HomeMy WebLinkAboutContract 32129-A1 AMENDMENT NO. 1 STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO. "3c9ly ' A I (M&C Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Kimley-Horn and Associates, Inc. , (Engineer) made and entered into City Secretary Contract No. 32129, (the Contract) which was authorized by the City Council by M&C 19873 on the 2nd day of December, 2003; and WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Relocations on Vickery Boulevard. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, of the Contract is amended to include the additional engineering services specified in M&C C-24129, adopted by the City Council on 9th day of March, 2010, and further amplified in a proposal let'-er dated January 11, 2010, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $380,345.00. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $772,245.00. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of , , 2010, in Fort Worth, Tarrant County, Texas. ATTEST: „7Contract Aut be : <� t Marty Hendrix City Secretary a Poo° APPR REC ED: n °04 0� APPROVED: 7 0 S. Frank Crumb, P.E. , Director'"' to Fernando Costa Water Department 4� �� � Assistant City Manager KIMLEY-HORN AND ASSOCIATES, INC. Engineer Name:Glenn Gary, P.E. Vice President 801 Cherry Street, Unit II Fort Worth, TX 76102 APPROVED'P ,to FORM AND LEGALITY: Assistant City Attorney -2- C7,ZMn Kimley-Horn and Associates, Inc, January 11, 2010 Suite 950 801 Cherry Street,Unit 11 Fort Worth,Texas Mr. Robert Sauceda 76102 City of Fort Worth Water Department 1000 Throckmorton St. Fort Worth,TX 76102 Re: Vickery Boulevard Water and Sanitary Sewer Improvements Additional Services.—Amendment No. 1 KHA No. 061018023 Dear Robert: Kimley-Horn and Associates,Inc.(Kimley-Horn or ENGINEER) is pleased to provide the City of Fort Worth(CITY)with Amendment No. 1 Part 1 for the Vickery Boulevard Water and Sanitary Sewer Improvements contract. The CITY has requested Kimley-Horn to perform additional services under this contract for the Proposed Fort Worth City Hall and Council Pavilion at the U.S. Post Office project. This amendment will include the alignment study and water system analysis for the proposed 36-inch water main from Henderson to the_. Eastside Pump Station(as shown in Exhibit 1)._The will also include the design for the relocation of 10-inch sanitary sewer main M-45 and the 36-inch water line for the relocation of the 30-inch water,line(as shown in Exhibits 1 and 2). ENGINEER will perform the work outlined in the following items for the Amendment: Item 1 (Design Management) ENGINEER will manage change,communicate effectively, coordinate internally and externally as needed,and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. • Communications and Reporting o Conduct and document monthly project update meetings with CITY Project Manager o Prepare invoices and submit monthly in the format requested by the CITY o Prepare and submit monthly progress reports in the format provided by the respective CITY Department o Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly TEL 817 335 6511 FAX 817 335 5070 Kimley-Horn Mr.Robert Sauceda,January 11,2010,Page 2 and Associates, Inc. according to the City of Fort Worth's Schedule Guidance Document o Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project • Deliverables o Meeting summaries with action items o Monthly invoices o Monthly progress reports o Baseline design schedule o Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes o Monthly M/WBE Report Form and Final Summary Payment Report Form Item 2 (Water Line Alignment Study and Water System Analysis) For the alignment study and water system analysis,ENGINEER will perform the following services: • Water Line Alignment Study o Horizontal alignment(excluding profiles)for two(2)options of the proposed 36-inch water main improvements from the intersection of Henderson Street and Pennsylvania Avenue the CITY's Eastside Pump Station o Opinion of probably construction cost for each alignment • Water System Analysis o As shown in Exhibit 1,the proposed 36-inch water line will not tie into the existing 30-inch water line. The connection is proposed to be made through the proposed 16-inch water line in Jennings Ave. Kimley-Horn will evaluate this transmission main's reliability and redundancy utilizing the maximum day and maximum hour plus fire flow conditions in the Holly Pressure Plane Model to determine how this will impact the water supply to the Eastside Pump Station. • Deliverables o Three(3)copies of the water line alignment study o Three(3)copies of the water system analysis report Kimley-Horn Mr.Robert Sauceda,January 11,2010,Page 3 and Associates, Inc. Item 3(Additional Water and Sanitary Sewer Design) The CITY has requested ENGINEER to perform the following additional water and sanitary sewer relocations for the Vickery relocation project in accordance with the scope of services in the original contract: • For the relocation of the existing 30-inch waterline,the ENGINEER will design the following water lines: o 36-inch water main along Pennsylvania,Jennings,and Broadway for 3,500 LF o 16-inch water line along Jennings for 1,300 LF o 12-inch water line along Pennsylvania for 2,400 LF o 8-inch water line along Jarvis for 1,000 LF For the relocation of the existing 10-inch sanitary sewer M-45,the ENGINEER complete the design of the following sanitary sewer lines: o 12-inch sanitary sewer M-45 along Vickery,Jennings,and Jarvis for 1,476 LF o 8-inch sanitary sewer L-196 along Vickery for 358 LF The ENGINEER will also prepare up to 45 details traffic control details associated with the water and sanitary sewer relocations Item 4(Survey and Subsurface Utility Engineering(SUE)) Due to the changes in the design listed above,the ENGINEER will perform 4,400 LF of survey, 3,300 LF of Level B SUE,and 4 Level A SUE. Item 5(Geotechnical Services) The ENGINEER will perform eight(8)bores to a total depth of 170 vertical for this project. Item 6(Corrosion Engineering) For the proposed 36-inch water main along Pennsylvania,Jennings and Broadway,the ENGINEER will perform the following services for the Corrosion Engineering: • Soil Corrosivity Evaluation—measure soil resistivity using the Wenner Four Electrode Method(ASTM G57)at three locations to a depth of 15 feet below grade. Perform chemical analysis to obtain minimum resistivity,chloride ion concentration, sulfate ion concentration,and soil pH on three(3)of the samples obtained during geotechnical investigations. Perform a field investigation to identify existing metallic Kimley-Horn Mr.Robert Sauceda,January 11,2010,Page 4 and Associates, Inc. pipelines,cathodic protection systems and high voltage AC or DC systems as sources for stray current interference. • Data Analysis and Letter Report—Analyze the results of the soil resistivity testing,chemical analysis and stray current investigation with respect to corrosivity and prepare a letter report with the results and recommendations for corrosion control. • Corrosion Control System Design—prepare details and technical specifications for Cathodic Protection system. Item 7(Additional Bidding and Construction Phase Services) The ENGINEER will provide one(1)additional bidding and construction phase services for this project. These services will be provided for the following in accordance with the scope of services in the original contract: • Preparation of a bidding package as required by the City. • Reproduction costs for the additional unit and set of bidding documents required by the City. • Pre-construction assistance for the additional unit and set of bidding documents required by the City. • Construction phase services for the additional unit and set of bidding documents required by the City. Scope of Services The scope of services for this amendment is divided into the following tasks: Item 1 (Design Management): $16,100(Water$12,075 Sewer$4,025) • Task 1—ENGINEER will manage change,communicate effectively, coordinate internally and externally as needed,and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. $16,100 Item 2(Water Line Alignment Study and Water System Analysis): $48,300(Water$48,300 Sewer$0) • Task 1—Water Line Alignment Study for 16,500 LF. $40,100 • Task 2—Water System Analysis for 16-inch connection to existing 30- inch water main. $8,200 KimleyHorn Mr.Robert Sauceda,January 11,2010,Page 5 and Associates, Inc. Item 3(Additional Water and Sanitary Sewer Design): $195,250 (Water$151,600 Sewer$43,650) • Task 1—Design of 8,200 LF of 36-inch through 8-inch water lines and traffic control for the revised water line alignments. $151,600 • Task 2—Design of 1,834 LF of 12-inch and 8-inch sanitary sewer lines and traffic control for the sanitary sewer lines. $43,650 Item 4(Survey and SUE): $ 1,800 Kimley-Horn $64,250 Survey $ 6,425 10% Sub Fee $72,475 Total (Water$50,905 Sewer$21,570) • Task 1—The ENGINEER will perform 4,400 LF of survey along Pennsylvania,Jennings and Broadway for the water main relocations. $19,690 • Task 2—The ENGINEER will perform 3,300 LF of Level B SUE along Jarvis,Pennsylvania, and Jennings for the water and sanitary sewer main relocations. This task also includes four(4)Level A SUE for the water main relocation on Pennsylvania and Jennings. $44,560 Item 5(Geotechnical Services): $8,200 Geotechnical $ 820 10% Sub Fee $9,200 Total (Water$9,200 Sewer$0) • Task 1—Perform geotechnical services for eight(8)bores for the 36- inch water main relocation. $8,200 Item 6(Corrosion Engineering): $15,000 Corrosion $ 1,500 10% Sub Fee $16,500 Total (Water$16,500 Sewer$0) • Task 1—For the proposed 36-inch water main along Pennsylvania, Jennings and Broadway,the ENGINEER will perform the services for the Corrosion Engineering. $15,000 Kimley-Horn Mr.Robert Sauceda,January 11,2010,Page 6 and Associates,Inc. Item 7(Additional Bidding and Construction Phase Services): $22,700 Total (Water$17,025 Sewer$5,675) Task 1—Pre-construction assistance for the additional unit and set of bidding documents required by the City. $10,500 o This task includes preparation and delivery of addenda to plan holders and responses to questions submitted to the DOE by prospective bidders. Also included is attending the scheduled pre-bid conference,assisting in reviewing the bids for completeness and accuracy,attending the project bid opening, developing bid tabulations in hard copy and electronic format, and submitting four(4)copies of the bid tabulation. o After the City has selected the low bidder,the ENGINEER will prepare the conformance documents for the water and sanitary sewer bid package. Task 2—Construction phase services for the additional unit and set of bidding documents required by the City. $12,200 o The ENGINEER will perform the shop drawing reviews and construction period observations every other month. We recommend that the City increase the budget by$380,345 for these additional services. From the additional services listed above,the recommended breakdown for water and sewer services is as follows:. Description Water Sewer Total Item I —Design Management $12,075 $4,025 $16,100 Item 2—Water Line Alignment Study and Water System $48,300 $- $48,300 Analysis Item 3—Additional Water and $151,600 $43,650 $195,250 Sanitary Sewer Design Item 4—Survey and SUE $50,905 $21,570 $72,475 Item 5—Geotechnical Services $9,020 $- $9,020 Item 6—Corrosion Engineering $16,500 $- $16,500 Item 7—Additional Bidding and $17,025 $5,675 $22,700 Construction Phase Services Total $305,425 $74,920 $380,345 Kimley-Horn Mr.Robert Sauceda,January 11,2010,Page 7 and Associates, Inc. The following table summarizes the Fee per Work Phase breakdown: Work Phase Water Sewer Total 31 $26,037.50 $5,572.00 $31,609.50 32 $156,225.00 $33,432.00 $189,657.00 33 $78,112.50 $16,716.00 $94,828.50 51 $45,050.00 $19,200.00 $64,250.00 Total $305,425.00 $74,920.00 $380,345.00 The following table summarizes our recommended budget revisions by Item (please see attached Fee Breakdown for an hourly breakdown of each item): Description Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Item 7 Total Pre- $16,100 $- $- $- $ - $- $- $16,100 Engine rin&_ Conceptual $_ $48,300 $14,000 $72,475 $9,020 $16,500 $- $160,295 Engineering Preliminary Construction $- $- $54,800 $- $- $- $- $54,800 Plans _ Final Construction $- $- $126,450 $- $- $- $- $126,450 Plans ---- Pre- Construction $- $- $- $- $- $ - $10,500 $10,500 Services Construction $- $_ $- $_ $- $ _ $12,200 $12,200 Phase Services Total $16,100 $48,300 $195,250 $72,475 $9,020 $16,500 $22,700 $380,345 KimleyHorn Mr.Robert Sauceda,January 11,2010,Page 8 and Associates, Inc. The following table summarizes our recommended budget revisions and shows the revised contract amount: Description Original Fee Amend No. 1 Revised Contract Pre-Engineering _$- $16,100 $16,100 Conceptual Engineering $133,900 $160,295 $294,195 Preliminary Construction $104,500 $54,800 $159,300 Plans — Final Construction Plans $137,650 $126,450 $264,100 Pre-Construction Services $1,500 $10,500 $12,000 Construction Phase $14,350 $12,200 $26,550 Services Total Project $391,900 $380,345 $772,245 The ENGINEER will subcontract a portion of these services to SAM, Inc., Addula Consulting Engineers, and V&A Engineering M/WBE subconsultants. The amount we will be subcontracting is$87,450. This represents an M/WBE participation percentage of 23.0%for these additional services. With these Additional Services,our revised contract amount will be$772,245. This will revise our total contract M/WBE participation from$80,000(20.4%)to $167,450 (21.7%). The water and sewer design fees for this amendment are$305,425 and$74,920 respectively. Our revised project water and sewer design fees will be$603,269 and$168,976 respectively. We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES,INC. Glenn A. Gary,P.E. Sr. Vice President GAG/CTD:ctd Attachments: K:\FTW Utilities\061018023\Ppp\Amend-l-Post�f ..\Amendl-Vickery-Ltr_doc iviait, Keview Page 1 Official,Ito of the City of Fort Worth, IVOR CITY COUNCIL AGENDA FORr, COUNCIL ACTION: Approved on 3/9/2010-Ord. No. 19068-03-2010 DATE: 3/9/2010 REFERENCE NO.: **C-24129 LOG NAME: 60VICKERYA1- KIMLEYHORN CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Amendment No. 1 in the Amount of$380,345.00 to City Secretary Contract No. 32129 with Kimley-Horn and Associates, Inc., for Water and Sanitary Sewer Main Relocations on Vickery Boulevard, Jennings Avenue and Pennsylvania Avenue and Adopt Appropriation Ordinance (COUNCIL DISTRICT 8) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$412,345.00 from the Water and Sewer Operating Fund to the Water Capital Projects Fund in the amount of$321,425.00 and Sewer Capital Projects Fund in the amount of$90,920.00; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of$321,425.00 and the Sewer Capital Projects Fund in the amount of$90,920.00, from available funds; and 3. Authorize the City Manager to execute Amendment No. 1 in the amount of$380,345.00 to City Secretary Contract No. 32129 with Kimley-Horn and Associates, Inc., for Water and Sanitary Sewer Main relocations on Vickery Boulevard, Jennings Avenue and Pennsylvania Avenue thereby increasing the contract amount to$772,245.00. DISCUSSION: On December 2, 2003, (M&C C-19873)the City Council authorized the City Manager to execute an engineering agreement in the amount of$391,900.00 with Kimley-Horn and Associates, Inc., for Water and Sanitary Sewer Main Relocations on Vickery Boulevard. Amendment No. 1 will provide for the following: Design for the relocation of the existing 10-inch sanitary sewer main and 30-inch water main for the proposed City Hall and Council Pavilion at the U.S. Post Office on Lancaster Avenue Alignment study and water system analysis of a proposed 36-inch water main from the Henderson Street/Pennsylvania Avenue intersection to the Eastside Pump Station located on Vickery Boulevard Additional bidding and construction phase services Design Management Additional design survey Subsurface utility exploration Cathodic protection design Geotechnical investigation Kimley-Horn and Associates, Inc., proposes to perform the additional services for a lump sum fee of $380,345.00. City staff considers this fee to be fair and reasonable for the scope of services proposed. M/WBE - Kimley-Horn and Associates, Inc., is in compliance with the City's M/WBE Ordinance by committing to 23 percent M/WBE participation on this Amendment No. 1. In addition to the contract cost, $32,000.00 (water: $16,000.00, sewer$16,000.00) is required for project management, land cost and utility clearance. ttp://apps.cfwnet.org/council_packet/mc_review.asp?ID=13078&councildate=3/9/2010 3/10/2( MALI; Keview Page 2 This project is located in COUNCIL DISTRICT 8, Mapsco 76D and 77E. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations, and the adoption of the attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fund/A_c_count/Centers _2_) P253__53.1.350. 609170143433 $305425.00 37253 53.1200_609170.14.3.433 $3054Z5.00 2)_P258_531200 _7091.70143433 $74,920.00 3)P258.531200709170143433 $74,920.00 27253.531350 609170143442 $5,000.00 1) PE45 538040 0609020 321 425.00 2)_P253 541100 6091.70143441. $5-000.00 11_PE45 538040 0709020 90 920.00 2)_P25:3_531500_609170143473 $3000.00 2)_P258__511010709170143430 $3,000.00 2) P253 511010 609170143430 $3,000.00 2)P256 _541100 709170143441 $_5000.00 2 P258 531350 709170143442 $5 000.00 2 P258 531350 709170143473 $3 000.00 1&2_) $90-920.00 P258 476045 7091701434ZZ 1&2_) $321,425..00 P253 476045 609170.1434ZZ Submitted for CitkManager's Office_by- Fernando Costa (6122) Ori ina Ing.Degartmentt Head: S. Frank Crumb (8207) Additional.Information Contact: Roberto C. Sauceda (2387) ATTACHM_E_NTS 60VICKERYAl-KIMLEYHORN AO.doc 60VICKERYAl-KIMLEYHORN MAP.pdf .ttp://apps.cfwnet.org/council_packet/mc—review.asp?ID=13078&councildate=3/9/2010 3/10/20