HomeMy WebLinkAboutContract 33324 CITY SECRETARY CONTRACT NO. Amendment No. 1 STATE OF TEXAS § CITY SECRETARY NO. 31492 (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Baird, Hampton and Brown, Inc. (Engineer) made and entered into City Secretary Contract No. 31492 (the Contract) which was authorized by the City Council by M&C C-20513; and WHEREAS, the Contract involves engineering services for the following project: 2004 CIP Minor Drainage Projects — Contract A — Minor Projects A-1 through A-9 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly-authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services and provide additional contract time as specified in a proposal letter dated December 13th, 2005, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $20,477. The additional contract time for these services is 30 working days. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $ 86,231 + $ 20,477 = $ 106,708. All other provisions of the Contract, essly amended herein, shall remain in full force and effect. va��� ] , � �i CITY � '� � [[ryryee?7 y ��I1I7�!'l(1�r „/` NA - Contract Amendment No. 1 Page 1 of 2 �T:Tft� Executed on this the day of , 2006, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVE /) A. Douglas Rademaker, P.E. Ma A. O t Director, Department of Assistant City Manager Engineering Baird, Hampton and Brown (BHB) Engineering and Surveying ENGINEER ATTEST: Marty Hend , City Secretary By: ngl� Konstaine B �NO M&C REQUIRED Vice Presesident APPROVED AS TO FORM AND LEGALITY: ry Amy Ra y AssistanirCity Attorney Contract Amendment No. 1MR Page 2 of 2 Baird, Hampton & Brown, Inc. o 0 o Engineering & Surveying December 13, 2005 Ms.Joseph Bergeron PE, Project Manager Department of Engineering City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Tel(817)871-7949, Fax 871-7854 RE: 104 CIP Minor Drainage Projects—Contract A Al. Ha rlanwood-Overton Park West SD A2.Woodway-Wedgway SD Extension A3. 2008 Teakwood Trace SD Extension A4. Kensington SD Extension A5. Chapin-Guadalupe SD Extension A6. Monticello Park SD Extension A7. E. Lancaster-Dallas SD Extension—Deleted from Scope A8. 3436 Clayton Road E. SD Extension A9. 3804 So. Timberline Drive A10. 2709 Fairway Drive City Project No 00093, BHB No 04.129.00 Mr. Bergeron: We are pleased to have been selected to assist the City of Fort Worth with the above referenced project; submitted herewith, is our request for a contract amendment to address the additional scope of work associated with the inclusion of Project A-10, 2709 Fairway Drive and other miscellaneous items. The estimated construction cost for this additional scope of work has been estimated at $76,000; we propose an engineering fee, which includes basic and additional services, of$20,477. Additional services consist of topographic (design) surveys, drainage analysis, erosion control plan, storm water pollution prevention plan, and other miscellaneous items. We propose to continue to utilize the services of an M/WBE surveying firm to assist us with this project, and thus provide 43% M/WBE participation, on this contract modification. Thank you, BHB Engineering &Surveying Konstantine Bakintas, PE Vice President Enclosure e:\2004.000.000\2004.129.000\docs\contract\amendment proposal.doc /t, a, Bpp7 rt,:rGnnpq]�g�6LLRn�:io 1�U 6300 Ridglea Place, Ste 700 Fort Worth,Texas 76116 Tel: 817-338-1277 Fax:817-338-9245 E-Mail: mail@bhbinc.com Baird, Hampton & Brown, Inc. Engineering & Surveying Proposal for Contract Modification Additional Scope of Work 1.Add Storm Drain Extension Project(A-10)at 2709 Fairway Drive 2. Modify Plans for Reconstruction of 29th Street Culverts at Tony's Creek December 13, 2005 A. Basic Services: Professional fees for Basic Services are determined per the procedures outlined in"A Manual of Practice for Engaging the Services of a Consulting Engineer', published in 1982 by the Consulting Engineers Council and the Texas Society of Professional Engineers. Proposed fees are based upon Curve"A". Part A-Conceptual Design, and Part B- Plans & Specifications Transportation & Public Works: (Construction Cost X ASCE Curve"A"X 85%) Drainage Improvements (A-10)$76,000 X 8.6%X 85% = $5,556 Basic Services Total = $5,556 B. Additional & Surveying Services: Surveying Services: Topographic Survey (A-10) 500 LF X$3.75 = 1,875 Drainage Easement(A-10) 1 Ea X$300 = 300 Additional Survey on (A-2) 560 LF X$3.75 = 2,100 Additional Survey on (A-4) 533 LF X$3.75 = 2,000 Additional Survey on (A-6) 350 LF X$3.75 = 1,313 Additional Survey on (A-8) 350 LF X$3.75 = 1,313 Sub-Total for Surveying Services $ 8,901 Additional Services: Storm Drain Project(A-10) Prepare Drainage Analysis (A-10) $14,240/8 = $ 1,708 Prepare Erosion Control Plan (A-10) $6,320/8 =$ 790 Prepare SW3P W/NOI & NOT $2,000/8 = 250 $2,820 Additional Services: Reconstruction of 29th Street Culverts at Tony's Creek Modify Culvert Plans& Profiles $3,200 = $3,200 Additional Services Total =$14,921 Total for Basic and Additional Services =$20,477 CITY EiX Y rn 'W"O"� m "� 6300 Ridglea Place, Ste 700 Fort Worth,Texas 76116 Tel: 817-338-1277 Fax: 817-338-9245 E-Mail:mail@bhbinc.com