HomeMy WebLinkAboutContract 49109 (3) AT&T Texas CITY SECRETARY,,M
al&(
CONTRACT NO. 0
APPLICATION and LETTER OF AGREEMENT FOR CONSTRUCTION SERVICES
May 4, 2017 CWOTS Record Number: 1283T14
Customer Billing Telephone Numb 1 ge41
BILL TO: City of Fort Worth-Aviation Dept.
4201 N. Main Street, Suite 200 Q q`
Fort Worth, TX 76106
WORK SITE LOCATION: Runway on west end of Eagle Parkway (Alliance)
DESCRIPTION OF CONSTRUCTION SERVICES TO BE PERFORMED: 8 S ti E Z
This cost estimate is for project to place a new 192 cubit foot manhole with frame and cover in new
easement. To tie new manhole into existing conduit system, duct structure will be located, the existing
pipes will be cut and four(4) new conduits will be joined to existing conduits at break point to reestablish
conduits and preserve pathways to manhole. Manhole 269 in conflict will be removed and old conduits
will be abandoned in place. Customer is to provide location and staking for new easement as well as
desired depth of placement information to AT&T construction forces.
LABOR EXPENSE: $20,866.42 MATERIAL EXPENSE: $3,360.00
CORPORATE OVERHEAD EXPENSE: $1,838.08 PAYMENT RECEIVED 12/23/2014: -$24,346.60
ESTIMATED CHARGE FOR CONSTRUCTION SERVICES:
ESTIMATED COST: $26,064.50 -$24,346.60=$1,717.90
(Actual charges may exceed this estimated cost.)
Applicant requests that Southwestern Bell Telephone Company d/b/a AT&T Texas, (hereafter "SWBT")
perform the above-described construction services on Applicant's behalf. Applicant agrees to pay the
charge(s) indicated above for such services plus applicable taxes. The work is to be done on an
"Actual Cost" basis, all charge(s) will be computed in accordance with SWBT's ordinary accounting
practices and will include allocated costs for labor, engineering, materials, transportation, motor
vehicles, tool and supply expenses and sundry billings from sub-contractors and suppliers for work and
materials related to the job . The Applicant affirms that the cost estimate furnished by the Telephone
Company has been considered only as an estimate of approximate costs and that the actual costs
incurred by the Telephone Company in doing the work at the particular time and location might be
higher. Said estimated cost is subject to change due to any number of factors including, but not limited
to, changing conditions in the field, weather delays, or changes in the scope of the work.
ESTIMATED PRICE QUOTE
The above estimated price is guaranteed for 60 days from May 4, 2017. If the charges are not
accepted within 60 days the order will be cancelled and a new order will need to be placed. The
second estimate may be higher than the estimated price set out above.
OFFICIAL RECORD
COTV SECRETARY
AT&T Texas
a`}&t
PAYMENT
Applicant agrees to make an advance payment of $1,717.90 prior to commencement of the work.
Charges for construction services and applicable taxes will be billed on a special bill separate from the
bill that Applicant receives for telephone service.
Applicant, its agents, servants, or employees agree to make payment on change orders within thirty
(30) days of the date of signature on the change order. Failure to make payment within the designated
thirty (30) day time period will operate to cancel the change order and SWBT will cease all work activity
on the project until payment is made.
When the Applicant agrees to Interval Billing *, the balance of the Contract Price or Actual Cost (as
applicable) will be made in monthly payments. If the Actual Cost made varies from the Estimated Cost,
then a correcting adjustment will be made in the last payment. If the parties cannot agree to Interval
Billing, Applicant will make an advanced payment as indicated above.
*Applicable to orders over $25,000 and work will take 6 or more months to complete
STOP WORK ORDER
In the event that Applicant issues a stop work order, or places the project "on hold", at any point during
the progress of the work, said stop work order or request to "hold" work must be issued in writing and
must be delivered via certified mail, return receipt requested to Natasha Holvey, 4801 Matlock Road,
Room 1316, Arlington, Texas, 76018. If Applicant issues a stop work order, or a request to "hold"
work, the contract price quoted herein will remain valid until sixty (60) days from the date of the stop
work or "hold" work order. At the expiration of the sixty (60) days, the contract price quoted herein will
expire and a new contract price will be determined and provided, in writing, to Applicant. The new
contract price may be higher than the contract price quoted in this custom work order.
If, after issuing a stop work, or"hold" work order, Applicant elects to cancel the contract, Applicant must
inform SWBT, in writing of the cancellation. Southwestern Bell Telephone Company will deduct any
expenses incurred in performing the work from Applicant's advance payment and refund any remaining
funds to Applicant.
Under no circumstances will SWBT, be responsible to Applicant for any alleged damages or additional
expenses incurred by Applicant as a result of a stop work order or an order to "hold" work on the
project.
CANCELLATION
If the Applicant cancels the work prior to completion, Applicant must notify SWBT, in writing of said
cancellation.
If Applicant elects to cancel the work prior to completion, Applicant agrees to pay SWBT for the costs it
has incurred in starting performance under the contract. If Applicant has made an advance payment,
SWBT will deduct its costs and expenses incurred as of the date of Applicant's notice of cancellation
from the amount of the advance payment. Any amount remaining will be refunded to Applicant.
AT&T Texas
at&
CHANGES IN SCOPE OF WORK OR CHANGES IN FIELD CONDITIONS
Should concealed conditions exist, including conditions that may exist below the surface of the ground,
or if conditions exist that could not have been anticipated by SWBT at the time of this agreement,
SWBT will be entitled to additional funds and/or additional time to complete the work. Southwestern
Bell Telephone Company will request such additional funding and/or additional time through a request
for a change order.
Conditions that may materially alter the scope of the work and/or the cost associated with the work
include but are not limited to conditions that exist below the surface of the ground and could not have
been anticipated at the time of the price quote, above ground barriers, Acts of God affecting the
progress or sequencing of the work, labor disputes, and other conditions or circumstances that SWBT,
could not reasonably anticipate at the time of providing the above referenced price quote to Applicant.
Should Applicant or its agents, servants, or employees order or seek changes in the scope of the work,
SWBT is entitled to seek from Applicant, its agents, servants, or employees, additional funds as
necessary to perform the work, and additional time, as necessary to complete the work. Said request
for additional funds and/or additional time will be through change order.
All change orders will be in writing.
All change orders will be submitted and accepted by Applicant, its agents, servants or employees,
before SWBT proceeds to execute the work or, if work has been initiated on the project, continues with
executing the work except in an emergency endangering life or property.
Applicant, its agents, servants or employees, are deemed to have accepted the terms of any change
order by signing where indicated on the change order.
Under no circumstances will SWBT's request for a change order be deemed or used as evidence of
delay on the project. Nor will any change order issued in this project be used to charge SWBT with
responsibility for any alleged delay on the project.
NO DAMAGE FOR DELAY
Under no circumstances will SWBT be held liable to Applicant, Applicant's agents, employees or contractors, for
any alleged delay on the project that forms the basis for this agreement for construction services.
TIME TO COMPLETE
Any representation by SWBT, its agents, servants or employees that the project, or any additional work
authorized by change order, will be complete by a certain date or certain time period is strictly an
estimate and not binding on SWBT, its agents, servants, or employees. All estimated completion dates
are subject to changing conditions in the field, changes in the scope of the work, relocation of existing
utilities not within SWBT's control, Acts of God, weather delays, labor disputes, vendor/contractor
disputes, and other conditions or circumstances that SWBT, its agents, servants, or employees, could
not reasonably anticipate at the time of the estimate.
AT&T Texas
Texas law governs the application of this agreement and all terms contained therein.
ENTIRE AGREEMENT
The parties agree that the terms set forth herein constitute the entire agreement and there are no other
agreements regarding the project that is the subject of this agreement between the parties.
MODIFICATION & NOTICE
Any modification to this agreement must be made in writing and signed by both parties. Any party to
this agreement may provide the other party with notice of any fact or condition by providing such
information in writing and serving said writing via certified mail, return receipt requested.
ACCEPTED FOR ACCEPTED FOR
CUSTOMER: SOUTHWESTERN BELL TELEPHONE
COMPANY:
X � - X 4"im
Authorized Signature, Title or Title: dmin OSP Planning Engineering Design
Relationship to Company or Individual
Company: �';�,, o{fit ►,/o,{C Company: SWBT d/b/a AT&T Texas
Printed Printed
Name: Name: Natasha Holvey
Date: �/,3p�7 Date:
APPROVAL RECOMMENDED
By:
Bill WeWea
Aviation Director
APPROVED AS TO FORM AND LEGALITY M&C: N/A
Date: N/A
By:
Joh B. (JB) S rong Form 1295:
Assistant City Attorney
ATST:
By:;
Mary J. Kas r
City Secre I ••
Contract Manager
By signing, I acknowledge t at I am the person responsible for the monitoring and administration of this
contract inclu ing ensurin all p rformance and reporting requirements.
By: �
Julie)t6stak
Project Spe ialist/Seni r Administrative Assistant
Aviation Departmen
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
AT&T Texas
at&}
May 4, 2017
City of Fort Worth-Aviation Dept.
4201 N. Main Street, Suite 200
Fort Worth, TX 76106
RE: CWOTS Record Number: 1283T14
Dear Ms. Hostak and Ms. Goines,
This letter is in regards to your request for Southwestern Bell Telephone Company d/b/a AT&T
Texas (hereafter "SWBT") to perform construction services for you. Enclosed please find an
Application and Letter of Agreement for Construction Services. This application describes the
construction services you have requested along with the associated charges for us to do the
work. We require an advance payment on this amount, which is also shown on the
application.
Both the SIGNED APPLICATION and the ADVANCE PAYMENT OR PURCHASE ORDER,
made payable to AT&T, must be received by our office before we can proceed on your behalf
with the work. Our mailing address for these documents is listed below:
SWBT d/b/a AT&T Texas
Attn: Esmeralda Ceballos
Address: 4801 Matlock Road, Room B16
City, State, Zip: Arlington, TX 76018
Office Hours: 8:00 AM to 4:30 PM
If you decide not to proceed with this work, please call our business office so that we may
cancel your request. As always, please feel free to contact our business office at
888-321-8535 if you have any questions regarding this matter.
Please refer to the record number at the top of your application to assist us in locating your file.
Sincerely,
Esmeralda Ceballos
CWOTS Department
Southwestern Bell Telephone Company
817-467-8124 or 888-321-8535 - Phone
817-467-8198 or 800-851-7311 - Fax
CERTIFICATE OF INTERESTED PARTIES
FORM 3.295
10f1
Complete Nos. 1-4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number:
of business. 2017-209592
AT&T
Dallas, TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 05/18/2017
being filed.
City of Fort Worth Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a
description of the services,goods,or other property to be provided under the contract.
00960
00960 Alliance Runway Extension, Utility Relocation
Nature of interest
4
Name of Interested Party City,State,Country(place of business) (check applicable)
Controlling Intermediary
AT&T Dallas,TX United States X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct.
MYP`�e LARRY G CHASTEEN
Notary ID # 12081512
My Commission Expiros Signature of authorized agent f ontracting business entity
k(OOF , August 25, 2020
F A
Sworn to and subscribed before me,by the said /YAIX4�c to I d G �! this the `i� day of L
20 to certify which,witness my hand and seal of office.
Arm l[nr�sE h ( l qti PP '2CBki
signatV officer administering oath Printed nam of officer administering oath Titl of officer admlhistering oath
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883