HomeMy WebLinkAboutContract 33316 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary ���4COUNTY OF TARRANT § Contract No. WHEREAS, Chadwick Farms, Ltd., hereinafter called "Developer", desires to make certain improvements to Chadwick Farms, Cleveland-Gibbs Road & Elizabeth Creek Bridge, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Marc Footlik, its duly authorized officer, and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II,paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. COMMUNITY FACILITIES AGREEMENT S v*�, , ,�pp � CHADWICK FARMS,Cleveland-Gibbs Road and Elizabeth Creek Bride ar' \l C17u} 4b Page 1 of 5 R. WORK TO. F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). k Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct the proposed improvements as shown on the following exhibits which are attached hereto and incorporated herein for all intents and purposes: COMMUNITY FACILITIES AGREEMENT CHADWICK FARMS,Cleveland-Gibbs Road and Elizabeth Creek Bridge Page 2 of 5 Q,e Exhibit B Paving Exhibit B-1 Storm Drains Exhibit C Street Lights and Signs M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City-€ef its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $1,239,061.80. C. Cleveland-Gibbs Road is located within the jurisdictions of the Cities of Fort Worth and Northlake. Payment of City of Fort Worth participation shall not become due and payable to the Developer until the entire length of Cleveland-Gibbs Road from Litsey Road to S.H. 114 has been completed and accepted by both the City of Fort Worth and the City of Northlake. COMMUNITY FACILITIES AGREEMENT 15��b{YY � CHADWICK FARMS,Cleveland-Gibbs Road and Elizabeth Creek Bridge Of bit Page 3 of 5 FYI SUMMARY OF COST Chadwick Farms Cleveland Gibbs Road Item Developer City Cost Total Cost Cost A. Construction 1. Streets $255,263.85 $ 62,010.00 $ 317,273.85 Bridge Improvements $0.00 $' 733,076.00 $ 733,076.00 2. Storm Drainage $116,025.80 $ 116,025.80 3. Street Lights $13,750.00 $ 13,750.00 4. Street Name Signs $100.00 $ 100.00 B. Engineering Design 6% - $ 43,984.56 $ 43,984.56 C. Construction Engineering $ - and Mana ement b DOE 4% $ 14,851.59 $ 14,851.59 TOTALS $399,991.24 $ 839,070.56 $ 1,239,061.80 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 2. Developer's column for Item C represents four percent(4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. COMMUNITY FACILITIES AGREEMENT CHADWICK FARMS,Cleveland-Gibbs Road and EIizabeth Creek Bridge Page 4 of 5 4DNhExecuted this�ay of , 2004 Approval Recommended: CITY OF FORT WORTH Z By: ;� Robert Goode, P. E., Director Marc A. Ott Transportation and Public Works Assistant City Manager ATTEST: Approv to Form and Le t Marty Hendrix ssist C' Attorney City Secretary Attest: DEVELOPER Chadwick Farms, Ltd. By: C adwick Development,LLC B Contra .t AuthorizatioA Marc Footlik, President Date COMMUNITY FACILITIES AGREEMENT CHADWICK FARMS,Cleveland-Gibbs Road and Elizabeth Creek Bridge Ci SVrS1 HT Hy Page 5 of 5 1y' WOPYR) M. G®®DwIN CIVIL ENGINEERS PLANNERS-r SURVEYORS ARSHA LLL ENGINEER'S OPINION OF PROBABLE COST Date: 1/6/2005 Project:Chadwick Farms Client:Chadwick Farms,LTD. Cleveland-Gibbs Road Job No:9933 Location:Fort Worth,Texas Page: 1 of 3 ITEM UNIT TOTAL No. DESCRIPTION UNIT QUANTITY PRICE COST Paving Facilities 1. 'l 8"Concrete Pavement S.Y. 4,521 $25.00 $113,025.00 ' 2. ✓ Lime Stabilized Subgrade S.Y. 4,942 $2.25 $11,119.50— 3. -t- Hydrated Lime Ton 67 $105.00 $7,035.00 4 4. 8"Concrete Pavement* S.Y. 2,160 $25.00 $54,000.00 i (T/PW Participation) 5. ✓Lime Stabilized Subgrade* S.Y. 2,160 $2.25 $4,860.00 —L, (T/PW Participation) 6. Hydrated Lime Ton 30 $105.00 $3,150.00 (T/PW Participation) 7. ✓ 75'x 234'Concrete Beam L.S. 1 $733,076.00 $733,076.00 - Span Bridge** 8. ✓ Barrier Free Ramps Ea. 2 $650.00 $1,300.00 9. Barricade&Header L.F. 41 $30.00 $1,230.00 - 10. ✓4'Concrete Sidewalk L.F. 1,862 $14.00 $26,068.00 Paving Subtotal $954,863.50 10%Contingency $95,486.35 Paving Subtotal $1,050,349.85 *Transportation/Public Works Cost Participation is based up on the annexation agreement for Chadwick Farms,which stipulates the CFA policy at the time of annexation will be utilized for said development. Therefore,T/PW Cost Participation for Cleveland-Gibbs Road Improvments for turn lanes,median breaks,first 7 feet of concrete paving width,and subgrade totals$62,010.00 using the City of Fort Worth established unit prices. **Transportation/Public Works Cost Participation is based up on the annexation agreement for Chadwick Farms,which stipulates the CFA policy at the time of annexation will be utilized for said development. Therefore,T/PW Cost Participation for Cleveland-Gibbs Road Bridge Improvements shall be 100% of the cost based on the size of the drainage basin for Elizabeth Creek. The cost of the bridge includes all components to complete construction including,but not limited to abutments,paving slab,erosion control,aprons,railing,decking,bracing,and beams. T/PW's Cost Participation for Elizabeth Creek Bridge totals$733,076.00. Total City of Fort Worth T/PW Cost Participation=$795,086.00 This Engineer's opinion of probable construction cost is made on the basis of the Engineer's experience and best judgement as a design professional. It must be recognized that any evaluation of work to be performed to construct this project must by necessity be speculative in nature until completion of its actual detailed design. In addition the engineer has no control over the cost of labor material or services to be furnished by others or over market conditions. Accordingly Goodwin &Marshall, Inc. can not guarante , that actual costs will not vary from the opinions expressed herein. QJ � j �� 2405 MUSTANG DRIVE/GRAPEVINE,TX 76051 /817-329-4373/817-329-445 1 3131 EAST CAMELBACK,SUITE 200/PHOENIX,AZ 85016/602-606-5760/602-60 -5*f9� ENGINEER'S OPINION OF PROBABLE COST Date: 1/6/2005 Project: Chadwick Farms Client: Chadwick Farms, LTD. Cleveland-Gibbs Road Job No: 9933 Location: Fort Worth, Texas Page: 2 of 3 ITEM UNIT TOTAL No. DESCRIPTION UNIT QUANTITY PRICE COST Storm Drain Facilities 1. 10'Depressed Curb Inlets Ea. 4 $2,300.00 $9,200.00 2. 21" R.C.P. L.F. 148 $38.00 $5,624.00 3. 24" R.C.P. L.F. 168 $46.00 $7,728.00 4. 27" R.C.P. L.F. 870 $52.00 $45,240.00 5. 27" Sloped End Headwall Ea. 1 $2,000.00 $2,000.00 6. 4'x 4'Junction Box Ea. 3 $2,500.00 $7,500.00 7. Gabion Wall S.Y. 216 $125.00 $27,000.00 8. Trench Safety L.F. 1,186 $1.00 $1,186.00 Storm Drain Subtotal $105,478.00 10% Contingency $10,547.80 Storm Drain Subtotal $116,025.80 This Engineer's opinion of probable construction cost is made on the basis of the Engineer's experience and best judgement as a design professional. It must be recognized that any evaluation of work to be performed to construct this project must by necessity be speculative in nature until completion of its actual detailed design. In addition the engineer has no control over the cost of labor material or services to be furnished by others or over market conditions. Accordingly Goodwin & Marshall, Inc. can not guarantee that actual costs will not vary from the opinions expressed herein. I . STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK RESIDENTIAL 0 EA $ 2, 000 $0, 000. 00 CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000. 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000. 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 .00 MID-BLOCK ARTERIAL MEDIAN 5 EA $ 2, 500 $12, 500. 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000. 00 Subtotal $12,500.00 City's Cost $00 ,000.00 Developer's Subtotal $12,500 .00 10% Contingencies $1,250 .00 Project Total $13,750.00 Adjacent Developer's Cost $0,000.00 Developer's Cost $13,750.00 2% Inspection Fee $0,00.00 CFA CODE #2004119 DEVELOPER' S COST: $13,750.00 CHADWICK FARMS-CLEVELAND GIBBS RD August 31, 2004 Fort Worth, Texas August 29, 2005 PAGE I OF Exhibit C II. STREET LIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works. 3. The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. the developer agrees to pay the city the amount shown below prior to the City starting it's design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors. 5. The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER'S COST: $13,750.00 CHADWICK FARMS-CLEVELAND GIBBS RD August 31, 2004 FORT WORTH, TEXAS CFA CODE #2004119 Page II of Exhibit C III. "STREETLIGHTS" MID-BLOCK ARTERIAL CLEVELAND GIBBS RD 5 (DOUBLE ARMS) CHADWICK FARMS - CLEVELAND GIBBS RD Page III of Exhibit C Iv STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following one (1) intersections at a cost to the Developer of$100.00: Cleveland Gibbs Rd & Ashmore Av Chadwick Farms — Cleveland Gibbs Rd CFA code: 2004119 August 20, 2004 Ff. zWONITH, TFK. Texas Motor Speedway 0 0� PCO 35W 114 GAF Northlake r Fj Cit Limits of fh Forth Worth P City limits El zabetht �emetery S7*i•L'li C.? � I r SUEr C� e ` LITSEY CHADWICK FARMS , VICINITY MAP N.T.S T) 0 0 N 0 N CLEVELAND-DDD D D D° O °� DD 0 CC;DADWICC K FARMS L 0 O ELIZABETH CREEK BRIDGE TO CITY DIS I FORT WORTH/NORTHLAKE CITY LIMITS v� v m v LKi C 11 11 11d11.t' E V CITY OF FORT WDRTD9 TEXAS U N C O N U OWNWDEVELOPER: PREPARED BY: Chadwick Farms, Ltd. GOODWIN! 0 5300 Town&Country Blvd.,Ste 260 MARSHALL Y 0 Frisco,Texas 75034 CWL a cm,EEJVs-PLANNRS-SURVEYORS 24O:S Mumnp Drlw,OrepmArr,Taxes 78061 j Metro(BIT)3784373 MARCH, 2004 tP W N � i 1�?r. •¢ra if iAl` ill IlHill Z ., Q I lI[li J i;in!; lii!i'i N LIZ D D— — W L H C7 � "i sllllll 5 UcoZ WLLJ Z yyCiii�� 4!i!:::: lkC Z L � m �fti jiijii O W W N W Z r Q�d wd d ifYii(ti N � N Y U W U U w / lV1tVi•;411'• d O i;,n., �,1i}';Cfli r D 00 Z iii 11!i i i i��V.I:•,;l': U Q N Q ;;V•• � LTJ O Z Z Z M W W WCL 0 N (n x CLO '�r\:::1•„ dr- - �- N d Z {';iii ;t1j it�`�I.IIIIII! '�"1 II�IIIIIII \� + tliillljl v :: o a O p o m N N ! C � � O = N j� U F1 2 0 U p p J a CO < N V n O v- o Z I N o � J3 a, Illlllllj � dllllll� CL \\ IIIIIIIII a '';'illi 'PIII ZLLJJ ;; cr- •ply?'1 �`•,1�;i;i; g O � O ...........�...... `•1iti8`• Cl. d cr- CL Cl. LLJ LLJ W ham— •\��•\J `•z::/i, J ;.,4efkp. i� ham— a r I�,II!IIIIII!�'r� | j . 7) . k @ P . + « ] \ \ § ! — \// / 5ru CL / '\ § | 0 In z , ± f ray 3 % iJ '� 4| Kw ) 2 � G ( W i \§ HI i }/ ; �! n �! 3 I' o i m !fill ( 14 '1111, § ) x CL q . � ,MM ) p« \ r � \ U z / \ _ ■ \ �! ! k/ ) $ § y� / / \ i ■ � Ink" . _ LLI ; \ \\ §� o = LH j } } �yg � � � Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication NNUu,� �»� COUNCIL ACTION: Approved on 4/12/2005 DATE: Tuesday, April 12, 2005 LOG NAME: 20CHDWK C/G RD. REFERENCE NO.: C-20655 SUBJECT: Authorize Execution of Community Facilities Agreement with Chadwick Farms, Ltd. for the Installation of Community Facilities to Serve Chadwick Farms RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a Community Facilities Agreement (CFA) with Chadwick Farms, Ltd. for the installation of community facilities to serve Chadwick Farms. DISCUSSION: Chadwick Farms, Ltd., the developer of a portion of Chadwick Farms, has executed a proposed contract for the installation of community facilities to serve the single family (783 lot) development located in north Fort Worth, bounded on the north by S.H. 114 and on the south by Litsey Road. This development is located in Council District 2. The proposed CFA for installation of the north/south thoroughfare (Cleveland Gibbs Road), reflects the Annexation Service Agreement corresponding to Ordinance No. 14387, approved by City Council on November 14, 2000, (M&C PZ-2243). That service agreement specifies that the City will reimburse the developer for pavement oversizing of the north/south thoroughfare from Litsey Road to S.H. 114 and for construction of drainage facilities as required according to the "Installation Policy of Community Facilities" in effect in November 2000. The developer is installing Cleveland Gibbs Road from the northern boundary of Chadwick Farms, Section II to S.H. 114. However, the subject CFA includes installation of the thoroughfare only to the Fort Worth/Northlake city limit line. The Fort Worth portion of Cleveland Gibbs Road includes a span bridge over Elizabeth Creek. The estimated costs of community facilities for Chadwick Farms from the northern boundary of Section II to the City limit line are as follows: Infrastructure Category Developer city Total Paving $255,263.85 $62,010.00 $317,273.85 Bridge Improvements $0.00 $733,076.00 $733,076.00 Storm Drain $116,025.80 $0.00 $116,025.80 Street Lights $13,750.00 $0.00 $13,750.00 Street Name Signs $100.00 $0.00 $100.00 Engineering Design (6%) $0.00 $43,984.56 $43,984.56 Inspection $14,851.59 $0.00 $14,851.59 Total $399,991.24 $839,070.56 $1,239,061.80 http://www.cfwnet.org/council_packet/Reports/mc_print.asp 4/17/2006 Page 2 of 2 Execution of this CFA would entail the allocation of City funds in the amount of$839,070.56 from the 2004 Bond Program Standard CFA Obligation funds. Funds for this project were included in the 2004 CIP. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the New Development Fund. TO Fund/Account/Centers FROM Fund/Account/Centers C202 541200 202760022583 $795,086.00 C202 531200 202760022583 $43,984.56 Submitted for City Manager's Office by: Marc Ott (8476) Originating Department Head: Robert Goode (7804) Additional Information Contact: Katherine Mehl (7918) http://www.cfwnet.org/council_packet/Reports/mc_print.asp 4/17/2006