27 PART Q - SPECIAL (CONDITIONS C. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. No more than 2000 linear feet of pipe will be televised at one time for review by the Engineer. When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is emphasized All television inspection video tapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor. The cost or retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. Sanitary sewer mains must be laced with enough water to fill all low pints. The television inspection must be done immediately following the lacing of the main with no water flow. If sewer is active, flow must be restricted to provide a clear image of sewer being inspected. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service tap observed during inspection. All television logs shall be referenced to stationing as shown on the plans. A copy of these television logs will be supplied to the City. r 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. Tapes will be returned to the Contractor upon completion of review by the Engineer. Tapes shall not be erased without the permission of the Engineer. 09/01/04 SC-2$ ( PART D - SPECIAL CONDITIONS If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re- televise and provide a good tape of the line at no additional cost to the City. If a good I tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera. I D. PAYMENT OF POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for post-construction Television Inspection of sanitary sewers shall be per linear foot of sewer televised. The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily evaluated as to sewer conditions and for providing appropriate means for review of the tapes by the Engineer. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The quantity of TV inspection shall be measured as the total length of new pipe installed. All costs associated with this work shall be included in the appropriate bid item - Post-Construction Television Inspection. I The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. 1 D-39 SAMPLES AND QUALITY CONTROL TESTING A. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all materials proposed to be used on the project, including a mix design for any asphaltic and/or Portland cement concrete to be used, and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The contractor shall provide manufacturer's certifications for all manufactured items to be used in the project and will bear any expense related thereto. f B. Tests of the design concrete mix shall be made by the contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement, and mortar which are to be used later in the concrete. The Contractor shall provide a certified copy of the test results to the City. C. Quality control testing of in-place material on this project will be performed by the city at its own expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the contractor and will be billed at commercial rates as determined by the City. The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish materials and equipment conforming to the requirements of the contract. D. Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safety system (if required) for the site to be tested, and any work effort involved is deemed to be included in the unit price for the item being tested. E. The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. 1 09101104 SC-29 �'' '►' ° ° FT. WORTH, TEX, PART D 3 SPECIAL CONDITIONS D-40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessary by the Engineer for the duration of the contract. These control measures shall at no time be used as a substitute for the permanent control measures unless otherwise directed by the Engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction. operations. The temporary measures shall include dikes, dams, berms, sediment basins, fiber mats, jute netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble liners, baled-hay retards, dikes, slope drains and other devices. B. CONSTRUCTION REQUIREMENTS: The Engineer has the authority to define erodible earth and the authority to limit the surface area of erodible-earth material exposed by preparing right-of-way, clearing and grubbing, the surface area of erodible-earth material exposed by excavation, borrow and to direct the CONTRACTOR to provide temporary pollution-control measures to prevent contamination of adjacent streams, other water courses, lakes,ponds or other areas of water impoundment. Such work may involve the construction of temporary berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats, seeding, or other control devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution-control measures shall be used to prevent or. correct erosion that may develop during construction prior to installation of permanent pollution control features, but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of-way, clearing and grubbing, excavation and borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching, seeding, and other such permanent pollution-control measures current in accordance with the accepted schedule. Should seasonal conditions make such limitations unrealistic, temporary soil-erosion-control measures shall be performed as directed by the Engineer. 1. Waste or disposal areas and construction roads shall be located and constructed in a manner that will minimize the amount of sediment entering streams. 2. Frequent fordings of live streams will not be permitted; therefore, temporary bridges or other structures shall be used wherever an appreciable number of stream crossings are necessary. Unless otherwise approved in writing by the Engineer, mechanized equipment shall not be operated in live streams. 3. When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the muddying of a stream. 4. All waterways shall be cleared as soon as practicable of false work, piling, debris or other obstructions placed during construction operations that are not a part of the finished work. 5. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and reservoirs with fuels, oils, bitumen, calcium chloride or other harmful materials. He shall conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish. C. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide temporary erosion control shall be considered subsidiary to the contract and no extra pay will be given for this work. 09101104 SC-30 ., t DART D SPECIAL CONDITIONS D-41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES The Contractor shall provide ingress and egress to the property being crossed by this construction and adjacent property when construction is not in progress and at night. Drives shall be left accessible at night, on weekends, and during holidays. The Contractor shall conduct his activities to minimize obstruction of access to drives and property during the progress of construction. Notification shall be made to an owner prior to his driveway being removed and/or rebuilt. D-42 PROTECTION OF TREES, PLANTS AND SOIL All property along and adjacent to the Contractors' operations including lawns, yards, shrubs, trees, etc., shall be preserved or restored after completion of the work, to a condition equal to or better than existed prior to start of work. An trees or other landscape features scarred or damaged b the Contractor's operations shall Y p 9 Y P be restored or replaced at the Contractor's expense. Trimming or pruning to facilitate the work will be permitted only by experienced workmen in an approved manner (No trimming or pruning without the property owners' consent). Pruned limbs of 1" diameter or larger shall be thoroughly ltreated as soon as possible with a tree wound dressing. + By ordinance, the Contractor must obtain a permit from the City Forester before any work (trimming, removal, or root pruning) can be done on trees or shrubs growing on public property including street Rights-of-Ways and designated alleys. This permit can be obtained by calling the Forestry Office at 871-5738. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association. A copy of these standards I can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture. Payment for negligent damage to public trees shall I be made to the City of Fort Worth and may be withheld from funds due the Contractor by the City. I To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall be immediately sealed using a commercial pruning paint. No separate payment will be made for any of the work involved for this item and all costs incurred will be considered a subsidiary cost of the project. D-43 SITE RESTORATION The contractor shall be responsible for restoring the site to original grade and condition after completion of his operations subject to approval of the Engineer. The basis for approval by the Engineer will be grade restoration to plus minus one-tenth (0.1) of a foot. D-44 CITY OF FORT WORTH STANDARD PRODUCT LIST Proposed products submitted in the bid documents must appear in the latest "City of Fort Worth f Standard Product List, for the bid to be considered responsive. Products and processes listed in the "City of Fort Worth Standard Product List shall be considered to meet City of Fort Worth minimum technical requirements. 09/01/04 SC-31 I PART D s SPECIAL CONDITIONS D-45 TOPSOIL, SODDING, SEEDING & HYDROMULCHING This item shall be performed in accordance with the City of Fort Worth Parks and Community Services Department Specifications for Topsoil, Sodding and Seeding. 1. TOPSOIL DESCRIPTION: This item will consist of furnishing and placing a minimum of six (6) inches of topsoil, free from rock and foreign material, in all parkways and medians to the lines and grades as established by the Engineer. CONSTRUCTION METHODS: Topsoil will be secured from borrow sources as required to supplement material secured from street excavation. All excavated materials from streets which is suitable for topsoil will be used in the parkways and medians before any topsoil is obtained from a borrow source. Topsoil material secured from street excavation shall be stockpiled at locations approved by the Engineer, and at completion of grading and paving operations, topsoil shall be placed on parkway areas so as to provide a minimum six (6) inches of compacted depth of topsoil parkways. 2. SODDING DESCRIPTION: Sodding will consist of furnishing and planting Bermuda, Buffalo or St. Augustine grass in the areas between the curbs and walks, on terraces, in median strips, on embankments or cut slopes, or in such areas as designated on the Drawings and in accordance with the requirements of this Specification. Recommended Buffalo grass varieties for sodding are Prairie and 609. MATERIALS: Sod shall consist of live and growing Bermuda, Buffalo or St. Augustine grass secured from sources where the soil is fertile. Sod to be placed during the dormant state of these grasses shall be alive and acceptable. Bermuda and Buffalo grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a two (2) inch minimum thickness of native soil attached to the roots. St. Augustine grass sod-shall have a healthy, virile root system of dense, thickly matted roots throughout a one (1) inch minimum thickness of native soil attached to the roots. The sod shall be free from obnoxious weeds or other grasses and shall not contain any matter deleterious to its growth or which might affect its subsistence or hardiness when transplanted. Sod to be placed between curb and walk and on terraces shall be the same type grass as adjacent grass or existing lawn. Care shall be taken at all times to retain native soil on the roots of the sod during the process of excavating, hauling, and planting. Sod material shall be kept moist from the time it is dug until planted. When so directed by the Engineer, the sod existing at the source shall be watered to the extent required prior to excavating. Sod material shall be planted within three days after it is excavated. CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross-sections shown on the Drawings and as provided for in other items of the contract, sodding of the type specified shall be performed in accordance with the requirements hereinafter described. Sodding shall be either "spot' or "block"; either Bermuda, Buffalo or St. Augustine grass. a. Spot Sodding 09/01/04 SC-32 PART Q - SPECIAL CONDITIONS Furrows parallel to the curb line or sidewalk lines, twelve (12) inches on centers or to the i dimensions shown on the Drawings, shall be opened on areas to be sodded. In all furrows, sod approximately three (3) inches square shall be placed on twelve (12) inch I centers at proper depth so that the top of the sod shall not be more than one-half (1/2) inch below the finished grade. Holes of equivalent depth and spacing may be used instead of furrows. The soil shall be firm around each block and then the entire sodded area shall be carefully rolled with a heavy, hand roller developing fifteen (15) to twenty-five (25) pounds per square inch compression. Hand tamping may be required on terraces. Ib. Block Sodding. At locations on the Drawings or where directed, sod blocks shall be carefully placed on the prepared areas. The sod shall be so placed that the entire designated area shall be Icovered, and any voids left in the block sodding shall be filled with additional sod and tamped. The entire sodded area shall be rolled and tamped to form a thoroughly compact solid mass. Surfaces of block sod, which, in the opinion of the Engineer, may slide due to the height or slope of the surface or nature of the soil, shall,. upon direction of the Engineer, be pegged with wooden pegs driven through the sod block to the firm earth, sufficiently close to hold the block sod firmly in place. t When necessary, the sodded areas shall be smoothed after planting has been completed and shaped to conform to the cross-section previously provided and existing at the time sodding operations were begun. Any excess dirt from planting operations shall be spread uniformly over the adjacent areas or disposed of as directed by the Engineer so that the completed surface will present a sightly appearance. lThe sodded areas shall be thoroughly watered immediately after they are planted and shall be subsequently watered at such times and in a manner and quantity directed by the Engineer until completion and final acceptance of the project by the City of Fort Worth. 3. SEEDING ! DESCRIPTION: "Seeding" will consist of preparing ground, providing and planting seed or a l mixture of seed of the kind specified along and across such areas as may be designated on the Drawings and in accordance with these Specifications. l MATERIALS: ( a. General. All seed used must carry a Texas Testing Seed label showing purity and germination, name, type of seed, and that the seed meets all requirements of the Texas Seed Law. Seed furnished shall be of the previous season's crop and the date of analysis ( shown on each tag shall be within nine (9) months of time of delivery to the project. Each 1 variety of seed shall be furnished and delivered in separate bags or containers. A sample of each variety of seed shall be furnished for analysis and testing when directed by the Engineer. The specified seed shall equal or exceed the following percentages of Purity and germination: f l 09/01/04 SC-33 PART D - SPECIAL CONDITIONS Common Name Purity Germination Common Bermuda Grass 95% 90% Annual Rye Grass 95% 95% Tall Fescue 95% 90% Western Wheatgrass 95% 90% Buffalo Grass Varieties Top Gun 95% 90% Cody 95% 90% Table 120.2.(2)a. URBAN AREA WARM-SEASON SEEDING RATE (lbs.); Pure Live Seed (PLS) Mixture for Clay or Tight Soils Mixture for Sandy Soils Dates (Eastern Sections) (Western Sections) (All Sections) Feb 1 Bermudagrass 40 Buffalograss 80 Bermudagrass 60 to Buffalograss 60 Bermudagrass 20 Buffalograss 40 May 1 Total: 100 Total: 100 Total: 100 Table, 120.2.(2)b TEMPORARY COOL-SEASON SEEDING RATE; (lb.) Pure Live Seed (PLS) Dates (All Sections) Aug 15 Tall Fescue 50 to Western Wheatgrass 50 May 1 Annual Rye 50 Total: 100 CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross-sections shown on the Drawings and as provided for in other items of this Contract, seeding of the type specified shall be performed in accordance with the requirements hereinafter described. a. Watering. Seeded areas shall be watered as directed by the Engineer so as to prevent washing of the slopes or dislodgment of the seed. b. Finishing. Where applicable, the shoulders, slopes, and ditches shall be smoothed after seed bed preparation has been completed and shaped to conform to the cross-section previously provided and existing at the time planting operations were begun. BROADCAST SEEDING: The seed or seed mixture in the quantity specified shall be uniformly distributed over the areas shown on the Drawings and where directed. if the sowing of seed is by hand, rather than by mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer shall be distributed at the same time provided the specified uniform rate of application for both is obtained. "Finishing" as specified in Section D-45, Construction Methods, is not applicable since no seed bed preparation is required. DISCED SEEDING: Soil over the area shown on the Drawings as directed to be seeded shall be loosened to a minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter or they shall be removed. The area shall then 09101104 SC-34 PART D - SPECIAL CONDITIONS be finished to line and grade as specified under "Finishing" in Section D-45, Construction Methods. The seed, or seed mixture, specified shall then be planted at the rate required and the I application shall be made uniformly. If the sowing of seed is by hand rather than by l mechanical methods, seed shall be raked or harrowed into the soil to a depth of approximately one-eight (1/8) inch. The planted area shall be rolled with a corrugated roller of the "Cultipacker" type. All rolling of the slope areas shall be on the contour. ASPHALT MULCH SEEDING: The soil over the area shown on the Drawings, or as directed to be seeded, shall be loosened to the minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter, or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D- 45, Construction Methods. Water shall then be applied to the cultivated area of the seed bed until a minimum depth of six (6) inches is thoroughly moistened. IAfter the watering, when the ground has become sufficiently dry to be loose and pliable, the seed, or seed mixture specified, shall then be planted at the rate required and the application I shall be made uniformly. If the sowing of seed is by hand, rather than mechanical methods, ( the seed shall be sown in two directions at right angles to each other. Seed and fertilizer may be distributed at the same time, provided the specified uniform rate of application for both is 1 obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of approximately one-quarter (1/4) inch. The planted surface area and giving a smooth surface without ruts or tracks. In between the time compacting is completed and the asphalt is I applied, the planted area shall be watered sufficiently to assure uniform moisture from the surface to a minimum of six (6) inches in depth. I The application of asphalt shall follow the last watering as rapidly as possible. Asphalt shall be of the type and grade as shown on the Drawings and shall conform to the requirements of the item 300, "Asphalts, Oils and Emulsions". If the type of asphalt to be used is not shown on the Drawings, or if Drawings are not included, then MS-2 shall be used. Applications of f the asphalt shall be at a rate of three-tenths (0.3) gallons per square yard. It shall be applied t to the area in such a manner so that a complete film is obtained and the finished surface shall be comparatively smooth. RE-SEEDING OF AREAS PLANTED WITH COOL SEASONS SPECIES: Areas where temporary cool season species have been planted may be replanted beginning February 1 with warm season species as listed in Table 120.2(2)a. The re-seeding will be achieved in the following manner. The cool season species shall be mowed down to a height of one (1) inch to insure that slit-seeding equipment will be able to cut through the turf and achieve adequate ( soil penetration. 1 * Slit-seeding, is achieved through the use of an implement which cuts a furrow (slit) in the f soil and places the seed in the slit which is then pressed close with a cult packer wheel. 1 4. HYDROMULCH SEEDING: If hydro mulch seeding is provided, seed mix shall have 95% purity of Bermuda grass and have a germination rate of 90%. Contractor shall ensure that the grass establishes. 09/01/04 SC-35 I PAIN D - SPECIAL CONDITIONS 5. CONSTRUCTION WITHIN PARK AREAS TURF RESTORATION OF PARK AREAS: FERTILIZER DESCRIPTION: "Fertilizer" will consist of providing and distributing fertilizer over such areas as are designated on the Drawings and in accordance with these Specifications. MATERIALS: All fertilizer used shall be delivered in bags or containers clearly labeled showing the analysis. The fertilizer is subject to testing by the City of Fort Worth in accordance with the Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used with an analysis of 16-20-0 or 16-5-8 or having the analysis shown on the Drawings. The figures in the analysis represent the percent of nitrogen, phosphoric acid, and potash nutrients respectively as determined by the methods of the Association of Official Agricultural Chemists. In the event it is necessary to substitute a fertilizer of a different analysis, it shall be a pelleted or granulated fertilizer with a lower concentration. Total amount of nutrients furnished and applied per acre shall equal or exceed that specified for each nutrient. CONSTRUCTION METHODS: When an item for fertilizer is included in the Drawings and proposal, pelleted or granulated fertilizer shall be applied uniformly over the area specified to be fertilized and in the manner directed for the particular item of work. Fertilizer shall be dry and in good physical condition. Fertilizer that is powdered to caked will be rejected. Distribution of fertilizer as a particular item of work shall meet the approval of the Engineer. Unless otherwise indicated on the Drawings, fertilizer shall be applied uniformly at the average rate of three hundred (300) pounds per acre for all types of "Sodding" and four hundred (400) pounds per acre for all types of"Seeding". MEASUREMENT: Topsoil secured from borrow sources will be measured by the square yard in place on the project site. Measurement will be made only on topsoils secured from borrow sources. Acceptable material for"Seeding"will be measured by the linear foot, complete in place. Acceptable material for"Sodding"will be measured by the linear foot, complete in place. Acceptable material for"Fertilizer" shall be subsidiary to the price of sodding or seeding. PAYMENT: All work performed as ordered and measured shall be subsidiary to the contract unless and otherwise noted in the plans and bid documents to be paid for at the unit price bid for each item of work. Its price shall be full compensation for excavating (except as noted below), loading, hauling, placing and furnishing all labor, equipment, tools, supplies, and incidentals necessary to complete work. All labor, equipment, tools and incidentals necessary to supply, transport, stockpile and place topsoil or salvage topsoil as specified shall be included in "Seeding" or "Sodding" bid items and will not be paid for directly. "Spot sodding" or "block sodding" as the case may be, will be paid for at the contract unit price per square yard, complete in place, as provided in the proposal and contract. The contract unit price shall be the total compensation for furnishing and placing all sod; for all 09101104 SC-36 I PART D - SPECIAL CONDITIONS rolling and tamping; for all watering; for disposal of all surplus materials; and for all materials, 1 labor, equipment, tools and incidentals necessary to complete the work, all in accordance with the Drawings and these Specifications. The work performed and materials furnished and measuredas provided under Measurement „shall be paid for at the unit price for "Seeding", or "Sodding", of the type specified, as the case may be, which price shall each be full compensation for furnishing all materials and for performing all operations necessary to complete the work accepted as I follows: Fertilizer material and application will not be measured or paid for directly, but is considered subsidiary to Sodding and Seeding. I D-46 CONFINED SPACE ENTRY PROGRAM It shall be the responsibility of the contractor to implement and maintain a variable "CONFINED SPACE ENTRY PROGRAM" which must meet OSHA requirements for all its employees and subcontractors at all times during construction. All active sewer manholes, regardless of depth, I are defined by OSHA, as "permit required confined spaces". Contractors shall submit an acceptable "CONFINED SPACE ENTRY PROGRAM" for all applicable manholes and maintain ( an active file for these manholes. The cost of complying with this program shall be subsidiary to 1 the pay items involving work in confined spaces. { D-47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION 1. Prior to the final inspection being conducted for the project, the contractor shall contact the city inspector in writing when the entire project or a designated portion of the project is substantially complete. l 2. The inspector along with appropriate City staff and the City's consultant shall make an I inspection of the substantially completed work and prepare and submit to the contractor a list of items needing to be completed or corrected. 3. The contractor shall take immediate steps to rectify the listed deficiencies and notify the owner in writing when all the items have been completed or corrected. 4. Payment for substantial completion inspection as well as final inspection shall be subsidiary to the project price. Contractor shall still be required to address all other deficiencies, which are discovered at the time of final inspection. 5. Final inspection shall be in conformance with general condition item "C5-5.18 Final Inspection" of PART C - GENERAL CONDITIONS. ( D-48 EXCAVATION NEAR TREES 6. The Contractor shall be responsible for taking measures to minimize damage to tree limbs, tree trunks, and tree roots at each work site. All such measures shall be considered as incidental work included in the Contract Unit Price bid for applicable pipe or structure installation except for short tunneling/tree augering. 7. Any and all trees located within the equipment operating area at each work site shall, at the direction of the Engineer, be protected by erecting a "snow fence" along the drip line or edge of the tree root system between tree and the construction area. I 09101104 SC-37 C';r, (o; CIVY SECAETAQY Ff. WORTH, TEX, DART D - SPECIAL CONDITIONS 8. Contractor shall inspect each work site in advance and arrange to have any tree limbs pruned that might be damaged by equipment operations. The Engineer shall be notified at least 24 hours prior to any tree trimming work. No trimming work will be permitted within private property without written permission of the Owner. 9. Nothing shall be stored over the tree root system within the drip line area of any tree. 10. Before excavation (off the roadway) within the drip line area of any tree, the earth shall be sawcut for a minimum depth of 2 feet. 11.At designated locations shown on the drawings, the "short tunnel" method using Class 51 D.I. pipe shall be utilized. 12. Except in areas where clearing is allowed, all trees up to 8" in diameter damaged during construction shall be removed and replaced with the same type and diameter tree at the contractor's expense. 13. Contractor shall employ a qualified landscaper for all the work required for tree care to ensure utilization of the best agricultural practices and procedures. 14. Short tunneling shall consist of power augering or hand excavation. The tunnel diameter shall not be larger than 1-1/2 times the outside pipe diameter. Voids remaining after pipe installation shall be pressure grouted. D-49 CONCRETE ENCASEMENT OF SEWER PIPE Concrete encasement of sewers shall be paid for at the Contract Unit Price per linear foot of concrete encasement as measured in place along the centerline of the pipe for each pipe diameter indicated. The Contract Unit Price shall include all costs associated with installation and reinforcement of the concrete encasement. D- 50 CLAY DAM Clay dam construction shall be performed in accordance with the Wastewater Clay Dam Construction, figure in the Drawings in these Specifications, at locations indicated on the Drawings or as directed by the City. Clay dams shall be keyed into undisturbed soil to make an impervious barrier to reduce groundwater percolation through the pipeline trench. Construction material shall consist of compacted bentonite clay or 2:27 concrete. Payment for work such as forming, placing and finishing shall be subsidiary to the price bid for pipe installation. D- 51 EXPLORATORY EXCAVATION (D-HOLE) The Contractor shall be responsible for verifying the locations of all existing utilities prior to construction, in accordance with item D-6. At locations identified on the drawings, contractor shall conduct an exploratory excavation (D-Hole), to locate and verify the location and elevation of the existing underground utility where it may be in potential conflict with a proposed facility alignment. The exploratory excavation shall be conducted prior to construction of the entire project only at locations denoted on the plans or as directed by the engineer. Contractor shall submit a report of findings (including surveyed elevations of existing conflicting utilities) to the City prior to the start of construction of the entire project. If the contractor determines an existing utility is in conflict with the proposed facility, the contractor shall contact the engineer immediately for appropriate design modifications. 09/01/04 SC-38 ' R PART D R SPECIAL CONDITIONS The contractor shall make the necessary repairs at the exploratory excavation (D-Hole) to obtain a safe and proper driving surface to ensure the safety of the general public and to meet the approval of the City inspector. The contractor shall be liable for any and all damages incurred Idue to the exploratory excavation (D-Hole). Payment shall not be made for verification of existing utilities per item D-6. Payment for I exploratory excavation (D-Hole), at locations identified on the plans or as directed by the Engineer, shall include full compensation for all materials, excavation, surface restoration, field surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No payment shall be made for exploratory excavation(s) conducted after construction has begun. D- 52 INSTALLATION OF WATER FACILITIES I 52.1 Polyvinyl Chloride (PVC) Water Pipe POLYVINYL Chloride Plastic Water Pipe and fittings on this Project shall be in accordance with the material standard contained in the General Contract Documents. Payment for work such as backfill, bedding, blocking, detectable tapes and all other associated appurtenant required, shall be included in the linear foot price bid of the appropriate BID ITEM(S). 52.2 Blocking Concrete blocking on this Project will necessarily be required as shown on the Plans and shall be installed in accordance with the General Contract Documents. All valves shall have concrete blocking provided for supporting. No separate payment will be made for any of the work involved for the item and all costs incurred will be considered to be included in the linear foot bid price of the pipe or the bid price of the valve. I52.3 Type of Casing Pipe 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 I Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of E1-15, E1-5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as Ifollows: For the inside and outside of casing pipe, coal-tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203. Touch-up after field welds shall provide coating equal to those specified above. C. Minimum thickness for casing pipe used shall be 0.375 inch. Stainless Steel Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing Company or an approved equal shall be used on all non- concrete pipes when installed in casing. Installation shall be as recommended by the Manufacturer. 2. SEWER: Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. 3. PAYMENT: Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. I 09/01/04 SC-39 PART D - SPECIAL CONDITIONS 52.4 Tie-Ins The Contractor shall be responsible for making tie-ins to the existing water mains. It shall be the responsibility of the Contractor to verify the exact location and elevation of the existing line tie-ins. And any differences in locations and elevation of existing line tie-ins between the contract drawings and what may be encountered in the field shall be considered as incidental to construction. The cost of making tie-ins to existing water or sanitary sewer mains shall be included in the linear foot bid price of the pipe. 52.5 Connection of Existing Mains The Contractor shall determine the exact location, elevation, configuration and angulation of existing water or sanitary sewer lines prior to manufacturing of the connecting piece. Any differences in locations, elevation, configuration, and or angulation of existing lines between the contract drawings and what may be encountered in the said work shall be considered as incidental to construction. Where it is required to shut down existing mains in order to make proposed connections, such down time shall be coordinated with the Engineer, and all efforts shall be made to keep this down time to a minimum. In case of shutting down an existing main, the Contractor shall notify the Manager, Construction Services, Phone 871-7813, at least 48-hours prior to the required shut down time. The Contractor's attention is directed to Paragraph C5-5.15 INTERRUPTION OF SERVICE; Page C5-5(5), PART C - GENERAL CONDITIONS OF THE WATER DEPARTMENT GENERAL CONTRACT DOCUMENTS AND GENERAL SPECIFICATIONS. The Contractor shall notify the customer both personally and in writing as to the location, time, and schedule of the service interruption. The cost of removing any existing concrete blocking shall be included in the cost of connection. Unless bid separately all cost incurred shall be included in the linear foot price bid for the appropriate pipe size. 52.6 Valve Cut-Ins It may be necessary to cut-in gate valves to isolate the water main from which the extension and/or replacement is to be connected. This may require closing valves in other lines and putting consumers out of service for that period of time necessary to cut in the new valve; the work must be expedited to the utmost and all such cut-ins must be coordinated with the engineer in charge of inspection. All consumers shall be individually advised prior to the shut out and advised of the approximate length of time they may be without service. Payment for work such as backfill, bedding, fittings, blocking and all other associated appurtenants required, shall be included in the price of the appropriate bid items. I 52.7 Water Services The relocation, replacement, or reconnection of water services will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. All service's shall be constructed by the contractor utilizing approved factory manufactured tap saddles (when required) and corporation stops, type K copper water tubing, curb stops with lock wings, meter boxes, and if required approved manufactured service branches. All materials used shall be as specified in the Material Standards (E1- 17 & E1-18) contained in the General Contract Documents. 09101104 SC-40 PART D _ SPECIAL CONDITIONS All water services to be replaced shall be installed at a minimum depth of 36 inches below final grade. All existing 3/4-inch water service lines which are to be replaced shall be replaced with 1- inch Type K copper, 1-inch diameter tap saddle when required, and 1-inch corporation from the main line to the meter box. ( All services which are to be replaced or relocated shall be installed with the service main I tap and service line being in line with the service meter unless otherwise directed by the Engineer. IA minimum of 24 hours advance notice shall be given when service interruption will be required as specified in Section C5-5.15 INTERRUPTION OF SERVICE. IAll water service meters shall be removed, tagged, and collected by the contractor for pickup by the Water Department for reconditioning or replacement. After installation of the water service in the proposed location and receipt of a meter from the project inspector I the contractor shall install the meter. The meter box shall be reset as necessary to be flush with existing ground or as otherwise directed by the Engineer. All such work on the outlet side of the service meter shall be performed by a licensed plumber. I15. WATER SERVICE REPLACEMENTS: Water service replacement or relocation is required when the existing service is lead or is too shallow to avoid breakage during street 1 reconstruction. The contractor shall replace the existing service line with Type K copper from the main to the meter, curb stop with lock wings, and corporation stop. Payment for all work and materials such as backfill, fittings, type K copper tubing, curb I stop with lock wings, service line adjustment, and any relocation of up to 12-inches from center line existing meter location to center line proposed meter location shall be included I in the Linear Foot price bid for Copper Service Line from Main to five (5) feet behind Meter. Any vertical adjustment of customer service line within the 5 foot area shall be subsidiary to the service installation. Payment for all work and materials such as tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. 16. WATER SERVICE RECONNECTION: Water service reconnection is required when the existing service is copper and at adequate depth to avoid breakage during street reconstruction. The contractor shall adjust the existing water service line as required for reconnection and furnish a new tap with corporation stop. The contractor will be paid for one (1) Service Tap to Main for each service reconnected plus for any copper service line used in excess of five (5) feet from Main to five (5)feet behind the Meter. 17. WATER SERVICE METER AND METER BOX RELOCATIONS: When the replacement and relocation of a water service and meter box is required and the location of the meter I and meter box is moved more than twelve (12) inches, as measured from the center line of the existing meter to location to the center line of the proposed meter location, separate payment will be allowed for the relocation of service meter and meter box. Centerline is defined by a line extended from the service tap through the meter. Only relocations made perpendicular to this centerline will be paid for separately. Relocations made along the centerline will be paid of in feet of copper service line. I09/01/04 SC-41 PART D - SPECIAL CONDITIONS When relocation of service meter and meter box is required, payment for all work and materials such as backfill, fittings, five (5) feet of type K copper service and all materials, labor, and equipment used by and for the licensed plumber shall be included in the price bid for the service meter relocation. All other costs will be included in other appropriate bid item(s). This item will also be used to pay for all service meter and meter box relocations as required by the Engineer when the service line is not being replaced. Adjustment of only the meter box and customer service line within 5 feet distance behind the meter will not justify separate payment at any time. Locations with multiple service branches will be paid for as one service meter and meter box relocation. 4. NEW SERVICE: When new services are required the contractor shall install tap saddle (when required), corporation stop, type K copper service line, curb stop with lock wings, and meter box. Reinforced plastic meter boxes with cast iron lid shall be provided for all 2 inch water meters or smaller. The reinforced plastic water meter boxes shall comply with section E1-18A— Reinforced Plastic Water Meter Boxes. Payment for all work and materials such as backfill, fittings, type K copper tubing, and curb stop with lock wings shall be included in the Linear Foot price bid for Service Line from Main to Meter five (5) feet behind the meter. Payment for all work and materials such as tap saddle, corporation stops, and fittings shall be included in the price bid for Service Taps to Mains. Payment for all work and materials such as furnishing and setting new meter box shall be included in the price bid for furnish and set meter box. 18. MULTIPLE SERVICE BRANCHES: When multiple service branches are required the contractor shall furnish approved factory manufactured branches. Payment for multiple service branches will include furnishing and installing the multiple service branch only and all other cost will be included in other appropriate bid item(s). 19. MULTIPLE STREET SERVICE LINES TO SINGLE SERVICE METER: Any multiple service lines with taps servicing a single service meter encountered during construction shall be replaced with one service line that is applicable for the size of the existing service meter and approved by the Engineer. Payment shall be made at the unit bid price in the appropriate bid item(s). 52.8 2-Inch Temporary Service Line A. The 2-inch temporary service main and 3/4-inch service lines shall be installed to provide temporary water service to all buildings that will necessarily be required to have severed water service during said work. The contractor shall be responsible for coordinating the schedule of the temporary service connections and permanent service reconnections with the building owners and the Engineer in order that the work be performed in an expeditious manner. Severed water service must be reconnected within 2 hours of discontinuance of service. A 2-inch tapping saddle and 2-inch corporation stop or 2-inch gate valve with an appropriate fire hydrant adapter fitting shall be required at the temporary service point of connection to the City water supply. The 2-inch temporary service main and 3/4-inch service lines shall be installed in accordance to the attached figures 1, 2 and 3. 2" 09/01/04 SC-42 PART D - SPECIAL CONDITIONS temporary service line shall be cleaned and sterilized by using chlorine gas or chlorinated lime (HTH) prior to installation. The out-of-service meters shall be removed, tagged and collected by the Contractor for I delivery to the Water Department Meter Shop for reconditioning or replacement. Upon I restoring permanent service, the Contractor shall re-install the meters at the correct location. The meter box shall be reset as necessary to be flush with the existing ground or Ias otherwise directed by the Engineer. The temporary service layout shall have a minimum available flow rate of 5 GPM at a I dynamic pressure of 35 PSI per service tap. This criteria shall be used by the Contractor to determine the length of temporary service allowed, number of service taps and number of feed points. JWhen the temporary service is required for more than one location the 2-inch temporary service pipes, 3/4-inch service lines and the 2-inch meter shall be moved to the next Isuccessive project location. Payment for work such as fittings, 3/4-inch service lines, asphalt, barricades, all service connections, removal of temporary services and all other associated appurtenants Irequired, shall be included in the appropriate bid item. B. In order to accurately measure the amount of water used during construction, the 1 Contractor will install a fire hydrant meter for all temporary service lines. Water used during construction for flushing new mains that cannot be metered from a hydrant will be estimated as accurately as possible. At the pre-construction conference the contractor I will advise the inspector of the number of meters that will be needed along with the locations where they will be used. The inspector will deliver the hydrant meters to the locations. After installation, the contractor will take full responsibility for the meters until + such time as the contractor returns those meters to the inspector. Any damage to the meters will be the sole responsibility of the contractor. The Water Department Meter Shop will evaluate the condition of the meters upon return and if repairs are needed the contractor will receive an invoice for those repairs. The issued meter is for this specific project and location only. Any water that the contractor may need for personal use will require a separate hydrant meter obtained by the Contractor, at its cost, from the Water Department. 52.9 Purging and Sterilization of Water Lines Before being placed into service all newly constructed water lines shall be purged and sterilized in accordance with E2-24 of the General Contract Documents and Specifications except as modified herein. The Contractor will furnish all water for INITIAL cleaning and sterilization of water lines. All materials for construction of the project, including ( appropriately sized "pipe cleaning pigs", chlorine gas or chlorinated lime (HTH) shall be furnished by the Contractor. Chlorinated lime (HTH) shall be used in sufficient quantities to provide a chlorine residual of fifty (50) PPM. The residual of free chlorine shall be f measured after 24 hours and shall not be less than 10 parts per million of free chlorine. 1 Chlorinated water shall be disposed of in the sanitary sewer system. Should a sanitary sewer not be available, chlorinated water shall be "de-chlorinated" prior to disposal. The line may not be placed in service until two successive sets of samples, taken 24 hours apart, have met the established standards of purity. ( 09101104 SC-43 PART D - SPECIAL CONDITIONS Purging and sterilization of the water lines shall be considered as incidental to the project and all costs incurred will be considered to be included in the linear foot bid price of the pipe. 52.10 Work Near Pressure Plane Boundaries Contractor shall take note that the water line to be replaced under this contract may cross or may be in close proximity to an existing pressure plane boundary. Care shall be taken to ensure all "pressure plane" valves installed are installed closed and no cross connections are made between pressure planes 52.11 Water Sample Station GENERAL: All water sampling station installations will be per attached Figure 34 or as required in large water meter vaults as per Figure 33 unless otherwise directed by the Engineer. The appropriate water sampling station will be furnished to the Contractor free of charge; however, the Contractor will be required to pick up this item at the Field Operations Warehouse. PAYMENT FOR FIGURE 34 INSTALLATIONS: Payment for all work and materials necessary for the installation of the 3/4-inch type K copper service line will be shall be included in the price bid for copper Service Line from Main to Meter. Payment for all work and materials necessary for the installation tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, concrete support block, curb stop, fittings, and an incidental 5-feet of type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work and materials necessary for the installation tap saddle, gate valve, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, modification to the vault, fittings, and all type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. 52.12 Ductile Iron and Gray Iron Fittings Reference Part E2 Construction Specifications, Section E2-7 Installing Cast Iron Pipe, fittings, and Specials, Sub section E2-7.11 Cast Iron Fittings: E2-7.11 DUCTILE-IRON AND GRAY-IRON FITTINGS: All ductile-iron and gray-iron fittings shall be furnished with cement mortar lining as stated in'Section E1-7. The price bid per ton of fittings shall be payment in full for all fittings, joint accessories, polyethylene wrapping, horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle necessary for construction as designed. All ductile-iron and gray-iron fittings, valves and specials shall be wrapped with polyethylene wrapping conforming to Material Specification E1-13 and Construction 09101104 SC-44 1 PACT D - SPECIAL CONDITIONS Specification E2-13. Wrapping shall precede horizontal concrete blocking, vertical tie- down concrete blocking, and concrete cradle. Payment for the polyethylene wrapping, horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle shall be included in bid items for vales and fittings and no other payments will be allowed. 1 ID-53 SPRINKLING FOR DUST CONTROL All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered to this Icontract. D-54 DEWATERING JThe Contractor shall be responsible for determining the method of dewatering operation for the water or sewage flows from the existing mains and ground water. The Contractor shall be responsible for damage of any nature resulting from the dewatering operations. 1 The DISCHARGE from any dewatering operation shall be conducted as approved by the Engineer. Ground water shall not be discharged into sanitary sewers. IDewatering shall be considered as incidental to a construction and all costs incurred will be considered to be included in the project price. D- 55 TRENCH EXCAVATION ON DEEP TRENCHES I Contractor to prevent any water flowing into open trench during construction. Contractor shall not leave excavated trench open overnight. Contractor shall fill any trench the same day of excavation. No extra payment shall be allowed for this special condition. 1 D-56 TREE PRUNING A. REFERENCES: National Arborist Association's "Pruning Standards for Shade Trees". fB. ROOT PRUNING EQUIPMENT I1. Vibratory Knife 2. Vermeer V-1550RC Root Pruner C. NATURAL RESOURCES PROTECTION FENCE 3. Steel "T" = Bar stakes, 6 feet long. 4. Smooth Horse-Wire: 14-1/2 gauge (medium gauge) or 12 gauge (heavy gauge). 1 5. Surveyor's Plastic Flagging: "Tundra" weight, International fluorescent orange or red color. 6. Combination Fence: Commercially manufactured combination soil separator fabric on wire mesh backing as shown on the Drawings. ! 09101104 SC-45 PART D , SPECIAL CONDITIONS D. ROOT PRUNING 7. Survey and stake location of root pruning trenches as shown on drawings. 8. Using the approved specified equipment, make a cut a minimum of 36 inches deep in order to minimize damage to the undisturbed root zone. 9. Backfill and compact the trench immediately after trenching. 10. Place a 3-foot wide by 4-inch deep cover of mulch over the trench as required by the Engineer. 11. Within 24 hours, prune flush with ground and backfill any exposed roots due to construction activity. Cover with wood chips of mulch in order to equalize soil temperature and minimize water loss due to evaporation. i 12. Limit any grading work within conservation areas to 3-inch maximum cut or fill, with no roots over 1-inch diameter being cut unless cut by hand or cut by specified methods, equipment and protection. E. MULCHING: Apply 2-inches to 4-inches of wood chips from trimming or clearing operation on areas designated by the Engineer. F. Tree Pruning shall be considered subsidiary to the project contract price. D- 57 TREE REMOVAL Trees to be removed shall be removed using applicable methods, including stump and root ball removal, loading, hauling and dumping. Extra caution shall be taken to not disrupt existing utilities both overhead and buried. The Contractor shall immediately repair or replace any damage to utilities and private property including, but not limited to, water and sewer services, pavement, fences, walls, sprinkler system piping, etc., at no cost to the Owner. All costs for tree removal, including temporary service costs, shall be considered subsidiary.to the project contract price and no additional payment will be allowed. D- 58 TEST HOLES The matter of subsurface exploration to ascertain the nature of the soils, including the amount of rock, if any, through which this pipeline installation is to be made is the responsibility of any and all prospective bidders, and any bidder on this project shall submit his bid under this condition. Whether prospective bidders perform this subsurface exploration jointly or independently, and whether they make such determination by the use of test holes or other means, shall be left to the discretion of such prospective bidders. If test borings have been made and are provided for bidder's information, at the locations shown on the logs of borings in the appendix of this specification, it is expressly declared that neither the City nor the Engineer guarantees the accuracy for the information or that the material encountered in excavations is the same, either in character, location, or elevation, as shown on the boring logs. It shall be the responsibility of the bidder to make such subsurface investigations, as he deems necessary to determine the nature of the material to be excavated. The Contractor assumes all responsibility for interpretation of these records and for making and maintaining the required excavation and of doing other work affected by the geology of the site. 09/01/04 SC-46 PART D SPECIAL CONDITIONS The cost of all rock removal and other associated appurtenances, if required, shall be included in the linear foot bid price of the pipe. 1 D- 59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION I Prior to beginning construction on any block in the project, the contractor shall, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: The notification notice or flyer shall be posted seven (7) days prior to beginning any construction activity on each block in the project area. The flyer shall be prepared on the Contractor's J letterhead and shall include the following information: Name of Project, DOE No., Scope of Project (i.e. type of construction activity), actual construction duration within the block, the name of the contractor's foreman and his phone number, the name of the City's inspector and his 1 phone number and the City's after-hours phone number. A sample of the 'pre-construction notification' flyer is attached. I The contractor shall submit a schedule showing the construction start and finish time for each block of the project to the inspector. In addition, a copy of the flyer shall be delivered to the City Inspector for his review prior to being distributed. The contractor will not be allowed to begin construction on any block until the flyer is delivered to all residents of the block. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, the contractor shall prepare and deliver a notice or flyer of the I pending interruption to the front door of each affected resident. The notice shall be prepared as follows: 1 The notification or flyer shall be posted twenty-four (24) prior to the temporary interruption. The flyer shall be prepared on the contractor's letterhead and shall include the following information: Name of the project, DOE number, the date of the interruption of service, the period the f interruption will take place, the name of the contractor's foreman and his phone number and the name of the City's inspector and his phone number. A sample of the temporary water service interruption notification is attached. A copy of the temporary interruption notification shall be delivered to the inspector for his review prior to being distributed. The contractor shall not be permitted to proceed with interruption of Iwater service until the flyer has been delivered to all affected residents and businesses. Electronic versions of the sample flyers can be obtained from the Construction office at (817) 871-8306. IAll work involved with the notification flyers shall be considered subsidiary to the contract price Iand no additional compensation shall be made. ` D- 60 TRAFFIC BUTTONS 1 The removal and replacement of traffic buttons is the responsibility of the contractor and shall be considered a subsidiary item. In the event that the contractor prefers for the Signals, Signs and Markings Division (SSMD) of the Transportation/Public Works Department to install the markings, the contractor shall contact SSMD at (817) 871-8770 and shall reimburse SSMD for all costs 1 09/01/04 SC-47 PMA ART D - SPECIAL CONDITIONS incurred, both labor and material. No additional compensation shall be made to the contractor for this reimbursement. D- 61 SANITARY SEWER SERVICE CLEANOUTS Whenever a sanitary sewer service line is installed or replaced, the Contractor shall install a two- way service cleanout as shown in the attached detail. Cleanouts are to be installed out of high traffic areas such as driveways, streets, sidewalks, etc. whenever possible. When it is not possible, the cleanout stack and cap shall be cast iron. Payment for all work and materials necessary for the installation of the two-way service cleanout which are required to provide a complete and functional sanitary sewer cleanout shall be included in the price bid for Sanitary Sewer Service Cleanouts. D-62 TEMPORARY PAVEMENT REPAIR The Contractor shall provide a temporary.pavement repair immediately after trench backfill and compaction using a minimum of 2-inches of hot mix asphalt over a minimum of 6-inches of compacted flex base. The existing asphalt shall be saw cut to provide a uniform edge and the entire width and length of the temporary repair shall be rolled with a steel asphalt roller to provide smooth rideability on the street as well as provide a smooth transition between the existing pavement and the temporary repair. Cost of saw cutting shall be subsidiary to the temporary pavement repair pay item. The contractor shall be responsible for maintaining the temporary pavement until the paving contractor has mobilized. The paving contractor shall assume maintenance responsibility upon such mobilization. No additional compensation shall be made for maintaining the temporary pavement. D- 63 CONSTRUCTION STAKES The City, through its Surveyor or agent, will provide to the Contractor construction stakes or other customary method of markings as may be found consistent with professional practice, establishing line and grades for roadway and utility construction, and centerlines and benchmarks for bridgework. These stakes shall be set sufficiently in advance to avoid delay whenever practical. One set of stakes shall be set for all utility construction (water, sanitary sewer, drainage etc.), and one set of excavation/or stabilization stakes, and one set of stakes for curb and gutter/or paving. It shall be the sole responsibility of the Contractor to preserve, maintain, transfer, etc., all stakes furnished until completion of the construction phase of the project for which they were furnished. If the City or its agent determines that a sufficient number of stakes or markings provided by the City, have been lost, destroyed, or disturbed, to prevent the proper prosecution and control of the work contracted for in the Contract Documents, it shall be the Contractor's responsibility, at the Contractor's sole expense, to have such stakes replaced by an individual registered by the Texas j Board of Professional Land Surveyor as a Registered Land Surveyor. No claims for delay due to lack of replacement of construction stakes will be accepted, and time will continue to be charged in accordance with the Contract Documents. D- 64 EASEMENTS AND PERMITS The performance of this contract requires certain temporary construction, right-of-entry agreements, and/or permits to perform work on private property. 09101104 SC-48 i i PART D - SPECIAL CONDITIONS IONS The City has attempted to obtain the temporary construction and/or right-of-entry agreements for properties where construction activity is necessary on City owned facilities, such as sewer lines or manholes. For locations where the City was unable to obtain the easement or right-of-entry, it shall be the Contractor's responsibility to obtain the agreement prior to beginning work on subject property. This shall be subsidiary to the contract. The agreements, which the City has obtained, are available to the Contractor for review by contacting the plans desk at the Department of Engineering, City of Fort Worth. Also, it shall be the responsibility of the Contractor to obtain written permission from property owners to perform such work as cleanout repair and sewer service replacement on private property. Contractor shall adhere to all requirements of Paragraph C6-6.10 of the General Contract Documents. The Contractor's attention is directed to the agreement terms along with any special conditions that may have been imposed on these agreements, by the property owners. The easements and/or private property shall be cleaned up after use and restored to its original condition or better. In event additional work room is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment will be allowed for this item. The City has obtained the necessary documentation for railroad and/or highway permits required for construction of this project. The Contractor shall be responsible for complying with all I provisions of such permits, including obtaining the requisite insurance, and shall pay any and all costs associated with or required by the permit(s). It is the Contractor's responsibility to provide the required flagmen and/or provide payment to the appropriate railroad/agency for all flagmen ( during construction in railroad/agency right-of-way. Any and all costs associated with compliance with permits(s) including payment for flagmen shall be subsidiary to the project price. No additional payment will be allowed for this item. D- 65 PRE-CONSTRUCTION NEIGHBORHOOD MEETING After the pre-construction conference has been held but before construction is allowed to begin I on this project a public meeting will be held at a location to be determined by the Engineer. The contractor, inspector, and project manager shall meet with all affected residents and present the projected schedule, including construction start date, and answer any construction related I questions. Every effort will be made to schedule the neighborhood meeting within the two weeks following the pre-construction conference but in no case will construction be allowed to begin until this meeting is held. D- 66 WAGE RATES The labor classifications and minimum wage rates set forth herein have been predetermined by I the City Council of the City of Fort Worth, Texas, in accordance with statutory requirements, as being the prevailing classifications and rates that shall govern on all work performed by the Contractor or any Subcontractor on the site of the project covered by these Contract Documents. II In no event shall less than the following rates of wages be paid. (Attached) ID- 67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE A. It is the intent of the City of Fort Worth to comply with the requirements of the Asbestos NESHAP found at 40 CFR Part 61, Subpart M. This specification will establish procedures to be used by all Excavators in the removal and disposal of ACP in compliance with NESHAP. Nothing in this specification shall be construed to void any provision of a 09101104 SC-49 I PART D - SPECIAL CONDITIONS contract or other law, ordinance, regulation or policy whose requirements are more stringent. B. ACP is defined under NESHAP as a Category II, non-friable material in its intact state but which may become friable upon removal, demolition and/or disposal. Consequently, if the removal/ disposal process renders the ACP friable, it is regulated under the disposal requirements of 40 CFR 61.150. A NESHAP notification must be filed with the Texas Department of Health. The notification must be filed at least ten days prior to removal of the.material. If it remains in its non - friable state, as defined by the NESHAP, it can be disposed as a conventional construction waste. EPA defines friable as material, when dry, which may be crumbled, pulverized or reduced to powder by hand pressures. C. The Generator of the hazardous material is responsible for the identification and proper handling, transportation, and disposal of the material. Therefore, it is the policy of the City of Fort Worth that the Excavator is the Generator regardless of whether the pipe is friable or not. D. It is the intent of the City of Fort Worth that all ACP shall be removed in such careful and prudent manner that it remains intact and does not become friable. The Excavator is responsible to employ those means, methods, techniques and sequences to ensure this result. E. Compliance with all aspects of worker safety and health regulations including but not limited to the OSHA Asbestos Standard is the responsibility of the Excavator. The City of Fort Worth assumes no responsibility for compliance programs, which are the responsibility of the Excavator. (Copy of forms attached) D-68 STORM WATER POLLUTION PREVENTION PERMIT: As defined by Texas Commission on Environmental Quality (TCEQ) regulations, a Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required for all construction activities that result in the disturbance of one to five acnes (Small Construction Activity) or five or more acres of total land (Large Construction Activity). The contractor is defined as an `operator" by state regulations and is required to obtain a permit. Information concerning the permit can be obtained through the Internet at http://www.tnrcc.state.tx.us/permitting/water perm/wwperm/construct.html. Soil stabilization and structural practices have been selected and designed in accordance with North Central Texas Council of Governments Best Management Practices and Erosion Control Manual for Construction Activities (BMP Manual). This manual can be obtained through the Internet at www.dfwstormwater.com/runoff.htmi. Not all of the structural. controls discussed in the BMP Manual will necessarily apply to this project. Best Management Practices are construction management techniques that, if properly utilized, can minimize the need for physical controls and possible reduce costs. The methods of control shall result in minimum sediment retention of not less than 70%. NOTICE OF INTENT (NOI): If the project will result in a total land disturbance equal to or greater than 5 acres, the contractor shall sign at the pre-construction meeting a TCEQ Notice of Intent (NOI) form prepared by the engineer. It serves as a notification to the TCEQ of construction activity as well as a commitment that the contractor understands the requirements of the permit for storm water discharges from construction activities and that measures will betaken to implement and maintain storm water pollution prevention at the site. The NOI shall be submitted 09/01/04 SC-50 ( ` PAIN D - SPECIAL CONDITIONS to the TCEQ at least 48 hours prior to the contractor moving on site and shall include the required ( $100 application fee. The NOI shall be mailed to: Texas Commission on Environmental Quality ( Storm Water& General Permits Team; MC-228 P.O. Box 13087 IAustin, TX 78711-3087 A copy of the NOI shall be sent to: ( City of Fort Worth Department of Environmental Management 5000 MLK Freeway IFort Worth, TX 76119 NOTICE OF TERMINATION (NOT): For all sites that qualify as Large Construction Activity, the ( contractor shall sign, prior to final payment, a'TCEQ Notice of Termination (NOT)form prepared by the engineer. It serves as a notice that the site is no longer subject to the requirement of the permit. I The NOT should be mailed to: I Texas Commission on Environmental Quality Storm Water& General Permits Team; MC-228 P.O. Box 13087 I Austin, TX 78711-3087 I STORM WATER POLLUTION PREVENTION PLAN (SWPPP): A document consisting of an erosion control and toxic waste management plan and a narrative defining site parameters and techniques to be employed to reduce the release of sediment and pollution from the construction site. Five of the project SWPPP's are available for viewing at the plans desk of the Department of Engineering. The selected Contractor shall be provided with three copies of the SWPPP after award of contract, along with unbounded copies of all forms to be submitted to the Texas ( Commission on Environmental Quality. LARGE CONSTRUCTION ACTIVITY— DISTURBED AREA EQUAL TO OR GREATER THAN 5 ACRES: A Notice of Intent (NOI) form shall be completed and submitted to the TCEQ including payment of the TCEQ required fee. A SWPPP that meets all TCEQ requirements prepared by the Engineer shall be prepared and implemented at least 48 hours before the commencement of construction activities. The SWPPP shall be incorporated into in the contract documents. The contractor shall submit a schedule for implementation of the SWPPP. Deviations from the plan must be submitted to the engineer for approval. The SWPPP is not warranted to meet all the conditions of the permit since the actual construction activities may vary from those anticipated during the preparation of the SWPPP. Modifications may be required to fully conform to the requirements of the Permit. The contractor must keep a copy of the most current SWPPP at the construction site. Any alterations to the SWPPP proposed by the contractor must be prepared and submitted by the contractor to the engineer for review and approval. A Notice of Termination (NOT)form shall be submitted within 30 days after final stabilization has been achieved on all portions of the site that is the responsibility of the permittee, or, when another permitted operator 1 assumes control over all areas of the site that have not been finally stabilized. SMALL CONSTRUCTION ACTIVITY- DISTURBED AREA EQUAL TO OR GREATER THAN ONE ACRE BUT LESS THAN FIVE ACRES: Submission of a NOI form is not required. However, 09101104 SC-51 OFFICIA'A WON@ CITY 011:101 RY ��, WORTH, TEX, PART D - SPECIAL CONDITIONS a TCEQ Site Notice form must be completed and posted at the site. A copy of the completed Site Notice must be sent to the City of Fort Worth Department of Environmental Management at the address listed above. A SWPPP, prepared as described above, shall be implemented at least 48 hours before the commencement of construction activities. The SWPPP must include descriptions of control measures necessary to prevent and control soil erosion, sedimentation and water pollution and will be included in the contract documents. The control measures shall be installed and maintained throughout the construction to assure effective and continuous water pollution control. The controls may include, but not be limited to, silt fences, straw bale dikes, rock berms, diversion dikes, interceptor swales, sediment traps and basins, pipe slope drain, inlet protection, stabilized construction entrances, seeding, sodding, mulching, soil retention blankets, or other structural or non-structural storm water pollution controls. The method of control shall result in a minimum sediment retention of 70% as defined by the NCTCOG "BMP Manual." Deviations from the proposed control measures must be submitted to the engineer for approval. PAYMENT FOR SWPPP IMPLEMENTATION: Payment shall be made per lump sum as shown on the proposal as full compensation for all items contained in the project SWPPP. FOR DISTURBED AREAS LESS THAN 1 ACRE, SPECIAL CONDITION D -40 SHALL BE APPLICABLE. D-69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS It is the Contractor's responsibility to coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. The Contractor may obtain a hydrant water meter from the Water Department for use during the life of named project: In the event the Contractor requires that a water valve on an existing live system be turned off and on to accommodate the construction of the project, the Contractor must coordinate this activity through the appropriate City representative. The Contractor shall not operate water line valves of existing water system. Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. D-70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD The City reserves the right to require any pre-qualified contractor who is the apparent low bidder(s)for a project to submit such additional information as the City, in sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information if requested may be grounds for rejecting the apparent low bidder as non-responsive. Affected contractors will be notified in writing of a recommendation to the City Council D-71 EARLY WARNING SYSTEM FOR CONSTRUCTION Time is of the essence in the completion of this contract. In order to insure that the contractor is responsive when notified of unsatisfactory performance and/or of failure to maintain the contract schedule, the following process shall be applicable: 09101104. SC-52 I PART D - SPECIAL CONDITIONS I The work progress on all construction projects will be closely monitored. On a bi-monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the contractor is less than the percentage of time allowed by 20% or more (example: 10% of the work completed in 30% of the stated contract time as may be amended by change order), the following proactive measures will be taken: 1. A letter will be mailed to the contractor by certified mail, return receipt requested demanding that, within 10 days from the date that the letter is received, it provide sufficient equipment, materials and labor to ensure completion of the work within the I contract time. In the event the contractor receives such a letter, the contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time. 2. The Project Manager and the Directors of the Department of Engineering, Water Department, and Department of Transportation and Public Works will be made aware of the situation. If necessary, the City Manager's Office and the appropriate city Icouncil members may also be informed. 3. Any notice that may, in the City's sole discretion, be required to be provided to I interested individuals will distributed by the Engineering Department's Public Information Officer. I 4. Upon receipt of the contractor's response, the appropriate City departments and directors will be notified. The Engineering Department's Public Information Officer will, if necessary, then forward updated notices to the interested individuals. 5. If the contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract, the bonding Icompany will be notified appropriately. D-72 AIR POLLUTION WATCH DAYS IThe Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the I OZONE SEASON, within the Metroplex area, runs from May 1, through OCTOBER 31, with 6:00 a.m. - 10:00 a.m. being critical BECAUSE EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON IOZONE FORMATION. . The Texas Commission on Environmental Quality(TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the IWATCH day. On designated Air Pollution Watch Days, the Contractor shall bear the responsibility of being aware that such days have been designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of I motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and certified by EPA as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. 1 09/01/04 SC-53 PART D - SPECIAL CONDITIONS If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. -6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. D-73 FEE FOR STREET USE PERMITS AND RE-INSPECTIONS A fee for street use permits is in effect. In addition, a separate fee for re-inspections for parkway construction, such as driveways, sidewalks, etc., will be required. The fees are as follows: 1. The street permit fee-is $30.00 per permit with payment due at the time of permit application. 2. A re-inspection fee of $25.00 will be assessed when work for which an inspection called for is incomplete. Payment is due prior to the City performing re-inspection. Payment by the contractor for all street use permits and re-inspections shall be considered subsidiary to the contract cost and no additional compensation shall be made. 09/01/04 SC-54 f (To be printed on Contractors Letterhead) l Date: I DOE No: 3176 PROJECT NAME:Main C1C4B Sanitary Sewer Drainage Area Part 15 MAPSCO LOCATION: 76L LIMITS OF CONST.: West of 9`s Avenue along FWWR between Rosedale and Oleander Estimated Duration of Construction on your Street : <XX>days jr Ar A I I I THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL REHABILITATE SEWER LINES ON OR AROUND YOUR PROPERTY. COGI CONSTRUCTION WILL BEN APPROXIMATELY :SEVEN DAYS I FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR I ANY OTHER ISSUE, PLEASE CALL: IMr. <CONTRACTOR'S SUPERINTENDENT>AT <TELEPHONE NO.> I OR Mr. <CITY INSPECTOR> AT <TELEPHONE NO.> l AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL 871-7970 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL. I OFFICI kill RECORD FT. 'rt;;.OR ��'ORM111, VE In A PART D ® SPECIAL CONDITIONS - CITY OF FORT WORTH HIGHWAY CONSTRUCTION PREVAILING WAGE RATE FOR 2000 CLASSIFICATION HOURLY RATE Asphalt Raker $10.32 Asphalt Shoveler $9.75 Batching Plant Weigher $9.65 Carpenter(Rough) $13.64 Concrete Finisher-Paving $10.16 Concrete Finisher Helper (Paving) $9.70 Concrete Finisher-Structures $13.44 Flagger $7.00 Form Builder-Structures $13.44 Form Setter-Paving & Curbs $10.25 Form Setter-Structures $9.75 Laborer-Common $7.64 Laborer-Utility $8.64 Mechanic $13.25 Servicer $10.13 Pipe Layer $7.35 Pipe Layer Helper $6.75 Asphalt Distributor Operator $11.45 Asphalt Paving Machine Operator $11.09 Concrete Paving Saw $10.53 Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (< 1 1/2 $10.00 CY) Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (> 1 1/2 $11.52 CY) Front End Loader (2 1/2 CY& less) $9.94 Front End Loader(over 2 1/2 CY) $9.32 Milling Machine Operator $8.00 Mixer $11.00 Motor Grader Operator (Fine Grade) $12.31 Motor Grader Operator $13.75 Pavement Marking Machine $11.00 Roller, Steel Wheel Plant-Mix Pavements $9.88 Roller, Steel Wheel Other Flatwheel or Tamping $12.12 Roller, Pneumatic, Self-Propelled Scraper $8.02 Traveling Mixer $10.00 Reinforcing Steel Setter (Paving) $9.75 Truck Driver-Single Axle (Light) $8.00 Truck Driver-Tandem Axle Semi-Trailer $10.22 Truck Driver-Lowboy/Float $10.54 Truck Driver-Transit Mix $10.63 Truck Driver-Winch $9.80 09/01/04 ` SC-56 `s ' FART D , SPECIAL_ CONDITIONS FORTWORTH �- Daft: DOE NO. XXXX r Project Name: I NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT,PLEASE CALL: MR. AT I (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT I (CITY INSPECTOR) (TELEPHONE NUMBER) ITHIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, 1 _ ,CONTRACTOR I I I 09101104 SC-57 I PART D s SPECIAL CONDITIONS F TEXAS DEPARTMENT OF HEALTH DEMOLITION f RENOVATION INGTIFIdXtI N FORM Nare.ciRcLE rrEws THAT ARE AMEJ0,1=Cr 0 T T H NOTIFICATION# 1) Abatement Contractor; T I-I License Number: AddressGlty; isbe: Ip; offkwPiletrta Ivumbar: 1 ,Iat� lte:l hone Number- , Arte 5upervisoc t loam NOm � U Sites Suporrdsor 'C Lfixrrt NNumber: -- Trained On-Site NESHAP Individual. Caruftecort tate, -___ ©emaildon Contractor: .-Office Phone bturnbert n ddke Citi EleiE: - A 2) Pro]ect Canvultsutt 2r Qiveralbs+r, TDWI License,Nuniber; Mding Address: city. —_ State: Zirr= _ _ Office Phones Number,t 1 T N 3) Facility ter. H Adtentioo;`-__ Madin$Addfesa: Cl ty;- State-.4r.—Owner Phone Numbers 'i "No th o _ tf be ct�a(�d from �rtY1a��notification Isn aYiit&d6n�t$�� �r+�ffl��tluile��#n+��3sr�tllle ad�]t' fvrtheiriMoileawl N ` 4) Description or Facility Name: PF►y§i�(Addr�s; Cauruy= Oicy; �Ip: Facility Phone it umbert ) c r Coni act Perworr Descrip Ilan of AreaMoom Number _ Prior Use- FulLffe-Lidw- 46 of&illdlrt acll ty: sire: Mttmbar of Fiwre; School(K_12): a YES 11 NO 5) Type of Vl ark ® 11emolition U Renovatlon(Abatement) ❑ Annual Cansolidetad lilartcvuiU be during-. ill Day [IEvening b Nfgttit t] PFi d F rateot t_ Description at work schedule. Is lhis a Public Building? 0 YES 0 NO Federal Faclil } H tyFr❑YES 0 NO If'iduetria]Mita`?❑YES ONO El F ESVIAP-Moly Facility? ❑ YES ❑ No Is Buitding/Fadlity oncup" a YES a No t 7) Nottlrreation Types CHECIK ONLY ONE €l Original(10 Worldn,g Days) C Canceilallon a Amendment ❑ EmeugencyFOrdered If this 1s an amendment,which amendment number Is ihls?_ (Enclose copy of orlgInail andtor last ammidment) I lF an emergency,vobo did you talk with at TDH?—_ __ FmergenW4 e Date and Hour of Emergency(Hl=iirMWt3Dt'Y); risioription of the andden,un ecte+d event and explanation of how the everdtauusad UriFaeoriditfads$cWaLild ci re £. equipment damage(computers;machinery;etc 9) Description of procedures to be followed In the event ilhat unexpected asheatos is.found or ffw0ously non-friable asbeatos material becomes exumbled,pulverized,or rued to powder, 'E S 9) Waa an Asbestos survey performed? ❑ YES a NO Dale: f 1 TDH InapetAtr License Nes: Ane4ffoal Method.0 PLM ❑TEM❑Assumed Tali LaWaloff-yUce"a No; Fl (For TAHPA(public building)projecle;are assumpUon must be made by a TDD Licensed Inspector) 10) Descriptlon of planned dernobtion or renovation*wk,types of material,and method(s)to be used: 11) Description of work pracAfeels and engineering cores to be used to prevent emissions of asbestos at the demoliticnfrenovation: 09101104 SC-58 PAIN D - SPECIAL CONDITIONS 12) ALL applicable items in the following table must be completed: IF NO ASSESTOS PRESENT CHECK HERE Approximate amount of Check unit of measurement AShaatas-Containing Building Material Asbesllbos I 'TY pa Ptpea Surface Area Ln Ln SO SO Ou Cu Ft kf Ft- M_ Ft M RACM to be removed RACM NOT removed Interior Category I norr friabls removed Exkwidt Category I non-friable removed ---- - _ Catewry I non fdabre NOT removed Interior Category It nort-ftiatate removed Exterior GAtegimy tl non-friable removed - -- Cate Il nrm-friable NOT removed RAGNt Off-Facility Component 13) Waste Transporter Name: ---- TDFI License Number, Address: City: Mate: ZIp: IContact person: _- Phwa hrurnher: ( 3 14) Warta Disposal Site Name: Addrei --_ -- City= State: Ztp-. --- f Tefgp'hone: )--.-------. TNRCC Permit Number I! 15) For structurally unsound facilities,attach a copy of tramaGtien order and identify Governmental Official below. Names-----. Reglstratlon No:-- — - Tilie ICate of order{MM1DDM) f- 1- Dale order tp begin(MMIDDIYY) I I- 16) Scheduled hates of Asbestos Abatement(MMIDE)PrY) Start: t ! comply, I f I 17) Scheduled QetesLremoli#ionlRenQvation(M1+I fiIDI fYti`) ;Mart:_ �! Co plate, f I Note=if the start date an flits natilication cavi rtat be mat,tho Tata Regional or Local Program office Must bit contacted by phone priortothe start date. Falluro to do su Is avrcl-atlhn rn accordanceto TAHPA.Suction 29g.t31. I 1 berabys certify{that all Information I have provided Is erect;complete.aria tale to the bast of my knowledge, I acknowledge that I am responsible for all aspects of the notification.+oim,including,but not limiting,content and submissirn dates. The maxtrnurn penalty is$14.Q411 per day per violation. (Slant ltae of Building Owner/Operator (Printed Marna) (Dale) (Telephone) or Delegated ConsultantlConlractor) # 3 (Fax Number) MAIL TO: ASI—STOS NOTIFICATION SECTION TOXIC SUBSTANCES CONTROL DIVISION TEXAS DEPARTMENT OF HEALTH *Fairex am not accep[od" PO BOX 148538 *Faxes aro not accepted, AUSTIN,TX 78714-353tf I PIS 512-834-60 1,1-800-672--5648 Form.PB#5,dat€d OT129102.Replaces TDH form dated 07113MI_For assirdance in compfeting loom,cam I-WO-572-5548 l - I09101104 SC-59 1 Part DA. Additional Special Conditions I ` PART DA - ADDITIONAL SPECIAL CONDITIONS DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS (OMITTED).....4 DA-2 PIPELINE REHABILITATION CURED-IN-PLACE PIPE (OMITTED) ...........................4 DA-3 PIPE ENLARGEMENT SYSTEM (OMITTED)..............................................................4 DA-4 FOLD AND FORM PIPE (OMITTED)...........................................................................4 DA-5 SLIPLINING (OMITTED)..............................................................................................4 DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT (OMITTED)....................................4 DA-7 TYPE OF CASING PIPE (OMITTED)...........................................................................4 DA-8 SERVICE LINE POINT REPAIR/ CLEANOUT REPAIR(OMITTED)...........................4 DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION (OMITTED)4 I DA-10 MANHOLE REHABILITATION (OMITTED)..................................................................4 DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION (OMITTED) .............4 DA-12 INTERIOR MANHOLE COATING- MICROSILICATE MORTAR SYSTEM (OMITTED)4 DA-13 INTERIOR MANHOLE COATING-QUADEX SYSTEM (OMITTED)...........................4 DA-14 INTERIOR MANHOLE COATING-SPRAY WALL SYSTEM (OMITTED).........._.......4 DA-15 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM (OMITTED).................4 DA-16 INTERIOR M/H COATING: PERMACAST SYSTEM W/ EPDXY LINER(OMITTED) .4 DA-17 INTERIOR MANHOLE COATING-STRONG-SEAL-SYSTEM (OMITTED)....................4 DA-18 RIGID FIBERGLASS MANHOLE LINERS (OMITTED)................................................4 DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION (OMITTED)-............. ..............4 DA-20 PRESSURE GROUTING (OMITTED)..........................................................................4 DA-21 VACUUM TESTING OF REHABILITATED MANHOLES (OMITTED) ..........................4 DA-22 FIBERGLASS MANHOLES (OMITTED) ......................................................................4 I DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES (OMITTED)...4 DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER (OMITTED) .........................4 DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS (OMITTED)..................................5 DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE (OMITTED)...........................5 I DA-27 GRADED CRUSHED STONES (OMITTED)................................................................5 DA-28 WEDGE MILLING 2"TO O" DEPTH 5.0'WIDE (OMITTED)........................................5 I DA-29 BUTT JOINTS- MILLED (OMITTED)...........................................................................5 i DA-30 2" H.M.A.C. SURFACE COURSE (TYPE"D" MIX) (OMITTED)...................................5 DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER ............................................5 DA-32 NEW 7" CONCRETE VALLEY GUTTER (OMITTED)..................................................5 DA-33 NEW 4" STANDARD WHEELCHAIR RAMP(OMITTED).............................................5 DA-34 8" PAVEMENT PULVERIZATION (OMITTED)....................... ...... ..............................6 DA-35 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) (OMITTED) .......6 I DA-36 RAISED PAVEMENT MARKERS (OMITTED)..............................................................6 DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATER. HANDLING (OMITTED)....6 DA-38 LOADING, TRANSPORT., & DISPOSAL OF CONTAMINATED SOIL (OMITTED),,,,,6 I DA-39 ROCK RIPRAP- GROUT- FILTER FABRIC (OMITTED)............................................6 DA-40 CONCRETE RIPRAP (OMITTED) ...._...... ........____........ .......................... ........_6 DA-41 CONCRETE CYLINDER PIPE AND FITTINGS (OMITTED)....:...................................6 DA-42 CONCRETE PIPE FITTINGS AND SPECIALS (OMITTED).........................................6 DA-43 UNCLASSIFIED STREET EXCAVATION (OMITTED).................................................6 DA-44 6" PERFORATED PIPE SUBDRAIN (OMITTED).........................................................6 I DA-45 REPLACEMENT OF 4" CONCRETE SIDEWALKS (OMITTED) ..................................6 DA-46 RECOMMENDED SEQUENCE OF CONSTRUCTION................................................6 DA-47 PAVEMENT REPAIR IN PARKING AREA(OMITTED)................................................7 DA-48 EASEMENTS AND PERMITS (OMITTED)...................................................................7 DA-49 HIGHWAY REQUIREMENTS (OMITTED)...................................................................7 DA-50 CONCRETE ENCASEMENT.......................................................................................7 11/02/04 ASC-1 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-51 CONNECTION TO EXISTING STRUCTURES (OMITTED).........................................7 DA-52 TURBO METER WITH VAULT AND BYPASS INSTALLATION (OMITTED)...............7 DA-53 OPEN FIRE LINE INSTALLATIONS(OMITTED),... DA-54 WATER SAMPLE STATION (OMITTED)...... ................. ............................... DA-55 CURB ON CONCRETE PAVEMENT (OMITTED)........... ....__.................... .........._-7 DA-56 SHOP DRAWINGS (OMITTED)...........................................................:.......................7 DA-57 COST BREAKDOWN (OMITTED)...........................................................:...................7 DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY(OMITTED)............... 7 DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP ....................................................................7 DA-60 ASPHALT DRIVEWAY REPAIR......... ............ ...................... .......... ........____...7 DA-61 TOP SOIL (OMITTED)...................................................................................... ..........7 DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT (OMITTED)7 DA-63 BID QUANTITIES (OMITTED)......._._...................... .............___...._.7 DA-64 WORD IN HIGHWAY RIGHT OF WAY (OMITTED) ....................................................8 DA-65 CRUSHED LIMESTONE (FLEX-BASE) (OMITTED)....................................................8 DA-66 OPTION TO RENEW (OMITTED)................................................................................8 DA-67 NON-EXCLUSIVE CONTRACT(OMITTED)................................................ DA-68 CONCRETE VALLEY GUTTER (OMITTED)................................................................8 DA-69 TRAFFIC BUTTONS(OMITTED)........................................................................:........8 DA-70 PAVEMENT STRIPING (OMITTED)............................................................................8. DA 71 H.M.A.C. TESTING PROCEDURES (OMITTED)...................................:.....................8 DA-72 SPECIFICATION REFERENCES.................................................................................8 DA-73 RELOCATION OF SPRINKLER SYSTEM BACK-FLOW PREVENTER/CONTROL VALVE AND BOX(OMITTED)..................................................... .................................8 DAA 74 RESILIENT-SEATED GATE VALVES .........................................................................8 DA-75 EMERGENCY SITUATION, JOB MOVE-IN (OMITTED)..............................................8 DA-76 1 fa" &2" COPPER SERVICES (OMITTED)......................_.......____..............__..8 DA-77 SCOPE OF WORK(UTIL. CUT) (OMITTED)............................................. ..................8 DA-78 CONTRACTOR'S RESPONSIBILTY(UTIL. CUT) (OMITTED)....................................8 DA-79 CONTRACT TIME (UTIL. CUT) (OMITTED)................................................................8 DA-80 REQUIRED CREW PERSONNEL& EQUIPMENT(UTIL. CUT) (OMITTED)..............8 DA-81 TIME ALLOWED FOR UTILITY CUTS (UTIL. CUT) (OMITTED).................................8 DA-82 LIQUIDATED DAMAGES (UTIL. CUT) (OMITTED).....................................................8 DA-83 PAVING REPAIR EDGES (UTIL. CUT) (OMITTED)....................................................9 DA-84 TRENCH BACKFILL (UTIL. CUT) (OMITTED)........................................:....................9 DA-85 CLEAN-UP (UTIL. CUT) (OMITTED)...........................................................................9 DA-86 PROPERTY ACCESS (UTIL. CUT) (OMITTED)......................................................._9 DA-87 SUBMISSION OF BIDS (UTIL. CUT) (OMITTED)........................................................9 DA-88 STANDARD BASE REPAIR FOR UNIT I (UTIL. CUT) (OMITTED)...,..........__......._9 DA-89 CONCRETE BASE REPAIR FOR UNIT 11 & UNIT III (UTIL. CUT) (OMITTED) .....__9 DA-90 2" TO 9" H.M.A.C. PAVEMENT(UTIL, CUT) (OMITTED)............................................9 DA-91 ADJUST WATER VALVE BOXES, M/H, &VAULTS (UTIL. CUT) (OMITTED) ............9 DA-92 MAINTENANCE BOND (UTIL. CUT) (OMITTED)........................................................9 DA-93 BRICK PAVEMENT(UTIL. CUT) (OMITTED)...........__.................... 9 DA-94 LIME STABILIZED SUBGRADE (UTIL. CUT) (OMITTED)........ ..................... ......9 DA-95 CEMENT STABILIZED SUBGRADE (UTIL. CUT)(OMITTED)....................................9 DA-96 REPAIR OF STORM DRAIN\STRUCTURES (UTIL. CUT) (OMITTED)......................9 DA-97 "QUICK-SET" CONCRETE (UTIL. CUT) (OMITTED)..................................................9 DA-98 UTILITY ADJUSTMENT(UTIL. CUT) (OMITTED).......................................................9 DA-99 STANDARD CONC. SIDEWALK&WHEELCHAIR RAMPS (UTIL. CUT) (OMITTED) 9 11/02/04 ASC-2 i ^ PART DA - ADDITIONAL SPECIAL CONDITIONS I DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR(UTIL. CUT) (OMITTED)....................9 DA-101 CONCRETE CURB AND GUTTER(UTIL. CUT) (OMITTED)......................................9 DA-102 PAYMENT (UTIL. CUT) (OMITTED)......................................... .................................9 i DA-103 DEHOLES (MISC. EXT.) (OMITTED)..........................................................................9 DA-104 CONSTRUCTION LIMITATIONS (MISC, EXT.) (OMITTED)......... .............................9 DA-105 PRESSURE CLEANING AND TESTING (MISC. EXT.) (OMITTED)............---... ......9 i DA-106 BID QUANTITIES (MISC. EXT.) (OMITTED)...............................................................9 DA-107 LIFE OF CONTRACT(MISC. EXT.) (OMITTED).......................................................10 DA-108 FLOWABLE FILL (MISC. EXT.) (OMITTED).............................................................10 i DA-109 BRICK PAVEMENT REPAIR (MISC. REPL) (OMITTED).........................................10 DA-110 DETERMINATION AND INITIATION OF WORK (MISC. REPL) (OMITTED)...........10 DA-111 WORK ORDER COMPLETION TIME (MISC. REPL) (OMITTED)............................10 DA-1 12 MOVE IN CHARGES (MISC. REPL.) (OMITTED).....................................................10 DA:113 PROJECT SIGNS (MISC. REPL.) (OMITTED)..........................................................10 DA-114 LIQUIDATED DAMAGES (MISC. REPL.)(OMITTED)....-...... ......---....... ............10 DA-115 TRENCH SAFETY SYSTEM DESIGN (MISC. REPL.) (OMITTED)...........................10 iDA-116 FIELD OFFICE (OMITTED).......................................................................................10 DA-117 TRAFFIC CONTROL PLAN (OMITTED)...................................................................10 DA-118 COORDINATION OF WORK W/CONTRACTOR FOR OTHER UNITS (OMITTED).10 1 i i i i i i I i91/02/04 ASC-3 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS (OMITTED) DA-2 PIPELINE REHABILITATION CURED-IN-PLACE PIPE (OMITTED) DA-3 PIPE ENLARGEMENT SYSTEM (OMITTED) DA-4 FOLD AND FORM PIPE (OMITTED) DA-5 SLIPLINING (OMITTED) DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT (OMITTED) DA-7 TYPE OF CASING PIPE (OMITTED) DA-8 SERVICE LINE POINT REPAIR/CLEANOUT REPAIR (OMITTED) DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION (OMITTED) DA-10 MANHOLE REHABILITATION (OMITTED) DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION (OMITTED) DA-12 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM (OMITTED) DA-13 INTERIOR MANHOLE COATING -QUADEX SYSTEM (OMITTED) DA-14 INTERIOR MANHOLE COATING - SPRAY WALL SYSTEM (OMITTED) DA-15 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM (OMITTED) DA-16 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPDXY LINER (OMITTED) DA-17 INTERIOR MANHOLE COATING-STRONG-SEAL-SYSTEM (OMITTED) DA-18 RIGID FIBERGLASS MANHOLE LINERS (OMITTED) DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION (OMITTED) DA-20 PRESSURE GROUTING (OMITTED) DA-21 VACUUM TESTING OF REHABILITATED MANHOLES (OMITTED) DA-22 FIBERGLASS MANHOLES DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES (OMITTED) DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER (OMITTED) 11102104 ASC-4 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS (OMITTED) DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE (OMITTED) DA-27 GRADED CRUSHED STONES (OMITTED) IDA-28 WEDGE MILLING 2"TO 0" DEPTH 5.0'WIDE (OMITTED) DA-29 BUTT JOINTS— MILLED (OMITTED) IDA-30 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX) (OMITTED) DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER This item shall include the removal and reconstruction of existing concrete valley gutters at locations to be determined in field: I t pavement, concrete base curb and utter, and Removal of existing concrete valley, asphal pavem g , necessary excavation to install the concrete valley gutters all shall be subsidiary to this pay item. Furnishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details, shall be subsidiary to this Pay Item. See standard specification Item No. 314, "Concrete Pavement", Item 312 "Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item No. 106, "Unclassified Street I Excavation" Item No. 208 "Flexible Base." Measurement for final quantities of valley gutter will be by the square yard of concrete pavement and the curb and gutter section will be included. Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no additional cost. See Item 314" Concrete Pavement". Asphalt base material may be required at times as directed by the Engineer to expedite the work I at locations identified in the field. The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per Isquare inch. Contractor shall work on one-half of Malley Gutter at a time, and the other half shall be open to traffic. Work shall be completed on each half within seven (7) calendar days. IIf the contractor fails to complete the work on each half within seven (7) calendar days, a $100 dollars liquidated damage will be assessed per each half of valley gutter per day. I The unit price bid per square yard for Concrete Valley as shown on the proposal will be full compensation for materials, labor, equipment, tools and incidentals necessary to complete the i work. I DA-32 NEW 7" CONCRETE VALLEY GUTTER (OMITTED) IDA-33 NEW 4" STANDARD WHEELCHAIR RAMP (OMITTED) 11/02/04 ASC-5 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-34 8" PAVEMENT PULVERIZATION (OMITTED) DA-35 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) (OMITTED) DA-36 RAISED PAVEMENT MARKERS (OMITTED) DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING (OMITTED) DA-38 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL (OMITTED) DA-39 ROCK RIPRAP -GROUT-FILTER FABRIC (OMITTED) DA-40 CONCRETE RIPRAP(OMITTED) DA-41 CONCRETE CYLINDER PIPE AND FITTINGS (OMITTED) DA-42 CONCRETE PIPE FITTINGS AND SPECIALS (OMITTED) DA-43 UNCLASSIFIED STREET EXCAVATION (OMITTED) DA-44 6" PERFORATED PIPE SUBDRAIN (OMITTED) DA-45 REPLACEMENT OF 4" CONCRETE SIDEWALKS (OMITTED) DA-46 RECOMMENDED SEQUENCE OF CONSTRUCTION In order to facilitate timely reconstruction of the affected roadway surfaces (subsequent to water/sewer installation) under the City's roadway maintenance program, it is recommended that the proposed water and/or sanitary sewer improvements be conducted on the project streets based upon the following sequence: 1. Heatherwood Ct. 2. Lake Harbor Ct. 3. Summit Cove 4. Lake Highlands Dr. 6. Stonewood Ct. 6. Lake Country Ct. 7. Aspen Wood Ct. 8. Trailridge Dr. g. Incline Terrace After the work start date has been established, the selected contractor shall be required to submit the beginning and ending dates for all work (including pavement repair) on each of the project streets. Please be advised that the contractor has the option of submitting a different sequence of construction than staffed above. The contractor shall not be allowed to begin work (but time charges will begin on the project) until the preferred sequence of construction and the start and end work dates for each street have been submitted to the City. 11102104 ASC-6 I PART DA - ADDITIONAL SPECIAL CONDITIONS DA-47 PAVEMENT REPAIR IN PARKING AREA(OMITTED) f _ DA-48 EASEMENTS AND PERMITS (OMITTED) DA-49 HIGHWAY REQUIREMENTS (OMITTED) DA-50 CONCRETE ENCASEMENT Concrete encasement shall be Class E (1500 psi) concrete and for sewer line encasements shall ( conform to Fig. 113, for water line encasements it shall conform to Fig. 20 of the General I Contract Documents. Requirements for such encasement are specified in Sections E1-20 and E2-20 of the General Contract Documents. IPayment for work such as forming, placing, and finishing including all labor, tools, equipment and material necessary to complete the work shall be included in the linear foot price bid for Concrete Encasement. DA-51 CONNECTION TO EXISTING STRUCTURES OMITTED fDA-52 TURBO METER WITH.VAULT AND BYPASS INSTALLATION (OMITTED) DA-53 OPEN FIRE LINE INSTALLATIONS (OMITTED) DA-54 WATER SAMPLE STATION (OMITTED) IDA-55 CURB ON CONCRETE PAVEMENT(OMITTED) DA-56 SHOP DRAWINGS (OMITTED) I -57 COST BREAKDOWN (OMITTED) DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY (OMITTED) DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP IWhen H.M.A.C. greater than 9 inches in depth is encountered, it shall be replaced with a combination of H.M.A.G, and 2;27 concrete base, as determined by the Engineer, to achieve the f required thickness of pavement. I DA-60 ASPHALT DRIVEWAY REPAIR IAt locations where H.M.A.C, driveways are encountered, such driveways shall be completely replaced for the full extent of utility cut with H.M.A.C, equal to or better than the existing driveway. DA-61 TOPSOIL (OMITTED) DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT (OMITTED) IDA-63 BID QUANTITIES (OMITTED) I11/02/04 ASC-7 I PART DA - ADDITIONAL SPECIAL CONDITIONS DA-64 WORK IN HIGHWAY RIGHT OF WAY (OMITTED) DA-65 CRUSHED LIMESTONE (FLEX-BASE) (OMITTED) DA-66 OPTION TO RENEW (OMITTED) DA-67 NON-EXCLUSIVE CONTRACT (OMITTED) DA-68 CONCRETE VALLEY GUTTER(OMITTED) DA-69 TRAFFIC BUTTONS (OMITTED) DA-70 PAVEMENT STRIPING (OMITTED) DA-71 H.M.A.C. TESTING PROCEDURES (OMITTED) DA-72 SPECIFICATION REFERENCES When reference is made in these specifications to a particular ASTM, AWWA, ANSI or other specification, it shall be understood that the latest revision of such specification, prior to.the date of these general specifications or revisions thereof, shall apply. DA-73 RELOCATION OF SPRINKLER SYSTEM BACK-FLOW PREVENTER/CONTROL VALVE AND BOX(OMITTED) DA-74 RESILIENT-SEATED GATE VALVES Any resilient-seated gate valves supplied for this contract shall conform to Material Standard E1-26, STANDARD SPECIFICATIONS FOR RESILIENT-SEATED GATE VALVES, with the exception of size requirements in sections E-26.1. All resilient-seated gate valves shall be mechanical joints and be approved on the City of Fort Worth Standard Product List. DA-75 EMERGENCY SITUATION, JOB MOVE-IN (OMITTED) DA-76 1 %" & 2" COPPER SERVICES (OMITTED) DA-77 SCOPE OF WORK (UTIL. CUT) (OMITTED) DA-78 CONTRACTOR'S RESPONSIBILTY (UTIL. CUT) (OMITTED) DA-79 CONTRACT TIME (UTIL. CUT) (OMITTED) DA-80 REQUIRED CREW PERSONNEL & EQUIPMENT (UTIL. CUT) (OMITTED) DA-81 TIME ALLOWED FOR UTILITY CUTS (UTIL. CUT) (OMITTED) DA-82 LIQUIDATED DAMAGES (UTIL. CUT) (OMITTED) 11/02/04 ASC-8 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-83 PAVING REPAIR EDGES (UTIL. CUT) (OMITTED) DA-84 TRENCH BACKFILL (UTIL. CUT) (OMITTED) l DA-85 CLEAN-UP (UTIL. CUT) (OMITTED) DA-86 PROPERTY ACCESS (UTIL. CUT) (OMITTED) DA-87 SUBMISSION OF BIDS (UTIL. CUT) (OMITTED) I DA-88 STANDARD BASE REPAIR FOR UNIT I (UTIL. CUT) (OMITTED) DA-89 CONCRETE BASE REPAIR FOR UNIT 11 & UNIT III (UTIL. CUT) (OMITTED) DA-90 2" TO 9" H.M.A.C. PAVEMENT(UTIL. CUT) (OMITTED) DA-91 ADJUST WATER VALVE BOXES, MANHOLES, AND VAULTS (UTIL. CUT) (OMITTED) IDA-92 MAINTENANCE BOND (UTIL. CUT) (OMITTED) DA-93 BRICK PAVEMENT (UTIL. CUT) (OMITTED) DA-94 LIME STABILIZED SUBGRADE (UTIL. CUT) (OMITTED) I DA-95 CEMENT STABILIZED SUBGRADE (UTIL. CUT) (OMITTED) ` DA-96 REPAIR OF STORM DRAIN\STRUCTURES (UTIL. CUT) (OMITTED) DA-97 "QUICK-SET"CONCRETE (UTIL.CUT) (OMITTED) DA-98 UTILITY ADJUSTMENT(UTIL. CUT) (OMITTED) DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS (UTIL. CUT) (OMITTED) I DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR(UTIL. CUT) (OMITTED) IDA-101 CONCRETE CURB AND GUTTER (UTIL. CUT) (OMITTED) DA-102 PAYMENT(UTIL. CUT) (OMITTED) DA-103 DEHOLES (MISC. EXT.) (OMITTED) DA-104 CONSTRUCTION LIMITATIONS (MISC. EXT.) (OMITTED) I DA-105 PRESSURE CLEANING AND TESTING (MISC. EXT.) (OMITTED) DA-106 BID QUANTITIES (MISC. EXT.) (OMITTED) 11/02/04 ASC-9 OFFICIAL RECORD + CIff SI-1-JINARY J ppA � ��SI� X PART DA - ADDITIONAL SPECIAL CONDITIONS DA-107 LIFE OF CONTRACT (MISC. EXT.) (OMITTED) DA-108 FLOWABLE FILL (MISC. EXT.) (OMITTED) DA-109 BRICK PAVEMENT REPAIR (MISC. REPL.) (OMITTED) DA-110 DETERMINATION AND INITIATION OF WORK (MISC. REPL.) (OMITTED) DA-111 WORK ORDER COMPLETION TIME (MISC. REPL.) (OMITTED) DA-112 MOVE IN CHARGES (MISC. REPL.) (OMITTED) DA-113 PROJECT SIGNS (MISC. REPL.) (OMITTED) DA-114 LIQUIDATED DAMAGES (MISC. REPL.) (OMITTED) DA-115 TRENCH SAFETY SYSTEM DESIGN (MISC. REPL.) (OMITTED) DA-116 FIELD OFFICE (OMITTED) DA-117 TRAFFIC CONTROL PLAN (OMITTED) DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS (OMITTED) . 1,1/02/04 ASC-10 { 4 i 1 y 5 2 f 5 Part E. Specifications 3 i SECTION E100 - MATERIAL SPECIFICATIONS MATERIAL STANDARD E 100 f JANUARY 1, 1978 (ADDED 5/13/90) DEPARTMENT a enals, construction methods and procedures used in thin project shall conform to 0 E2, and E2A of the Fort Worth Water Department General Contract x coons° E1, ocubflments and General Specifications, together with any additional material .' construction(s) or later revision(s). (See revisions listed on this sheet). Sections E1, E2 and E2A of .the Fort Worth Water Department General Contract i 6 cuments and General Specifications are hereby made a part of this contract Deo osame as if copies verbatim herein, and such cument by reference for all purposes, the sections are filed and kept in the office of the City Secretary of the City of Fort Worth as an official record of the City of Fort Worth. INDEX E1 MATERIAL SPECIFICATIONS . E2 CONSTRUCTION SPECIFICATIONS E3 GENERAL DESIGN DETAILS 1' i Revisions as of April 20, 1981, follow: l E1-2.4 Backfill: (Correct minimum compaction requirement to 95% Proctor density and correct P.I. values as follows:) a. Additional backfill requirements when approved for use in streets: 1. Type B Backfill (a) Maximum plastic index (PI) shall be 8 2. Type C Backfill (a) Material meeting requirements and having a PI of 8 or less I shall be considered as suitable for compaction by jetting (b) Material meeting requirement and having 4-PI of 9 or more shall be considered. for use only with mechanical compaction. E 2-2.11Trench Backfill: (Correct minimum compaction requirement whenever it appears in this section to 95% Proctor density except for paragraph a.1:where the °95% modified Procter density" shall remain unchanged). k: I j 1 NoTF _rtlf SIZES 1JVOI CATfv 1A1 MIS SPFc 01UPW shleAetD ,BE 9Eu1sED ACCDRD))lrr To THE sTAlVOAXD ptTAlt ATInt! sseTlw '`STAA►D�RD f'1GtlaZES � UET�tI.S" pF THESE CONtRACT DOtKJItE/VTt i 3I''EGIFlGdTlo�t SECTION E1-18A— REINFORCED PLASTIC WATER METER BOXES ( Revised March 27, 2003) E1.18A.1 SCOPE: This specification covers three types of water meter boxes, Type A and B, and Type C. E1.18A.1.1 Class A Standard Meter Box: Intended for use with services utilizing 5/8" X3/4", 34" and 1" meters. E 1.18A.1.2 Class B Standard Meter Box: Intended for use with services utilizing*1-1/2".and 2" meters. E1.18A.1.3 Class C Standard Meter Box: Intended for use with services utilizing two 5/8" X 3/a or 3/" meters. E1.1.8A.2 CONSTRUCTION: Reinforced`plastic water meter boxes and iron cover lidsuriderthis�specification will include three-specific sizes of a-rectangular shape. Those three sizes will.be referred to us:. -------- - ----- CtA��`A18-"Box; 12" high --------- CLASS 'B', 15.25"x 27".Box, 12" high CLASS 'C', 18"x 16'-Box, 12" high E1.18A.3. REINFORCED PLASTIC METER BOX SPECIFICATION The meter box shall be constructed of Linear _Medium Density Polyethylene (LMDPE) as defined in ASTM D-883-95A and have a minimum wall thickness of g ..500". The exterior shall be black to provide UV protection. Boxes shall be able "to' withstand a' minimum 15;000 pounds vertical load and shall-withstand a - minimum 400-pounds sidewall load. The meter box.exterior.shall be free from seams or parting lines and all edges and corners are to be smooth and free from-sharp edges so the unit can be handled safely without gloves. E1.18A.4. IRON METER BOX LID SPECIFICATION The meter box lids are to be made of cast iron -according to ASTM A48-84, Class 358 or ductile iron according to ASTM A-536. The lids shall withstand a minimum vertical load of 15,000 pounds. Castings are coated with a bituminous emulsified asphalt unless otherwise specified, ground smooth, and cleaned with shot blasting, to get a uniform quality free from strength defects and distortions. Dimensions shall be within industry standards of plus or minus (+/-) one-sixteenth of an inch per foot. All castings.will bear the Manufacturer's IS (name or logo) and Country of Origin. Casting weights may vary plus or minus (+/-) five-percent from drawing weight per industry standards. Part F. Insurance and Bonds Certificate of Insurance Performance Bond Payment Bond Maintenance Bond Vendor Compliance to State Law Contractor Compliance with Worker's Compensation Laws VENDOR COMPLIANCE TO STATE LAW The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to non-resident bidders. This law provides that, in order to be awarded a contract as a low bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the state of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a non-resident bidder in order to obtain a comparable contract in the state in which the non-resident's principal place of business is located. The appropriate blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state or r non-resident contractors to do so will automatically disqualify that bidder. Resident bidders must r check the box in Section B. A. Non-resident vendors in (give state), our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non-resident vendors in (give state), our principal place of business are not required to underbid resident bidders. B. Our principal place of business or corporate offices are in the State of Texas. Bidder: Company By e Print) 10 Lze . k-a V1 Address Signature UJ d I 6l&d , I /1 ! 0 . Re-S Oki el l City/State/Zip Title (Please Print) r THIS FORM MUST BE RETURNED WITH YOUR QUOTATION z I CSR BC DATE(MM/DD/YYYY) ACORD CERTIFICATE OF LIABILITY INSURANCE SHUCI-1 1 06/29/05 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE holey Featherston Insurance HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR '. 0. Box 97513 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. 'Wichita Falls TX 76307-7513 _Phone: 940-723-7111 Fax:940-322-9549 INSURERS AFFORDING COVERAGE NAIC# ISURED INSURER A: American Home Assurance Co 19380 IINSURER B: Bituminous Casualty Corp 20095 S.H.U.C. Inc. INSURER C: 310 Lee Lane INSURER D: Weatherford TX 76087-7701 INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR NSR TYPE OF INSURANCE POLICY NUMBER DATEYMM/DD/YY E PDATEY(MM/DDlYY) LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 B X COMMERCIAL GENERAL LIABILITY CLP3210118 05/01/05 05/01/06 PREMISES(Eaoccurence) $ 100,000 CLAIMS MADE. X❑OCCUR MED EXP(Any one person) s5,000 PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG s2,000,000 X POLICY PRO LOC JECT AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 J B X ANY AUTO CAP3210120 05/01/05 05/01/06 (Ea accident) ALL OWNED AUTOS BODILY INJURY SCHEDULED AUTOS (Per person) $ X HIRED AUTOS BODILY INJURY $ X NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESSIUMBRELLA LIABILITY EACH OCCURRENCE s2,000,000 B X OCCUR E] CLAIMS MADE CUP2576188 05/01/05 05/01/06 AGGREGATE $2,000,000 $ DEDUCTIBLE $ X RETENTION $10,000 $ WORKERS COMPENSATION ANDTORY LIMITS X I ER EMPLOYERS'LIABILITY WC1512707 05/01/05 05/01/06 E.L.EACH ACCIDENT $ 1000000 ANY PROPRIETOR/PARTNER/EXECUTIVE I OFFICER/MEMBEREXCLUDED? E.L.DISEASE-EA EMPLOYEE $ 1000000 If yes,describe under SPECIAL PROVISIONS below E.L.DISEASE-POLICY LIMIT $ 1000000 OTHER 3 LEASED/RENTED CLP3210118 05/01/05 05/01/06 PER ITEM 100,000 EQUIPMENT I I I PER OCC 100,000 ^ESCRIPTION OF OPERATIONS/LOCATIONS!VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS 2E: Water Replacement Contract 2002-STM-F CERTIFICATE HOLDER CANCELLATION FORTC01 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN I CITY OF FORT WORTH NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL 1000 THROCKMORTON IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR FORT WORTH TX 76102-6311 REPRESENTATIVES. ' AU R ATI b CORD 25(2001/08) ©ACORD CORPORATION 1988 i IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. D iCORD 25(2001/08) JtHM ` MMI, � Ge CERTIFICATE OF INSURANCE TO: CITY OF FORT WORTH Date: NAME OF PROJECT: WATER REPLACEMENT CONTRACT 2002 STM-F PROJECT NUMBER: PW53-060530176470 IS TO CERTIFY THAT: S.H.U.C.,INC. is,at the date of this certificate,Insured by this Company with respect to the business operations hereinafter described,for the type of insurance and accordance with provisions of the standard policies used by this Company,and further hereinafter described. Exceptions to standard policy noted on reverse side hereof. TYPE OF INSURANCE Policy Effective Expires Limits of Liability Worker's Compensation Comprehensive General Bodily Injury: Liability Insurance(Public Ea.Occurrence: $ Liability) Property Damage: Ea.Occurrence: $ Blasting Ea.Occurrence: $ Collapse of Building or structures adjacent to Ea.Occurrence: $ excavations Damage to Underground Utilities Ea.Occurrence: $ Builder's Risk p Comprehensive Bodily Injury: @p Automobile Liability Ea.Person: $ Ea.Occurrence:$ Property Damage: Ea.Occurrence:$ Bodily Injury: Contractual Liability Ea.Occurrence: $ Property Damage: Ea.Occurrence: $ Other Locations covered: !I Description of operations covered: The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or canceled by the insurer in less than five(5)days after the insured has received written notice of such change/or cancellation. Where applicable local laws or regulations require more than five(5)days actual notice of change or cancellation to be assured,the above policies contain such special requirements,either in the body thereof or by appropriate endorsement thereto attached. The City,its officers,employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's worker's compensation insurance policy. Agency Insurance Co.: Fort Worth Agent By Address Title CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A Labor Code Section 406.096(2000),as amended,Contractor certifies that it provides workers' compensation insurance coverage for all its employees employed on city of Fort Worth Department of Engineering No.3706 and City of Fort Worth Project Number PW53-060530176470 S.H.U. I C. CON TOR By: �yl� :�rt��r►1q� �-�uelse�l��re�;dPnfi Title 5 aao Da e STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME,the undersigned authority,on this day personally appeared Sherman Hud&or- known to me be the person whose name is subscribed to the foregoing instrument,and acknowledged to me that he executed the same as the act and deed of S.H.U.C.,INC.the purpose and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of''_��.2005. Notafy Public in and for the State of Texas KAREN SNS LANE (Votary Public STATE OF TEXAS °r My Comm.Exp. 11/22/2008 l CITY �VMT RV FT, 1r, 70JTfl, TEX. Bond#TXC41255 PERFORMANCE BOND THE STATE OF TEXAS § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we (1) S.H.U.C., INC. as Principal herein, and (2) Merchants Bonding Companya corporation organized under the laws of the State of(3) Iowa , and who is authorized to issue surety bonds in the State of Texas, Surety herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties,Texas,Obligee herein,in the sum of: SIX HUNDRED SIXTY-SEVEN THOUSAND EIGHT HUNDRED THREE AND 12/110................................. Dollars($667,803.12)for the payment of which sum we bind ourselves,our heirs,executors,administrators, successors and assigns,jointly and severally,firmly by these present. 05 WHEREAS, Principal has entered into a certain written contract with the Obligee date'd''t"e� ` 0 2005 a copy of which is hereto attached and made a part hereof for all purposes,for the construction of: WATER REPLACEMENT CONTRACT 2002 STM-F NOW THEREFORE, the condition of this obligation is such, if the said Principal shall faithfully perform the work in accordance with the plans, specifications, and contract documents and shall fully indemnify and hold harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal's default, and reimburse and repay Obligee for all outlay and expense that Obligee may incur in making good such default, then this obligation shall be void;otherwise,to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of such statute,to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. SIGNED AND SEALED this day of 2005. EST: - „� (Principal)Secretary PRINCI BY: (SEAL) Title: 6h,--,-Mini hudn PTd",tet 510 Lee Lane Weatherford,TX 76087 Al Witness as to Principal Merchants Bonding Company Sure B Name: Staci Gross ATTEST: (Attorney-in-fact) Address: P O Box 26720 Secretary Austin,TX 78755-0720 AL) Telephone Number: 800-252-9656 Witn\ss �to Sure NOTE'�J (1) Correct name of Principal(Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition,an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of the bond shall not be prior to date of Contract. Bond#TXC41255 PAYMENT BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we(1) S.H.U.C., INC.as Principal herein, and (2) Merchants Bondinq Company a corporation organized and existing under the laws of the State of(3) Iowa , as surety, are held and firmly bound unto the City of Fort Worth,a municipal corporation located in Tarrant and Denton Counties, Texas,Obligee herein, in the amount of SIX HUNDRED SIXTY-SEVEN THOUSAND EIGHT HUNDRED THREE AND 12/110.................................Dollars ($667,803.12) for the payment whereof, the said Principal and Surety bind themselves and their heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these presents: ,111N 2 8 2005 WHEREAS,the Principal has entered into a certain written contract with the Obligee dated the day of A.D. ,2005,which contract is hereby referred to and made a part hereof as if fully and to the same extent as if copied at length,for the following project: WATER REPLACEMENT CONTRACT 2002 STM-F NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully make payment to each and every claimant(as defined in Chapter 2253,Texas Government Code, as amended)supplying labor or materials in the prosecution of the work under the contract,then this obligation shall be void;otherwise,to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute,to the same extent as if it were copied at length herein, IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. SIGNED AND SEALED this day of 2005. JUN 2820W S.H.U.C. A PRINCIP .hA BY: (Principal) ecretary Name: 5h�Y m�'►� Aud_cCr. Title: (SEAL 310 Lee Lane Weatherford,TX 76087 Witne as to Principal Merchants Bondin Company SUE ATTEST: By Name: Staci Gross Secretary Attorney in Fact (SEAL) Address: P O Box 26720 Austin,TX 78755-0720 Witness s to urety Telephone Number: (800)252-9656 NOTE: 1. Correct name of Principal(Contractor). 2. Correct name of Surety. 3. State of incorporation of Surety. Telephone number of surety must be stated. In addition,an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of bond shall not be prior to date of Contract. Bond#TXC41255 MAINTENANCE BOND THE STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL MEN BY THESE PRESENTS: That S.H.U.C., INC., (Contractor), as principal, and Merchants Bonding Company, a corporation organized under the laws of the State of Iowa , (Surety), do hereby acknowledge themselves to be held and bound to pay unto the City of Fort Worth, a Municipal Corporation chartered by virtue of Constitution and laws of the State of Texas, ("City") in Tarrant County, Texas the sum of SIX HUNDRED SIXTY-SEVEN THOUSAND EIGHT HUNDRED THREE AND 12/110.................................Dollars ($667,803.12) lawful money of the United States, for payment of which sum well and truly be made unto said City and its successors, said Contractor and Surety do hereby bind themselves,their heirs,executors,administrators,assigns and successors,jointly and severally. This obligation is conditioned,however;that, WHEREAS,said Contractor has entered into a written Contract with the City of Fort Worth,dated the 19 day of 2005copy of which is hereto attached and made a part hereof,the performance of the 200J,- . following described public improvements: WATER REPLACEMENT CONTRACT 2002 STM-F the same being referred to herein and in said contract as the Work and being designated as project PW53- 060530176470and said contract, including all of the specifications, conditions, addenda, change orders and written instruments referred to therein as Contract Documents being incorporated herein and made a part hereof,and, WHEREAS, in said Contract,Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during a period of after the date of Two (2)Years after the date of the final acceptance of the work by the City;and WHEREAS,said Contractor binds itself to maintain said work in good repair and condition for said term of Two(2)Years;and, WHEREAS, said Contractor binds itself to repair or reconstruct the work in whole or in part at any time within said period, if in the opinion of the Director of the Water Department of the City of Fort Worth, it be necessary;and, WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to repair or reconstruct said work as herein provided. NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconstruct said work in accordance with all the terms and conditions of said Contract, these_presents shall be null and void, and have no force or effect. Otherwise this Bond shall be and remain in full force and effect,and the City shall have and recover from the Contractor and Surety damages in the premises prescribed by said Contract. This obligation shall be continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. IN WITNESS WHEREOF, this instrument is executed in 3 counterparts, each one of which shall be deemed an original,this day of ,A.D. 2005. JUN 2 8 200 ATTEST: (SEAL) S.H.U. Contra By: Secretary Name: Title: ae s Jj ATTEST: (SEAL) Merchants Bonding Company Surety BY: Y Secretary Name: Staci Gross Title: Attorney-in-Fact P O Box 26720 Austin, TX 78755-0720 Address POWER OF ATTORNEY Merchants Bonding Company (Mutual) Nations Bonding Company Bond No. KNOW All PERSONS BY THESE PRESENTS:That MERCHANTS BONDING COMPANY(MUTUAL)is a corporation duty organized under the laws of the State of Iowa,and that NATIONS BONDING COMPANY is a oorporallon duly organized under the laws of the State of Texas (herein collectively called the"Companies'),and that the Companies do hereby make,constitute and appoint Donal Boley,Steve Deal,Staci Gross and/or Janet Kaiser of Wichita Falls and State of Texas their true and lawful Attomey-in-Fact,with full power and authority hereby conferred in their name,place and stead,to sign,execute, acknowledge and deliver In their behetf as surety any and all bonds,undertakings,recognizances or other written obligations in the nature thereof,subject to the limitation that any such instrument shall not exceed the amount of: TWO MILLION($2,000,000.00)DOLLARS and to bind the Companies thereby as fully and to the same extent as If such bond or undertaking was signed by the duly authorized officers of the Companies,and all the acts of said Attomey-in-Fact,pursuant to the authority herein given,are hereby ratified and confirmed. This Power-of-Attomey Is made and executed pursuant to and by authority of the following bylaws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on November 16, 2002 and adopted by the Board of Directors of Nations Bonding Company on April 19,2003. 'The Chairman of the Board or President or any Vice President or Secretary shall have power and authority to appoint Attomeys-in-Fact,and to authorize them to execute on behalf of the Company,and attach the Seal of the Company thereto, bonds and undertakings,recognizances,contracts of Indemnity and other writings obligatory In the nature thereof. The signature of any authorized officer and the Seal of the Company may be affixed by facsimile to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shell have the same force and effect as though manually fixed." In Witness Whereof,the Companies have caused this instrument to be signed and seated this 1st day of May,2003. •o . !.0. :�o�"c C??, •• MERCHANTS BONDING COMPANY(MUTUAL) 0,•�APOq;., 0�.�PPOq�. !_ NATIONS BONDING COMPANY •42 G .�• . • V i►.,t• o_ Q'0: ery:? -o- Q �: :3; ..��•. 2003 a; .•y 1933 :cc; .�' •• Ai STATE OF IOWA ••'•'•� •�'••••• President COUNTY OF POLK as. On this lot day of May,2003,before me appeared Larry Taylor,to me personally known,who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY(MUTUAL)and NATIONS BONDING COMPANY;and that the seals affixed to the foregoing Instrument are the corporate seals of the Companies;and that the sold instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. In Testimony Whereof,I have hereunto set my hand and affixed my Official Seal at the City of Des Moines,Iowa,the day and year first above written. ` MARILYN BOYD F Commission Number 10012 My Commission Expires 4 Novtmber4,2004 !Votary Publk,Polk County,Iowa STATE OF IOWA COUNTY OF POLK ss. 1, William Warner,Jr.,Secretary of MERCHANTS BONDING COMPANY(MUTUAL)and NATIONS BONDING COMPANY,do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies,which is still in full force and effect and has not been amended or revoked, „j u N 4 0 LUIS:}. In Witness Whereof,I have hereunto set my hand and affixed the seal of the Companies on this day of co �00�•oRPOq'C ..0 P0 '0!•. .Co '�' 00 c� A4, 0':0: :►r= _ _o- r^: ; • :�• •_• 0:3'• •�' 1933 Secretary ..• 2003 a° :_. :c. •• Jct. �a : NBC 0103(4/03) ••••••• •• %OND C2 � 3 v d DEI WM[Nn IOWA '*Z` I Merchants Bonding Company P.O. BOX 26720 .AUSTIN, TEXAS 78755-0720 I I Please send all notices of claim on this bond to: Merchants Bonding Company (Mutual) 6850 Austin Center Blvd., Suite 200 PO Box 26720 Austin, TX 78755-0720 (512) 343-9033 1 r� : THE STATE OF TEXAS § PART G-CONTRACT COUNTY OF TARRANT § J u N 2 8 20058 THIS CONTRACT, made and entered into the day of , 2005and between the City of Fort Worth, a home-rule municipal corporation located in Tarrant County, Texas, acting through its City Manager thereunto duly authorized so to do, Party of the First Part, hereinafter termed "OWNER", and S.H.U.C., INC.the City of Weatherford County of TARRANT and State of TEXAS, Party of the Second Part, hereinafter termed "CONTRACTOR". i WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the Party of the First Part (Owner), said Party of the Second Part (Contractor) hereby agrees with the said party of the First Part(Owner) to commence and complete certain improvements described as follows: WATER REPLACEMENT CONTRACT 2002 STM-F And all extra work connected therewith,under the terms as stated in the Contract Documents, and at his(their)own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, superintendent, labor, bonds,insurance, and other accessories and services necessary to complete the said construction, in accordance with all the requirements of the Contract Documents, which include all maps, plats, blueprints and other drawings and printed or written explanatory matter thereof, and the specifications thereof, as prepared by the Engineers employed by the Owner, each of which has been identified by the endorsement of the Contractor and the Engineers thereon, together with the Contractor's Written Proposal and the other parts of the Contract Documents hereto attached, including the Fort Worth Water Department General Contractor Documents and General Specifications,all of which are made a part hereof and collectively and constitute the entire contract. I I t 1 1 AFFIL l A END The Contractor hereby agrees to commence work within ten(10) days after the date written notice to do so shall have been given to him, and to substantially complete same within the time stated in the proposal. The Owner agrees to pay the contractor in current funds for the performance of,the contract in accordance with the Proposal submitted therefore, subject to additions and deductions, as provided in the Contract Documents and all approved modifications thereof,and to make payment on account thereof as provided therein. IN WITNESS WHEREOF,the Parties to these presents have executed this Contract in 3 counterparts in the year and say first above written. Citv of Fort Worth Texas Owner ATTEST: Party o the 'rst part BY: Marc A. Ott,Assistant 'ity anager City Secretary Contract uthorl-zatipn (Seal) —JL..` � Dade - _ _- WITNESSES: S.H.U.C.,INC. 310 Lee Lane Weatherford,TX 76087 Contrac r� , By: Title: 51terma, sow Prete Cent APPROVED: proved as to Forte nd Legality: A.Douglas Rademaker,P.E.Director Asst. y A orney Department of Engineering i r CITY 310uffmpy 0 Sao1"11A TEX.i Part H. Standard Figures and Details (1 i. i � - =-r• - _aa�.-srrrfc') E,r'/,S'f /t-, 11 11 St L X11 Tern '� I*f�<ZiLVi1 tit �• S«Y/Ce =2i �ili�rll Nrii ' I ' Se .-r ci_srrrtirrrr 1'•� tR 11 �1 1 v If e NN �l■�iL it L.` 1� w t t i-lll.t 111Zi1;1 1� 1� If I1 To Qvl,�r/ `� k-�/tt/'.Scion/y, _ /nhrd�c�/v}► Crbs.s/irk . TPn�, 5trVic a E, fill i 1 CITY WATER DEPARTMENT FORT WORTH, TEXAS rroic,4i. 4eAlt'V ® r-ooA ss i.AYo a r F/GU�PE f ���a C i "Tud��7.9 cover Asstrtr �'orec%'rte guard ' ; ': a _.'..�. 'i����•�• ..r' ::`: �- 14 "' ft'%l� /Ojy'�71'! SQ/'V/ C�Yy /o�-C•s s. Conn�ct�� fi-orr� � �riYd/<< Strvi�•� bY'�dSJ shd// he E•riat Cboodr ScrVics lies CITY WATEF DEPARTMENT FORT WORTH, TEXAS C'ONAlZ- . . Cr1o1V •ET,�/L F ,ohm// Cavei- 2"G1.91V ijJ¢ S1�oEs�d, Finished 2 �6. I I CITY WATER DEPARTMENT FORT WORTH, TEXAS /NTZ_RSE C71- 0,V cRo SS1,V 3 , C O V O L K . M 00 0 2U L 0 'J l�J � ad v v Ln E a� i L `° J d L � A^ • � •� L (U W a v CUE � N ¢C ami .r z u ¢ 4J sir •`-' s tiC L L — X c V- F- > F- W S L v N L O — C) 3 a.•- N ¢ ® — N Q Q O 3 m ►- U aE I O 3 vi E NN --e a O c N ro c C) c o O 7C3 X X_ C^ H _ � N c -0 m 0 0 0 AG O ou ¢ V c _ L L fn (, V C) eo3 a o O 4-1H O +� U Ln / �2 f9 c C - LL. O U fu -a O W In U1 - L •- O v (o • \ L. U U N U 4-JL Q VI -0 O a C 2 •- •- �p N N r0 C U U L L U a "' a " " X L L c o N N a 4- 4- rD N X O O Q O Z N tN Q Q — o F- m w m I '� , F 1 N • C N M In U ZI L- a)N U') Q L co •N O r r- L N L 4-1 D O C > O � L C O) - 'D N � O - 3 N r0 C L r..r O vl ro 0 vi C - Ln 4J C rr-rl �D r0 O O r..r fU +J O N r I N •- ++ 3 ^ N ' .1 a o ``� L _ w w rn L N E -Y r - - rr r0 Oa u IL a.0 'D r0 rp 11 r l 1 • 1- - L L C � I— � O 7 r0 C U U X J T F-r1 1 O -0 -D O C r• 1 1 L L m 0 •- O 1 1 1 I (0 rII L U +-) 1 O II I ICL) fu J IM rD rD 4-1 L O 4) , N N N m ¢ [ !r 1 11 of--I I � Z 1 I 1 1 I I -•: ,_ -_ o LU U '0 N 1 IN -- N 0 E- > LLI CO :A.• W U- Q rt II Ir � tt c.v t` F-Z v, T u �WZco rn �~ N J _ o \ �a� co N � m � oz � L� cn 0 OWLLLM C) V' � Li �i Q J > LL =p cc) o cn �Z OW�- �� z Q o 0 co'0Q ULt_ U 1-Q O� LQ Vn C� �U V�o �o 0O Cn � E r- m M u E M E � E to u io E Z E Z RLHOM LNOJ tf]u' 0 _ N O O b313W E W omE \ E \ E v U a3.LVM t- Co.N o to W to X LO °° CO. N E C� w `-' '"'-' " ` E X N M O ❑ U V _ co E = E N. It I LO co W � u w co E = w ►` � c,4 E U '- •- O to co E z • � to °0E coE mE _ F- 3m .—� > ru r Co rn�Lo � E x M ^ X L -t co CD m k Paving Or Other F-7= Surface Material 0. Li .♦ •+• � v:QB �'• �O%•• . •;,'V�/ice o,' U •�. Roadway Base L-T I I I If Valve Operating Nut is More Than 3' Below Pave- ment Surface - Provide i l Extension Stem To 1 ' Below McKinley Iron and Steel Co. , Pavement Surface. I No. YB5 three piece valve box or equal . Detail Pertains to All Gate Valve Gate Valve Sizes 4" Thru 12" _Torque bolts prior to backfill . I. Main l I. I TYPICAL GATE VALVE AND BOX , EXTENSION STEM DETAIL FIGURE 3 E 1-IOMaterial 1_1_78 E 2-10 Construct ion y 611 Lead from Mains. 12" antl Larger to Have Gate Valve Existing or ' Proposed Curb • .'. Bottom Rest Concrete Blocking ,;•., r — 'A'! Concrete ��. + :� Blocking i _ J Fire. Hydrant Main Exercise care to avoid Plugging Drain Hole, Witt) Concrete Existing or Proposed CurbCD Firc Hydrant to Pavement or Other Surface be Set Plumb Trench 2'-6" Ba sc Parkway Extension Barrel an Stem for Extra Bury Depth if Necessary Gate Valve Minimum 7 C.F. Grav i 6" Fire Hydrant Proportionally Anchoring Coup- Lead Around Base ling for Connec- ds:4 tion off of Con- Ma in trete Pipe 12". "a, + Diameter and Larger .Q.•• �• •. Concrete Blocking Concrete Rest 12" x 12" x o" Bury Depth; (1) 3'-6" for Cast Iron Pipe Varies (2) 5'-0" for A-C Pipe Ref. Figure 6 I 1 STANDARD FIRE HYDRANT DETAIL E1-12 Mat '-'-�� FIGURE 5 E2-12 Const NOTE: Bearing Areas shown are based on 150 P.S. I .G test pressure and 3000 P.S. F. soil bearing value. 9� Plug ,.. op �o�gas d Tee 1500/# Concrete •" ~`_Y �o �O�o s •..D..`, 'r, % :/ � "'.a•'y..y.las s '`'i' �' _ •i t '�-.p '�•''''p• x Bend II.11 E 1500# Concrete i HORIZONTAL BLOCKING TABLE *Dimension "X" May Vary If Necessary To Provide Bearing Against Undisturbed Trench Wall I. i p e X 11 ° - 151 22° - 30' 450 900 Tee & Plug Size Dim. n• n• ax. Kin. Max. Min• Max. Min. Max Ft. "All AreE Vol , " " a "C" Area Vola I'D" Area Vol . "Ell r a Vol 4" 1 . .90 .8 .05 •95 .90 .05 .95 .90 .05 .91 .82 .05 1 . 16 .5 .05 611 1 .5 .90 ."8 C .05. .95 .90 .05 1 .05 1 . 10 .051 1 .73 1 .99 .05 1 . 19 1 .41 .05 811 1 . 0 .8 .95 •95 •90 .05 1 .41 2.00 .05 1 .86 3.47 . 1 1 .57 2.4 . 1 1011 1 .5 .90 .8 .05 1 .26 1 .60 .05 1 .79 3.20 . 1 2. 18 5.62 .2 1 .991 3.9 • 15 1211 1 . 1 . 10 1 .2 .0 1 .48 2.30 . 1 2. 14 4.50 .2 2.8 6.00 .3 2.38 5.65 .2 I 1611 2 1 .41 2.0 . 1 2.00 4.00 . 1 2.8 8.00 .4 14. 10 .6 3. 16 10.0 . 20" 2 1 .7 3. 10 .2 2.54 6.20 .3 3.52 12.40 .6 4.70 .o0 1 . 15 3.9415.55 •75 2411 2 2. 14 4.5o .2 .00 .00 .5 4.25 1&10 • 5 5.65 32.00 1 .85 4.76 .60 1.05 3011 2.5 2.66 7. 10 .55 3.78 14.20 1 .0 5.30 28.20 1 .75 7.05 4380 3.4 5.91 35-332. 1 611 2.5 3..33 10.00 4.50 20.40 1 .4 6.36 40.80 2.65 8.50 72.00 5. 1 .20W002-954211 2 1 1 2 2 8. 03 4. 8 18. 0 1.6 6.00 DO 2. 8.48 zoo .4 1 1 . 14 126. 10.4 0.5 .00 6.70 4500 7.00 9.40 8$00 0.00 13.00 20 16.0 10.7C NOTES: Minimum areas shown are in square feet. Volumes shown are in cubic yards. Vertical dimensions of all block bearing areas shall be identical to the horizontal dimension shown. HORIZONTAL BLOCKING DETAIL FIGURE 9 E-1- Zo Material 1-1 -78 E-2-20 Construction Class "B" (2500{#) Concrete 1 A o: I C #4 Steel Bar p. ,•C l+� � I /I oo. I 00 B Keep concrete clear of e\ ( ( pipe joints and bolts a i Wrap pipe with 15# roofing felt __, I . - Form as necessary BENDS 900 450 221/2° 11 1/4° Vol . Req'd. C.F. 39.99 21 .64 11 .03 5.54 A Ft. 2.50 1 .42 1 .0 0.75 6 B Ft. 4.0 3.88 3.36 2.75 -- C Ft. 4.0 3.88 3.36 2.75 ' b c *Vol . Req 'd. C.F. 71 .09 38.47 19.61 9.85 �- A Ft. 2.83 1 .67 1 .5 1 .0 8 B Ft. 5.0 4.8 3.66 3.2 o C Ft. 5.0 4.8 3.66 3.2 *Vol . Req 'd. C.F. 111 .07 60.11 30.65 15.40 A Ft. 3.25 1 .92 1 .75 1 .5 10 B Ft. 5.9 5.6 4.25 3.25 z C Ft. 5.9 5.6 4.25 3.25 *Vol . Req 'd. C.F. 159.94 86.56 44.13 22.17 .� o A Ft. 5A 4.17 2.42 �.b 1 .42 1 .25 12 B Ft. 6.2 6.0 5.54 4.2 C Ft. 6.2 6.0 5.54 4.2 *Volume calculated on the basis of concrete reacting--thrust on the respective bends under an internal pressure of 150 psig at the rate of 150 lb. wt. per cu, ft. of concrete. ` ' 1 EXAMPLE A VERTICAL TIE - DOWN BLOCK DETAIL 1-1 -78 FIGURE G U R E II E1-20 Material 7 E2-20 Construction i Akk Ol 1 " air release valve, 2 ea. close nipples, 2 ea. 12" length copper or brass risers, 2 ea. gate valves, and 1 ea. tee. O2 L 14" x 14" x 4" x 96" with 1 ea. 3/8" dia. U-clamp. Each end of angle to be bolted to floor slab with 4" lag bolts. Angle to be treated with 2 coats of red lead primer prior to installation. f O3 Water main with threaded insulator tap. r r ` Refer to Figures 16 and 17 for vault materials and dimensions. I AIR RELEASE VALVE DETAIL 1-1-78 FIGURE 1 5 E 1 -11 MATERIALS E 2-I1 CONSTRUCTION Existing surface tackfill as specified r r e 1 s I r 1 1 • • ' � 1 � .�.�a •. •`r. �:f/,o'�;:fit y:y: .• •' ••..� ,� Y. lD 611 min. dimension. 611 max. for pay purposes when bid per cubic yard. I O2 611 min. dimension. Max. for pay purposes shall be 611 on main 2411 and smaller, 911 on mains 30" and larger, when bid per cubic yard. Q3 411 min. dimension. 411 max. for pay purposes I when bid per cubic yard. 4O Class ''E11 1500# concrete. Concrete encasement I shall stop 11 either side of joint, and when encasing concrete pressure pipe, full lengths of pipe shall be encased, joints excluded. CONCRETE ENCASEMENT DETAIL -�-�8 FIGURE 20 E 1-7 Material E 2-7 Construction 2" X 3/4" Bushing 3/4" Sampling Tap 2" Gate Valve 2" Short Nipple c x 2" Tee o After Sterilization Remove Piping o c and Install Plug N U% j Backfill - 2" Coupling to be I plugged w/2" C. I . Plug after sampling NOTE: Chlorination blowoff 4" and Larger Water Line 'A'i, and sample point for 'y. deadend water piping. • �f+ Contractor is to furnish all labor and _ ,• materials. Material Embedmentwill be removed and Plug after Sampling retained by the Con- tractor after satis- factory ,samples have 1 MW WK - been obtained. ,�,_Backf i 1 1 1" Concrete Blockin per Fig. 9. l 3" and SmaI'le r Water-tine trn8 Embedment k STANDARD DETAIL } END PLUG CHLORINATION BLOWOFF AND SAMPLING POINT FIGURE 27 1-1-78 E 2-24 Construction Spec. NOTES: Ol 6" blind flange tapped 2'' with 2" brass plug. O2 125# pattern blind flange drilled and tapped for 6'' blind flange. 6" blind flange attached with bronze bolts . Gaskets shall be full faced as otherwise required in E 2-4. O3 Lifting lugs shall be provided in quantities 4 sufficient to loft and handle the flange as a balanced load. O4 Attach the 125# pattern blind flange with steel 3 bolts and bronze nuts then cover with cement grout after installation. 2 O5 125# pattern flange, unless required otherwise. l Flanges and blind flanges to be designed to withstand pressure rating of pipe. © Wye branch to be one size larger than, but tapered to standard , run normal diameter unless otherwise specified. OStandard run diameter. 5 6 7 45° STANDARD CLEANING WYE DETAIL Material Specificatio-) E 1 -4 Constructio-i Specificatio--. E 2-4 FIGURE 28 1-1 -7s When a fire hydrant is located at end of Mains 6" and 8'' in diameter, wye may be omitted Contractor will make a reasonable effort to prevent back-flow of purged water (See E2-24) EXTEND PIPE RISER ABOVE GROUND LEVEL 'Polly-Pig" CAP AFTER DITCH HAS BEEN DEWATERED C` J �a 1 . Install MJ Wye at terminal end of main 2. Closure on A-C pipe will require "Ring-Tight" to plain end adapter in addition to MJ Wye 3. Block Wye streight run end plug 4. After cleaning with "Polly-Pig" install branch end plug. CLEANING WYE DETAIL FOR NON - LOOPED SYSTEM 12'11AND UNDER FIGURE 29 E1-7 Material 1-1-78 E2-7 Construction O N co 2 9-C? _3" 2'-4' cc m CL ° • O O p 01+ C. • • • �D T O � 1 � 1 • • m CD • • • 0 P-0 CD • • - CO W � 10 • • � 1 •� .�, . W T CD O N (D m O 3 m CD Otoi n � ACo va a�° • ° '� �` ° m Na ca a M `► C co cn O O Qv W a n Iota a O o® '° � e m m cy-rr, W o U O F- O W ON ZQ NS > W 0 Ln o6 j j O O Q F �_ F- 1, X UQ JO U WF- LLI Q-(n -0 Y C, 0 F- W LLJ OZ(n U ' W L,jL� .-LLJ •. /%r J W OU F m W D-D Q - j J 2 U p W W W LO J j LL W Z) O F- W O W J z O w o N w Q L� J> j J QON0UX W?i J p N r jr co (n Q 't Zp CO W Q S(n (n - _w 0_ r%r O J Q U a-F=--Z'�x U_- 0 0 /, J W LSI Q_ Cr 0 LLJ Q - of j (, YOi O°*6OF-0 (,X (' Z?�UF' S S jr OfQpZ O W F-F, O mW ZF- v7�0� r Q o O w =NwOFpZOW3 m Zo U WWw-0-0--UW 0 Q� jr Z Eli-m (.�w0 > �O j O ~Z)U)UZ UU�I� �_ O ~ j U JO (,JQ}L,JLLJ0 C OU rjr JWU)0-�F-a-a.O_Li- Q OW j QWQu)F-U(ncna O 0 Q =Q W N Of ./r.r N / \ _(> (n Y i— WW wiz �Ny CGo_ ISL ,' i F—J N F Z Z W OU �� 0WCK Ow F- Z., Q la//l F- Z_ 0N, Lv= �1 oCLLz o>- �_ w U }Z 0_ F- ~w J c�� W N V ~ p U' 0_ Z Z O >� > D S LLJ M:F- 0: \ F- < Q (n CL 3 0 Q \ F- U- LL W U J J \ J F- Z Ow H o �W m U Z w pw U U Q OJ DQ0 F- Op wo� w� w S \ F- Z > 3} oas0 \ Q W Z Z< Qo w w J ZQ LnJ Z �.� Wa. w - F- F-W Sd' 0_ �W 0O(n JW - V) � Q Q OWN SQ QZ Ln W� �ND: � O W \ z = W CV�S (WnF— �� p wWa wW N CO Q N ��o 0UW (nn a o ~� 0;:,0Q . C) ("FK- S w�wUF-L` wUW m Of a-_ - \` CV (7 W F-W O J Q-d W F- (n0 C9 U •\\.,. LLw �O�QWa (n0 w (�� F- Q LLJWmW j�` O 0 J�0LL.WF 0�(n � W p ¢OO F-o - m \\� w WO S WF �OF-� pZ> UW O w� ZZ WLL� 0W Q UF- Op.W W U(n 0-= �� Wp m0 QZ W�tr OF IL Q F- Lj F-W U W F- O U FSS W00 0j mF-0Q a-m .:c >- mw= Wo w QZ ~~ (0W> Z(' Z N r7F-(�F-(n(n 4U)?� LnU 2 0E- =NW XW F- p N CL V)W Q F (n.60 U o(n Q J� O Q W w orf D 0 Q N , O z O W U N 2 F- U- < E WOWO WO m 2 Q = 3: WF0 af W Z - C) O � D F- U U � > 0 (1- ZW 6 ~ Z t0- 0 ZFW- a_ 000UOW g0 U F- W :2 z D F- 0O � LL o O ¢ � ml� T W 1._ :2ui0 .=. J h- W N U) W dS W UDZ Q }- C¢JH WUQ �W N I..._. Z W M W F- - W a- W L`J U LLJ L� W DU � U - 0 dao Of U U _j U V) U 0 � _ z I1. � WZ LLQN p W W W O O N LZ } O Z � wW W W0U W IYWIY Z W Om0 > m Q � 0z > Liw > LLJ F- W Z_ J = W JOF- 0 �w O W' W _ ZZ U) W F- _ _ U W N > F- W UQQZ mUU - zw Q w X Q 00-1 = = F- 0 W = 00 m Z 0- JzC.) W W z � U) O � omu Nco r7UL, F- Q O w U ZO W > 0 D 0 = O 0 W (~j0 -Q ~ W W U � w F- � Q a U a � � ¢ p Z � � W JL, Q 20 Q W _ O pU) OLLN Cl. Z Y � W C.)UW zNU W U) (nom LLJ LLI W 04 � F- OWmw W0 a V) Of W wU p L,..I Q_W < 0 W O J Z0 �L� (y .60UI � V) l U -J 0N � Q j � � I.. J fnQ 'tOm )- WQ2V1 Za F- mZ N. z ==! cr0 ow �w O � zV) F- 0 U-- W F- O X01- C) > Fw- w f: Ln lJi U - W Z Z F-.� � T ;I.' w Q Zcno � V) V) (IfLLJ Oo 1-- o ¢ (D � II • F z � ct �� )Ow � � w ¢ 0 ¢ Ucnw o w UZ � Ld � WwcOCL (� W � Q � zdC� �_ LL LL O J W U J { ' Z ~ O N U Z r U U U U F- W U FL 3 � � LLJ f - �C) w UJLLJU) CL WCl0- L� >-- W uj z J 0 '•.'f-• h ZF- wWZ 'f•• N Wz LLj woo =W ~ o _• cn � w I z w Ld w Uzi < ¢ w :.I :', • w zd LO J �j m w O V) F' O W J W U Z J w 0 = w W W WO WZ 0 = m > Q ] UZ J W Y J � Q. Z � W QQ .I•. :. lYI Z � C wW W m 0 h- Z� mmw UWwO I'.' : '.' N w Q. W J 2 Z W W F- I'.'•• J a Q =~ (I ZU) WQ O ZOZ -� ... W 3 wa I W� trWZ ZW F- •.{.' 2 ZF g W = p Z _ F fn r Q > W~ W w I m ~ m = O 0 a � + oa � ¢ wZ r . Z % o m0 J w � t. � z z QF � _ w ¢ HZ Zmw = �' Q W Q W� �;; H- LZZ F- F- LaF- �_ wL � CSF > U w J a NNZ p trU) a Qf OWO Q � w W � O � w OWN U J � r 0 W cy- 0 Q Ld w Z1- + N .f O Z - O >Q \ = OW M N O Q Z CL w H (� Q w o = wD F- OF- 0 ( U Z F.(n -� N Fo i� 00 m �m w w LLJO WY U (n Q > F- d w U) Oa.. -- N pU i(D H m U Q W 00 z a 1- O N WZ <o OfO o Z~ � CL W OW U Q =o U D J (n WQ Q� UU x O �- '- o O} =c.)v, Z_~ crur 0 a W I— CL ca Boz Z W F- < zLLJ � � w azF j o w U I `° (-4j CL Cl_ Q U F- Q z C ~ Z gCl� w Q• — cl- • J —51 Y/z oMIN. U (n m I— cn. (n z w x w w c0.) z z W Q > Q W o m O N Ln LC Ln �.U io ao �Q Wz w0 QJ In LLII W J �� ` m �aU ' , J� JNQ wJ (ni , Q _� x�r �w U CO UJ Nw LnQz �- W w wwo " w� 00 Z-�LLJN --� v �Z a: F-CLw - of �-Q cn� LLJ L'J OUQ (f)&4 -�LLQ I-0- ZO UO Q� Z� m QU ZLL (D C) m� 0Z-i m ALJ 0 0 O - CD LJ _ Q�z �� z � z 0 w- _ w mo D �N t-- = z' Q a o zo Q-zo Z Q� F- J Q X U w O= w Q (nQ J w J¢ �H lC) :E w O U() x� 0 m0 (n Qwp OU oOEn- LJ w %F-- _ x:2 w w(n aj mCim? rim �w(n U Q a� 'htir' d o .� LO W fir.; \\\ r I C3 I- �LCL tw Tt" , f O W LU x 0 ct \\ LIJ 0 LZLJ . aoOz } Co Ul Z U •�YiY�•at,a,- \ \ \ p •'' ';i; _ ----.may--- o ` w' „ ..,Ic^ .. .... I In 0.;''.aw.'.� ' i +y' w O , LTJEn W.t1i c ` O LL LoF- wO f ww z � W r �� co 0 3 Z (n u� N W o a WLJ CO i 0 LL, CL Ww � z d►- W LLI zx O O GN < O N n- F; mttiteiCA U - w ao CL �n JU O W= O FW� p F..._ N 0 \ tjj -0 O z Z Y \ J a X i J, �vv (� W� F7- En a \ QJ m U n ¢� W m w - > mo I - pu w w } a xo U cr- Z O_ W V) 0-1a� �. w �- x o w x �- 0 0 >r E-- _9 �/ J =f- I' omo F-U W Oz z x �O �Fw Q �Qw o = > W oa-w O � r u' w� r� Q OF �Q Of O Q J W ` Q LJFz V)a z r> r— I �� z ---- -------------L.I - � = Ww 0o �. Cl- Us wNLl LJLLj 3F J�'U InW m Qao a-OZ 7,U>-=Q>- W W OC `�Ui J I m OQF- F=-W Q} - N��z�w JJ WWQF--ali ' p-. - 0ZN —JJW W-.0 ` wC) ww-i =3WZWZ \ ZZ o H W J F-- F-O a o m Q~ U Q�p Dwo Zw(nr>wui x_ <� m =w ' uj<o wQ V1JafxF- W m0 d WpQp JJ V -WQ O O Qoz =Q.SUJ6Ja J / Z Q F- �-O UJ=Lrzz O W z W ZW O—pJ U Q WwaO JAW �F-dO--W _ LLF— 02h ~�ZU�ZVI O 0(n _ Q 4 N aUIJ WO of 0< z ._QQ. N41-=OHO s -111-1 (n I ETYPI-Ti EBE1l FILL SEESPEC. 2.4 MINIMUM 6" INITIAL — L - ' I I— G.C.D. BACKFILL COVER . —III y' " • '�' ' SAND MATERIAL EMBEDMENT I II III & INITIAL BACKFILL II SEE SPEC. E1-2.3 G.C.D. EdII MINIMUM 6" I— EMBEDMENT --:::�— II—IIIIII —11 I—III—I I I-1 I I—I I I—E 11— I,II—III—III—III' WATER: SIZES UP TO AND INCLUDING 12" -111-1w III�I i l TYPEBACKFILL E1 SEESPEC 2.4 MINIMUM INITIAL BACKFILL COVER — `� "1" > 11= G.C.D. WATER — 6", SEWER 12mCRUSHED STONE OR SAND STORM DRAIN 12" MATERIAL INITIAL BACKFILL SEE SPEC. E1-2.4(b) OR IIIIII �° ° ` ISI. ° • •' •° Et—2.3 G.C.D. MINIMUM 6" — ° ' ' ° °°°• =Fl I: EMBEDMENT =III °_� "_,_— CRUSHED STONE II—III—III—III—III—III=111 SEE SPEC. E1=2.3 —III—III—III=III=III=III— G.C.D. WATER: SIZES 16" AND LARGER SEWER:' ALL SIZES STORM DRAIN: ALL SIZES MATERIAL SPECIFICATIONS SAND GRADATION *LESS THAN 10% PASSING #200 SIEVE THE EMBEDMENT AND BACKFILL DETAILS PROVIDED ON THIS •P.I. a 10 OR LESS SHEET SHALL REPLACE APPROPRIATE PROVISIONS OF BOTH THE E1-2.4-(b) AND E1-2.3 OF THE G.C.D. AND STD. SPEC. ITEM 402 OF THE TPW STANDARD SPECIFICATIONS FOR STREET do STORM DRAIN CONSTRUCTION. ALL OTHER CRUSHED STONE GRADATION PROVISIONS OF THESE ITEMS SHALL APPLY. SIEVE SIZE % RETAINED 1" 0-10 1/2" 40-95 WATER, SEWER & STORM DRAIN #4 so0-1-100 3/8" 0 EMBEDMENT AND BACKFILL DETAILS Ids 95-100 CITY OF FORT WORTH—CONSTRUCTION STANDARD FIGURE A DATE:2-19-02 APPENDIX A Roadway Core Results x 1 CITY OF FORT WORTH CONSTRUCTION SERVICES LABORATORY RESULTS FOR TEST HOLE AND PLASTICITY INDEX PROJECT: WATER REPLACEMENT PROJECT 2002 STM-F & STM-G DOE NO. : 3703 FUND CODE: 01 HOLE # 1 LAB NO: 3.6516 LOCATION: 7908 SUMMIT COVE CT. N/4 4 . 00" HMAC 6. 00" YELLOWISH BROWN CLAY W/GRAVEL 10. 00=' YELLOWISH BROWN CLAY ATTERBURG LIMITS: LL: 37 . 0 PL: 16. 2 PI: 20. 8 SHRKG: 10. 0% MUNSELL COLOR CHART: 7/6 YELLOW CLAY UNIT WEIGHT: 146. 0 #/CFT HOLE # 2 LAB NO: 36517 LOCATION: 7936 SUMMIT COVE CT. CL 3 . 50" HMAC 7 . 50" GRAY CLAY W/GRAVEL 9. 00" GRAY CLAY ATTERBURG LIMITS: LL: 30. 4 PL: 16. 1 PI: 14. 3 SHRKG: 9. 0% MUNSELL COLOR CHART: 6/2 LIGHT BROWNISH GRAY SANDY CLAY UNIT WEIGHT: 142. 0 #/CFT HOLE # 3 LAB NO: 36518 LOCATION: 7813 SUMMIT COVE CT. CL 4 . 00" HMAC 6. 00" YELLOWISH BROWN CLAY W/GRAVEL 10 . 00" BROWN SANDY CLAY W/GRAVEL ATTERBURG LIMITS: LL: 33 . 4 PL: 18 . 0 PI: 15. 4 SHRKG: 9. 0% MUNSELL COLOR CHART: 7/3 VERY PALE BROWN CLAY UNIT WEIGHT: 146. 0 #/CFT HOLE # 4 LAB NO: 36519 LOCATION: 7800 BAYSHORE CT. N/4 5. 00" HMAC 6. 00" BROWN SANDY CLAY W/GRAVEL 9. 00" LIGHT BROWN CLAY ATTERBURG LIMITS: LL: 29. 4 PL: 15. 1 PI : 14 . 3 SHRKG: 8 . 0% MUNSELL COLOR CHART: 7/2 LIGHT GRAY SANDY CLAY UNIT WEIGHT: 146. 0 #/CFT 2 DOE # 3703 HOLE # 5 LAB NO: 36520 LOCATION : S/4 OF GRASSLAND CT. 25' EAST OF CROSSWIND DR. 7 . 50" HMAC 4 . 50" BROWN CLAY 8 . 00" BROWNISH GRAY CLAY ATTERBURG LIMITS: LL: 52 . 3 PL: 26. 2 PI : 26. 1 SHRKG: 16. 0 MUNSELL COLOR CHART: 6/2 LIGHT BROWNISH GRAY CLAY UNIT WEIGHT: N/A #/CFT HOLE # 6 LAB NO: 36521 LOCATION: 7754 GRASSLAND CT. CL 9 . 25" HMAC 3 . 75" BROWN CLAY 7 . 00" GRAY CLAY ATTERBURG LIMITS: LL: 33 . 2 PL: 15. 4 PI : 17 . 8 SHRKG: 9. 0% MUNSELL COLOR CHART: 7/2 PINKISH GRAY CLAY UNIT WEIGHT: N/A #/CFT HOLE # 7 LAB NO: 36522 LOCATION: 7749 INCLINE TER. S/4 5 . 00" HMAC 6. 00" BROWN SANDY CLAY W/GRAVEL 9 . 00" BROWN CLAY ATTERBURG LIMITS: LL:- 29. 7 PL: 14 . 8 PI: 14 . 9 SHRKG: 8 . 0% MUNSELL COLOR CHART: 7/2 PINKISH GRAY SANDY CLAY UNIT WEIGHT: 146. 0 #/CFT HOLE # 8 LAB NO: 36523 LOCATION: 7721 INCLINE TER. CL 4 . 50" HMAC 6 . 50" REDDISH BROWN CLAY W/GRAVEL 9. 00" REDDISH BROWN CLAY ATTERBURG LIMITS: LL: 36. 7 PL: 19. 7 PI : 17 . 0 SHRKG: 9. 0% MUNSELL COLOR CHART: 6/1 GRAY CLAY UNIT WEIGHT: 146. 0 #/CFT HOLE # 9 LAB NO: 36524 LOCATION: N/4 OF INCLINE TER. 20' SOUTH OF TRAIL RIDGE DR. 5 . 00" HMAC 6. 00" BROWN CLAY 9. 00" YELLOWISH BROWN CLAY ATTERBURG LIMITS: LL: 52 . 4 PL: 22 . 9 PI: 29. 5 SHRKG: 14 . 0% MUNSELL COLOR CHART: 7/3 VERY PALE BROWN CLAY UNIT WEIGHT: 146. 0 #/CFT OFFICIAL RIC0to clyy Mr;����� 1, wol'7 UoU6l, Uul", 3 DOE # 3703 HOLE # 10 LAB NO: 36525 LOCATION: 7733 TRAIL RIDGE DR. W/4 6. 00" HMAC 6. 00" LIGHT .BROWN SANDY CLAY W/GRAVEL 8 . 00" LIGHT BROWN SANDY CLAY ATTERBURG LIMITS: LL: 32 . 3 PL: 16. 4 PI: 15. 9 SHRKG: 9. 0% MUNSELL COLOR CHART: 7/2 LIGHT GRAY CLAY UNIT WEIGHT: 146. 0 #/CFT HOLE #11 LAB NO: 36526 LOCATION : CL OF TRAIL RIDGE DR. 45' SOUTH OF LAKEVIEW 6. 00" HMAC 14. 00" YELLOWISH BROWN CLAY ATTERBURG LIMITS: LL: 44 . 8 PL: 20. 7 PI: 24 . 1 SHRKG: 12 . 0% MUNSELL COLOR CHART: 7/3 PALE YELLOW CLAY UNIT WEIGHT: 146. 0 #/CFT 'HOLE # 12 LAB NO: 36527 LOCATION: 7613 TRAIL RIDGE DR. E/4 5. 50" HMAC 6. 50" LIGHT BROWN SANDY CLAY W/GRAVEL 8 . 00" TAN SANDY CLAY ATTERBURG LIMITS: LL: 32 . 7 PL: 14 . 7 PI: 18 . 0 SHRKG: 10. 00 .MUNSELL COLOR CHART: 8/2 VERY PALE BROWN CLAY UNIT WEIGHT: 146. 0 #/CFT HOLE # 13 LAB NO: 36528 LOCATION: CL OF TRAIL RIDGE DR. 40' NORTH OF LAKE COUNTRY 0. 75" HMAC 6. 50" YELLOWISH BROWN SANDY CLAY W/GRAVEL 13. 25" YELLOWISH GRAY CLAY ATTERBURG LIMITS: LL: 40. 4 PL: 21. 0 PI: 19. 4 SHRKG: 11. 0% MUNSELL COLOR CHART: 6/2 LIGHT BROWNISH GRAY CLAY UNIT WEIGHT: 128 . 0 #/CFT HOLE # 14 LAB NO: 36529 LOCATION: 2456 ASPEN WOOD CT. W/4 6. 00 HMAC 7 . 00" LIGHT BROWN SANDY CLAY W/GRAVEL 7 . 00" YELLOWISH BROWN SANDY CLAY W/GRAVEL ATTERBURG LIMITS: LL: 33 . 8 PL: 17 . 8 PI: 16. 0 SHRKG: 9. 0% MUNSELL COLOR CHART: 7/3 VERY PALE BROWN CLAY UNIT WEIGHT: 146. 0 #/CFT HOLE # 15 LAB NO: 36530 LOCATION: 7450 ASPEN WOOD CT. CL 6.25" HMAC 6. 75" YELLOWISH BROWN SANDY CLAY W/GRAVEL 7 . 00" YELLOWISH BORWN SANDY CLAY ATTERBURG LIMITS: LL: 39. 3 PL: 25. 7 PI: 13. 6 SHRKG: 8. 0o MUNSELL COLOR CHART: 7/3 VERY PALE BROWN SANDY CLAY UNIT WEIGHT: 146. 0 #/CFT 4 DOE # 3703 HOLE # 16 LAB NO: 36531 LOCATION: 8853 GREENHAVEN DR. N/4 2. 00" HMAC 5 . 00" BROWN SANDY CLAY W/GRAVEL 13 . 00" YELLOWISH BROWN CLAY W/GRAVEL ATTERBURG LIMITS: LL: 33. 5 PL: 16. 2 PI: 17 . 3 SHRKG: 10. 0% MUNSELL COLOR CHART: 8/4 PALE YELLOW CLAY UNIT WEIGHT: 133.0 #/CFT HOLE # 17 LAB NO: 36532 - LOCATION: 8829 GREENHAVEN DR. CL 2. 25" HMAC 7 . 75" GRAY SANDY CLAY W/GRAVEL 10 . 00" BROWNISH GRAY SANDY CLAY ATTERBURG LIMITS: LL: 36. 2 PL: 18 . 8 PI: . 17 . 4 SHRKG: 8 . 0% MUNSELL COLOR CHART: . 7/2 LIGHT GRAY CLAY UNIT WEIGHT: 134 . 0 #/CFT HOLE # 18 LAB NO: 36533. LOCATION: 8800 GREENHAVEN DR. S/4 3. 00" HMAC 4 . 00" TAN SAND W/GRAVEL 13 . 00" BROWN SANDY CLAY W/GRAVEL ATTERBURG LIMITS: LL: 43. 4 PL: 21. 5 PI: 21. 9 SHRKG: 12. 0% MUNSELL COLOR CHART: 7/2 LIGHT GRAY CLAY UNIT WEIGHT: 138 . 0 #/CFT HOLE # 19 LAB NO: 36534 LOCATION: 7222VISTA CLIFF DR. N/4 0 . 50" HMAC 6. 00" YELLOWISH BROWN SANDY CLAY W/GRAVEL 9. 00" TAN CLAY W/GRAVEL ATTERBURG LIMITS: LL: 29 . 1 PL: 18 . 8 PI: 10. 3 SHRKG: 6.0% MUNSELL COLOR CHART: 7/3 PINK SANDY CLAY UNIT WEIGHT: 1.26. 0 #/CFT HOLE # 20 LAB NO: 36535 LOCATION: 8834 VISTA CLIFF DR. CL 4 . 00" HMAC 5. 00" BROWN SANDY CLAY W/GRAVEL 11 . 00" BROWN CLAY W/GRAVEL ATTERBURG LIMITS: LL: 29. 2 PL: 18 . 6 PI: 10 . 6 SHRKG: 6.0% MUNSELL COLOR CHART: - 7/1 LIGHT GRAY SANDY CLAY UNIT WEIGHT: 146. 0 #/CFT 5 DOE # 3703 HOLE # 21 LAB NO: 36536 LOCATION: 8831 SAND CASTLE CT. N/4 3. 00" HMAC 6. 00" YELLOWISH BROWN SANDY CLAY W/GRAVEL 11. 00" TAN CLAY W/GRAVEL ATTERBURG LIMITS : LL: 25. 4 PL: 15 . 6 PI: 9. 8 SHRKG: 6. 0% MUNSELL COLOR CHART: 7/3 VERY PALE BROWN SANDY CLAY UNIT WEIGHT: 138 . 0 #/CFT HOLE # 22 LAB NO: 36537 LOCATION: 8809 SAND CASTLE CT. CL 9. 00" HMAC 4 . 00" LIGHT GRAY CLAY W/GRAVEL 7 . 00" DARK GRAY CLAY W/GRAVEL ATTERBURG LIMITS : LL: 29. 0 PL: 19. 7 PI : 9. 3 SHRKG: 4 . 0% MUNSELL COLOR CHART: 5/1 GRAY SANDY CLAY UNIT WEIGHT: N/A #/CFT HOLE # 23 LAB NO: 36538 LOCATION: CL OF WOODSIDE HILL DR. 100' EAST OF SKYLAKE DR. 5. 00" HMAC 6. 00" BROWN CLAY W/GRAVEL 9. 00" LIGHT BROWN CLAY W/GRAVEL ATTERBURG LIMITS : LL: 35 . 7 PL: 18 . 5 PI : 17 . 2 SHRKG: 8 . 0% MUNSELL COLOR CHART: 7/2 LIGHT GRAY CLAY UNIT WEIGHT: 146. 0 #/CFT HOLE # 24 LAB NO: 36539 LOCATION: 7504 WOODSIDE HILL DR. CL 8 . 00" HMAC 2 . 00"DARK BROWN CLAY 3 . 00" HMAC 2 . 00" BROWN CLAY 5. 00" TAN CLAY W/GRAVEL ATTERBURG LIMITS : LL: 29 . 5 PL: 19. 7 PI: 9. 8 SHRKG: 5. 0% MUNSELL COLOR CHART: 6/3 PALE BROWN SANDY CLAY UNIT WEIGHT: N/A #/CFT HOLE # 25 LAB NO: 36540 LOCATION: 7600 WOODSIDE HILL DR. W/4 2 . 00" HMAC 8 . 00" LIGHT BROWN SANDY CLAY W/GRAVEL 10. 00" BROWN SANDY CLAY - ATTERBURG LIMITS: LL: 45. 4 PL: 23. 6 PI: 21 . 8 SHRKG: 12 . 0% MUNSELL COLOR CHART: 7/4 PALE YELLOW CLAY UNIT WEIGHT: 133 . 0 #/CFT 6 DOE # 3703 HOLE # 26 LAB NO: 36541 LOCATION: 7700 WOODSIDE HILL DR. CL 1 . 50" HMAC 6. 00" BROWN SANDY CLAY W/GRAVEL 12 . 50" BROWN CLAY W/GRAVEL ATTERBURG LIMITS: LL: 61. 0 PL: 27 . 0 PI: 34 . 0 SHRKG: 17 . 0% MUNSELL COLOR CHART: 6/3 PALE BROWN CLAY UNIT WEIGHT: 132 . 0 #/CFT HOLE # 27 LAB NO: 36542 LOCATION: 7729 WOODSIDE HILL DR. E/4 5 . 00" HMAC 5 . 00" LIGHT BROWN CLAY W/GRAVEL 10 . 00" REDDISH BROWN CLAY ATTERBURG LIMITS: LL: 48. 3 PL: 25. 0 PI: 23. 3 SHRKG: 15. 0% MUNSELL COLOR CHART: 6/4 LIGHT YELLOWISH BROWN CLAY UNIT WEIGHT: 146. 0 .#/CFT HOLE # 28 LAB N0: 36543 LOCATION: S/4 OF WOODSIDE HILL DR. 35' EAST OF LAKE COUNTRY 2 . 00" HMAC 7 . 00" BROWN SANDY CLAY W/GRAVEL 11 . 00" LIGHT GRAY CLAY W/GRAVEL ATTERBURG LIMITS : LL: 52. 0 PL: 24 . 2 PI: 27 . 8 SHRKG: 14 . 0% MUNSELL COLOR CHART: 6/2 LIGHT BROWNISH GRAY CLAY UNIT WEIGHT: 133. 0 #/CFT HOLE # 29 LAB NO: 36544 LOCATION: N/4 OF LAKE HIGHLANDS DR. 20' WEST OF CANYON CREST RD. 4 . 00" HMAC 16. 00" YELLOWISH BROWN CLAY W/GRAVEL ATTERBURG LIMITS: LL: 35. 0 PL: 20 . 7 PI: 14 . 3 SHRKG: 7. 0% MUNSELL COLOR CHART: 8/2 VERY PALE BROWN SANDY CLAY UNIT WEIGHT: 146. 0 #/CFT HOLE # 30 LAB NO: 36545 LOCATION: 7601 LAKE HIGHLANDS DR. CL 0 . 25" HMAC 9. 75" BROWN SANDY CLAY W/GRAVEL 10 . 00" .LIGHT GRAY CLAY W/GRAVEL ATTERBURG LIMITS: LL: 25. 1 PL: 15 . 9 PI: 9. 2 SHRKG: 6. 0% MUNSELL COLOR CHART: 7/2 LIGHT GRAY CLAY UNIT WEIGHT: N/A #/CFT HOLE # 31 - LAB NO: 36546 LOCATION: 7700 LAKE HIGHLANDS DR. S/4 4 . 00" HMAC 4 . 00" DARK BROWN CLAY W/GRAVEL 12 . 00" REDDISH BROWN CLAY W/GRAVEL ATTERBURG LIMITS: LL: 33. 8 PL: 16. 3 PI: 17 . 5 SHRKG: 8 . 0% MUNSELL COLOR CHART: 7/2 LIGHT GRAY CLAY UNIT WEIGHT: 146. 0 #/CFT 7 DOE # 3703 HOLE # 32 LAB NO: 36547 LOCATION: CL OF LAKE HIGHLANDS DR. 50' EAST OF CROSSWIND 3 . 50" HMAC 7 . 50" YELLOWISH BROWN CLAY W/GRAVEL 9 . 00" LIGHT TAN CLAY W/GRAVEL ATTERBURG LIMITS : LL: 29. 1 PL: 16. 6 PI: 12 . 5 SHRKG: 7 . 0% MUNSELL COLOR CHART: 8/2 VERY PALE BROWN SANDY CLAY UNIT WEIGHT: 142. 0 #/CFT HOLE # 33 LAB NO: 36548 LOCATION: 8401 LAKE HARBOR CL 4 . 50" HMAC 15. 50" BROWN CLAY W/GRAVEL ATTERBURG LIMITS: LL: 44 .2 PL: 22 . 2 PI: 22. 0 SHRKG: 13. 0% MUNSELL COLOR CHART: 6/2 LIGHT BROWNISH GRAY CLAY UNIT .WEIGHT: 146. 0 #/CFT . HOLE # 34 LAB NO: 36549 LOCATION: 8620 LAKE COUNTRY -CT. CL 3 . 75" HMAC 6. 25" BROWN CLAY W/GRAVEL 10 . 00" LIGHT BROWN SANDY CLAY W/GRAVEL ATTERBURG LIMITS: LL: 36.2 PL: 18 . 4 PI: 17 . 8 SHRKG: 9. 0% MUNSELL COLOR CHART: 7/1 LIGHT GRAY CLAY UNIT WEIGHT: 144 . 0 #/CFT HOLE # 35 LAB NO: 36550 LOCATION: 7509 HEATHERWOOD CT. E/4 3 . 75" HMAC 4 . 25" BROWN CLAY W/GRAVEL 12 . 00" BROWN SANDY CLAY ATTERBURG LIMITS: LL: 35. 6 - PL: 19. 0 PI: 16. 6 SHRKG: 8 . 0% MUNSELL COLOR CHART: 5/2 GRAYISH BROWN CLAY UNIT WEIGHT: 144 . 0 #/CFT HOLE # 36 LAB NO: 36551 LOCATION: 8636 STONEWOOD CT. CL 3 . 00" HMAC 12 . 00" YELLOWISH BROWN CLAY 5 . 00" LIGHT GRAY CLAY ATTERBURG LIMITS: LL: 30. 5 PL: 16. 7 PI: 13 . 8 SHRKG: 8 . 0% MUNSELL COLOR CHART: 7/3 VERY PALE BROWN SANDY CLAY UNIT WEIGHT: 138 . 0 #/CFT HOLE # 37 LAB NO: 36552 LOCATION: 8644 STONEWOOD CT. W/4 4 .25" HMAC 6. 75" BROWN CLAY W/GRAVEL 9. 00" TAN CLAY W/GRAVEL ATTERBURG LIMITS: LL: 36. 6 PL: 18 . 6 PI: 18 . 0 SHRKG: 11 . 0% MUNSELL COLOR CHART: 7/2 LIGHT GRAY CLAY UNIT WEIGHT: 146. 0 #/CFT 8 DOE # 3703 HOLE # 38 LAB NO: 36553 LOCATION: 7500 HEATHERWOOD CT. CL 3 . 50" HMAC 3 . 50" BROWN CLAY 13 . 00" DARK BROWN SANDY CLAY ATTERBURG LIMITS: LL: 32 . 8 PL: 17 . 4 PI: 15 . 4 SHRKG: 8 . 0% MUNSELL COLOR CHART: 6/3 PALE BROWN CLAY UNIT WEIGHT: 142. 0 #/CFT APPPROVAL: RY JERI ROUTING DATE TESTED: 05-21-04 ABE CALDERON DATEREPORTED: 05-27-04 TONY SHOLOLA TESTED BY: HERNANDEZ FILE