Contract 49164
i CITY SECTARY CONTRACT NO. 49 (0 y FORT WORTH Water Emergency Response Contract Caty Project No. 100774 2017 8 7 ,0 e 8�0 j! a RECF1�X11 � C1� SFRRESA�� Fv art L99 � telOF s ent 1 OFFICIAL MORD r lTY SgORV ARY rr,*WORTH,TX CITY OF FORT WORTH, TEXAS WA TER DEPAR TMENT WATER EMERGENCY RESPONSE CONTRACT PROJECT NUMBER: City Project No. 100774 JOHN CARMAN,P.E. DIRECTOR WATER DEPARTMENT 2017 ( 7 "pi?07,EED CHRISTOPHER HARD R,P. TING ASSISTANT DIRECTOR, WATER DEPARTMENT APPROVED 0 6 �l O I TONYSH OLA,P.E.,E /1 -7 NGINEERING MANAGER, WATER DEPARTMENT r �7 RECOMME DED DATE t I f I FORTWORTH PROJECT MANUAL FOR THE CONSTRUCTION OF Water Emergency Response Contract City Project No. 100774 Betsy Price David Cooke Mayor City Manager John Carman, P.E. Director, Water Department February 2017 000000-1 TABLE OF CONTENTS Page i of 5 1 SECTION 00 00 00 2 TABLE OF CONTENTS 3 4 0005 10 Mayor and Council Communication 5 0005 15 Addenda 6 00 11 13 Invitation to Bidders 7 00 21 13 Instructions to Bidders 8 00 35 13 Conflict of Interest Affidavit 9 00 41 00 Bid Form 10 00 42 43 Proposal Form Unit Price 11 0043 13 Bid Bond 12 00 43 37 Vendor Compliance to State Law Nonresident Bidder 13 0045 11 Bidders Prequalifications 14 00 45 12 Prequalification Statement 15 00 45 13 Bidder Prequalification Application 16 00 45 26 Contractor Compliance with Workers' Compensation Law 17 00 45 40 Minority Business Enterprise Goal 18 00 45 41 Small Business Enterprise Goal 19 00 52 43 Agreement 20 0061 13 Performance Bond 21 0061 14 Payment Bond 22 0061 19 Maintenance Bond 23 00 61 25 Certificate of Insurance 24 00 72 00 General Conditions 25 00 73 00 Supplementary Conditions 26 27 Division 01 - General Requirements 28 29 01 1100 Summary of Work 30 01 2500 Substitution Procedures 31 01 31 19 Preconstruction Meeting 32 01 3233 Preconstruction Video 33 01 33 00 Submittals 34 01 35 13 Special Project Procedures 35 0145 23 Testing and Inspection Services 36 01 5000 Temporary Facilities and Controls 37 01 55 26 Street Use Permit and Modifications to Traffic Control 38 01 57 13 Storm Water Pollution Prevention Plan 39 01 60 00 Product Requirements 40 01 66 00 Product Storage and Handling Requirements 41 01 7000 Mobilization and Remobilization 42 01 71 23 Construction Staking and Survey 43 01 7423 Cleaning 44 01 77 19 Closeout Requirements 45 01 78 23 Operation and Maintenance Data 46 01 7839 Project Record Documents 47 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100774 000000-2 TABLE OF CONTENTS Page 2 of 5 1 Technical Specifications which have been modified by the Engineer 2 specifically for this Project; hard copies are included in the Project's Contract 3 Documents 4 5 Division 02 - Existing Conditions 6 7 0241 14 Utility Removal/Abandonment 8 9 Division 32 - Exterior Improvements 10 11 3201 17 Permanent Asphalt Paving Repair 12 3201 18 Temporary Asphalt Paving Repair 13 32 11 23 Flexible Base Courses 14 3231 13 Chain Fences and Gates 15 3231 26 Wire Fences and Gates 16 3231 29 Wood Fences and Gates 17 18 Division 33 - Utilities 19 20 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 21 33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type 22 33 12 10 Water Services 1-inch to 2-inch 23 33 12 11 Large Water Meters 24 33 1225 Connection to Existing Water Mains 25 33 1230 Combination Air Valve Assemblies for Potable Water Systems 26 33 1240 Fire Hydrants 27 28 Technical Specifications listed below are included for this Project by reference 29 and can be viewed/downloaded from the City's Buzzsaw site at: 30 31 htps://Proiectpoint.buzzsaw.com/client/fortworthgov/Resources/02%20- 32 %20Construction%2ODocuments/Specifications 33 34 Division 02 - Existing Conditions 35 36 0241 13 Selective Site Demolition 37 0241 14 Utility Removal/Abandonment 38 0241 15 Paving Removal 39 40 Division 03 - Concrete 41 42 03 30 00 Cast-In-Place Concrete 43 03 34 13 Controlled Low Strength Material (CLSM) 44 03 34 16 Concrete Base Material for Trench Repair 45 03 80 00 Modifications to Existing Concrete Structures 46 47 48 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100774 000000-3 TABLE OF CONTENTS Page 3 of 5 1 Division 31 - Earthwork 2 3 31 1000 Site Clearing 4 31 23 16 Unclassified Excavation 5 31 2323 Borrow 6 31 2400 Embankments 7 31 2500 Erosion and Sediment Control 8 31 36 00 Gabions 9 31 3700 Riprap 10 11 Division 32 - Exterior Improvements 12 13 3201 17 Permanent Asphalt Paving Repair 14 3201 18 Temporary Asphalt Paving Repair 15 3201 29 Concrete Paving Repair 16 32 11 23 Flexible Base Courses 17 32 it 29 Lime Treated Base Courses 18 32 it 33 Cement Treated Base Courses 19 32 12 16 Asphalt Paving 20 32 1273 Asphalt Paving Crack Sealants 21 32 13 13 Concrete Paving 22 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 23 32 13 73 Concrete Paving Joint Sealants 24 32 14 16 Brick Unit Paving 25 32 16 13 Concrete Curb and Gutters and Valley Gutters 26 32 1723 Pavement Markings 27 32 17 25 Curb Address Painting 28 3231 13 Chain Fences and Gates 29 3231 26 Wire Fences and Gates 3o 3231 29 Wood Fences and Gates 31 3232 13 Cast-in-Place Concrete Retaining Walls 32 3291 19 Topsoil Placement and Finishing of Parkways 33 3292 13 Hydro-Mulching, Seeding, and Sodding 34 32 93 43 Trees and Shrubs 35 36 Division 33 - Utilities 37 38 33 01 30 Sewer and Manhole Testing 39 33 01 31 Closed Circuit Television (CCN) Inspection 4o 3303 10 Bypass Pumping of Existing Sewer Systems 41 33 04 10 Joint Bonding and Electrical Isolation 42 33 04 11 Corrosion Control Test Stations 43 33 0412 Magnesium Anode Cathodic Protection System 44 33 0430 Temporary Water Services 45 33 0440 Cleaning and Acceptance Testing of Water Mains 46 33 04 50 Cleaning of Sewer Mains 47 33 05 10 Utility Trench Excavation, Embedment, and Backfill 48 3305 12 Water Line Lowering CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100774 000000-4 TABLE OF CONTENTS Page 4 of 5 1 33 05 13 Frame, Cover and Grade Rings 2 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 3 33 05 16 Concrete Water Vaults 4 33 05 17 Concrete Collars 5 33 0520 Auger Boring 6 33 0521 Tunnel Liner Plate 7 33 0522 Steel Casing Pipe 8 33 0523 Hand Tunneling 9 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 10 33 05 26 Utility Markers/Locators 11 33 0530 Location of Existing Utilities 12 33 11 05 Bolts, Nuts, and Gaskets 13 33 11 10 Ductile Iron Pipe 14 33 11 11 Ductile Iron Fittings 15 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 16 33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type 17 33 11 14 Buried Steel Pipe and Fittings 18 33 12 10 Water Services 1-inch to 2-inch 19 33 12 11 Large Water Meters 20 33 1220 Resilient Seated Gate Valve 21 33 1221 AWWA Rubber-Seated Butterfly Valves 22 33 1225 Connection to Existing Water Mains 23 33 1230 Combination Air Valve Assemblies for Potable Water Systems 24 33 1240 Fire Hydrants 25 33 1250 Water Sample Stations 26 33 1260 Standard Blow-off Valve Assembly 27 33 31 12 Cured in Place Pipe (CIPP) 28 33 31 13 Fiberglass Reinforced Pipe for Gravity Sanitary Sewers 29 33 31 15 High Density Polyethylene (HDPE) Pipe for Sanitary Sewer 30 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 31 33 31 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer Pipe 32 3331 22 Sanitary Sewer Slip Lining 33 3331 23 Sanitary Sewer Pipe Enlargement 34 33 31 50 Sanitary Sewer Service Connections and Service Line 35 33 31 70 Combination Air Valve for Sanitary Sewer Force Mains 36 33 39 10 Cast-in-Place Concrete Manholes 37 33 39 20 Precast Concrete Manholes 38 33 39 30 Fiberglass Manholes 39 33 39 40 Wastewater Access Chamber (WAC) 40 33 39 60 Epoxy Liners for Sanitary Sewer Structures 41 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 42 3341 11 High Density Polyethylene (HDPE) Pipe for Storm Drain 43 33 46 00 Subdrainage 44 33 46 01 Slotted Storm Drains 45 33 46 02 Trench Drains 46 3349 10 Cast-in-Place Manholes and Junction Boxes 47 33 49 20 Curb and Drop Inlets 48 33 49 40 Storm Drainage Headwalls and Wingwalls CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100774 000000-5 TABLE OF CONTENTS Page 5 of 5 1 2 Division 34 - Transportation 3 4 3441 10 Traffic Signals 5 3441 11 Temporary Traffic Signals 6 3441 13 Removing Traffic Signals 7 3441 15 Rectangular Rapid Flashing Beacon s 3441 16 Pedestrian Hybrid Signal 9 34 41 20 Roadway Illumination Assemblies 10 34 41 30 Aluminum Signs 11 3471 13 Traffic Control 12 13 Appendix 14 15 GC-4.01 Availability of Lands 16 GC-4.02 Subsurface and Physical Conditions 17 GC-4.04 Underground Facilities 18 GC-4.06 Hazardous Environmental Condition at Site 19 GC-6.06.D Minority and Women Owned Business Enterprise Compliance 20 GC-6.07 Wage Rates 21 GC-6.09 Permits and Utilities 22 GC-6.24 Nondiscrimination 23 GR-01 60 00 Product Requirements 24 25 END OF SECTION CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100774 M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas o TI oRCITY COUNCIL AGENDA Il COUNCIL ACTION: Approved on 5/2/2017 - Ordinance No. 22699-05-2017 DATE: 5/2/2017 REFERENCE NO.: **C-28216 LOG NAME: 60WEMERCON- CONATSER CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of a Contract with Conatser Construction TX, LP, in the Amount of $1,250,000.00 for 2017 Water Emergency Response Contract, Provide for Additional Project Costs for a Total Project Amount of$1,500,000.00 and Adopt Appropriation Ordinance (ALL COUNCIL DISTRICTS) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of$1,500,000.00 from available funds; and 2. Authorize the execution of a contract with Conatser Construction TX, LP, in the amount of $1,250,000.00 for 2017 Water Emergency Response Contract which includes two optional renewals, (CPN 100774). DISCUSSION: The work to be performed under this contract consists of replacing and/or relocating large diameter water mains and other pertinent construction required in response to emergency water main break incidents. The project was advertised for bid on January 19, 2017 and January 26, 2017 in the Fort Worth Star-Telegram and on March 2, 2017, the following bids were received. Bidder Amount Time of Completion Conatser Construction TX, LP $11,969,763.20 365 Calendar Days William J. Schultz, Inc. d/b/a Circle C Construction $12,551,530.00 Company In addition to the contract amount, $250,000.00 is required for project management, material testing and inspection. The bid documents included a stipulation that the total quantities listed may not reflect actual quantities and that the amount budgeted for the projects is $1,250,000.00. Final payments will be made based on actual measured quantities. The bid documents also included a stipulation giving the City the option to renew (subject to appropriated funding) this contract two times under the same terms, conditions and unit prices. This project will have no impact on the Water Department's operating budget when completed. Construction under this contract is on an as-needed basis. The contract will expire when the contract amount is exhausted or one year after the effective date, whichever occurs later. http://apps.cfwnet.org/council_packet/mc_review.asp?ID=24584&councildatc=5/2/2017 6/5/2017 M&C Review Page 2 of 2 M/WBE OFFICE: Conatser Construction TX, LP, is in compliance with the City's BDE Ordinance by committing to six percent MBE participation. The City's MBE goal on this project is six percent. This project is located in ALL COUNCIL DISTRICTS. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Water Capital Projects Fund. The Fiscal Year 2017 Water Operating Budget includes appropriations of$21,060,000.00 for the purpose of providing Pay-As-You-Go funding for water capital projects. After this transfer for Fiscal Year 2017, the balance will be $7,930,387.00. Appropriations for 2017 Water Emergency Response Contract as depicted below: Fund Existing Additional Project Appropriations Appropriations Total* Water Capital Projects $0.00 $1,500,000.00 $1,500,000.00 Fund 56002 Project $0.00 $1,500,000.00 $1,500,000.00 Total IF * Numbers rounded for presentation purposes TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: John Carman (8246) Additional Information Contact: Adolfio Lopez (7829) ATTACHMENTS 60WEMERCON CONATSER 1295.pdf 60WEMERCON-CONATSER WATER CAP FUND A017r.docx http:Happs.cfwnet.org/council_packet/rne_review.asp?ID=24584&councildate=5/2/2017 6/5/2017 FORTWORTH WATER EMERGENCY RESPONSE CONTRACT City Project Number: 100774 ADDENDUM NO. 1 Release Date: January 30,2017 Revised Bid Opening Date: March 2,2017 Information to Bidders: 1. Replace entire "00 21 13 Instructions to Bidders"with the attached,revised Instructions to Bidders document. Note section 3.5 contains additional requirements. 2. Move bid opening shown in "00 11 13 Invitation to Bidders"from February 16, 2017 to March 2,2017. Please acknowledge receipt of the Addendum in the bid proposal and on the outside of the sealed envelope. John Carman Receipt Acknowledged: Director, er Departure By: /ra+-f/y6G=AJg JirdDeeter,P.E. Engineering Services MATER DEPARTMENT ENGINEERING AND FISCAL SERVICES THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102 817-392-8240 * FAX 817-392-8195 Co Printed on recycled paper 002113-1 INSTRUCTIONS TO BIDDERS Page 1 of 10 1 SECTION 00 2113 2 INSTRUCTIONS TO BIDDERS 3 4 1. Defined Terms 5 6 1.1.Terms used in these INSTRUCTIONS TO BIDDERS,which are defined in Section 00 72 7 00- GENERAL CONDITIONS. 8 9 1.2.Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 10 meanings indicated below which are applicable to both the singular and plural thereof. 11 12 1.2.1. Bidder: Any person,firm,partnership, company, association, or corporation acting 13 directly through a duly authorized representative,submitting a bid for performing 14 the work contemplated under the Contract Documents. 15 16 1.2.2. Nonresident Bidder:Any person,firm,partnership,company, association, or 17 corporation acting directly through a duly authorized representative, submitting a 18 bid for performing the work contemplated under the Contract Documents whose 19 principal place of business is not in the State of Texas. 20 21 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 22 (on the basis of City's evaluation as hereinafter provided)makes an award. 23 24 2. Copies of Bidding Documents 25 26 2.1.Neither City nor Engineer shall assume any responsibility for errors or misinterpretations 27 resulting from the Bidders use of incomplete sets of Bidding Documents. 28 29 2.2.City and Engineer in making copies of Bidding Documents available do so only for the 30 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant 31 for any other use. 32 33 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 34 35 3.1.All Bidders and their subcontractors are required to be prequalified for the work types 36 requiring prequalification at the time of bidding.Bids received from contractors who are 37 not prequalified(even if inadvertently opened)shall not be considered. Prequalification 38 requirement work types and documentation are as follows: 39 6 40 3.1.1. Paving—Requirements document located at; P 41 https://projecipoint.buzzsaw.com/fortworthizov/Resources/02%20- 42 %20Construction%2ODocuments/Contractor%2OPrequalification/TPW%2OPaving 43 %20Contractor%2OPregualification%2OProgram/PREQUALIFICATION%20REQ 44 UIREMENTS%20FOR%20PAVING%2000NTRACTORS.PDF?public 45 46 3.1.2. Roadway and Pedestrian Lighting—Requirements document located at; CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 Addendum No.I 0021 13-2 INSTRUCTIONS TO BIDDERS Page 2 of 10 1 https://projectpoint.buzzsaw.com/fortworthgov/Resources/02%20- 2 %20Construction%2ODocuments/Contractor%2OPrequalification/TP WVo2OPaving 3 %20Contractor%2OPrequalification%2OProgram/PREQUALIFICATION%20REQ i 4 UIREMENTS%20FOR%2OPAVING%2000NTRACTORS.PDF?public 5 6 3.1.3. Water and Sanitary Sewer—Requirements document located at; 7 hiips://projecipoint.buzzsaw.com/fortworthgov/Resources/02%20- 8 %20Construction%2ODocuments/Contractor%2OPrequalification/Water%2Oand%2 9 OSanitary%2OSewer%20Contractor%20Prequalification%2OProgram/WSS%20pre 10 qual%20requirements.doc?public 11 12 13 3.2.Each Bidder unless currently prequalified,must be prepared to submit to City within 14 seven(7)calendar days prior to Bid opening,the documentation identified in Section 00 15 45 11,BIDDERS PREQUALIFICATIONS. 16 17 3.2.1. Submission of and/or questions related to prequalification should be addressed to 18 the City contact as provided in Paragraph 6.1. 19 20 21 3.3.The City reserves the right to require any pre-qualified contractor who is the apparent low 22 bidder(s)for a project to submit such additional information as the City, in its sole 23 discretion may require,including but not limited to manpower and equipment records, 24 information about key personnel to be assigned to the project, and construction schedule, 25 to assist the City in evaluating and assessing the ability of the apparent low bidder(s)to 26 deliver a quality product and successfully complete projects for the amount bid within 27 the stipulated time frame. Based upon the City's assessment of the submitted 28 information, a recommendation regarding the award of a contract will be made to the 29 City Council. Failure to submit the additional information,if requested,may be grounds 30 for rejecting the apparent low bidder as non-responsive.Affected contractors will be 31 notified in writing of a recommendation to the City Council. 32 33 3.4.In addition to prequalification, additional requirements for qualification may be required 34 within various sections of the Contract Documents. 35 l t ` r CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 Addendum No.1 002113-3 INSTRUCTIONS TO BIDDERS Page 3 of 10 1 3.5. Additional pre-qualifications are required for this contract as follows: Bidder shall 2 provide an acceptable experience record for emergency repair of large diameter water 3 mains. Bidder shall submit manpower and equipment records along with the resume(s) 4 of key personnel who will be assigned to work on the emergency.Bidders must provide 5 a plan of action for immediately responding when contacted about an emergency, 6 staying on the site until completion of the emergency repair and handling more than one 7 emergency work order at a time.An acceptable experience record must reflect the 8 Bidder's experience with emergency work of the same nature and magnitude as that of 9 this contract(emergency repair of 24"-54"diameter water mains)and such experience 9 10 must have been gained not more than four(4)years prior the date on which bids are to 9 11 be received for this project.The names and contact person(s)of past clients for projects 12. completed within this time frame along with their addresses and telephone numbers shall 13 be supplied. The requested material must be submitted to the City no later than fourteen 14 (14)days prior to the date of the opening of the bids. The City will provide a list of 15 prequalified contractors for this project seven(7)days prior to the date of the opening of 16 the bids.This list will be posted.Any bids not satisfying these prequalification 17 requirements shall be rejected as non-responsive. All pre-qualification information 18 must be delivered to Water Department 311 W 10'h Street,Fort Worth TX 76102, 19 Attention: Scott Lafferty. 20 21 22 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 23 24 4.1.Before submitting a Bid, each Bidder shall: 25 26 4.1.1. Examine and carefully study the Contract Documents and other related data 27 identified in the Bidding Documents(including"technical data"referred to in 28 Paragraph 4.2.below).No information given by City or any representative of the 29 City other than that contained in the Contract Documents and officially 30 promulgated addenda thereto, shall be binding upon the City. 31 32 4.1.2. INTENTIONALLY DELETED 33 34 4.1.3. Consider federal, state and local Laws and Regulations that may affect cost, 35 progress,performance or furnishing of the Work. 36 37 4.1.4. Be advised, City,in accordance with Title VI of the Civil Rights Act of 1964,78 38 Stat.252,42 U.S.C.2000d to 2000d-4 and Title 49, Code of Federal Regulations, 39 Department of Transportation, Subtitle A, Office of the Secretary,Part 21, 40 Nondiscrimination in Federally-assisted programs of the Department of 41 Transportation issued pursuant to such Act,hereby notifies all bidders that it will 42 affirmatively insure that in any contract entered into pursuant to this advertisement, 43 minority business enterprises will be afforded full opportunity to submit bids in 44 response to this invitation and will not be discriminated against on the grounds of 45 race, color, or national origin in consideration of award. 46 47 48 49 50 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 Addendum No.1 0021 13-4 INSTRUCTIONS TO BIDDERS Page 4 of 10 1 4.1.5.1NTENTIONALLY DELETED 2 3 4.1.6. Be advised that the Contract Documents on file with the City shall constitute all of 4 the information which the City will furnish. All additional information and data 5 which the City will supply after promulgation of the formal Contract Documents 6 shall be issued in the form of written addenda and shall become part of the Contract 7 Documents just as though such addenda were actually written into the original 8 Contract Documents.No information given by the City other than that contained in 9 the Contract Documents and officially promulgated addenda thereto, shall be 10 binding upon the City. - 11 12 4.1.7. INTENTIONALLY DELETED 13 14 4.1.8.Detennine the difficulties of the Work and all attending circumstances affecting the 15 cost of doing the Work, time required for its completion, and obtain all information 16 required to make a proposal. Bidders shall rely exclusively and solely upon their 17 own estimates, investigation,research,tests, explorations, and other data which are 18 necessary for full and complete information upon which the proposal is to be based. 19 It is understood that the submission of a proposal is prima-facie evidence that the 20 Bidder has made the investigation, examinations and tests herein required. Claims 21 for additional compensation due to variations between conditions actually 22 encountered in construction and as indicated in the Contract Documents will not be 23 allowed. 24 25 4.1.9. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or 26 between the Contract Documents and such other related documents. The Contractor 27 shall not take advantage of any gross error or omission in the Contract Documents, 28 and the City shall be permitted to make such corrections or interpretations as may 29 be deemed necessary for fulfillment of the intent of the Contract Documents. 30 31 4.2. Reference is made to Section 00 73 00—Supplementary Conditions for identification of. 32 33 4.2.1.INTENTIONALLY DELETED 34 35 4.2.2. those drawings of physical conditions in or relating to existing surface and 36 subsurface structures (except Underground Facilities)which are at or contiguous to 37 the site that have been utilized by City in preparation of the Contract Documents. 38 39 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 40 on request. Those reports and drawings may not be part of the Contract 41 Documents, but the "technical data" contained therein upon which Bidder is entitled 42 to rely as provided in Paragraph 4.02. of the General Conditions has been identified 43 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 44 responsible for any interpretation or conclusion drawn from any "technical data" or 45 any other data, interpretations, opinions or information. 46 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 Addendum No.1 0021 13-5 INSTRUCTIONS TO BIDDERS Page 5 of 10 1 4.3.The submission of a Bid will constitute an incontrovertible representation by Bidder(i) 2 that Bidder has complied with every requirement of this Paragraph 4, (ii)that without 3 exception the Bid is premised upon performing and furnishing the Work required by the 4 Contract Documents and applying the specific means,methods,techniques, sequences or 5 procedures of construction(if any)that may be shown or indicated or expressly required 6 by the Contract Documents, (iii)that Bidder has given City written notice of all 7 conflicts, errors, ambiguities and discrepancies in the Contract Documents and the 8 written resolutions thereof by City are acceptable to Bidder, and when said conflicts, 9 etc., have not been resolved through the interpretations by City as described in 10 Paragraph 6., and (iv)that the Contract Documents are generally sufficient to indicate 11 and convey understanding of all terns and conditions for performing and furnishing the 12 Work. 13 14 4.4.The provisions of this Paragraph 4, inclusive, do not apply to Asbestos,Polychlorinated 15 biphenyls (PCBs),Petroleum,Hazardous Waste or Radioactive Material covered by 16 Paragraph 4.06. of the General Conditions,unless specifically identified in the Contract 17 Documents. 18 19 5. Availability of Lands for Work,Etc. 20 21 5.1.The lands upon which the Work is to be performed,rights-of-way and easements for 22 access thereto and other lands designated for use by Contractor in performing the Work 23 are identified in the Contract Documents. All additional lands and access thereto 24 required for temporary construction facilities, construction equipment or storage of 25 materials and equipment to be incorporated in the Work are to be obtained and paid for 26 by Contractor. Easements for permanent structures or permanent changes in existing 27 facilities are to be obtained and paid for by City unless otherwise provided in the 28 Contract Documents. 29 30 5.2.Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed 31 in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- 32 of-way, easements, and/or permits are not obtained,the City reserves the right to cancel 33 the award of contract at any time before the Bidder begins any construction work on the 34 project. 35 36 5.3. The Bidder shall be prepared to commence construction without all executed right-of- 37 way, easements, and/or permits, and shall submit a schedule to the City of how _ 38 construction will proceed in the other areas of the project that do not require permits 39 and/or easements. 40 41 6. Interpretations and Addenda 42 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 Addendum No.1 002113-6 INSTRUCTIONS TO BIDDERS Page 6 of 10 1 6.1.All questions about the meaning or intent of the Bidding Documents are to be directed to 2 City in writing on or before 2 p.m.,the Monday prior to the Bid opening. Questions 3 received after this day may not be responded to.Interpretations or clarifications 4 considered necessary by City in response to such questions will be issued by Addenda 5 delivered to all parties recorded by City as having received the Bidding Documents. 6 Only questions answered by formal written Addenda will be binding. Oral and other 7 interpretations or clarifications will be without legal effect. 8 9 Address questions to: 10 11 City of Fort Worth 12 1000 Throckmorton Street 13 Fort Worth,TX 76102 14 Attn: Adolfo Lopez, Water Department 15 Fax: (817)392-2527 16 Email:Adolfo.Lopez@fortworthtexas.gov I Phone: (817)392-7829 18 6 19 20 6.2.Addenda may also be issued to modify the Bidding Documents as deemed advisable by 21 City. f 22 l 23 6.3.Addenda or clarifications may be posted via Buzzsaw. l 24 25 6.4.A prebid conference may be held at the time and place indicated in the Advertisement or 26 INVITATION TO BIDDERS. Representatives of City will be present to discuss the ll 27 Project. Bidders are encouraged to attend and participate in the conference. City will 28 transmit to all prospective Bidders of record such Addenda as City considers necessary 29 in response to questions arising at the conference. Oral statements may not be relied 30 upon and will not be binding or legally effective. 31 32 7. Bid Security 33 34 7.1.Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 35 (5)percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 36 the requirements of Paragraphs 5.01 of the General Conditions. 37 38 7.2.The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 39 have been satisfied. If the Successful Bidder fails to execute and deliver the complete 40 Agreement within 10 days after the Notice of Award,City may consider Bidder to be in 41 default,rescind the Notice of Award,and the Bid Bond of that Bidder will be forfeited. 42 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all 43 other Bidders whom City believes to have a reasonable chance of receiving the award 44 will be retained by City until final contract execution. 45 46 8. Contract Times 47 The number of days within which, or the dates by which,Milestones are to be achieved in 48 accordance with the General Requirements and the Work is to be completed and ready for 49 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 50 attached Bid Form. 51 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 Addendum No.1 0021 13-7 INSTRUCTIONS TO BIDDERS Page 7 of 10 1 9. Liquidated Damages 2 Provisions for liquidated damages are set forth in the Agreement. 3 4 10. Substitute and "Or-Equal" Items 5 The Contract, if awarded,will be on the basis of materials and equipment described in the 6 Bidding Documents without consideration of possible substitute or "or-equal" items. 7 Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or- 8 equal"item of material or equipment may be furnished or used by Contractor if acceptable to 9 City, application for such acceptance will not be considered by City until after the Effective 10 Date of the Agreement. The procedure for submission of any such application by Contractor 11 and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General 12 Conditions and is supplemented in Section 01 25 00 of the General Requirements. 13 14 11. Subcontractors, Suppliers and Others 15 16 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020- 17 12-2011 (as amended),the City has goals for the participation of minority business 18 and/or small business enterprises in City contracts.A copy of the Ordinance can be _ 19 obtained from the Office of the City Secretary. The Bidder shall submit the MBE and 20 SBE Utilization Form, Subcontractor/Supplier Utilization Form,Prime Contractor 21 Waiver Form and/or Good Faith Effort Form with documentation and/or Joint 22 Venture Form as appropriate. The Forms including documentation must be received 23 by the City no later than 2:00 P.M. CST, on the second business days after the bid 24 opening date. The Bidder shall obtain a receipt from the City as evidence the 25 documentation was received.Failure to comply shall render the bid as non- 26 responsive. 27 28 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person 29 or organization against whom Contractor has reasonable objection. 30 31 12. Bid Form 32 33 12.1. The Bid Form is included with the Bidding Documents; additional copies may be 34 obtained from the City. 35 36 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid For-in 37 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 38 the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit 39 price item listed therein. In the case of optional alternatives,the words "No Bid," 40 "No Change," or "Not Applicable" may be entered. Bidder shall state the prices, 41 written in ink in both words and numerals, for which the Bidder proposes to do the 42 work contemplated or furnish materials required. All prices shall be written legibly. 43 In case of discrepancy between price in written words and the price in written 44 numerals,the price in written words shall govern. 45 46 12.3. Bids by corporations shall be executed in the corporate name by the president or a 47 vice-president or other corporate officer accompanied by evidence of authority to 48 sign. The corporate seal shall be affixed. The corporate address and state of 49 incorporation shall be shown below the signature. 50 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 Addendum No.1 0021 13-8 INSTRUCTIONS TO BIDDERS Page 8 of 10 1 12.4. Bids by partnerships shall be executed in the partnership name and signed by a 2 partner,whose title must appear under the signature accompanied by evidence of 3 authority to sign. The official address of the partnership shall be shown below the 4 signature. 5 6 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 7 member and accompanied by evidence of authority to sign. The state of formation of 8 the firm and the official address of the firm shall be shown. 9 10 12.6. Bids by individuals shall show the Bidder's name and official address. 11 12 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 13 indicated on the Bid Form. The official address of the joint venture shall be shown. 14 15 12.8. All names shall be typed or printed in ink below the signature. 16 17 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda,the numbers of 18 which shall be filled in on the Bid Form. 19 20 12.10. Postal and e-mail addresses and telephone number for communications regarding the 21 Bid shall be shown. 22 23 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 24 Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance 25 to State Law Non Resident Bidder. 26 27 13. Submission of Bids 28 Bids shall be submitted on the prescribed Bid Form,provided with the Bidding Documents, 29 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 30 addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed 31 envelope,marked with the City Project Number,Project title,the name and address of 32 Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent 33 through the mail or other delivery system,the sealed envelope shall be enclosed in a separate 34 envelope with the notation "BID ENCLOSED" on the face of it. 35 36 14. Modification and Withdrawal of Bids 37 38 14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office 39 cannot be withdrawn prior to the time set for bid opening. A request for withdrawal 40 must be made in writing by an appropriate document duly executed in the manner 41 that a Bid must be executed and delivered to the place where Bids are to be submitted 42 at any time prior to the opening of Bids. After all Bids not requested for withdrawal "- 43 are opened and publicly read aloud,the Bids for which a withdrawal request has been 44 properly filed may, at the option of the City,be returned unopened. 45 46 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 47 time set for the closing of Bid receipt. 48 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 Addendum No.1 0021 13-9 INSTRUCTIONS TO BIDDERS Page 9 of 10 1 15. Opening of Bids 2 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 3 abstract of the amounts of the base Bids and major alternates (if any)will be made available 4 to Bidders after the opening of Bids. 5 6 16. Bids to Remain Subject to Acceptance 7 All Bids will remain subject to acceptance for the time period specified for Notice of Award 8 and execution and delivery of a complete Agreement by Successful Bidder. City may, at 9 City's sole discretion,release any Bid and nullify the Bid security prior to that date. 10 11 17. Evaluation of Bids and Award of Contract 12 13 17.1. City reserves the right to reject any or all Bids, including without limitation the rights 14 to reject any or all nonconforming,nonresponsive, unbalanced or conditional Bids 15 and to reject the Bid of any Bidder if City believes that it would not be in the best 16 interest of the Project to make an award to that Bidder,whether because the Bid is 17 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 18 meet any other pertinent standard or criteria established by City. City also reserves 19 the right to waive informalities not involving price, contract time or changes in the 20 Work with the Successful Bidder. Discrepancies between the multiplication of units 21 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 22 between the indicated sum of any column of figures and the correct sum thereof will 23 be resolved in favor of the correct sum. Discrepancies between words and figures 24 will be resolved in favor of the words. 25 26 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 27 among the Bidders,Bidder is an interested party to any litigation against City, 28 City or Bidder may have a claim against the other or be engaged in litigation, 29 Bidder is in arrears on any existing contract or has defaulted on a previous 30 contract,Bidder has performed a prior contract in an unsatisfactory manner, or 31 Bidder has uncompleted work which in the judgment of the City will prevent or 32 hinder the prompt completion of additional work if awarded. 33 34 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers, and 35 other persons and organizations proposed for those portions of the Work as to which 36 the identity of Subcontractors, Suppliers, and other persons and organizations must 37 be submitted as provided in the Contract Documents or upon the request of the City. 38 City also may consider the operating costs,maintenance requirements,performance 39 data and guarantees of major items of materials and equipment proposed for 40 incorporation in the Work when such data is required to be submitted prior to the 41 Notice of Award. 42 - - 43 17.3. City may conduct such investigations as City deems necessary to assist in the 44 evaluation of any Bid and to establish the responsibility, qualifications, and financial 45 ability of Bidders,proposed Subcontractors, Suppliers and other persons and 46 organizations to perform and furnish the Work in accordance with the Contract 47 Documents to City's satisfaction within the prescribed time. 48 49 17.4. Contractor shall perform with his own organization,work of a value not less than 50 35% of the value embraced on the Contract, unless otherwise approved by the City. 51 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 Addendum No.1 0021 13-10 INSTRUCTIONS TO BIDDERS Page 10 of 10 1 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and 2 responsive Bidder whose evaluation by City indicates that the award will be in the 3 best interests of the City. 4 5 17.6. Pursuant to Texas Government Code Chapter 2252.001,the City will not award 6 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 7 the lowest bid submitted by a responsible Texas Bidder by the same amount that a 8 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 9 comparable contract in the state in which the nonresident's principal place of 10 business is located. 11 12 17.7. A contract is not awarded until formal City Council authorization. If the Contract is 13 to be awarded, City will award the Contract within 90 days after the day of the Bid 14 opening unless extended in writing. No other act of City or others will constitute 15 acceptance of a Bid. Upon the contractor award a Notice of Award will be issued by 16 the City. 17 18 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 19 20 18. Signing of Agreement 21 When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the 22 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 23 Contractor shall sign and deliver the required number of counterparts of the Agreement to 24 City with the required Bonds, Certificates of Insurance, and all other required documentation. 25 City shall thereafter deliver one fully signed counterpart to Contractor. 26 27 28 29 END OF SECTION CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 Addendum No. 1 c FORTWORTH NATER EMERGENCY RESPONSE CONTRACT City Project Number: 100774 ADDENDUM NO. 2 Release Date: February 24, 2017 Information to Bidders: 1. Add the attached concrete a e — t and steel pipe fittings lists to the Pant B Proposal. To be used in conjunction with bid items 79—90. Please acknowledge receipt of the Addendum in the bid proposal and on the outside of the sealed envelope. C John Carman Receipt Acknowledged: DireciDeeter, er Departmen By: Ji P.E. Engineering Services WATER DEPARTDENT ENGINEERING AND FISCAL SERVICES THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102 817-392-8240 * FAx 817-392-8195 �j, Printed on recycled paper 24" STEEL PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BID COST 24" 30 BEVEL $ 24" 5° BEVEL $ 24" 11-1/40 BEND $ 24" 22-1/20 BEND $ 24" 450 BEND $ 24" 67-1/20 BEND $ 24" 900 BEND $ 24" CLEANING WYE $ 24" DISHED HEAD PLUG $ 24" SPLIT BUTT STRAP CLOSURE $ 24" x 24" STEEL TO D.I. ADAPTOR $ 24" x 16" STEEL OUTLET $ 24" x 12" STEEL OUTLET $ 24" x 10" STEEL OUTLET $ 24" x 8" STEEL OUTLET $ 24" x 6" STEEL OUTLET $ TOTAL LUMP SUM $ 30" STEEL PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BID COST 30" 30 BEVEL $ 30" 5° BEVEL $ 30" 11-1/40 BEND $ 30" 22-1/20 BEND $ 30" 450 BEND $ 30" 67-1/20 BEND $ 30" 900 BEND $ 30" CLEANING WYE $ 30" DISHED HEAD PLUG $ 30" SPLIT BUTT STRAP CLOSURE $ 30" STEEL TO D.I. ADAPTOR $ 30" x 16" STEEL OUTLET $ 30" x 12" STEEL OUTLET $ 30" x 10" STEEL OUTLET $ 30" x 8" STEEL OUTLET $ 30" x 6" STEEL OUTLET $ TOTAL LUMP SUM $ 36" STEEL PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BID COST 36" 30 BEVEL $ 36" 5° BEVEL $ 36" 11-1/40 BEND $ 36" 22-1/20 BEND $ 36" 450 BEND $ 36" 67-1/20 BEND $ 36" 900 BEND $ 36" CLEANING WYE $ 36" DISHED HEAD PLUG $ 36" SPLIT BUTT STRAP CLOSURE $ 36" STEEL TO D.I. ADAPTOR $ 36" x 16" STEEL OUTLET $ 36" x 12" STEEL OUTLET $ 36" x 10" STEEL OUTLET $ 36" x 8" STEEL OUTLET $ 36" x 6" STEEL OUTLET $ TOTAL LUMP SUM $ 42" STEEL PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BID COST 42" 30 BEVEL $ 42" 5° BEVEL $ 42" 11-1/40 BEND $ 42" 22-1/20 BEND $ 42" 450 BEND $ 42" 67-1/20 BEND $ 42" 900 BEND $ 42" CLEANING WYE $ 42" DISHED HEAD PLUG $ 42" SPLIT BUTT STRAP CLOSURE $ 42" STEEL TO D.I. ADAPTOR $ 42" x 16" STEEL OUTLET $ 42" x 12" STEEL OUTLET $ 42" x 10" STEEL OUTLET $ 42" x 8" STEEL OUTLET $ 42" x 6" STEEL OUTLET $ TOTAL LUMP SUM $ 48" STEEL PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BID COST 48" 30 BEVEL $ 48" 5° BEVEL $ 48" 11-1/40 BEND $ 48" 22-1/20 BEND $ 48" 450 BEND $ 48" 67-1/20 BEND $ 48" 900 BEND $ 48" CLEANING WYE $ 48" DISHED HEAD PLUG $ 48' SPLIT BUTT STRAP CLOSURE $ 48" STEEL TO D.I. ADAPTOR $ 48" x 16" STEEL OUTLET $ 48" x 12" STEEL OUTLET $ 48" x 10" STEEL OUTLET $ 48" x 8" STEEL OUTLET $ 48" x 6" STEEL OUTLET $ TOTAL LUMP SUM $ 54" STEEL PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BID COST 54" 30 BEVEL $ 54" 5° BEVEL $ 54" 11-1/40 BEND $ 54" 22-1/20 BEND $ 54" 450 BEND $ 54" 67-1/20 BEND $ 54" 900 BEND $ 54" CLEANING WYE $ 54" DISHED HEAD PLUG $ 54" SPLIT BUTT STRAP CLOSURE $ 54" STEEL TO D.I. ADAPTOR $ 54" x 16" STEEL OUTLET $ 56" x 12" STEEL OUTLET $ 54" x 10" STEEL OUTLET $ 54" x 8" STEEL OUTLET $ 54" x 6" STEEL OUTLET $ TOTAL LUMP SUM $ 24" CONCRETE CYLINDER PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BID COST 24" 30 BEVEL $ 24" 5° BEVEL $ 24" 11-1/40 BEND $ 24" 22-1/20 BEND $ 24" 450 BEND $ 24" 67-1/20 BEND $ 24" 900 BEND $ 24" CLEANING WYE $ 24" DISHED HEAD PLUG $ 24" SPLIT BUTT STRAP CLOSURE $ 24" x 24" CONC. TO D.I. ADAPTOR $ 24" x 16" M.J. OUTLET $ 24" x 12" M.J. OUTLET $ 24" x 10" M.J. OUTLET $ 24" x 8" M.J. OUTLET $ 24" x 6" M.J. OUTLET $ TOTAL LUMP SUM $ 30" CONCRETE CYLINDER PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BID COST 30" 30 BEVEL $ 30" 50 BEVEL $ 30" 11-1/40 BEND $ 30" 22-1/20 BEND $ 30" 450 BEND $ 30" 67-1/20 BEND $ 30" 900 BEND $ 30" CLEANING WYE $ 30" DISHED HEAD PLUG $ 30" SPLIT BUTT STRAP CLOSURE $ 30" CONC. TO D.I. ADAPTOR $ 30" x 16" M.J. OUTLET $ 30" x 12" M.J. OUTLET $ 30" x 10" M.J. OUTLET $ 30" x 8" M.J. OUTLET $ 30" x 6" M.J. OUTLET $ TOTAL LUMP SUM $ 36" CONCRETE CYLINDER PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BID COST 36" 30 BEVEL $ 36" 5° BEVEL $ 36" 11-1/40 BEND $ 36" 22-1/20 BEND $ 36" 450 BEND $ 36" 67-1/20 BEND $ 36" 900 BEND $ 36" CLEANING WYE $ 36" DISHED HEAD PLUG $ 36" SPLIT BUTT STRAP CLOSURE $ 36" CONC. TO D.I. ADAPTOR $ 36" x 16" M.J. OUTLET $ 36" x 12" M.J. OUTLET $ 36" x 10" M.J. OUTLET $ 36" x 8" M.J. OUTLET $ 36" x 6" M.J. OUTLET $ TOTAL LUMP SUM $ 42" CONCRETE CYLINDER PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BID COST 42" 30 BEVEL $ 42" 5° BEVEL $ 42" 11-1/4° BEND $ 42" 22-1/20 BEND $ 42" 450 BEND $ 42" 67-1/20 BEND $ 42" 900 BEND $ 42" CLEANING WYE $ 42" DISHED HEAD PLUG $ 42" SPLIT BUTT STRAP CLOSURE $ 42" CONC. TO D.I. ADAPTOR $ 42" x 16" M.J. OUTLET $ 42" x 12" M.J. OUTLET $ 42" x 10" M.J. OUTLET $ 42" x 8" M.J. OUTLET $ 42" x 6" M.J. OUTLET $ TOTAL LUMP SUM $ 48" CONCRETE CYLINDER PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BID COST 48" 30 BEVEL $ 48" 5° BEVEL $ 48" 11-1/40 BEND $ 48" 22-1/20 BEND $ 48" 450 BEND $ 48" 67-1/20 BEND $ 48" 900 BEND $ 48" CLEANING WYE $ 48" DISHED HEAD PLUG $ 48' SPLIT BUTT STRAP CLOSURE $ 48" CONC. TO D.I. ADAPTOR $ 48" x 16" M.J. OUTLET $ 48" x 12" M.J. OUTLET $ 48" x 10" M.J. OUTLET $ 48" x 8" M.J. OUTLET $ 48" x 6" M.J. OUTLET $ TOTAL LUMP SUM $ 54" CONCRETE CYLINDER PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BI® COST 54" 30 BEVEL $ 54" 50 BEVEL $ 54" 11-1/40 BEND $ 54" 22-1/20 BEND $ 54" 450 BEND $ 54" 67-1/20 BEND $ 54" 900 BEND $ 54" CLEANING WYE $ 54" DISHED HEAD PLUG $ 54" SPLIT BUTT STRAP CLOSURE $ 54" CONC. TO D.I. ADAPTOR $ 54" x 16" M.J. OUTLET $ 56" x 12" M.J. OUTLET $ 54" x 10" M.J. OUTLET $ 54" x 8" M.J. OUTLET $ 54" x 6" M.J. OUTLET $ TOTAL LUMP SUM $ FORTWORTH [ WATER EMERGENCY RESPONSE CONTRACT City Project Number: 100774 [ ADDENDUM NO. 3 Release Date:February 28, 2017 Bid Opening,Date: March 2, 2017 [ Information to Bidders: Add the additional bid items listed below to the Part B -Proposal [ 129. 2 Ea. 12 Foot Dia. Vertical Shaft [ Excavation (0'-12' Depth) Per Each: Dollars and Cents 130. 10 Vf, Vertical Shaft Excavation Extra Depth (Over 12') Per Vertical Foot: Dollars and Cents I Please acknowledge receipt of the Addendum in the bid proposal and on the outside of the sealed envelope. [ John Carman Receipt Acknowledged: Director, Water Department By: L J' Deeter, P.E. Engineering Services WA'V'ER DEPARTMENT ENGINEERING AND FISCAL SERVICES THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102 817-392-8240 * FAX 817-392-8195 Co Printed on recycled paper 00 11 13-1 INVITATION TO BIDDERS Page 1 of 2 1 SECTION 00 1113 2 INVITATION TO BIDDERS 3 4 RECEIPT OF BIDS 5 Sealed bids for the construction of Water Emergency Response Contract, City Proj. No. 6 100774 will be received by the City of Fort Worth Purchasing Office: 7 8 City of Fort Worth 9 Purchasing Division 10 1000 Throckmorton Street 11 Fort Worth, Texas 76102 12 until {1:30 P.M. CST, Thursday, February 16, 20171, and bids will be opened publicly 13 and read aloud at 2:00 PM CST in the Council Chambers. 14 15 GENERAL DESCRIPTION OF WORK 16 The major work will generally consist of the following: 24"- 54"water mains and water 17 services. 18 19 Bidders should be aware that the City reserves the right to renew this contract for two 20 (2) one year terms/expenditures of 1,250,000.00 under the same terms, conditions, and 21 unit prices. 22 23 PREQUALIFICATION 24 The improvements included in this project must be performed by a contractor who is 25 pre-qualified by the City at the time of bid opening. The procedures for qualification and 26 pre-qualification are outlined in the Section 00 21 13 — INSTRUCTIONS TO BIDDERS. 27 28 DOCUMENT EXAMINATION AND PROCUREMENTS 29 The Bidding and Contract Documents may be examined or obtained on-line by visiting 30 the City of Fort Worth's Purchasing Division website at 31 http://www.fortworthgov.org/purchasing/ and clicking on the Buzzsaw link to the 32 advertised project folders on the City's Buzzsaw site. The Contract Documents may be 33 downloaded, viewed, and printed by interested contractors and/or suppliers. 34 35 Copies of the Bidding and Contract Documents may be obtained from Fort Worth Water 36 Dept., Design Services 927 Taylor St. Fort Worth Texas 76102 37 38 There is no cost of Bidding and Contract Documents 39 40 CITY'S RIGHT TO ACCEPT OR REJECT BIDS 41 City reserves the right to waive irregularities and to accept or reject bids. 42 43 44 45 46 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100774 Revised July 1,2011 0011 13-2 INVITATION TO BIDDERS Page 2 of 2 1 2 3 4 INQUIRIES 5 All inquiries relative to this procurement should be addressed to the following: 6 Attn: Adolfo Lopez, City of Fort Worth 7 Email: adolfo.lopez@fortworthtexas.gov 8 Phone: 817-392-7829 9 AND/OR 10 Attn: Jim Deeter,P.E., City of Fort Worth 11 Email: jim.deeter@fortworthtexas.gov 12 Phone: 817-392-7803 13 14 ADVERTISEMENT DATES 15 January 19, 2017 16 January 26, 2017 17 18 END OF SECTION CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100774 Revised July 1,2011 0021 13-1 INSTRUCTIONS TO BIDDERS Page 1 of 10 1 SECTION 00 2113 2 INSTRUCTIONS TO BIDDERS 3 4 1. Defined Terms 5 6 1.1.Terms used in these INSTRUCTIONS TO BIDDERS,which are defined in Section 00 72 7 00- GENERAL CONDITIONS. 8 9 1.2.Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 10 meanings indicated below which are applicable to both the singular and plural thereof. 11 12 1.2.1. Bidder: Any person,firm,partnership, company, association, or corporation acting 13 directly through a duly authorized representative, submitting a bid for performing 14 the work contemplated under the Contract Documents. 15 16 1.2.2. Nonresident Bidder: Any person,firm,partnership, company, association, or 17 corporation acting directly through a duly authorized representative, submitting a 18 bid for performing the work contemplated under the Contract Documents whose l19 principal place of business is not in the State of Texas. 20 21 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 22 (on the basis of City's evaluation as hereinafter provided)makes an award. 23 24 2. Copies of Bidding Documents N 25 26 2.1.Neither City nor Engineer shall assume any responsibility for errors or misinterpretations 27 resulting from the Bidders use of incomplete sets of Bidding Documents. 28 29 2.2.City and Engineer in making copies of Bidding Documents available do so only for the 30 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant 31 for any other use. 32 33 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 34 35 3.1.All Bidders and their subcontractors are required to be prequalified for the work types 36 requiring prequalification at the time of bidding. Bids received from contractors who are 37 not prequalified(even if inadvertently opened)shall not be considered. Prequalification 38 requirement work types and documentation are as follows: 39 40 3.1.1. Paving—Requirements document located at; 41 https://proiccipoint.buzzsaw.com/fortworthizov/Resources/02%20- 42 %20Construction%2ODocuments/Contractor%2OPregualification/TPW%2OPaving 43 %20Contractor%2OPrequalification%2OProgram/PREQUALIFICATION%20REQ 44 UIREMENTS%20FOR%20PAVING%2000NTRACTORS.PDF?public 45 f46 3.1.2. Roadway and Pedestrian Lighting—Requirements document located at; l l CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 ` Revised August 21,2015 0021 13-2 INSTRUCTIONS TO BIDDERS Page 2 of 10 1 haps://projecipoint.buzzsaw.com/fortworthizov/Resources/02%20- 2 %20Construction%2ODocuments/Contractor%2OPrequalification/TPW%2OPaviniz 3 %20Contractor%2OPregualification%2OProggm/PREQUALIFICATION%20REQ 4 UIREMENTS%20FOR%20PAVING%2000NTRACTORS.PDF?public 5 6 3.1.3. Water and Sanitary Sewer—Requirements document located at; 7 https://proiecipoint.buzzsaw.com/fortworthizov/Resources/02%20- 8 %20Construction%2ODocuments/Contractor%o2OPregualification/Water%2Oand%2 9 OSanitM%2OSewer%2OContractor%2OPrequalification%2OProgram/WSS%20pre 10 gual%20requirements.doc?public 11 12 13 3.2.Each Bidder unless currently prequalified, must be prepared to submit to City within 14 seven(7) calendar days prior to Bid opening,the documentation identified in Section 00 15 45 11,BIDDERS PREQUALIFICATIONS. 16 17 3.2.1. Submission of and/or questions related to prequalification should be addressed to 18 the City contact as provided in Paragraph 6.1. 19 20 21 3.3.The City reserves the right to require any pre-qualified contractor who is the apparent low 22 bidder(s)for a project to submit such additional information as the City, in its sole 23 discretion may require, including but not limited to manpower and equipment records, 24 information about key personnel to be assigned to the project, and construction schedule, 25 to assist the City in evaluating and assessing the ability of the apparent low bidder(s)to 26 deliver a quality product and successfully complete projects for the amount bid within 27 the stipulated time frame. Based upon the City's assessment of the submitted 28 information, a recommendation regarding the award of a contract will be made to the 29 City Council. Failure to submit the additional information, if requested,may be grounds 30 for rejecting the apparent low bidder as non-responsive. Affected contractors will be 31 notified in writing of a recommendation to the City Council. 32 33 3.4.In addition to prequalification, additional requirements for qualification may be required 34 within various sections of the Contract Documents. 35 36 3.5.Special qualifications required for this project include the following: 37 38 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 39 40 4.1.Before submitting a Bid, each Bidder shall: 41 42 4.1.1. Examine and carefully study the Contract Documents and other related data 43 identified in the Bidding Documents (including "technical data" referred to in 44 Paragraph 4.2. below).No information given by City or any representative of the 45 City other than that contained in the Contract Documents and officially 46 promulgated addenda thereto, shall be binding upon the City. 47 48 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and 49 site conditions that may affect cost,progress,performance or furnishing of the 50 Work. 51 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 0021 13-3 INSTRUCTIONS TO BIDDERS Page 3 of 10 1 4.1.3. Consider federal, state and local Laws and Regulations that may affect cost, 2 progress,performance or furnishing of the Work. 3 4 4.1.4. Be advised, City, in accordance with Title VI of the Civil Rights Act of 1964, 78 5 Stat. 252,42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, 6 Department of Transportation, Subtitle A, Office of the Secretary, Part 21, 7 Nondiscrimination in Federally-assisted programs of the Department of 8 Transportation issued pursuant to such Act, hereby notifies all bidders that it will 9 affirmatively insure that in any contract entered into pursuant to this advertisement, 10 minority business enterprises will be afforded full oppol tunny to submit bids in 11 response to this invitation and will not be discriminated against on the grounds of 12 race, color, or national origin in consideration of award. 13 14 4.1.5. Study all: (i)reports of explorations and tests of subsurface conditions at or 15 contiguous to the Site and all drawings of physical conditions relating to existing 16 surface or subsurface structures at the Site (except Underground Facilities)that 17 have been identified in the Contract Documents as containing reliable "technical 18 data" and(ii)reports and drawings of Hazardous Environmental Conditions, if any, 19 at the Site that have been identified in the Conti-act Documents as containing 20 reliable "technical data." 21 22 4.1.6. Be advised that the Contract Documents on file with the City shall constitute all of 23 the information which the City will furnish. All additional information and data 24 which the City will supply after promulgation of the formal Contract Documents 25 shall be issued in the form of written addenda and shall become part of the Contract 26 Documents just as though such addenda were actually written into the original 27 Contract Documents.No information given by the City other than that contained in 28 the Contract Documents and officially promulgated addenda thereto, shall be 29 binding upon the City. 30 31 4.1.7. Perform independent research, investigations,tests, borings, and such other means 32 as may be necessary to gain a complete knowledge of the conditions which will be 33 encountered during the construction of the project. On request, City may provide 34 each Bidder access to the site to conduct such examinations, investigations, 35 explorations,tests and studies as each Bidder deems necessary for submission of a 36 Bid. Bidder must fill all holes and clean up and restore the site to its former 37 conditions upon completion of such explorations, investigations,tests and studies. 38 39 4.1.8. Determine the difficulties of the Work and all attending circumstances affecting the 40 cost of doing the Work,time required for its completion, and obtain all information 41 required to make a proposal. Bidders shall rely exclusively and solely upon their 42 own estimates, investigation, research,tests, explorations, and other data which are 43 necessary for full and complete information upon which the proposal is to be based. 44 It is understood that the submission of a proposal is prima-facie evidence that the 45 Bidder has made the investigation, examinations and tests herein required. Claims 46 for additional compensation due to variations between conditions actually 47 encountered in construction and as indicated in the Contract Documents will not be 48 allowed. 49 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 0021 13-4 INSTRUCTIONS TO BIDDERS Page 4 of 10 1 4.1.9. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or 2 between the Contract Documents and such other related documents. The Contractor 3 shall not take advantage of any gross error or omission in the Contract Documents, 4 and the City shall be permitted to make such corrections or interpretations as may 5 be deemed necessary for fulfillment of the intent of the Contract Documents. 6 7 4.2. Reference is made to Section 00 73 00—Supplementary Conditions for identification of: 8 9 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 10 the site which have been utilized by City in preparation of the Contract Documents. 11 The logs of Soil Borings, if any, on the plans are for general information only. 12 Neither the City nor the Engineer guarantee that the data shown is representative of 13 conditions which actually exist. 14 15 4.2.2. those drawings of physical conditions in or relating to existing surface and 16 subsurface structures (except Underground Facilities) which are at or contiguous to 17 the site that have been utilized by City in preparation of the Contract Documents. 18 19 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 20 on request. Those reports and drawings may not be part of the Contract 21 Documents, but the "technical data" contained therein upon which Bidder is entitled 22 to rely as provided in Paragraph 4.02. of the General Conditions has been identified 23 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 24 responsible for any interpretation or conclusion drawn from any "technical data" or 25 any other data, interpretations, opinions or information. 26 27 4.3.The submission of a Bid will constitute an incontrovertible representation by Bidder(i) 28 that Bidder has complied with every requirement of this Paragraph 4, (ii) that without 29 exception the Bid is premised upon performing and furnishing the Work required by the 30 Contract Documents and applying the specific means, methods,techniques, sequences or 31 procedures of construction(if any)that may be shown or indicated or expressly required 32 by the Contract Documents, (iii)that Bidder has given City written notice of all 33 conflicts, errors, ambiguities and discrepancies in the Contract Documents and the 34 written resolutions thereof by City are acceptable to Bidder, and when said conflicts, 35 etc., have not been resolved through the interpretations by City as described in 36 Paragraph 6., and(iv)that the Contract Documents are generally sufficient to indicate 37 and convey understanding of all terms and conditions for performing and furnishing the 38 Work. 39 40 4.4.The provisions of this Paragraph 4, inclusive, do not apply to Asbestos,Polychlorinated 41 biphenyls (PCBs), Petroleum,Hazardous Waste or Radioactive Material covered by 42 Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract 43 Documents. 44 45 5. Availability of Lands for Work, Etc. 46 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 002113-5 INSTRUCTIONS TO BIDDERS Page 5 of 10 1 5.1.The lands upon which the Work is to be performed,rights-of-way and easements for 2 access thereto and other lands designated for use by Contractor in performing the Work 3 are identified in the Contract Documents. All additional lands and access thereto 4 required for temporary construction facilities,construction equipment or storage of 5 materials and equipment to be incorporated in the Work are to be obtained and paid for 6 by Contractor. Easements for permanent structures or permanent changes in existing 7 facilities are to be obtained and paid for by City unless otherwise provided in the 8 Contract Documents. 9 10 5.2.Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed 11 in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- 12 of-way, easements, and/or permits are not obtained,the City reserves the right to cancel 13 the award of contract at any time before the Bidder begins any construction work on the 14 project. 15 16 5.3. The Bidder shall be prepared to commence construction without all executed right-of- 17 way, easements,and/or permits, and shall submit a schedule to the City of how 18 construction will proceed in the other areas of the project that do not require permits 19 and/or easements. 20 21 6. Interpretations and Addenda 22 23 6.1.All questions about the meaning or intent of the Bidding Documents are to be directed to 24 City in writing on or before 2 p.m.,the Monday prior to the Bid opening. Questions 25 received after this day may not be responded to. Interpretations or clarifications 26 considered necessary by City in response to such questions will be issued by Addenda 27 delivered to all parties recorded by City as having received the Bidding Documents. 28 Only questions answered by formal written Addenda will be binding. Oral and other 29 interpretations or clarifications will be without legal effect. 30 31 Address questions to: 32 33 City of Fort Worth 34 1000 Throckmorton Street 35 Fort Worth,TX 76102 36 Attn: Adolfo Lopez, Water Department 37 Fax: (817)392-2527 38 Email:Adolfo.Lopez@fortworthtexas.gov 39 Phone: (817)392-7829 40 41 42 6.2.Addenda may also be issued to modify the Bidding Documents as deemed advisable by 43 City. 44 45 6.3.Addenda or clarifications may be posted via Buzzsaw. 46 f CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 0021 13-6 INSTRUCTIONS TO BIDDERS Page 6 of 10 1 6.4.A prebid conference may be held at the time and place indicated in the Advertisement or 2 INVITATION TO BIDDERS. Representatives of City will be present to discuss the 3 Project. Bidders are encouraged to attend and participate in the conference. City will 4 transmit to all prospective Bidders of record such Addenda as City considers necessary 5 in response to questions arising at the conference. Oral statements may not be relied 6 upon and will not be binding or legally effective. 7 8 7. Bid Security 9 10 7.1.Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 11 (5) percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 12 the requirements of Paragraphs 5.01 of the General Conditions. 13 14 7.2.The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 15 have been satisfied. If the Successful Bidder fails to execute and deliver the complete 16 Agreement within 10 days after the Notice of Award, City may consider Bidder to be in 17 default, rescind the Notice of Award, and the Bid Bond of that Bidder will be forfeited. 18 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all 19 other Bidders whom City believes to have a reasonable chance of receiving the award 20 will be retained by City until final contract execution. 21 22 8. Contract Times 23 The number of days within which, or the dates by which,Milestones are to be achieved in 24 accordance with the General Requirements and the Work is to be completed and ready for 25 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 26 attached Bid Form. 27 28 9. Liquidated Damages 29 Provisions for liquidated damages are set forth in the Agreement. 30 31 10. Substitute and "Or-Equal" Items 32 The Contract, if awarded, will be on the basis of materials and equipment described in the 33 Bidding Documents without consideration of possible substitute or "or-equal" items. 34 Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or- 35 equal" item of material or equipment may be furnished or used by Contractor if acceptable to 36 City, application for such acceptance will not be considered by City until after the Effective 37 Date of the Agreement. The procedure for submission of any such application by Contractor 38 and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General 39 Conditions and is supplemented in Section 01 25 00 of the General Requirements. 40 41 11. Subcontractors,Suppliers and Others 42 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 0021 13-7 INSTRUCTIONS TO BIDDERS Page 7 of 10 1 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020- 2 12-2011 (as amended),the City has goals for the participation of minority business 3 and/or small business enterprises in City contracts. A copy of the Ordinance can be 4 obtained from the Office of the City Secretary. The Bidder shall submit the MBE and 5 SBE Utilization Form, Subcontractor/Supplier Utilization Form,Prime Contractor 6 Waiver Form and/or Good Faith Effort Form with documentation and/or Joint 7 Venture Form as appropriate. The Forms including documentation must be received 8 by the City no later than 2:00 P.M. CST, on the second business days after the bid 9 opening date. The Bidder shall obtain a receipt from the City as evidence the 10 documentation was received. Failure to comply shall render the bid as non- 11 responsive. 12 13 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person 14 or organization against whom Contractor has reasonable objection. 15 16 12. Bid Form 17 18 12.1. The Bid Form is included with the Bidding Documents; additional copies may be 19 obtained from the City. 20 21 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form 22 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 23 the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit 24 price item listed therein. In the case of optional alternatives,the words "No Bid," 25 "No Change," or"Not Applicable" may be entered. Bidder shall state the prices, 26 written in ink in both words and numerals, for which the Bidder proposes to do the 27 work contemplated or furnish materials required. All prices shall be written legibly. 28 In case of discrepancy between price in written words and the price in written 29 numerals,the price in written words shall govern. 30 31 12.3. Bids by corporations shall be executed in the corporate name by the president or a 32 vice-president or other corporate officer accompanied by evidence of authority to 33 sign. The corporate seal shall be affixed. The corporate address and state of 34 incorporation shall be shown below the signature. 35 36 12.4. Bids by partnerships shall be executed in the partnership name and signed by a 37 partner, whose title must appear under the signature accompanied by evidence of 38 authority to sign. The official address of the partnership shall be shown below the 39 signature. 40 41 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 42 member and accompanied by evidence of authority to sign. The state of formation of 43 the firm and the official address of the firm shall be shown. 44 45 12.6. Bids by individuals shall show the Bidder's name and official address. 46 47 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 48 indicated on the Bid Form. The official address of the joint venture shall be shown. 49 50 12.8. All names shall be typed or printed in ink below the signature. 51 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 0021 13-8 INSTRUCTIONS TO BIDDERS Page 8 of 10 1 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda,the numbers of 2 which shall be filled in on the Bid Form. 3 4 12.10. Postai and e-mail addresses and telephone number for communications regarding the 5 Bid shall be shown. 6 7 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 8 Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance 9 to State Law Non Resident Bidder. 10 11 13. Submission of Bids 12 Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, 13 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 14 addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed 15 envelope, marked with the City Project Number,Project title,the name and address of 16 Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent 17 through the mail or other delivery system,the sealed envelope shall be enclosed in a separate 18 envelope with the notation "BID ENCLOSED" on the face of it. 19 20 14. Modification and Withdrawal of Bids 21 22 14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office 23 cannot be withdrawn prior to the time set for bid opening. A request for withdrawal 24 must be made in writing by an appropriate document duly executed in the manner 25 that a Bid must be executed and delivered to the place where Bids are to be submitted 26 at any time prior to the opening of Bids. After all Bids not requested for withdrawal 27 are opened and publicly read aloud,the Bids for which a withdrawal request has been 28 properly filed may, at the option of the City, be returned unopened. 29 30 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 31 time set for the closing of Bid receipt. 32 33 15. Opening of Bids 34 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 35 abstract of the amounts of the base Bids and major alternates (if any) will be made available 36 to Bidders after the opening of Bids. 37 38 16. Bids to Remain Subject to Acceptance 39 All Bids will remain subject to acceptance for the time period specified for Notice of Award 40 and execution and delivery of a complete Agreement by Successful Bidder. City may, at 41 City's sole discretion,release any Bid and nullify the Bid security prior to that date. 42 43 17. Evaluation of Bids and Award of Contract 44 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 0021 13-9 INSTRUCTIONS TO BIDDERS Page 9 of 10 1 17.1. City reserves the right to reject any or all Bids, including without limitation the rights 2 to reject any or all nonconforming,nonresponsive, unbalanced or conditional Bids 3 and to reject the Bid of any Bidder if City believes that it would not be in the best 4 interest of the Project to make an award to that Bidder, whether because the Bid is 5 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 6 meet any other pertinent standard or criteria established by City. City also reserves 7 the right to waive informalities not involving price, contract time or changes in the 8 Work with the Successful Bidder. Discrepancies between the multiplication of units 9 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 10 between the indicated sum of any column of figures and the correct sum thereof will 11 be resolved in favor of the correct sum. Discrepancies between words and figures 12 will be resolved in favor of the words. 13 14 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 15 among the Bidders, Bidder is an interested party to any litigation against City, 16 City or Bidder may have a claim against the other or be engaged in litigation, 17 Bidder is in arrears on any existing contract or has defaulted on a previous 18 contract, Bidder has performed a prior contract in an unsatisfactory manner, or 19 Bidder has uncompleted work which in the judgment of the City will prevent or 20 hinder the prompt completion of additional work if awarded. 21 22 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers, and 23 other persons and organizations proposed for those portions of the Work as to which 24 the identity of Subcontractors, Suppliers, and other persons and organizations must 25 be submitted as provided in the Contract Documents or upon the request of the City. 26 City also may consider the operating costs, maintenance requirements,performance 27 data and guarantees of major items of materials and equipment proposed for 28 incorporation in the Work when such data is required to be submitted prior to the 29 Notice of Award. 30 31 17.3. City may conduct such investigations as City deems necessary to assist in the 32 evaluation of any Bid and to establish the responsibility, qualifications, and financial _ 33 ability of Bidders,proposed Subcontractors, Suppliers and other persons and 34 organizations to perform and furnish the Work in accordance with the Contract 35 Documents to City's satisfaction within the prescribed time. 36 37 17.4. Contractor shall perform with his own organization, work of a value not less than 38 35% of the value embraced on the Contract, unless otherwise approved by the City. 39 40 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and 41 responsive Bidder whose evaluation by City indicates that the award will be in the 42 best interests of the City. _ 43 44 17.6. Pursuant to Texas Government Code Chapter 2252.001,the City will not award 45 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 46 the lowest bid submitted by a responsible Texas Bidder by the same amount that a 47 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 48 comparable contract in the state in which the nonresident's principal place of 49 business is located. 50 CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 0021 13-10 INSTRUCTIONS TO BIDDERS Page 10 of 10 1 17.7. A contract is not awarded until formal City Council authorization. If the Contract is 2 to be awarded, City will award the Contract within 90 days after the day of the Bid 3 opening unless extended in writing. No other act of City or others will constitute 4 acceptance of a Bid. Upon the contractor award a Notice of Award will be issued by 5 the City. 6 7 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 8 9 18. Signing of Agreement 10 When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the 11 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 12 Contractor shall sign and deliver the required number of counterparts of the Agreement to 13 City with the required Bonds, Certificates of Insurance, and all other required documentation. 14 City shall thereafter deliver one fully signed counterpart to Contractor. 15 16 17 18 END OF SECTION CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 100774 Revised August 21,2015 00 35 13- 1 CONFLICT OF INTEREST AFFIDAVIT Page 1 of 1 1 SECTION 00 35 13 2 CONFLICT OF INTEREST AFFIDAVIT 3 4 Each bidder, offeror, or respondent (hereinafter also referred to as "you'd to a City of 5 Fort Worth (also referred to as "City'� procurement are required to complete Conflict of 6 Interest Questionnaire (the attached CIQ Form) and Local Government Officer Conflicts 7 Disclosure Statement (the attached CIS Form) below pursuant to state law. This affidavit 8 will certify that the Bidder has on file with the City Secretary the required documentation 9 and is eligible to bid on City Work. The referenced forms may be downloaded from the 10 website links provided below. 11 12 http://www.ethics.state.tx.us/forms/CIQ.pdf 13 14 htti)://www.ethics.state.tx.us/forms/CIS.pdf 15 16 CIQ Form is on file with City Secretary 17 18 0 CIQ Form is being provided to the City Secretary 19 20 CIS Form is on File with City Secretary 21 22 0 CIS Form is being provided to the City Secretary 23 24 25 26 BIDDER: 27 zs �rnnai,'ematULA 1 x,LP By: BYr)C-k 29 Company 9906G (Pllet30 p311 C)• 6DXJr3yLSignature: .�, - 32 Address33 stn 1 34 -'0�-� D`' �1� �Q�1 q Title: 35 City/State/Zip (Please Print) 36 37 38 END OF SECTION CITY OF FORT WORTH WATER EMERGENCY RESPONSE CONTRACT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100774 Revised March 27, 2012 0041 00 BID FORM Page 1 of 3 SECTION 00 4100 BID FORM TO: The City Manager c/o:The Purchasing Department 1000 Throckmorton Street City of Fort Worth,Texas 76102 FOR: Water Emergency Response Contract City Project No.: 100774 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization,or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt,fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice"means the offering, giving, receiving,or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process to the detriment of City(b)to establish Bid prices at artificial non-competitive levels,or(c)to deprive City of the benefits of free and open competition. c. "collusive practice"means a scheme or arrangement between two or more Bidders,with or without the knowledge of City,a purpose of which is to establish Bid prices at artificial, non- competitive levels. d. "coercive practice"means harming or threatening to harm,directly or indirectly,persons or their property to influence their participation in the bidding process or affect the execution of the Contract. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 00 410000 43 13_00 42 43_00 43 37_00 45 12_00 3513_Bid Proposal Workbook.xls 0041 00 BID FORM Page 2 of 3 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Water Improvements 4. Time of'Completion 4.1. The Work will be complete for Final Acceptance within 365 days days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions, 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work(and/or achievement of Milestones)within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions . c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 *If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. Total Bid $ ��� 9�q� X43. a0 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook.xls 0041 00 BID FORM Page 3 of 3 7. Bid Submittal This Bid is submitted on ry-la rC1�1 a� �©�� by the entity named below. Respectfully submitted, Receipt is acknowledged of the Initial following Addenda: By: Addendum No. 1: ✓ ( ature) Addendum No. 2: r Addendum No. 3: ✓ Le Addendum No. 4: (- LvQed'(Vame) Title: Company: yiaks- P Y--CoYI1'-u-C1 bvl-TY,LPCorporate Seal: Address: P o- (�)Q-/' I OD' Ll iz:-o U0 ,fix Ce1 �� State of Incorporation: `-r'p-xa S Email: b tib CV, O Phone: g — 5 3,L-4 — 1`7 L4 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook.xls BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 1. 0170.0102 20 Ea. Work Order Mobilization 01 70 00 $ $3,000.00 $ $60,000.00 Per Each: Three Thousand Dollars and No Cents 2. 3311.0661 100 Lf. 24" PVC C905 Water Pipe $ $390.00 $ $39,000.00 Per Linear Foot: Three Hundred Ninety Dollars and No Cents 3. 3311.0551 100 Lf. 24" DIP Water $ $430.00 $ $43,000.00 Per Linear Foot: Four Hundred Thirty Dollars and No Cents 4. 3311.0751 100 Lf. 30" DIP Water $ $500.00 $ $50,000.00 Per Linear Foot: Five Hundred Dollars and No Cents 5. 3311.0851 100 Lf. 36" DIP Water $ $600.00 $ $60,000.00 Per Linear Foot: Six Hundred Dollars and No Cents 6. 3311.0951 100 Lf. 42" DIP Water $ $675.00 $ $67,500.00 Per Linear Foot: Six Hundred Seventy Five Dollars and No Cents 7. 3311.1051 100 Lf. 48" DIP Water $ $750.00 $ $75,000.00 Per Seven Hundred Fifty Dollars and No Cents 8. 3311.1151 100 Lf. 54" DIP Water $ $850.00 $ $85,000.00 Per Linear Foot: Eight Hundred Fifty Dollars and No Cents 9. 3311.0671 100 Lf. 24"Steel AWWA C200 Water Pipe $ $430.00 $ $43,000.00 Per Linear Foot: Four Hundred Thirty Dollars and No Cents 10. 3311.0761 100 Lf. 30"Steel AWWA C200 Water Pipe $ $475.00 $ $47,500.00 Per Linear Foot: Four Hundred Seventy Five Dollars and No Cents B-1 BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 11. 3311.0861 100 Lf. 36"Steel AWWA C200 Water Pipe $ $510.00 $ $51,000.00 Per Linear Foot: Five Hundred Ten Dollars and No Cents 12. 3311.0961 100 Lf. 42"Steel AWWA C200 Water Pipe $ $545.00 $ $54,500.00 Per Linear Foot: Five Hundred Forty Five Dollars and No Cents 13. 3311.1061 100 Lf. 48"Steel AWWA C200 Water Pipe $ $600.00 $ $60,000.00 Per Linear Foot: Six Hundred Dollars and No Cents 14. 3311.1161 100 Lf. 54"Steel AWWA C200 Water Pipe $ $720.00 $ $72,000.00 Per Linear Foot: Seven Hundred Twenty Dollars and No Cents 15. 3311.0681 100 Lf. 24"Conc.AMA C303 Water Pipe $ $220.00 $ $22,000.00 Per Linear Foot: Two Hundred Twenty Dollars and No Cents 16. 3311.0771 100 Lf. 30"Conc.AWWA C303 Water Pipe $ $280.00 $ $28,000.00 Per Linear Foot: Two Hundred Eighty Dollars and No Cents 17. 3311.0871 100 Lf. 36"Conc.AWWA C303 Water Pipe $ $380.00 $ $38,000.00 Per Linear Foot: Three Hundred Eighty Dollars and No Cents 18. 3311.0971 100 Lf. 42" Conc.AWWA C303 Water Pipe $ $400.00 $ $40,000.00 Per Linear Foot: Four Hundred Dollars and No Cents 19. 3311.1071 100 Lf. 48"Conc.AWWA C303 Water Pipe $ $500.00 $ $50,000.00 Per Linear Foot: Five Hundred Dollars and No Cents B-2 BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 20. 3311.1171 100 Lf. 54"Conc.AWWA C303 Water Pipe $ $600.00 $ $60,000.00 Per Linear Foot: Six Hundred Dollars and No Cents 21. 3305.2007 100 Lf. 24"Water Carrier Pipe(DI w/SS Casing Spacers) $ $310.00 $ $31,000.00 Per Linear Foot: Three Hundred Ten Dollars and No Cents 22. 3305.2008 100 Lf. 30"Water Carrier Pipe(DI w/SS Casing Spacers) $ $370.00 $ $37,000.00 Per Linear Foot: Three Hundred Seventy Dollars and No Cents 23. 3305.2009 100 Lf. 36"Water Carrier Pipe(DI w/SS Casing Spacers) $ $500.00 $ $50,000.00 Per Linear Foot: Five Hundred Dollars and No Cents 24. 3305.2010 100 Lf. 42"Water Carrier Pipe(DI w/SS Casing Spacers) $ $575.00 $ $57,500.00 Per Linear Foot: Five Hundred Seventy Five Dollars and No Cents 25. 3305.2011 100 Lf. 48"Water Carrier Pipe(DI w/SS Casing Spacers) $ $650.00 $ $65,000.00 Per Linear Foot: Six Hundred Fifty Dollars and No Cents 26. 3305.2012 100 Lf. 54"Water Carrier Pipe(DI w/SS Casing Spacers) $ $750.00 $ $75,000.00 Per Linear Foot: Seven Hundred Fifty Dollars and No Cents 27. 3305.1006 100 Lf. 36"Casing by Open Cut(Welded Steel) $ $400.00 $ $40,000.00 Per Linear Foot: Four Hundred Dollars and No Cents B-3 BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 28. 3305.1007 100 Lf. 42"Casing by Open Cut(Welded Steel) $ $450.00 $ $45,000.00 Per Linear Foot: Four Hundred Fifty Dollars and No Cents 29. 3305.1008 100 Lf. 48"Casing by Open Cut(Welded Steel) $ $500.00 $ $50,000.00 Per Linear Foot: Five Hundred Dollars and No Cents 30. 3305.1009 100 Lf. 54" Casing by Open Cut(Welded Steel) $ $550.00 $ $55,000.00 Per Linear Foot: Five Hundred Fifty Dollars and No Cents 31. 3305.1010 100 Lf, 60" Casing By Open Cut(Welded Steel) $ $600.00 $ $60,000.00 Per Linear Foot: Six Hundred Dollars and No Cents 32. 3305.1011 100 Lf. 66"Casing By Open Cut(Welded Steel) $ $650.00 $ $65,000.00 Per Linear Foot: - Six Hundred Fifty Dollars and No Cents 33. 3305.1012 100 Lf. 72"Casing By Open Cut(Welded Steel) - $ $700.00 $ $70,000.00 Per Linear Foot: Seven Hundred Dollars and No Cents 34. 3305.1106 100 Lf. 36"Casing By Other Than Open Cut (Welded Steel w/Grout) $ $835.00 $ $83,500.00 Per Linear Foot: Eight Hundred Thirty Five Dollars and No Cents 35. 3305.1107 100 Lf. 42"Casing By Other Than Open Cut (Welded Steel w/Grout) $ $980.00 $ $98,000.00 Per Linear Foot: Nine Hundred Eighty Dollars and No Cents B-4 BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 36. 3305.1108 100 Lf. 48"Casing By Other Than Open Cut (Welded Steel w/Grout) $ $1,135.00 $ $113,500.00 Per Linear Foot: One Thousand One Hundred Thirty Five Dollars and No Cents 37. 3305.1109 100 Lf. 54"Casing By Other Than Open Cut (Welded Steel w/Grout) $ $1,280.00 $ $128,000.00 Per Linear Foot: One Thousand Two Hundred Eighty Dollars and No Cents 38. 3305.1110 100 Lf. 60"Casing By Other Than Open Cut (Welded Steel w/Grout) $ $1,420.00 $ $142,000.00 Per Linear Foot: One Thousand Four Hundred Twenty Dollars and No Cents 39. 3305.1111 100 Lf. 66"Casing By Other Than Open Cut (Welded Steel w/Grout) $ $1,575.00 $ $157,500.00 Per Linear Foot: One Thousand Five Hundred Seventy Five Dollars and No Cents 40. 3305.1112 100 Lf. 72"Casing By Other Than Open Cut (Welded Steel w/Grout) $ $1,715.00 $ $171,500.00 Per Linear Foot: One Thousand Seven Hundred Fifteen Dollars and No Cents 41. 3305.1301 100 Lf. 36"Tunnel Liner Plate By Other Than Open Cut $ $960.00 $ $96,000.00 Per Linear Foot: Nine Hundred Sixty Dollars and No Cents 42. 3305.1302 100 Lf. 42"Tunnel Liner Plate By Other Than Open Cut $ $960.00 $ $96,000.00 Per Linear Foot: Nine Hundred Sixty Dollars and No Cents 43. 3305.1303 100 Lf. 48"Tunnel Liner Plate By Other Than Open Cut $ $1,115.00 $ $111,500.00 Per Linear Foot: One Thousand One Hundred Fifteen Dollars and No Cents B-5 I SID LIST DESCRIPTION OF ITEMS WITH SID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 44. 3305.1304 100 Lf. 54"Tunnel Liner Plate By Other Than Open Cut $ $1,260.00 $ $126,000.00 Per Linear Foot: One Thousand Two Hundred Sixty Dollars and No Cents 45. 3305.1305 100 Lf. 60"Tunnel Liner Plate By Other Than Open Cut $ $1,380.00 $ $138,000.00 Per Linear Foot: One Thousand Three Hundred Eighty Dollars and No Cents a 46. 3305.1306 100 Lf. 66"Tunnel Liner Plate By Other Than Open Cut $ $1,555.00 $ $155,500.00 Per Linear Foot: One Thousand Five Hundred Fifty Five Dollars and No Cents 47. 3305.1307 100 Lf. 72"Tunnel Liner Plate By Other Than Open Cut $ $1,680.00 $ $168,000.00 Per Linear Foot: One Thousand Six Hundred Eighty Dollars and No Cents 48. 3312.3007 5 Ea. 20"Gate Valve w/Vault $ $23,000.00 $ $115,000.00 Per Each: Twenty Three Thousand Dollars and No Cents 49. 5 Ea. 20" Gate Valve-Direct Bury $ $18,000.00 $ $90,000.00 Per Each: Eighteen Thousand Dollars and No Cents 50. 3312.3008 5 Ea. 24" Gate Valve w/Vault $ $28,000.00 $ $140,000.00 Per Each: Twenty Eight Thousand Dollars and No Cents 51. 5 Ea. 24" Gate Valve-Direct Bury $ $24,000.00 $ $120,000.00 Per Each: Twenty Four Thousand Dollars and No Cents 52. 3312.3009 5 Ea. 30" Gate Valve w/Vault $ $40,000.00 $ $200,000.00 Per Each: Forty Thousand Dollars and No Cents B-6 SID LIST DESCRIPTION OF ITEMS WITH SID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 53. 5 Ea. 30"Gate Valve-Direct Bury $ $34,000.00 $ $170,000.00 Per Each: Thirty Four Thousand Dollars and No Cents 54. 3312.3010 5 Ea. 36"Gate Valve w/Vault $ $55,000.00 $ $275,000.00 Per Each: Fifty Five Thousand Dollars and No Cents 55. 5 Ea. 36"Gate Valve- Direct Bury $ $48,000.00 $ $240,000.00 Per Each: Forty Eight Thousand Dollars and No Cents 56. 3312.3011 5 Ea. 42"Gate Valve w/Vault $ $80,000.00 $ $400,000.00 Per Each: Eighty Thousand Dollars and No Cents 57. 5 Ea. 42"Gate Valve-Direct Bury $ $70,000.00 $ $350,000.00 Per Each: Seventy Thousand Dollars and No Cents 58. 3312.3012 5 Ea. 48"Gate Valve w/Vault $ $105,000.00 $ $525,000.00 Per Each: One Hundred Five Thousand Dollars and No Cents 59. 5 Ea. 48"Gate Valve- Direct Bury $ $95,000.00 $ $475,000.00 Per Each: Ninety Five Thousand Dollars and No Cents 60. 3312.5000 5 Ea. 36"AWWA Butterfly Valve w/Vault $ $95,000.00 $ $475,000.00 Per Each: Ninety Five Thousand Dollars and No Cents 61. 3312.5001 5 Ea. 42"AWWA Butterfly Valve w/Vault $ $115,000.00 $ $575,000.00 Per Each: One Hundred Fifteen Thousand Dollars and No Cents 62. 3312.5002 5 Ea. 48"AWWA Butterfly Valve w/Vault $ $120,000.00 $ $600,000.00 Per Each: One Hundred Twenty Thousand Dollars and No Cents B-7 BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 63. 3312.5003 5 Ea. 54"AWWA Butterfly Valve w/Vault $ $160,000.00 $ $800,000.00 Per Each: One Hundred Sixty Thousand Dollars and No Cents 64. 3312.3108 2 Ea. 20"Cut-In Gate Valve w/Vault $ $30,000.00 $ $60,000.00 Per Each: Thirty Thousand Dollars and No Cents 65. 3312.3109 2 Ea. 24"Cut-In Gate Valve w/Vault $ $35,000.00 $ $70,000.00 Per Each: Thirty Five Thousand Dollars and No Cents 66. 3312.3110 2 Ea. 30"Cut-In Gate Valve w/Vault $ $48,000.00 $ $96,000.00 Per Each: Forty Eight Thousand Dollars and No Cents 67. 3312.3111 2 Ea. 36"Cut-In Gate Valve w/Vault $ $70,000.00 $ $140,000.00 Per Each: Seventy Thousand Dollars and No Cents 68. 3312.3112 2 Ea. 42"Cut-In Gate Valve w/Vault $ $95,000.00 $ $190,000.00 Per Each: Ninety Five Thousand Dollars and No Cents 69. 2 Ea. 48"Cut-In Gate Valve w/Vault $ $115,000.00 $ $230,000.00 Per Each: One Hundred Fifteen Thousand Dollars and No Cents 70. 2 Ea. 54"Cut-In Gate Valve w/Vault $ $175,000.00 $ $350,000.00 Per Each: One Hundred Seventy Five Thousand Dollars and No Cents 71. 0241.1353 3 Ea. Salvage 20"Water Valve $ $1,800.00 $ $5,400.00 Per Each: One Thousand Eight Hundred Dollars and No Cents B-8 BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 72. 0241.1354 3 Ea. Salvage 24"Water Valve $ $2,400.00 $ $7,200.00 Per Each: Two Thousand Four Hundred Dollars and No Cents 73. 0241.1355 3 Ea. Salvage 30"Water Valve $ $3,000.00 $ $9,000.00 Per Each: Three Thousand Dollars and No Cents 74. 0241.1356 3 Ea. Salvage 36"Water Valve $ $3,600.00 $ $10,800.00 Per Each: Three Thousand Six Hundred Dollars and No Cents 75. 0241.1357 3 Ea. Salvage 42"Water Valve $ $4,200.00 $ $12,600.00 Per Each: Four-Thousand Two Hundred Dollars and No Cents 76. 0241.1358 3 Ea. Salvage 48"Water Valve $ $5,000.00 $ $15,000.00 Per Each: Five Thousand Dollars and No Cents 77. 0241.1359 3 Ea. Salvage 54"Water Valve $ $6,000.00 $ $18,000.00 Per Each: Six Thousand Dollars and No Cents 78. 3311.0001 10 Tn. Ductile Iron Water Fittings w/Restraint 3311 11 24"&Larger $ $12,000.00 $ $120,000.00 Per Ton: Twelve Thousand Dollars and No Cents 79. 3311.0011 1 Ls. 24"Steel Pipe Fittings(Per Attached List) $ $34,458.00 $ $34,458.00 Per Lump Sum: Thirty Four Thousand Four Hundred Fifty Eight Dollars and No Cents 80. 3311.0011 1 Ls. 30"Steel Pipe Fittings(Per Attached List) $ $44,325.60 $ $44,325.60 Per Lump Sum: Forty Four Thousand Three Hundred Twenty Five Dollars and Sixty Cents B-9 BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 81. 3311.0011 1 Ls. 36"Steel Pipe Fittings(Per Attached List) $ $56,808.00 $ $56,808.00 Per Lump Sum: Fifty Six Thousand Eight Hundred Eight Dollars and No Cents 82. 3311.0011 1 Ls. 42"Steel Pipe Fittings(Per Attached List) $ $75,747.60 $ $75,747.60 Per Lump Sum: Seventy Five Thousand Seven Hundred Forty Seven Dollars and Sixty Cents 83. 3311.0011 1 Ls. 48"Steel Pipe Fittings(Per Attached List) $ $98,280.00 $ $98,280.00 Per Lump Sum: Ninety Eight Thousand Two Hundred Eighty Dollars and No Cents 84. 3311.0011 1 Ls. 54"Steel Pipe Fittings(Per Attached List) $ $132,646.80 $ $132,646.80 Per Lump Sum: One Hundred Thirty Two Thousand Six Hundred Forty Six Dollars and Eighty Cents 85. 3311.0021 1 Ls. 24"Conc. Cyl. Pipe Fittings(Per Attached List) $ $34,537.20 $ $34,537.20 Per Lump Sum: Thirty Four Thousand Five Hundred Thirty Seven Dollars and Twenty Cents 86. 3311.0021 1 Ls. 30"Conc. Cyl. Pipe Fittings(Per Attached List) $ $44,325.60 $ $44,325.60 Per Lump Sum: Forty Four Thousand Three Hundred Twenty Five Dollars and Sixty Cents 87. 3311.0021 1 Ls. 36"Conc. Cyl. Pipe Fittings(Per Attached List) $ $56,808.00 $ $56,808.00 Per Lump Sum: Fifty Six Thousand Eight Hundred Eight Dollars and No Cents 88. 3311.0021 1 Ls. 42"Conc. Cyl. Pipe Fittings(Per Attached List) $ $75,099.60 $ $75,099.60 Per Lump Sum: Seventy Five Thousand Ninety Nine Dollars and Sixty Cents B-10 BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 89. 3311.0021 1 Ls. 48"Conc. Cyl. Pipe Fittings(Per Attached List) $ $98,280.00 $ $98,280.00 Per Lump Sum: Ninety Eight Thousand Two Hundred Eighty Dollars and No Cents 90. 3311.0021 1 Ls. 54"Conc. Cyl. Pipe Fittings(Per Attached List) $ $132,646.80 $ $132,646.80 Per Lump Sum: One Hundred Thirty Two Thousand Six Hundred Forty Six Dollars and Eighty Cents 91. 3312.1002 3 Ea. 1"Comb,Air Valve Assembly for Water $ $4,500.00 $ $13,500.00 Per Each: Four Thousand Five Hundred Dollars and No Cents 92. 3312.1002 3 Ea. 2"Comb.Air Valve Assembly for Water $ $7,500.00 $ $22,500.00 Per Each: Seven Thousand Five Hundred Dollars and No Cents 93. 3312.2203 3 Ea. 3"Comb.Air Valve Assembly for Water $ $14,500.00 $ $43,500.00 Per Each: Fourteen Thousand Five Hundred Dollars and No Cents 94. 3312.2004 3 Ea. 4"Comb.Air Valve Assembly for Water $ $16,500.00 $ $49,500.00 Per Each: Sixteen Thousand Five Hundred Dollars and No Cents 95. 3312.2005 3 Ea. 6" Comb.Air Valve Assembly for Water $ $19,500.00 $ $58,500.00 Per Each: Nineteen Thousand Five Hundred Dollars and No Cents 96. 3312.1006 3 Ea. 8" Comb.Air Valve Assembly for Water $ $22,500.00 $ $67,500.00 Per Each: Twenty Two Thousand Five Hundred Dollars and No Cents B-11 BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 97. 3312.6001 3 Ea. 4" Blow Off Valve $ $5,500.00 $ $16,500.00 Per Each: Five Thousand Five Hundred Dollars and No Cents 98. 3312.6002 3 Ea. 6" Blow Off Valve $ $7,500.00 $ $22,500.00 Per Each: Seven Thousand Five Hundred Dollars and No Cents 99. 3312.6003 3 Ea. 8" Blow Off Valve $ $9,500.00 $ $28,500.00 Per Each: Nine Thousand Five Hundred Dollars and No Cents 100. 3312.6004 3 Ea. 12"Blow Off Valve $ $14,500.00 $ $43,500.00 Per Each: Fourteen Thousand Five Hundred Dollars and No Cents 101. 0241.1602 3 Ea. Remove Concrete Water Vault 0241 14 $ $7,500.00 $ $22,500.00 Per Each: Seven Thousand Five Hundred Dollars and No Cents 102. 3305.0109 200 Lf. Trench Safety 3305 10 $ $100.00 $ $20,000.00 Per Linear Foot: One Hundred Dollars and No Cents 103. 3216.0101 50 Lf. 6"Conc Curb and Gutter(Replaced) 32 16 13 $ $50.00 $ $2,500.00 Per Linear Foot: Fifty Dollars and No Cents 104. 3216.0101 50 Lf. 6"Conc Curb and Gutter Attached to Conc. Pvmt(Replaced) $ $60.00 $ $3,000.00 Per Linear Foot: Sixty Dollars and No Cents 105. 3216.0301 50 Sy. 9"Conc Valley Gutter, Residential 32 16 13 $ $90.00 $ $4,500.00 Per Square Yard: Ninety Dollars and No Cents B-12 BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 106. 3216.0302 50 Sy. 11" Conc Valley Gutter, 32 16 13 Arterial/Industrial $ $110.00 $ $5,500.00 Per Square Yard: One Hundred Ten Dollars and No Cents 107. 3201.0151 100 Lf. Asphalt Pvmt Repair,Water Service 32 01 17 $ $42.00 $ $4,200.00 Per Linear Foot: Forty Two Dollars and No Cents 108. 3201.0111 100 Lf. 4'Wide Asphalt Pvmt Repair, Residential 32 01 17 $ $52.00 $ $5,200.00 Per Linear Foot: Fifty Two Dollars and No Cents 109. 3201.0112 100 Lf. 5'Wide Asphalt Pvmt Repair, Residential 3201 17 $ $62.00 $ $6,200.00 Per Linear Foot: Sixty Two Dollars and No Cents 110. 3201.0113 100 Lf. 6'Wide Asphalt Pvmt Repair, Residential 3201 17 $ $72.00 $ $7,200.00 Per Linear Foot: Seventy Two Dollars and No Cents 111. 3201.0121 100 Lf. 4'Wide Asphalt Pvmt Repair,Arterial 3201 17 $ $56.00 $ $5,600.00 Per Linear Foot: Fifty Six Dollars and No Cents 112. 3201.0122 100 Lf. 5'Wide Asphalt Pvmt Repair,Arterial 3201 17 $ $66.00 $ $6,600.00 Per Linear Foot: Sixty Six Dollars and No Cents 113. 3201.0123 100 Lf. 6'Wide Asphalt Pvmt Repair,Arterial 3201 17 $ $76.00 $ $7,600.00 Per Linear Foot: Seventy Six Dollars and No Cents 114. 3201.0131 100 Lf. 4'Wide Asphalt Pvmt Repair,Industrial 3201 17 $ $58.00 $ $5,800.00 Per Linear Foot: Fifty Eight Dollars and No Cents B-13 SID LIST DESCRIPTION OF ITEMS WITH SID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 115. 3201.0132 100 Lf. 5'Wide Asphalt Pvmt Repair, Industrial 32 01 17 $ $68.00 $ $6,800.00 Per Linear Foot: Sixty Eight Dollars and No Cents 116. 3201.0133 100 Lf. 6'Wide Asphalt Pvmt Repair, Industrial 32 01 17 $ $78.00 $ $7,800.00 Per Linear Foot: Seventy Eight Dollars and No Cents 117. 3201.0201 100 Sy. Asphalt Pvmt Repair Beyond Defined 32 01 17 Width, Residential $ $40.00 $ $4,000.00 Per Square Yard: Forty Dollars and No Cents 118. 3201.0202 100 Sy. Asphalt Pvmt Repair Beyond Defined 33 01 17 Width,Arterial $ $45.00 $ $4,500.00 Per Square Yard: Forty Five Dollars and No Cents 119. 3201.0203 100 Sy. Asphalt Pvmt Repair Beyond Defined 34 01 17 Width,Industrial $ $50.00 $ $5,000.00 Per Square Yard: Fifty Dollars and No Cents 120. 3201.0301 100 Sy. 2"Extra Width Asphalt Over Exist. Base 32 01 17 $ $24.00 $ $2,400.00 Per Square Yard: Twenty Four Dollars and No Cents 121. 3201.0302 100 Sy. 3"Extra Width Asphalt Over Exist. Base 32 01 17 $ $30.00 $ $3,000.00 Per Square Yard: Thirty Dollars and No Cents 122. 3201.0303 100 Sy. 4" Extra Width Asphalt Over Exist. Base 32 01 17 $ $40.00 $ $4,000.00 Per Square Yard: Forty Dollars and No Cents B-14 SID LIST DESCRIPTION OF ITEMS WITH UID SPECIFICATION UNIT TOTAL ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 123. 3211.0211 100 Sy. 6" Flexible Base,Type B, GR-1321123 $ $20.00 $ $2,000.00 Per Square Yard: Twenty Dollars and No Cents 124. 3211.0212 100 Sy. 6" Flexible Base,Type B,GR-2 32 11 23 $ $25.00 $ $2,500.00 Per Square Yard: Twenty Five Dollars and No Cents 125. 3201.0614 100 Sy. Conc Pvmt Repair, Residential 32 01 29 $ $62.00 $ $6,200.00 Per Square Yard: Sixty Two Dollars and No Cents 126. 3201.0616 100 Sy. Conc Pvmt Repair,Arterial/Industrial 32 01 29 $ $72.00 $ $7,200.00 Per Square Yard: Seventy Two Dollars and No Cents 127. 100 Sy. Conc. Pvmt Repair Beyond Defined Width, Residential $ $60.00 $ $6,000.00 Per Square Yard: Sixty Dollars and No Cents 128. 100 Sy. Conc. Pvmt Repair Beyond Defined Width,Arterial/Industrial $ $70.00 $ $7,000.00 Per Square Yard: Seventy Dollars and No Cents 129. 2 Ea. 12 Foot Dia.Vertical Shaft Excavation (0'-12' Depth) $ $50,000.00 $ $100,000.00 Per Each: Fifty Thousand Dollars and No Cents 130. 10 Vf. Vertical Shaft Excavation Extra Depth (Over 12') $ $3,000.00 $ $30,000.00 Per Vertical Foot: Three Thousand Dollars and No Cents TOTAL AMOUNT BID $ $11,969,763.20 B-15 24" STEEL PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BID COST 24" 30 BEVEL $ 1,041.60 24" 5° BEVEL $ 1,041.60 24" 11-1/40 BEND $ 1,814.40 24" 22-1/20 BEND $ 1,814.40 24" 450 BEND $ 2,482.80 24" 67-1/20 BEND $ 3,115.20 24" 900 BEND $ 3,820.80 24" CLEANING WYE $ 7,461.60 24" DISHED HEAD PLUG $ 1,592.40 24" SPLIT BUTT STRAP CLOSURE $ 2,928.00 24" x 24" STEEL TO D.I. ADAPTOR $ 1.,741.20 24" x 16" STEEL OUTLET $ 1,581.60 24" x 12" STEEL OUTLET $ 1,267.20 24" x 10" STEEL OUTLET $ 1,099.20 24" x 8" STEEL OUTLET $ 922.80 24" x 6" STEEL OUTLET $ 733.20 TOTAL LUMP SUM $ 34,458.00 30" STEEL PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING BID COST 30" 30 BEVEL $ 1,293.60 30" 5° BEVEL $ 1,293.60 30" 11-1/40 BEND $ 2,247.60 30" 22-1/20 BEND $ 2,247.60 30" 450 BEND $ 3,242.40 30" 67-1/20 BEND $ 4,267.20 30" 900 BEND $ 5,127.60 30" CLEANING WYE $ 10,501.20 30" DISHED HEAD PLUG $ 2,035.20 30" SPLIT BUTT STRAP CLOSURE $ 3,541.20 30" STEEL TO D.I. ADAPTOR $ 2,275.20 30" x 16" STEEL OUTLET $ 1,776.00 30" x 12" STEEL OUTLET $ 1,413.60 30" x 10" STEEL OUTLET $ 1,215.60 30" x 8" STEEL OUTLET $ 1,021.20 30" x 6" STEEL OUTLET $ 826.80 TOTAL LUMP SUM $ 44,325.60