HomeMy WebLinkAboutContract 33256 a.
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No
WHEREAS, Risinger-Deer Creek, L.P., hereinafter called "Developer", desires to
make certain improvements to Deer Creek North Addition — Phase 1A, an addition to
the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth, is hereby incorporated into this Community Facilities Contract
as if copy herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and
obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
OFFICIAL
1 dw . ty
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damazes are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain(B-1) Attached; Street Lights and Signs (C) Attached.
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, Bl, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, stone drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $275,661.31.
SUMMARY OF
COST
Deer Creek North Addition Phase 1A
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $139,507.60 139,507.60
2. Storm Drainage $115,080.20 115,080.20
3. Street Lights $10,400.00 10,400.00
$
4. Street Name Signs $490.00 490.00
B. Engineering Design $
C. Construction Engineering
and Management by DOE $ $
4% 10,183.51 10,183.51
D. Materials Testingby DOE $
2% 5,091.76
TOTALS 275,661.31 $ - 275,661.31
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk.
2. Developer's column for Item C represents four percent(4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
4 CITY Z"'N Y
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Dev-loper
has executed this instrument in triplicate, at Fort Worth,Texas this theday of
1204. RECEIVED
Approval Recommended: If 11,
Transportation and Public Works
Department-z�—z/-
'
Robert Goode, P. E.
Director
City o rth
NO M&C REQUIRED Marc Ott
Assistant City Manager
ATTEST:
Marty Hendrix
City Secretary
Approv as to Form:
DEVELOPER
Assist i AttornBy: Risinger—Deer Creek, L.P.
a Texas Limited Partnership
By: DLH JR, Land Company
ATTEST: its General Partner
By: _ i]��n ,�
Corporate Secretary Erf. Hudgins, Jr.
President
PIMA kkid:105
CITY Oftly
200415310_lA_CFA REVISED FORMAT WITH 4%.doc FT. WORTH, TEX.
UNIT II: STORM DRAIN
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and install, including all appurtenant work,complete in place,the following items)
(D-No. refers to related items in the Part D Special Conditions:)
1. 36 LF 21-inch Storm drain pipe (Class III RCP)
(complete in place with trench excavation and
trench compaction),per linear foot
Forty Three Dollars
and Seventy Cents $43.70 $1,573.20
2. 1,246 LF 24" Storm drain pipe(Class III RCP)
(Complete in place with trench excavation and
trench compaction),per linear foot
Forty Eight Dollars
and Zero Cents $48.00 $59,808.00
3. 576 LF 30" Storm drain pipe(Class III RCP)
(complete in place)with trench excavation and
trench compaction,per linear foot
Sixty Two Dollars
and Zero Cents $62.00 $35,712.00
4. 2 EA 24"Type `A' sloped headwall (complete in
place), per each
One Thousand Three Hundred Dollars
and Zero Cents $1,300.00 $2,600.00
5. 3 EA 4' Square storm drain manhole, per each
Two Thousand Five Hundred Dollars
and Zero Cents
$2,500.00 $7,500.00
B-7
6. 2 EA 10-foot curb inlet(complete in place),per each
Two Thousand One Hundred Dollars
and Zero Cents $2,100.00 $4,200.00
7. 18 SY 12"— 18"rock rubble rip rap(no grout),per
square yard
Fifty Dollars
and Zero Cents $50.00 $900.00
8. 1,858 LF Trench backfill density testing,per linear foot
One Dollars
and Zero Cents $1.00 $1,858.00
9. 1,858 LF Trench Safety, per linear foot
Zero Dollars
and Fifty Cents $0.50 $929.00
TOTAL AMOUNT BID STORM DRAIN: $115,080.20
CIT 6ECVPUY
UNIT 11 PAVING
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and install,including all appurtenant work, complete in place,the following items)
(D No.refers to related items in the Part D Special Conditions:)
1. 5,046 SY 6-inch Lime stabilized subgrade,per square
yard
One Dollars
and Fi ft Cents $1.50 $7,569.00
2. 76 Ton Lime @ 30 lbs/s.y.,per ton
Ninety Two Dollars
and Zero Cents $92.00 $6,992.00
3. 4,914 SY 6-inch Concrete pavement(complete in
place)with silicone joint sealing and 7"curb),
per square yard
Twenty Dollars
and Forty Cents $20.40 $100,245.60
4. 669 SY 4-inch Sidewalks, per square yard
Twenty Nine Dollars
and Zero Cents $29.00 $19,401.00
5. 2 EA Handicap ramps,per each
Six Hundred Fifty Dollars
and Zero Cents $650.00 $1,300.00
B-9
6. 1 LS Deceleration Lane Pavement Striping
(TxDOT service road), complete in place,per
lump sum
Four Thousand Dollars $4,000.00 $4,000.00
and Zero Cents
TOTAL AMOUNT BID PAVING: $139,507.60
B-10
TOTAL AMOUNT BID WATER $ 9,694.45
TOTAL AMOUNT BID SEWER $ 7,046.00
TOTAL AMOUNT BID STORM DRAIN $ 115,080.20
TOTAL AMOUNT BID PAVING $ 139,507.60
GRAND TOTAL AMOUNT BID $ 271,328.25
B-11
PART B -PROPOSAL(Cont.)
After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver
an approved Surety Bond and such other bonds as required by the Contract Documents, for the
faithful performance of the Contract. The attached bid security, if required is to become the
property of the Developer.
The undersigned bidder certified that he has obtained at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978, and
that he has read and thoroughly understands all the requirements and conditions of those General
Documents and the specific Contract Documents and appurtenant plans.
The successful bidder shall be required to perform the work in accord with the following
publications, both of which are incorporated herein and made a part hereof for all purposes:
1. The General Contract Documents and General Specifications for Water
Department Projects dated January 1, 1978, which may be purchased from the Water
Department.
2. The Standard Specifications for Street and Storm Drain Construction which
may be purchased from the Department of Transportation & Public Works.
The undersigned assures that its employees and applicants for employment and those of any labor
organization, subcontractors, or employment agency in either furnishing or referring employee
applicants to the undersigned are not discriminated against as prohibited by the terms of City
Ordinance No. 7278 as amended by City Ordinance No. 7400.
The Bidder agrees to begin construction within 1 calendar days after issue of the work order,
and to complete the contract within 2�working days after beginning construction as set forth in the
written work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
A. The principal place of business of our company is in the State of
Nonresident bidders in the State of , our principal
place of business, are required to be percent lower than resident bidders
by state law. A copy of the statute is attached.
Non resident bidders in the State of ,our principal
place of business, are not required to underbid resident bidders.
B. The principal place of business of our company or our parent company or
majority owner is in the State of Texas.
B-12 FY. W"0.l°iIH� YEi1.
I (we) acknowledge receipt of the following addenda to the plans and specifications,.all of the
provisions and requirements of which have been taken into consideration on preparation of the
foregoing bid:
Addendum No. 1 (Initials) Addendum No. 3 (Initials)
Addendum No. 2 (Initials) Addendum No. 4 (Initials)
Respectfully submitted,
BurnsCo Construction, Inc.
Y�
Title
President
Address
4200 South Hulen Street
Suite 513
Fort Worth, Texas 76109
Telephone: 817-738-3200
(Seal)
Date:
B-13
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 2 EA $ 2, 600 $5, 200. 00
MID-BLOCK RESIDENTIAL 2 EA $ 2, 600 $5, 200.00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 600 $00, 000. 00
MID-BLOCK COLLECTOR 0 EA $ 2, 600 $00, 000.00
MID-BLOCK ARTERIAL 0 EA $ 3, 000 $00, 000.00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 3, 000 $00, 000.00
RELOCATE EXISTING LIGHT 0 EA $ 1, 650 $00, 000.00
Subtotal $10, 400. 00
City' s Cost $00, 000. 00
Developer' s Subtotal $10, 400. 00
4% Inspection fee $00,000.00
Project Total $10, 400. 00
Adjacent Developer' s Cost $00.000. 00
Developer' s Cost $10,400.00
CFA CODE #2006003
DEVELOPERS COST: $10,400.00
DEER CREEK NORTH ADDITION, PHASE IA
February 2, 2006
Fort Worth, Texas February 3, 2006
IV
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $245.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following two (2) intersections at a cost
to the Developer of$490.00:
S Freeway (1-35W) & Rustic View Rd
Iron Ridge Dr & Rustic View Rd
Deer Creek North Addition, Phase 1A
CFA code: 2006003 January 24, 2006
A Final Plat Of
Lot 1 of Block 11
Lot 1X & Lots 1 thru 5 of Block 12
Lots 1X & 2X of Block 12A
Lot 51 of Block 22
DEER CREEK NORTH ADDITION
situated in the
G. Hamilton Survey, Abstract No. 751,
and the
J. Sise Survey, Abstract No. 1434
being situated in the
City of Fort Worth, Tarrant County, Texas
10 LOTS 2.577 ACRES
THIS PLAT WAS PREPARED IN NOVEMBER, 2005 N
0
Uj
THIS PLAT FILED IN CABINET SLIDE NO. DATE: -------- o
' a
Off
WILLOW dP H pp
WILLOW
LLO q c WAN
Z
GREE y G co"'-
Z gERR`(B ,Ma�SpER 0RU
M
a ASHLEY PICE`�0 EVERMAN
v WILD �� c
RCH STER
I COLNSHIR f.pr'�aG SSE
YORKSHIR YIUR PALETTE
WOODHALL FORUM WAY
SO TT-i WORTH
7 SOUTHVIEW
3
C J
W G
Yz < < ZU z u PROJECT
Q
G O ¢ J 0
:2
a ¢ a v 0
RUTH ALE SITE
CD
RISINGER RISING
Z
I o
C'
J
K
m 0
K
➢ O U
r O YQ
( O
A
N N PARK COIN
CLARK
COAD
A
r
A a BLUE
>
> LUCK ALSUE
o AIRFIELD GARDEN ACRES
CITY LIMIT PLAZA
CITY w
U W OAK G
� w
W m
0 TIMOTHY
STELLA MAE
3
35W Z STUCKERT
Q
o W
1° CROCKETT
DEER
CROWLEY GREEK
op 6,974
GREE
VICINITY MAP
DEER CREEK NORTH ADDITION
RECEIVED PHASE IA
;AN rx N.T.S. �Dunawa
y —
AV Associates,L.P. '—d.t%- Wl cM
1501 M-w-G i, 100.Fol WgO�TX 76107
TN:(817)]]51171,1¢(617(135-7417
o �
� Q
v3
� W
0
00 0 �0
G � W
o,
�
o � � � ~
(n � W �
Lo i L,-
W
(Zu k) Li
vi CL
Oc u oI. F
AA
WNO to
i � C�d �
W
O
I I I I I I I n
_' --ad_i �-aa P 8'r -Qos t
d Q _
O U '� W
i CL `a�� W
CN
ad riQ..ggt;9 lI�P(
I
LAJ
VA
I II ili I I I I I ` i C�\1
aAirQ Mo7IoH $UOIIS -===
! - - - -- _
ORO
00
NW
~ m W �
WV
V-
CO C� W�
�I Z caCo
W Q.
0Q) k
� ,O
N ~ h
q �
V
, I ., � e I � I I c I r I •. I I �'1 �'Y
N^ -.4wa-4019 u0ji
i ! ! ! I ! - .c����• ' (ice! >,
r—r.
I I
- -- "M[ A10II0H 1110US - k
Z
LJN