Loading...
HomeMy WebLinkAboutContract 32129-A4 CITY SECRETARY AMENDMENT No. 4 cONTRACT NO. TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and GSWW, Inc. , made and entered into City Secretary Contract No. 32129, (CONTRACT) which was authorized by M&C C-20821 on the 28th day of June, 2005 in the amount of $102,340. 00; and WHEREAS, GSWW, Inc. was subsequently acquired by and merged into Burgess & Niple, Inc. (collectively and hereafter, ENGINEER) ; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $18, 875 . 00 which was authorized administratively on September 19, 2006, Amendment Number 2 in the amount of $21, 601. 00 which was authorized by M&C No. C-24112 on March 24, 2010 and Amendment No. 3 in the amount of $8, 863 . 00 which was authorized administratively on August 8, 2012; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2004, STM-H; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated August 26, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $5,780 . 00 . 2 . OFFICIAL RECORD ���'► Page -1- CITY SECRETARY Iv�p 6'1 ��0 FT.!NORTH, TX RE�'� Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $157, 459 . 00 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . ElECtTTED anti 1TITECrI IE4 as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Burgess & Niple, Inc . Fernando Costa Dr. Stev Sanders, P.E. Assistant City Manager Vice President Burgess & Niple, Inc . DATE: DATE: %0Z ZZ 0 APPROV L RECOMMENDED: S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: [ U1�1 Date :I AA t, Dougl-a-s-W,--Black (Ic Assistant City Attorney TTES / M -- ---- ar J. Kayser �8 %o City Secretary 000 CX Page BURGESS & NIPLE 395o Fossil Creek Blvd. ( Suite 210 Fort Worth, TX 76137 817.306.1444 August 26, 2013 Mr. Rakesh Chaubey, P.E. Project Manager City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Re: Supplemental Authorization Request #4 WATER AND SEWER REPLACEMENT CONTRACT 2004, STM-H City Project No. 00193; DOE No. 4893; B&N No. PR51936/39318/0350-002 Water Project No. P 253 603170019383 Sewer Project No. P 258 703170019383 Proposed Amendment No. 4 to City Secretary Contract No. 32129 Mr. Chaubey: This letter is our formal request for Supplemental Authorization to be compensated for additional engineering services as requested by the City. Note that the original design contract was between GSWW, Inc. and the City of Fort Worth. Since then, GSWW was purchased by Burgess & Niple. We operate as Burgess & Niple. GSWW does not exist anymore. Justification City forces found an old, private sanitary sewer line draining the residence at 2917 Alton Road. This sewer crosses 2913 Alton Road to get to the manhole at STA 3+60 of Sanitary Sewer L-2406. The private sanitary sewer is damaged and needs to be replaced. As well, it needs to be a public sewer, requiring it to be contained within a sanitary sewer easement. This amendment will incorporate the extra engineering and surveying effort required for the additional work. Our proposed Scope of Work is as follows: We will have the existing sewer and the proposed alignment surveyed and we will provide a sanitary sewer easement on 2917 Alton Road. Note that the needed sanitary sewer easement on 2913 Alton Road is already being prepared under Supplemental Authorization #3. We will provide a single plan & profile sheet of this design. After construction, we will provide a mylar record drawing. This construction work will be performed by City forces. The City will expose the existing utility lines so that the Surveyor can locate them and so we can design the replacement sewer line. We will not be responsible for obtaining Rights of Entry from these property owners. Based upon this scope of work, the additional design cost proposed for Amendment No. 4 is $5,780.00. buraessniolexorn d City of Fort Worth August 26, 2013 DOE #4893 Page 2 PROJECT FEE DETAILS Contract Item Description Fee Original Contract Water and SS Repl Contract 2004 $102,340.00 City Sec'y Contract# 32129 Approved Amendment No. 1 Permanent Easements, TCE's, and TROE's $18,875.00 City Sec'y Contract# 34016 Approved Amendment No, 2 Resurrect Archived Project $21,601.00 City Sec'y Contract #32129-A2 Approved Amendment No. 3 Relocating sanitary sewer in 2905/2909 $8,863.00 City Sec'y Contract#32129-A3 Alton Road Proposed Amendment No. 4 Relocating sanitary sewer in 2913/2917 $5,780.00 Alton Road REVISED TOTAL PROJECT FEE $157,459.00 MNVBE Consultant ANA Consultants/ Non- M/WBE Prime Mas-Tek Consultants/ Consultant for PROJECT FEES Consultant Trevino Reproduction Reproduction Base Contract $102,340.00 $68,442.00 $30,594.00 $3,304.00 Amendment 1 $ 18,875.00 $5,000.00 $13,875.00 $0.00 Amendment 2 $ 21,601.00 $20,775.00 $0.00 $826.00 Amendment 3 $ 8,863.00 $4,343.00 $4,500.00 $20.00 Amendment 4 5 780.00 $2,760.00 $3,000.00 $20.00 Total Contract $4.170.00 Percent of Total 64.35% 33.00% 2.65% Please let me know if you have any questions or need additional information concerning this request. Respectfully submitted, Burgess & Niple, Inc. TBPE FIRM REGISTRATION NO. F-10834 04;"w0 William D. Wendland, P.E. Associate Director, Fort Worth Municipal Projects Section Enclosures D$projeW350-0021Amendments to Eng Contract1350-002_Amendment 4_WDW_20130826.docx burgessniple.com B&N Project PR39318/51936 BURGESS & NIPLE Engineers ■ Planners 2004 Capital Improvements Program-STM-H Amendment 4 WATER PROJECT NO.P 253 603170019383 SEWER PROJECT NO.P 258 703170019383 DOE PROJECT NO.4893 Design Services for relocating sanitary sewer in 2913/2917 Alton Road PROPOSED HOURS FOR EACH TASK TOTAL $ 220.00 $ 195.00 1 $113.00 $ 87.00 Direct AMOUNT Task Work Task Descriptions Prin. P.M. P.E. CAD Tech Costs a Site visit prior to design 1 1 $ 20.00 $ 328.00 Topographic survey and 1 sewer easement(ANA- b sub-consultant) $ 3,000.00 $ 3,000.00 c Plan&Profile sheet of replacement sewer line 1 4 12 $ - $ 1,691.00 d Project Management 3 50.00 $ 635.00 e Mylar plan submittal assume 1 sheet and delivery) 1 $ 42.00 $ 129.00 TOTAL 23 hours 0 5 5 13 1 $ 3 112.00 1 $ 5,783.00 Rounded Fee=$5,780.00 Z:1$projec11350-0021Amendmenls to Eng Contract139318-Amendment 4-Contract Price-Hour Summary-20130823.x1sx 1 8/26/2013 3:59 PM