HomeMy WebLinkAboutContract 47925-CA2 CnY SECRETARY FORT WORTH, City of Fort Worth CONTRACT N0. Change Order Request Breakdown Project Namel Concrete Paving Restoration 2016-02 at Various Locations City Sec# 47925 Client Project#(s)l CPN 100065 Contractor Westhill Construction PM Tariqul Islam Inspector Mike Flute Change Order Submittal# Date 4/13/2017 Dept. T/PW Contract Time Totals CD Original Contract Amount $745,524.00 $745,524.00 150 Extras to Date $49,790.00 $49,790.00 45 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $795,314.00 $795,314.00 195 Amount of Proposed Change Order $49,431.25 $49,431.25 10 Revised Contract Amount $844,745.25 $844,745.25 205 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $49,431.25 $49,431.25 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 13.31 MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $931,905.00 JUSTIFICATION(REASONS) FOR CHANGE ORDER This change order is necessary to add items to the contract to complete the installation of the Morningside Railroad Crossing. Increase in the SY of stamped and stained 4"concrete and 8"raised concrete curb and gutter is due to the change of the width of the median from 3 ft continuous median to a varying 3-9 ft median.Addition concrete paving due to overruns on Shackleford Street. 10 days are being added to the contr � r? A, ` o. c OF tC NW w ase , Cnty Seen�tly sEca 0 ,t.( OF OFFICIAL.RECORD CITY SECRETARY FT.WORTH,TX b y FORT WORTH City of Fort Worth Change Order Additions Project Name I Concrete Paving Restoration 2016-02 at Various Locations City Sec# 47925 Client Project# I CPN 100065 Contractor Westhill Construction PM Tadqui Islam Inspector Mike Flute Change Order Submittal# 0 Date 4/1312017 ADDITIONS Qty Unit Unit Cost Total Yellow ermop astic Pavement Markings TIPW 33 24:White Stop Bar T/PW 150.00000000 LF $14.25 3T White Reflective RPM'S T/PW 17.0000 000 EA $4.35 35 White Non Reflective RPM's T/PW 68.00000000 EA $3.16 36 RR Legend Markings T/PW TZ10000000 EA $695.00 37 Removal of Existing Pavement Markings T/PW 1.00000000 LS ---$650.00 650.00 Inc 30 8°Curb dowelled with pavement T/PW 25.00000000 LF $30.00 Inc 31 Stamped and Stained Concrete(4 inch) T/PW 70.00000000 SY 117.00 Inc 4 Remove Concrete and Replace with 7"Concrete Pavement HES T/PW 4 0.00000000 SY $77.00 T/PW $49,431.25 Sub Total Additions $49,431.25 Change Order Additions Page 1 of 1 FOEzr WORTH City of Fort Worth Change Order Deletions Project Name Concrete Paving Restoration 2016-02 at Various Locations CitySec# 47925 Client Project# CPN 100065 Contractor Westhill Construction PM Tadqui Islam Inspector Mike Flute Change Order Submittal# 0 Date 4/13/2017 DELETIONS HEM DESCRIPTION UEPT City Unit Unit Cost Total T/PW $0.00 Sub Total Deletions $U.U0 Change Order Deletions Page 1 of 1 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 CFW Change Order Approval St-COApp02 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Projects/100065 - Concrete Restoration (2016-2)/Contractor/Change Orders/Change Order Breakdown #2 CPN 100065.x1s Attachments(0) No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?Siteld=51500&ProcessI... 5/24/2017 CFW Change Order Approval St-COApp02 Page 2 of 3 FORT WORTH, C'ty of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: St-COSub02 Change Order No.: St-COApp02 Date Started: 2017-05-01 City Sec. No.: 47925 Date Due: 2017-05-12 Project Name: 100065 - Concrete Restoration (2016-2) 100065 DOE Numbers: Project Numbers: Project Concrete restoration at various locations Description: Project Manager: Tariqul Islam City Inspector: Mike Flute Contractor: Westhill Construction COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 39,391.00 39001-0200431-5740010-- 10 C01571-CO7580 TPW $ 10,040.25 30100-0200431-5740010-- 100065-003380 Total Cost: $ 49,431.25 Total Requested Days: 10 Approval Status: https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?Siteld=51500&ProcessI... 5/24/2017 CFW Change Order Approval St-COApp02 Page 3 of 3 Approved: Yes Comments: User: Katie Newby Date: 2017-05-04 9:34 AM Approved: Yes Comments: User: Tariqul Islam Date: 2017-05-04 9:41 AM Approved: Yes Comments: User: Riad Nusrallah Date: 2017-05-05 4:46 PM Approved: Yes Comments: User: Richard Martinez Date: 2017-05-08 9:40 AM Approved: Yes Comments: User: Richard Martinez Date: 2017-05-09 6:16 PM Approved: Yes Comments: User: Doug Wiersig Date: 2017-05-11 10:38 PM Approved: Yes Comments: User: Doug Black Date: 2017-05-19 10:29 AM Approved: Yes Comments: User: Jay Chapa Date: 2017-05-24 12:50 PM --------------- Action Required: https://projectpoint.buzzsaw.com/ bz web/Forms/ForrnPrint.aspx?SiteId=51500&ProcessL.. 5/24/2017 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Tariqul Islam Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature