HomeMy WebLinkAboutContract 33368-A1 AMENDMENT NO. 1
STATE OF TEXAS S CITY SECRETARY CONTRACT NO. .33 3(A-Al
(No M&C Needed)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Deltatek
Engineering. , (Engineer) made and entered into City Secretary
Contract No. 33368, (the Contract) which was authorized and M&C
was not required;
WHEREAS, the Contract involves engineering services for the
following project:
Engineering Design Services: Plan upgrade and construction
management with Inspection for Safety and regulatory Improvement
to the Water Storage Facilities, Project No. 00465;
WHEREAS, it has become necessary to execute Amendment No. 1
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated December 71 2009, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services and Construction Management with inspection to be
performed by Engineer total $23, 905.00 .
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall net
exceed the sum of $47,365.00 . OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the day of rCk 20$0, in Fort Worth,
Tarrant County, Texas.
ATTEST.
4
��yt�'0.�3Ytt ri
� aa000�ab�
4L'C —06 ID
rty Hendrix NO M&C RE UIR111)
it. Secretary o ; Q
c tc aoc.`OBJ
APPROVAL RECOMMENDED: }`''' � APPROVED.
Frank Crumb, P.E. Fernando Costa
Director, Water Department Assistant City Manager
Deltatek Engineering
ENGINEER
i
By:
Name: Bahram Niknam, P.E.
President
14114 Dallas Parkway, Suite 480
Dallas, Texas 75254
APPROVED AS TO FORM AND LEGALITY:
Amy Ramsey
Assistant City Attorney
-2- OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
December 7, 2009
Mr. Seiavash Mir
Project Manager
City of Fort Worth Water Department
1000 Throckmorton Street
Fort Worth,Texas 76102
Reference: Safety and Regulatory Improvements
Fort Worth Water Storage Facilities
Water Production Project No. 0605004-539120
Plan Upgrade for Advertisement
Dear Mr. Mir:
On November 29, 2006, Deltatek Engineering has issued plans and specifications for
various water storage facilities safety and regulatory improvements. Due to time lapsed, it
is recommended to upgrade these documents prior to advertisement. The facilities
included in this task are listed below:
1. Armstrong Ranch
2. Calmont
3. Como
4. Lake Country
5. Meadowbrook
6. Northwest
7. Randoll Mill
8. Sun Country
Since renovation of Como is under contract, related improvements to this facility can be
included as a change order or use contingency in the current contract with N. G. Painting.
Additionally, if City plans to rehabilitate the Randoll Mill GST next year, this facility can
be eliminated also from Safety and Regulatory project.
Plan Upgrade &Construction Management
Deltatek Engineering is proposing to upgrade these documents and manage the
construction for the following fee breakdown:
Plans and specifications upgrade: $12,655.00
Onsite observation and testing: $11,250.00
Total: $23,905.00
14114 Dallas Parkway,Suite 480 Dallas,Texas 75254
Finn Registration No.F-4419
469-374-9800 Fax 469-374-9801
Email:bn c)deltatekene.corn
Page 2
Upon your approval, we will prepare Engineering Services Contract for execution.
Should you have any questions, please let me know.
Sincerely,
DELTATEK ENGINEER G
Bahram Niknam, P.E.