Loading...
HomeMy WebLinkAboutContract 32129-A3 AMENDMENT No. 3 CITY SECRETARY �Z ZCl- C,amcT 110, TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and GSWW (having been acquired by Burgess & Niple, Inc. ) , (ENGINEER) made and entered into City Secretary Contract No. 32129, (the CONTRACT) which was authorized by the City Council by M&C C-20821 on the 28th day of June, 2005 and subsequently revised by two (2) previous amendments; and WHEREAS, the CONTRACT was revised by: Amendment Number 1 in the amount of $18, 875 . 00 which was authorized administratively on September 19, 2006and Amendment Number 2 in the amount of $21, 601 . 00 which was authorized by M&C No. C-24112 on March 24, 2010; and WHEREAS, the CONTRACT involves engineering services for the following project : Water and Sanitary Sewer Rehabilitation Contract 2004, STM-H; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW, THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated June 7, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $8, 863. 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $ 151, 679. 00 . 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Page -1- i;_ -"'�-1 2 P1 EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER GSWW Fernando Costa Dr. Steve Sanders, P.E. Assistant City Manager Vice President 3950 Fossil Creek Blvd. , Ste 210 Fort Worth, TX 76137 DATE: Q ,. DATE: 3 J((/ Z Z lD APP OXTAIL RECO NDED: -)6' S. Frank Crumb, P.E. , Director Water Department APPRO AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney q-4 ATTEST: q'��� [offh� jJ O p � 0 o d a ry J. Ka er °o 0 ity Secretary �� Q00000000 a�aA OFFICIAL RECORD rITY SECRETARY (moo qj()RJ'7 J"q TK N0 M&C RE-Q[7RRLD Page -2- SURGESS & NIPLE 395o Fossil Creek Blvd. I Suite 210 I Fort Worth, TX 76137 1817.3o6.1444 June 7, 2012 Mr. Rakesh Chaubey, P.E. Project Manager City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Re: Supplemental Authorization Reauest(revised) WATER AND SEWER REPLACEMENT CONTRACT 2004, STM-H City Project No. 00193; DOE No. 4893; B&N No. PR39318/0350-002 Water Project No. P 253 603170019383 Sewer Project No. P 258 703170019383 Proposed Amendment No. 3 to City Secretary Contract No. 32129 Mr. Chaubey: This letter is our formal request for Supplemental Authorization to be compensated for additional engineering services as requested by the City. Note that the original design contract was between GSWW, Inc. and the City of Fort Worth. Since then, GSWW was purchased by Burgess & Niple. We operate as Burgess & Niple. GSWW does not exist anymore. Justification City forces found a private sanitary sewer draining the residence at 2905 Alton Road. This sewer crosses 2909 Alton Road to get to the manhole at STA 3+60 of Sanitary Sewer L-2406. I had a meeting with the City and the homebuilder for a new house at 2909 Alton Road. This amendment will incorporate the extra engineering effort required for the additional work. Our proposed Scope of Work is as follows: We will have the proposed alignment surveyed and we will provide 2 sanitary sewer easements - one on 2905 Alton Road and one on 2913 Alton Road. We will provide a single plan & profile sheet of this design. After construction, we will provide a mylar record drawing. This construction work will be added to the current construction contract by change order. The City Inspector will coordinate getting the current contractor to expose the existing utility lines so that the Surveyor can locate them and so we can design the replacement sewer line. Based upon this scope of work, the additional design cost proposed for Amendment No. 3 is $8,863.00. CELEBRATING ]no YEARS 1912-2012 B&N burgessniple.com C ity of Fort Worth June 7, 2012 DOE #4893 Page 2 PROJECT FEE DETAILS Contract Item Description Fee Original Contract Water and SS Repl Contract 2004 $102,340.00 C ity Secy Contract# 32129 Approved Amendment No. 1 Permanent Easements, TCE's, and $18,875.00 City Sec'y Contract# 34016 TROE's Approved Amendment No. 2 Resurrect Archived Project $21,601.00 City Sec'y Contract# 32129-A2 Proposed Amendment No. 3 Relocating sanitary sewer in 2905 12909 $8,863.00 Alton Road REVISED TOTAL PROJECT FEE $151.679.00 The M/WBE goal of the original contract was 19%. M/WBE Consultant ANA Consultants/ Non- M/WBE Prime Mas-Tek Consultants/ Consultant for PROJECT FEES Consultant Trevino Reproduction Reproduction Base Contract $102,340.00 $68,442.00 $30,594.00 $3,304.00 Amendment 1 $ 18,875.00 $5,000.00 $13,875.00 $0.00 Amendment 2 $ 21,601.00 $20,775.00 $0.00 $826.00 Amendment 3 $ 8,863.00 $4 343.00 $4,500.00 $20.00 Total Contract Percent of Total 65.0% 32.3% 2.7% Please let me know if you have any questions or need additional information concerning this request. Respectfully submitted, Burgess &Niple, Inc. TBPE FIRM REGISTRATION NO. F-10834 6)4400f 60 fi'i4� William D. Wendland, P.E. Associate Director, Fort Worth Public Sector Enclosures ZA$proied1350-00ZAmendment9 to Eng Contract1350-002_Amendment 3R_WDW_20120607.docc burgessniple.com