Loading...
HomeMy WebLinkAboutContract 45477-A4 Cav'soCRETARY AMENDMENT N0.4 TO CITY SECRETARY CONTRACT No. 45477 WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 45477, (the CONTRACT) which was authorized by M&C C-26695 on the 4th day of March, 2014 in the amount of $99,300. 00; and WHEREAS, the CONTRACT involves engineering services for the following project: Trinity Trails Clear Fork-East Bank Extension Project; and WHEREAS, it has become necessary to execute Amendment No.4 to the CONTRACT to include an increased scope of work and revised fee. WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 of the CONTRACT provided for an increased deductible amount of $250, 000. 00. This amendment did not adjust the contract amount. Amendment Number 2 of the CONTRACT provided for additional design services to be performed by Engineer in the amount of $331,295. 00. Amendment Number 3 of the CONTRACT provided for additional design services to be performed by Engineer in the amount of $28, 005.00. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated October 13, 2015, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $22,200. 00. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all City of Fort Worth Professional Services Agreement Amendment Template OFFICIAL RECORD PMO Official Release 6/1/2012 Pagel of 3 CITY SECRETARY FT.WORTH, TSG work and services shall be an amount of $480, 800. 00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: Cit Fort Worth Halff Associates Inc. Su lanis Le y H hes Assistant City Manager Wice President DATE: DATE: lob(, APPROVAL RECOMME Ri hard Zavala Di ector, Park and Recreation Department APPROVED AS TO FORM AND LEGALITY: M&C: Date: Douglas W. Black Assistant City Attorney V®R1' 0 ATT 0 Op°o °oo°O° a. y J. Kayser )(� City Secretary City of Fort Worth Professional Services Agreement Amendment Template OFFICIAL RECORD PMO Official Release 8/1/2012 Page 2 of 3 CITY SECRETARY FT. WORTH, TX FUNDING BREAKDOWN SHEET City Secretary No. 45477 Amendment No. 4 Department Fund-Department-Account Amount Park and 39405 0800450 200 . 00 Recreation / / 5330500 $22, Total: $22, 200 . 00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 ON■ ich North Bowser Road mo� Richardson,Texas 75081 NN� (214)346-6200 Fax(214)739-0095 ADDITIONAL SERVICES CONFIRMATION No.4 To: Clarence Bryant Date: October 13,2015 From: David Buchanan AVO: 30117 Email: dbuchanan@halff.com Project: Trinity Trails Clear Fork — East Bank Extension VIA: Email Fort Worth Contract Number:45477 As discussed, Halff Associates is please to submit this scope amendment and additional services confirmation for $22,200 to provide Engineering and H&H Services to revise the trail alignment and elevations from STA 6+00 (Just North of the IH30 Overpass) to STA 17+79 (End of Trail) as directed by Tarrant Regional Water District (TRWD) on October 07, 2015 for the Trinity Trails Clear Fork—East Bank Extension Project.The fees required to perform the associated services will be in addition to the currently contracted fees. Per our understanding of the requirements,the specific tasks are identified as follows: A. Additional Services: 1. Construction Documentation($17,000): a. Halff shall update, for approval by the City, TxDOT and TRWD, an updated 95% Construction Document Set that incorporates the revised vertical and horizontal alignments from STA 6+00 to STA 17+79 as directed by TRWD. The additional tasks included in this scope of services are as follows: L Design and Sheet Updates: Preparation of the updated 95%Construction Document Set will include updates to the following: 1. Typical Sections 2. Quantity Summary 3. Site Grading and Drainage 4. Dimension Control 5. Trail Plan and Profile 6. Structural(Removal of Retaining Wall 'B'and an extension of Retaining Wall 'C') 7. Retaining Wall Details: Modify existing design from stone facade to cast-in-place form liner) 8. Cost Estimate 9. Specifications Bowse ENE HALFF� ich North Texas 5081 Road ENE Richardson,Texas 75081 mom (214)346-6200 Fax(214)739-0095 2. H&H Services($5,000): a. Revisions to the hydraulic analysis will be provided based on the updated trail vertical and horizontal alignment.The specific tasks are identified as follows: L Modify the revised existing model per the updated alignment. ii. Incorporate the proposed trail improvements into the hydraulic model to assess impacts to the water surface elevation and valley storage. iii. Provide necessary feedback and design recommendations for the vertical and horizontal alignment to the design team to minimize hydraulic impacts. iv. Update the CDC Permit and Hydraulic Report with the updated hydraulic modeling and hydraulic impacts 3. Reimbursable Expenses($200): a. Reimbursable Expenses shall include, but are not necessarily limited to expenses for supplies,printing of plans and specifications and similar incidentals. ❑ Attachments: SIGNED: COPIES: ® File ❑ Owner ❑ Contractor ❑ Other: