Loading...
HomeMy WebLinkAboutContract 48981-CO1 CITY SECRETARY FORT WORTH,,, City of Fort Worth CONTRACT N0. Change Order Request Breakdown Project Namel HMAC Street Rehabilitation at Various Locations Contract 2016-7 City Sec# 1 48981 Client Project#(s)l CPN#100620 Contractor TexasBit an Oldcastle Co. PM Tariqul Islam Inspector Daniel Roy Change Order Submittal# 0 Date 5/9/2017 Dept. T/PW Contract Time Totals CD Original Contract Amount $1,090,406.02 $1,090,406.02 170 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,090,406.02 $1,090,406.02 170 Amount of Proposed Change Order $13,907.60 $13,907.60 7 Revised Contract Amount $1,104,313.62 $1,104,313.62 177 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $13,907.60 $13,907.60 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.2870 MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,363,007.53 JUSTIFICATION(REASONS) FOR CHANGE ORDER This change order is to incorporate funds into the contract to pay for stripping on North Caylor Rd.within the limits of Sunset Circle and Keller Haslet Rd. North Caylor Rd.was paved under a Water Dept.contract, however the contract did not include stripping.The contract time will be extended by 7 days for the additional work. byo t= ��F.FORT� Ito nald P. Gonzales, t. City Secretary )11�XAS A 6 RE�E�vED N a SUN 2 2011 wot OFFICIAL RECORD !� cocO� �' CITY SECRETARY °�s 8 ` 9 FT. WORTH,TX FORT WORTH City of Fort Worth Change Order Additions Project Name HMAC Street Rehabilitation at Various Locations Contract 2016-7 City Sec# 48981 Client Project# CPN#100620 Contractor TexasBit an Oldcastle Co. PM[ Tadqul Islam Inspector Daniel Roy Change Order Submittal# 0 Date 519/2017 ADDITIONS Unit mCost Total Solid/Dash, de a ow Spray Thermoplastic Double Yellow 24 "Solid/Dash,White/Yellow Spray Thermoplastic Edge Line T/PW 7,900.00000000 LF $0.83 25 4"Reflective Marker,Type I-C or Type ll-C/R,A/A or BB Installed T/PW 100.00000000 Each 4.13 26 Prep and Seal Pavement Surface for "Markings(Double Yellow) T/PW 420.00000000 LF 0.22 27 Prep and Seal Pavement Surface for 4"Markings(Edge Line) T/PW 420.00000000 LF 0.11 28 2"Preformed Thermoplastic(125 mil)White/Yellow Solid Line Installed T/PW 11.00000000 LF $22.00 T/PW $13,907.60 EE Sub Total Additions ;13,907.60 Change Order Additions Page 1 of 1 FORTWORTH City of Fort Worth Change Order Deletions Project Name I HMAC Street Rehabilitation at Various Locations Contract 2016-7 City Sec# 48981 Client Project# I CPN#100620 Contractor TexasBit an Oldcastle Co. PM Tariqul Islam I Inspector Daniel Roy Change Order Submittal# 0 Date 5/9/2017 DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total TPW $0.00 Sub Total Deletions 0.00 Change Order Deletions Page 1 of 1 M/SBE Breakdown for this Change Order M/SBE'Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 CFW Change Order Approval St-COApp01 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Projects/100620 - HMAC Surface Overlay (2016-7)/Contractor/Change Orders/#100620 C01 Change Order Breakdown 051217.x1s Attachments(0) No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 6/9/2017 CFW Change Order Approval St-COApp01 Page 2 of 3 FORT City of Fort Worth WORTHo. Change Order Request Approval (Change Order Breakdown Available in Links) ............................................................... For Change Order Submittal No.: :.............................................................: Change Order No.: St-COApp01 Date Started: 2017-05-15 City Sec. No.: 48981 Date Due: 2017-05-26 Project Name: 100620 - HMAC Surface Overlay (2016-7) 100620 DOE Numbers: Project Numbers: Project HMAC surface overlay at various locations Description: Project Manager: Tariqul Islam City Inspector: William Mason Contractor: Texas Bit COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 13,907.60 30100 0200431 5740010 7 100620 006280 Total Cost: $ 13,907.60 Total Requested Days: 7 Approval Status: https://projeetpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&ProcessId... 6/9/2017 CFW Change Order Approval St-COApp01 Page 3 of 3 Approved: Yes Comments: User: Daniel Roy Date: 2017-05-24 9:32 AM Approved: Yes Comments: User: Mary Loveless Date: 2017-05-24 9:55 AM Approved: Yes Comments: User: Tariqul Islam Date: 2017-05-24 9:57 AM Approved: Yes Comments: User: Riad Nusrallah Date: 2017-05-24 1:39 PM Approved: Yes Comments: User: Richard Martinez Date: 2017-05-25 9:59 AM Approved: Yes Comments: User: Doug Wiersig Date: 2017-05-30 11:24 AM Approved: Yes Comments: User: Doug Black Date: 2017-06-01 1:25 PM Approved: Yes Comments: User: Jay Chapa Date: 2017-06-09 4:40 PM Action Required: https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&ProcessId... 6/9/2017 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. a, Tariqul Islam Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature