Loading...
HomeMy WebLinkAboutOrdinance 22729-05-2017 ORDINANCE NO.22729-05-2017 AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE INTERGOVERNMENTAL CONTRIBUTION FUND IN THE AMOUNT OF $2,800,000.00, FROM AVAILABLE FUNDS, FOR THE PURPOSE OF FUNDING CONSTRUCTION OF THE TRAIL DRIVE EXTENSION PROJECT AND A DESIGN PROCUREMENT AGREEMENT WITH THE BASS FOUNDATION, LLC; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That in addition to those amounts allocated to the various City departments for Fiscal Year 2016-2017 in the Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the Intergovernmental Contribution Fund in the amount of$2,800,000.00,from available funds,for the purpose of funding Construction of the Trail Drive Extension Project and a Design Procurement Agreement With the Bass Foundation,LLC. SECTION 2. That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3. That this ordinance shall be cumulative of Ordinance No. 22393-09-2016 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4. This ordinance shall take effect upon adoption. APPROVED AS TO FORM AND LEGALITY: Douglas W.Black, Mar J. ay er, Sr.Assistant City Attorney City Wretary ADOPTED AND EFFECTIVE: May 16,2017 Ordinance No.22729-05-2017 Page 1 of 1 Trail Drive Extension-Phase I 10 s 1sQ_nrF _MQvarcer"o- 00, Q OLa = rtNI. aQn uzne F b i Mar 'mqdoQr __ I7rail Drive Ext Phase 414t3S r7ue 12/1s3/16 Wed1/3/ o�arceLrA�,y� !�n lamJuQl oa T_.Drive Extension Phase l 7 2 Notice to Proceed-Design 0 days rue 12/13/16 Tue 12/13/16 Notice Proceed-Design �',,. Topographical Survey 20 days Tue 12/13/16 Mon 1/30/17 l..ZIW Topographical Survey 3 Geotechnical 32 days Thu 1/19/17 Mon 2/20117 Geotechnical 4-- SUE 30 days Mon 1/9/17 Wed 218117 SUE 5 Conceptual(3D%)Design 42 days Mon 2/16/17 Mon 2/27/17 i Conceptual(30%)Design - _61 Prepare Conceptual(30%)Design Plans 28 days Mon 1/16/17 Mon 2/13/17 repare Conceptual(30%)Design Plans 7 Conceptual(305S)Design Plans Submittal 0 days Mon 2/13/17 Mon 2/13/17 Conceptual(30%)Design Plans Submittal Conceptual(30%)Design Review 14 days Mon 2/13/17 Mon 2/27/17 j, .Conceptual(30%)Design Review 9 Conceptual(30%)Design review meeting 0 days Mon 2/27/17 Mon 2/27/17 #,Conceptual(30%)Design review meeting 10 '�i ROW Clearing 150 days Mon 2/27/17 Thu 7/27/17 1 ROW Clearing a Prepare ROW Documents&Approval 60 days Mon 2/27/17 Fri 4/26/17 Prepare ROW Documents Be Approval 12 Franchise Utility Relocation 90 days Fri 4/26/17 Thu 7/27/17 No Franchise Utility Relocation 13 Prelim.Final(95%)P5&E 63 days Mon 2/27/17 Mon 5/1/17 �1 Prelim.Final(95%)PS&E 14 '�. Prepare Final(95%)PS&E 49 days Mon 2127117 Mon 4/17/17 0liiiiiiiiiiiiiililPrepam Final(95%)PS&E --15 Prelim.Final(95%)PS&E Submittal 0 days Mon 4/17/17 Mon 4/17/17 (M.Prelim.Final(95%)PS&E Submittal 16 Prelim.Final(95%)PS&E Review 14 days Mon 4/17/17 Mon 5/1/17 - Prelim.Final(95%)PS&E Review 17 j Prelim.Final(95%)PS&E Design review meeting 0 days Mon 5/1/17 Mon 5(1(17 i(N-,Prelim.Final(95%)PS&E Design review meeting 18 Final(100%1 PS&E 14 days Mon S/1/17 Mon 5115/17 r" Final(100%)PS&E 19 Prepare Final PS&E(100%) 14 days Mon 5/1/17 Mon 5/15/17 Prepare Final PS&E(100%) 20 Final PS&E Submittal 0 days Mon 5/15/17 Mon 5/15/17 Final PS&E Submittal 21 Advertisement and Bidding 21 days Mon 5/15117 Mon 615/17Advertisement and Bidding 22 !, Advertisement Period 21 days Mon 5/15/17 Mon 6/5/17 4i-A-dvend sement Period 23 Bid Opening-Contractor Selection 0 days Mon 6/5/17 Mon 6/5/17 Bid Opening-Contractor Selection 24 City Mayor&Counsel 60 days Mon 6/5/17 Fri 8/4/17 City Mayor&Counsel 25 Execute Contract Documents 60 days Mon 6/5/17 Fri 8/4/17 Execute Contract Documents 26 Pre Construction Activities 0 days Fri 8/4/17 Fri 8/4117 PreConstruction Activities 27Hold Pre-Construction Meeting 0 days Fri 8/4/17 Fri 8/4/17 Hold Pre-Construction Meeting 28 Construction Contract 180 daysFri 8/4/17 We 1/31/18 1 Construction Contract '..Project:Trail Drive Extension-Phase 1 Page 1 ` Date:Thu 1/26117 1 DUNAWAY M ry� Xy y�tp'WI y u n I 1 III lu r tr � I - r y i a 4r CUE511RyAE RD. � r •�Ar<�..11. •�v f r I " � V Exhof OFSLWAamws ` "� FORT WORT ��NAWAy TRAIL DRIVE EXTENSION s aso eoaer A—.wne+a0-w Ww T. 76107 reCe79915J111•F=17.35.9439 RPM REG51MT10N 1 W981 W January 4,2017 CFW-TRAIL DRIVE EXTENSION-OPCC 1/26/2017 DUNAWAY PROBABLE CONSTRUCTION COST SUMMARY FOR TRAIL DRIVE EXTENSION 1/26/2017 DESCRIPTION AMOUNT PHASE I -Trail Drive from Lancaster to Crestline & Van Zandt $ 3,846,479.43 PHASE IIA-Trail Drive from Crestline to University $ 1,540,508.31 PHASE 1 - 8" Waterline $ 220,563.75 Totall $ 5,607,551.49 Landscapign Portion Total $ 312,351.50 25% Contingency+Mobilization Included in Total Amounts Phase I-Construction from Lancaster to Crestline including Van Zandt Lane Demolition from Lancaster to Crestline Pulverize and overlay Lancaster from University to Foch Bridge Trail Drive&Van Zandt Roadway from Lancaster to Crestline Signalization at Trail Drive and Lancaster Sidewalks Storm improvements Landscaping,Hardscaping&Irrigation Lighting Phase IIA-Construction from Crestline to University Demolition Trail Drive Roadway from Crestline to University Signalization at Trail Drive and Lancaster Storm improvements Sidewalks Landscaping,Hardscaping&Irrigation Lighting 101`9 CFW-TRAIL DRIVE EXTENSION-OPCC 1/26/2017 DUNAWA y TRAIL DRIVE EXTENSION DEMOLITION FOR TRAIL DR.,EXISTING CRESTLINE AND VAN ZANDT LN. Phase I Phase IIA NO. ITEM UNIT PRICE CITY. AMOUNT CITY. AMOUNT 1 Remove Asphalt Pavement(Trail Drive,Crestline,&Van Zandt) Sy $ 6.75 #### $ 70,044.75 5449 $ 36,780.75 2 Remove Concrete Sidewalk Sy $ 9.00 472 $ 4,248.00 0 $ - 3 Remove Concrete Pavement(Crestline @ University) Sy $ 12.50 0 $ - 825 $ 10,312.50 4 Site Clearing Sy $ 4.50 #### $ 97,920.00 6100 $ 27,450.00 5 6"-12"Tree Removal EA $ 400.00 3 $ 1,200.00 6 $ 2,400.00 6 12"-18"Tree Removal EA $ 750.00 8 $ 6,000.00 5 $ 3,750.00 7 18"-24" Tree Removal EA $ 1,200.00 2 $ 2,400.00 1 $ 1,200.00 8 Remove Existing Retaining Wall LF $ 256.00 0 $ - $ - 9 Relocate Street Light Pole EA $ 1,100.00 3 $ 3,300.00 3 $ 3,300.00 10 Remove Misc.Traffic Items EA $ 15,500.00 1 $ 157500.00 1 $ 15,500.00 $200,612.75 $100,693.25 25% Contingency $ 50,153.19 $ 25,173.31 TOTAL= Fs-250,765,941 $125,866.56 2OF9 CFW-TRAIL DRIVE EXTENSION-OPCC 1/26/2017 AgQtr DUNAWA v 60'ROW TRAIL DRIVE EXTENSION PAVING,SINGING,PAVEMENT MARKING,LANDSCAPE,AND LIGHTING IMPROVEMENTS Phase I Phase IIA NO. ITEM UNIT PRICE QTY. AMOUNT CITY. AMOUNT 1 Unclassified Excavation CY $ 19.00 3,300.00 $ 62,700.00 2,300.00 $ 43,700.00 2 SWPPP>_1 acre EA $ 5,500.00 1.00 $ 5,500.00 1.00 $ 5,500.00 3 Traffic Control MO $ 3,500.00 6.00 $ 21,000.00 6.00 $ 21,000.00 4 Hydrated Lime TN $ 152.00 118.85 $ 18,065.81 93.00 $ 14,136.00 5 6"Lime Treatment SY $ 3.75 6,603.00 $ 24,761.25 5,166.00 $ 19,372.50 6 10"Conc Pvmt SY Is 56.00 6,183.00 $ 346,248.00 4,696.00 $ 262,976.00 7 Pulverize and Relay Asphalt SY $ 2.75 9,077.00 $ 24,961.75 - $ - 8 3"Asphalt Base Type B SY $ 18.00 9,077.00 $ 163,386.00 $ 9 3"Asphalt Pvmt Type D SY $ 19.00 9,077.00 $ 172,463.00 $ 10 Retaining Wall(285'long) CY $ 950.00 250.00 $ 237,500.00 $ 11 6"Concrete Driveway SF $ 7.00 2,550.00 $ 17,850.00 $ - 12 4"Conc Sidewalk(10'wide) SF $ 6.44 20,882.55 $ 134,483.62 21,060.00 $ 135,626.40 13 4"Pvmt Marking LF $ 2.00 8,700.00 $ 17,400.00 8,300.00 $ 16,600.00 14 Miscellaneous Pavement Markings EA $ 6,500.00 1.00 $ 6,500.00 1.00 $ 6,500.00 15 Barrier Free Ramp EA $ 1,600.00 14.00 $ 22,400.00 4.00 $ 6,400.00 16 Topsoil CY $ 12.00 950.00 $ 11,400.00 200.00 $ 2,400.00 17 Block Sod Placement SY $ 4.75 6,500.00 $ 30,875.00 1,200.00 $ 5,700.00 18 Landscaping EA $ 45,000.00 1.00 $ 45,000.00 1.00 $ 45,000.00 19 3"Cedar Elms Trees EA $ 590.00 60.00 $ 35,400.00 32.00 $ 18,880.00 20 Signing EA $ 5,500.00 1.00 $ 5,500.00 1.00 $ 5,500.00 21 CFW Antique Street Lights EA $ 6,500.00 33.00 $ 214,500.00 11.00 $ 71,500.00 22 Pull Boxes EA $ 550.00 33.00 $ 18,150.00 11.00 $ 6,050.00 23 4"Schedule 80 PVC LF $ 10.00 2,630.00 $ 26,300.00 2,100.00 $ 21,000.00 24 Irrigation System w/Control&Electrical Service EA $ 25,500.00 1.00 $ 25,500.00 1.00 $ 25,500.00 25 1 Pavement-Stamped Concrete SF 1$ 80.00 1,300.00 $ 104,000.00 1,100.00 $ 88,000.00 $ 1,791,844.43 $ 821,340.90 25% Contingency $ 447,961.11 $ 205,335.23 TOTAL= $ 2,239,805.54 $ 1,026,676.13 Landscaping $ 245,655.00 30F9 CFW-TRAIL DRIVE EXTENSION-OPCC 1/26/2017 �r DUNAWAY VAN ZANDT LANE PAVING, SINGING, PAVEMENT MARKING, LANDSCAPE,AND LIGHTING IMPROVEMENTS Phase I NO. ITEM UNIT PRICE QTY. AMOUNT 1 Unclassified Excavation Cy $ 19.00 2,216.67 $ 42,116.67 2 SWPPP>_1 acre LS $ 2,500.00 1.00 $ 2,500.00 3 Traffic Control MO $ 2,500.00 2.00 $ 5,000.00 4 lHydrated Lime TN 1 $ 152.00 58.79 $ 8,935.78 5 6" Lime Treatment Sy $ 4.00 3,266.00 $ 13,064.00 6 10"Conc Pvmt Sy $ 56.00 3,060.00 $ 171,360.00 7 6"Concrete Driveway SF $ 7.00 490.00 $ 3,430.00 8 4"Conc Sidewalk(10'wide) SF $ 3.20 8,200.00 $ 26,240.00 9 4"Pvmt Marking LF 1 $ 2.00 1,600.00 $ 3,200.00 10 Miscellaneous Pavement Markings LS $ 3,500.00 1.00 $ 3,500.00 11 Barrier Free Ramp EA $ 1,500.00 4.00 $ 6,000.00 12 Topsoil Cy $ 12.00 92.00 $ 1,104.00 13 Block Sod Placement Sy $ 4.75 550.00 $ 2,612.50 14 Landscaping LS $ 35,000.00 1.00 $ 35,000.00 15 3"Cedar Elms Trees EA $ 590.00 22.00 $ 12,980.00 16 Signing LS $ 4,200.00 1.00 $ 4,200.00 17 CFW Antique Street Lights EA $ 6,500.00 19.00 $ 123,500.00 18 Pull Boxes EA $ 550.00 19.00 $ 10,450.00 19 4"Schedule 80 PVC LF $ 10.00 1,710.00 $ 17,100.00 20 Irrigation System w/Control&Electrical Service LS $ 15,000.00 1.00 $ 15,000.00 $ 507,292.94 25% Contingency $ 126,823.24 TOTAL= $ 634,116.18 Landscaping $ 66,696.50 40F9 CFW-TRAIL DRIVE EXTENSION-OPCC 1/26/2017 i` A*c DUNAWAY FOCH TO LANCASTER ROAD RECONSTRUCTION PAVING, SIGNING, PAVEMENT MARKING IMPROVEMENTS Phase NO. ITEM QTY UNIT PRICE AMOUNT 1 Unclassified Excavation 1,000 CY $ 19.00 $ 19,000.00 2 Remove Concrete Pavement 511 SY $ 12.50 $ 6,387.50 3 Traffic Control 1 MO $ 3,500.00 $ 3,500.00 4 Hydrated Lime 6 TN $ 152.00 $ 894.67 5 6" Lime Treatment 327 SY $ 3.75 $ 1,226.25 6 10"Conc Pvmt 350 SY $ 56.00 $ 19,600.00 7 6" Concrete Driveway 350 SF $ 7.00 $ 2,450.00 8 4" Conc Sidewalk(10'wide) 1,660 SF $ 3.20 $ 5,312.00 9 4" Pvmt Marking 500 LF $ 2.00 $ 1,000.00 10 Miscellaneous Pavement Markings 1 LS $ 2,500.00 $ 2,500.00 11 Barrier Free Ramp 2 EA $ 1,600.00 $ 3,200.00 12 Signing 1 LS $ 1,500.00 $ 1,500.00 $ 66,570.42 25% Contingency $ 16,642.61 TOTAL= $ 83,213.03 5OF9 CFW-TRAIL DRIVE EXTENSION-OPCC 1/26/2017 DUNAWAY TRAIL DRIVE EXTENSION TRAFFIC-TRAIL DRIVE @ W. LANCASTER Phase I BID LIST ITEM NO. ITEM QTY UNIT PRICE AMOUNT 2605.0111 Furnish/Install Elec Sery Pedestal 1 EA $ 6,500.00 $ 6,500.00 2605.3014 2"CONDT RM(Riser) 20 LF $ 531.00 $ 10,620.00 2605.3015 2"CONDT PVC SCH 80(T) 50 LF $ 10.00 $ 500.00 2605.3025 3"CONDT PVC SCH 80(T) 100 LF $ 12.00 $ 1,200.00 2605.3026 3"CONDT PVC SCH 80(B) 400 LF $ 19.00 $ 7,600.00 3441.1001 3-Sect Signal Head Assmbly 8 EA $ 1,000.00 $ 8,000.00 3441.1002 4-Sect Signal Head Assmbly 2 EA $ 1,180.00 $ 2,360.00 3441.1011 Ped Signal Head Assmbly 8 EA $ 1,500.00 $ 12,000.00 3441.1021 2"Ped Push BTN Station w/Sign 8 EA $ 1,400.00 $ 11,200.00 3441.1220 Furnish/Install Model 711 Preemption Detector 4 EA $ 1,900.00 $ 7,600.00 3441.1224 Furnish/Install Preemption Cable 400 LF $ 8.00 $ 3,200.00 3441.1230 Furnish/Install Radar Presence Detection Device 4 EA $ 7,000.00 $ 28,000.00 3441.1234 Furnish/Install Radar Cable 400 LF $ 10.00 $ 4,000.00 3441.1236 Furnish/Install Radar Detector Back Plate 4 1 LF $ 4,200.00 $ 4,200.00 3441.1315 20/C 14 AWG Multi-Conductor Cable 500 LF $ 5.00 $ 2,500.00 3441.1317 6/C 16 AWG Multi-Conductor Cable 250 LF $ 3.00 $ 750.00 3441.1318 8/C 16 AWG Multi-Conductor Cable 500 LF $ 4.00 $ 2,000.00 3441.1408 NO 6 Insulated Elec Condr 250 LF $ 2.00 $ 500.00 3441.1409 jND 8 Insulated Elec Condr 500 LF $ 1.50 $ 750.00 3441.1414 NO 8 Bare Elec Condr 150 LF $ 1.50 $ 225.00 3441.1503 Ground Box Type D,w/Apron 5 EA $ 650.00 $ 3,250.00 3441.1603 Furnish/Install 10'-14'Ped Pole Assmbly 4 EA $ 1,500.00 $ 6,000.00 3441.1611 Furnish/Install Type 41 Signal Pole 2 EA $ 15,000.00 $ 30,000.00 3441.1613 Furnish/Install Type 43 Signal Pole 2 EA $ 4,000.00 $ 8,000.00 3441.1614 Furnish/Install Type 44 Signal Pole 0 EA $ - $ - 3441.1620 Install Type 44 Signal Pole 0 EA $ - $ - 3441.1623 Furnish/Install Mast Arm 16'-36' 2 EA $ 5,500.00 $ 11,000.00 3441.1624 Furnish/Install Mast Arm 40'-48' 2 EA $ 8,000.00 $ 16,000.00 3441.1627 Install Mast Arm 40'-48' 0 EA $ - $ - 3441.1701 TY 1 Signal Foundation 4 EA $ 1,000.00 $ 4,000.00 3441.1703 TY 3 Signal Foundation 2 EA $ 3,000.00 $ 6,000.00 3441.1704 TY 4 Signal Foundation 2 EA $ 3,300.00 $ 6,600.00 3441.4001 Furnish/Install Alum Sign Mast Arm Mount 4 EA $ 532.00 $ 2,128.00 9999.0000 3-Sec Signal Head Ventilated Backplate 8 NS $ 300.00 $ 2,400.00 9999.0000 4-Sec Signal Head Ventilated Backplate 2 NS $ 324.00 $ 648.00 9999.0000 4/C 16 AWG Multi-Conductor Cable 200 NS $ 2.30 $ 460.00 $ 210,191.00 25% Contingency $ 52,547.75 TOTAL= $ 262,738.75 6OF9 1/26/2017 DUNAWAY TRAIL DRIVE EXTENSION TRAFFIC-TRAIL DRIVE @ UNIVERSITY Phase IIA BID LIST ITEM NO. ITEM CITY UNIT PRICE AMOUNT 2605.0111 Furnish/Install Elec Sery Pedestal 1 EA $ 6,500.00 $ 6,500.00 2605.3014 2"CONDT RM(Riser) 20 LF $ 531.00 $ 10,620.00 2605.3015 2"CONDT PVC SCH 80(T) 50 LF $ 10.00 $ 500.00 2605.3025 3"CONDT PVC SCH 80(T) 150 LF $ 12.00 $ 1,800.00 2605.3026 3"CONDT PVC SCH 80(B) 500 LF $ 19.00 $ 9,500.00 3441.1001 3-Sect Signal Head Assmbly 4 EA $ 1,000.00 $ 4,000.00 3441.1002 4-Sect Signal Head Assmbly 2 EA $ 1,180.00 $ 2,360.00 3441.1011 Ped Signal Head Assmbly 8 EA $ 1,500.00 $ 12,000.00 3441.1021 2" Ped Push BTN Station w/Sign 8 EA $ 1,400.00 $ 11,200.00 3441.1220 Furnish/Install Model 711 Preemption Detector 4 EA $ 1,900.00 $ 7,600.00 3441.1224 Furnish/Install Preemption Cable 400 LF $ 8.00 $ 3,200.00 3441.1230 Furnish/Install Radar Presence Detection Device 1 EA j$ 7,000.00 $ 7,000.00 3441.1234 Furnish/Install Radar Cable 250 LF $ 10.00 $ 2,500.00 3441.1236 Furnish/Install Radar Detector Back Plate 4 0 LF $ - $ - 3441.1315 20/C 14 AWG Multi-Conductor Cable 800 LF $ 5.00 $ 4,000.00 3441.1317 6/C 16 AWG Multi-Conductor Cable 350 LF $ 3.00 $ 1,050.00 3441.1318 8/C 16 AWG Multi-Conductor Cable 800 LF $ 3.00 $ 2,400.00 3441.1408 NO 6 Insulated Elec Condr 500 LF $ 1.55 $ 775.00 3441.1409 NO 8 Insulated Elec Condr 1000 LF $ 1.50 $ 1,500.00 3441.1414 NO 8 Bare Elec Condr 350 LF $ 1.25 $ 437.50 3441.1503 Ground Box Type D,w/Apron 6 EA $ 650.00 $ 3,900.00 3441.1603 Furnish/Install 10'-14' Ped Pole Assmbly 4 EA $ 1,500.00 $ 6,000.00 3441.1611 Furnish/Install Type 41 Signal Pole 0 EA $ - $ - 3441.1613 Furnish/Install Type 43 Signal Pole 0 EA $ - $ - 3441.1614 Furnish/Install Type 44 Signal Pole 4 EA $ 15,000.00 $ 60,000.00 3441.1620 Install Type 44 Signal Pole 2 EA $ 886.00 $ 1,772.00 3441.1623 Furnish/Install Mast Arm 16'-36' 0 EA $ - $ - 3441.1624 Furnish/Install Mast Arm 40'-48' 2 EA $ 8,000.00 $ 16,000.00 3441.1627 Install Mast Arm 40'-48' 2 EA $ 1,700.00 $ 3,400.00 3441.1701 TY 1 Signal Foundation 4 EA $ 1,000.00 $ 4,000.00 3441.1703 TY 3 Signal Foundation 0 EA $ 500.00 $ - 3441.1704 TY 4 Signal Foundation 4 EA $ 3,310.00 $ 13,240.00 3441.4001 Furnish/install Alum Sign Mast Arm Mount 4 EA $ 531.00 $ 2,124.00 9999.0000 3-Sec Signal Head Ventilated Backplate 4 NS $ 300.00 $ 1,200.00 9999.0000 4-Sec Signal Head Ventilated Backplate 2 NS $ 325.00 $ 650.00 9999.0000 4/C 16 AWG Multi-Conductor Cable 400 NS $ 2.00 $ 800.00 $ 202,028.50 25% Contingency $ 50,507.13 TOTAL= $ 252,535.63 7OF9 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 5/16/2017 - Ordinance No. 22729-05-2017 & Resolution No. 4783-05-2017 DATE: Tuesday, May 16, 2017 REFERENCE NO.: C-28245 LOG NAME: 20TRAIL DRIVE EXTENSION SUBJECT: Authorize Execution of an Interlocal Agreement with Tarrant County in an Amount Not to Exceed $2,800,000.00 for Construction of the Trail Drive Extension Project, Authorize Execution of a Design Procurement Agreement With the Bass Foundation, LLC, in an Amount Not to Exceed $1,255,000.00 for the Design of Trail Drive from University Drive to Lancaster Avenue, Adopt Resolution in Support of Future Funding of the Trail Drive Extension Project and Adopt Appropriation Ordinance (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the execution of an Interlocal Agreement with Tarrant County in an amount not to exceed $2,800,000.00 for Construction of the Trail Drive Extension Project; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Intergovernmental Contribution Fund, Trail Drive Extension Project, in the amount of$2,800,000.00; 3. Authorize the reallocation of appropriations and receipts from the General Capital Projects Fund, Facilities Renovation and Expansion Programmable Project, to the Trail Drive Extension Project in the amount of$1,382,552.00 4. Authorize the execution of a Design Procurement Agreement with the Bass Foundation, LLC, in an amount not to exceed $1,255,000.00 for the design of Trail Drive from Lancaster to University Drive (City Project No. 100742). DISCUSSION: The City Council has been previously briefed on the development of the Trail Drive Extension Project and the partnership between the City of Fort Worth, Tarrant County, the Fort Worth Independent School District (FWISD) and the Bass Foundation, LLC, in Informal Reports No. 9722 and No. 9832. FWISD has dedicated 60 feet of right-of-way along the corridor (M&C L-18567), its contribution to the project is estimated at $1,742,000.00. The Bass Foundation agreed to advance the design of the project under the terms of a Design Procurement Agreement. This Agreement contemplates the City's reimbursement of the Bass Foundation in an amount not to exceed $1,255,000.00 from revenues to be received from the sale of 350 Belknap. The reimbursement would be limited to design expenses incurred by the Bass Foundation until the contract oversight is transferred to the City, at which point the City would pay any remaining costs directly from these funds. Staff considers this amount to be fair and reasonable for the scope of design services proposed to be performed. Upon reimbursement, it is the intent of the Bass Foundation to invest a portion Logname: 20TRAIL DRIVE EXTENSION Page I of 3 of these funds in improved trails, parking and landscaping around the Van Zandt Cottage. Staff from Tarrant County and the City have agreed to terms in an Interlocal Agreement that will provide for reimbursement by the County of up to $2,800,000.00 in construction costs in support of the project. The County approved their funding commitment on May 9, 2016. The total project budget estimate is $7.575M with a total construction cost of$6,000,000.00 including $5,607,552.00 as the estimate of probable cost plus $350,000.00 in staff related project management, inspection and materials testing. The City's participation will be supported through the sale of $3,000,000.00 in tax notes as presented to the City Council on April 12, 2017. A separate but necessary project to enable the construction of the new road segment is the demolition and relocation of the current Parks and Recreation maintenance functions operating at the Crestline facility. This relocation will result in improved visibility and access to the historic Van Zandt Cottage and increased functional parkland in Trinity Park of approximately 9 acres. The estimated cost of this relocation is $10 million and will replace obsolete facilities. Although this relocation would occur in the near future, the overall improvement of maintenance facilities for Parks and Recreation at James Avenue is proposed as a second phase at an estimated cost of$9 million in the 2018 bond project. It is anticipated that existing facilities will be demolished as early as October 2017 to make way for the new road. Existing staff and equipment will be temporarily relocated to other City property while the new facility is built. An M&C authorizing the sale of the tax notes for these projects is included as a separate action item on this City Council agenda. Design of the Trail Drive Extension project is scheduled for completion by Summer of 2017. Construction is expected to begin in February 2018 and conclude by Fall of 2018. The table below lists the planned expenditures and revenues: Project Components F— Cost Revenue Design Procurement $1,225,000.00 $ 0.00 greement Construction $5,607,552.00 $ 0.00 Project Delivery Support —F� 350,000.00 $ 0.00 arrant County Funding $ 0.00 $2,800,000.00 City Pay-Go-Funding 10.00 1$1,382,552.00 City Tax $3,000,000.00 No� nticipated tess TOTAL $7,182,552.00 7,182,552.00 This project is located in COUNCIL DISTRICT 9. This contract will be with a governmental entity, state agency or public institution of higher education: Tarrant County. FISCAL INFORMATION /CERTIFICATION: The Director of Finance certifies that funds are available in the General Capital Projects Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the Intergovernmental Contribution Fund. Logname: 20TRAIL DRIVE EXTENSION Page 2 of 3 FUND IDENTIFIERS (FIDs): TO Fund Department ccoun Proe-c-tj �Progrmactivity Budget Reference # moun ID D Year (Chartfield 4 FROM Fund Department ccounj Project Program ctivity Budget Reference # moul ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by Jay Chapa (5804) Originating Department Head: Douglas Wiersig (7801) Martin Phillips (8447) Additional Information Contact: Bryan Beck (7909) Logname: 20TRAIL DRIVE EXTENSION Page 3 of 3