Loading...
HomeMy WebLinkAboutContract 33255 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, ONE WOODLAND SPRINGS, LTD., hereinafter called "Developer", desires to make certain improvements to Village of Woodland Springs, Phase VII, Section 1, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Mehrdad Moayedi, Manager of Centamtar Terras, L.L.C., its duly authorized General Partner, and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the CFA TPW REVISED 4% 20051230.doc 1 �� fi/.31YA FL , 1511. F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the allejeed nealikence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: CFA TPW REVISED 4% 20051230.doc 2 Water(A)None; Sewer(A-1)None;Paving(B) attached; Storm Drain(13- 1) attached; Street Lights and Signs (C) attached. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $691,560.78. Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $467,318.86 467,318.86 2. Storm Drainage $194,474.20 194,474.20 3. Street Lights $2,496.00 2,496.00 4. Street Name Signs $800.00 800.00 B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ 4% 26,471.72 26,471.72 TOTALS 691,560.78 $ - 691,560.78 Notes: 1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets. Sidewalk cost is included under street cost. The developer is responsible for installation of sidewalk. 2. Developer's column for Item C represents four percent(4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. CFA TPW REVISED 4% 20051230 3 CITY Z"IMMY IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary,with the corporate seal of the City affixed, an said De e oper has executed this instrument in triplicate, at Fort Worth,Texas this thed ay of , 200 . RECEIVEC Approval Recommended: Transportation and Public Works Department - l NO M&C REQUIRED Robert Goode, P. E. Director ATTEST: City Of Fort rth rVN6U�ow- By: kA- #en Ma Ot City Secretary Assistant City anager Approved as to Form: i ssist# t Cd y Attorney ATTEST: DEVELOPER ONE WOODLAND SPRINGS, LTD. A Texas Limited Partnership By: Centamtar Terras, L.L.C. A Texas Limited Liability Company Its General Partner By: Corporate Secretary Mehrdad Moayedi Manager F:4R�Ih"'J CFA TPW REVISED 4% 20051230.doc 4 tiff �R�--'Vffly W"10 HH, TEK. MPRIO SINHLULH Fax:21.:16V: 940 ?an 1 '06 9:29 F1.03 ARI �SINACOLA & SONS PHASE VAWTV41- Item Description: Quantity Unit Unit Bid Total Bid 1 6-Stabilized Subgrade 18,068.00 SY 1.65 $ 29,812.20 2 Hydrated Lime @ 30#I SY 272.00 TN 85.00 $ 23,120.00 3 64 3000 PSI Conc. Pvmt w/7'curb 14,024.00 SY 20.28 $ 284,406.72: 4 7"3000 PSI Conc. Pvmt.w/7 curb 3,486.00 SY 24.29 $ 84,674.94 5 Sawcut&Rem. Exist Curb &Gutter 158,00 LF 10.00 $ 1,580,00 6 Sawcut&Rem.Exist. Sidewalk 800.00 SF 2.00 $ 1.600.00 7 4'Sidewalk 3,978.00 SF 3.75 $ 14,917.50 8 Temp.TY 111 Barricade 1.00 EA 1,500.00 $ '1,500.OD 9 AsphaltPvmt.(6") 1,193.00 SY 19-00 $ 22,667.00 10 Street Header 1.00 EA 600,00 ' $ 500.06 11 Storm Water Management 1.00 LS 1,000,00 - s 1,000.00 12 W-4 Pvmt Markers 11.00 EA 5.00 -$ 55.00 13 Y-4 Pvmt Markers 106.00 EA 5.00 $ 530.00 14 ti-CR-4 Pvmt. Markers 155.00 EA 5.25 $ 813.75 15 II-AA4 Pvmt, Markers 27.00 EA 5.25 $ 141.75 PHASE Vil SECTION 1 TOTAL $ 467,318.88 ADDITIONAL BID ITEMS Item Description Quantity Unit Unit Bid Total-Bid 1 MH Slockouts 35.00 EA 175.00 $ 6,.125.00 ADDITIONAL.BID ITEMS TOTAL $ 6,125.00 _ PROPOSAL SUMMARY GRADING-Phase VI Section 4 TOTAL $ 139,592.000 PHASE Vi SECTIONT4 TOTAL. $ 380,610.28. PHASE VII SECTION 1 TOTAL $ 467,318.86• PROPOSAL SUMMARY TOTAL $: 987,421..1+ .. . ADDITIONAL BID ITEMS TOTAL $ -. 6,125.06 No bond costs have been added to this proposal. If bonds are required add costs below as needed. Payment/Performance/Maintenance Bond $ 11,030.00, QUALIFICATIONS: — Units are based on Catter& Burgess, Inc. plans Dated: 04105-Received:08/01/05, -. All work on this proposal will be performed with one move-in at one time -- Phase V1 and V11 paving to be completed concurrently with one mobilization Prfeso r W10fZM5 x005-z1a;0*1006, IMS NJt;3 6 P ProPosal;VW of W"dbnd*9s W PH vl SEC s VII SEC 1-Pr 9 OF I;v j P -Cy, ON SICIETA t. MPRIO .'S1NHC0LR Fax:21ZISV3940 Jan 1 '06 9:29 P.04 ARIO SINACOL-A & SONS EXCAVMWQ.12M. — Excavation is based on a conventional scraper operation not to exceed 10017'haul — Final quantities will be determined using"Approved Plans" — See line item for bond cost — No compaction,concrete or geotechnical testing — No excavation or backfill for lot retaining walls — No fence removal,replacement or repair — No grade tc)drain or channel excavation — No hand labor in tree area No clearing on perimeter fence lines No hazardous material removal No import,export or trucking of rnaterial No landscape,irrigation,electrical adjustments or repairs No maintenance,installation or removal of erosion control devices No median paving stones No permanent traffic markings or signage other than items quoted No permits,impact fees or fees of any kind No pond de-mucking,cleaning or general clean up No respreading of topsoil,sod,or seeding Rock excavation included;no special processing of rock such as crusher,hoe ram, etc. No undercutting No sales tax on incorporated materials No street'lightng No surveying No trash hauWff Colored concrete included in barrier free ramps Reinforced steel to be#3s on 24"c-c both ways - Street Subgrade to be+/-0.20 feet,and pad subgrade to be+1-0.30 feet of proposed grades - No building demolition or haul-off - No well abandonment - Trees to be chipped and disposed on-site - Owner to provide a concrete plant site With city water, either on-site or aclacent to the project site location (minimum 2 acres) - Proposal based upon approval of batch plant site by respective municipality, if a plant site is not available that will meet respective city regulations,unit prices for concrete paving Will be. adjusted due to ready mix concrete use - We have quoted this project on a unit price basis, any work not specifically quoted or qualified is excluded Should you have any questions,or need clarification regarding this proposal,please feet free to contact this office. M Si=er ly. 1 SI co &SONS EXCAVATING,INC. chael'SS"Inaq Vice Preside F'6MW'Wt0J20D5 ZOOS-21804100S; Markings;G&P Pr*P*94J;V19*OfW66ft""9W CH V!SEC 4&VnSEG I.Prop Ntgo:S of 3' 01/17/2006 08;58 FAX 9722869178 Z003/003 41 48'CLASS III RCP 290 LF $117.00 $33,93000 42 36"CLASS III RCP 439 LF $69.05 $30,312.95 43 33"CLASS III RCP 735 LF $61.75 $45,386.25 44 30"CLASS III RCP 321 LF $53.95 $17,317.95 45 24"CLASS III RCP 247 LF $42.55 $1009.85 46 21-CLASS III RCP 20 LF $36.30 $726.00 47 (2)12"CLASS IV RCP 100 LF $57.00 $5,700.00 48 TRENCH SAFETY 2212 LF $0.10 $221.20 49 10'STANDARD CURB INLET 8 EA $3.215.00 $17.720.00 50 15'STANDARD CURB INLET 2 EA $2,800.00 $5,600.00 51 20'STANDARD CURB INLET 1 EA $3,300.00 $3,300.00 52 33"TYPE B HEADWALL 1 EA $1,200.00 $1,200.00 53 48"TYPE B HEADWALL 1 EA $1,875.00 $1,875.00 54 4'SQUARE DROP INLET 1 EA $2,575.00 $2,575.00 55 12"61 SLOPE HEADWALL 2 EA $1,200.00 $2,400.00 56 4'SQUARE MANHOLE 3 EA $2,500.00 $7,500.00 57 5'SQUARE MANHOLE 1 EA $3,000.00 $3,000.00 58 ROCK RUBBLE RIP RAP 94 SY $50.00 $4,700.00 59 STORM WATER MANAGEMENT 1 LS $500.00 $500.00 SUB-TOTAL $194,474.20 71 PAYMENT,PERFORMANCE&MAINT.BOND 1 LS $15,000.00 $15,000.00 SUB-TOTAL $15,000.00 TOTAL $634,518.25 We have allowed 60 working days for this project. PROVISIONS: 1.Erosion control for stage one inlet protection(inlet bottoms only)is included and all other erosion Control and maintenance by others. 2.All underground utility conflicts to be relocated by others. 3. Proposal based on utility work being Installed prior to any new gas,electric,cable or other utilities. 4.Utility spoils will be stockpiled onsite at a location approved by owner. 5.Exclusions: a.Tree Protection and Clearing f. Inspection Fees and Permits b. Landscaping and Sprinklers g_Construction Staking, Layout and Surveying c.Traffic Control h.Additional Mobilization d.Seeding,Sodding and Hydromulching 1. Lab Cost and Water Meters e. Density and Soils Testing 6. Roadway sub-grade must be+!-0.20 of a foot prior to construction and will be returned to like condition upon completion. 7. Due to erratic pipe prices,this pricing is valid for 7 days from date above. Signed: Name: Jason J.Daniels Title: V.P.of Operations III. STREET LIGHTS: 1. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 8 EA $ 0, 000 $00, 000. 00 MID-BLOCK RESIDENTIAL 4 EA $ 0, 000 $00, 000 . 00 CHANGE OF DIRECTION RESIDENTIAL 4 EA $ 01000 $00, 000. 00 MID-BLOCK COLLECTOR 0 EA $ 01000 $ --0-- MID-BLOCK ARTERIAL PARKWAY 0 EA $ 01000 $ --0— MID-BLOCK ARTERIAL MEDIAN 0 EA $ 0, 000 $ __0__ RELOCATE EXISTING LIGHT 0 EA $ 0, 000 $ --0-- 0 (200 watt lights) x $7 . 05 (per light) x 24 months = $00, 000. 00 16 (100 watt lights) x $6.50 (per light) x 24 months = $2,496.00 Total: $2,496. 00 The Street Lights will be installed by TRI County Electric Cooperative the developers initial 24- month power charge will be $2 ,496. 00 After the initial 24-month power charge the City of Fort Worth, WILL ASSUME THE POWER COST. CFA CODE #2005108 VILLAGES OF WOODLAND SPRINGS WEST, PHASE VII-SEC I August 27, 2005 Fort Worth, Texas August 31, 2005 PAGE I OF EXHIBIT C 2. STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of THE Director. 3. Streetlights on arterial streets shall be installed with underground conduit and conductors. 4 . The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit at a depth not less than 30 inches and at least 18-inch behind the curb, "clear from all other utilities". 5. The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit between streetlights proposed for installation and the power source to become operational. 6. A 3-inch schedule 80 PVC conduit is required when crossing streets at a depth not less than 30 inches, unless indicated otherwise on the plans concrete pull boxes shall be provided at the crossing points. 7. The developer shall pay the initial two year power cost to TRI- COUNTY ELECTRIC COOPERATIVE, after the initial two year cost the City of Fort Worth, will assume the power cost. 8 . The developer or their contractor shall contact City' s street light division 48 hours prior to starting any installation of conduit and/or streetlights at (817) 871-6596 to insure proper inspection of work. TOTAL DEVELOPER' S COST $2,496.00 THE VILLAGES OF WOODLAND SPRINGS WEST, PHASE VII-SEC I August 27, 2005 Fort Worth, Texas AUGUST 27, 2005 PAGE II OF EXHIBIT C CFA CODE #2005104 Off FT. w"�P?TH, TES, III "STREET LIGHTS" INTERSECTIONS NORTH RIVERSIDE DR & TWIN FLOWER DR 1 TRIANGLE LEAF DR & TWIN FLOWER DR 1 TRIANGLE LEAF DR & NINERBARK DR 1 KELLR HICKS RD & NINERBARK DR 1 TWIN FLOWER DR & ROUND LEAF DR 1 ROUND LEAF DR & SANDCHERRY DR 1 ROUND LEAF DR & TIANGLE LEAF DR 1 SANDCHERRY DR & TIMBERLAND BLVD 1 MID BLOCK TRIANGLE LEAF DR 1 TWINFLOWER DR 2 SANDCHERRY DR 1 CHANGE OF DIRECTIONS TRIANGLE LEAF DR 1 ROUND LEAF DR 2 SANDCHERRY DR 1 THE VILLAGES OF WOODLAND SPRINGS WEST, PHASE VII- SECTION- I PAGE III OF EXHIBIT C FT, WORTH, 0. IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of$100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following eight (8) intersections at a cost to the Developer of $800.00: Timberland Blvd & Sandcherry Dr Sandcherry Dr & Round Leaf Dr Twinflower Dr & Old Denton Rd Twinflower Dr & Triangle Leaf Dr Twinflower Dr & Round Leaf Dr Triangle Leaf Dr & Ninebark Dr Triangle Leaf Dr& Round Leaf Dr Keller Hicks Rd & Ninebark Dr Villages of Woodland Springs West, Phase VII, Section 1 CFA code: 2005108 August 17, 2005 0F�IC;ls,I � � h o W U o a g(oz G I Nbr z m N � N M 03AI3338 m s Z WzI w ��a a w tqLL � J 0 �i Z /bbd ,NOS o000 % p, LLE Sfl c�°O000� aao N� ❑ SS/ z 0° ��� --� o� � Jia 414 of !� US HOH38HlaON 3 1f13) O 4 p O F/1SIA H' ~ Q � Uw 0 Z75- _ o -j C 0 Lt w LU La I v l x i i I o M56H1 CL Y •. •- M.9 W O V O I 4- ' U ti 0 3 _S U t/O m t0 M O O O II ' Z (7 O ICU ,,,A- is t �c 4 ! i N 0 � _ o N w a rT� y rn C/� ? o cn m� o W uC Zp U Ikr+Till �n O A j� �a 0 0 o OlZ- Z% .TR. ;; h h h x � " w I _ O x a R Q � N b h N w N bN M1 A M1 b b N to h " N „ h p I ' WK M1 N �a Oo N I W V W 04 I Nr w Lriff Q X10 o amsardua xcaorr Y WC. I pW I a v�o J •W v> I W C� W Om Ov I� C W w H N Y Y U ) a Lw a-� � > O 303x O [Ocr m. WJ WW I mo cocV -_ —0 0 CL a Q Ln .-- N m N J LL ZnN� W W O o N} N> vm v> Q Q O W N 3 a 0 x o 0 aa: Cl- Ir co Irm U:m — a ' U O Z:) Io O M O W w Z EL J a z In Q V n ID WN n 5 � C W w 0 O a O 3 O p 3 m P 3 ! 1 p 1 1 S ' n 1 n I m i 1 b O M w I I+1 N M u N wo I 1 p �= n m A i m - 0 O m I�j, I 0 N I I I N 1p Val I N I \---N M I N I o NaAIXU MV83MN 1 Z a eGq ,p I Q I _ O J ^ I I m 11 I ' (OYUX NQ/NdQ?IO) HAM 3Q/SN3IN MYON I I �I 11 u u n p W W z z z �W J J w z U w z — F Q U H 31 Q Q� W fr_ J 0 --.) 11 O W J p H 0 3� a- rg cy- W 2 0 O o+ O J z Q li Io H z Q W In O In — .2 S c Lf) Fi ~ o d (1: d C� (n — O O O O _ m i a� M a� ft- ft- d CL Lx J to • Z U O O r � 17 cn O OL) F11 Lo w W (/7 O cn a W F- f .- rC r�� � 1�� o N vrJa N m CW o ��++ W LU WJ m o Z � W a Q o N O O f I 1 qq oI q 1 N N N N N h N N ^ n � ' - -- - --- -;;I:-!- --4 F :I entxa avert axnob 1 1 ' I po I I q h I P4 I O N I XHVUSWN �A1GQ I 1 I I 1 I �-----'-� II�I•I N U _f4l 1 (OYOU NQW30 aw) I� �O 30SN3AM IILNON 0 1 a F- MW _ OWE;-; c (7 -tr0 J F-W J N= F- W2Q o W W F-F- Z a Z 0 F- 3 WV) In -01 W-iz F- O o W J -10 _1O C) F- W = J O n-- W W CL O Z N W tr Z -J tr F- LL- V)W 4_ F- N O (.n W O to F-F- N o d F-N N H F- (L NZO O - _ O CL L?j Q fL W J u c